HomeMy WebLinkAboutR-2002-005 Amended 2002 - 2007 Six-Year Transportation Improvement Program ( TIP )RESOLU'I ION NO. R-2002- 05
A RESOLUTION amending the adopted Six -Year Transportation Improvement Program
for the period of 2002 through 2007 for the construction of streets and
arterial streets in the City of Yakima.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year
Program for the construction of streets and arterial streets in the City of Yakima for the
ensuing six year period, all as contemplated and required by State and Federal law, and
WHEREAS, the City of Yakima has identified a need to amend the current Six Year
Program for the construction of streets and arterial streets in the City of Yakima; and
WHEREAS, after a public hearing on the matter, held at a regular meeting of the
Yakima City Council on January 15, 2002 the City Council finds that the projects attached
hereto should be amended to include these projects on the adopted Six Year Transportation
Improvement Program for the period of 2002 through 2007 for the construction of streets and
arterial streets in the City of Yakima, now, therefore;
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The Washington Avenue Road Widening Project and the Nob Hill Road Widening Project, a
copy of which is attached hereto and by this reference made a part hereof, is hereby amended
to be included in the official Six -Year Transportation Improvement Program for the period of
2002 — 2007 for the City of Yakima.
ADOPTED BY THE CITY COUNCIL this 15th day of January, 2002.
ATTEST:
4
City Clerk
,Ze
Mayor
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co
MPO/RTPO:
City No.: 1485
Page 1
Six Year Transportation Improvement Program
From 2002 to 2007
Hearing Date• 6/19/2001 Adoption Date• 6/19/2001
Amend Date:
Resolution No . R-2001-97
o 2
c v D.
u-
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Protect Title
Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
Improvement
' Type(s)
cn Status
Total Length
1 -4 ; Utility Codes
Project Costs in Thousands of Dollars
Fund Source Information
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
r
'6
a
no`-
Phase
Start
(rnnriddtyyyy)
Federal Funding
Federal
Fund
Code
Federal
Cost by
Phase
Slate
Fund
Code
Slate
Funds
Local
Funds
Total1
Funds
1st
2nd
I 4th
3rd 6 h
Envir
Type
R/W
Required
Date
(MM v>7
1
2
3
8
9
10
11
12
13
14
15
16
1718
1 19
20
21
14
1
Railroad Grade Separation - Phase 1
BNSF Tracks
from: Lincoln Avenue to: Yakima Avenue
New Construction
01
S 080
T
O
P
$
T-
P
G
T
O
G
S
-
PE
CN
Totals
RW
CN
_
1/1/2002
1/1/2004
5/1/2003
6/112004
_ _ _
STP
STP
s I P
SIP
1644
3000
4644
2000
18000
AIP
AIP
AIPI
AIPI
256
1000
1256
5001
30001
10001
1900
4000
5900
1 1 zsoo
220001
500
500
1
1400
3000
4400
- --------
19001
1900
500 1 2000
j 22000
EA
CE
No
-----
Yes
9/1/2003
14
2
Railroad Grade Separation - Phase 2
BNSF Tracks/I Street
from: Lincoln Avenue lo: Yakima Avenue
New Construction
O 1
P
80
Totals
20000
3500 1000 24500
500 24000
14
3
Railroad Grade Separation - Phase 3
BNSF Track/Street
from: I Street to- Washington Avenue
Railroad Grade Separation including crossings at seven major
Intersections. Curb, gutter, sidewalk.
01
j P
1.5T
PE
RW
CN
3/1/2003
6/1/2003
3/1/2004
I STP
STP
STP
3000
2000
20000
AIP
AIP
AIP
10001 1000
7001 300
50001
5000
3000
25000
50001 1
30001 1
2500011
1
EA
Yes
3/1/2004
Totals
25000
-
---OTHERI
6700 1300 33000
____
33000
00
4
Signal Upgrades
Local Selection in Non -Attainment Area
from: N/A to: N/A
Local selection in non -attainment area
12
S
N/A
PE
CN
CN
1/1/2002
3/1/2002
3/1/2002
CMAQ
CMAO
310
I 231 23
OTHER 1 533167 910
PWTFI 80l 80
231 1
9101No
801 I
EA
Totals
310
613 90 1013 1013
14
5
W Washington Avenue - South 24th Ave to South 40th
W Washington Avenue
from: South 24th Avenue to: South 40th Avenue
Widen/Reconstruct, curb, gutter sidewalk
04
03
S
N/A
C
G
O
P
S._
T
C
G
O
P
S
T
PE
RW
CN
Totals
1/1/2001
1/1/2002
6/1/2002
REV
REV
REV
235
290
1837
2362
1 1 591 294
1 1 2981 5881
1 1 2871 2124
644 3006
----3363361
294 1 1
5881 1
21241
3006
-----
-
EA
Yes
6/1/2002
14
6
West Washington Ave - South 40th Ave to South 48th
West Washington Ave
from: South 40th Ave to: South 48th Ave
Widen/Reconstruct, curb, gutter, sidewalk
03
04
S
N/A
PE
RSV
CN
5/1/2001 1 STP(U)
1/1/2002 1 STP(11)
6/1/2002 I STP(ll)
AIPI 3361 1
AIP 1 4001 1 4001 4001 1
AIPI 26281 1 26281 26281
EA
Yes
6/1/2002
Totals 3364 3364 3364
Report Date June 15, 2000
Supersedes previous editions
WIWashington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO:
Page 2
Six Year Transportation Improvement Program
From 2003 to 2008
Hearing Date: 6/19/2001
Amend Date
Adoption Date:
Resolution No..
o No
-
u_
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
Project Title
D Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F, Describe Work to be Done
! Improvement
Types)
cn Status
Total Length
m
v
9
5
7
ri
N
8
o
8
Phase
Start
(mm/dd/yy)y)
9
Project Costs in Thousands of Dollars
Expenditure
(Local'
1st
16
Schedule
Agency)
Federally
Projects
I.nvir
Type
20
Funded
Only
RNV
Required
Dale
(MMn 1q
21
Federal Funding
Federal
Fund
Code
10
Fund
Federal
Cost byFund
Phase
11
Source
State
Code
12
Information
Stale
Funds
13
Local
Funds
14
Total
Funds
15
2nd
17
3rd
4th
Thr
6th
19
1
2
3
18
07
7
West Washington Avenue S. 48th Avenue to S 64th
West Washington Avenue
from: South 48th Avenue to: South 64th Avenue
Widen/reconstrucl, curb, gutter and sidewalk
03
04
03
04
03
01
S
S
S
S
102
50
5
N/A
73
(1
C
G
O
P
S
T
C
(,
O
P
S
T
C
C
0
P
S
T
S
C
G
OCN
P
S
T
C
G
P
S
T
W
PE
RW
CN
Totals
PE
RW
CN
Totals
RW
CN
—
Totals
PE
CN
Totals
PE
RW
1/1/2002
2/1/2002
7/1/2002
1/1/2002
3/1/2002
7l 112002
6/1/2002
5/1/2001
8/1/2001
1
STP(()) i
SiP(U)
STP(E) 1
STP (U)
47
478
AIP
AIP
AIP
1
AIP
AIP 1
-------�
84
123
897
1104
36
52
385
473
551
1
3451
400
71
75
120
175
1282
1577
1
55
1851
574
814
54`
5531
607
61
335
396
90
360
925
120
175
1282
1577
EA
EA
CE
EA
EA-
EA
Yes
6/1/2002
Yes
6/1/2002
Yes
4/1/2002
8
West Washington Avenue S. 64th Avenue to S 72nd
West Washington Avenue
from: South 64th Avenue to: South 72nd Avenue
Widen/reconstruct, curb, gutter, sidewalk
1
1851
2291
414
I 551
185 1
5741
814
541
553
607
1
16
9
West Mead Ave - South 16th Ave to South 11th Ave
West Mead Ave
from: South 16tt/ Avenue to: South 11th Avenue
Reconstruct/Widen
--_----
---1----
I
525
50
273
323
1
AIP 1
AIP1
AIP1
82
111
1 62
19
10
Powerhouse Canal Corridor
Powerhouse Road
from: Robertson School to- North 24th Avenue
Install Asphalt Pathway
611
335
396
1
1
No
_.
Yes
4/1/2002
Yes
1/1/2002
73
02
11
Nob Hill Blvd. W - 68th Avenue S. to 80th Avenue S.
West Nob Hill Blvd.
from: South 68th Avenue to: South 80th Avenue
Reconstruct to miror arterial standards
04
03
S
3
1/1/2002
4/1/2002
1/1/2003
541 361
2161 1441
55513701
901
3601
9251
4801
1
1
1
Totals
PE
RW
CN
Totals
6/1/2001
1/1/2002
6/1/2002
825 550
1375
140
340
1480
1960
1375
1401
3401
10001
1480
1
02
12
River Road
River Road
from: North 16th Avenue to: Fruitvate Blvd.
Widening, curb, gutter, sidewalk, reconstruction
01
04
A(PI
AIP
AIP
1121 281
2721 681
1184 2961
1568 392
480
Ileport Date: June 15, 2000
Supersedes previous editions
Washington State Department of Transportation
-en
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO:
Page3 Six Year Transportation Improvement Program
From 2002 to 2007
Hearing Date• 6/19/2001
Amend Date:
Adoption Date•
Resolution No..
Functional
Class
Priority
Number
Project Identification
Status
rn Total Length
Utility Codes
Project Costs in Thousands of
Dollars
Federally Funded
A. Federal Aid No. B. Bridge No.
m
Fund
Source
Information
Expenditure Schedule
Projects Only
C. Project Title
d a
Federal Funding
(Local Agency)
D. Street/Road Name or Number
0
`o.l-
-cc
.
Phase
Federal
Federal
State
ReqRuired
4th
E. Beginning MP or road - Ending MP or road
E
W
Start
Fund
Cost by
Fund
State
Local
Total
Thru
Envir
Date
F. Describe Work to be Done
i
(mn,7dd/yvyy)
Code
Phase
Code
Funds
Funds
Funds
1st
2nd
3rd
6th
Type
(MM/YY)
1
2
3
4
8 9
10
11
12
13
1415
16
20
21
17
18
19
14
13
04
S
1
C
PE 8/8/2001
CN
STF'
27
4
31
311
EA
North 5th Ave /Fruitvale Blvd
03
G
5/1/2002
SIT
273
43
316
316
No
North 5th Ave/Fruitvale Roundabout
from: North 5th Ave to: Fruitvale Blvd
O
P
Roundabout, curb, gutter, sidewalk
S
_
T
Totals
300
47 347
347
19
14
03
S
N/A
G
PE
1 6/1/2001
STP(E)
18
321 50
50 1
EA
YVT Enhancement
C
CN I 1/1/2002
STP(E)
160
251 18.51
1851
No
South 3th Avenue
from: South 3th Avenue to: Pine Street
S
T
Car Bam and Museum Restoration
W
P
Totals 178
57 235
235
00
15
12
S
N/A
CM 1/1/2002 STP 22001 I
20001 42001
20001
22001
CE
Transit Operating / Capital Expenses
21
No
Various Areas
22
from: N/A to: N/A
23
24
Totals
2200 2000 4200f
2000
2200
00
16
22
S
N/A
PE
5/1/2002
STP(E)
27
1
1 41 31 I
311
Fruitvale Canal Pathway
06
CN
8/1/2002
STP(E)
241
39 280 I
2801 I
CE
No
Fruitvale Blvd/North 20th Ave
from: North 20th Ave to: Englewood Ave
Construct Pathway/Sidewalk
Totals
268
43
311 311
00
17
01
S
N/A
PE 1 1/1/2002 I STP(E) 601
121
721 721
---
CE
- - -
Sidewalks/Pedestrian Facilitiesl3
No
N/A
from: N/A to: N/A
Sidewalk and pedestrian facilities
Totals
60 12
72
72
00
18
12
S
N/A
PE
10/1/2003
1 1 401
46
1
401
-
--
CE
--
North 16th Ave - Signal @ River Road
RW
5/1/2004
1 541 54I
1 54
Yes
North 16th Ave
from: North 16th Ave to: River Road
CN
9/1/2004
1 1 2501 250
1 1
250
Install New Signal
Totals
344 344
40
54 250
Report Date: June 15, 2000
Supersedes previous editions
Washington State Department of Transportation
��
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO•
Page 4
Six Year Transportation Improvement Program
From 2002 to 2007
Hearing Date. 6/19/2001
Amend Date:
Adoption Date
Resolution No..
Functional
Class
Priority
Number
Project Identification
A. Federal Ald No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done •
aImprovement
Type(s)
Icn ' status
cn Total Length
Utility Codes
m
2
Project Costs in Thousands of Dollars
Fund Source Information
-"--
Expenditure Schedule
Federally Funded
Projects Only
r
a
m
o
n_
Phase
Start
(^mold/YYYY)
Federal Funding
Federal
Fund
Code
Federal
Cost by
Phase
State4th
Fund
Code
State
Funds
Local
Funds
Total
Funds
1st
(Local Agency)
2nd
3rd
Thru
6th
Envir
Type
—
RNV
Required
Dale
(MM/Yy)
2
3
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
1901
North 40th Ave Signal @ Castlevale
North 40th Ave
from: North 40th Ave to. Castlevale
Install new signal
12
S fl/A
C
G
S
W
CN
Totals
7/1/200"
SVP(U)
75
75
---
50
50
125
125
125
125
EA
No
00
20
Bus Stop Zones - Transit
Bus Stops
from: N/A 10: N/A
Bus Stops
22
S 1 N/A
i
PE
CN
4/1/2003
6/1/2003
_ --- --�
a
1 1 131
1 1 1161
1311
116
131
1 1161
- -----
EA
- -
No
Totals
129 129
129
19
21
CBD Parking Loss
Various Areas
from: N/A to: N/A
Rehabilitate Pavernent
07
S
N/A
�
PE
CN
Totals
6/1/2002
6/1/2002
1
1
1
81
721
80
---
8`
72I
80
21 21
181 181
20 20
2
18
20
2
18
20
EA
No
09
22
Sports Complex Access
Beech Street
from: Fair Avenue to: 1-82
Includes 13th and Maple Streets, curb, gutter, sidewalk, drainage,
lighting
01
05
P
NIA
C
G
o
P
S
T
PE
CN
1/1/2003
6/1/2003
STP(U)
STP(U)
2
8
I 1 281 301
1 2501 258
301
I 1 2581
EA
Totals
10
278 288 288
17
23
4637/4566
East Nob Hill Blvd at South 6th Street
East Nob Hill Blvd
from: East Nob Hill Blvd to: South 6th Street
Install new signal
06
01
P
Signal
P
RW
CN
2/1/2002
8/1/2003
STP(U)
STP(U)
65
400
10 1 75
1 1 621 462
—
751
4621 1
EA
Yes
Totals
PE
CN
10/ 1/2003
1011/200:
1
465
72 537 537
291 29I
1 2571 257 1
291
•' 257
EA
No
00
24
East Nob Hill Blvd - Signal @ Fair Ave
East Nob Hill Blvd
from: East Nob Hill Blvd to: Fair Ave
Install Signal @ E. Nob Hill Blvd & Fair Avenue
12
P
N/A
Totals 286 286 29 257 -----
Report Date- June 15, 2000
Supersedes previous editions
1171 Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co
City No.: 1485
MPO/RTPO•
Page 5
Six Year Transportation Improvement Program
From 2002 to 2007
Hearing Date- 6/19/2001 Adoption Date:
Amend Date:
Resolution No.:
-@'
w
c v
u.
Priority 1
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
,��
m 7
aF
E
j
n
°
i-
D
u
Project Costs in Thousands of Dollars
Federally Funded
y
L
°
Fund
Federal Rending
Source
Information
Expenditure Schedule
(Local Agency)
Projects
- -
Only
-
RNV
ami
,
Phase
Start
(rnm/ddi Yyyvl
Federal
Fund
Code
Federal
Cost byFund
Phase
State
Code
State
Funds
Local
Funds
Total
Funds
1st
2nd
3rd
4th
Thru
6th
Envir
T e
YP
Required
pate
(MM/Y13
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
—19
20
21
02
25
Nob Hill Blvd
Nob Hill Blvd
from: South 52nd Avenue to: South 68th Avenue
Widen, curb, gutter, sidewalk, lighting, drainage
04
P
77
P
C
G
0
S
r
PE
CN
1/1/2003
6/1/2003
_
srP(u)
STP(U)
_-._ _-
107
1183
17
193
124
1376
_
124
1376
EA
No
Totals
1290
_
210 1500 124 1376
00
26
Annual Signal Upgrades
Local Selection
from: N/A to: N/A •
Upgrade Signal
01
P
N/A
4/1/2003 PE?
t1 6/1/2003
101 ion I 101
90 90 ( 1 90
CE
No
Totals
100 100 100
00
27
Various Overlay Projects/Selected on Local Priority
N/A
from: N/A to: N/A
Rehabilitate Pavernent
07
P
N/A
CN 1 7/1/2003
1 STP(U)
I 1731
1 1 271 200i 1 2001
I
EA
-
No
Totals
_
173
_
27 200 200
00
28
Storm DrainsNegetation
Local Selection
from: City Wide to:
City Wide
32
P
N/A
PE 1 4/1/2003
CN 1 9/1/2003
801
720
80 - -
1 7201 801 720
---
---
EA
-- -- - -
No
Totals
800 800 800
17
29
Reconstruction Rudkin Road
Rudkin Road
from: East Mead to: Viola Avenue
Reconstruct, excavate ballast, lop course, curb, gutter, sidewalk
03
06
P
.28
1/1/
T
P
g
PE
CN
1/1/2002
1/1/2003
STP(C)
STP(C)
60
300
OTHER I 1 151 75
OTHER 1 3001701 670
75 1
1 6701
--
CE
— -----_
No
Totals 360 300 85 745 75 670
14
30
North 16th Ave - Signal @ Englewood Ave
North 16th Ave
from: North 16th Ave to: Englewood Ave
Install New Signal
12
S
N/A
PE ' 1/1/2002
RW' 1/1/2002
Cf1 ' 6/1/2002
STP
STP
STP
- 171 1 11 181 181 1
9
1411 1 1 61 1471 1471 1
CE
Yes
Totals 167 8 175 175
Report Date June 15, 2000
Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co
City No.: 1485
MPO/RTPO:
Page 6
Six Year Transportation Improvement Program
From 2002 to 2007
Hearing Da e• 6/19/2001
Amend Date:
Adoption Date:
Resolution No.:
Report Date June 15, 2000
Supersedes previous editions
Priority
Number
Project Identification
A. Federal Aid No. B. Bridge No.
C. Project Title
Improvement
Type(s)
cn Status
a Total Length
, Utility Codes I
Project Phase
Project Costs in Thousands of Dollars
Expenditure
Schedule
Locai A9 ency)
Y)
Federally
Projects
Funded
Only
RAN
Fund
Federal Funding
Source
Information
0
D Street/Road Name or Number
Phase
Federal
Federal
State
4th
Required
ri
E. Beginning MP or road - Ending MP or road
Start
Fund
Cost hy
Fund
State
Local
Total
Envir
Date
F Describe Work to be Done
lrrrmidahvlY)
Code
Phase
Code
Funds
Funds
Funds
1st
2nd
3rd
61b i
Type
(MMivv)
1
2
3
9
10 11
12
13
14
15
16
17
2.0
21
18
19
17
31
03
P
76
C
I'0 9/t12u0=
STP
97
urHER 18
6
121
121
CE
East Mead Avenue Reconstruction
East Mead Avenue
from: Rudkin Road to: South 10th Street
06
G
p
P
CN 1 4/1/2005
STP
873
OTHER 163
55 1091
10911
No
Reconstruct, excavate ballast, top course, curb, gutter storm
S
T
Totals
970
181 61
1212
1212
00
32
06
P
N/A
S
PE
4/1/2002
i
1 5 51
5
1
CE
�-
Intersection Improvements
G
CN
7/1/2002
I I 451 451451
No
Selected on Local Priority
from: N/A to: N/A
C
Curb, gutter, sidewalk, safety Improvements, striping. signs
totals
50
50 50
11
33
04
P
1 C
99 1 1/1/2002 !
RW 3/1/2002
STP(U)13
1 21 15
151 1
CE
South 18th Street & East Nob Hell Blvd
South 18th Street
from: South 18th Street to: East Nob Hill Blvd
01
3
S
W
:
CN 1/1/2003
STP(U)8
STP(U) 1 140
z 20
1 1 251 165
201 1
1 1651
No
Widen south leg for Double LT from west bound Nob Hill: (Tie to
WSDOT Project) possible curb, gutter, and sidewalk
Totals
171 29 200
35
165
16
34
01
N/A
CN 1 2/1/2005 I
STP 1 1001 1 1 501 1501
1501
1
CE
South 6th Street - Signals @ 8 Street & Lincoln
No
South 6th Street
from: B Street to: Lincoln
Install Signals at B Street and Lincoln
Totals 100
50
150
150
16
35
01
P
N/A
CN 1 2/1/2005 1 SIP 1 1001 ---- --------
501 1501
1501
( 1
CE -
-- -
South 8th Street - Signals @ B Street & Lincoln
No
South 8th Street
from: B Street to: Lincoln
Install Signals @ E Street and Lincoln
Totals
100
50 150
150
Grand Totals
for Yakima
60051 19825 9872 89748
52750
10897 2731 24270
Report Date June 15, 2000
Supersedes previous editions
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No.
For Meeting of January 15, 2002
ITEM TITLE: Public Hearing to Amend Six-year Transportation Improvement Program
(STIP) to include recently annexed projects.
SUBMITTED BY: Department of Community and Economic Development -
Engineering Division
CONTACT PERSON/TELEPHONE: William R. Cook, CED Department Director, 575-6227.
SUMMARY EXPLANATION:
Attached is a copy of the proposed amended Six -Year Transportation Improvement Plan
(STIP) for the 2002 — 2007 planning years. After the recent annexation, Washington
Avenue from 48th Avenue to 72nd Avenue and Nob Hill Widening from 68th Avenue to 80th
Avenue were dropped from the County' s STIP and need to be included in the City of
Yakima STIP. This amendment will allow roadway improvement projects within the
recently annexed area to be consistent with the approved City Budget and the following
years' proposed budget for these projects. This will also make the City' s agreement
with Congdon match the required agreed upon improvements.
Resolution X Ordinance Contract Other (Specify) STIP
Funding Source
APPROVED FOR SUBMITTAL:
City Manager
STAFF RECOMMENDATION:
Adopt the amended STIP.
BOARD/COMMISSION RECOMMENDATION:
COUNCIL ACTION: Hearing conducted.
Resolution adopted. RESOLUTION NO. R-2002-05