Loading...
HomeMy WebLinkAboutR-2005-106 Yakima Urban Area Comprehensive Plan Capital Facilities Element AmendmentRESOLUTION NO. R - 2005 - 106 A RESOLUTION to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the Six-year Transportation Improvement Program (STIP) for the period of 2006 through 2011. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six-year Transportation Program for the construction or repair of streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law, and WHEREAS, the City of Yakima desires to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to reflect the adoption of the 6 -Year STIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the 6 -Year STIP, and WHEREAS, this amendment is limited to incorporation of the projects listed in 6 - Year Transportation Improvement Plan for the period of 2006 to 2011 to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided under RCW 36.70A.130(2B) and RCW 35.77.010, and WHEREAS, public hearings have been held by the Yakima City Council on the 6 - Year Transportation Improvement Plan on Tuesday, June 28, 2005, and again on July 5, 2005, with proper public notice as required by RCW 35.77.010 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The adopted 6 -Year Transportation Improvement Plan for the period of 2006 through 2011 for the City of Yakima shall be incorporated as an amendment to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan. ADOPTED BY THE CITY COUNCIL this 5th day of July, 2005. ATTEST: City Clerk P Paul P. George, Mayor Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/28/2005 Adoption Date: 7/5/2005 Amend Date: Resolution No.. R-2005-105 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road 9 F. Describe Work to be Done Improvement I Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type R/W Required Date (MWyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 1 01 P 0.2 T PE 1/1/2006 STP(U) 7500 AIP 1285 1000 9785 5000 4785 EA Railroad Grade Separation -'B' St - Lincoln Ave 06 P CN ALL 1/1/2006 1/1/2006 AIP AIP 7000 500 7000 500 7000 500 No BNSF Tracks/I St 07 G from: N 1st St to: N 1st Ave 08 0 ConstOuct Grade Separations and adjacent roadway reconstructon W Totals 7500 8785 1000 17285 5000 12285 S 17 2 01 S 0.3 p PE 1/1/2006 OTHERI 1491 371 186 186 1 1 EA Front St Rehabilitation 12 0 RW CN 1/1/2006 1/1/2006 OTHER ( 771 191 96 OTHERI 17021 4261 2128 96 2128 1 Yes BNSF Track/Street from: Yakima Ave to: 'D' St 06 T W 06/01/06 Realignment of Front Street, curb, gutter and sidewalk reconstruction with S Totals 1928 482 2410 2410 historic district renovation including A St. rebuild 14 3 04 S 1.02 W PE 1/1/2006 AIP1 3981 3531 751 7511 1 1 EA W Washington Ave - S 52nd Ave to S 72nd Ave 03 T CN 1/1/2006 STP(U) 500 AIP 1 16981 5271 2725 27251 Yes W Washington Ave from: S 52nd Ave to: S 72nd Ave 0 S 01/01/05 Widen, reconstruct, curb, gutter, sidewalk P Totals 500 2096 880 3476 3476 16 4 04 S .73 0 PE 1/1/2006 STP(U) 370 AIP1 55 1 425 4251 1 EA W Nob Hill Blvd - S 68th Ave to S 80th Ave 03 W RW CN 4/1/2006 1/1/2007 STP(U) 144 AIP 1 216 AIP) 555 1 360 3701 925 3601 1 1 9251 Yes W Nob Hill Blvd from: S 68th Ave to: S 80th Ave 0 P 04/01/06 Reconstruct to minor arterial standards T Totals 514 826 370 1710 785 925 S Report Date: July 5, 2005 Page 1 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/28/2005 Adoption Date: 7/5/2005 Amend Date: Resolution No.. R-2005-105 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement I Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm✓ddyyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type RNV Required Date (M >7 Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 02 5 River Road Realignment River Road from: N 16th Ave to: Fruitvale Blvd Widening, curb, gutter, sidiewalk, reconstructrion, irrigation relocation 01 04 S 11 c G P T S W RW CN 1/1/2006 4/1/2006 STP(U) 200 AIP AIP 272 1184 68 296 340 1680 340 1680 CE Yes 01/01/06 Totals 200 1456 364 2020 2020 19 6 YVT Barn Rehabilitation S 3rd Ave from: S 3rd St to: Pine St Car Bam and Museum Restoration, including property purchase 03 P N/A G C S T W P PE CN 6/1/2006 6/1/2006 STP(E) STP(E) 18 1816 I 321 50 I 2721 2088 501 18161 2721 I EA No Totals 1834 304 2138 1866 272 00 7 Transit Operating/Capital Expenditures Various Areas from: N/A to: N/A Supplemental Funding for Transit Service Operating Expenses 12 22 23 24 31 S N/A CN I 1/1/2006 I 5307 13331 I 10001 2333 23331 1 CE No Totals 1333 1000 2333 2333 00 8 Transit Service to Selah & WSDOT Complex (Union Gap) Demonstration Transit Project Expansion from: to: Two year pilot project to provide City of Selah and WSDOT site in Union Gap with weekday bus service 22 S N/A ALL1 1/1/2006 1 I I 1 1 301 301 301 1 CE No Totals 30 30 30 Report Date. July 5, 2005 Page 2 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/28/2005 Adoption Date: 7/5/2005 Amend Date: Resolution No.. R-2005-105 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road g 9 F Describe Work to be Done Improvement Type(s) Status Total Length v v Project Costs in Thousands of Dollars Expenditure Schedule Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/ddfyyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir Type RNV Required Date (MM/y Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 9 N 16th Ave - Signal @ River Rd N 16th Ave from: N 16th Ave to: River Rd Install new signal 12 S N/A _ w T P S _ PE RW CN 1/1/2006 4/1/2006 1/1/2006 STP(U) STP(U) STP(U) 27 40 232 3 6 36 30 46 268 30 268 46 CE Yes 04/01/05 Totals 299 45 344 298 46 07 10 W Lincoln Ave Sidewalks W Lincoln Ave from: N 18nd Ave to: N 29th Ave Sidewalks on the Northside 12 S .5 T P W S PE RW CN 1/1/2006 1/1/2006 6/1/2006 PSMPI 61 41 10 PSMP1 61 41 10 PSMPI 741 991 173 101 1 101 1731 CE Yes 04/01/05 Totals 86 107 193 193 17 11 SR12 - N 40th Ave SR12 - N 40th Ave from: N 40th Ave to: SR12 Widen intersection and on-ramp, Interceptor crossing 01 S N/A p O T W S PE RW CN 1/1/2006 1/1/2006 1/1/2006 PSMPI 320' 80 OTHERI 260' 140 OTHER I 1920' 100 400 400 2020 400 400 2020 1 1 1 CE Yes 01/01/06 Totals 2500 320 2820 2820 14 12 E Nob Hill Blvd at S 6th St E Nob Hill Blvd from: E Nob Hill Blvd to: S 6th St Install signal @ E Nob Hill Blvd and S 6th St 12 01 S Signal T W 0 RW CN 1/1/2006 6/1/2006 TPPI TPP 651 101 I 4001 621 751751 462 4621 CE Yes 01/01/05 Totals 465 72 537 537 Report Date: July 5, 2005 Page 3 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/28/2005 Adoption Date: 7/5/2005 Amend Date: Resolution No.: R-2005-105 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding(Local State Fund Code State Funds Local Funds Total Funds Envir Type RNV Required Date (MMi'Y) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 13 Nob Hill Blvd Nob Hill Blvd from: S 52nd Ave to: S 68th Ave Widen, curb, gutter, sidewalk, lighting, drainage 04 P .77 p C G 0 S T PE RW CN 1/1/2006 6/1/2006 6/1/2007 STP(U) STP(U) 107 300 TPP 1183 17 40 193 124 340 1376 124 340 1376 EA Yes 01/01/07 Totals 407 1183 250 1840 1840 00 14 Annual Signal Upgrades Local Selection from: N/A to: N/A Upgrade signals 01 P N/A PE CN ON 8/1/2006 8/1/2006 8/1/2006 CMAQ STP(S) CMAQ 50 150 300 1 1 501 100 AIP1 2001 1 350 1 1 1 300 1001 1 1 3501 1 3001 CE EA No No Totals 500 200 50 750 100 650 CN I 7/1/2006 I STP(U) I 1731 1 1 271 2001 2001 1 00 15 Various Overlay Projects/Selected on Local Priority N/A from: N/A to: N/A 07 S N/A w S Totals 173 27 200 200 00 16 Storm DrainsNegetation Local Selection from: City Wide to: City Wide 32 P N/A PE CN 1/1/2006 1/1/2006 801 801 801 7201 720 7201 EA No Totals 800 800 800 Report Date: July 5, 2005 Page 4 Supersedes previous editions Washington State Department of Transportation -en Agency: Yakima Co. No.: 39 Co. Name: Yakima Co City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/28/2005 Adoption Date: 7/5/2005 Amend Date: Resolution No.: R-2005-105 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type RNV Required Date (My) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 17 Reconstruction Rudkin Rd Rudkin Rd from: E Mead Ave to: Rainier Place Reconstruct, excavate ballast, top course, curb, gutter, sidewalk Partner with City of Union Gap, additional sewer force main 03 06 P .76 W T P S PEI CN 1/1/2007 1/1/2008 STP(C) STP(C) 87 500 TPP 500 22 84 109 1084 109 1084 CE No Totals 587 500 106 1193 109 1084 17 18 E Mead Ave Reconstruction E Mead Ave from: Rudkin Rd to: Fair Ave Partner with City of Union Gap, reconstruct, excavate ballast, top course, curb, gutter, storm, acp 03 06 P 76 C G 0 P S T PE CN 9/1/2006 4/1/2007 STP(S) STP 97 873 TPPI 181 TPP I 1631 61 1211 551 1091 1211 1 1091 CE No Totals 970 181 61 1212 121 1091 19 19 Longfiber Rd - Phase 2 (3 -Phases) Longfiber Rd from: Valley Mall Blvd to: W Washington Ave New roadway construction and reconstruction, 3 -lane w/turn, curb, gutter, sidewalks - Partner with City of Union Gap, waterloop with development 01 03 P .50 p S W T 0 PE CN 1/1/2008 1/1/2009 1 1 1 1 1061 106 1183 1 1183 1 1061 1 1 1183 CE CE No No Totals PE CN 4/1/2006 7/1/2006 1 1 1 1 1289 1289 51 51 45 1 451 106 51 1 461 I 1183 00 20 Street Asset Amenities Route Maintenance, Repair ,Improvements from: to: Maintenance of Shelters, Benches and Signage throughout our Route System 22 31 S N/A O Totals 50 50 50 Report Date: July 5, 2005 Page 5 Supersedes previous editions Washington State Department of Transportation f// Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/28/2005 Adoption Date: 7/5/2005 Amend Date: Resolution No.: R-2005-105 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement Type(s) Status Total Length vgl S' Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type R/W Required Date (My) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 11 21 E Nob Hill Blvd & S 18th St E Nob Hill Blvd from: S 18th St to: E Nob Hill Blvd Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT Project) possible curb, gutter and sidewalk 04 01 P 1 c S W T PE RW CN 1/1/2006 3/1/2006 1/1/2007 STP(U) STP(U) STP(U) 13 18 140 2 2 25 15 20 165 15 20 165 CE Yes 01/01/06 Totals 171 29 200 35 165 16 22 Roadway City Wide Shoulder Improvements City Wide from: to: City Wide shoulder improvements, PM10 abatement. 01 S N/A s CN I 7/1/2006 I CMAQ ( 4001 1 1 541 4541 4541 1 CE No Totals 400 54 454 454 16 23 N 8th St & N 6th St - Signal Flashers @'B' St & Lincoln Ave N 6th St from: 'B' St to: Lincoln Ave Install signals on N 8th St & N 6th St @'B' St and Lincoln, flashers 01 S Signal CN 1 1/1/2006 1 STP(S) 1 801 I I 111 911 911 I 1 EA No Totals 80 11 91 91 14 24 E Nob Hill Blvd & Fair Ave E Nob Hill Blvd from: E Nob Hill Blvd to: Fair Ave Intersection widening & new signal, curb, gutter and sidewalk, street lighting, stormwater 31 03 04 S N/A O C P T W PEI 1/1/2006 1 STP(U) 1 721 1 1 111 831 831 1 1CE Yes 10/01/06 Totals 72 11 83 83 Report Date: July 5, 2005 Page 6 Supersedes previous editions Washington State Department of Transportation -en Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/28/2005 Adoption Date: 7/5/2005 Amend Date: Resolution No.: R-2005-105 o y 0 ri Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road 9 g F Describe Work to be Done Improvement I Type(s) Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir Type RNV Required Date Date (M Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 25 S 80th Ave - Tieton Dr to Zier Rd S 80th Ave from: Tieton Dr to: Zier Rd Major widening, curb, gutter, sidewalk 04 P 1.3 0 C P T W S PE RW CN 1/1/2006 1/1/2007 6/1/2006 AIP AIP AIP 104 303 1323 16 47 207 120 350 1530 120 350 1530 EA Yes 01/01/07 Totals 1730 270 2000 120 350 1530 00 26 Capture of 2002 Unobligated 5307 Funds Request of additional funding for buses from: to: Seek additional unobligated 5307 operating funds that may be available to purchase four new transit buses 22 S O PEI 1/1/2006 I 1 1 1 1 4001 4001 4001 ( I CE No Totals 400 400 400 17 27 Zier Rd - S 75th Ave to S 72nd Ave Zier Rd from: S 75th Ave to: S 72nd Ave Minor widening, curb, gutter and sidewalk 05 06 S 15 C S T PE CN 1/1/2006 6/1/2006 STP(E) STP(E) 22 75 71 29 201 95 291 951 CE Yes 03/01/05 Totals 97 27 124 124 17 28 Englewood Ave - N 40th Ave to N 56th Ave Englewood Ave from: N 40th Ave to: N 56th Ave Widen roadway, curb, gutter, sidewalk 05 06 P 2.15 W S T P 0 C PE RW CN 1/1/2009 6/1/2009 1/1/2010 STP(C) STP(C) STP(C) 216 277 1367 1 ( 1 341 250 431 320 2131 1580 250 320 1580 EA Yes 04/01/09 Totals 1860 290 2150 2150 Report Date: July 5, 2005 Page 7 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/28/2005 Adoption Date: 7/5/2005 Amend Date: Resolution No.: R-2005-105 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road g g F Describe Work to be Done Improvement Type(s) Status Total Length v o o Z. Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir Type RNV Required Date (MM/yy) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 29 W Washington Ave Median Removal W Washington Ave from: S 16th Ave to: S 24th Ave Removal of median in Washington Ave lengthening turn lanes 05 S .5 0 W PE CN 1/1/2006 1/1/2006 STP(U) STP(U) 36 228 5 36 41 264 41 264 CE No Totals 264 41 305 305 17 30 Englewood Ave - N 24th Ave to N 16th Ave Englewood Ave from: N 16th Ave to: N 24th Ave Widen, curb, gutter and sidewalk, water and sewer lines 05 06 P 2 0 W S PE RW CN 1/1/2007 1/1/2008 6/1/2009 STP(U) STP(U) STP(U) 173 259 1865 1 1 271 200 1 1 411 300 1 1 1351 2000 1 2001 1 1 300 1 1 2000 EA Yes 01/01/09 Totals 2297 203 2500 200 300 2000 00 31 Pedestrian Bridge Pedestrian Bridge from: N 10th St to: Yakima Greenway Construct pedestrian bridge from Gateway area to Yakima Greenway, power, handicap accessible, lights 12 32No P .25 T P 0 PE CN 1/1/2008 3/1/2009 STP(E) STP(E) 200 2000 271 227 2701 2270 1 227 1 2270 CE Totals 2200 297 2497 227 2270 00 32 Gravel Road B.S.T Various Areas from: City Wide to: PM -10 Abatement. Street Sweeper Acquisition 07 S N/A S CN CN 4/1/2006 6/1/2006 CMAQ 155 1 1 2001 2001 1001 501 50 1 1 301 185 1851 1 CE No Totals 155 230 385 285 50 50 Report Date: July 5, 2005 Page 8 Supersedes previous editions Washington State Department of Transportation -AggeenIF Yakima Co. No.: 39 City No.. 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/28/2005 Adoption Date: 7/5/2005 Amend Date: Resolution No.: R-2005-105 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement I Type(s) ' fn Total Length I Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type R/W Required Date (Miyl/yy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 08 33 12 p N/A T PE 5/1/2006 STP(S) 20 3 54 23 454 23 454 CE Powerhouse Rd & Englewood Ave p RW CN 9/1/2006 9/1/2006 STP(S) STP(S) 400 300 45 345 345 Yes Powerhouse Rd from: Powerhouse Rd to: Englewood Ave O S 09/01/20 Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal, C Totals 720 102 822 822 possible roundabout W 07 34 12 P N/A p PE 1/1/2010 STP(S) 20 31 23 31 23 1 1 23 23 CE S 48th Ave & Summitview Ave Signalization T RW CN 6/1/2010 8/1/2010 STP(S) STP(S) 20 340 511 391 1 391 Yes S 48th Ave from: S 48th Ave to: Summitview Ave 06/01/10 Signalization Totals 380 57 437 437 07 35 12 P N/A p PE 4/1/2006 101 10 1401 140 101 1401 CE S 3rd Ave & W Washington Ave Signal T CN 6/1/2006 No S 3rd Ave from: S 3rd Ave to: W Washington Ave Signal Upgrades Totals 150 150 150 07 36 12 p N/A p PE 1/1/2006 STP(S) 10 60 101 20 601 120 201 1201 CE S 16th Ave & W Washington Ave Signal T CN 6/1/2006 STP(S) No S 16th Ave from: S 16th Ave to: W Washington Ave Included in Union Gap's Valley Mall Blvd. project Totals 70 70 140 140 Report Date: July 5, 2005 Page 9 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/28/2005 Adoption Date: 7/5/2005 Amend Date: Resolution No.: R-2005-105 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type R/W Required Date (MyUyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 07 37 12 P 2 p PE 1/1/2008 STP(S) 43 7 50 50 CE W Nob Hill Blvd Sidewalks T RW 6/1/2008 STP(S) 85 15 100 100 Yes W Nob Hill Blvd from: S 16th Ave to: E 182 Overpass W S CN 3/1/2009 STP(S) 255 45 300 300 09/01/08 Sidewalks on southside Totals 383 67 450 150 300 00 38 06 P 1 p PE 1/1/2009 STP(S) 45 1 I 6 51 51 CE Beech St Pedestrian Connection 32 T RW CN 6/1/2009 1/1/2010 STP(S) STP(S) 150 400 20 1 1 54 170 454 170 Yes Beech St from: Fair Ave to: Chalmers/Riverside 454 09/01/09 Construct under SR82 to Greenway pedestrian Totals 595 80 675 51 624 07 39 12 P 2 p PE 1/1/2009 STP(S) 34 61 40 1 1 40 CE W Lincoln Ave Sidewalks T RW 6/1/2009 STP(S) 68 121 80 1 1 Yes W Lincoln Ave from: N 56th Ave to: N 29th Ave S W CN 1/1/2010 STP(S) 454 701 524 580 09/01/10 Sidewalks, meters and fire hydrants replacement or relocation Totals 556 88 644 644 08 40 01 P .5 W PE 1/1/2008 STP(E) 337 1 53 390 1 390 CE W Lincoln Ave 8'B' St Realignment W Lincoln Ave from: W 5th Ave to: Custer St 12 T S P RW CN 1/1/2009 1/1/2010 STP(E) STP(E) 831 1429 1 129 223 960 1652 1 1650 Yes 09/01/10 Realignment of W Lincoln Ave, sidewalks, curb, lights 0 gutter, G Totals 2597 405 3002 390 2610 Report Date: July 5, 2005 Page 10 Supersedes previous editions Washington State Department of Transportation -enAggency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/28/2005 Adoption Date: 7/5/2005 Amend Date: Resolution No.: R-2005-105 o j Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement I Type(s) ' m tnn Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type R/W Required Date (N1 Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thrth 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 41 School Safety Projects Various Locations - Citywide from: to: Crossing flashers, sidewalks, signing, other features 12 S N/A w PE CN 1/1/2006 1/1/2006 PSMP PSMP 10 190 2 38 12 228 12 190 CE No Totals 200 40 240 202 02 42 E Nob Hill Blvd. Reconstruction E Nob Hill Blvd. from: S 6th Street to: S 18th Street Major roadway widening and reconstruction to 5 lanes with intersection improvements, curb, gutter, sidewalks, replacement or relocation of meters 03 04 06 P .85 C G 0 P S T PE RW CN 1/1/2008 1/1/2009 1/1/2010 STP(C) STP(C) STP(C) 433 865 5190 1 1 1 671 1351 8101 500 1000 6000 1 1 1 I 1 I 500 1000 6000 EA Yes 1/1/09 Totals 6488 1012 7500 7500 17 43 S 72nd Avenue & W Washington Avenue S 72nd Ave from: S 72nd Ave to: W Washington Ave Intersection improvement, possible roundabout 01 12 06 P N/A W S T PO PE RW CN 1/1/2008 1/1/2009 1/1/2010 STP(C) STP(C) STP(C) 433 865 5190 1 1 671 1 1 1351 1 8101 500 1000 6000 I I I 1 500 1000 6000 CE Yes 1/1/2008 Totals 6488 1012 7500 7500 14 44 4579 S 1st St. - E. Washington Ave. Intersection Improvement S 1st St. from: S lot St. to: E Washington Ave. Realign intersection, upgrade traffic signal 12 S N/A p W S TT PEI 7/1/2006 I STP 1 20011 1 301 2301 2301 1 1 EA Yes 01/01/06 Totals 200 30 230 230 Report Date: July 5, 2005 Page 11 Supersedes previous editions Washington State Department of Transportation -en Agency: Yakima Co. No.: 39 Co. Name: Yakima Co City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/28/2005 Adoption Date: 7/5/2005 Amend Date: Resolution No.: R-2005-105 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road g g F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir T Type R/W Required Date (My) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 06 45 4562 Tieton Dr - S 5th Ave. Intersection Project Tieton Drive from: 5th Ave. Intersection to: Replace traffic signal with roundabout 12 P N/A p W T 0 S ALL 4/4/2006 STP(U) 200 WSDOT 200 400 400 CE No Totals 200 200 400 400 17 46 4587 S 48th Ave. Reconstruction S 48th Avenue from: Summitview Ave. to: Nob Hit Blvd. Widen, curb, gutter, sidewalk, lighting, drainage 03 P 1.00 p T W S 0 ALLI 4/1/2006 I STP 1 18001 1 1 2431 20431 501 1993 EA No Totals 1800 243 2043 50 1993 14 47 South 72nd Ave & Mead Ave Intersection South 72nd Ave from: South 72nd Ave to: Mead Ave New intersection, signals, curb, gutter and sidewalk 03 12 S N/A O P S T W PE CN 1/1/2006 6/1/2006 STP(U) STP(U) 41 304 71 481 48 352 481 1 3521 1 CE No Totals 345 55 400 400 00 48 E Mead & S 1st St Signal E Mead from: E Mead to: S 1st St Signal 12 S N/A p S T W CN 1 1/1/2006 CMAQ ( 87 131 100 1001 1 CE No Totals 87 13 100 100 Report Date: July 5, 2005 Page 12 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/28/2005 Adoption Date: 7/5/2005 Amend Date: Resolution No.. R-2005-105 7. g H LL U Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title Street/Road Name or Number E. Beginning MP or road - EndingMP or road g g F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/dd yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir Type RMID. Required Date M (M /'') Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 08 49 Yakima Ave. Historic District from: Front Street to: 9th St/A St Install historical lighting, sidewalk modifications and other improvements, pedestrian corridor 06 12 S 75 p W S T PE CN 1/1/2006 9/1/2006 OTHER OTHER 870 4000 870 4000 870 4000 CE No Totals 4870 4870 4870 00 50 William 0. Douglas Pathway from: Pine St to: Cowiche Canyon Pathway improvements and signage, to Cowiche Canyon 14 32 P N/A 0 S P W PE CN 1/1/2006 7/1/2006 STP(E) STP(E) 8 87 1 1 i 21 I 131 10 100 101 I 1001 1 CE No Totals 95 15 110 110 16 51 S 66th Avenue S 66th Ave from: Scenic Drive to: Summitview Widen roadway, curb, gutter, sidewalk and utilities 04 03 P .76 W T S P 0 PE CN 1/1/2006 7/1/2006 STP(E) STP(E) 8 87 I 1 1 21 1 131 10 100 101 I 1001 1 Yes 1/1/2008 Totals 95 15 110 110 00 52 40th Avenue and Summitview Signal Upgrade 40th Avenue from: 40th Avenue to: Summitview Signal upgrade, radius improvements, turn lane extension 12 P N/A w S T P 0 PE RW CN 1/1/2008 1/1/2008 6/6/2008 STP(U) STP STP(U) 100 50 250 I 131 I 71 1 301 113 57 280 113 57 280 1 1 CE Yes 1/1/2008 Totals 400 50 450 450 Report Date: July 5, 2005 Page 13 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/28/2005 Adoption Date: 7/5/2005 Amend Date: Resolution No.. R-2005-105 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road g g F. Describe Work to be Done Improvement I Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mmfdd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir Type R/W Required Date (MM/YY) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 53 40th Avenue and Englewood 40th Avenue from: 40th Avenue to: Englewood Replace traffic signal poles, upgrade controller 12 P N/A w T S P 0 PE RW CN 1/1/2008 1/1/2008 1/1/2009 STP STP STP 75 50 115 10 7 16 85 57 131 85 57 131 CE Yes 1/1/2008 Totals 240 33 273 273 00 54 16th Avenue and Fruitvale Blvd 16th Avenue from: 16th Avenue to: Fruitvale Blvd Replace traffic signal poles, radius improvements, ADA ramps 12 p N/A w T S P 0 PE RW CN 1/1/2009 6/1/2008 1/1/2008 STP STP STP 100 50 250 1 1 141 114 71 57 341 284 1141 1 571 1Yes 2841 CE 1/1/2008 Totals 400 55 455 455 00 55 1st Street an I Street 1st Street from: 1st Street to: I Street Replace and upgrade traffic signal equipment 12 P N/A w T S P 0 PE CN 1/1/2008 1/1/2009 STP STP 25 100 1 1 41 291 1 1 1 1 131 113 1 1 29 113 CE No Totals 125 17 142 142 02 56 Mead Ave. Railroad Grade Separation Mead Ave. from: Presson Place to: Maryland Construct railroad overpass including all utilities 01 P N/A w T S P 0 PE RW CN 6/1/2009 1/1/2009 1/1/2010 STP(U) STP(U) STP(U) 650 2500 5200 1 150 500 1 800 800 3000 600016000 1 800 3000 CE Yes 1/1/2010 Totals 8350 1450 9800 3800 6000 Report Date: July 5, 2005 Page 14 Supersedes previous editions Washington State Department of Transportation -Aggeenncy: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/28/2005 Adoption Date: 7/5/2005 Amend Date: Resolution No.: R-2005-105 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title Street/Road Name or Number E. Beginning MP or road - Ending MP or road F Describe Work to be Done Improvement I Type(s) 9 rn Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule Agency) Federally Funded Projects Only Project Phase 11 Phase Start (mm/dd /yyyy) Fund Source Information Federal Funding(Local State Fund Code State Funds Local Funds Total Funds Envir Type RNVD. Required Date (,Hhyyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 02 57 Washington Ave. Railroad Grade Separation Washington Ave. from: Longfibre Road to: Railroad grade overpass including all utilities 01 P N/A O P S T1/1/2009 PE RW 6/1/2009 1/1/2009 1/1/2010 STP(U) STP(U) STP(U) 650 2500 5200 150 500 800 800 3000 6000 800 3000CN 6000 CE Yes Totals 8350 1450 9800 9800 00 58 Yakima Pathway Connections Yakima from: to: Citywide pathway connections, utility improvements, signage including Cowiche Canyon, Powerhouse Rd, Greenway including Naches Railway 01 P 4 O P S T W PE RW CN 6/1/2009 1/1/2009 1/1/2010 STP(U) STP(U) STP(U) 200 600 1500 1 30 1 70 250 230 670 1750 1 1 1 670 230 1750 CE Yes 1/1/2009 Totals 2300 350 2650 670 1980 59 Frontage Road from: S. 1st St. to: Lincoln Ave Construct frontage road including all utilities for future development and Terrace Heights connection. p N/A O P S T W PE RW CN 1/1/2010 1/1/2011 6/1/2011 STP(U) STP(U) STP(U) 200 300 700 1 1 271 227 411 341 1 951795 1 1 227 341 795 CE Yes 1/1/2010 Totals 1200 163 1363 1363 00 60 YVT Pathway 'NT Right of Way from: to: Development pathway in West Valley area including 50th Ave, Wide Hollow, Ahtanum including at utilities and signage 03 32 P N/A O P S T W PE CN 1/1/2010 6/1/2010 STP(U) STP(U) 250 750 1 1 1 1 301 280 r 1 1 1001 850 1 1 280 850 CE No Totals 1000 130 1130 1130 Report Date: July 5, 2005 Page 15 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2006 to 2011 Hearing Date: 6/28/2005 Adoption Date: 7/5/2005 Amend Date: Resolution No.: R-2005-105 o N u U Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road g g F Describe Work to be Done Improvement I Type(s) y E 10 Total Length I Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase Phase Start (mm/d Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir Type R/W Required Date (MM/y Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6thh 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 06 61 34th Ave & River Rd Improvements Fruitvale Blvd. from: 34th Ave. to: River Rd. Intersection improvements including lumination, sewer, water, curb, water and sidewalks 01 12 P N/A O P S T W PE CN 1/1/2009 6/1/2009 STP(U) STP(U) 50 450 4 60 54 510 54 510 CE No Totals 500 64 564 564 06 62 Englewood Ave Englewood Ave from: 24th Ave to: 40th Ave Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer and Water lines. 01 05 12 P N/A O P S T W PE RW CN 1/1/2008 6/1/2008 1/1/2009 STP(U) STP(U) STP(U) 300 200 700 1 411 341 1 271 227 951 795 1 3411 1 2271 795 CE Yes 1/1/2009 Totals 1200 163 1363 568 795 Report Date: July 5, 2005 Grand Totals for Yakima 37435 27206 11992 76633 32655 19347 6056 18535 Page 16 Supersedes previous editions BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. l For Meeting of July 5, 2005 ITEM TITLE: Public Hearing to: A) adopt the Six-year Transportation Improvement Program (STIP) for years 2006 to 2011, and to amend the Metropolitan Transportation Plan; and B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted Six-year Transportation Improvement Program (STIP). SUBMITTED BY: t rtment of Community and Economic Development - Cook, Director CONTACT PERSON/TELEPHONE: K. Wendell Adams, P.E., Engineering Manager, 575-6111. SUMMARY EXPLANATION: See Attached. Resolutions X Ordinance Contract Other (Specify) STIP Funding Source APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: 1) Hold the Public Hearing, 2)Adopt Resolution approving the STIP and amend the regional Metropolitan Transportation Plan, 3) Adopt Resolution amending the Comprehensive Plan Capital Facilities Element. BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION: (A) List of projects amended to include 1) improvements to 34th Ave & River Rd. intersection, and 2) Englewood Ave improvements [24`h to 40th Avenues]. Resolution adopted. RESOLUTION No. R-2005-105 (B) Resolution adopted. RESOLUTION NO. R-2005-106 Six-year Transportation Improvement Program (continued) A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its SixYear Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue or federal revenue will be used. The plan for 2006 - 2011 includes fourteen (14) funded projects. Funding for the remainder of the projects will continue to be sought. The next authorization of TEA -21 is still pending with several extensions of the act already passed. The Transportation Equity Act of 1998 for the 21st Century (TEA -21) began with the passage of the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. It specifies the systems on which certain funds can be used, expands the kinds of activities for which funds can be used and promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and programming of projects. SAFETEA requires each designated MPO to develop a Transportation Improvement Program (UP), and the state to develop a Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for the transportation projects. Projects listed in the STIP are the only projects that will be approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal funds or by the State of Washington for approved State -funding agencies. The STIP is a prioritized program of transportation projects, compiled from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's transportation program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Citizen participation is an integral part of the planning process at all levels. Local Agencies are required to develop and adopt a six-year transportation program. All local agencies are required to hold at least one public hearing during the development of the six-year transportation program. Project ranking was performed utilizing data supplied by the Street and Traffic Division. These rankings were then integrated with other project needs and the total list was reviewed and adjusted to the particular need of the City of Yakima. Listed projects that were modified from the 1st Hearing on June 28, 2005 induded: Priority 50, William O. Douglas pathway limits modified as requested. Listed projects that were added from the 1st Hearing on June 28, 2005 induded: Priority 56, Mead Avenue Railroad Grade Separation; Priority 57, Washington Avenue Railroad Grade Separation; Priority 58, Yakima Pathway Connections, city-wide; Priority 59, Frontage Road, 1st Street to Lincoln Avenue; Priority 60, YVT Pathway along several miles of YVT right-of-way city-wide. 2 — June 30, 2005 Six-year Transportation Improvement Program (continued) B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted the Six-year Transportation Plan for 2006 to 2011. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. This amendment is limited to incorporate only those projects that are adopted in the STIP and is not subject to the "once a year" change required under the laws of the Growth Management Act.