Loading...
HomeMy WebLinkAboutR-2004-104 Yakima Capital Facilities Plan AmendmentRESOLUTION NO. R-2004- um A RESOLUTION to amend the Yakima Capital Facilities Plan to incorporate the Six-year Transportation Improvement Program (STIP) for the period of 2005 through 2010. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six-year Transportation Program for the construction or repair of streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law, and WHEREAS, the City of Yakima desires to amend the Yakima Capital Facilities Plan to reflect the adoption of the 6 -Year STIP, as contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth Management Act and consistency of the Comprehensive Plan and the 6 -Year transportation, and WHEREAS, this amendment is limited to incorporation of the projects listed in 6 - Year Transportation Improvement Plan for the period of 2005 to 2010 to the Capital Facilities Plan, which is contemplated and provided under RCW 36.70A.130(2B) and RCW 35.77.010, and WHEREAS, public hearings have been held by the Yakima City Council on the 6 - Year Transportation Improvement Plan on Tuesday, July 6, 2004, and again on July 20, 2004, with proper public notice as required by RCW 35.77.010 BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: That upon closure of the public hearing process and adoption of the 6 -Year Transportation Improvement Plan, 2005 to 2010 for the City of Yakima shall be incorporated as an amendment to the Capital Facilities Element of the Yakima Urban Area Comprehensive Plan. ADOPTED BY THE CITY COUNCIL this 20th day of July, 2004. ATTEST: City Clerk a, krzrr Mayor A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six -Year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue or federal revenue will be used. The plan for 2005 — 2010 consists of fourteen (15) funded projects totaling $11,078,000. Funding for the remainder of the projects will continue to be sought. The next authorization of TEA -21 will be called SAFETEA, standing for Safe, Accountable, Flexible, and Efficient Transportation Equity Act of 2003. The Transportation Equity Act of 1998 for the 21 st Century (TEA -21) began with the passage of the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. It specifies the systems on which certain funds can be used, expands the kinds of activities for which funds can be used and promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and programming of projects. SAFETEA requires each designated MPO to develop a Transportation Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for the transportation projects. Projects listed in the STIP are the only projects that will be approved by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal funds. The STIP is a prioritized program of transportation projects, compiled from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the intermodal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's transportation program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Citizen participation is an integral part of the planning process at all levels. Local Agencies are required to develop and adopt a six-year transportation program. All local agencies are required to hold at least one public hearing during the development of the six-year transportation program. Project ranking was performed utilizing data supplied by the Street and Traffic Division. These rankings were then integrated with other project needs and the total list was reviewed and adjusted to the particular need of the City of Yakima. B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted the Six-year Transportation Plan for 2005 to 2010. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. This amendment is limited to incorporate only those projects that are adopted in the STIP and is not subject to the "once a year" change required under the laws of the Growth Management Act. 2 — July 15, 2004 The following projects that have been added since last year's TIP submittal: Street Asset Amenities: Route maintenance, repair & improvements Modified from "Bus Stop Zones" for more broad application Facility Upgrade: Transit Center Expansion Project Add 300 sq. ft. to the north side of transit center, for security officer, information, and sales. West Lincoln Sidewalks: 29th to 18th Avenues Extended the limits for new sidewalk to 18th Avenue Longfiber Road - Phase 2: W. Washington to Valley Mall Blvd. New 3 -lane roadway; partnership with City of Union Gap Intersection Improvements: Selected on local priority, East Nob Hill Blvd., to 6th Street ' West Lincoln Sidewalks: 56th to 40th Avenues New sidewalks West Lincoln Avenue & 'B' Street Realignment 5th Avenue to Custer Realignment including sidewalks, curb, gutter, lights. School Safety Project.: Various Locations, Citywide Sol rr-pcnvered crossirr f flasbsre sizkwallrc signing East Nob Hill Blvd. Reconstruction: 6th to 18th Streets Roadway widening to 5 -lanes, nezv curb, gutter & sidewalk, and lighting. The above additions to the TR' have been selected for addition from: City Council; Pavement Management Systems rating (PMS) input; Community input via public hearings and other communication; Bicycle Pedestrian_ Committee; TransAction Committee; Other Committee Recommendations; Collision reporting and ratings; Adjacent Communities. July 15, 2004 Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road g g F. Describe Work to be Done Improvement I Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase phase Start (m r✓ddiyyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type RNV Required Date (MMNy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 1 Railroad Grade Separation -'B' St - Lincoln Ave BNSF Tracks/I St from: N 1st St to: N 1st Ave Construct Grade Separations and adjacent roadway reconstruction 01 06 07 08 P 0.2 T P G 0 W PE CN CN 1/112005 12006 2007 5010 PIP PIP PIP 500 1285 7000 1000 500 7295 7000 500 7295 7000 EA No Totals 5010 8785 1000 14795 14795 17 2 Front St Rehabilitation BNSF Track/Street from: Yakima Ave In: 'D' St Realignment of Front Street, curb, gutter and sidewalk reconstruction with historic district renovation 01 12 06 P 0.3 p O T PE RW CN 3/1/2005 6/1(2005 6/112006 01-4t1R1 1491 371 186 OT1E:R I 771 191 96 OT 17021 4261 2128 1861 961 I 1 21281 EA Yes 06/01/06 Totals 1928 482 2410 282 2128 14 3 W Washington Ave - S 52nd Ave to S 72nd Ave W Washington Ave from: S 52nd Ave to: S 72nd Ave Widen. reconstruct, curb, gutter, sidewalk 04 03 S 1.02 W T 0 S P PE CN 1/1/2005 1/1/2005 PIP' 3981 3531 7511 7511 1 PIP' 16981 5271 2225 22251 1 EA Yes 01/01/05 Totals 2096 880 2976 2976 16 4 W Nob Hill Blvd - S 681h Ave to S 80th Ave W Nob Hill Blvd from: S 68th Ave to: S 80th Ave Reconstruct to minor arterial standards 04 03 S .73 c W 0 P T PE RW CN 1/1/2005 4/1/2006 1/1/2007 STP(U) STP(U) 370 144 P IPI 551 1 425 PIP 1 2161 1 360 PIPI 5551 3701 925 4251 1 360 1 1 9251 EA Yes 04/01/06 Totals 514 826 370 1710 785 925 Report Date: July 20, 2004 Page 1 Supersedes previous editions 1 T Washington State Department of Transportation 11 Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 A o H tj n_ Priority 1 Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - EndingMP or road g g F. Describe Work to be Done Improvement Type(s) ._ a in Total Length I v o 0 c 5 Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) Federally Funded Projects Only Project Phase 'phase Start (mm/dd/yyyy) Fund Source Information Federal Funding State Code State Funds Local Funds Total Funds Envir Type RAN Required Date (MM/YY) Federal Fund Code Federal Cost byFund Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 02 5 River Road Realignment River Road from: N 16th Ave to: Fruitvale Blvd I Widenino. curb. nutter. sidewalk. rernnstnulrinn 01 04 S 1.1 C G P T W RW CN 1/12005 4/1.2006 AIP AIP 272 1184 1456 68 296 364 340 1480 1820 340 1000 1340 480 _, _ .. 480 CE Yes 01/01/06 1 1 Totals 19 6 YVT Bam Rehabilitation S 3rd Ave from: S 3rd St to: Pine St Car Bam and Museum Restoration 03 P N/A G C S T W P PE CN 6/1/2005 6/12006 STP(E) STP(E) 18 1730 1 1 1 1 321 2701 50 2000 501 1 17301 2701 EA No Totals 1748 302 2050 1780 270 00 7 Transit Operating/Capital Expenses Various Areas from: N/A to: N/A Supplemental Funding for Transit Service Operating Expenses 12 22 23 24 31 S N/A CN 1 1/1/2005 1 5307 1 12721 1 1 10001 22721 22721 1 1 CE No Totals 1272 1000 2272 2272 09 8 Street Asset Amenities Route Maintenance, Repair & Improvements from: to: Maintenance of shelters, benches and signage throughout our route system 22 31 S N/A O ALL 1 1/1/2005 1 1 1 1 1 301 301 301 1 1 CE No Totals 30 30 30 Report Date: July 20, 2004 Page 2 Supersedes previous editions Washington State Department of Transportation -en Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Amend Date: Adoption Date: 7/20/2004 Resolution No.: R-2004-103 Report Date: July 20, 2004 Page 3 Supersedes previous editions Priority Number Project Identification Improvement I Type(s) 1 Total Length Project Costs in Thousands of Dollars Federally Funded _ A. Federal Aid No. B. Bridge No. re w . a Fund Source Information Expenditure Schedule Projects Only m C. Project Title 1 . a Federal Funding (Local Agency) RAN 5 0 D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done in Z. a i P:lase Start (mr.✓dd/YYYy) Federal Fund Code Federal Cost by Phase State Fund Code State Funds Local Funds Total Funds 1st 2nd 3rd 4th 6th Envir Type Required Date (M 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 9 Facility Upgrade Transit Center Expansion Project from: to: Add 300 sq ft section to the North side of our transit renter N hoe.... a 12 21 S N/A O CN `/1/2005 5309(Bus) 56 35 91 91 CE No ve senty officer. information/ticket sales Totals 56 35 91 91 t 14 10 N 16th Ave - Signal © River Rd N 16th Ave from: N 16th Ave to: River Rd Install new signal 12 S N/A w T P PE RW CN 1/1/2005 4/1/2005 1/1/2006 STP(U) STP(U) STP(U) 27 40 232 1 3 i 6 1 36 30 46 268 301 1 1 461 2681 CE Yes 04/01/05 Totals 299 45 344 298 46 07 11 W Lincoln Ave Sidewalks W Lincoln Ave from: N 18nd Ave to: N 29th Ave Sidewalks on the Northside 12 S .5 T P PE RW CN 1/12005 1/12005 6/12005 PSMPI 61 41 10 PSMP 1 61 41 10 PSMP I 741 991 173 101 1 101 1 1731 CE Yes 04/01/05 Totals 86 107 193 20 173 17 12 SR12 - N 40th Ave SR12 - N 40th Ave from: N 40th Ave to: SR12 Widen intersection and on-ramp 01 P N/A p 0 T W PE RW CN 1/12005 1/1/2006 1/12006 TPPI 3201 801 400 TPP I 9601 2401 1200 TPP I 19201 4801 2400 4001 1 12001 1 24001 CE Yes 01/01/06 Totals 3200 800 4000 4000 Report Date: July 20, 2004 Page 3 Supersedes previous editions T Washington State Department of Transportation -Aggeenncy: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 Functional Class Priority Number • Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement Type(s) Status Total Length v .L• Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency) 9 Federally Funded Projects Only Project Phase COS a E. <04, Fund Source Information Federal Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type Required Date vowyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 6(h 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 13 E Nob Hill Blvd at S 6th St E Nob Hill Blvd from: E Nob Hill Blvd to: S 6th St 12 01 S Signal T W 0 RW CN 1/1.'2005 6/1,2005 TPP TPP 65 400 10 62 75 462 75 462 CE Yes 01/01/05 i Totals 465 72 537 537 14 14 Nob Hill Blvd Nob Hill Blvd from: S 52nd Ave to: S 68th Ave Widen, curb, gutter, sidewalk, lighting, drainage 04 p .77 p C G O S T PE RW CN 1/1,2006 6/1,2006 6/1/2007 STP(U) STP(U) 107 300 1 1 1 1 TPP I 11831 171 401 1931 124 340 1376 1241 1 3401 1 13761 EA Yes 01/01/07 Totals 407 1183 250 1840 1840 00 15 Annual Signal Upgrades Local Selection from: N/A to: N/A Upgrade signals 01 p N/A PE CN CN 4/12005 8/12005 8/1/2005 CMAQ STP(S) CMAQ 50 150 300 1 1 AIP1 2001 1 1 501 1 1 100 350 300 1001 1 1 3501 1 3001 CE No Totals 500 200 50 750 100 650 00 16 Various Overlay Projects/Selected on Local Priority N/A from: N/A to: N/A 07 S N/A CN I 7'12005 I STP(U) I 1731 1 1 271 2001 2001 1 EA No Totals 173 27 200 200 Report Date: July 20, 2004 Page 4 Supersedes previous editions Washington State Department of Transportation -Aggeenncy: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 o H ti Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done . m o a al- = a in Total Length Utility Codes Project Costs in Thousands of Dollars Federally Funded Project Phase Fund Source Information Expenditure Schedule Projects Only Federal Funding (Local Agency) RJW Phase Start (m d/YYYY) Federal Fund Code Federal Cost by Phase State Fund Code State Funds Local Funds Total Funds 1st 2nd 3rd 4th Thru 6th Envir Type Required Date (Mtiyyy) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 17 Storm DrainsNegetation Local Selection from: City Wide to: Ciiy 9r tdc 32 P N/A PE CN P/2005 /':/2005 80 720 80 720 80 720 EA No Totals 800 800 800 17 18 ReconstructionCN Rudkin Rd Rudkin Rd from: E Mead Ave to: Rainier Place Reconstruct, excavate ballast, top course. curb, gutter, sidewalk Partner with City of Union Gap 03 06 P .76 w T P S PE 1/1/2007 +/1/2008 STP(C) STP(C) 87 500 1 1 841 184 TPP 500 I I I 1091 1 1084 CE No Totals 587 500 106 1193 109 1084 17 19 E Mead Ave ReconstructionNo E Mead Ave from: Rudkin Rd to: Fair Ave Partner with City of Union Gap, reconstruct, excavate ballast. top course, curb, gutter, storm, acp 03 p .76 c O P s PE CN 9/1/2006 a/1/2007 STP(S) ST 873 TPP1 1631 551 10917 TPP1 181 61 1 1211 10911 1 CE T Totals 970 181 61 1212 121 1091 19 20 Longflber Rd - Phase 2 (3 -Phases) Longfiber Rd from: Valley Mall Blvd to: W Washington Ave New roadway construction and reconstruction, 3 -lane wttum, curb, gutter, sidewalks - Partner with City of Union Gap 01 03 p .50 p S W T O PE CN 1/:/2008 1/1/2009 1 1 1061 1061 1 1 106 1 1 11831 11831 1 1 1183 CE No Totals 1289 1289 1289 Report Date: July 20, 2004 Page 5 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.. R-2004-103 Functional Class Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Expenditure Schedule (Local Agency Federally Funded Projects Only Project Phase Phase Ftart (mr✓dd/yyyy) Fund Source Information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir Type RNV Required Date (M Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 21 Intersection Improvements Selected on Local Priority from: E Nob Hill Blvd to: S 6th St Gurb outte:, sidce+a!k =let, .--;....... .........,2.. sT , - -- P - N/A -- s G C PE CN - Totals 4/1/2005 7/1/2005 '- -- - --- -- -- '- 5 45 -• 50 5 45 -' - 50 5 45 — 50 --' ------- - CE No r 11 22 E Nob Hill Blvd & S 18th St E Nob Hill Blvd from: S 18th St to: E Nob Hill Blvd Widen south leg for double LT from west bound Nob Hill; (Te to WSDOT Project) possible curb. gutter and sidewalk 04 01 P 1 C S W T PE RW CN 1/1/2006 3/1/2006 1/1/2007 STP(U) STP(U) STP(U) 13 18 140 1 ( 1 1 1 1 21 15 21 20 251 165 151 1 201 1 1 1651 CE Yes 01/01/06 Totals 171 29 200 35 165 16 23 S 6th St - Signals ©'B' St & Lincoln S 6th St from: '8' St to: Lincoln Ave Install signals at 8 St and Lincoln Ave 01 S N/A CN 1 2/1/2005 STP(S) 1 1001 AIP1 1501 501 3001 3001 1 CE No Totals 100 150 50 300 300 16 24 N 8th St - Signals © 'B' St & Lincoln Ave N 8th St from: 'B' St to: Lincoln Ave Install signals /4 '8' St and Lincoln. flashers 01 P Signal CN I 2/1!2005 STP(S) 80 1 111 911 911 1 1 EA No Totals 80 11 91 91 Report Date: July 20, 2004 Page 6 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Amend Date: Adoption Date: 7/20/2004 Resolution No.: R-2004-103 o H °D. u_ Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement Type(s) Status Total Length UtIlIty Codes Project Costs in Thousands of Dollars Federally Funded Fund Source Information Expenditure Schedule Projects Only r Federal Funding Agency) (LocalR/VV m Phase Start (mm/ddyyyy) Federal Fund Code Ftederal Cost by Phase State Fund Code State Funds Local Funds Total Funds 1st 2nd 3rd 4th Thru 6th Envir Type Required Date (mm/YY) 1 Z 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 25 E Nob Hill Blvd & Fair Ave E Nob Hill Blvd from: E Nob Hill Blvd to: Fair Ave en+, gutter and s;d^^4: street y.^.b•;na10/01/06 Intxresw7inn widwninn R naw c;nn?I n :, 31 03 04 P N/A 1 0 C P T W PE RW CN '/1/2006 10/1/2006 1/1/2007 STP(S) STP(S) STP(S) 72 62 789 11 10 123 83 72 912 83 72 912 CE Yes i 1 otals 923 144 1067 83 72 912 17 26 S 80th Ave - Tieton Dr to Zier Rd S 80th Ave from: Tieton Dr to: Zier Rd Major widening. curb, gutter, sidewalk 04 P 1.3 0 C P T W PE RW CN `/1/2006 '/1/2007 6/1/2006 AIP1 1041 161 120 AIP 1 3031 471 350 AIP� 13231 2071 1530 1201 1 3501 1 � 1530 EA Yes 01/01/07 Totals 1730 270 2000 470 1530 19 27 N 7th St Reconstruction N 7th St from: Lincoln Ave to: 'H' St Street reconstruction into Yakima Resource Center 03 P .5 PEI '/1/2006 1I 11 1 4001 4001 4001I CE No Totals 400 400 400 17 28 Zier Rd - S 75th Ave to S 72nd Ave Zier Rd from: S 75th Ave to: S 72nd Ave Minor widening, curb, gutter and sidewalk 05 06 S 15 C S T P PE CN /1/2005 1 6/1/2005 STP(E) STP(E) 22 75 1 1 1 71 20195 29 291 1I 951 CE Yes 03/01 /05 Totals 97 27 124 124 Report Date: July 20, 2004 Page 7 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 ^— o H r._) u_ Priority 1 Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement Type(s) w Total Length Utility Codes Project Costs In Thousands of Dollars Schedule (Local Agency) Federally Funded Projects Only Project Phase 01m m ��m Fund Source Information Expenditure Federal Funding State Fund Code State Funds Local Funds Total Funds RNV Required Date (MMyyy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th 6th Envir. Type 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 29 Englewood Ave - N 40th Ave to N 56th Ave Englewood Ave from: N 40th Ave to: N 56th Ave „ -- s.. _..':_,,t,. g,.bar, s.�cnalk 05 06 P 2.15 w S T P PE RW CN /1/2009 6/1/2009 1/1/2010 STP(C) STP(C) STP(C) 216 277 1367 34 43 213 250 320 1580 250 320 1580 EA Yes 04/01/09 1 r Totals 1860 290 2150 2150 16 30 W Washington Ave Median Removal W Washington Ave from: S 16th Ave to: S 24th Ave Removal of median in Washington Ave lengthening tum lanes 05 S .5 0 PEI `/1/2005 CN `/1/2005 STP(U) STP(U) 36 228 1 1 1 51 361 41I 411 264 2641 1 CE No Totals 264 41 305 305 17 31 Englewood Ave - N 2491 Ave to N 16th Ave Englewood Ave from: N 24th Ave to: N 40th Ave Widen, curb, gutter and sidewalk 05 06 P 2 0 PE RW CN '/"/2007 "/1/2008 6/1/2009 STP(U) STP(U) STP(U) 173 259 865 1 1 1 271 41 1 1351 200 300 1000 2001 1 3001 10001 EA Yes 01/01/09 Totals 1297 203 1500 1500 00 32 Pedestrian Bridge Pedestrian Bridge from: N 10th St to: Yakima Greenway Construct pedestnan bridge from Gateway area to Yakima Greenway, power, handicap accessible, lights 14 32 P .25 T P O PE CN '/1/2008 3/1/2009 STP(E)200 STP(E) I 2000 1 1 271 2701 227 2271 1 2270! 22701 CE No Totals 2200 297 2497 2497 Report Date: July 20, 2004 Page 8 Supersedes previous editions T Washington State Department of Transportation 1,71 Aggeenncy: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Amend Date: Adoption Date: 7/20/2004 Resolution No.: R-2004-103 Report Date: July 20, 2004 Page 9 Supersedes previous editions Project Identification - __. ��- N I Status D y D o, Total Length -I -0 O 'U -I r I -4 Utility Codes Project Costs In Thousands of Dollars o A. Federal Aid No. B. Bridge No. m Fund Source Information Expenditure Schedule Federally Funded Projects Only H a C. Project Title ; m m Federal Funding(Local Agency) o f D. Street/Road 2 a 0. ci C Cl -a~ Z Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done 6 m 2 t Phase Start (mrn/dd/yyyy) Federal Fund Code Federal Cost by Phase State Fund Code State Funds Local Funds Total Funds 1st 2nd 3rd 4th 6th Envir Type R/W Required Date (MI WYY ) 1 2 3 4 8 9 10 11 12 13 14 15 16 17 18 19 00 33 Gravel Road B.S.T Various Areas from: to: PM -10 Abatement 07 CN 4/1/2005 200 200 100 50 50 20 CE 21 No Iotais 200 200 100 50 08 34 Powerhouse Rd 8 Englewood AveRW Powerhouse Rd from: Powerhouse Rd to: Englewood Ave Intersection, realignment. curb, gutter, sidewalk, Safety Flashing Signal 12 PE CN 5/1/2005 9/1/2005 9/1/2005 STP(S) STP(S) STP(S) 20 400 300 1 1 541 454 1 1 451 345 50 4541 3451 1 CE Yes 09/01/20 Totals 720 102 822 822 07 35 S 48th Ave & Summitview Ave Signalization S 48th Ave from: S 48th Ave to: Summitview Ave Signalization 12 PE RW CN 1/1/2010 6/1/2010 8/1/2010 STP(S) STP(S) STP(S) 20 20 340 1 1 3 1 1 51 23 391 231 1 3911 CE Yes 06/01/10 Totals 380 57 437 437 07 36 S 3rd Ave & W Washington Ave Signal S 3rd Ave from: S 3rd Ave to: W Washington Ave Signal Upgrades 12 P N/A p T PEI 4/1/2006 CN 6/1/2006 I I 10110 101 1401 1401 1401 I CE No Totals 150 150 150 Report Date: July 20, 2004 Page 9 Supersedes previous editions Washington State Department of Transportation -Aggeenncy: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 Functional Class Priority Number Project Identification A Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement Type(s) Status Total Length Utility Codes Project Costs in Thousands of Dollars Schedule (Local Agency) Federally Funded Projects Only Project Phase n0 S1 .7 Fund Source Information Expenditure Federal Funding State Funds Local Funds Total Funds Envir Type RNV Date (MMM ) Federal Fund Code Federal Cost by Phase StateRequired Fund Code 1st 2nd 3rd 4th Thru 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 07 37 12 P N/A p PE CN 111/2006 STP(S) 10 10 20 20 CE S 16th Ave 8 W Washington Ave Signal T 6/1/2006 STP(S) 60 60 120 120 No S 16th Ave from: S 16th Ave to: W Washington Ave c.nnai 1 i„n.AnAc ! I I l totals , 70 70 140 140 07 38 12 p 2 p PE 1:112008 STP(S) 43 1 71 50 501 1 CE W Nob Hill Blvd Sidewalks W Nob Hill Blvd from: S 16th Ave to: E 182 Overpass T RW CN 6/1%2008 3/1/2009 STP(S) STP(S) 85 255 1 151 451 100 300 1001 I 3001 Yes 09/01/08 Sidewalks on southside Totals 383 67 450 450 00 39 06 P 1 p PE 11/2009 STP(S) 45 1 61 51 1 1 51 CE Beech St Pedestrian Connection 32 T RW 611'2009 STP(S) 150 1 201 170 1 1 170 Beech St from: Fair Ave to: Chalmers/Riverside CN 1/1/2010 STP(S) 400 1 541 454 1 1 454 Yes 09/01/09 Construct pedestrian under SR82 to Greenway _ Totals 595 80 675 221 454 07 40 12 P 2 p PE RW 1112009 STP(S) 34 1 1 61 40 1 1 40 CE W Lincoln Ave Sidewalks W Lincoln Ave T CN 6/1/2009 1/1/2010 STP(S) STP(S) 68 204 1 1 121 1 361 80 240 1 1 80 1 240 Yes from: N 56th Ave to: N 40th Ave 09/01/10 Sidewalks Totals 306 54 360 360 Report Date: July 20. 2004 Page 10 Supersedes previous editions `ashington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: YVCOG Six Year Transportation Improvement Program From 2005 to 2010 Hearing Date: 7/6/2004 Adoption Date: 7/20/2004 Amend Date: Resolution No.: R-2004-103 — _ n —° ti U Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done E 17.' S /- p en Twin; Laiiyiii Utility Codes I Protect Costs In Thousands of DollarsFedera8y Expenditure Schedule (Local Agency) Funded Projects Only Project Phase Phase Start (mm/dd/yyyy) Fund Source information Federal Funding State Fund Code State Funds Local Funds Total Funds Envir. Type R/W Required Date (MM./yy) Federal Fund Code Federal Cost by Phase 1st 2nd 3rd 4th Thru 61h 1 2 3 4 5 i 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 08 41 W Lincoln Ave d'B' St Realignment W Lincoln Ave from: W 5th Ave to: Custer St Realignment of W Lincoln Ave, sidewalks. curb, gutter, lights 01 12 P 5 w T S P G PE RW CN 1/1/2008 1/1/2009 1/1/2010 STP(E) STP(E) STP(E) 337 831 1429 53 129 223 390 960 1652 390 960 1650 CE CE Yes 09/01/10 No Totals PE CN 1 1/1/2005 1/1/2005 2597 405 3002 3000 1 PSMP1 101 21 121 121 1 PSMP 1 1901 381 228 1901 1 I 16 42 School Safely Projects Various Locations - Citywide from: to: Crossing flashers, sklewalks, signing, other features 12 S IQ!, Totals 200 40 240 202 02 43 E Nob Hlll Blvd. Reconstruction E Nob Hill Blvd. from: 5 6th Street to: S 18th Street Major roadway widening end reconstruction to 5 lanes With Intersection Improvements, curb, gutter. sidewalks 03 04 06 P .i1`- c G 0 P S T PE RW CN 1/1/2008 1/1/2009 1/12010 STP(C) STP(C)' STP(C) 433 865 5190 1 1 671 500 1 1 1351 1000 1 1 8101 6000 1 1 1 1 1 1 500 1000 6000 EA Yes 1/1 /09 Totals 6488 1012 7500 7500 Grand i ltais for Yakima Report Date: July 20, 2004 30067 22986 12119 65172 27900 21682 5446 10104 Page 11 Supersedes previous editions BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. For Meeting of July 20, 2004 ITEM TITLE: Public Hearing to: A) Adopt the Six-year Transportation Improvement Program (STIP) for years 2005 to 2010, and to amend the Metropolitan Transportation Plan; and B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the adopted Six-year Transportation Improvement Program (STIP). SUBMITTED BY: fitment of Community and Economic Development - William Cook, Director CONTACT PERSON/TELEPHONE: K. Wendell Adams, P.E., Engineering Manager, 575-6111. SUMMARY EXPLANATION: See Attached explanation and list of new projects added since 2003. Resolution X Ordinance Contract Other (Specify) STIP Funding Source APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: 1) Hold Public Hearing, 2)Adopt Resolution approving the STIP and amend the regional Metropolitan Transportation Plan, 3) Adopt Resolution amending the Comprehensive Plan Capital Facilities Element. BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION: Resolution adopted. RESOLUTION NO. R-2004 —103. Resolution adopted. RESOLUTION NO. 2004-104