Loading...
HomeMy WebLinkAboutR-2003-045 Yakima County Agreement (re: Tieton Drive Sewer Extension )RESOLUTION NO. R-2003-45 A RESOLUTION authorizing and directing the City Manager of the City of Yakima to execute an agreement with Yakima County, for the construction of a Sewer Extension Project for the City of Yakima. WHEREAS, the City of Yakima desires to extend sewer service mainline and sidesewers along Tieton Drive from South 72nd Avenue to South 96th Avenue; and WHEREAS, the County intends to construct a road improvement project known as the R 3093 and R 3094, Tieton Drive Improvement Project, which project lies along the same location as the desired sewer mainline; WHEREAS, the County and the City agree that having the sewer mainline project constructed in combination with the County's road improvement project is mutually beneficial; and WHEREAS, the City has determined that it is in the best interest to provide funding for the sewer mainline extension and to allow Yakima County to do the construction; and WHEREAS, the Yakima City Council deems it to be in the best interest of the City that the attached agreement document be executed by the City of Yakima, accordingly; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager of the City of Yakima is hereby authorized and directed to execute and agreement with Yakima County for the purpose mentioned above, a copy of which agreement is attached hereto and by reference made a part hereof ADOPTED BY THE CITY COUNCIL this 18t day of March, 2003. ATTEST: City Clerk Mary Place, Mayor AGREEMENT FOR SANITARY SEWER IMPROVEMENTS AND FUNDING THIS AGREEMENT is entered into between the City of Yakima, (hereinafter the "City") whose address is 129 North 2nd Street, Yakima, Washington 98901, and Yakima County, Washington (hereinafter the "County") through its Public Works Department, whose address is 128 North 2nd Street, Room 408 County Courthouse, Yakima, Washington 98901. 1. RECITALS. 1.1 The County intends to construct a road improvement project known as the C2503; Tieton Drive Improvement Project: South 96th Avenue to South 72nd Avenue (hereinafter "the Road Project"). 1.2 The City wants to have sanitary sewer and side sewer lines (hereinafter "the Sewer Project") constructed at certain locations within the limits of the Road Project. The location of the Sewer Project is shown on Exhibit 'A'. 1.3 The County and City agree that having the Sewer Project constructed in combination with the Road Project is mutually beneficial. 1.4 The City has determined that it is in its best interest to provide funding for he Sewer Project and to allow Yakima County to do the construction. 1.5 The Yakima County Engineer has determined that it is in the best interests of the County that the Yakima County Public Works Department contract for the construction of the Sewer Project within the same construction contract as the Road Project. NOW, THEREFORE IT IS HEREBY AGREED: 2. THE CITY SHALL: 2.1 the County. Provide the design, details, specifications, and estimate for the Sewer Project to 2.2 Review the County's final contract plans and specifications and provide written approval of the Sewer Project plans and specifications to the County before the advertisement of the project. 2.3 Review construction bids provided by the County and provide written notice of approval or disapproval of the Sewer Project bids to the County before the award of a construction contract. Written notice will be provided to the County no later than five working days following opening of bids. 2.4 Review and approve all Source of Materials submittals regarding the Sewer Project. 2.5 Provide all on-site field inspection for the construction of the Sewer Project except those services to be provided by the County identified in items 3.5 and 3.6 of this agreement. The field inspection will be consistent with Sections 7-08, 7-17, and 7-18 of the Washington State Department of Transportation's 1998 Standard Specifications for Road, Bridge, and Municipal Construction. 2.6 Prepare a monthly progress estimate of quantities used on the Sewer Project using the bid item schedule for the construction contract. The progress estimate will be provided to the County no later than the 5th day of each month. The progress estimate will include all work completed through the last day of the previous month. 2.7 Upon review and approval by the City of the amounts charged, provide monthly progress payments to the County for work performed on the Sewer Project by the contractor. Progress payments will be made to the County no later than the 20th day of each month. The progress payment shall be based on the progress estimate provided for in item 2.6 of this agreement. 2.8 Upon review and approval by the City of the amounts charged, provide a final payment to the County for all costs reasonably incurred by the County that are directly related to the Sewer Project. These Costs shall include actual sewer construction costs made to the contractor, County personnel labor costs for time reasonably spent on the Sewer Project work, and material testing expenses. Final payment shall be made to the County no later than 30 days after the City receives a reporting of final costs from the County. 3. YAKIMA COUNTY SHALL: 3.1 Incorporate the City's Sewer Project design, details, and specifications into the County's Road Project. The Sewer Project construction bid items shall be listed under a separate pay schedule within the contract documents. 3.2 Provide a copy of the final plans and specifications for the construction project to the City Engineer for his review and approval before the advertisement of the project. 3.3 Provide a copy of the bid results to the City Engineer for his review and approval before the award of a construction contract. 3.4 Provide copies of all Source of Materials submittals for the Sewer Project to the City Engineer for his review and approval before use of the materials on the project. 3.5 Provide field inspection and material testing of trench excavation, trench backfilling, and pavement repair required for the Sewer Project. 3.6 Provide construction control surveying for the Sewer Project. 3.7 Make progress payments to the contractor. 3.8 Provide a report of final costs for the Sewer Project to the City following completion of the construction contract. The report shall include a breakdown of costs incurred by the County. CITY OF YAKIMA Richard A. Zais, City Manager 3 zee? Date Signed ATTEST: 4c ia 9 Cy Clerk City Contract No. 000,3 -36 Authorized by City BOARD OF YAKIMA COUNTY COMMISSIONERS es S. Palacios, Chairman ames M. Lewis, C ner Ron F. Gamache, Commissioner ATTEST: Carla M. Ward, Clerk of the Board Approv-d as t. • 0 Resolution No. /Q'o?X.3 — //S Deputy Prosecuting Attorn s II II Tn 10 PARCEL 181319-33008 -w- -w S.S. STA. 1+49 L= 35' t4GICC49 DDRIMI(C &MDD PRELIMINARY PLAT No, 438; EXAMINER No, 096-4-17 Icnxtn MU/ cru o©1ATtIZ aa©. 305 North 6th Avenue, Yakima, Washington 98902 (509) 453-6281 CN089 Compw.r RI. 1694 ProJwt Ne, MAY, 2000 JJA JJA kis Dram C', k.B SCALE: HOR, 1".20' VERT„ 1"-5' 1 S.S. STA. 1+53 L - 35' w - ---t- ---w- -w-- T PARCEL 181319-33009 EXG. NOB HILL WATER MAIN •w- -w EBYC K .01! S S S 15 Ja 1+00 N 89.39.47" W �•—•—•—•—•—•—•—•—•—•—•—•—•—• EXG. S.M.H. STA—(0+08) -w PARCEL 181319-33005 R 3cict Exhibit A amp PARCEL 181319-33405 S.S. STA, 3+80 L= 24' S.S. STA, 3+76 L = 24' -w- -w -w- -w- -W- -w- 0+00 STA 0+00 CASED MON. LCR 2M-1417 S.M.H. /1 STA 1+80.00 NOTE: SANITARY SEWER TO BE CONSTRUCTED WITH YAKIMA COUNTY'S TIETON DRIVE PROJECT, VERIFY MANHOLE RIM ELEVATION WITH YAKIMA COUNTY CONSTRUCTION PLANS, WHEN COMPLETED. CDSE-'01' OIL TIETON DRIVE (ROAD & CANAL R,O,W.) APPROVED ENGIN ELTI NN1810N O snow DRIVEWAY /t'SEWER 0 DRAINAGE IJ WATER 0 _ II 1+00 2+00 3+00 APPROVED FOR CONS111UO710N AB NO7D ABOVE AII, CONNECTION CNARDEC. INPFED. IVON oyona, FEES, mECON, AND [ASEM.N} "'N}S MUST BE MO BEFORE GAN. STBOCTION 041 MIR BY T - _1A A' m _ rms. a i. MTP.71/ r N0 turn: / 4+00 5+00 1285 1260 1255 EXG. GROUND LINE 8" PVC PIPE L - 188.00 LF 5 - +0.023 MH # STA 1+80.00 RIM EL. - 1243.5 IE WEST . 1235.90 IE EAST . 1236.00 8" PVC PIPE L • 350,00 L.1' S - +0.0286 1240 1235 1230 ;5 EXG. MH STA—(0+06) RIM EL. • 1241.33 IE NORTH - 1232,33 IE EAST . 1231,80 IE (OUT) - 1231,5C 1225 1220 PARCEL 181319-33408 PARCEL 181319-33408 PEO KM mLE EfihRQ IEZ4la4 E% %B ITZ:g: `( %E'YE N@ PREUMINARY PLAT No. 4361 EXAMINER No. 096-4-17 68 110,70' N EASEMENT 69 SZOCIATIE 305 North 81h Avonw, Yakimo, Washington 98902 (509) 453-8281 C5X15\1194\TREETI O Cw4BW nE 1494 MAY 2000 JJA JJ mAg NP. 0.9 aPMn CNKhM 110.70' N 89°59'47" W S.S. STA. 6+62.5 L_24' S.S. STA. 6+66.5 L _ 24' EXO. N08 HILL WATER AWN I W W W—�w w--1°arvr-w w 6^ slue Wim' D+oo _ _ _ _ _ _ _._._._._._.�.--•_ S S S 1 600 ,_._.—.._._.-+•._._. ._._ I 4 S {� S S S 7 00 �.._._._.#-._._._._._.__._ S.M.H. 3 N 89.5D'47" W STA 6+60.00 (6+47.00) S.M.H. r2TIETON DRIVE 221 40' L7 w W_ -.-----w (� 3aa3 STA 5+30.00 EDeC er elL NOTE: SANITARY SEWER TO BE CONSTRUCTED WITH YAKIMA COUNTY'S TIETON DRIVE PROJECT, VERIFY MANHOLE RIM ELEVATION WITH YAKIMA COUNTY CONSTRUCTION PLANS, WHEN COMPLETED. 5+00 6+00 7+00 ■■■■■■■■.■. ■■■■■■■■■iimmu ■■■■■■■ ■■■■■■■■■■■■.■■■■■■■.■■■■■■ ■■■■•■ EXO. GROUND LINE .■■■■■■■• MMEN■■■■■.■■.■■■■■.■■■� ■_■■■■. MOMM■..■■■■■MEMOM■■matimmummummummummomm .... Enma manam■■mmammum1110!_!____ ,,�■■• i.__�s��r . E 30.00 if ■■■■■■■■■ ��,.,,,,,_,,,_.__ ■■■r■■ 8 _ +0.0100 ■ STA �+30.00 ■■■ ■ EW1126 ■■■ /t1 SCALE: HOR. 1 "_20' VERT.. 1"4,5' Exhibit A APPROVED COUNTY ROAD ENGINEER YDATNEMA QUNZY WASNf-wNG�BY STA 26+47ED C.22 UNMMK 1.01194-1134 APPROVED cITY O YANiMA 8N0INEL ND DIVISION 0 Mir 0 ONIVEWAY *MEN 0 OwMNAOE 0 O • I APB/FOVEA POB CONSTNUCTION AS NOM ABOVE. All CONNECTION C1M0E5.IMMfC' TM OEPOSIT.FEES. MECCN. AND EASEMENT BEOUINLMENT6 MUM BE MET BEANIE CON. BTRUCTIONCw0)001 TNIt J� ` NO. � cAn7t1L•�' MOMMOIROM■■■■■.■■ ■■■■■■■■■■■MP ■■■■■■■■■■■■.a■■ MMOMMINIMMIMMO ■■■■■■■■■■■■■■■■ ■■■■■■■■■.■•P ■■■■■■■■■■ ■■■■■■■.■■■■■■■. ..■ o ■ ■■■■■■HEMI ■■■■■■■■■■P 9+00 1111:1:111111111 1111111.1...1 im mmommommom mommummumm 11 11111111111 1111111111111 MH X13 STA 8+80.00 ,e+47 00) RIM EL. _ 1267 00 IE WEST _ 1249.60 IE EAST 1249.70 1 11111111111 1235 1230 1225 /7/1i/.0 I i CUT CATCH LINE (TYP.)•1 SECTION 19 ac .30, T. 13 t\ Mill MIMI- NMI% 111•1111i. D 10 20 40 N P� U11UIY NEW EDGE w CONFLICT r OF PAVEMENT UTILITY CONFUCT w w 'w w • 18 E. Wiv FILL CATCH UNE (TYP.) i z+s, 3� ± 1 . OUT 1231 ,3(' 5; Exhibit A 4-4 L..F UTILITY - —caaFQc.W • FILL CATCH UNE (TYP.) NEW EDGE OF PAVEMEM\ TIETON DRIVE I 1 127 128 0 UTlUTY 2646.53 FT N89'43'31'E' uT1UTY—�\ \i% CONFUCT ` • 6 CONST a o� + 1 01 M4 - 0 / / / R/W FILL CATCH LINE (TYP.) 2 32' /// 11ETON DRIVE STA. ▪ 129+09.93 = 92ND AVENUE STA. 20+00.00 • I• 1256 - _ _ `! i i i • J�� i i i i p 1256 _ 1254 i I 1\ 1 1254 1 • I ��� 1 � PROPOSED CENTERUNe PROFILE I i I 1252 1252 1 I i 1250 i EXISTING CENTERUNE PROFILE o \�� I 1250 1 1 1248 i I N ^ r 1 t. < I N;+ On� 1 1 I i 1 '1 1 °1 \\ i i i 1248 J7 _• � j •I `` i I ` 1 I ...iv I j 1246 1246 i< < I ! \. ! . .4../ tri i •i •I 1244 ' I • 1 1 i , `�\ i~ i �1� I 1 �. i ss 1 I 1 i 1244 1242 1 i I i �.i 1242 i I i 1 •a• ' M d• 1p ^i CO _ Of h O h N 1 M i v . ul 117 • ,..01 l':'-^ r';.-1.--.--- •CO �_ CO- ..__ tfi i �.. V' • M +M' N. G��d _._ _1n fD I . Of t0 O N .- O �p M N T, h T; <O N I .f• 'n`� .- h • .COCO '-u-16 1 240 N :n 1n 1A 1 1n u) 1n 1n u') : v7 1A 1n :n : 1n 1n I 1n u7 I in In I d• •d d• v •d• v .d• ; v d• i v d• : v �t I N N, N N I N N i N TIN N 1 N N. N N: N N 1 N N 1 N N• N !...1 1 C.11 N 1 N N• N N I N N 1 N ^ j N N• N N .e ' w O v d • h y I N_ .` N I N I 1240 �'^ 125+00 126+00 127+00 128+00 129+00 130+00 YAKIMA COUNTY PUBLIC WORKS DEPT 1'-"0\ 2m (5372.2AVS T'0 5, 9'"' AViNU ) R3094 - REGION STATE r4DERAL AID NG. WASH. 5TPU5 -4562(0051,,, r ti PREPARED UND ;X THE DIRECTION OF: ow 111 ENGINEERING 677 Woodland Square Lp SE Lace , Washington 98503 (360 493-6002 ((360 493-2476 Fax CIVIL • TRANSPORTATION • PLANNING • SURVEYING DRAWN: CHECKED BY: W.H.I-. 10 -3-941 SCALE: HORIZ. r VERT. r REVISION: FNAMM RGPo3001.DW& PLAN & 5 ���' 4 OF 28 // NIS 0 10 20 40 F_•, ,t Zv-j T \1213 °= -3- EX. HOUSE SECTION 19 8c 30, T. 13 N., R. 18 E. W.V. PROPOSED ORYWF71 LOcALOCATIONONoN FILL CATCHtUNE (TYP.) 1T V� tJJ -4 tl1 SP SP Exhibit A R CONST. c. 11.11.1 .....1C11 •U1 JTX- CONFLICT w w MIR UTILITY - CONFLICT TIETON DRIVE CONFLICT w T _ _ �1Tlllw�— NEW EDGE CONFUCT OF PAVEMENT 131 b1 : N• CO v — r CONFLILI CT 132 133 134 UTIUTY - CONFLICT NEW EDGE OF PAVEMENT • / Is •K tiI PROPOSED DRYWELL LOCATION FILL CATCH UNE (TYP.) EX. HOUSE '5� N1: x Nr1 ti I ' 1 1. I 1242 1 1 i ! 1 , 1 1 I 1., ZT , r1 vl 1 1 .,..1 t I • I I 1 j ! i i N I '�s'• N ! N 1 ��. 1242 I ',39s ! I O 1240 I ! N i 1 ± in •a' 1 i 1 II M •1 1 4 i i I H w �' 1 / j / I 1240 I 'i9.'''r i G I 1238 i I 1 ' j , I i ! i j ,,/� �• ! I ! 1238 •-•\ I t•-•...••••• j \�� EXISTING CENTERLINE PROFILE I 1236 ! 1 I 1 1 �- PROPOSED EENTERUNE PROFILE 1 I ,v I I I i 1236 i' I \`! �� 1234 1 \��� I i \ �_ — 1 ' � k _�/ i ��'��� ' I : i 1 i 1234 1232 j •_`'�--_._ _ - ----- -- - : I i 1 � j 1232 1 i i ° / /j1 11230 . i1 i 1 I 1 j 1 1 1230 i i i• 1 1 i VPI STAR 1S2+67.00 I i I I 1 I j , 1228 1 i i{ • ! i VPI EL R 1230.34 I CURVE L9 + 310.00 I E R 3.50 I ! 1 I I 1228 -- 1 an rn i t\ O j 0 .- M r7 , r _i_4:1—__.___. m-!__� __. ____. �_.•t_____.__01.i-M Cf • N C1 O ^ i t\ tel ' N 1211 CO , M 111 W .T- .-• m I� M m a Ci COm m v1 1 V• n • 1 0 ,r M_ __._. n t __.__ m I O--_ t I N . O f -- _�Nj O m ID 10 N r .- I� M' m�r) �11� 1 nn M 1226 1 N_ N I N N N N I N N I N N • �,,,i T r1 rl V• N MJ N N I N M` M MIM M ,-- r.1 ^ NIN N N_ ^ cV e•f i N M] [V --v -,+----Iri-1'Yj'---.____t0_• Lei- - 1` • ,G' of M MIM M M M M M M MIM MIM M' M M N NIN Ni N N?N_ N N NIN NIN N: N_ N - 6 Ci M M r N NIN N N" 11226 130+00 131+00 132+00 133+00 134+00 135+00 1 ' YAKIMA COUNTY PUBLIC WORKS DEPT. 1M1 f ° OVA M 0OJ p (5, 72 `-r 110 51961 -AV, 83074 - REGION STATE FEDERAL AID NO. WA5hi 5TP1.15-4562(005) r, •PREPARED UNDER THE DIRECTION OF: mamas oAilloo 31191.115 9/14/41 Algona BARBA ENGINEERING 677 Woodland Square L) SE Lace, Washington 98503 (360 493-6002 (360 493-2476 Fax OPAL • TRANSPORTATION • PLANNING • SURVEYING CHECKED BY l 1-0\ 21IV; °LAN &� pp0MMLE (// 1F-4 TA • 0 10 20 40 ‘1,1 tr, 418.1111am."12111n. AT BS Mina SECTION • kt:4 < 1,LS, Co'7-• 11 31. c. AJ CUT CATCH UNE (TYP.) FILL CATCH LINE (TM.) 1 SP SP 19 & 30, T. 13 N" 18 E. W. FIL1. CATCH UNE (TYP.) V \ CUT CATCH UNE (TYP.) „.. `,t, i747), ) u. O. 77) : Exhibit A CONST. U71LITY CONFLICT UTIUTY FUCT 1.11111 umu.ry NEW EDGE WA CONFLICT' , OF PAVEMENT w coNFuc-r 136 '1 T1ETON DRIVE 138 139 CONST. G UTIUTY CONFLICT NEW *1111.11garifill- VFJAENI 0 u-nurr CONFLICT o 0 CO 1 0 A. 1 • LU LU (n „n= LU - ow LL1 00, FILL CATCH UNE (TYP.) tz• 07 CUT CATCH LINE (TIP.) 0 x 240' TAPER • z. a 2 • 1256 ' - J. I ' . . , I I , . i ---- ' .----rI -' I . PROPOD;CENTERUNE PROFILE SE • I . • l -...4...,,,,z, : ' I 1256 1254 1 • . . i • ; • ; /"'; -.- : i 1 . . 1 I • — -_, . 1254 1252 - • ! . 1 ; • . • 1,........,...-* . ! --- • I I . i . • . 1252 1250 , i 1 , ; . . , „...--- . -• . i , 1 ; . 1 . 1250 124 o I ; i1111i . • i:•. ..,. 112244-86 i, . ii 1244 • - ...- : 1 . . . : : I i VPI STA . 139+50.00 1 I I I i 1 ), 12,4 < .; ::. ; • 1242 ..r. . , I I . 1 : i ; . . . ; . , I I ; . E 8.92 , • 1't. . , i i i I i , . 1 1242 r ,t.,r_l - 9 1240 5" 1240 , 4 :c•1 N4t (') K 1;- 0N : Nr 1 I 66 + r!d l 1 .),; 04 VOV1 .11. oi Of ,3„ NN. .i IC,V d 0 0 0N I; 704 VY ;I ,) r) o N. 0N ro Nsi .. (0 " u, ,) L) •'1 " 0) io 0) 0) 01 I N Lc) uI .N iI 01 in 0) 01 •,•1 N. 0 0 n 0 N 4. c00-0 -1 I,i to 0) 0)i n -i) 0) 1240 135+00 136+00 137+00 _ 138+00 139+00 140+00 ' ( YEA COITN'TY PUBLIC 'WORKS DErPT.- 21VE \1-1 AP0V ,M,- l- (51 721\2 AVKJ 10 5, 961- AV4ILE) 3c)9 REGION 1C) STATE FEDERAL AID NO WASH. 5TPU5 -456210051 PREPARED UNDER THE DIRECTION O.F: 0P9172111/75/00 );xpates zotlos 411. ENGINEERING' 677 Woodland Square Lp SE Lace , Washington 98503- 360 493-5002 (350 493-2476 Fax CIVIL • 1RANSPORTA1ION - PLANNING • SURVEYINt CHECKED BY -rok 211\/ MAN & Pg0F11, 6 OF 263,._ NIS 111•111111111 SNP 0 10 20 18 40 CUT CATCH UNE (TIP ) SECTIO \I 19 & 30, TIETON DRIVE STA. 142+28.51 = 88T1 -I AVENUE STA. 0+00.00 FILL CATCH UNE (TYP.) a a u71uTr CONFLICT IH -unur _ CONFUCT x CUT CATCH UNE (TYP) 3-----x—x—m—x- x •'•f X NEW EDGE OF PAVEMENT 141 0 UnuTY CONFLICT R T• � w w. lei -'- !fi . iR 0 z 142 w CO CO of STA N 45 16 1 00 • IU I Q .`741 137 CL, T. 13 k ., 'R. _,18 E. W. \ I,, 1 S ;i FILL CATCH UNE (TIP.) V Exhibit A 42+2 392.66 89 8.01 j000'19"R X 7/ x CUT CATCH UNE (TYP.) UTILITY CONFUCT UTILITY 0- CONFLICT w TIETON DRIVE 143 M —0 — —. — FILL CATCH UNE (TYP.) 0 0 x x w UTILITY w CONFLICT 1.1.1 1!44 NEW EDGE OF PAVEMENT/\ 11e\ 240' TAPER CONST �. O N L LLI 1nW = /I LA 7ZQ —1 J sZa- U w xj v 0 G 0 U 31UTY CONFUCTN XT—�" \ \ \\ NA4\ 56' RAN YAKIMA `/ALLEY O'P' \ 1 \\ ` 3 9 1256 , 1 i \ 1 �j r i I i 1 i i j i i i i I I I i I � 1 j .� 1 1 1256 �� 1254 _ - _ _ i i \ PROPOSEDICENTERUNE PROFILEI i I I i 1254 1252 , I1'r �, �� j I 1252 1250 i ; I I i i• 1 i `�ti� , -,-_,. C 1 , 1250 124 E ! I j I i I i EXISTING CENTERLINE PROFlLE, I �\ i \\` I II ! ¢ i N w I i ! I 124$ I __ I ; �o� I+ rn `4'32>, ' S '--`i• 95 ! W S j I I j 1 I I `�- I ! i -• I\ ��� ���� 12461246 1244 1242 _\,� rn_ m • (V .- \ ` `; 4 1 1240 N N 124-4 ` ; 111 iN ;> i y • I i ! i 1242 ! i i ! o :0) ,r) . ,n 1240 N_ -r O N m If) ,n N N I N O• lm m, O: In I ,- L'3 to N i N a)! to u) i to u -i ,n I ,n N t N 10.-4- N 1 N N ,n N N m 9 ,r) N N m Y) 1 , 4 I N m1n n 1 N n 1n I n N • N ofo ml' 0) N N r- ,- i 0 V- n M I DI M N N I If) : � N ! to in Ln N; N N! N N I N mi,- m: N i O In ' In NIN m1n h 1 m O I on I[) I N: N 101N . I m 0) I CO V t N I N `m 0110 m m I m [O n t\ t0 v . -t �' -a N: N N N ml m 1 c0 In P N I N p)io Ln i L7 If) ! -t P N! N I of m 0 0) ,D N) f� n v i 11 M") I (i T T P �I' N N N I N 140+00 141+00 142+00 143+00 144+00 145+00 i 0• YLEMAA COUNTY PUBLIC WORKS DEPT, I IM \-r (5) 72\3 AV. 1'0 5, 96'- 3Og4- J / REGION I STATE I r.6DERAL AID N0j' 10 WASH. ST1'05 -456210051 PREPARED UNDER THE DIRECTION OF: 1:0.38115-0,30/00 x Z/18/01. I ,10.0a !Wan ENGINEERING 677 Woodland Square Lp SE Lace , Washington 98503 (360 493-6002 ((360 493-2476 Fax CIVIL • TRANSPORTATION • PLANNING • SURVEI1NG DRAWN: W.H:L. 10 -03 -99 CHECKED BY: SCALE: HORIZ. 1" • 20' VERT. 1" • 2' REVISION FNAMEL RGP06001,0WC0 l J i6 5 7 OF 28 LE o co + 1 10 0.. ••i• , 4 fE fi t -r) SECTION 19 & 30, T. 13 .1111.1.,MINE1111111 0 10 20 FILL CATCH UNE (1w.) 40 N \ 7`E.• 'LT.) , - 18 E. W.IV PROPOSED ORYWELL LOCATION = H 3(1 "c4 0 .6) ? 81-7 PROPMED RELOCATED - --CANAL - 4-c-; -7) 0 , 0417 1.21'?-., CU▪ T ATCH Exhibit A - UNE (TtP.) 1-1 ,• ▪ 1-1Z (,r) CONST. w r./ -x UTILITY CONFLICT/ (3- -4 ce) 240' TAPER 43 0_ 0 0 Cd z !:•, 146 NEW EDGE PAVEMENT w w TIETON DRIVE 147 ----- UT1U7Y CONFLICT4 141+t.7 73 ------- - G -- G -- G G G G NEW EDGEUllUTY ----XX OF PAVEMEITN\ CONFUCT -X----X -rx Xx x x x x 1(1 1 (IN 148 w UllUTY CONFLICT 149 •-••••.„ G CONST. o 0 GO CL. CL "••••Id- • LLI LLIV) M:5 = 1-- ..cE (1) N._ E=1 4; CONFLJCI FILL CATCH UNE (TYP.) PROPOSED DR'YWEU_ LOCATION v ' t -r -o•43 wic,-k•P ),I 12,i ,n• ax., t,e1.14, c<.)-r-rocA\p,ioot, R.1`,"•• 1 •Z B. 4•5 De.$‘1/ 1 V2-5-,73 1,e,001_ vUL,3 peslr -441%77,1 F.4 , _.1- ; I 1246 ; , 1 •----- , ; ' . I 1 ; I . ! ; • ' • , ! , ""•••.c... -x,',- 1246 1244 . , • • . i , , i . . . 0 ...- co. • , - , ;• I . , , i , . , 1244 1242 ; . . , Reff,serret-N-TeRtNE-pRopra ,. ! , . _ --.. - , . . . . , , , r -r• r•• 11 ,-, 5 ; • r'') -- d : ' I , t..05.3/4. --z-- . . .... ------ . . , ; . , .• I 1 1 1242. -._ 1240 1 ! 1240 a- _ .•i ,- 1238 I i • ___ ,1 Q .4. ; i • . : - 1238 ! I EXISTING CENTERUNE PROFILE , I 1236 • ir , ; . ; 1 • • 1 I ; • i • I I ; . i I + v• - 11 < , Crl -," N ••-. II ...! 1..,J 1 . 1 . • • . . . , ; ; ' • 1 i 1 i 1236 ----------' , 1234 VPI STA = 145+80.00 I I VPI STA = 1504-40.00 ,VPI I : . , ' 1234 ' ' . EL = 1237,80 . CURVE LEN = 390.00 . • 5 = 2.61 • . , i . , . . vp, E,1„,._=:21 .561 2., CURVE LEN = 450.00 E =13.56 I I . ; , - . 1232 ; . • 1232 ' , i i 1 . - 1 I . • . 4-4--- ; cf3 In 0 a) • tc) ci ,- a; ci I 0 1230 , cq N I Cs1 N i N .. 1 - - 1 ••"' u) i c-4 Ci • ci• .,r, I ‘..1 - ; - CI 7 4 ..... o CCI 0 3, N 0 ci cri 471 .3, a; , ai -1! I .11 r) r) .. ..., ro ! r) N • C‘I N I N ; CO • 0 4 1 4- cri i ai ”1 1 1'1 N NI .,.... .- .4 10 4 N oi , ai PI • 143 .'.4. I N.- . ro ! rt- 4 i 4 ai ' ci, NI 1 N Cd 0 CO 1". cri oi ro ro C4 N .- .- 4 I N CO • 0 ai I 6 c0 I 4 N • N •- 4. 0 . 0 .- • N ! 6 NI 1 N 4- , •-• . N I r-••• ro i •-•,• C.4 C,I •;- ;•-• r•-• , 03 .4- 1 ,c3 CY ; N ••-• •-• 4 I CO ul i co N N "' "- 1 I 1.3 ! co d' • PI U3 0 ••:r I 0 -4- ••,- ci . - N 1 CN N • CY , 4 I 4 .- •-"' I ".' 149+00 03 i 0 N ! 0 : ci ' I .1.• - '•;; C4 1 N '' "* 1 .4 •.0 0 I Lcr Or 1 ci -a- • .rr N ! N I I 1230 145+00 -L---- 146+00 147+00 _ 148+00 150+00 YAKIMA COUNTY _ PUBLIC WORKS DEPT.— IM (5, 72\3 AV,"\ TO 5196 AV\ 3091 - •-•-▪ • REGION 10 STATE FEDERAL AID m WASH. TPUS - 45621005 PREPARED TINDER THE DIRECTION OF: u•1 01 ,149 '44.2911042,. 107i41.2‘.- 0•CU.S.,7 Mall= u/le/oo MPIFLIES3/0)j(31 40.11214 a trill ENGINEERING 677 Woodland Square 1.4) SE Lacei Washington 98503 (360 493-6002 (360 493-2476 Fax CIVIL • TRANSPORTATION • PLANNING • SURVE'llt DRA7N: W,H.L. 10-0.3 -99 CHECKED BY: SCALE: HORIZ. 1" VERT. 1" REVISION: FNAILE: KC.P0700LIDWG 5 •-•-• 8 OF 28 O N- -.:1 } 1 PROPOSED RELOCATED CANAL ; CUT CATCH UNE (TYP•) I, SECTIO 9' \ 19 & 30, T. 13 EX. HOUSE V. • -43 CONST. 151 •, 18 E. W. V NNW 0 10 20 40 Exhibit A / y 'w-----unuTf Unurr CONFLICT CONFLICT / \,N W w'- \ W— w w .W _. -- CT TIETON DRIVE 152 153 c c 154 c NEW EDGE OF PAVEMENT 0 CONST. UTIUTY GONFUCT EX. $A4 M A4 EX. HOUSE FILL CATCH UNE (TYP.)• O W Li) I 1238 ILJO i•—_ 1236• �1 I \ `_, 1236 1234 PROPOSED CENTERLINE PROFILE I i 1 ��\ I i I __ �� �\ I ' I i ! I I 1234 1 ; 1232 ! I I 1 I i\ I I i .. I i 1 I i 1232 , 1230 1230---...., _ I. . I ' --- . i • . 1228 1228 I • 1;co 1 o IN d i I 1 1226 1 : I • I 1 i II y I ii w •I i �It8 � 6y ! , 1 o 'R + ---ri u < 0 N M N N N N n N 1226 \� \\� , A w 0, N N r • , 1224 I 1222 i EXISTING CENTERUNE PROFILE^' • 1 �� • 1224 I , 1 1 N N ! O ! v 1297 , N M +1 . to ! 01 M,M N' N r col to 1 0 CO I M M I c0 to 01 4 [Ll +7I n n ro N! N N N to 0 tO N N N r7 r'7 N 1 N - of of 0+ • v t0 N M. r7 N! N .. - O' t0 N! !n t0 tO M I M N N V" 1 to M; t0 N 1 to N M N I N -- O u] P. V) 7 4 rn. M N_ 1 N 01 O M M r7 n r7 N 1 N I O 1 0 M I N N' N M'M N 1 N * O ,.. i O M'M N! N N. n 0 1 v 07 i 01 :n co' N, N N i N N_ I N_ N• N _ C I v < N N 1 N N N N 1 N ro I rn N O) t0 1 lo N N .N- I^ M W O, N N 1 N N; N W i N N ri N N 0 117 ` W M N 150+00 151+00 I , 152+00 153+00 154+00 155+00 YAKQ4A tonli COUNTY PUBLIC WORKS DEPT. ( (5:72\3AV; 1O 5, 96- - AV\ k 305+ J/ REGION ( PREPARED UNDER THE DIRECTION OF: STATE WASH, FEDERAL AID NO. 5TPUS — 4562(005) j 11/10/00 EXPIRLS 2i715im ENGINEERING 677 Woodland Square Lp SE Lace , Washington 98503 (360 493-6002 (360 493-2476 Fax CML • TRANSPORTATION • PLANNING • SURVEYING t DRAWN W.H.L. 10 -03 -9�1 CHECKED BY \ SCALE: HORIZ. I' 20 VERT r • 2' REVISION: FNAME: RCP0800IDWG 1:110\ 21V� 5 -r 9 OF 28 BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. For Meeting of March 18, 2003 ITEM TITLE: Authorize Agreement with Yakima County for Construction of Sewer Extension SUBMITTED BY: Department of Community and Economic Development - Engineering T'vision t• i CONTACT PERSON/TELEPHON 'William R. Cook, CED Department Director, 575-6227. SUMMARY EXPLANATION: Attached is an agreement to authorize the City of Yakima to enter into a contract with Yakima County to incorporate a sewer mainline into the County road project on Tieton Drive. Resolution X Ordinance Contract X Other (Specify) Funding Source APPROVED FOR SUBMITTAL: _ Ar___I-L. City nager STAFF RECOMMENDATION: Authorize City Manager to sign agreement with Yakima County. BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION: Resolution adopted. RESOLUTION NO. R-2003-45