Loading...
HomeMy WebLinkAboutR-2002-037 Set public hearing date for Amendment to 2002-2007 Six Year Transportation Improvement Program (TIP)RESOLUTION NO. R-2002-37 A RESOLUTION fixing the time and place for hearing on an amendment to the 2002 through 2007 Six Year Transportation Improvement Program (STIP). VMEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State and Federal law, and WHEREAS, the City of Yakima has identified a need to amend the current Six Year Program for the construction of streets and arterial streets in the City of Yakima; and WHEREAS, a public hearing must be held on said amended program before final approval, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF Y . That said amended program shall be presented for hearing and determination on Tuesday, April 16, 2002, at the hour of 2:00 PM on said day, in the Council Chambers of the City of Yakima, at Yakima City Hall, Yakima, Washington, or as soon thereafter as the same may be heard, and that notice of such hearing be given as approved by law. ADOPTED BY THE CITY COUNCIL this Pd day of April, 2002. ayor ATTEST: City Clerk Washington State Department of Transportation Af -Agency: Yakima Co. NO.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: Page 1 Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date: 6119/2001 Adoption Date: 6/19/2001 Amend Date: Resolution No.: R-2001-97 Report Date: June 15, 2000 Supersedes previous editions Project Identification Project Costs in Thousands of Dollars Federally Funded A. Federal Aid No. B. Bridge No. d d Expenditure Schedule Projects Only Fund Source Information ^ E m V o N (Local Agency) o N w C. Project Title ; a t Federal Funding R/W = D. Street/Road Name or Number ati m g w a Phase State Envir Required Federal Federal 4th u_ a Z E. Beginning MP or road - Ending MP or road E oState :Da) Start Fund Cost by Fund Local Total 1st 2nd 3rd Thru Type Date F. Describe Work to be Done ¢. (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th (MM 1 2 3 4 5 1 6 1 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 1 01 S 0.80 T PE 1/1/2002 STP 1 1644 AIP1 2561 1 1900 5001 14001 EA Railroad Grade Separation - Phase 1 O CN 1/1/2004 STP 3000 Alp 1 10001 1 4000 1 30001 1900 No BNSF Tracks P from: Lincoln Avenue to: Yakima Avenue S New Construction Totals 4644 1256 5900 500 4400 1900 14 2 01 P 80 T RW 5/1/2003 STP 2000 AIPI 5001 2500 1 500 2000 CE Railroad Grade Separation -Phase 2 P CN 6!112004 STP 18000 Alp 1 30001 10001 22000 1 22000 Yes BNSF Tracks/I Street G from: Lincoln Avenue to: Yakima Avenue 9/1/2003 New Construction Totals 20000 3500 1000 24500 500 24000 14 3 01 P 1.5 T PE 311!2003 STP 3000 AIPI 1000 10001 50001 50001 1 EA RW 6!1/2003 STP 2000 Alp 1 7001 3001 3000 30001 Yes Railroad Grade Separation - Phase 3 P CN 3/1/2004 STP 20000 Alp 1 50001 I 25000 25000 1 BNSF Track/Street O from: I Street to: Washington Avenue G 3/1/2004 Railroad Grade Separation including crossings at seven major S Totals 25000 6700 1300 33000 33000 intersections. Curb, gutter, sidewalk. 00 4 12 S N/A PE 11112002 CMAQ OTHER 1 1 231 23 231 1 EA CN 3/1/2002 CMAQ 310 OTHER I 5331 671 910 9101 1 No Signal Upgrades CN 3/1/2002 PWTF 801 1 80 801 1 Local Selection in Non -Attainment Area from: N/A to: N/A Local selection in non -attainment area Totals 310 613 90 1013 1013 14 5 04 S N/A C PE 1/1/2001 REV 235 I 581 294 2941 EA W Washington Avenue - South 24th Ave to South 40th 03 G RW 1/1/2002 REV 290 1 298 1 2871 1 58a 2124 5881 1 21241 1 Yes W Washington Avenue O CN 6!1/2002 REV 1837 from: South 24th Avenue to: South 40th Avenue P 6/1/2002 Widen/Reconstruct, curb, gutter, sidewalk S Totals 2362 644 3006 3006 T 14 6 03 S N/A C PE 5/1/2001 STP(U) AIP1 3361 3361 3361 EA West Washington Ave -South 40th Ave to South 48th 04 G RW 1/1/2002 STP(U) Alp AIPI 1 4001 2628 1 400 1 2628 4001 2628 1 Yes West Washington Ave O CN 6/1/2002 STP(U) from: South 40th Ave to: South 48th Ave P 6/1/2002 Widen/Reconstruct, curb, gutter, sidewalk S Totals 3364 3364 3364 T Report Date: June 15, 2000 Supersedes previous editions AIIIIIIIIII Washington State Department of Transportation Agency: Co. No.: City No.: Yakima 39 Co. Name: Yakima Co. 1485 MPO/RTPO: Page Six Year Transportation Improvement Program From 2003 to 2008 Hearing Date: 6/19/2001 Adoption Date: Amend Date: Resolution No.: Report Date: June 15, 2000 Supersedes previous editions Project Identification Project Costs in Thousands of Dollars Federally Funded Fund -- Source Information — A. Federal Aid No. B. Bridge No.v Expenditure Schedule Projects Only E� c o N (Local Agency) Federal Funding RNV o y = C. Project Title > v L —° U ° D. Street/Road Name or Number n� in : --_� ° Phase State Required Federal Federal 4th d Z E. Beginning MP or road - Ending MP or road t°- = Start Fund Cost b Fund State Local Total Th 1st 2nd 3rd ru Envir Date F. Describe Work to be Done '2 (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (M ) 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 07 7 03 S 1.02 C PE 1/1/2002 t AIPI 841 361 120 1201 I EA i West Washington Avenue S. 48th Avenue to S. 64th 04 G RW 2/1/2002 AIP 1 1231 521 175 1751 1 Yes West Washington Avenue O CN 7/1/2002 AIP 8971 385 1282 12821 from: South 48th Avenue to: South 64th Avenue P 6/1/2002 Widen/reconstruct, curb, gutter and sidewalk S Totals 1104 473 1577 1577 T 8 03 S C PE 1/1/2002 1 1 551 551 551 EA West Washington Avenue S. 64th Avenue to S. 72nd 04 .50 G RW 3/1/2002 AIP 1 1851 1 185 1851 Yes West Washington Avenue O CN 7/1/2002 AIP 1 2291 3451 574 5741 1 from: South 64th Avenue to: South 72nd Avenue P 6/1/2002 Widen/reconstruct, curb, gutter, sidewalk S Totals 414 400 814 814 T 16 903 S C RW STP(U) 47 1 1 71 54 541 1 CE West Mead Ave - South 16th Ave to South 11th Ave .5 G CN 6/1/2002 STP(U) 478 75 1 553 553 Yes West Mead Ave O from: South 16th Avenue to: South 11th Avenue P 4/1/2002 Reconstruct/Widen S Totals 525 82 607 607 T 19 1001 S NIA S PE 1 5/1/2001 STP(E) 50 11 611 611 EA Powerhouse Canal Corridor CN 8/1/2001 STP(U) 273 1 621 335 3351 1 No Powerhouse Road from: Robertson School to: North 24th Avenue Install Asphalt Pathway Totals 323 73 396 396 02 1104 S 73 C PE 1/1/2002 AIP1 541 361 90� EA Nob Hill Blvd. W - 68th Avenue S. to 80th Avenue S. 03 G RW 4/112002 AIP 1 2161 1441 360 Yes West Nob Hill Blvd. � CN 1/1/2003 AIP 5551 3701 925 9259011 925 from: South 68th Avenue to: South 80th Avenue P 4/1/2002 Reconstruct to minor arterial standards S Totals 825 550 1375 1375 T 02 12 01 S 11 C PE 6/1/2001 AIP1 1121 281 140 1401 EA River Road 04 G RW 1/1/2002 AIP 1 2721 681 340 3401 1 Yes River Road CN 6/1/2002 AIP 11841 2961 1480 100D� 4801 P from: North 16th Avenue to: Fruitvale Blvd. S 1/1/2002 Widening, curb, gutter, sidewalk, reconstruction T Totals 1568 392 1960 1480 480 W Report Date: June 15, 2000 Supersedes previous editions — Washington State Department of Transportation v7 Agency: Yakima Co. NO.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: Page 3 Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date: 6/19/2001 Adoption Date: Amend Date: Resolution No.: Report Date: June 15, 2000 Supersedes previous editions Project Identification Project Costs in Thousands of Dollars Federally Funded A. Federal Aid No. B. Bridge No. c y d Fund Source Information Expenditure Schedule Projects Only „ E y o N (Local Agency) Federal Funding RNV C, N C. Project Title ; a v r 2 E D. Street/Road Name or Number a� m w o Phase State Required Federal Federal 4th U -n Z E. Beginning MP or road - Ending MP or road E Fo- W Start Start Fund Cost by Fund State Local Total 1st 2nd 3rd Date F. Describe Work to be Done ao` Code Phase Code Funds Funds Funds 6th Type ypEnve Type (M>7 1 1 2 1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 19 20 21 14 1304 S 1 C C PE 818/2001 I STP 27 41 31 311 I EA North 5th Ave /Fruitvale Blvd 03 CN 5/1/2002 STP 273 11 431 316 3161 1 No North 5th Ave/Fruitvale Roundabout p from: North 5th Ave to: Fruitvale Blvd P Roundabout, curb, gutter, sidewalk S Totals 300 47 347 347 T 19 14 03 S N/A G PE 6/1/2001 STP(E) 18 321 501 501 EA YVT Enhancement C CN 1/1/2002 STP(E) 160 1 251 1851 1851 1 No South 3th Avenue S from: South 3th Avenue to: Pine Street T Car Barn and Museum Restoration W Totals 178 57 235 235 P 00 15 12 S N/A CN 1 1/1/2002 I STP I 22001 1 1 20001 42001 20001 22001 I CE Transit Operating / Capital Expenses 21 No Various Areas 22 from: N/A to: N/A 23 24 Totals 2200 2000 4200 2000 2200 00 1622 S N/A PE 5/1/2002 STP(E) 27 1 41 311 311 1 CE Fruitvale Canal Pathway 06 CN 8/1/2002 STP(E) 241 1 391 2801 2801 1 No Fruitvale Blvd/North 20th Ave from: North 20th Ave to: Englewood Ave Construct Pathway/Sidewalk Totals 268 43 311 311 00 17 01 S N/A PE 1 1/1/2002 I STP(E) I 601 1 1 121 721 721 CE Sidewalks/Pedestrian Facilities13 No N/A from: N/A to: N/A Sidewalk and pedestrian facilities Totals so 12 72 72 00 18 12 S N/A PE 10/1/2003 1 401 4011401 CE North 16th Ave - Signal @ River Road RW 5/1/2004 1 541 54 54 Yes North 16th Ave CN 9/1/2004 1 2501 250 1 1 250 from: North 16th Ave to: River Road Install New Signal Totals 344 344 40 54 250 Report Date: June 15, 2000 Supersedes previous editions MAP Washington State Department of Transportation Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: Page Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date: 6/19/2001 Adoption Date: Amend Date: Resolution No.: Report Date: June 15, 2000 Supersedes previous editions Project Identification Project Costs in Thousands of Dollars Federally Funded A. Federal Aid No. B. Bridge No. d s N w Expenditure Schedule Projects Only Fund Source Information 6 E N N c o (Local Agency) N .L C. Project Title ; a U r Federal Funding R/W E D. Street/Road Name or Number o in w Q- Phase State Envir Required Federal Federal 4th u ti Z E. Beginning MP or road -Ending MP or road E _ o o Start Fund Cost by Fund State Local Funds Total 1st 2nd 3rd Thru Type Date F. Describe Work to be Done a (mm/dd/yyyy) Code Phase Code Funds Funds 6th (MUYY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 19 01 S N/A C CN 1 7/1/2001 I STP(U) 751 1 501 125 1251 1 EA North 40th Ave - Signal @ Castlevale 12 G No North 40th Ave S from: North 40th Ave to: Castlevale W Install new signal Totals 75 50 125 125 00 20 22 S N/A PE 4/1/2003 131 131 131 EA Bus Stop Zones - Transit CN 611/2003 1 1 1161 1161 1 1161 No Bus Stops from: N/A to: N/A Bus Stops Totals 129 129 129 19 21 07 S NIA PE 6/1/2002 1 1 1 81 721 8 72 21 181 2 2 2 181 18 18 EA CBD Parking Lots CN x/1/2002 No Various Areas from: N/A to: N/A Rehabilitate Pavement Totals 80 80 20 20 20 20 09 22 01 P N/A C PE 1 1/1!2003 STP(U) 2 1 1 281 30 1 301 EA Sports Complex Access 05 G CN 6/1/2003 STP(U) 8 1 2501 258 1 2581 Beech Street O from: Fair Avenue to: 1-82 P Includes 13th and Maple Streets, curb, gutter, sidewalk, drainage, S Totals 10 278 288 288 lighting T 17 23 4637/4566 06 P Signal P Rw 2/1/2002 STP(U) 6s11 1 101 751 751 1 EA East Nob Hill Blvd at South 6th Street 01 CN 8/1/2003 STP(U) 400 1 1 621 4621 4621 Yes East Nob Hill Blvd from: East Nob Hill Blvd to: South 6th Street Install new signal Totals 465 72 5371 537 00 24 12 P N/A PE 10/1/2003 291 2911 291 EA East Nob Hill Blvd -Signal @Fair Ave CN 10/1/2003 1 2571 257 1 257 No East Nob Hill Blvd from: East Nob Hill Blvd to: Fair Ave Install Signal @ E. Nob Hill Blvd & Fair Avenue Totals 286 286 29 257 Report Date: June 15, 2000 Supersedes previous editions Washington State Department of Transportation CAP Agency: Yakima Co. No.: 39 City No.: 1485 Co. Name: Yakima Co. MPO/RTPO: Pages Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date: 6/19/2001 Adoption Date: Amend Date: Resolution No.: Report Date: June 15, 2000 Supersedes previous editions Project Identification Project Costs in Thousands of Dollars Federally Funded A. Federal Aid No. B. Bridge No. a t 6 W d Fund Source Information Expenditure Schedule Projects Only N Eo H r (Local Agency) Federal Funding RlVV o N C. Project Title m ' � U � —° U 2 E D. Street/Road Name or Number ° r'- in 4 a Phase State Required Federal Federal 4th u- d Z E. Beginning MP or road - Ending MP or road E i° 'Z 0- Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Date F. Describe Work to be Done (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th TypEnve Type (/ fMMO a`o 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 02 2504 P 77 P PE 1/1/2003 STP(U) i 107 1 171 124 1241 1 EA Nob Hill Blvd C CN 6/1/2003 STP(U) 1183 193 1376 13761No Nob Hill Blvd G from: South 52nd Avenue to: South 68th Avenue O Widen, curb, gutter, sidewalk, lighting, drainage S Totals 1290 210 1500 124 1376 T 00 26 01 P N/A PE 1 4/1/2003 1 101 101 1 101 CE Annual Signal Upgrades CN 8/1/2003 1 901 901 1 901 No Local Selection from: N/A to: N/A Upgrade Signal Totals 100 100 100 00 27 07 P N/A CN I 7/1/2003 I STP(U) I 1731 1 1 271 2001 1 2001 EA Various Overlay Projects/Selected on Local Priority No N/A from: N/A to: N/A Rehabilitate Pavement Totals 173 27 200 200 00 28 32 P N/A PE 1 4/1/2003 1 801 801 1 801 EA Storm Drains/Vegetation CN 9/1/2003 1 1 7201 720 1 7201 No Local Selection from: City Wide to: City Wide Totals 800 800 800 17 29 03 03 P 28 W PE 1/1/2002 STP(C) 60 OTHER 15 751 75 1 1 CE Reconstruction Rudkin Road T CN 1/1/2003 STP C) 300 OTHER 3001 701 670 6701 No Rudkin Road P from: East Mead to: Viola Avenue S Reconstruct, excavate ballast, top course, curb, gutter, sidewalk Totals 360 300 85 745 75 670 14 30 12 S N/A PE 1/1/20 02 STP 17 1 18) 181 CE North 16th Ave -Signal @Englewood Ave RW 20 2 1/1/0 STP 9 11 10 101 1 Yes North 16th Ave CN 6/1/2002 STP 141 61 147 1471 1 from: North 16th Ave to: Englewood Ave Install New Signal Totals 167 8 175 175 Report Date: June 15, 2000 Supersedes previous editions Washington State Department of Transportation -enAggency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: Page 6 Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date: 6/19/2001 Adoption Date: Amend Date: Resolution No.: Grand Totals for Yakima 60081 19825 9877 89783 52785 10897 2731 24270 Report Date: June 15, 2000 Supersedes previous editions Project Identification Project Costs in Thousands of Dollars Federally Funded Fund Source Information A. Federal Aid No. B. Bridge No.m u Expenditure Schedule Projects Only o N w C. Project Title ^ E N a = o s (Local Agency) Federal Funding Rohl -9 U g D. Street/Road Name or Number a c~ is N Q a Phase State Required Federal Federal 4th U. o- Z E. Beginning MP or road - Ending MP or road E �°- M m Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Envir Date F. Describe Work to be Done n`o. (mm/dd/yyyy) Code Phase Code Funds Funds Funds 6th Type (MM/yy) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 31 03 P C PE 9/1/2004 STP1 971 OTHER 1 181 6 121 121 1 CE East Mead Avenue Reconstruction 06 .76 G CN 4/1/2005 STP 873 OTHER 1 1631 551 1091 10911 1 No East Mead Avenue O from: Rudkin Road to: South 10th Street P Reconstruct, excavate ballast, top course, curb, gutter, storm S Totals 970 181 61 1212 1212 T 00 32 06 P N/A $ PE 411/2002 1 51 5 51 1 CE Intersection Improvements G CN 7/1/2002 451 45 451 1 No Selected on Local Priority C from: N/A to: N/A Curb, gutter, sidewalk, safety improvements, striping, signs Totals 50 50 50 11 33 04 P 1 C PE 1/1/2002 STP(U) 13 21 15 151 1 CE South 18th Street & East Nob Hill Blvd 01 G RW 3!1/2002 STP(U) 18 21 20 20 1 No South 18th Street S CN 1/1/2003 STP(U) 140 1 251 165 1 165 from: South 18th Street to: East Nob Hill Blvd W Widen south leg for Double LT from west bound Nob Hill; (Tie to Totals 171 29 200 35 165 WSDOT Project) possible curb, gutter, and sidewalk 16 34 01 P N/A CN 1 2/1/2005 1 STP 1 1001 1 501 1501 1501 1 CE South 6th Street - Signals @ B Street & Lincoln No South 6th Street from: B Street to: Lincoln Install Signals at B Street and Lincoln Totals 100 50 150 150 16 35 01 P N/A CN 1 2/1/2005 1 STP 1 1001 1 1 501 1501 1501 1 1 CE South 8th Street - Signals @ B Street & Lincoln No South 8th Street from: B Street to: Lincoln Install Signals @ B Street and Lincoln Totals 100 50 150 150 00 31 S AL 1 5/1/2002 1 STP 1 301 1 1 51 351 351 1 CE 136 Metropolitan Area Traffic Model Update No Urban Streets from: to: Update the metropolitan traffic model for the Yakima Valley Totals 30 5 35 35 Conference of Governments to implement modelling. Grand Totals for Yakima 60081 19825 9877 89783 52785 10897 2731 24270 Report Date: June 15, 2000 Supersedes previous editions BUSINESS OF THE CITY COUNCIL YAKIMA, WASIHINGTON AGENDA STATEMENT Item No. Z) For Meeting of April 2, 2002 • • • Transportation Improvement Program SUBMITTED BY: Department of Community and Economic Development - Engineering Division CONTACT PERSON/TELEPHONE ' m R. Cook, GED Department Director, 575-6227. SUMMARY EXPLANATION: Attached is a copy of the proposed amended Six -Year Transportation Improvement Plan (STIP) for the 2002 — 2007 planning years. This amendment to the STIP will obligate funds for an updated traffic model for the urban area (Priority No. 36). This work will be accomplished using Federal funds and will be administrated by the City Engineering and Public Works staff. STAFF RECOMMENDATION: Set Public Hearing Date for April 16, 2002. BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION: Resolution adopted. RESOLUTION NO. R-2002-37