HomeMy WebLinkAboutR-2005-096 2005 - 2010 Six-Year Transportation Improvement Program Amendment (TIP)RESOLUTION NO. R-2005-96
A RESOLUTION to amend the Six-year Transportation Improvement Program (STIP) for
the period of 2005 through 2010 to include projects affecting the City's
Transportation Plan.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six-year
Transportation Program for the construction or repair of streets in the City of Yakima for the
ensuing six year period, all as contemplated and required by State RCW 35.77.010 and
applicable Federal law, and
WHEREAS, the City of Yakima desires to amend the adopted 6 -Year STIP, as
contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the 6 -Year STIP, and
WHEREAS, this amendment is limited to incorporation of the projects listed in 6 -
Year Transportation Improvement Plan for the period of 2005 to 2010 to the Capital
Facilities Element of the Yakima Urban Area Comprehensive Plan, which is contemplated
and provided under RCW 36.70A.130(2B) and RCW 35.77.010, and
WHEREAS, a public hearing has been held by the Yakima City Council on
amending the 6 -Year Transportation Improvement Plan on Tuesday, June 28, 2005, with
proper public notice as required by RCW 35.77.010
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted 6 -Year Transportation Improvement Plan for the period of 2005 through 2010
for the City of Yakima, shall be amended as shown on the revised 6 -Year Transportation
Improvement Plan attached.
ADOPTED BY THE CITY COUNCIL this 28th day of June, 2005.
ATTEST:
City Clerk
ar„ a
Paul P. Georg
Washington State Department of Transportation
vIv
Agency: Yakima
Co. No.: 39 Co. Name: . Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2005 to 2010
Hearing Date: 7/6/2004 Adoption Date: 7/5/2005
Amend Date: 6/28/2005
Resolution No.: R -2004 -
Functional
Class
I Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
Improvement
. Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Expenditure
Federal Funding
State
Fund
Code
State
Funds
Local
Fun
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
1
Railroad Grade Separation -'B' St - Lincoln Ave
BNSF Tracks/I St
from: N 1st St to: N 1st Ave
Construct Grade Separations and adjacent roadway reconstructon
01
06
07
08
P
0.2
T
P
G
0
W
PE
CN
ALL
1/1/2006
1/1/2007
1/1/2005
STP(U)
5010
AIP
AIP
AIP
1285
7000
500
1000
7295
7000
500
7295
7000
500
EA
No
Totals 5010 8785 1000 14795 14795
17
2
Front St Rehabilitation
BNSF Track/Street
from: Yakima Ave to: 'D' St
Realignment of Front Street, curb, gutter and sidewalk reconstruction with
historic district renovation
01
12
06
P
0.3
p
0
T
W
PE
RW
CN
3/1/2005
6/1/2005
6/1/2006
OTHERI 1491 371 186
OTHER 771 191 96
OTHERI 17021 4261 2128
186
96
1
1
21281
EA
Yes
06/01/06
Totals 1928 482 2410 282 2128
14
3
W Washington Ave - S 52nd Ave to S 72nd Ave
W Washington Ave
from: S 52nd Ave to: S 72nd Ave
Widen, reconstruct, curb, gutter, sidewalk
04
03
S
1.02
w
T
0
S
P
PE
CN
1/1/2005
1/1/2005
STP(U)
1
500
AIPI 3981 3531 7511 7511
AIP 1 16981 5271 2725 27251
1
1
EA
-
Yes
01/01/05
Totals 500 2096 _ 880 3476 3476
16
4
W Nob Hill Blvd - S 68th Ave to S 80th Ave
W Nob Hill Blvd
from: S 68th Ave to: S 80th Ave
Reconstruct to minor arterial standards
04
03
S
.73
C
W
0
P
T
PE
RW
CN
1/1/2005
4/1/2006
1/1/2007
STP(U)
STP(U)
370
144
AIPI 551 1 425
AIP 1 2161 1 360
AIP! 5551 3701 925
4251
3601
1 925
EA
Yes
04/01/06
Totals 514 826 370 1710 785 925
Report Date: July 5, 2005
Page 1
Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: WCOG
Six Year Transportation Improvement Program
From 2005 to 2010
Hearing Date: 7/6/2004 Adoption Date: 7/5/2005
Amend Date: 6/28/2005
Resolution No.: R -2004 -
Functional
Class
• Priority
Number
Project IdentificationProject
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - EndingMP or road
9 g
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Tota(
Funds
Envir.
Type
RNV
Required
Date
(M >7
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
02
5
River Road Realignment
River Road
from: N 16th Ave to: Fruitvale Blvd
Widening, curb, gutter, sidiewalk, reconstructrion
01
04
S
1.1
c
G
P
T
S
W
RW
CN
1/1/2005
4/1/2006
AIP
AIP
272
1184
68
296
340
1480
340
1000
480
CE
Yes
01/01/06
Totals 1456 364 1820 1340 480
19
- 6
YVT Barn Rehabilitation
S 3rd Ave
from: S 3rd St to: Pine St
Car Barn and Museum Restoration
03
p
N/A
G
C
S
T
W
P
PE
CN
6/1/2005
6/1/2006
STP(E)
STP(E)
18
1730
1 321 501 501
-1 2701 2000 . 17301 2701
EA
No
Totals 1748 302 2050 1780 270
00
7
Transit Operating/Capital Expenses
Various Areas
from: N/A to: N/A
Supplemental Funding for Transit Service Operating Expenses
12
22
23
24
31
S
N/A
CN 1 1/1/2005 I 5307 1 12721 1 1 10001 22721 22721 1
-
CE
No
Totals 1272 1000 2272 2272
09
8
Transit/Street Asset Amenities
Route Maintenance, Repair & Improvements
from: to:
Maintenance of shelters. benches and signage throughout our route system.
22
31
S
N/A
G
ALL' 1/1/2005 1 1 1 301 301 301 1
CE
No
Totals 30 30 30
Report Date: July 5, 2005
Page 2
Supersedes previous editions
vI�
Agency: Yakima
Washington State Department of Transportation
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2005 to 2010
Hearing Date: 7/6/2004 Adoption Date: 7/5/2005
Amend Date: 6/28/2005
Resolution No.: R -2004 -
j - .9
a'
E
a Z
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
Improvement
Type(s)
'
fn
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
PhaseFederal
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MMm )
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 17
18
19
20
21
00
9
12
S
N/A
Q
CN
1/1/2005
5307
56
35
91
91
CE
Facility Upgrade
21
No
Transit Center Expansion Project
from: . to:
Add 300 sq ft section to the North side of our transit center to house a
security officer, information/ticket sales
Totals 56 35 91 91
14
10
12
S
N/A
W
PE
1/1/2005
STP(U)
STP(U)
27
40
1 1 31 30
1 1 61 46
30
1
461
CE
N 16th Ave - Signal @ River Rd
T
RW
CN
4/1/2005
1/1/2006
STP(U)
232
361 268
268
1
Yes
N 16th Ave .
from: N 16th Ave ' to: River Rd
P
04/01/05
Install new signal
Totals 299 45 344 298 46
07
11
12
S
.5
T
PE
1/1/2005
PSMPI 6
PSMPI 6
4
4
10
10
101
101
CE
W Lincoln Ave Sidewalks
P
RW
CN
1/1/2005
6/1/2005
PSMP 74
99
173
'1 173
Yes
W Lincoln Ave
W
from: N 1Bnd Ave to: N 29th Ave
-
04/01/05
Sidewalks on the Northside
Totals 86 107 193 20 173
17
12
01
S
N/A
p
PE
1/1/2005
OTHERI 3201 801 400
OTHERI 2601 1401 400
4001
4001
CE
SR12 - N 40th Ave
0
RW
CN
1/1/2006
1/1/2006
OTHERI 19201 1001 2020
20201
Yes
SR12 - N 40th Ave
from: N 40th Ave to: SR12
T
W
01/01/06
Widen intersection and on-ramp, sewer trunk line
S
Totals 2500 320 2820 2820
Report Date: July 5, 2005
Page 3
Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
. Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2005 to 2010
Hearing Date: 7/6/2004 Adoption Date: 7/5/2005
Amend Date: 6/28/2005 Resolution No.: R -2004 -
Functional
Class
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - EndingMP or road
g 9
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envlr.
Type
RM/ •
Required
Date
(MM/yr
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 I 17
18
19
20
21
14
13
E Nob Hill Blvd at S 6th St
E Nob Hill Blvd
from: E Nob Hill Blvd to: S 6th Sl
install signal @ e Nob Hill Blvd and S 6th SI
12
01
S
Signal
T
W
0
RW
CN
1/1/2005
6/1/2005
TPP
TPP
65
400
10
62
75
462
75
4621
CE
Yes
01/01/05
Totals 465
72
537 537
14
14
Nob Hill Blvd
Nob Hill Blvd
from: S 52nd Ave to: S 68th Ave
Widen, curb, gutter, sidewalk, lighting, drainage
04
P
.77
p
C
G
0
S
T
PE
RW
CN
1/1/2006
6/1/2006
6/1/2007
STP(U)
STP(U)
107
300
1 1
1 1
TPPI 11831
171
401
1931
124
340
1376
124
340
1376
1
1
1
EA
Yes
01/01/07
Totals 407 1183
250
1840 1840
00
15
Annual Signal Upgrades
Local Selection
from: N/A to: N/A
Upgrade signals
01
P
N/A
PE
CN
CN
4/1/2005
8/1/2005
8/1/2005
CMAQ
STP(S)
CMAQ
50
150
300
1 1
AIP I 2001
1 1
501
1
100
350
300
1001 1
3501
1 3001
CE
No
Totals 500 200
50
750 100 650
00
16,
Various Overlay Projects/Selected on Local Priority
N/A
from: N/A to: N/A
07
S
N/A
w
CN 1 7/1/2005 1 STP(U) I 1731 1 1
271
200 2001 1
EA
No
Totals 173
27
200 200
Report Date: July 5, 2005
Page 4
Supersedes previous editions
Washington State Department of Transportation
Vh.r,
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2005 to 2010
Hearing Date: 7/6/2004 Adoption Date: 7/5/2005
Amend Date: 6/28/2005 Resolution No.: R -2004 -
o rn
�j
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - EndingMP or road
g g
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only`
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNV'
Required
Date
(M�
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
- 17
18
19
20
21
00
17
Storm DrainsNegetation
Local Selection
from: City Wide to:
City Wide
32
P
N/A
PE
CN
1/1/2005
1/1/2005
80
720
80
720
80
720
EA
No
Totals 800 800 800
17
18
Reconstruction Rudkin Rd
Rudkin Rd
from: E Mead Ave to: Rainier Place
Reconstruct, excavate ballast, top course. curb, gutter, sidewalk
Partner with City of Union Gap
03
06
P
.76
w
T.
P
S
PE
CN
1/1/2007
1/1/2008
STP(C)
STP(C)
87
500
1 1 221 1091 1091
TPP 1 5001 841 1084 1
1
1 1084
CE
No
Totals 587 500 106 1193 109 1084
17
19
E Mead Ave Reconstruction
EMeadAve
from: Rudkin Rd to: Fair Ave
Partner with City of Union Gap. reconstruct, excavate ballast, top course,
curb, gutter, storm, acp
03
06
P
.76
C
G
0
P
S
T
PE
CN
9/1/2006
4/1/2007
STP(S)
STP
97
873
TPP1 181 61 121
TPP 1631 551 1091
1211 1
1091
CE
No
Totals 970 181 61 1212 121 1091
19
20
Longfiber Rd - Phase 2 (3 -Phases)
Longfiber Rd
from: Valley Mall Blvd to: W Washington Ave
New roadway construction and reconstruction, 3 -lane w/turn, curb, gutter,
sidewalks - Partner with City of Union Gap
01
03
P
.50
p
S
W
T
0
PE
CN
1/1/2008
1/1/2009
1 1
1 1
1061 106
11831 1183
1 1 106
1 1 1183
CE
No
Totals 1289 1289 1289
Report Date: July 5, 2005
Page 5
Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2005 to 2010
Hearing Date: 7/6/2004 Adoption Date: 7/5/2005
Amend Date: 6/28/2005
Resolution No.: R -2004 -
o` h
u
ti
Priority 1
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - _Ending MP or road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
a
ci
Project Costs in Thousands of Dollars
Expenditure Schedule
(Coca/ Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mn✓ddiyyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds_
Total
Funds
RM/
Required
Date
(mm/yr
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
Envir.
Type
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
21
Intersection Improvements
Selected on Local Priority
from: E Nob Hill Blvd to: S 6th St
Curb, gutter, sidewalk, safetyimprovements, sloping, signs
P
N/A
s
G
C
PE
CN
4/1/2005
7/1/2005
5
45
5
45
5
45
CE
No
Totals
50 50 50
11
22
E Nob Hill Blvd & S 18th SI
E Nob Hill Blvd
from. S 18th St to: E Nob Hill Blvd
Widen south leg for double LT from west bound Nob Hill, (Tie to WSDOT
Project) possible curb, gutter and sidewalk
04
01
P
.1
c
S
W
T
PE
RW
CN
1/1/2006
3/1/2006
1/1/2007
STP(U)
STP(U)
STP(U)
13
18
140
I I
'�
1 1
21 15
21 20
. 251 165
151 I
201 1
1651
CE
Yes
01/01/06
Totals 171
29 200 35 165
16
23
Roadway City Wide Shoulder Improvements
City Wide
from: to:
City Wide shoulder improvements, PM10 abatement.
01
S
N/A
CN 1 7/1/2005 I CMAQ 1 4001 1 1
541 4541 4541 1 1CE
No
Totals 400
54 454 454
16
_
24
NI 8th St & N 6th St - Signal Flashers @ 'B' St & Lincoln Ave
N 6th St
from: 'B' Sl to: Lincoln Ave
Install signals on N 8th St & 5 6th St @ 'B' St and Lincoln, flashers
01
S
Signal
CN 1 2/1/2005 STP(S) 1 801
111 911 911 1
EA
Na
Totals 80
11 91 91
Report Date: July 5, 2005
Page 6
Supersedes previous editions
AMP
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2005 to 2010
Hearing Date: 7/6/2004 Adoption Date: 7/5/2005
Amend Date: 6/28/2005
Resolution No.: R -2004 -
Functional
Class
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.Fund
C. Project Title
D. StreeVRoad Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)RAN
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
:-
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru 6th
Envir.
Type
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15.
16
17
18
19
20
21
14
2531
E Nob Hill Blvd 8 Fair Ave
E Nob Hill Blvd
from: E Nob Hill Blvd to: Fair Ave
Intersection widening & new signal, curb, gutter and sidewalk, street lighting,
stormwater
03
04
S
N/A
0
C
P
T
W
PE
1/1/2006
STP(U)
72
11
83
83
CE
Yes
10/01/06
Totals 72 11
83 83
17
26
ZierRW
S 80th Ave -Tieton Dr to Rd '
S 80th Ave
from: Tieton Dr to: Zier Rd
Major widening, curb, gutter, sidewalk
04
P
1.3
O
P
T
W
PE
CN
1/1/200
1/1/2007
6/1/2006
AlP1 104
AIP1 303
AIPI 1323
11
471
2071
120
350
1530
1201 1
3501 1
1 1
1530
EA
Yes
01/01/07
Totals 1730 270
2000 470
1530
19
27
N 7th St Reconstruction
N 7th St
from. Lincoln Ave to: 'H' St
Street reconstruction into Yakima Resource Center
03
P
-5
PEI 1/1/2006 I I I 1 4001
4001 1 4001
1CE
No
Totals 400
400 400
17
28
Zier Rd - S 75th Ave to S 72nd Ave
Zier Rd
from: S 75th Ave to: S 72nd Ave
Minor widening, curb, gutter and sidewalk
05
06
S
.15
c
S
T
P
PE
CN
1/1/2005
6/1/2005
STP(E)
STP(E)
22
75
1 1 71
1 1 201
291 291 1
95 951 1
CE
Yes
03/01/05
Totals 97 27
124 124
Report Date: July 5, 2005
Page 7
Supersedes previous editions
ale..
Washington State Department of Transportation
VIP
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2005 to 2010
Hearing Date: 7/6/2004 Adoption Date: 7/5/2005
Amend Date: 6/28/2005
Resolution No.: R -2004 -
Functional
Class
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C: Project Title
D. Street/Road Name or Number
E. Beginning MP or road - EndingMP or road
g g
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(m ✓dd/yyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
local
Funds
Total
Funds
RW
Required
Date
(M,tv,y)
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
Envir.
Type
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
29
Englewood Ave - N 40th Ave to N 56th Ave
Englewood Ave
from: N 40th Ave to: N 56th Ave
Widen roadway, curb, gutter, sidewalk
05
06
P
2.15
W
S
T
P
0
C
PE
RW
CN
1/1/2009
6/1/2009
1/1/2010
STP(C)
STP(C)
STP(C)
216
277
1367
34
43
213
250
320
1580
250
320
1580
EA
Yes
•
04/01/09
Totals 1860 290
2150 2150
16
30
W Washington Ave Median Removal
W Washington Ave
from: S 16th Ave to: S 24th Ave
Removal of median in Washington Ave lengthening tum lanes
05
S
.5
PE
CN
1/1/2005
1/1/2005
STP(U)
STP(U)
36
228
51
36
41 I
264
411
264
CE
No
Totals 264 41
305 305
17
31
Englewood Ave - N 24th Ave to N 16th Ave
Englewood Ave
from: N 16th Ave to: N 24th Ave
Widen, curb, gutter and sidewalk, water and sewer lines
05
06
P
2
0
W
S
PE
RW
CN
1/1/2007
1/1/2008
6/1/2009
STP(U)
STP(U)
STP(U)
( )
173
259
1865
1
1
1
271
411
1351
200
300
2000
2001 1
3001 1
1 2000
EA
Yes
01/01/09
Totals 2297 203
2500 500 2000
00
32
Pedestrian Bridge
Pedestrian Bridge
from: N 10th St to: Yakima Greenway
Construct pedestrian bodge from Gateway area to Yakima Greenway,
power, handicap accessible, lights
14
32
P
.25
T
P
0
PE
CN
1/1/2008
3/1/2009
STP(E)
STP(E)
200
2000
1 1
1 1
271
2701
227
2270
2271 1
22701
CE
No
Totals 2200 297
2497 2497
Report Date: July 5, 2005
Page 8
Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2005 to 2010
Hearing Date: 7/6/2004 Adoption Date: 7/5/2005
Amend Date: 6/28/2005 Resolution No.: R -2004 -
o
.)
LL U
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - EndingMP or road
g g
F. Describe Work to be Done
Improvement I
Type(s)
2
in
Total Length
Utility Codes
1 Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund
Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/V'/
Required
Date
(MM/Y))
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 I 17
18
19
20
21
00
33
Gravel Road B.S.T.
Various Areas
from: City Wide to:
PM -10 Abatement. Street Sweeper Acquisition
07
S
N/A
CN
CN
4/1/2005
6/1/2005
CMAQ
155
200
30
200
185
1001 50
1851
50
CE
No
Totals
155 230
385 285 50 50
08
34
Powerhouse Rd & Englewood Ave
Powerhouse Rd
from: Powerhouse Rd to: Englewood Ave
Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal
12
P
N/A
T
P
0
S
C
W
PE
RW -
CN
5/1/2005
9/1/2005
9/1/2005
STP(S)
STP(S)
STP(S)
20
400
300
1 1 31
1 1 541
1 1 451
23
454
345
231 1
4541 1
3451 1
- -
CE
Yes
09/01/20
Totals
720 102
822 822
07
35
S 48th Ave & Summitview Ave Signalization
S 48th Ave
from: S 48th Ave to: Summitview Ave
Signalization
12
P
N/A
p
T
PE
RW
CN
1/1/2010
6/1/2010
8/1/2010
STP(S)
STP(S)
STP(S)
20
20
340
1 1 31
1 1 31
1 1 511
23
23
391
1 231
1 231
1 3911
CE.
Yes
06/01/10
Totals
380 57
437 437
07
36
S 3rd Ave & W Washington Ave Signal
S 3rd Ave
from: S 3rd Ave to: W Washington Ave
Signal Upgrades
12
P
N/A
p
T
PE
CN
4/1/2006
6/1/2006
1 1 101
1 1 1401
10
140
101 1
1401
CE
No
Totals
150
150 150
Report Date: July 5, 2005
Page 9
Supersedes previous editions
Washington State Department of Transportation
-Ii
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2005 to 2010
Hearing Date: 7/6/2004 Adoption Date: 7/5/2005
Amend Date: 6/28/2005
Resolution No.: R -2004 -
j i�
;�
.° E
a Z
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
C.
ro
m d
ni-
E
'
to
ITotal Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm✓dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNV
quired
ReDate
(mtivyy)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
07
37
S 16th Ave 8 W Washington Ave Signal
S 16th Ave
from. S 16th Ave to: W Washington Ave
Signal Upgrades
12
P
N/A
p
T
PE
CN
1/1/2006
6/1/2006
STP(S)
STP(S)
10
60
10
60
20
120
20
120
CE
No
Totals
70
70
140 140
07
38
W Nob Hill Blvd Sidewalks
W Nob Hill Blvd
from: S 16th Ave to: E 182 Overpass
Sidewalks on southside
12
P
2
p
T
W
PE
RW
CN
1/1/2008
6/1/2008
3/1/2009
STP(S)
STP(S)
STP(S)
43
85
255
1
1 1
1 1
71
151
451
50
100
300
501 1
1001 1
3001 1
CE
Yes
09/01/08
Totals
383
67
450 450
00
39
Beech St Pedestrian Connection
Beech St
from: Fair Ave - to: Chalmers/Riverside
Construct pedestrian under SR8210 Greenway
06
32
p
1
p
T
PE
RW
CN
1/1/2009
6/1/2009
1/1/2010
STP(S)
STP(S)
STP(S)
45
150
400
1 1
1 1
1 1
61
201
541
51
170
454
1 1 51
1 1 170
1 1
454
CE
Yes
09/01/09
Totals
595
80
675 221 454
07
40
W Lincoln Ave Sidewalks
W Lincoln Ave
from: N 56th Ave to: N 29th Ave
Sidewalks
12
P
2
p
T
PE
RW
CN
1/1/2009
6/1/2009
1/1/2010
STP(S)
STP(S)
STP(S).
34
68
454
1 1
1 1
61
121
701
40
80
524
1 40
80
1 1 524
CE
Yes
09/01/10
Totals
556
88
644 644
Report Date: July 5, 2005
Page 10
Supersedes previous editions
Anita
Washington State Department of Transportation
Wir
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2005 to 2010
Hearing Date: 7/6/2004 Adoption Date:
Amend Date: 6/28/2005
Resolution No.: R -2004 -
_
1O
o v,
E. 19
v
ti
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
d
m
a
n�
E
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal FundingRNV
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
Required
Date
(,ymvyy)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
08
41'
W Lincoln Ave &'B' St Realignment
W Lincoln Ave
from: W 5th Ave to: Custer St
Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights
01
12
P
-5
�/�/
T
S
P
0
G
PE
RW
CN
1/1/2008
1/1/2009
1/1/2010
STP(E)
STP(E)
STP(E)
337
831
1429
53
129
223
390
960
1652
390
960
1650
CE
Yes
09/01/10
Totals 2597 405 3002 3000
16
42
School Safety Projects
Various Locations - Citywide
from: to:
Crossing flashers, sidewalks. signing. other features
12
S
N/A
PE
CN
1/1/2005
1/1/2005
PSMPI 101 21 12
PSMP 1 190j 381 228
121 1
1901
CE
No
Totals 200 40 240 202
02
43
E Nob Hill Blvd. Reconstruction
E Nob Hill Blvd.
from: S 6th Street to: S 18th Street
Major roadway widening and reconstruction to 5 lanes with intersection
improvements, curb, gutter, sidewalks
03
04
06
P
.85
C
G
P
S
T
PE
RW
CN
1/1/2008
1/1/2009
1/1/2010
STP(C)
STP(C)
STP(C)
433
865
5190
1 ' 67
1 135
1 810
500
1000
6000
1 1
1 1
1 1
500
1000
6000
EA
Yes
1/1/09
Totals 6488 1012 7500 7500
44
Transit Service to Selah & WSDOT Complex (Union Gap)
Demonstration Pilot Project Expansion
from: to:
2 yr pilot project to provide City of Selah and WSDOT site in Union Gap
with weekday bus service. r
22
s
ALL I 7/4/2005 1 CMAQ I 4501 1 1 601 5101 2751 2351 1
CE
No
Totals 450 60 510 ' 275 235
Report Date: July 5, 2005
Page 11
Supersedes previous editions
7m Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2005 to 2010
Hearing Date: 7/6/2004 Adoption Date: 7/5/2005
Amend Date: 6/28/2005
Resolution No.: R -2004 -
Functional
Class
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
Improvement I
Type(s)
i.
'
i.
in
Total Length I
v
u
Project Costs in Thousands of Dollars
Expenditure Schedule
(Coca! Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W ---
Required
Date
(MAY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
. 18
19
20
21
14
45
4579
S 1st St. - E. Washington Ave. Intersection Improvement
S1st St.
from: S 1st St. to: E Washington Ave.
Realign intersection, upgrade traffic signal
12
S
N/A
p
W
S
T
PE
7/1/2005
STP(U)
200
30
230
230
-
EA
Yes
01/01/06
Totals 200 30 230 230
06
46
4562
Tieton Dr - S 5th Ave. Intersection Project
Tieton Drive
from: 51h Ave. Intersection to:
Replace traffic signal with roundabout
12
P
N/A
p
W
ALL! 4/4/2006 STP(U) 2001 WSDOT1 2001 1 4001 4001 1 1
CE
No
Totals 200 200 400 400
17
47
4587
S 48th Ave. Reconstruction
S 48th Avenue
from: Summitview Ave. to: Nob Hill Blvd.
Widen. curb, gutter, sidewalk. lighting, drainage
03
P
1.00
p
T
W
S
ALL 1 4/1/2006 1 STP 1 18001 I 1 2431 20431 501 19931 I
EA
No
Totals 1800 243 2043 50 1993
14
48
South 72nd Ave & Mead Ave Intersection
South 72nd Ave
from: South 72nd Ave to: Mead Ave
New intersection, signals, curb, guner and sidewalk
03
12
S
N/A
0
P
S
T
W
PE
CN
1/1/2005
6/1/2005
STP(U)
STP(U)
41
304
71 48
1 481 352
481 I
3521 1
CE
No
Totals 345 55 400 400
Report Date: July 5, 2005
Page 12
Supersedes previous editions
VA Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2006 to 2011
Hearing Date: 7/6/2004 Adoption Date: 7/5/2005
Amend Date: 6/28/2005 Resolution No.: R -2004 -
I. Functional
Class
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
Improvement I
Type(s)
-
n
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/ddfyyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
RNV
Required
Date
(M/,,/yy)
Federal
Fund
Code
Federal
Cost by
Phase
t
1s6th
2nd
3rd
4th
Thru
Envir.
Type
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
49
E Mead & S 1st St Signal
E Mead
from: E Mead to: S lst St
Signal
12
S
N/A
p
S
T
W
CN
6/1/2005
STP(U)
87
13
100
CE
No
Totals 87 13 100
08
50
Yakima Ave. Historic District
from: Front Street to: 9th SVA St
Install historical lighting, sidewalk modifications and other improvements
06
12
S
.75
p
W
S
T
PE
CN
7/1/2005
9/1/2005
OTHERI 8701 1 8701
OTHER I 40001 1 4000
8701 1
1 40001
CE
No
Totals 4870 4870 870 4000
• 00
51
William O. Douglas Pathway
from: Pine St to: Cowiche Canyon
Pathway improvements and signage.
14
32
P
N/A
0
S
P
W
PE
CN
1/1/2006
7/1/2006
STP(E)
. STP(E)
8
87
1 21 10
1 131 100
101
. 1001
1
1
CE
No
Totals 95 15 110 110
Report Date: July 5, 2005
Grand Totals for Yakima
34598 27206 11990 73794 28894 27838 6818 10104
Page 13
Supersedes previous editions
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No.
For Meeting of Tune 28, 2005
ITEM TITLE: Hold Public Hearing to Amend Six-year Transportation
Improvement Program (STIP) to include additional Transit and
Roadway Projects
SUBMITTED BY: p ra tment of Community and Economic Development -
Engineering Division
CONTACT PERSON/TELEPHONE: K. Wendell Adams, City Engineer, 575-6111.
SUMMARY EXPLANATION:
Attached is a copy of the proposed amended Six -Year Transportation Improvement Plan
(STIP) for the 2005— 2010 planning years. The City of Yakima has identified a need to
amend the current Six Year Program for the construction of streets and arterial streets in
the City of Yakima to include additional Transit and Roadway projects affecting the
Federal Surface Transportation Program funds the City receive to accomplish
improvements within the City (see attached). This amendment needs to be included in the
current City of Yakima STIP. This amendment will allow the City to construct various
Transit and Roadway projects and acquire a street sweeper that were not included in the
previously adopted STIP.
As requested by Council Members, a copy of the County's Annual Road Construction Plan
is attached. This plan includes the streets that the City intends to annex in the near future.
Resolution X Ordinance Contract Other (Specify) Amended STIP & County
Annual Road Construction Plan
APPROVED FOR SUBMITTAL:
City Manager
STAFF RECOMMENDATION:
Adopt the amended STIP.
BOARD/COMMISSION RECOMMENDATION:
COUNCIL ACTION:
Resolution adopted. RESOLUTION NO. R-2005-96
SUMMARY OF PROPOSED AMENDMENTS TO THE
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
2005 — 2010
Priority 8; Transit/Street Asset Amenities
Priority 12; SR12 — N. 40th Ave.
Priority 23; Roadway Citywide Shoulder Improvements
Priority 24: N. 6th & N. 8th St. Signals
Priority 25; E. Nob Hill Blvd. & Fair Ave.
Priority 31; Englewood Ave. — N. 24th Ave. to N. 16th Ave.
Priority 33; Gravel Road B.S.T. — Street Sweeper Acquisition
Priority 44; Transit Service to Selah & WSDOT Complex (Union Gap)
Priority 45; S. 1st St. — E. Washington Ave. Intersection Improvement
Priority 49; E. Mead & S. 1st St. Signal
Priority 50; Yakima Ave./Historic District
Priority 51; William O. Douglas Pathway
2 -- June 23, 2005
YAKIMA COUNTY
PUBLIC SER!/ICES DEPARTMENT
COUNTY COMMISSIONERS
Ronald F. Gamache
Jesse 5. Palacios
Michael D. Leita
DIRECTOR
Vern M. Redifer, P.E.
COUNTY ENGINEER
Gary N. Ekstedt, P.E.
ANNUAL ROAD
CONSTRUCTION PROGRAM
2005
BOARD OF YAKTMA COUNTY COMMISSIOI\ERS
IN THE MATTER OF ADOPTION
OF THE YAKIMA COUNTY 2005
ROAD CONSTRUCTION PROGRAM
AS REQUIRED BY W.A.C. 136-16
Resolution No. 651-2004
WHEREAS, the County Engineer has prepared and did submit to the Board of
County Commissioners the Yakima County 2005 Road Construction Program, and the attached
ER&R 2005 Equipment Replacement List; and,
- WHEREAS, the Board has reviewed the Yakima County 2005 Road Construction
Program and the ER&R 2005 Equipment Replacement List with the County Engineer; now,
therefore,
BE It HEREBY RESOLVED by the Board of County Commissioners of Yakima
County, Washington,- that the attached Yakima County 2005 Road Construction Program and
ER&R 2005 Equipment Replacement List, as Prepared by the County- Engineer, are hereby
adopted.
Dated this 18h day of November, 2004.
projects\ 1-year\2005 resoadopt
• ATTEST:
Jennifer Ad
, Deputy Clerk of the Board
/lames M. Lewis, ? hakrman
;Ronald F. Gamache, County Conim.issioner
esse S. Palacios, County Commissioner
Constituting the Board of County Commissioners
for Yakima County, Washington
PAGE 1
LEGEND
1. Functional Classification.
RURAL (under 5,000 area)
01 Principal Arterial -Interstate
02 Principal Arterial -Other
06 Minor Arterial
07 Major Collector
08 Minor Collector
09 Local Access
00 No Classification Applicable
2. Improvement Type Codes.
01 New construction on new alignment
02 Reconstruction (added capacity)
03 Reconstruction (no added capacity)
04 Resurfacing/restoration/rehabilitation
05 Paths, trails, sidewalks
06 Other enhancements
08 New bridge
09 Bridge replacement
10 Bridge rehabilitation
11 Other bridge work
12 Safety/traffic operationslTSM
13 Environmentally related
URBAN (over 5,000 area)
11 Principal Arterial -Interstate
12 . Principal Arterial -Expressway
14 Principal Arterial Other
16 Minor Arterial
17 Collector
19 Local Access
14 intersection improvement
15 Rail highway crossing
16 Guardri.'I
17 Other/safety/roadside/traffic operation
18 Carpool, vanpool
21 Transit capital project
22 Transit operational project
23 Transit planning
24 Transit training/administration
31 Non capital improvement
32 Non motor vehicle project
3. Utility Codes. Utilities that may need to be relocated or maybe impacted by the project.
C Cable TV
G Gas
P Power
O Other
4. Project Phase.
Prelim. Engr.
Right of Way
Constr.
Grand Total
S
T
W
Project cost in thousands per phase.
Sewer
Telephone
Water
Preliminary engineering or planning
Right of way or land acquisition
Construction
Total of phases
5. Funding by Source Code.
BR Bridge Replacement/Rehabilitation NHS
CMAQ Congestion Mitigation and Air Quali S16
DEMO ISTEA Demo Projects
DISCR ISTEA Discretionary Projects
DOD Department of Defense Funds
ER Emergency Relief
IRR Indian Reservation Roads
IC Interstate Construction
IM Interstate Maintenance
6. Funds by State or Other Source
National Highway System
FTA Elderly and Disabled Persons
S18 FTA Rural Areas
S3 FTA Discretionary for Capital Expenditures
S9 FTA Urban Areas
STP(E) Transportation Enhancements
STP(H) Hazard Elimination
ST(RRI'') R/R Crossing Improvements
STP Surface Transportation Program
CAPP - County Arterial Preservation Program
RAP - Rural Arterial Program
AIP - Arterial Improvement Program
TPP - Transportation Partnership Program
TSNS - Traffic Safety Near Schools
Page 5
DAY LABOR CONSTRUCTION ($1,000's) :
TOTAL CONSTRUCTION PROGRAM =
COMPUTED DAY LABOR LIMIT =
TOTAL DAY LABOR CONST. PROGRAM =
$15,182
5800
5323
ANNUAL CONSTRUCTION PROGRAM FOR 2005
YAKIMA COUNTY
CURRENT POPULATION :
DATE RECOMMENDED PROG. SUBMITTED:
DATE OF ENVIRONMENTAL ASSESSMENT:
DATE OF FINAL ADOPTION:
ORDINANCE / RESOLUTION No:
226,000
08/12/04
11/10/04
11/1 8/04
651-2004
1
1
E
M
6 -YEAR
T.I.P.
ITEM
No.
F C
U L
N A
C S
T.S
ROAD
LOG
NO,
ROAD NAME AND/OR
BRIDGE NUMBER
LOCATION
PROJECT
DESCRIPTION
MP
FROM
L
F
U
2005 ESTIMATED EXPENDITURES
BUDGET
MP
TO
E
N
G
T
IMPRV.
TYPE
UTIL.
CODE
N
D
I
N
FUND
SOURCE
CODE
FUND
SOURCE
AMOUNT
($1,000'5)
PRELIM.
ENGR.
595.10
(51,000'5)
RIGHT
OF WAY
595.20
(51,000'5)
CONSTR.
ENGR.
(CE)
(51000'5)
CONSTR.
(CONT.)
($1000's1
• CONSTR.
(DAY LAB)
GRAND
TOTAL
1.00
....................................•....
....•.................•........
...............
......................
($1,000'5)
($14000'5)
1
1
16
42550
RIVERSIDE RD.
W. BIRCHFIELD RD.
TO
S.R. 24.
Reconstruct to 4 lanes
w/ curbs, gutters, sidewalks,
lighting, and channellzation -
0.00
C,G,
LOCAL
565
6.69%
$5
560
50
$0
SO
.565
0.52
0.52
02
P,S,
TPP
$906
93.31%
510
5540
$30
$320
38
0906
T,W,
F
WSDOT
SO
0.00%
50
50
30
$0
50
9O
0
TOTAL100.00%-
§971
_
$15
5600
$30
5320
56
5971
2
•......•.•
2
16
10250
SELAH LOOP RD.
GOODLANDER RD.
TO
GORE RD.
Reconstruct to 4 lanes '
wI curbs, gutters, sidewalks,
lighting, and channelizatlon
0.65
1.59
0.94
02
C,G,
P,T,
0,5
LOCAL
8115
10.54%
$26
589
SO _
50
g0
So
5115
5370
F
STP(U)
5370
33.91%
50
5370 _
SO
50
AIP
5606
55.55%
$78
5528
SO
30
SO
8606
TOTAL
$1,091
89.46%
$104
5987
30
00
00
31 091
..........
.. ........
3
3
16
50000
FORT RD.
HWY.97 VICINITY
TO
Reconstruct to'4 lanes
'
C,G,
LOCAL
50
0.00%
50
50
$o
$o soau'
RO8BINS RD.
w/ curbs, gutters, sidewalks,
0.08
0.86
0.78
02
P,S,
F
OTHER (2%)
525
100.00%
L_ $25
$0 .
SO
$0 J` $O 525
lighting, and canelizat
n ion
i
T,W,
STP(U)
50
0.00%
I S0
50
• 50 j
50 Sp $0.-"
_
• .
0 .
TOTAL .
I $25 _
100.00%
I 525
50
i . 50
_
• 50 $0 525
-
- ...
. ................ .... ..
.... ..
.. ....
V0
-- 'i
a
l 4
16
3,'t d...
96TH AVE.,'S. •
TIETON DR.
TO
Reconstruct to 3 lanes wl.cur`c.•�~�'
gutters, sidewalks, Illumination
I
.
.........
....
L LOCAL ....
.5464 • ...I
18 6::°'
0
50$
+40'
T-� ..... - --
5.93 o' _j?34
1
ZIER RD.
-
Tieton to Wide Hollow. Reconstruct
0.00 ,,
1.27
127
01
G,V, �'
F I
STP(R) -
$2.144
r 83.1'/%
30
50 -
I 5180__
$1,9 57
.
to 12' lanes w/ 8' shoulders to
7,0 .
TOTAL
52,578 �
100.00%
50 .
50
' 5220
62,3E0
$8 52,578
Zier.
'
..•.•.•.•.•.•..•....................
•............•..•...•.................
.
...............:...
.................
.
5
11
17
10020
POWERHOUSE RD., W:
COWICHE CANYON RD.
TO
NACHES RD., S.
Wlden existing roadway to 40' wide,
overly existing roadway, and
construct left turn lane at
Cowlche Canyon Rd. Intersection
1.00
1.58
0.58
02
C,P,
T,0
F
LOCAL
$...
25
100.00%
025
$0
. $0
SO
$0
$25
STP(U)
. 30
0.00%
30
$0
$0
50
50
S0
TOTAL
525
100.00%
$25
SO
50
SO
$0
525
6
12
17
32800
ZIER ROAD
VICINITY OF 88TH AVE., S.
TO
VICINITY OF 96TH AVE., S. EXT.
Add left tum lanes at entrance
to West Valley High School
approaches.
1.65
1.84
0.19
12
G,P,
T,0
F
LOCAL
...........02$
50
;24
51
$27
STP(S)
$114
80.85%
50
513
$10
_ 590
51
5114
TOTAL
5141
100.00%
30
315
$10
$114
82
5141
7
.................
14
N/A
VARIOUS
.................................
ADVERSE WEATHER
OPERATIONS PROGRAM
VARIOUS LOCATIONS
IN
YAKIMA COUNTY
Install Roadway Weather and
Stream Gage information Stations
at various locations in
Yakima County
NIA
N/A
17
N/A
5
LOCAL
§66
28.45%
010
50
- SO
$56
$0
$66
%.
040
50
51 0
f
5116
8166
TOTAL
5232
100.00%
550
50
510
5172
$O
2
8
15
07
10020
POWERHOUSE RD., W.
BRIDGE 4786
Reconstruct Existing Bridge
1.64
08
P,7
F
RAP
L 02....
r
$2
50
50
50
..............
50
$2
BR I
53,207 I
9.94
99.94 %
$7
8200
$250
52,750
50
83,207
TOTAL
53,209
r 100.00%
39
3200
8250
52,750
_
$3,209
8
.16
07
70410
MEYERS RD., N.
BRIDGE #485
Reconstruct existing bridge
'
3.2
09
5,T
F
RAP
562
19.25%
560
52
50
$0
SO_
$62
BR
3260
80.75%
3240
520
50
50
SO
5260
IRR
50
0.00%
50
50
50
50
SO
$0
TOTAL
5322
100.00%
5300
522
50
50
Sp
$322
10
17
07
50000
FORT RD.
BRIDGE #1354
Reconstruct existing bridge
13.91
09
P,T
F
RAP
$O
0.00%
$0
SO
50
$0
50SO
BR
3230
100.00%
5200
530
50
50
S0
5230
TOTAL
5230
100.00%
5200
530
50
50
SO
5230
PAGE 6
DAY LABOR CONSTRUCTION ($1,000's) :
TOTAL CONSTRUCTION PROGRAM =
COMPUTED DAY LABOR LIMIT =
TOTAL DAY LABOR CONST. PROGRAM =
$15,182
$800
$323
ANNUAL CONSTRUCTION PROGRAM FOR 2005
YAKIMA COUNTY
CURRENT POPULATION :
DATE RECOMMENDED PROG. SUBMITTED:
DATE OF ENVIRONMENTAL ASSESSMENT:
DATE OF FINAL ADOPTION:
ORDINANCE / RESOLUTION No:
226,000
08/1 2/04
11/10/04
11/18/04
651-2004
PAGE 7
I
T
E
M
6 -YEAR
T.I.P.
ITEM
No.
--
F C
U L
N A
C S
T.S
ROAD
LOG
NO.
--
ROAD NAME AND/OR
BRIDGE NUMBER
L
F
UBUDGET
2005 ESTIMATED EXPENDITURES
LOCATION
PROJECT
DESCRIPTION
MP
FROM
MP
TO
E
N
G
T
H
IMPRV.
TYPE
UTIL.
-CODE
—
N
0
I
N
G
FUND
SOURCE
CODE
FUND
SOURCE
AMOUNT
(31,000's)
PRELIM. RIGHT
ENGR. •
595.10 595.20
($1,000's) 000
CONSTR.•
(CE)
000
•
( ���
•
• '
GRAND
TOTAL
541.00
11
18
07
20020
SUMMITVIEW RD.
Reconstruct40oad County
000
($1,000's)
APPLE WAY RD. VIC.
standard 40' road (12' lanes,
��
Improve
C p
10.00%
7�
$0
V$1,000's)
FOR E RD
NE
ry'shoulders).
orizontal and vert.
5.02
7.12
210
03
S,T,
F
align.
OTOTAL.;
100.00%
.:0 0
0
$
0
....................
12
19
07
20150
NACHES RD., S.
............ ........
0.29 MILES SOUTH OF
NACHES-TIETON RD.
Reconstruct to County
standard 40'road (12' lanes,
-
LOCAL
§35
1 0
50
5
$0
$
9.00
10.02
1.02
03
C,P,
F
RAP
SO
0.00%
. %
50
EO EO
®'
j
30
0
SO
SR12
ove
'
horizontal
T
$196
84.98%
50 ®®$233
'�
�
50
all n$198
g ment.
TOTAL
5233
100.00/
30
$0
5233
..........
•
13
1 20
07
20400
NACHES-TIETON RD.
NACHES HEIGHTS RD.
TO
Widen existing roadway to 40' wide
LOCAL
§25
10.00%
525
$0
SO $0
.. $0
$25
1i
„
NACHES RD., S.
w/ truck climbing lane and overlay
2.42
3.88
1.46
02
P,T,
F
RAP
3225
90.00%
$225
30
SO $0
30
_
$225
...
existing roadway
TOTAL
5250
50EO
SOJ
SO
$25
1+z
i
26
08
•^•^:?
TRACK RD., N.
PARKER BRIDGE RD;
TO
T Reconstruct to County
standard 30' ACP road ' 0.20
F
LOCAL
..`170..
13.60 %
50
50
—'�le
;159—
I
_.-.'S1'. .,'.':.'$7
`O':
4.U8 3.88r
13
C P
C
RAP
$ x,080
86.40 %
$0
L $0
,':+!t 5403 _.]
--
1 3a
•
EGAN RD.
I
..
T0
TOTAL"
+—
51.50
'I f,0A0%
C 0
y-
50
..•1�
$10U I " 142.
1 58 �-
__ '1 J30_ -
1
.. i
---
r --
$1 250
_
15
27
08
60400
CHAFFEE RD.
MAPLE GROVE RD.
TO
Reconstruct gravel road to
standard 30' BST roadway
LOCAL
$36
9.86%
$0
• 34
$0
531
•"31
• $36
SCOON RD.
2.71
4.00
1.29
03
P,T,
F
RAP
3329
90.14%
50
538
520
52
$329
0
TOTAL
3365
100.00%
30
340
IMECIMIIIIIIIMEMINERNIMI
5365
16
28
MINOR SAFETY
TO BE DETERMINED BY
SAFETY MANAGEMENT
Construct spot safety
Improvements
-----
.....
, ..... .
.
PROJECTS
PRIORITY ARRAY
12F
LOCAL
3100
100.00%
57
518
310
567
50
3100
TOTAL
3100
100.00/
37
516
$10
367
50
5100
17
29
OVERLAYS -
TO BE DETERMINED BY
PVMNT. MANAGEMENT
Construct structural
overlays on arterial
LOCAL
3125
13.51%
$10
30
310
51
§125
VARIOUS ROADS
SYSTEM
roadways
04
F
CAPP
5800
86.49 %
533
30
360
59
$905
TOTAL
5925
100.00%
343
30
$70
59
§925
...•.................
•.............'.'''•.•.''•.
•.•'•.••.'.'.•.•.••'''.'•.
•.'.'•'.'.'.•.'.'.' r.'''.•'.'.•'.•.•''•.'.''
•.'.'.•..'.•.'.'.'.•.'.•.•_.•..•.......
.........
18
30
ACCESS ROADS
R.I.D.
PARTICIPATION/
Participate In RID's
to upgrade existing
CONTINGENCY
County roadways
03
F
LOCAL
525
100.00%
525-
$0
$0
®
30
525
TOTAL
325
100.00%
$25
50
30
.11.31111111
30
$25
IlilititE.I.Ititili.littirjr11111MMIlli®
.......1.....
19
31
09
63540
HUDSON ROAD
BRIDGE#489
Reconstruct existing bridge
5.07
09
P,T
F
PWTF
5230
®
51
3230
TOTAL
$330
89.70%
100.00%
325
$36
53
54
320
$30
®
$2
3230
5330
..........................................
.... ............
.........
..........................................................
.....................
...................'.-......•.•...,...•.•.•..........................................................................
........
20
32
09
50420
MCDONALD ROAD
BRIDGE#456
Reconstruct bridge
LOCAL
565
30.09% 57
51
$0
51
existing
10.29. 09
P,T
F
PWTF
3151
69.91% 317
53
510
3119
32
$65
5151
TOTAL
3216
100.00% 324
54
$10
5175
33
3218
2/
33
19
43550
COUNTRY CLUB DR.
BRIDGE #163
Reconstruct bridge
LOCAL
396
30.00%
312
55
310
368
51
existing
0.08
09
P,T
F
PWTF
3224
70.00%
328
310
320
5784
32
3224
TOTAL
3320
100.00%
340
515
330
5232
$3
5320
PAGE 7
DAY LABOR CONSTRUCTION ($1,000's) :
TOTAL CONSTRUCTION PROGRAM =
COMPUTED DAY LABOR LIMIT =
TOTAL DAY LABOR CONST. PROGRAM =
$15,182
$800
$323
ANNUAL CONSTRUCTION PROGRAM FOR 2005
YAKIMA COUNTY
CURRENT POPULATION :
DATE RECOMMENDED PROG. SUBMITTED:
DATE OF ENVIRONMENTAL ASSESSMENT:
DATE OF FINAL ADOPTION:
ORDINANCE / RESOLUTION No:
226,000
08/12/04
11/10/04
11/18/04
651-2004
I
T
E
M
6 -YEAR
T.I.P.
ITEM
No.
FC
U L
NA
C S
T.S
ROAD
LOG
NO.
ROAD NAME AND/OR
BRIDGE NUMBER
LOCATION
L
F
U
2005 ESTIMATED EXPENDITURES
BUDGET
PROJECT
DESCRIPTION
MP
FROM
MP
TO
E
N
G
T
H
IMPRV.
TYPE
UTIL.
600E
N
D
I
N
G
FUND
SOURCE
CODE
FUND
SOURCE
AMOUNT
PRELIM.
ENGR.
595.10
RIGHT
OF WAY
595.20
CONSTR.
ENGR.
(CE)
CONSTR.
(CONT.)
CONSTR,
(DAY LAB)
GRAND
TOTAL
541.00
22
•...................
34
09
50900
..........................
MARION DRAIN RD.
BRIDGE #421
`
)$1,000's)
(51,000's)
(01,000's)
($1,000's)
($1,000's)
($1,000's)
($1,000's)
Reconstruct bridge
LOCAL
510
20.00%
510
00
50
00
50
510
existing
12.51
09
P,T
F
BR
540
80.00%
540
$0
50
80
50
040
TOTAL
550
100.00,.
$50
00
50
50
$0
550
..
.....
......................
•
.
23
36
19
23900
COWICHE CANYON RD.
POVVE•RHOU E ROAD.
TO
Reali h Cowiche Canyon Road at
with Powerhouse Road.
LOCAL
$10
16.67%
$10
$0
50
$0
$0
010
MI. AFTER POWERHOUSE
Relocate existing Irrigation
0.00
0.20
0.20
14
G,P,
F
STP(S)
550
83.33%
550
00
50
50
$0
550
.2
RD.
siphon
on Cowiche Canyou Road.
7,0
TOTAL
560
.
� 100.00%
560
50
00
50
$0
$60
PEAR AVE.
Reconstruct gravel, road to
24
37
09
32340
ORCHARD AVE.
TO
standard 30' BST •
C,P,
LOCAL
5176
30.56%
$0
$0
$10
$165
$1
0178
• MIZE RD.
roadway
0.25
2.04
1.79
03
T,W,
F
PWTF
5400
69.44%
50
50
$30
$369
51
0400
0
TOTAL
5576
100.00%
$0
50
$40
5534
$2
$576
25
38
19
SUMMITVIEW AVE.
20530 84TH AVE., N. TO •
Reconstruct gravel road to
30'
C,G,
LOCAL
$155-1
30,69%
$0
T-$0
$10
5144
51 $155
standard paved roadway,
0.00 .
0.44 •
0.44
03
P,T,
F
PWTF
5350
6931%
50
I 50
$30
$319
L__ 51 5350
REST WAY
WO
TOTAL
x55 OS
I 10^ ,II%
�__..__
I 50S]
1
540
0 .._r.
_.
4
5 63
s2 --
...•�_.._.__.�1._..�..--`--
- --.yi
•
--_---
..:...
: •....:
�
: ::-0
•
::T__a�_
----- -
- 26
39
09
31440.
T•Fi_K RD.
DOUGLAS RC.
Reconstruct gravel road to
LOCAL
` CAL
T 575
30.007._
.. $ ...
50
..
SU'
.'.;:
570
_ �___,_
558
_
+51
..
TO
MCCAULEY RD.
standard 30'BST roadway
.
1.34
2.36
1.02
03
P,T,
F
PWTF
5175
I 70.00% •
SO
$14
510
0150
L--_' _5-�-
51 $175
_
0
TOTAL
5250
I 100.00%
50
$20
520
0208
$2 $250
.. .......
. ...
27
40
9
31240
FISK RD.
RODGERSRD.
TO
Reconstruct gravel road to
standard 30'
C,G,
LOCAL
519
31.67%
$3
$2
0
13
51
... $19
DOUGLAS RD.
paved roadway
1.22
1.40
0.18
03
P,S,
F
PWTF
541
68.33%
$7
53
30
530
51
$41 -_
T,W,
TOTAL
560
100.00%
510
05
30
343
$2
$60
... ..................
...... •.......•••'•.'r.'.. •...•........
0
_
28
41
09
35570
42nd. AVE., S.
McCULLOUGH RD.
TO
Reconstruct gravel road to
standard 30' 65T
LOCAL
559
30.11 %
50
$3
$0
052
$58
EMMA LN.
roadway0.00
0.50
0.50
03
P,T,
F
PWTF
5130
69.89%
50
$7
510
5112
$1
$130
O
TOTAL
5186
100.00%
$0
010
510
5164
$2
0186 =
29
42
09
60760
MOUNTAINVIEW RD.
OLD RO R RD,
TO
Reconstruct gravel road to
30'
C,G,
LOCAL
529
100.00'/.
50
50
$0
528
$1
SZy
COUNTY LINE RD., S.
standard paved roadway
1.02
2.04
1.02
03
P,T,
F
PWTF
50
0.00%
00
50
50
00
30
$0
0
TOTAL
329
100.00%
30
50
50
528
51
529
SUNNYSIDE C/L
Reconstruct gravel road to
C,G,
LOCAL
30
43
10
63100
CRESCENT AVE., NW.
TO
SWAN RD.
standard 30' paved roadway
0.81
1.09
0,28
03
P,S,
F
PWTF
$36
384
30,00%
70.00%
30
00
00
SO
00
510
335
373
$1
31
$36
$84
T,W,
TOTAL
5120
100.00%
50
00
510
_
5108
52
$120
..
..
0
31
44
19
33950
83RD AVE., S.
TIETON DR.
TO
Reconstruct gravel road to
standard 30'
C,G,
LOCAL
$29
30.53%
SD
$0
50
$28
...................
51
y29
END OF ROAD
paved roadway
0.00
0.23
0.23
03
P,S,
F
PWTF
368
69.47•/.
30
50
310
$55
01
$66
T,W,
TOTAL
595
100.00%
50
00
510
$83
S2
$95
0
88TH AVE„ S.
Reconstruct road to
32
45
19
33800
CHESTNUT AVE., W.
TO
gravel
30'
C,G,
LOCAL
3345
85 19%
50
30
330
5312
$3
-
96TH AVE., S. VICINITY
standard paved roadway
0.00
0.50
0.50
03
P,5,
F
PWTF
560
14.81%
30
50
50
359
01
5345
$90
T,W,
TOTAL
5405
100,00%
50
00
530
5371
54
5405
O
PAGE 8
DAY LABOR CONSTRUCTION ($1,000's)
TOTAL CONSTRUCTION PROGRAM =
COMPUTED DAY LABOR LIMIT =
TOTAL DAY LABOR CONST. PROGRAM =
$15,182
$800
$323
ANNUAL CONSTRUCTION PROGRAM FOR 2005
YAKIMA COUNTY
CURRENT POPULATION :
DATE RECOMMENDED PROG. SUBMITTED:
DATE OF ENVIRONMENTAL ASSESSMENT:
DATE OF FINAL ADOPTION:
ORDINANCE / RESOLUTION No:
226,000
08/12/04
11/10/04
11/18/04
651-2004
1
T
E
M
6 -YEAR
T.I.P.
ITEM
No.
F C
U L
N A
C S
T.S
ROAD
LOG
NO.
ROAD NAME ANDIOR
BRIDGE NUMBER
LOCATION
-
PROJECT
DESCRIPTION
MP
FROM
MP
TO
L
E
N
G
T
H
IMPRV.
TYPE
-
UFIL
BODE
F
U
N
D
I
N
G
2005 ESTIMATED EXPENDITURES
BUDGET
FUND
SOURCE
CODE
FUND
SOURCE
AMOUNT
($1,000's)
PRELIM.
ENGR.
595.10
51,000's)
RIGHT
OF WAY
595.20
($1,000's)
CONSTR.
ENGR.
(CE)
(51,000's)
CONSTR.
(CONT.)
(51,000's)
CONSTR.
(DAY LAB)
($1,000's)
GRAND
TOTAL
541.00
($1,000's)
90TH AVE., N.
33
46
19
33830
SUMMITVIEW AVE.
TO
CHESTNUT AVE., W.
Reconstruct gravel road to
standard 30' paved roadway
0.00
0.25
0.25
03
C,G,
P,S,
T,W,
O
F
LOCAL
593
54.71%
90
$0
910
982
51
593
PWTF
977
4E29%
$0
90
910
966
51
577
TOTAL
$170
100.00%
90
50
620
5148
52
9170
34
47
19
33780
YAKIMA AVE
..............................
AVE., N.
TO
Reconstruct
gravel88TH
standard 30' paved roadway
0.00
o
LOCAL
918
30.00%
$0
50
$0
517
- 51.
518 •
PWTF
542
70.00%
90
90
50
541
51
542
•liglill
0
100.00%
MM.
50
5'
558
1.111163111111
S60
Reconstruct gravel road to
standard 30' paved roadway
0.00
0.18
..
0.18
03
C,G,
P,S,
T,W,
o
F
LOCAL
580
60.15%
_ 50
50
$10
569
51
$80
35
48
19
33820
BARGE ST., W.
88TH AVE, N.
TO
. END OF GRAVEL RD.
PWTF
$53
39.85%
50
90
SO
552
81
553
TOTAL
9133
100.00%
90
50
910
$121 _J
52
$133
..............................................................................................................
••
•
.
36
49
9
55550
HAWK RD.
HUBBARDS LN. (BIA)
TO
AN
WHITE SW RD., W
Reconstruct gravel road to
standard 30' paved roadway
0.00
,1.00 1
..
0.00
03
C,G,
P,S,
TO, W,
LOCAL
$72
30.00% .
93
S6 -1--
510 ''""310)
563
S72
F . PWTF
5188
70.00%.
S7
514
510
(510)
I 5147
5168
TOTAL$240
°�$20
100.00.°
510'-
- -
(520)
j 5210
i $240
• •
.1'
•
••
37
50
'
09
-
12540
ADOBE WAY
' WENAS RD„ N.
TO
END OF ROAD
Reconstruct gravel road to.
standard 30' paved roadway
0,00
0.51
.0.51
03
C,P,
T,O,
LOCAL
I ,=174
82.38 %
50 •
I :,30
X143
Z1
5374
F
PWTF
$80 •
I 77,624.4
SO
50 -
_
500
I $69
51
980
TOTAL
5454
100.00%
60
50
540
5412
52
5454
....
.....•...•............
38
51
19
11890
LANCASTER RD:
MCGONAGLE RD.
TO
END OF ROAD
Reconstruct gravel road to
standard 30' paved roadway0.56
1.40
0.84 03
C,G,
P,T,
O
F
LOCAL
5475
70.37 %
50
50
540
5432
53
5475
PWTF
5200
29.63%
50
50
$20
5178
52
5200
TOTAL
$675
100,00%
90
50
560
5610
55
_
5675
39
52
9
62550
PERSON RD.
MP 0.17
TO .
ALEXANDER RD., E
Reconstruct gravel road to
standard 30' paved roadway
0.17
0.97
0.80
03
C,G,
P,5,
T,W,
0
F
LOCAL
559
30.26Y°
96
55
$D
947
51
$50
PWTF
5136
69.74%
514
510
910
5101
51
5136
TOTAL
5195
100.00%
520
515
510
5148
$2
5195
-
.......$;
•
40
53
9 .
66500
LIBERTY RD., N.
CARPENTER RD.
TO
ZILLAH DR., E
Reconstruct gravel road to
standard 30' BST roadway
0.00
1,51
1.51
03
C,G,
P,S,
T,W,
0
F
LOCAL
5126
30.00%
90
522
$10
593
.......
$1
5126
5128
PWTF
9294
70.00%
50
553
520
5220
9294
TOTAL
5420
100.00%
50
575
530
5313
52
$420
BEAM RD,
Reconstruct gravel road to
C,G,
LOCAL
562
29.52%
$0
510
50
551
$1
562
41
54
9
66490
CARPENTER RD.
TO
standard 30' BST roadway
0.00
1.03
1.03
03
P,S,
F
PWTF
5148
70,48%
50
525
610
$112
$1
5148 -
LIBERTY RD, N.
T,W,
TOTAL
5210
100.00%
$0
535
510
5163
62
5210
O
-
BEAM RD,
Reconstruct gravel road to
C,G,
LOCAL
538
14.90%
$2
510
S0
$25
51
$38
42
- 55
9
63480
BARKER RD,
TO
standard 30' paved roadway
0.00
0.86
0.86
03
P,S,
F
PWTF
9217
85.10%
513
960
510
5133
51
5217 -
YAKIMA VALLEY HWY VIC.
T,W,
TOTAL
8255
100,001/4
515
$70
510
5158
52
5255
O
-
MABTON SUNNYSIDE RD.
Reconstruct gravel road to
C,G,
LOCAL
564
29.77%
96
57
50
$50
51
$64
43
56
9
60950
WILLOWCREST DR.
TO
WILLOWCREST
standard 30' BST roadway
0.00
1.01
1.01
03
P,S,
F
PWTF
9161
70.23%
914
518
$10
5108
_
51
5151 -
DR.
T,W,
TOTAL
$115
100,00%
$20
525
510
9158
52
9215
0
PAGE 9
DAY LABOR CONSTRUCTION ($1,000's)
TOTAL CONSTRUCTION PROGRAM =
COMPUTED DAY LABOR LIMIT =
TOTAL DAY LABOR CONST. PROGRAM =
$15,182
$800
$323
ANNUAL CONSTRUCTION PROGRAM FOR 2005
YAKIMA COUNTY
CURRENT POPULATION :
DATE RECOMMENDED PROG. SUBMITTED:
DATE OF ENVIRONMENTAL ASSESSMENT:
DATE OF FINAL ADOPTION:
ORDINANCE / RESOLUTION No:
226,000
08/12/04
11/10/04
11/18/04
651.2004
PAGE 10
I
T
E
M
6 -YEAR
T.I.P.
ITEM
No.
-
F C
U L
N A
C S
T.S
ROAD
LOG
N0.
ROAD NAME AND/OR
BRIDGE NUMBER
LOCATION
L
F
U
2005 ESTIMATED EXPENDITURES
BUDGET
PROJECT
DESCRIPTION
MP
FROM
MP
TO
E
N
G
T
H
IMPRV.
TYPE
-
WAIL.
GODE
N
D
1
N
G
FUND
SOURCE
CODE
FUND
SOURCE
AMOUNT
($1,000's)
PRELIM.
ENGR.
595.10
($1,000's)
RIGHT
OF WAY
595.20
($1,000's)
CONSTR.
ENGR.
(CE)
($1,000's)
CONSTR.
(CONT.)
($1,000's
CONSTR.
(DAY LAB)
GRAND
TOTAL
541.00
44
.....•...•........................................
57
9
53050
HARRAH RD.
• ..
FORT RD.
TO
LARUE RD
...........................
Reconstruct gravel road to
(51,000'0)
(31,000'0)
standard 30' BST roadway
C,G,
LOCAL
366
30.00%
50
36
50
359
$1
$66
6.01
7.01
1.00
03
P,S,
F
PWTF
$154
70.00%
30
$14
510
3129
51
5154
T,W,
TOTAL
5220
100.00%
50
520
$10
3188
32
5220
O
45
:•:::.-i
58
:...:.........
9
..
50400
LOLL... ........
LARUE RD.
. . .... . .
LATERAL B RD.
TO
LATERAL C RD.
Reconstruct gravel road to
standard 30' BST roadway
C,G,
LOCAL
$66
30.00%
50
36
50
559
51
•
566
9.67
10.68
1.01
03
P,S,
F
PWTF
5154
70.00%
30
514
310
5129
51
5154
T,W,
TOTAL
5220
100.00%
50
320
310
3188
52
5220
0
•
•
•
..........................
•
OLL..
•
•
..................
•..
46
59
` •....-.
9
50400
•. '
LARUE RD.
LATERAL C RD.
TO
HARRAHRD.
Reconstruct gravel road to
standard 30' BST roadway
C,G,
LOCAL
$33
15.00%
50
53
50
....•rr.'.
111111E31111M
51
•. •... .".:::..
10.36
11.67
1.31
03
P,S,
F
PWTF
5187
85.00%
30
517
$10
5159
51
5®
T,W,
TOTAL
5220
100.00%
50
520
510
51 88
$2
5220
O
.._.:._._
.`. .•
..... ....•..•. ...'.•.'.'r.'.' ..:.. ...
..:.....:•..•...•..•..•...•.......•...•.'.'.'.•.'.'.'.•.'.'.'.•r.•.•..•.•..•..•.•. ... ,.,LOLL
.. L
O L L L O L L
... .. .
47
60
9
52280
DAISY LN.
CAMPBELL RD.
TO
Reconstruct gravel read to
standard 30'
C,G,
LOCAL
518
15.00%
52
55
SO 510 I s1
318'
END OF ROAD
paved roadway
0.00
0.25
'0.25
03
P,5, '
F
PWTF
$102
85.00%
38
525 '
510 658 $1
5102
T,W,
TOTAL
S120
100.00%
510
530
_
510 568- 32
_ 51 _
2 0
LOLL...
:.
... ...........
LOLL. LOLL:..
........
--
--� T .
_,.
0
I
_
-
..... .
-
...
..
LOLL LOLL.. ... ..
................... .,... LOLL
................
.. LOLL LOLL..••
LOLL
• ...........
.. •.. .........
_ _
.-50 - ... ..
61'.
3
52320
ASTER LN
CAMPBELL RD.
TO
RN const:uvt:gravel road to.
standard JO' roadway
OCG
LOCAL
31
I 52
-rt_
$0 '.
$t. _,
f .. si ;_
�'•
END OF ROAD
paved ,'
0.00
0.24
0.24
03
P,S,
F
PWTF .
542
68.85%
$7
54
60
530
$1
i- $42
T,W,
TOTAL
361
100.00%
510
36
$0
343
S2
$6j
--
... LOLL.
.. •LOLL.
.. ...
.......... ..
LOLL. .. LOLL ... ...........
...-... L.. �.... ...�
...
.............
LOLL LOLL
�
...
•�..
................
LOLL..
._. ,_..
...•........................
• .'. ...................
..�
.....
.........................
............. LOLL
.........
LOLL. ......
.. .••
49
62
9
52310
MCCREDY LN. .
WAPATO RD., W.
TO
DAISY LN.
Reconstruct gravel road to
standard 30' paved roadway
0.00
0.28
0.28
03
C,G,
P,S,
T,W,
0
F
LOCAL
.-.'. ...
319
. _.�.
15.20%
.,
32
.. ... �.
$5
�._..., .-
$0
_ ..._, �._
511
_
�$1� � •�_
$19
PWTF
$106
84.80%
38
530
610
557
51
5106
TOTAL
6125
100,00%
610
535
510
568
32
5125
.. ..............•
.......................
............
.................•...•...,..
LOLL ......................................
................
..........
LO•L
LOLL...
LOLL.
.......................
......................................................................
50
............
63
9
...
51520
. ..
SKONE WY.
...................................
WAPATO RD., 5.
TO _
DOVE LN.
Reconstruct gravel road to
standard 30' paved roadway0.00
0.25
0.25
03
C,G,
P,S,
T,W,
0
F
LOCAL
$18
30.00%
62
51
50 514
61
518
PWTF
$42
70.00%
53
34
30 534
51
542
TOTAL
$60 .
100.00%
55
55 .
50 548
52
560
. .•.................
. . .•.-OL..
..........................
•.......•.•....•.......
• ..
OLL. ................................•...................•..............
.................................................
...........................................................................
LOLL. LOLL.. ... LOLL
. . •LOLL.. ......
. ...... LOLL
..............
..........
....
LOLL .
..
.. ..
-
51
64
19
52740
SOUTH ST.
WAPATO RD., S.
TO
Reconstruct gravel road to
- standard 30' roadway0.00
-
C,G,
LOCAL
59
15.00%
51$9
®®®
.............
511
LOLL..
END OF ROAD
paved
0.23
0.23
03
P,S,
F
PWTF
551
85.00%
54
$5t
T,W,
TOTAL
560
100.00%
55
510
50 543 52
560
0
•LOLL
••••••••••••••••'•'•'•'•••''•''•••'
5••'•''••'•'. .•..•... LOLL .....:..........
52
65
' 19
52720
NORTH ST.
WAPATO RD. S.
TO
Reconstruct gravel road to
standard 30' paved roadway
0.00
C,G,
LOCAL
68
14.55%
$1
•
52
•
50 54
S1 �
S8
END OF ROAD
0.23
0.23
03
P,S,
F
PWTF
547
85.45%
34
68
50 534
51
547
T,W,
TOTAL
555
100.00%
65
610
30 $38
52
555
LOLL .................
LOLL
...
O
53
66
9
64640
WOODIN RD., W.
SCOON RD.
TO
Reconstruct gravel road to
standard 30' roadway
C,G,
LOCAL
$44
14.92%
33
511
30 529
$t
$44
MAPLE GROVE RD.
paved
0.00
1.01
1.01
03
P,5,
F
PWTF
5251
85.08%
517
$64
_
510 5159
51
5251
T,W,
TOTAL
5295
100.00%
520
575
510 $188
52
5295
.. ............
.....................
LOLL..
0
.....................
-.�.......�..�.�.......
54
67
9
24350
PIONEER WAY
SUMMITVIEW RD.
TO
Reconstruct gravel road to
standard 30' roadway
C,G,
LOCAL
680
...............................................
14.95%
68
61
510 360
$i
..
580
COWICHE MILL RD.
paved
0.00
2.81
2.61
03
P,S,
F
PWTF
5455
85.05%
$42
$4
$30 5378
51
5455
T,W,
TOTAL
3535
100.00%
550
35
540 $438
52
5535
O
PAGE 10
DAY LABOR CONSTRUCTION (51,000's) :
TOTAL CONSTRUCTION PROGRAM=
COMPUTED DAY LABOR LIMIT =
TOTAL DAY LABOR CONST. PROGRAM=
$15,182
$800
$323
ANNUAL CONSTRUCTION PROGRAM FOR 2005
YAKIMA COUNTY
CURRENT POPULATION :
DATE RECOMMENDED PROG. SUBMITTED:
DATE OF ENVIRONMENTAL ASSESSMENT:
DATE OF FINAL ADOPTION:
ORDINANCE / RESOLUTION No•
226,000
08/12/04
11/10/04
11/18/04
•
PAGE 11
1
T
6 -YEAR
T.I.P.
F C
U L
ROAD
ROAD NAME AND/OR
L
E
F
U
•
2005 ESTIMATED EXPENDITURES
BUDGET
E
M
ITEM
No.
N A
C S
T.S
LOG
NO.
BRIDGE NUMBER
LOCATION
PROJECT
DESCRIPTION
MP
FROM
MP
TO
N
G
T
H
IMPRV.
TYPE
UTIL.
BODE
N
ID
I
N
0
FUND
SOURCE
CODE
FUND
SOURCE
AMOUNT
PRELIM.
ENGR.
595.10
RIGHT
OF WAY
595.20
CONSTR.
ENGR.
(CE)
CONSTR.
(CONT.)
CONSTR.
(DAY LAB)
GRAND
TOTAL
541.00
SOUTH END OF BST
Reconstruct gravel road to
($1,000's)
($1,000's)
($1,005's)
(51,000's)
__151,000's)
($1,000's)
($1,000's)
55
68
09
15500
NILE RD.
TO
standard 30' BST roadway
1.55
LOCAL
520
30.30 %
512
$8
$0
30
$0
320
NORTH END OF BST
4.06
2.51
03
P 1',
F
PWTF
546
69,70%
528
$18
50
50
$0
$46
0
TOTAL
566
100.00%
$40
526
50
SO
30
366
56
69
19
63060
RIVERSIDE AVE., W.
SWAN RD. -
TO
Reconstruct gravel road to
standard 30'
standardroadway
0.41
C,G,
LOCAL
55
33.33%
$5
50
50
50
S0
$5
SUNNYSIDE CITY LIMITS
paved
0.79
0.38
03
P,T,
F
PWTF
E10
66.67%
510
$0
$0
50
50
510
TOTAL
515
100.00%
$15
50
50
50
50
515
...............
•
57
70
. 19
63140
EDISON RD., W.
SWAN....
RD.
4 . TO
Reconstruct ravel road to
standard 30' paved roadway
0.00
C,P,
LOCAL
559
............
30.26%
.. ..........................
$5
56
50
.......
$47
.........•..•.•.•..
$1 $59
.4 MILES AFTER SWAN RD.
0.40
0.40
03
T,W,
F
PWTF
5138
69.74%
$10
514
510
5101
51 3136
0
TOTAL
5195
3700.0014
515
520
510
5148
52 $195
_
MCCAULEY RD........................
econstncct gravel road to
R0.00
C,G,
LOCAL
58
71
9
31840 _
KNOX RD.
TO
standard 30' paved roadway
$5
33.33%
53
52 $0
SO
50 $5
WIDE HOLLOW RD.
' '..
0.20
.0.20
03
P,S,
F
PWTF
$10
66.67%
. 57
53 50
50
J
;0
T,W,
TOTAL
515
. 100.00%
510
SO
$5 �__
,.
..Q
$p
510
--- --'
x15'
0
_____t15
DOUGLAS
Reconstruct
.. ..
'-j
..
•
-
•
.....$9...
•
• ...
59
72
9
.31790
. MCCAULEY RD.
RD.
TO
gravel road to
Standard 30' paved roadway
' 0.00
C,G
LOCAL
j $18......
=30.00%
.-- 59..•
$o'......
-
$0..
so
__ _
WIDE HOLLOW RD.
.
1.28
1.28
03
P,S,
F
PWFF
542
70.00%
$21
521
50
.
$0
$42 -�
.
•
T,W,
0
TOTAL$0
560
100.00 %
530
$30
50
50
50
560
•
80
....
73
..........
19
64810
•
BAGLEY DR. •
--
HILL AVE.
TO30.00%
NE
BECKNER RD.
Reconstruct gravel road to
standard 30' paved roadway
0.00
0.33
0.33
03
C,G,
P,T,
0
LOCAL
;6
`' 53
$ 3
$3
50
$0
$D
•
$fi
F
PWTF
$14
70.00%
57
57
$0
$0
50
514
TOTAL
520
. 100.00%
510
510
_ 30
50
_
50
520
MCCLAIN
61
.................
75
19
64690
BECKNER RD.
DR.
TO
Reconstruct ravel road to
standard 30' paved roadway
0.18
0.37
C,G,
LOCAL
$6
30.00%
53
$3
_ $0
50
$0
$8
ROUSE RD.
0.19
03
P,S,
F
PWTF
$14
70.00%
57
37
SO
SO
_
50
514
T,W,
TOTAL
$20
100.00%
510
510
_ $0
50
50
520
-
-
-
0 -
-
MCCLA.I
.
62
76
19
64860
HILL AVE.
N R.
TO
Reconstruct gravel road to
standard 30' paved roadway
0.00
0.12
C,G,
LOCAL
$5
33.33 %
$3
52
;D
50
BAGLEY DR.
0.12
03
P.S.
F
PWTF
510
86.67 %
$7
53
30
50
510
TOTAL
515
100.00%
510
55
50
50
$0
815
0
83
77
19
20950
78TH AVE., N.
SUMMITVIEW AVE.
TO
Reconstruct gravel road to
standard 30' paved roadway
0.00
0.10
0.10
C,G,
LOCAL
55
31.25%
$3
52
50
$0
SO
S5
SKYLINE WY.
03
P,S,
F
PWTF
511
68.75%
57
$4
50
50
50
$11
T,W,
TOTAL
516
100,00%
510
56
50
50
50
516
0
SUMMITVIEW
64
78
19
20870
80TH AVE., N.
AVE
TO
Reconstruct gravel road to
standard 30' paved roadway
0.00
0.15
C,G,
LOCAL
54
40.00%
52
52
$0
$0
' ' ' ' '
$o
' ' ' S4
POPLARVIEW WAY
0.15
03
P,S,
F
PWTF
56
80.00%
33
53
_ 30
50
50
T,W,
TOTAL
510
100.00%
55
55
50
30
SO
58
$10
65
79
19
20980
SKYLINE WAY
76TH AVE., N.
TO
Reconstruct gravel road to
standard 30' paved roadway
0,00
LOCAL
52
20.00%
31
51
50
50
50
77TH AVE N.
0.06
0.06
03
C, P,
F
PWiF
58
80.00%
54
54
SD
$O
50
$2
58
T,0
TOTAL
510
100,00%
55
55
50
50
50
$10 -
PAGE 11
DAY LABOR CONSTRUCTION ($1,000'5) :
TOTAL CONSTRUCTION PROGRAM =
COMPUTED DAY LABOR LIMIT =
TOTAL DAY LABOR CONST. PROGRAM =
$15,182
$800
$323
ANNUAL CONSTRUCTION PROGRAM FOR 2005
YAKIMA COUNTY
CURRENT POPULATION
DATE RECOMMENDED PROG. SUBMITTED:
DATE OF ENVIRONMENTAL ASSESSMENT:
DATE OF FINAL ADOPTION:
ORDINANCE / RESOLUTION No:
226,000
00/12/04
11/10/04
11/18/04
651-2004
1
T
E
M
6 -YEAR
T.I.P.
ITEM
No.
F C
U L
N A
C 5
T.S
ROAD
LOG
N0.
ROAD NAME ANDIOR
BRIDGE NUMBER
LOCATION
PROJECT
DESCRIPTION
MP
FROM
MP
TO
L
E
N
0
7
H
IMPRV,
TYPE
UTI.
600E
F
U
N
D
I
N
G
FUND
SOURCE
CODE
FUND
SOURCE
AMOUNT
(51,OOo's)
2005 ESTIMATED EXPENDITURES
BUDGET
PRELIM.
ENGR.
595.10
(51,Oo0's)
RIGHT
OF WAY
595.20
($1,000's)
CONSTR.
ENGR.
(CE)
(51,000's)
CONSTR.
(51,000's)
(CONT.)
CONSTR.
(DAY LAB)
($1,000's)
GRAND
TOTAL
541.0'
� (51000's)
66
80
09
20970
POPLARVIEW WAY
LINCOLN AVE., W.
TO
END OF ROAD
Reconstruct gravel road to
standard 30' paved roadway
0.00
0.33
0.33
03
C,P,
7,0
F
LOCAL
$5
14.29%
52
53
50
50
50
55
PWTF
630
85.71%
513
517
60
$0
SO
530
TOTAL
635
100.00%
515
520
50
50
50
535
67
81
19
20770
80TH AVE., N.
ENGLEWOOD CREST DR.
• TO
" ENGLEWOOD CREST DR.
Reconstruct gravel road to
standard 30' paved roadway
0.02
0.13
0,11
03
C,G,
P,S,
7,W,
O
F
LOCAL
53
30.00%
$2
51
50
'_
$0
$0
$3
PWTF_
57
$10
70.00%
100.00%
53
55
54
55
50
50
50
50
50
50510
57
TOTAL
68
82
19
20650
ENGLEW000 CREST DR.
VIEWCREST PL
- TO
BLUE HILLS PL
Reconstruct gravel road to
standard 30' paved roadway
0.24
0.63
0.39
03
C,G,
P,5,
T,W,
0
F
LOCAL
$12
30.00%
56
56
50
50
SO
612
PWTF
$28
540
70.00%
100.00%
514
520
514
520
50
$0
SO
50
50
50
528
540
_
TOTAL
69 83
19
20810
VIEWCREST WAY
VIEWCREST PL
TO .
VIEWMONT DR.
Recr•nstruct gravel road to
standard 30' paved roadway
i _
0.02
0.11
0.09
03
C,G,
P,S,
T,W;
F
i
LOCAL
52
20.00%
51
51 SO" .
_'
$0 _
60
SO 52
PWTF-
58
80.00% .
54
54 50
50 -58
TOTAL 510
100.00%_
55
- - .55 _ _SO
$0
50 - -'
51_--
• 70
u
' 'rte-'
•
•
"
7 $2
84
19
-
20800 VIEWCREST WAY
VIEWMONT DR.
70 - "
84TH AVE., N.
i Reconstruct gravel road to
standard 30' paved roadway
'
-
. 0.00.
.0.14
0.14
. 03
C,G,
P,5,
' T,W,
O
F
-'
LOCAL'
-1
20.00:e
. 51
51 _
__ 30
50
I 50 52 i
PWTF 38
80A0%
'54
54 •
50 -
. $0
I 50 58
TOTAL 1 $10
100.00%-
$5
� SS
60 -
50
I 50 510'
it
71
85
19
20830
VIEWMONT DR.-
VIEWCREST WAY
TO
END OF ROAD
Reconstruct gravel road to
standard 30' paved roadway
0.00
0.27
0.27
03
C,G,
P,S,
7,W,
O
F
LOCAL
53
20.00%
52
51
54
50
$0
50
50
$0
50
53
S12
PWTF
$12
80.00%
$8
TOTAL
$15
100.00%
510
55
50
$0
50
S15
72
86
9
33000
HUGHES RD.
GILBERT RD.
TO
END OF ROAD
Reconstruct gravel road 10
standard 30' paved roadway
0.00
0.30
0.30
03
C,G,
P,S,
T,W,
0
F
LOCAL
53
20.00%
51
52
50
50
50
53
PWTF
612
80.00%
54
58
50
50
50
512
TOTAL
515
100.00 %
55
510
50
50
50
E15 -
73
87
19
13110
SHERRY AVE.
OLD NACHES HWY.
TO
END OF ROAD
Reconstruct gravel road to
standard 30' paved roadway
0.00
0.29
0.29
03
C,G,
P,S,
T,W,
0
F
LOCAL
54
33.33%
52
52
50
50
SO
S4
PWTF
58
86.67%
54
54
50
50
50
58
TOTAL
512
100.00%
56
56
50
50
50
512
...................................................
..•
....................................•••
•
•
•
74
88
9
13450
BERTSCH CIRCLE
GLEED RD., E.
TO
BERTSCH CIRCLE
Reconstruct gravel road to
standard 30' paved roadway
0,00
0.23
0.23
03
C,G,
P,S,F
T,W,
O
LOCAL
52
20,00%
$1
51
50
50
50
52
PWTF
58
80.00%
54
S4
50
50
SO
S8
_
TOTAL
510
100.00%
55
55
50
50
50
510
.
..
75
89
9
13550
HALL RD.
MAPLEWAY RD. VICINITY
TO
END OF ROAD
Reconstruct gravel road to
standard 30' paved roadway
0.06
0.52
0.47
03
C,G,
P,S,
T,W,
0
F
LOCAL
59
15.00%
52
$7
SO
50
50
59
PWTF
551
85.00%
58
543
$0
50
50
$51
TOTAL
560
100.00%
110
$50
50 _
50
S0
§60
76
90
9
55230
1ST ST., WHITE SWAN
LOCUST AVE.
TO
BIRCH AVE.
Reconstruct gravel road to
standard 30' paved roadway
0.00
0.16
0.16
03
C,G,
P,5,
T,W,
O
F
LOCAL
52
20.00%
51
51
50
SO
S0
S2
PWTF
S8
80.00%
54
$4
50
50
S0
$8
TOTAL
510
100.00%
55
55
50
58
50
510
PAGE 12
•
DAY LABOR CONSTRUCTION ($1,000's) :
TOTAL CONSTRUCTION PROGRAM =
COMPUTED DAY LABOR LIMIT =
TOTAL DAY LABOR CONST. PROGRAM =
$15,182
$800
$323
ANNUAL CONSTRUCTION PROGRAM FOR 2005
YAKIMA COUNTY
CURRENT POPULATION:
DATE RECOMMENDED PROG. SUBMITTED:
DATE OF ENVIRONMENTAL ASSESSMENT:
DATE OF FINAL ADOPTION:
ORDINANCE / RESOLUTION No:
226,000
08/12/04
11/10/04
11/18/04
651-2004
I
T
E
M
6 -YEAR
T.I.P.
ITEM
No.
F C
U L
N A
C S
T.S
ROAD
LOG
NO.
ROAD NAME AND/OR
BRIDGE NUMBER
LOCATION
PROJECT
DESCRIPTION
MP
FROM
MP
TO
L
E
N
G
T
H
IMPRV.
TYPE
—
LLTIL.
—CODE
F
U
N
D
I
N
G
FUND
SOURCE
CODE
FUND
SOURCE
AMOUNT
(51,000's)-
2005 ESTIMATED
BUDGET
EXPENDITURES
PRELIM.
ENGR.
595.10
(51,000'5)
RIGHT
OF WAY
595.20
(51,000's)
CONSTR.
ENGR.
(CE)
($1,000's)
CONSTR.
(CONT.)
($1,000's)
CONSTR.
(DAY LAB)
$1,000's)
GRAND
TOTAL
541.00
77
91
19
61980
PENN AVE
MABTON SUNNYSIDE RD.
TO
ALLEN RD. VICINITY
Reconstruct gravel road to
standard 30' paved roadway
0.00
0.36
0.36
03
C,G,
P,S,
T,W,
0
F
LOCAL
5140
50.00%
50
50
510
5129
$1
5140
5140
5280
PWTF
5140
50.00%
50
50
510
5129
_
51
TOTAL
5280
100.00%
90
50
520
5258
$2 _
78
92
19
43750
. CANYON RD.
LOCUST AVE
TO
KILGARY WAY
Reconstruct gravel road toC,G,
standard 30' paved roadway
0.00
0.69
0.69
03
P,S,
T,W,
O
F
LOCAL
518
30.00%
58
610
50
50
$0
$18
542
560
PWTF
542
70.00•/.
917
525
50
50
50
TOTAL
$60
100.00%
525
535
50
50
50
79
93
19
44400
HILLCREST DR., E.
HILLCREST DR.
TO
END OF ROAD
Reconstruct gravel road to
standard 30' paved roadway
..
0.00
0.23
0.23
03
C,G,
P,S,
T,W,
O
F
LOCAL
54
18.18V.
92
52
50
50
50
54
518
522
PWTF
518
81.82%
59
59
50
50
50
TOTAL
522
100.00%
511
511
50
50
50
80
94
19
11450
RUSHMORE RD., N '
END OF ROAD
TO
RUSHMORE RD.; S. -
Reconstruct gravel road to
standard 30' paved roadway
0.00 .
• 0.22
0.22
03
C,G,
P,8,
T,W,
F
LOCAL
56 30.00%
53 •
53
SO
SO $O - 56
PWTF
514 70.00%
97
57
40
50 50 - 574
TOTAL -
520. 100.00%'
510 510
50
'50 SO . 520
-F
—
... ........• .• .. ........-
•• • •
•
.......... ..
LOCAL. —56
17.14/
92
54
_2...,..
— 50
:50
50'
' SOL -1___.`
III— SO5299
SO
-
•
535
81
95
9 i 12500
GRABERRD: .
WENAS RD.; N.
TO
BRATHOVDE RD.
Reconstruct gravel road W
standard 30' paved roadway
0.00
0.39
0.39'
`03
C,G,
P,S,
T,W,
O
F
PWTF
529
82.86%
58
521
TOTAL
535
100.00%
510
525
50
50
82
96
8
68440
WAMPLER RD:
•
BUENA LOOP RD.
TO
PALEN RD. VICINITY
Reconstruct gravel road to
standard 30' paved roadway
0.00
0.42
0.42
03
C,G,
P,S,
T,W,
0
F
LOCAL
54
1C00%
$2
52
50
50
50 W
54
$21
525
PWTF
521
84.00%
$8
513
50 _
50
50
TOTAL
$25
100.00%
510
515
50
50
$0
83
97
9
61420
MURRAY RD
SNIPES PUMP RD.
- TO
WENDELL PHILLIPS RD.
Reconstruct gravel road to
standard 30' paved roadway
1.04
2.07
1.03
03
C,G,
P,S,
T,W,
O
F
LOCAL
58
16.00%
53
55
50
50
50
58
542
550
PWTF
542
84,00%
517
525
SO
50
50
TOTAL
550
100.00%
520
530
90
50
SO
84
98
9
66980
CENTENNIAL DR., W.
SCHOOLEY RD.
TO
YAKIMA VALLEY HWY VIC.
Reconstruct gravel road to
standard 30' paved roadway
0.00
0.30
0.30
03
C,G,
P,S,
T,W,
O
F
LOCAL
56
17.14%
51
55
50
50
SO
58
PWTF
529
82.86%
54
525
530
50
50
50
50
SO
50
529
535
TOTAL
535
100.00%
55
.•.•.•.•.•....•...•..•.•.•.•.•.•.•.•.•.•..•..•..•.•..•..•.•.•.•.•..•..._...•.•.•.•.•.•
.•.•r.•. •.•. . •. •. •. •.•.•.48.89...:..,}:.:........:.:.:.:...:.....•.•.•...•.•.•.•.•.•.'.'.�2f,d48.•.•.•. •.•r.•.v.•.•. •. .'.•.'S1',875.... •S1, 91. •.•.•.,.'St,3, :•.,..'.i14�859•: •:• •: : •: $g27:•:•i:•,.,...... .
08.
PAGE 13
DAY LABOR CONSTRUCTION (51,000's) :
TOTAL CONSTRUCTION PROGRAM =
COMPUTED DAY LABOR LIMIT =
TOTAL DAY LABOR CONST. PROGRAM =
$15,182
$800
$323
ANNUAL CONSTRUCTION PROGRAM FOR 2005
YAKIMA COUNTY
CURRENT POPULATION:
DATE RECOMMENDED PROG. SUBMITTED:
DATE OF ENVIRONMENTAL ASSESSMENT:
DATE OF FINAL ADOPTION:
ORDINANCE / RESOLUTION No:
226,000
08/12/04
11/10/04
11/18/04
651-2004
I
T
E
M
8 -YEAR
T.I.P.
ITEM
No.
F C
U L
N A
C S
T.S
ROAD
LOG
NO.
ROAD NAME AND/OR
BRIDGE NUMBER
LOCATION
PROJECT
DESCRIPTION
MP
FROM
MP
TO
_
L
E
N
G
T
H
IMPRV.
TYPE
-
UT -1L
-CODE
FUNDED
F
U
N
D
1
N
G
FUND
SOURCE
CODE
ARTERIALS
FUND
SOURCE
AMOUNT
_ ($1,000's)
2005 ESTIMATED EXPENDITURES
BUDGET
PRELIM.
ENGR.
595.10
(51,000's)
RIGHT
OF WAY
595.20
(51,000'5)
50
CONSTR.
ENGR.
(CE)
(51,000.5)
50
CONSTR.
(CONT.)
(51,000'5)
_ 50
CONSTR.
(DAY LAB)
(51,000's)
GRAND
TOTAL
541.00
(51,000'5)
.
_,
- - _
LOCALLY
50
50
_ 00
54
50
51,026
LOCAL MATCH FOR ARTERIALS /
GRANTS
51,026
5119
5190
550
5663
LOCAL MATCH FOR PWTF BRIDGE
5261
$30
57
520
5201
53
5261
LOCAL MATCH FOR PWTF ROAD 1 .
5331
50
50
520
5309
52
5331
LOCAL MATCH FOR PWTF ROAD 2
_
52 357
_
592
5135
5150
51,892
588
52 357
LOCAL MATCH FOR PWTF ROAD 3
5447
541
574
520
5303
$9
5447
LOCALLY
FUNDED ACCESS ROADS
FOR LOCAL ACCESS ROADS
$0
53,135
50
5133
$0
5209
50
5190
50
52,504
50
$99
51
SO
53 435.
- 5250
TOTAL
LOCALLY FUNDED SAFETY,.,
PRESERVATION, AND RID PROJECTS
5250
$42
-
516
' 520
$171 ,
TOTAL LOCAL FUNDS 54,672 -
- $324 -
5422 .^___
280
53.539
5107
54 612
PAGE 14
DAY LABOR CONSTRUCTION ($1,000's) :
TOTAL CONSTRUCTION PROGRAM=
COMPUTED DAY LABOR LIMIT =
TOTAL DAY LABOR CONST. PROGRAM =
$15,182
$800
$323
ANNUAL CONSTRUCTION PROGRAM FOR 2005
YAKIMA COUNTY
CURRENT POPULATION : 226,000
DATE RECOMMENDED PROG. SUBMITTED: 08/12/04
DATE OF ENVIRONMENTAL ASSESSMENT: 11/10104
DATE OF FINAL ADOPTION: 11/18/04
ORDINANCE! RESOLUTION No: 651-2004
1
T
E
M
6 -YEAR
T.I.P.
ITEM
No.
F C
U L
N A
C S
T.8
ROAD
LOG
NO.
ROAD NAME AND/OR
BRIDGE NUMBER
LOCATION
PROJECT
DESCRIPTION
MP
FROM
MP
TO
L
E
N
G
T
H
IMPRV.
TYPE
—
UTIL
-CODE
F
U
N
D
1
N
G
FUND
SOURCE
CODE
FUND
SOURCE
AMOUNT
(31,000'5)
2005 ESTIMATED EXPENDITURES
BUDGET
PRELIM.
ENGR
595.10
(51,000'5)
RIGHT
OF WAY
595.20
(51,000'5)
CONSTR.
ENGR.
(CE)
($1,000's)
CONSTR.
(CONT.)
($1,000's)
CONSTR.
(DAY LAB)
($1,000's)
GRAND
TOTAL
541.00
(51000's)
'
'
FUNDED PROJECT TOTALS.
•
PWTF BRIDGE
§605
570
516
550
5463
56
5605
PWTF ROAD 1
$750
50
50
560
$688
32
3750
PWTF ROAD 2
32,695
5204
5314
5170
51,839
3168
32,895
51,840
PWTF ROAD 3
51,840
5195
3402
390
$1,144
$9
PWTF - TOTAL
55,890
3469
3732
3370
54,134
5185
55,890
51,770
RAP
51,770
3359
338
3110
$1,254
$9
RID
STP(C)
.5166 •
54C
50
310
3116
50
$168
STP(E)
.__.�
1
51
_
STP(S)
5164
550
$13' .
310 .
390 '
3.154
STP(R)
52,342
50
5198
5180
$1,957
$7
$2,342"
STP(U)
$370
30
3370
$0
30
30
5370 '
BR
33,737
3487
5250 '_
5250
— 52,750
50
33 737
IRR (Fed)
30
50
50
30
50
50
50
WSDOT
50
50
50
30
30
$0
50
TSNS
AIP
5606
578
5528 _
50
30
30
3608
TPP
5906
$10
5540
330
5320
38
5906
OTHER
325
525
30 _
50
50
50
525
CAPP
5800
$33
30
360
3699
58
5800
TOTAL
321,448
51,875
53,091
51,300
314,859
5323
321 448
2005 MAINTENANCE EXPENSE
58,325
Road Levy
38 325
2005 SPECIAL MAINTENANCE
50
Road Levy
S0
PAGE 15