HomeMy WebLinkAboutR-2003-088 2004 - 2009 Six-Year Transportation Improvement Program (TIP)RESOLUTION NO. R-2003- 88
A RESOLUTION adopting a Six -Year Transportation Improvement Program
for the period of 2004 through 2009 for the construction of
streets and arterials streets in the City of Yakima and
amending the Metropolitan Transportation Plan.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program
for the construction of streets and arterial streets in the City of Yakima for the ensuing six year
period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law; and
WHEREAS, the City of Yakima desires to amend the Metropolitan Transportation Plan to
ensure compliance with the Growth Management Act and the regional transportation plan for the
construction of streets and arterial streets in the City of Yakima, all as contemplated and required by
State and Federal law, and
WHEREAS, after public hearings on the matter, held at regular meetings of the Yakima City
Council on May 20, 2003, then again on June 24, 2003, the City Council finds that the plan attached
hereto should be adopted as the Six -Year Transportation Improvement Program for the period of
2004 through 2009 for the construction of streets and arterial streets in the City of Yakima, now,
therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The Six -Year Construction Program for the period of 2004 through 2009, a copy of which is
attached hereto and by this reference made a part hereof, is hereby adopted as the official Six -Year
Transportation Improvement Program for the City of Yakima, including proposed amendments to the
Metropolitan Transportation Plan along with Street Improvements and Maintenance Overlay Program
which are also approved.
ADOPTED BY THE CITY COUNCIL this 24th day of June, 2003
ATTEST:
City Clerk
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO:
Six Year Transportation Improvement Program
From 2004 to 2009
Hearing Date: 6/24/2003
Amend Date:
Adoption Date: 6/24/2003
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
Improvement
Type(s)
in
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
s
a.
6
N
°
a
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
1
Railroad Grade Separation - Lincoln Avenue
at BNSF Tracks
from: North 1st Street to: North 1st Avenue
Reconstruct roadway and construct Railroad and Front St Underpass
01
08
06
S
0.2
T
0
P
G
W
PE
RW
CN
1/1/2004
1/1/2004
1/1/2005
STP
STP
STP
1644
3000
3000
AIP
AIP
AIP
256
405
1000
1900
3405
4000
500
405
1400
3000
3000
1900
EA
Yes
09/01/04
Totals 7644 1661 9305 905 7400 1900
14
2
Railroad Grade Separation -'B' Street & Lincoln Ave
at BNSF Tracks
from: North 1st Street to: North 1st Avenue
Reconstruct roadway and construct Railroad and Front St. Underpass
01
06
07
P
.2
T
P
G
0
W
PE
CN
10/1/2004
6/1/2006
STP
STP
557
9000
AIP
1
1 80001
1 671 6241 6241 1
10001 180001 1 1 18000
CE
Yes
09/01/04
Totals 9557 8000 1067 18624 624 18000
17
3
Front Street Rehabilitation
BNSF Tracks
from: Yakima Avenue to: 'D' Street
Realignment of Front & Reconstruction
12
01
P
.3
T
P
0
PE
RW
CN
3/1/2004
6/1/2005
6/1/2006
STP
STP
STP
30
20
200
AIP1
AIP
AIP
101 101 50
71 31 30
501 1 250
501 1
301 1
2501
EA
Yes
03/01/04
Totals 250 67 13 330 330
14
4
West Washington Avenue - South 24th Ave to South 40th Ave
W Washington Avenue
from: South 24th Avenue to: South 40th Avenue
Widen/Reconstruct, curb, gutter, sidewalk
04
03
S
2.5
c
0
P
T
W
RW
CN
7/1/2003
3/1/2004
REV
REV
290
1837
1 1 2981 5881 5881
1 1 2871 21241 21241
1
1
EA
Yes
08/01/04
Totals 2127 585 2712 2712
Report Date: June 19, 2003
Page 1
Supersedes previous editions
Washington State Department of Transportation
-enAgency: Yakima
Co. No.: 39 Co. Name: Yakima Co
City No.: 1485
MPO/RTPO:
Six Year Transportation Improvement Program
From 2004 to 2009
Hearing Date: 6/24/2003 Adoption Date: 6/24/2003
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Required
Date
(MM/yY)
21
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thu
6th
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
14
5
West Washington Ave - South 40th Ave to South 48th Ave
West Washington Avenue
from: South 40th Avenue to: South 48th Avenue
Widen/Reconstruct, curb, gutter, sidewalk
03
04
S
N/A
C
0
P
T
W
RW
CN
7/1/2003
4/1/2004
AIP
AIP
400
2628
200
400
2828
400
2828
EA
Yes
07/01/03
Totals 3028 200
3228 3228
14
6
West Washington Ave - South 48th Ave to South 64th Ave
West Washington Avenue
from: South 48th Avenue to: South 64th Avenue
Widen/reconstruct, curb, gutter and sidewalk
03
04
S
1,02
c
O
P
T
W
PE
RW
CN
6/1/2003
2/1/2004
4/1/2004
AIPI 841 361
AIP I 1231 521
AIP I 8971 3851
1201 1201 1
175 1751 1
12821 1282
EA
Yes
07/01/03
Totals 1104 473
1577 1577
14
7
West Washington Ave - South 64th Ave to South 72nd03
West Washington Avenue
from: South 64th Avenue to: South 72nd Avenue
Widen/reconstruct, curb, gutter, sidewalk
04
S
5
C
0
P
T
W
PE
RW
CN
6/1/2003
1/1/2004
7/1/2004
I 551
AIP I 1851Yes
AIP 22913451
55
574
551
574
1
EA
06/01/04
Totals 414 400
814 814
16
8
West Mead Ave - South 16th Ave to South 11th Ave
West Mead Ave
from: South 16th Avenue to: South 11th Avenue
Reconstruct/Widen
03
S
_5
C
0
P
T
W
CN I 6/1/2003 I STP(S) 1 690( 1 1 931
7831 7831 1 I
CE
Yes
07/01/03
Totals 690 93
783 783
Report Date: June 19, 2003
Page 2
Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO:
Six Year Transportation Improvement Program
From 2004 to 2009
Hearing Date: 6/24/2003 Adoption Date: 6/24/2003
Amend Date:
Resolution No.:
I N
cU
L.,..
Priority I
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)R/VV
Federally Funded
Projects Only
N
. cc
a
a)
2
cL
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
9
West Nob Hill Blvd - South 68th Avenue to South 80th Avenue
West Nob Hill Blvd.
from: South 68th Avenue to: South 80th Avenue
Reconstruct to minor arterial standards
03
04
S
.73
c
W
O
P
T
PE
RW
CN
1/1/2004
4/1/2004
1/1/2005
AIP
AIP
AIP
54
216
555
36
144
370
90
360
925
90
360
925
EA
Yes
04/01/04
Totals 825 550 1375 1375
02
10
River Road
River Road
from: North 16th Avenue to: Fruitvale Blvd.
Widening, curb, gutter, sidewalk, reconstruction
01
04
S
1.1
C
P
T
W
O
PE
RW
CN
6/1/2004
6/1/2004
8/1/2005
AIP I 1121 281 1401 1401 1
AIP I 2721 681 3401 3401 1
AIP I 11841 2961 1480 10001 4801
EA
Yes
06/01/05
Totals 1568 392 1960 1480 480
14
11
North 5th Ave /Fruitvale Blvd
North 5th Ave/Fruitvale Roundabout
from: North 5th Ave to: Fruitvale Blvd
Roundabout, curb, gutter, sidewalk
04
03
S
1
0
RW
CN
CN
6/1/2003
7/1/2003
7/1/2003
STP
STP(S)
STP(U)
10
263
150
1 1 1 10
1 1 361 299
1 1 201 170
101 1
2991 1
1701
EA
Yes
10/01/03
Totals 423 56 479 479
19
12
YVT Barn Rehabilitation
South 3th Avenue
from: South 3th Avenue to: Pine Street
Car Barn and Museum Restoration
03
S
N/A
PE
CN
8/1/2004
6/1/2005
STP(E)
STP(E)
169
1730
1 1 261 1951 19511
270 2000 2000
EA
No
Totals 1899 296 2195 195 2000
Report Date: June 19, 2003
Page 3
Supersedes previous editions
Washington State Department of Transportation
-Aggeenncy: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO:
Six Year Transportation Improvement Program
From 2004 to 2009
Hearing Date: 6/24/2003
Amend Date:
Adoption Date: 6/24/2003
Resolution No.:
_
`°
o N
6
LL
Priority I
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F Describe Work to be Done
Improvement
Type(s)
in
Total Length I
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
L
a
9
2
a
Phase
Start
(mm/dd/
YYYY)
Fund Source Information
Federal Funding
State4th
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
yp
R�
Required
Date
(MM/vY)
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
13
Transit Operating / Capital Expenses
Various Areas
from: N/A to: N/A
Supplement Transit Service Annual Expenses
12
21
22
23
24
S
N/A
CN
1/1/2004
5307
1275
1000
2275
1000
1275
CE
No
Totals 1275 1000 2275 1000 1275
14
14
North 16th Ave - Signal @ River Road
North 16th Ave
from: North 16th Ave to: River Road
Install New Signal
12
S
N/A
c
W
T
P
0
PE
RW
CN
1/1/2004
6/1/2004
1/1/2005
STP(S)
STP(S)
STP(S)
27
40
232
AIPI 1 31 30
1 1 6 I 46
1 1 361 268
301 1
461 1
1 2681
CE
Yes
08/01 /04
Totals 299 45 344 76 268
00
15
Bus Stop Zones - Transit
Route System Maintenance, Repair and
from: N/A to: N/A
Maintenance of shelters, benches and signage throughout our Route
System
22
S
N/A
O
P
T
W
PE
CN
4/1/2004
6/1/2004
1 1 131 13 131
1 1161 1161 1161I
CE
Totals 129 129 116 13
17
16
SR12 - North 40th Avenue
SR12 - North 40th Avenue
from: North 40th Avenue to: SR 12
Widen intersection and on-ramp
01
p
N/A
p
O
T
W
PE
RW
CN
6/6/2004
1/1/2005
6/1/2005
TPP I 3201 801 4001 4001
TPP I 9601 2401 1200 12001 1
TPP I 19201 4801 24001 24001
CE
Yes
06/06/05
Totals 3200 800 4000 4000
Report Date: June 19, 2003
Page 4
Supersedes previous editions
Washington State Department of Transportation
-en
Agency:
Co. No.:
City No.:
Co. Name:
MPO/RTPO:
Six Year Transportation Improvement Program
From 2004 to 2009
Hearing Date: 6/24/2003
Amend Date:
Adoption Date: 6/24/2003
Resolution No
_
LI
o y
ti
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length
,
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
StartFund
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/VN
Required
Date
(MMS
Federal
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
Facility
Bus Parking Area Asphalt Seal Coat
from: to:
Refumish Transit Bus Parking Area, Improve Drainage, Access and
Signage.
06
07
21
P
00
O
CN
3/1/2004
60
60
60
CE
No
Totals 60 60 60
14
18
4637/4566
East Nob Hill Blvd at South 6th Street
East Nob Hill Blvd
from: East Nob Hill Blvd to: South 6th Street
Install new signal
06
01
S
Signal
T
W
0
RW
CN
9/1/2003
8/1/2004
TPP I 651 101 75 751 1
TPP 1 4001 621 4621 4001 I
EA
Yes
12/01/03
Totals 465 72 537 475
14
19
Nob Hill Blvd
Nob Hill Blvd
from: South 52nd Avenue to: South 68th Avenue
Widen, curb, gutter, sidewalk, lighting, drainage
04
P
.77
p
C
G
0
T
W
PE
RW
CN
1/1/2005
6/1/2005
6/1/2006
STP(U)
300
TPP I 1071 171 1241 I 1241
1 1401 3401 3401Yes
TPP I 11831 1931 1376 1 1376
EA
01/01/06
Totals 300 1290 250 1840 464 1376
00
20
Annual Signal Upgrades
Local Selection
from: N/A to: N/A
Upgrade Signal
01
P
N/A
PE
CN
CN
4/1/2004
8/1/2004
8/1/2004
CMAQ
STP(S)
CMAQ
50
150
300
I I I 50
AIP I 2001 350!
300
501 I
3501
3001
CE
Totals 500 200 700 50 650
Report Date: June 19, 2003
Page 5
Supersedes previous editions
;Wi Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO:
Six Year Transportation Improvement Program
From 2004 to 2009
Hearing Date: 6/24/2003 Adoption Date: 6/24/2003
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State4th
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
RAN
Required
Date
(MM/Yl)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
21
Various Overlay Projects/Selected on Local Priority
N/A
from: N/A to: N/A
Rehabilitate Pavement
07
P
N/A
CN
7/1/2004
STP(U)
173
27
200
200
EA
Totals 173 27 200 200
00
22
Storm DrainsNegetation
Local Selection
from: City Wide to:
City Wide
32
P
N/A
PE
CN
4/1/2004
9/1/20047201
I 1 801 7801 7201 801EA
Totals 800 800 800
17
23
Reconstruction Rudkin Road
Rudkin Road
from: East Mead to: Viola Avenue
Reconstruct, excavate ballast, top course, curb, gutter, sidewalk
03
06
P
.28
w
T
P
C
O
PE
CN
1/1/2005
1/1/2005
STP(C)
STP(C)
154
1390
OTHER! 1 241 1781
OTHER 1 1 2161 1606
1 1781
1 16061
CE
Totals 1544 240 1784 1784
17
24
East Mead Avenue Reconstruction
East Mead Avenue
from: Rudkin Road to: South 10th Street
Reconstruct, excavate ballast, top course, curb, gutter, storm
03
06
p
.76
c
G
0
P
T
W
PE
CN
9/1/2004
4/1/2005
STP
STP
108
973
OTHER I 1 171 125 1251
OTHER 1 1 1521 1125! 1 11251
CE
Totals 1081 169 1250 1250
Report Date: June 19, 2003
Page 6
Supersedes previous editions
Washington State Department of Transportation
-enAgency: Yakima
Co. No.: 39 Co. Name: Yakima Co
City No.: 1485
MPO/RTPO:
Six Year Transportation Improvement Program
From 2004 to 2009
Hearing Date: 6/24/2003
Amend Date:
Adoption Date: 6/24/2003
Resolution No.:
2
y
�j
u_
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure
Schedule
(Coca! Agency)
Federally Funded
Projects Only
o
r
a
$
a
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
RNVR
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
25
Intersection Improvements
Selected on Local Priority
from: N/A to: N/A
Curb, gutter, sidewalk, safety improvements, striping, signs
06
P
N/A
PE
CN
4/1/2004
7/1/2004
5
45
5
45
5
45
CE
Totals
50 50
50
11
26
East Nob Hill Blvd & South 18th Street
East Nob Hill Blvd
from: South 18th Street to: East Nob Hill Blvd
Widen south leg for Double LT from west bound Nob Hill; (Tie to WSDOT
Project) possible curb, gutter, and sidewalk
04
01
P
1
c
W
T
P
PE
RW
CN
1/1/2005
3/1/2005
6/1/2006
STP(U)
STP(U)
STP(U)
13
18
140
1 1
1 1
1 1
21 1511
21 20
251 165
15 (
1 201
1 1 165
CE
Yes
01/01/06
Totals
171
29 200
35 165
16
27
North 6th Street - Signals @ B Street & Lincoln
North 6th Street
from: B Street to: Lincoln
Install Signals at B Street and Lincoln, flashers
01
P
N/A
CN 1 2/1/2005 1 STP(S) 1
1301 1 1
201 1501
1 1501 (
CE
Totals
130
20 150
150
16
28
North 8th Street - Signals @ B Street & Lincoln
North8th Street
from: B Street to: Lincoln
Install Signals @ B Street and Lincoln, flashers
01
S
N/A
CN 1 2/1/2004 I STP 1
801 1 1
111 911
911
1
CE
Totals
80
11 91
91
Report Date: June 19, 2003
Page 7
Supersedes previous editions
Washington State Department of Transportation
IOW
-enAggency: Yakima
Co. No.: 39 Co. Name: Yakima Co
City No.: 1485
MPO/RTPO:
Six Year Transportation Improvement Program
From 2004 to 2009
Hearing Date: 6/24/2003
Amend Date:
Adoption Date: 6/24/2003
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
o
c
a
o
a
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/W
Required
Date
(m
Federal
Fund
Code
Federal
Cost byFund
Phase
lst
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
29
E. Nob Hill Blvd & Fair Avenue
East Nob Hill Blvd
from: East Nob Hill Blvd to: Fair Avenue
Intersection Widening & New Signal, curb, gutter and sidewalk, street
lighting
03
04
P
N/A
C
0
P
T
W
PE
RW
CN
1/1/2005
6/1/2005
1/1/2006
STP
STP
STP
72
62
789
11
10
123
83
72
912
83
72
912
CE
Yes
10/01/05
Totals 923 144 1067 1067
17
30
S. 80th Ave Tieton Dr to Zier Rd.
S. 80th Ave.
from: Tieton Dr to: Zier Rd.
Major widening, curb, gutter, sidewalk
04
P
1.3
O
P
S
T
W
PE
RW
CN
1/1/2005
1/1/2005
6/1/2006
STP(U)
STP(U)
104
303
1323
1 1 16 1 1201 1 1201
1 1 471 3501 1 3501
1 1 2071 1530 1 1 1530
EA
Yes
1/1/2006
Totals 1730 270 2000 470 1530
19
31
North 7th Street Reconstruction
7th Street
from: Lincoln Ave to: H Street
Street Reconstruction into Boise Cascade
03
p
.5
PEI 1/1/2005 I 11 1 1 4001 4001 1 1 4001
CE
No
Totals 400 400 400
17
32
Zier Road - 75th Avenue to 72nd Avenue
Zier Road
from: 75th Avenue to: 72nd Avenue
Minor widening, curb, gutter and sidewalk
05
06
P
15
C
S
T
P
PE
CN
6/1/2004
8/1/2004
STP(E)
STP(E)
2
13
1 1 11 3
1 1 21 15
31 1
151
CE
No
Totals 15 3 18 18
Report Date: June 19, 2003
Page 8
Supersedes previous editions
Washington State Department of Transportation
411.
-enAgency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO:
Six Year Transportation Improvement Program
From 2004 to 2009
Hearing Date: 6/24/2003
Amend Date:
Adoption Date: 6/24/2003
Resolution No.:
Functional
Class
Priority
Number
Project Identification•
A. Federal Aid No. B. Bridge No.
C. Project TitleAgency)o
Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be DoneET
Improvement I
Type(s)
Status
Total Length
o
w
3
S
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local
Federally Funded
Projects Only
.as
a
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
StateRequired
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
RAND.
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
33
Englewood Ave N. 40th Ave to N. 56th Ave
Englewood Ave.
from: N. 40th Ave. to: N. 56th Ave.
Widen roadway, curb, gutter, sidewalk
05
06
p
2.15
0
P
S
W
T
PE
RW
CN
1/1/2008
6/1/2008
1/1/2009
STP(U)
STP(U)
STP(U)
216
277
1367
34
43
213
250
320
1580
250
277
1580
EA
Yes
4/2008
Totals 1860 290 2150
2107
16
34
W Washington Ave Median Removal
W Washington Ave.
from: S. 16th Ave. to: S. 24th Ave.
removal of median in Washington Ave. lengthening turn lanes
05
P
.5
0
PE
CN
1/1/2008
6/1/2008
STP(U)
36
228
1 1 51 41
361 2641
1
1
1
1
41
No
Totals 264 41 305
41
17
35
Englewood Ave. N. 24th Ave. - N. 40th Ave.06
Englewood Ave.
from: N. 24th Ave. to: N. 40th Ave.
Widen, curb, gutter and sidewalk
05
p
2
0
S
W
T
P
PE
RW
CN
1/1/2005
1/1/2008
6/1/2008
STP(U)
STP(U)
STP(U)
173
259
865
1 1 271 200
1351 1000'
1
1
1
1
200
300
1000
EA
Yes
1/1/2008
Totals 1297 203 1500
1500
16
36
Tieton Dr and S. 16th Ave. Intersection
Tieton Dr
from: S. 16th Ave. to: S. 16th Ave.
reconstruct intersection, signals, turn lanes and widen lanes
03
05
12
P
.25
0
P
S
T
W
PE
RW
CN
1/1/2008
1/1/2008
6/1/2008
WSDOTI 271 71 34
WSDOT 1 371 91 46
WSDOTI 1601401 200
1
1
1
1
1
34
46
200
Yes
1/1/2008
Totals 224 56 280
280
Report Date: June 19, 2003
Page 9
Supersedes previous editions
Washington State Department of Transportation
Zi
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO:
Six Year Transportation Improvement Program
From 2004 to 2009
Hearing Date: 6/24/2003 Adoption Date: 6/24/2003
Amend Date:
Resolution No.:
To'
w
i
. a
E
o Z
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
,��
E ,
a�
E
m 11
ci
ro
0
o
h
v
c°t
y
5
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
cu
r
a
cu
a
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
ed
Required
(MMM)Date
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
T6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
37
Pedestrian Bridge
from: North 10th Street to: Yakima Greenway
Construct Pedestrian Bridge from Gateway area to Yakima Greenway,
power, handicap accessible, lights
14
32
p
.25
T
P
0
PE
CN
1/1/2005
3/1/2008
STP(E)
STP(E)
200
2000
27
270
227
2270
227
2270
CE
No
Totals 2200 297 2497 2497
07
38
•
Tieton Dr South 40th Ave. Signal
Tieton Dr
from: South 40th Ave. to: Tieton Dr
Extend left turn lane and install turn signal
12
03
P
PE
CN
1/1/2004
6/1/2004
WSDOT1
271 71 341 341 1
1 1601 401 2001 2001 1
CE
No
Totals 187 47 234 234
07
39
North 16th Ave. at Englewood Ave.
North 16th Ave.
from: North 16th Ave. to: Englewood Ave.
new signaled intersection, signal poles, signals, lumination, sidewalk, curb
01
12
S
p
O
PE
RW
CN
7/1/2003
7/1/2003
8/1/2003
STP(E)
STP(E)
STP(E)
11
6
93
1 1 71 18
1 1 41 10
1 1 541 147
181 1
101 1
1471 1
CE
Yes
08/01/03
Totals 110 65 175 175
00
40
16th Avenue Signal Corridor
16th Avenue
from: to:
Signals, Timing Upgrades
12
S
p
T
PE
CN
7/1/2003
8/1/2003
CMAQ
CMAQ
10
176
1
1
1 41 14 141
241 2001 2001
1
1
CE
No
Totals 186 28 214 214
Report Date: June 19, 2003
Page 10
Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co
City No.: 1485
MPO/RTPO:
Six Year Transportation Improvement Program
From 2004 to 2009
Hearing Date: 6/24/2003
Amend Date:
Adoption Date: 6/24/2003
•
To
N
13
i
.-�
° E
n Z
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
w
E a
aF
=
in
.c
a)
0
,
t°2
v
v
0
—
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
a�
m
a
tiPhase
2
a
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R�
Required
Date
(MM/vY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
07
41
South 1st Street & Mead Avenue
South 1st Street
from: South 1st Street to: Mead Avenue
Signal Improvements
12
S
0.0
p
T
PE
CN
7/1/2003
9/1/2003
CMAQ
10
158
3
21
13
179
13
179
CE
No
Totals
168 24 192 192
00
42
Gravel Road B.S.T
from: to:
PM -10 Abatement
07
S
CN I 4/1/2004 I 1
1 11 2001 2001 1001
501
501
CE
No
Totals
200 200 100
50
50
08
43
Powerhouse Road & Englewood
Powerhouse Road
from: Powerhouse Road to: Englewood
Safety Flashing Signal
12
P
0.0
T
P
PE
CN
5/1/2004
9/1/2004
STP(S)
STP(S)
20
300
1 31
1 451
23 231
3451 3451
I
I
CE
No
Totals
320 48 368 368
07
44
South 48th Avenue & Summitview Avenue
South 48th Avenue
from: South 48th Avenue to: Summitview Avenue
Signalization
12
P
0.0
p
T
PE
RW
CN
1/1/2009
6/1/2009
8/1/2009
STP(S)
STP(S)
STP(S)
20
20
340
1 1 3
1 1 3
1 1 51
23
23
391
1
1
1
1
1
1
23
23
391
CE
Yes
06/01/09
Totals
380 57 437
437
Report Date: June 19, 2003
Page 11
Supersedes previous editions
71 Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO:
Six Year Transportation Improvement Program
From 2004 to 2009
Hearing Date: 6/24/2003 Adoption Date: 6/24/2003
Amend Date:
Resolution No.:
Functional
Class
?'»
.2 E
0 Z
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
co
o_
ar
.-
a
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/N/
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
07
45
South 3rd Avenue & Washington Avenue
South 3rd Avenue
from: South 3rd Avenue to: Washington Avenue
Signal Upgrades
12
p
0.0
p
T
PE
CN
4/1/2004
7/1/2004
10
140
10
140
10
140
CE
No
Totals 150 150 150
07
46
South 16th Avenue & West Washington Avenue
South 16th Avenue
from: South 16th Avenue to: West Washington Avenue
Signal Upgrades
12
P
0.0
p
T
PE
CN
1/1/2004
6/1/2004
STP(U)
STP(U)
10
60
1 1 101 20 201 1
1 1 601 1201 1201
CE
No
Totals 70 70 140 140
07
47
West Nob Hill Blvd.
West Nob Hill Blvd.
from: South 16th Avenue to: East 182 Overpass
Sidewalks on Southside
12
p
2.0
p
T
PE
RW
CN
1/1/2007
7/1/2007
3/1/2008
STP
STP
STP
43
85
255
1 1 71 50
1 1 151 100
1 1 451 300
1 1
1 1
1 1
50
100
300
CE
Yes
07/01/07
Totals 383 67 450 450
07
48
West Lincoln Avenue
West Lincoln Avenue
from: North 22nd Avenue to: North 29th Avenue
Sidewalks on the Northside
12
S
.5
T
p
PE
RW
CN
7/1/2003
1/1/2004
6/1/2004
PSMPI 61 41 10
PSMP I 61 41 10
PSMP I 741 991 173
101 1
101 1
1 1731
CE
Yes
09/01/04
Totals 86 107 193 20 173
Report Date: June 19, 2003
Page 12
Supersedes previous editions
Washington State Department of Transportation
-enAgency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO:
Six Year Transportation Improvement Program
From 2004 to 2009
Hearing Date: 6/24/2003
Amend Date:
Adoption Date: 6/24/2003
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
StateRequired
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir
Type
R/VV
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
Thru
6th
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
49
Beech Street Pedestrian Connection
Beech Street
from: Fair Avenue to: Chalmers/Riverside
Pedestrian Connection
06
32
p
1.0
p
T
PE
RW
CN
1/1/2006
6/1/2006
1/1/2007
STP
STP
STP
45
150
400
6
20
54
51
170
454
51
170
454
CE
Yes
07/01/06
Totals 595 80 675 221 454
07
50
West Lincoln Avenue Sidewalks
West Lincoln Avenue Sidewalks
from: North 32nd Avenue to: North 40th Avenue
Sidewalks
12
P
2.0
p
T
PE
RW
CN
1/1/2007
5/1/2007
3/1/2008
STP
STP
STP
34
68
204
1 1 61 40
1 1 121 801
1 1 361 240
1 1
1 1
1 1
40
80
240
CE
Yes
06/01/07
Totals 306 54 360 360
Report Date. June 19, 2003
Page 13
Supersedes previous editions
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No.
For Meeting of June 24, 2003
ITEM TITLE: Public Hearing to:
A) adopt the Six-year Transportation Improvement Program (STIP) for
years 2004 to 2009, and to amend the Metropolitan Transportation Plan;
and
B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to incorporate the adopted Six-year Transportation Improvement
Program (STIP).
SUBMITTED BY: Department of Community and Economic Development -
William Cook, Director
CONTACT PERSON/TELEPHONE: K. Wendell Adams, P. ., Engineering Manager, 575-6111.
SUMMARY EXPLANATION:
See Attached.
Resolution X Ordinance Contract Other (Specify) STIP
Funding Source
Afi-xl-,96eee4-c rt7
City Manager
APPROVED FOR SUBMITTAL:
STAFF RECOMMENDATION:
1) Hold the Public Hearing, 2)Adopt Resolution approving the STIP and amend the regional
Metropolitan Transportation Plan, 3) Adopt Resolution amending the Comprehensive Plan Capital
Facilities Element.
BOARD/COMMISSION RECOMMENDATION:
COUNCIL ACTION:
/�\ 4. 4L... P�:4 1.... ROW / 9G 77 r\A!\ J r r'tA/ 7!' (l4 A' l L. update '1-,
A) Each year a 1e City is required by ROVV )U. / / .0 10 and RC 36.8 1 . 1 2 1 w update its Six -Year
Transportation improvement Program (TIP) for submittal to the Washington State Department of
Transportation. This plan must include all transportation projects for which state gas tax revenue
or federal revenue will be used.
The plan for 2004 — 2009 consists of twenty (20) funded projects. Funding for the remainder of
the projects will continue to be sought.
The next authorization of TEA -21 will be called SAFETEA, standing for Safe, Accountable,
Flexible, and Efficient Transportation Equity Act of 2003. The Transportation Equity Act of 1998
for the 21s1 .antury (TEA -21) iegaiwith thepassage of the Intermodal Surface Td3 S;Lrt.atiol
E
Efficiency Act (ISTEA) of 1991. It specifies the systems on which certain funds can be used,
expands the kinds of activities for which funds can be used and promotes the role of the
Metropolitan Planning Organizations (MPO) in the planning and programming of projects.
SAFETEA requires each designated MPO to develop a Transportation Improvement Program
(TIP), and the state to develop a Statewide Transportation Improvement Program (STIP) as a
condition to securing federal funds for the transportation projects.
Projects listed in the STIP are the only projects that will be approved by the Federal Highway
Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal funds. The
STIP is a prioritized program of transportation projects, compiled from local and regional plans,
along with the Washington Transportation System Plan (WTP), which provides a backbone for
developing projects for the intermodal transportation network in the State of Washington.
The STIP contains federally funded projects plus state and local projects that are regionally
significant. These projects have been identified through the planning process as the highest
priority for the available funding to the state's transportation program.
Planning activities of state and local governments are essential parts of integrated regional
planning processes. Long range transportation planning is a part of the comprehensive land use
planning carried out by local governments. Citizen participation is an integral part of the planning
process at ail levels. Local Agencies are required to develop and adopt a six-year transportation
program. All local agencies are required to hold at least one public hearing during the
development of the six-year transportation program.
Project ranking was performed utilizing data supplied by the Street and Traffic Division. These
rankings were then integrated with other project needs and the total list was reviewed and adjusted
to the particular need of the City of Yakima.
B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to incorporate the adopted the Six-year Transportation Plan for 2004 to 2009. This will
ensure that we are in compliance with the Growth Management Act and that we are consistent
with the Comprehensive Plan as required. This amendment is limited to incorporate only those
projects that are adopted in the STIP and is not subject to the "once a year" change required
under the laws of the Growth Management Act.
2 -- June 19, 2003
MEMORANDUM
To: Bob Desgrosellier, Senior Engineer
From: Joan Davenport, Supervising Traffic Engineer
Date: June 16, 2003
Subject: Recommendations from Bicycle Pedestrian Advisory Committee for 6 -
Year Transportation Improvement Plan
The following list of recommendations from the City of Yakima Bicycle and Pedestrian
Advisory Committee was finalized at their June 11, 2003 meeting.
1. Lincoln Avenue between 20th and 24th Avenues: Lincoln Center sidewalk to
connect to Powerhouse Pathway. Some right of way may be needed. A 7 -foot
sidewalk was recommended as the minimum width. Safety grant awarded to City
of Yakima on 2002. Right of Way acquisition necessary.
2. North 40th Avenue, east side: Missing sidewalk link across one parcel in vicinity
of Mavis Street.
3. North 40th Avenue, west side of street between River Road and Powerhouse
Road.
4. Lincoln Avenue, north side of street between 24th and 32nd Avenue: missing
sidewalk link in vicinity of school. Right of way will likely be necessary. Grant
awarded to City of Yakima in 2002 for sidewalk up to 29th Avenue.
5. South 32" Avenue, between Tieton Drive and Nob Hill Elementary school,
west side and missing segments on east side.
6. New pathway extension from McGuiness Park to 6th Avenue. This would be
Phase 1 of a larger pathway concept which would connect the canal pathway to
Fair Avenue Pathway. The Committee will develop more specific
recommendations for the location of this pathway.
7. Summitview Avenue, north side: from 18th Avenue to Linden Lane. Sidewalk
needed. Recommend 7 foot width. Right of way will likely be necessary.
8. North 16th Avenue, west side from Lincoln Avenue to SR -12. This is a missing
sidewalk location which experiences pedestrian activity and is a very busy arterial
street.
9. Greenway Path connector from Myron Lake to Fruitvale Boulevard. Need
railroad crossing. Existing path will need to be re -designed for a railroad crossing.
Also, need accommodations at Fruitvale Boulevard.
10. Lincoln Avenue from Fair Avenue to 10th Street, missing sidewalk on north side.
11. Powerhouse Road adjacent to Robertson Elementary school to Englewood
intersection. It was noted that this area is used for a walk to school route, yet has
no sidewalk. The canal pathway in this vicinity helps get some children off the
street, but still no sidewalks connect patrolled school crossing with school
complex.
12. Nob Hill Boulevard, 3`d Avenue to 16th Avenue, south side of street missing
sidewalk segments.
13. Beech Street to 18th Street corridor, sidewalk or pathway connector needed
from Kiwanis park to commercial area and Greenway.