Loading...
HomeMy WebLinkAboutR-2005-069 Washington state Public works Trust Fund Loan applicationA RESOLUTION RESOLUTION NO. R-2005- 69 to authorize the City Manager to execute all necessary documents to complete and submit an application for a loan from the Washington State Public Works Trust Fund in the amount of $1,995,630 for the replacement of the City of Yakima's Ranney Well, and, if the loan application is approved, to execute all necessary certifications, agreements and other documents to complete the loan transaction. WHEREAS, the City of Yakima recognizes that the provision of infrastructure is important to all residents and businesses of the community; and WHEREAS, in the 2004 Water System Plan Update an evaluation of the domestic water system identified deficiencies in the water supply for the City of Yakima, including the need for a new water supply well to replace the Ranney Well; and WHEREAS, the City has the necessary ground water right for a new supply well; and WHEREAS, replacement of the Ranney Well will help correct the deficiencies identified in the aforementioned plan to optimize the water supply, meet the domestic water supply needs for Yakima, and increase the reliability of the City's water supply system; and WHEREAS, these improvements are consistent with both the 2004 Cost of Service and Rate Study and the City's Capital Improvements Plan (CIP); and WHEREAS, the Washington State Public Works Trust Fund has made low-interest loan funds available for the construction and repair of water utilities; and WHEREAS, the City will generate local funds from the Water CIP budget and reserves to be used as a local match for a Public Works Trust Fund loan in the amount of $352,170; and WHEREAS, the amount of local match funds provided will afford to the City a generous interest rate of 0.5% on the $1,995,630 loan; and WHEREAS, based on the foregoing, the City Council has determined that it is in the best interest of the City to apply for funding from the Washington Public Works Trust Fund to replace the City's Ranney Well, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized and directed to execute all necessary documents to complete and submit an application for a loan from the Washington State Public Works Trust Fund in the amount of $1,995,630 for the replacement of the City of Yakima's Ranney Well and, if the loan application is approved, to execute all necessary certifications, agreements and other documents to complete the loan transaction. ADOPTED BY THE CITY COUNCIL this 3`d day of May, 2005 ATTEST: City Clerk aul P. George, Mayor Washington State Public Works Board Public Works Trust Fund Loan Application Packet 2005-2006 Section 1: APPLICANT INFORMATION APPLYING FOR: ❑ Planning ❑ Pre -Construction Borrower: (Check Only One) El Construction ❑ Emergency City of Yakima, Water/Irrigation Division Municipal Corporation Agency (MCAG) Number: Federal Tax ID #: Street Address: Mailing Address: State: County: 8 5 9 11 - : 6: 0 0 1 2301 Fruitvale Blvd. 2301 Fruitvale Blvd. Yakima WA Zip Code: Yakima Congressional District: 4ffi Legislative District(s): 14th Has the local government experienced severe fiscal distress resulting from a natural disaster or emergency public works need in the past five years? ❑ YES I1 NO If "Yes," describe the event, when it occurred, and the fiscal distress it caused. Section 2: SYSTEM INFORMATION Primary system affected by this project. (Check only one) • Bridge • Road Q Domestic Water • Storm Sewer • Sanitary Sewer • Solid Waste/Recycling Population within jurisdiction: Contact Person: Street Address: Mailing Address: Telephone: Email Address: 79,500 Percent affected by this project: 82% Dave Brown 2301 Fruitvale Blvd. Yakima, WA 98902-1225 (509) 575-6204 FAX: (509) 575-6187 dbrown@ci.yakima.wa.us Section 3: PROJECT INFORMATION Project Title: Groundwater Well Scope of Work: Describe in detail what will be done as part of this project. • Conduct study to determine exact location for well, including hydrogeology and distribution system analysis and preparation of drilling bid specifications. • Design of well including pump and building • Drilling well, installing casing and screens • Installing pump • Building new pump house • Mechanical and electrical connections • Telemetry connections • Connection to water distribution system • Install Disinfection • Install Fluoride • Backup Generator • Treatment for taste & odor and/or iron & manganese • Define Wellhead Protection area and modify Wellhead Protection Program • Decommission Ranney Well Proposed Performance Measure (For Construction, Pre -Construction, and Emergency applicants only): Describe how the success of the project will be measured. Be sure to identify how the change will be measured, the standard against which the change will be noted, the amount of change that is expected, and when the change will have occurred. The project success will be measured by the well production of 4.3MGD of domestic water by 8/2007 that meets or exceeds all current drinking water standards. Attach Project Map (required) Total Project Cost: PVVTF Loan Request: $2,347,800.00 $1,995,630.00 General Project Information: Does this project acquire, expand, improve, or renovate a public water system(s) that is in violation of health and safety standards or does it cover the cost of extending service to such a system(s). Does the financing or development of the project involve any other jurisdiction? Project Schedule ❑ Yes Q No ❑ Yes Q No Indicate the month and year when the activities were or will be completed. For Pre -Construction Applications, please limit schedule to Pre -Construction Activities. For Planning Applications, list activities in "Other" categories below. Activity Engineering Report Environmental Review Land/ROW Acquisition Current Status Complete, WSP Update 3/2004 Completion Date Complete N/A Permits Obtained In Progress Public Involvement/Information Complete, WSP Update 4/2005 / 3/2004 Preparation of Bid Documents Not Started 10/2006 a Award Construction Contract F Start Construction Complete Construction Project in Use Other: Transfer Water Right Other: Other: Other: Not Started Not Started Not Started Not Started In Progress 11/2006 1/2007 6/2007 8/2007 9/2005 Project Costs For Pre -Construction Applications, please limit cost estimates to pre -construction activities. For Planning Applications, list costs in "Other" categories below. Engineering Report Environmental Review Land/ROW Acquisition Permits Public Involvement/Information Bid Documents Construction Other Fees Contingency (20%) Other: Wellhead Protection Program Other: Decommission old well Other: Other: TOTAL ESTIMATED COSTS $ 20,000 $ 5,000 $0 $5,000 $ 1,500 $130,000 $ 1,770,000 $ $ 386,300 $ 20,000 $ 10,000 $ $ $ 2,347,800 Project Financing Type of Fundin Source Amount Grant #1 Grant #2 Grant #3 Total Grants $1, 995, 630.00 This PWTF Request PWB Other Loan #1 Other Loan #2 Total Loans Local Revenue $1, 995, 630.00 Rates & Reserves $352,170.00 Source #1 Source #2 Source #3 Total Local Revenue $352,170.00 Other Funds Total Funding $2,347,800.00 Progra Construction Minimum of 5% Local Match linked to Interest rate -hate _ rm 15% Local Match ='/2% Interest Rate 10% Local Match = 1% Interest Rate II5% Local Match = 2% Interest Rate Minimum of 5% Local Match linked to Interest rate Pre -Construction Eme Plan . 15% Local Match =1/2% Interest Rate 10% Local Match = 1% Interest Rate 5% Local Match = 2% Interest Rate rgency No Match Required No Match Required 4% Interest Rate 20 years or life of the improvement, whichever is less 5 years (extended up to 20 years if construction funding is secured by the second loan repayment date) 20 years or life of the improvement whichever is Tess 0% Interest Rate 6 Years Solid Waste/Recycling 1111. Section 4: PROJECT NEED/SOLUTION Construction and Pre -Construction (Total Points = 40) Not Scored for Planning and Emergency Applications, but you are required to fill out Section 4. A. abject Category (6 points maximum for Construction and Pre -Construction) Identify the category (les) of the system(s) affected by the proposed project. (Check all that apply.) Bridge/ Sew • Principle Arterial El Supply/Source-Primary ■ Treatment • • Minor Arterial ■ Supply/Source-Secondary • Interceptor/Trunk Line ■ Final Disposal • Major Collector El Treatment • Pump/Lift Station • Minor Collector ■ Storage • Collector • Local/Other ■ Transmission • Telemetry/Equipment n Distribution • Conservation/Other n Telemetry/Equipment • Conservation/Other Stoewer • Storage/Detention • Waste Reduction/Recycling • Treatment ■ Remedial Action • Interceptor/Trunk Line ■ Final Disposal • Collector • Transfer Station • Other • Other 1. For Construction A Readiness -To -Proceed Permits approved 0 Engineering/design complete 0 Project is in concept stage EPOEMINOWnstRIMMIPPIIIMMEMIIIIIIME Readiness -To -Proceed Project will get permits approved 0 Project will complete engineering/design Project is in approved plan Project Need and Solution The City of Yakima currently serves a population of approximately 65,000. The current normal source of domestic water supply for the City is the Naches River Water Treatment Plant with a nominal capacity of 25 MGD. This supply is adequate to meet the projected maximum day demand (MDD) until 2008. The three active wells (Kiwanis, Airport, and Kissel Park) have been designated as emergency use supplies. A drought condition such as 2001 and again this year (2005) are examples of an emergency condition in which the emergency wells would be activated. A major portion of the normal surface water source of supply is subject to proration during low water years. In 2001 the output of the water treatment plant was reduced to 11.9 MGD and in 2005 the output is reduced to 12.5 MGD due to proration of the storage capacity water right. Including the emergency wells, the total supply capacity during 2001 was 23.5 MGD and in 2005 it will be 23.6 MGD (refer to Table 3-22). Referring to Figure 3-2, we can project that during a severe drought condition similar to 2001, the available supply might be less than the MDD beginning in 2004 if no additional source of supply is placed into service prior to that time. As discussed above, it is projected that an additional normal supply source will be necessary by 2008 in order to meet the MDD without having to utilize the emergency well supplies. The source capacity analysis presented in Table 3-22 is based on the development of new supply sources as shown below in Table 3-44. The proposed location for the new 3,000 gpm deep well is at the Elks or Gardner Park, located in Yakima. The property is already owned by the City. The altematives for developing new supply sources for the City of Yakima water system are limited by water rights considerations. As discussed in the 2004 Water System Plan Update, the City of Yakima holds a number of water rights that supply the City's domestic and municipal irrigation distribution systems. All of the City's surface water rights are currently under the jurisdiction of the Yakima County Superior Court as part of the surface water rights adjudication, Ecology v. Acquavella, et al. On November 21, 2002, the Court issued a Conditional Final Order that approves a proposed settlement of the City's Naches River water rights diverted at the Naches River Water Treatment Plant and at Nelson Bridge. For purposes of this plan, the Conditional Final Order provides an appropriate point of reference for the analysis of future supply source development. Ideally, any new source of normal water supply would not be subject to proration during low water years and would be available year around. All but one of the City's current surface water rights are subject to seasonal time of use limitations. The one existing groundwater right, which is currently not fully utilized, is the Ranney Well right. The original Ranney Well water right was for 5000 gpm and can be used year around. Of this 5000gpm, 2000gpm will be transferred to the Kissel Park Well. This leaves 3000gpm, which could be transferred to a new well. Under current regulations, the Ranney Well would likely be considered groundwater under the influence of surface water and therefore not suitable for domestic use without additional treatment. A new 3,000 gpm deep well would enable the City to beneficially use this existing water right, thereby providing the additional year round source which is needed and assuring that this right is not lost in the future for failure to put it to use as required by state water law. Table 3-22 Source Capacity Analysis for Years 2000 through 2025 in MGD Projected Demands 2000 2005 2010 2015 2020 2025 Average Day Demand 13.1 13.8 14.7 15.9 17.0 18.2 Maximum Day Demand 22.9 24.1 25.7 27.8 29.8 31.9 Peak Hour Demand 36.6 38.6 41.2 44.5 47.7 51.0 Existing Supply Capacity Existing Water Treatment Plant 1 25.0 25.0 25.0 25.0 25.0 25.0 Existing Wells - Emergency Use Only Kiwanis Well (3.4 MGD / 2,350 gpm) 3.4 3.4 3.4 3.4 3.4 3.4 Airport Well (4.0 MGD / 2,800 gpm) 4.0 4.0 4.0 4.0 4.0 4.0 Kissel Well (4.2 MGD / 2,900 gpm) 4.2 4.2 4.2 4.2 4.2 4.2 Total Emergency Well Capacity 11.6 11.6 11.6 11.6 11.6 11.6 Supply Capacity - Non-Drought Years Existing Water Treatment Plant 25.0 25.0 25.0 25.0 25.0 25.0 Existing Emergency Supply Wells 2' 3 0 0 0 0 0 0 Total Capacity 25.0 25.0 25.0 25.0 25.0 25.0 Supply Capacity - Drought Years Existing WTP (10 cfs + 29% of 29 cfs) 4 11.9 11.9 11.9 11.9 11.9 11.9 Existing Wells (Emergency Use) 2' 5 11.6 11.6 11.6 11.6 11.6 11.6 Total Capacity 23.5 23.5 23.5 23.5 23.5 23.5 Supply Requirements Required Supply to meet MDD 22.9 24.1 25.7 27.8 29.8 31.9 Projected Deficiency (w/o adding supply) - -- 0.7 2.8 4.8 6.9 Future New Supply Sources (Proposed) Elks/Gardner Park Well (1 at 3000 gpm / 4.3 MGD) 6 0.0 4.3 4.3 4.3 4.3 4.3 ASR Groundwater Wells? 0.0 0.0 3.6 7.2 7.2 7.2 Total Additional Supply from New Sources 0.0 4.3 7.9 11.5 11.5 11.5 Projected Supply Existing Water Treatment Plant (non-drought) 25.0 25.0 25.0 25.0 25.0 25.0 Existing Water Treatment Plant (drought) 4 11.9 11.9 11.9 11.9 11.9 11.9 Existing Groundwater Wells 2' 3 11.6 11.6 11.6 11.6 11.6 11.6 Future Elks/Gardner Park Well 6 0.0 4.3 4.3 4.3 4.3 4.3 Future ASR Groundwater Wells 7 0.0 0.0 3.6 7.2 7.2 7.2 Total Capacity - Non-Drought Year 3 25.0 29.3 32.9 36.5 36.5 36.5 Total Capacity - Drought Year 3' 4' 5' 7 23.5 27.8 31.4 35.0 35.0 35.0 1. The existing water treatment plant is rated at 25 MGD (17,400 gpm) consistent with the DOH Water Facilities Inventory (WFI). 2. Existing groundwater wells are designated for emergency use only. 3. Since the existing groundwater wells are for emergency use, they are excluded from the Non-Drought year supply. 4. During 2001, and due to drought conditions, the USBR reduced the storage control capacity of the WTP to 29%. 5. During 2001 drought conditions, the Groundwater Wells were activated. 6. The proposed Elks/Gardner Park Well would use 3000 gpm of the Ranney Well water right. Installation estimated for 2007. 7. Two future 2,500 gpm (3.6 MGD) ASR wells are proposed. Installations are estimated for 2007 and 2010. Initially both ASR wells will be designated as emergency sources. In 2015 one ASR well will be changed to a normal source. 35 30 25 20 15 10 5 0 1998 2000 2002 Figure 3-2 Projected 6 year and 20 year Maximum Day Demand 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2, Table 3 -44 New Source of Supply to Meet Future MDD New Source Capacity MGD Year Installed Type of Supply Elks/Gardner Park Well 4.3 2007 Normal ASR Well No. 1 3.6 2007 Emergency' ASR Well No. 2 3.6 2010 Emergency' '. Initially both ASR wells will be designated as emergency sources. In 2015 one ASR well will be changed to a normal source. I1 2022 Total MDD =30.86 MGD limml 2008 Total MDD =25.04 MGD �- 2022 L1 MDD = 21.91 MGD 2008 L1 MDD=17.87 MGD —;—Total MDD forecast all zones MGD t Level 1 MDD use forecast MGD —4.— Level 2 MDD use forecast MGD —F Level 3 MDD use forecast MGD 2008 L2 MDD =5.79 MGD —♦ TT 4 7022 L2 MDD = 7.05 MGD 2008 L3 MDD = 1.35 MGD 2022 L3 MDD = 1.70 MGD 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 2, Table 3 -44 New Source of Supply to Meet Future MDD New Source Capacity MGD Year Installed Type of Supply Elks/Gardner Park Well 4.3 2007 Normal ASR Well No. 1 3.6 2007 Emergency' ASR Well No. 2 3.6 2010 Emergency' '. Initially both ASR wells will be designated as emergency sources. In 2015 one ASR well will be changed to a normal source. Section 5: Local Management System Maintenance & Operations Describe four (4) distinct improvements made to the system or activities performed on the system or on-going �r4ivi+ioc I Inrlcr+�4on h.e +he cvc+em i , +ham .. n+ •.,1 Fa.... /A\ :.. aL... i..a.. .. a4...a .. ..a .:.. _ _ al__ _a_ v._ ...... •.uvv ...I .v... .4.41%,01 . v.y a..... .a..aay... u 1 u Fica g., QI Iv Ivul rt.) 111 U lc 1 ulul c reliability or performance. Be sure to indicate the month and year that the begin or occur. 11 IQ1 I I IQII IIQII I VI 11111J1 VVC LI IC JyJICI l l J examples began or occurred or will Past Improvement/activity From January 1, 2000 to application submittal Date: Month/Year Distribution System Leak Detection 7/2002 Replace Telemetry Radio Antennas 8/2002 Install Chlorine Residual Analyzer at Second Level Pump Station 1/2005 Replace Filter Effluent Turbidity Meters 2/2005 Restorative: If you are unable to give four examples, please explain why: Future Improvement/Activity Application submittal to December 31, 2010 Date: Month/Year Fire Hydrant Testing 8/2005 Distribution System Valve Testing and Exercising Program 10/2005 Replace Water Treatment Plant Effluent and Coagulation Control Center Turbidity Meters 2/2006 Flush distribution system to improve water quality 6/2006 Restorative: If you are unable to give four examples, please explain why: 1ministrative, Financial, and Planning scribe four (4) distinct improvements or on-going activities or planning processes undertaken by the stem in the past, and four (4) in the future that maintain or improve the system's financial, administrative d/or planning status. Be sure to indicate the month and year that the examples began or occurred or will in or occur. Past Improvement/Activity Date: Month/Year From January 1, 2000 to application submittal Evaluation Water Treatment Plant Intake structure Aquifer Storage and Recovery pilot test project 9/2000 12/2001 Update to the Water System Comprehensive Plan as required by RCW 43.20.050, RCW 90.54.180 Cost of Service and Rate Study 3/2004 7/2004 Restorative: If you are unable to give four examples, please explain why: Future Improvement/Activity Date Month/Year Application submittal to December 31, 2010 Complete an Operations and Maintenance Manual for Water Treatment Operations Update the Water System Emergency Response Plan Cost of Service and Rate Study 7/2005 7/2006 7/2009 Update to the Water System Comprehensive Plan as required by 3/2010 RCW 43.20.050, RCW 90.54.180 Restorative: If you are unable to give four examples, please explain why: System Capital Improvement Describe four (4) distinct capital projects undertaken in the past, and four (4) projects in the future that maintain, improve, or expand the system. Be sure to indicate the month and year that the examples began or occurred or will be • in or occur. Past Improvement/Activity Date Month/Year From January 1, 2000 to application submittal Design and construct Fluoridation System 4/2002 Design and construct fish barrier (screens) at the Water Treatment Plant river intake Construction of improvements to the Water Treatment Plant Chemical Feed Systems, including Chemical Containment 10/2002 11/2004 Design and construct improvements to the Water Treatment Plant filter pipe gallery 2/2005 Restorative: If you are unable to give four examples, please explain why: Future Improvement/Activity Date: Month/Year Application submittal to December 31, 2010 Design and construct pipe replacement/improvements to the second level reservoirs Design and construct New groundwater well 10/2005 6/2007 Design and construct improvements to the Water Treatment Plant filter backwash water storage lagoon and wastewater recycle system 10/2008 Design and construct enhanced ultra violet disinfection at the water treatment plant Restorative: If you are unable to give four examples, please explain wh 8/2009 APIIIMITCE,RTIFjc4TION RESOLUTION NO. R -2005- A RESOLUTION to authorize the City Manager to execute all necessary documents to complete and submit an application for a loan from the Washington State Public Works Trust Fund in the amount of $1,995,630 for the replacement of the City of Yakima's Ranney Well, and, if the loan application is approved, to execute all necessary certifications, agreements and other documents to complete the loan transaction. WHEREAS, the City of Yakima recognizes that the provision of infrastructure is important to all residents and businesses of the community; and WHEREAS, in the 2004 Water System Plan Update an evaluation of the domestic water system identified deficiencies in the water supply for the City of Yakima, including the need for a new water supply well to replace the Ranney Well; and WHEREAS, the City has the necessary ground water right for a new supply well; and WHEREAS, replacement of the Ranney Well will help correct the deficiencies identified in the aforementioned plan to optimize the water supply, meet the domestic water supply needs for Yakima, and increase the reliability of the City's water supply system; and WHEREAS, these improvements are consistent with both the 2004 Cost of Service and Rate Study and the City's Capital Improvements Plan (CIP); and WHEREAS, the Washington State Public Works Trust Fund has made low-interest loan funds available for the construction and repair of water utilities; and WHEREAS, the City will generate local funds from the Water CIP budget and reserves to be used as a local match for a Public Works Trust Fund loan in the amount of $352,170; and WHEREAS, the amount of local match funds provided will afford to the City a generous interest rate of 0.5% on the $1,995,630 loan; and WHEREAS, based on the foregoing, the City Council has determined that it is in the best interest of the City to apply for funding from the Washington Public Works Trust Fund to replace the City's Ranney Well, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized and directed to execute all necessary documents to complete and submit an application for a loan from the Washington State Public Works Trust Fund in the amount of $1,995,630 for the replacement of the City of Yakima's Ranney Well and, if the loan application is approved, to execute all necessary certifications, agreements and other documents to complete the loan transaction. ADOPTED BY THE CITY COUNCIL this 3`d day of May, 2005. ATTEST: Paul P. George, Mayor City Clerk CERTIFICATION BY PREPARER OF APPLICATION (Staff Member or Consultant) WHEREAS, David Brown has prepared this application for a Washington State Public Works Trust Fund loan; and WHEREAS, the preparer recognizes and acknowledges that the information in this application is the only information that will be considered in the evaluation and/or rating process. Incomplete responses will result in a reduced chance of funding, and that in order to ensure fairness for all, the Public Works Board does not accept any additional written materials or permit applicants to make presentations before the Board; and WHEREAS, the information provided in this application is true and correct to the best of the preparer's belief and knowledge; and NOW THEREFORE, David Brown recognizes and acknowledges the above declarations and certifies that this application meets the above requirements. Signed: Title: Water/Irrigation Division Manager Phone Number: Date: ATTEST: 509-575-6204 98312681100000 021605.apr oiaer Associates r 1 IN LI, w 7 Existing of Withdrawal Point Ranney _ .70 1 Selah I. 11 — '- •r2` 7 / 1 1 8 9 10 11 1, � 18 17 1 ._ = •� ; msn'4 Maps & Directions Yakima, Washington, United States eamrinngg Mkreso t4 ~ �apP. nt�b Tadwlogy .Summitview Ave Harwood Ahtanum �4= Wiley City L V7 Mlao�ol MapPoint•N United States Military Reservation Yakima Training Center Terrace Heights eirchfield Vakama Indian Reservation 02005 Microsoft Corp 02004 NA'TEQ , and forGOT, Inc . 24 Moxee City Your right to use maps and routes generated on the MSN service is subiect at all times to the MSN Terms of Use. Data credits. copyright, and disclaimer. ITEM TITLE: BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. For Meeting Of: May 3, 2005 Consideration of a resolution authorizing the City Manager to execute documents and agreements pursuant to a loan application to the Washington Public Works Trust Fund for $1,995,630 to drill a new 3,000 gallon per minute water supply well. SUBMITTED BY: Dave Brown, Water/Irrigation Division Manager CONTACT: Dave Brown, 575-6204 SUMMARY EXPLANATION: The City of Yakima Water/Irrigation Division requests Council approval to apply for a $1,995,630 loan from the state Public Works Trust Funds for a new 3,000 gallon per minute water supply well. This application would be for 2005-06 funds, with the work scheduled to be completed from 2006 to 2007. In order to secure the lowest program interest rate of 0.5%, the City is required to provide a local match (from non -grant sources) of at least 15%. The Water/Irrigation Division is proposing the match of $352,170 be provided from its Capital Improvements Program budget (reserves). The total project cost is estimated at $2,347,800. The scope of work for the includes: • Conduct study to determine exact location for well, including hydrogeology and distribution system analysis and preparation of drilling bid specifications. • Design of well including pump and building • Drilling well, installing casing and screens • Installing pump • Building new pump house • Mechanical and electrical connections • Telemetry connections Cont... next page Resolution X Ordinance Contract Other: Loan Application Funding Source: 474 Water Improvement Fund - Washington State Public Works Trust Fund Approval for Submittal: STAFF RECOMMENDATION: Staff recommends approval of the resolution. COUNCIL ACTION: Resolution adopted. RESOLUTION NO. R-2005-69 1 Cont.. from first page • Connection to water distribution system • Install Disinfection • Install Fluoride • Backup Generator • Treatment for taste & odor and/or iron & manganese • Define Wellhead Protection area and modify Wellhead Protection Program • Decommission Ranney Well These improvements are consistent with, and identified in, the 2004 Cost of Service and Rate Study, as well as the 2004 Water System Plan. With Council approval staff will submit the application by May 9, 2005. The project funding list will be announced this fall and must be approved by the legislature in the 2006 session. 2