Loading...
HomeMy WebLinkAboutR-2002-005 Amended 2002 - 2007 Six-Year Transportation Improvement Program ( TIP )RESOLU'I ION NO. R-2002- 05 A RESOLUTION amending the adopted Six -Year Transportation Improvement Program for the period of 2002 through 2007 for the construction of streets and arterial streets in the City of Yakima. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program for the construction of streets and arterial streets in the City of Yakima for the ensuing six year period, all as contemplated and required by State and Federal law, and WHEREAS, the City of Yakima has identified a need to amend the current Six Year Program for the construction of streets and arterial streets in the City of Yakima; and WHEREAS, after a public hearing on the matter, held at a regular meeting of the Yakima City Council on January 15, 2002 the City Council finds that the projects attached hereto should be amended to include these projects on the adopted Six Year Transportation Improvement Program for the period of 2002 through 2007 for the construction of streets and arterial streets in the City of Yakima, now, therefore; BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Washington Avenue Road Widening Project and the Nob Hill Road Widening Project, a copy of which is attached hereto and by this reference made a part hereof, is hereby amended to be included in the official Six -Year Transportation Improvement Program for the period of 2002 — 2007 for the City of Yakima. ADOPTED BY THE CITY COUNCIL this 15th day of January, 2002. ATTEST: 4 City Clerk ,Ze Mayor Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co MPO/RTPO: City No.: 1485 Page 1 Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date• 6/19/2001 Adoption Date• 6/19/2001 Amend Date: Resolution No . R-2001-97 o 2 c v D. u- Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Protect Title Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Improvement ' Type(s) cn Status Total Length 1 -4 ; Utility Codes Project Costs in Thousands of Dollars Fund Source Information Expenditure Schedule (Local Agency) Federally Funded Projects Only r '6 a no`- Phase Start (rnnriddtyyyy) Federal Funding Federal Fund Code Federal Cost by Phase Slate Fund Code Slate Funds Local Funds Total1 Funds 1st 2nd I 4th 3rd 6 h Envir Type R/W Required Date (MM v>7 1 2 3 8 9 10 11 12 13 14 15 16 1718 1 19 20 21 14 1 Railroad Grade Separation - Phase 1 BNSF Tracks from: Lincoln Avenue to: Yakima Avenue New Construction 01 S 080 T O P $ T- P G T O G S - PE CN Totals RW CN _ 1/1/2002 1/1/2004 5/1/2003 6/112004 _ _ _ STP STP s I P SIP 1644 3000 4644 2000 18000 AIP AIP AIPI AIPI 256 1000 1256 5001 30001 10001 1900 4000 5900 1 1 zsoo 220001 500 500 1 1400 3000 4400 - -------- 19001 1900 500 1 2000 j 22000 EA CE No ----- Yes 9/1/2003 14 2 Railroad Grade Separation - Phase 2 BNSF Tracks/I Street from: Lincoln Avenue lo: Yakima Avenue New Construction O 1 P 80 Totals 20000 3500 1000 24500 500 24000 14 3 Railroad Grade Separation - Phase 3 BNSF Track/Street from: I Street to- Washington Avenue Railroad Grade Separation including crossings at seven major Intersections. Curb, gutter, sidewalk. 01 j P 1.5T PE RW CN 3/1/2003 6/1/2003 3/1/2004 I STP STP STP 3000 2000 20000 AIP AIP AIP 10001 1000 7001 300 50001 5000 3000 25000 50001 1 30001 1 2500011 1 EA Yes 3/1/2004 Totals 25000 - ---OTHERI 6700 1300 33000 ____ 33000 00 4 Signal Upgrades Local Selection in Non -Attainment Area from: N/A to: N/A Local selection in non -attainment area 12 S N/A PE CN CN 1/1/2002 3/1/2002 3/1/2002 CMAQ CMAO 310 I 231 23 OTHER 1 533167 910 PWTFI 80l 80 231 1 9101No 801 I EA Totals 310 613 90 1013 1013 14 5 W Washington Avenue - South 24th Ave to South 40th W Washington Avenue from: South 24th Avenue to: South 40th Avenue Widen/Reconstruct, curb, gutter sidewalk 04 03 S N/A C G O P S._ T C G O P S T PE RW CN Totals 1/1/2001 1/1/2002 6/1/2002 REV REV REV 235 290 1837 2362 1 1 591 294 1 1 2981 5881 1 1 2871 2124 644 3006 ----3363361 294 1 1 5881 1 21241 3006 ----- - EA Yes 6/1/2002 14 6 West Washington Ave - South 40th Ave to South 48th West Washington Ave from: South 40th Ave to: South 48th Ave Widen/Reconstruct, curb, gutter, sidewalk 03 04 S N/A PE RSV CN 5/1/2001 1 STP(U) 1/1/2002 1 STP(11) 6/1/2002 I STP(ll) AIPI 3361 1 AIP 1 4001 1 4001 4001 1 AIPI 26281 1 26281 26281 EA Yes 6/1/2002 Totals 3364 3364 3364 Report Date June 15, 2000 Supersedes previous editions WIWashington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: Page 2 Six Year Transportation Improvement Program From 2003 to 2008 Hearing Date: 6/19/2001 Amend Date Adoption Date: Resolution No.. o No - u_ Priority Number Project Identification A. Federal Aid No. B. Bridge No. Project Title D Street/Road Name or Number E. Beginning MP or road - Ending MP or road F, Describe Work to be Done ! Improvement Types) cn Status Total Length m v 9 5 7 ri N 8 o 8 Phase Start (mm/dd/yy)y) 9 Project Costs in Thousands of Dollars Expenditure (Local' 1st 16 Schedule Agency) Federally Projects I.nvir Type 20 Funded Only RNV Required Dale (MMn 1q 21 Federal Funding Federal Fund Code 10 Fund Federal Cost byFund Phase 11 Source State Code 12 Information Stale Funds 13 Local Funds 14 Total Funds 15 2nd 17 3rd 4th Thr 6th 19 1 2 3 18 07 7 West Washington Avenue S. 48th Avenue to S 64th West Washington Avenue from: South 48th Avenue to: South 64th Avenue Widen/reconstrucl, curb, gutter and sidewalk 03 04 03 04 03 01 S S S S 102 50 5 N/A 73 (1 C G O P S T C (, O P S T C C 0 P S T S C G OCN P S T C G P S T W PE RW CN Totals PE RW CN Totals RW CN — Totals PE CN Totals PE RW 1/1/2002 2/1/2002 7/1/2002 1/1/2002 3/1/2002 7l 112002 6/1/2002 5/1/2001 8/1/2001 1 STP(()) i SiP(U) STP(E) 1 STP (U) 47 478 AIP AIP AIP 1 AIP AIP 1 -------� 84 123 897 1104 36 52 385 473 551 1 3451 400 71 75 120 175 1282 1577 1 55 1851 574 814 54` 5531 607 61 335 396 90 360 925 120 175 1282 1577 EA EA CE EA EA- EA Yes 6/1/2002 Yes 6/1/2002 Yes 4/1/2002 8 West Washington Avenue S. 64th Avenue to S 72nd West Washington Avenue from: South 64th Avenue to: South 72nd Avenue Widen/reconstruct, curb, gutter, sidewalk 1 1851 2291 414 I 551 185 1 5741 814 541 553 607 1 16 9 West Mead Ave - South 16th Ave to South 11th Ave West Mead Ave from: South 16tt/ Avenue to: South 11th Avenue Reconstruct/Widen --_---- ---1---- I 525 50 273 323 1 AIP 1 AIP1 AIP1 82 111 1 62 19 10 Powerhouse Canal Corridor Powerhouse Road from: Robertson School to- North 24th Avenue Install Asphalt Pathway 611 335 396 1 1 No _. Yes 4/1/2002 Yes 1/1/2002 73 02 11 Nob Hill Blvd. W - 68th Avenue S. to 80th Avenue S. West Nob Hill Blvd. from: South 68th Avenue to: South 80th Avenue Reconstruct to miror arterial standards 04 03 S 3 1/1/2002 4/1/2002 1/1/2003 541 361 2161 1441 55513701 901 3601 9251 4801 1 1 1 Totals PE RW CN Totals 6/1/2001 1/1/2002 6/1/2002 825 550 1375 140 340 1480 1960 1375 1401 3401 10001 1480 1 02 12 River Road River Road from: North 16th Avenue to: Fruitvate Blvd. Widening, curb, gutter, sidewalk, reconstruction 01 04 A(PI AIP AIP 1121 281 2721 681 1184 2961 1568 392 480 Ileport Date: June 15, 2000 Supersedes previous editions Washington State Department of Transportation -en Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO: Page3 Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date• 6/19/2001 Amend Date: Adoption Date• Resolution No.. Functional Class Priority Number Project Identification Status rn Total Length Utility Codes Project Costs in Thousands of Dollars Federally Funded A. Federal Aid No. B. Bridge No. m Fund Source Information Expenditure Schedule Projects Only C. Project Title d a Federal Funding (Local Agency) D. Street/Road Name or Number 0 `o.l- -cc . Phase Federal Federal State ReqRuired 4th E. Beginning MP or road - Ending MP or road E W Start Fund Cost by Fund State Local Total Thru Envir Date F. Describe Work to be Done i (mn,7dd/yvyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM/YY) 1 2 3 4 8 9 10 11 12 13 1415 16 20 21 17 18 19 14 13 04 S 1 C PE 8/8/2001 CN STF' 27 4 31 311 EA North 5th Ave /Fruitvale Blvd 03 G 5/1/2002 SIT 273 43 316 316 No North 5th Ave/Fruitvale Roundabout from: North 5th Ave to: Fruitvale Blvd O P Roundabout, curb, gutter, sidewalk S _ T Totals 300 47 347 347 19 14 03 S N/A G PE 1 6/1/2001 STP(E) 18 321 50 50 1 EA YVT Enhancement C CN I 1/1/2002 STP(E) 160 251 18.51 1851 No South 3th Avenue from: South 3th Avenue to: Pine Street S T Car Bam and Museum Restoration W P Totals 178 57 235 235 00 15 12 S N/A CM 1/1/2002 STP 22001 I 20001 42001 20001 22001 CE Transit Operating / Capital Expenses 21 No Various Areas 22 from: N/A to: N/A 23 24 Totals 2200 2000 4200f 2000 2200 00 16 22 S N/A PE 5/1/2002 STP(E) 27 1 1 41 31 I 311 Fruitvale Canal Pathway 06 CN 8/1/2002 STP(E) 241 39 280 I 2801 I CE No Fruitvale Blvd/North 20th Ave from: North 20th Ave to: Englewood Ave Construct Pathway/Sidewalk Totals 268 43 311 311 00 17 01 S N/A PE 1 1/1/2002 I STP(E) 601 121 721 721 --- CE - - - Sidewalks/Pedestrian Facilitiesl3 No N/A from: N/A to: N/A Sidewalk and pedestrian facilities Totals 60 12 72 72 00 18 12 S N/A PE 10/1/2003 1 1 401 46 1 401 - -- CE -- North 16th Ave - Signal @ River Road RW 5/1/2004 1 541 54I 1 54 Yes North 16th Ave from: North 16th Ave to: River Road CN 9/1/2004 1 1 2501 250 1 1 250 Install New Signal Totals 344 344 40 54 250 Report Date: June 15, 2000 Supersedes previous editions Washington State Department of Transportation �� Agency: Yakima Co. No.: 39 Co. Name: Yakima Co. City No.: 1485 MPO/RTPO• Page 4 Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date. 6/19/2001 Amend Date: Adoption Date Resolution No.. Functional Class Priority Number Project Identification A. Federal Ald No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done • aImprovement Type(s) Icn ' status cn Total Length Utility Codes m 2 Project Costs in Thousands of Dollars Fund Source Information -"-- Expenditure Schedule Federally Funded Projects Only r a m o n_ Phase Start (^mold/YYYY) Federal Funding Federal Fund Code Federal Cost by Phase State4th Fund Code State Funds Local Funds Total Funds 1st (Local Agency) 2nd 3rd Thru 6th Envir Type — RNV Required Dale (MM/Yy) 2 3 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 1901 North 40th Ave Signal @ Castlevale North 40th Ave from: North 40th Ave to. Castlevale Install new signal 12 S fl/A C G S W CN Totals 7/1/200" SVP(U) 75 75 --- 50 50 125 125 125 125 EA No 00 20 Bus Stop Zones - Transit Bus Stops from: N/A 10: N/A Bus Stops 22 S 1 N/A i PE CN 4/1/2003 6/1/2003 _ --- --� a 1 1 131 1 1 1161 1311 116 131 1 1161 - ----- EA - - No Totals 129 129 129 19 21 CBD Parking Loss Various Areas from: N/A to: N/A Rehabilitate Pavernent 07 S N/A � PE CN Totals 6/1/2002 6/1/2002 1 1 1 81 721 80 --- 8` 72I 80 21 21 181 181 20 20 2 18 20 2 18 20 EA No 09 22 Sports Complex Access Beech Street from: Fair Avenue to: 1-82 Includes 13th and Maple Streets, curb, gutter, sidewalk, drainage, lighting 01 05 P NIA C G o P S T PE CN 1/1/2003 6/1/2003 STP(U) STP(U) 2 8 I 1 281 301 1 2501 258 301 I 1 2581 EA Totals 10 278 288 288 17 23 4637/4566 East Nob Hill Blvd at South 6th Street East Nob Hill Blvd from: East Nob Hill Blvd to: South 6th Street Install new signal 06 01 P Signal P RW CN 2/1/2002 8/1/2003 STP(U) STP(U) 65 400 10 1 75 1 1 621 462 — 751 4621 1 EA Yes Totals PE CN 10/ 1/2003 1011/200: 1 465 72 537 537 291 29I 1 2571 257 1 291 •' 257 EA No 00 24 East Nob Hill Blvd - Signal @ Fair Ave East Nob Hill Blvd from: East Nob Hill Blvd to: Fair Ave Install Signal @ E. Nob Hill Blvd & Fair Avenue 12 P N/A Totals 286 286 29 257 ----- Report Date- June 15, 2000 Supersedes previous editions 1171 Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co City No.: 1485 MPO/RTPO• Page 5 Six Year Transportation Improvement Program From 2002 to 2007 Hearing Date- 6/19/2001 Adoption Date: Amend Date: Resolution No.: -@' w c v u. Priority 1 Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title D. Street/Road Name or Number E. Beginning MP or road - Ending MP or road F. Describe Work to be Done ,�� m 7 aF E j n ° i- D u Project Costs in Thousands of Dollars Federally Funded y L ° Fund Federal Rending Source Information Expenditure Schedule (Local Agency) Projects - - Only - RNV ami , Phase Start (rnm/ddi Yyyvl Federal Fund Code Federal Cost byFund Phase State Code State Funds Local Funds Total Funds 1st 2nd 3rd 4th Thru 6th Envir T e YP Required pate (MM/Y13 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 —19 20 21 02 25 Nob Hill Blvd Nob Hill Blvd from: South 52nd Avenue to: South 68th Avenue Widen, curb, gutter, sidewalk, lighting, drainage 04 P 77 P C G 0 S r PE CN 1/1/2003 6/1/2003 _ srP(u) STP(U) _-._ _- 107 1183 17 193 124 1376 _ 124 1376 EA No Totals 1290 _ 210 1500 124 1376 00 26 Annual Signal Upgrades Local Selection from: N/A to: N/A • Upgrade Signal 01 P N/A 4/1/2003 PE? t1 6/1/2003 101 ion I 101 90 90 ( 1 90 CE No Totals 100 100 100 00 27 Various Overlay Projects/Selected on Local Priority N/A from: N/A to: N/A Rehabilitate Pavernent 07 P N/A CN 1 7/1/2003 1 STP(U) I 1731 1 1 271 200i 1 2001 I EA - No Totals _ 173 _ 27 200 200 00 28 Storm DrainsNegetation Local Selection from: City Wide to: City Wide 32 P N/A PE 1 4/1/2003 CN 1 9/1/2003 801 720 80 - - 1 7201 801 720 --- --- EA -- -- - - No Totals 800 800 800 17 29 Reconstruction Rudkin Road Rudkin Road from: East Mead to: Viola Avenue Reconstruct, excavate ballast, lop course, curb, gutter, sidewalk 03 06 P .28 1/1/ T P g PE CN 1/1/2002 1/1/2003 STP(C) STP(C) 60 300 OTHER I 1 151 75 OTHER 1 3001701 670 75 1 1 6701 -- CE — -----_ No Totals 360 300 85 745 75 670 14 30 North 16th Ave - Signal @ Englewood Ave North 16th Ave from: North 16th Ave to: Englewood Ave Install New Signal 12 S N/A PE ' 1/1/2002 RW' 1/1/2002 Cf1 ' 6/1/2002 STP STP STP - 171 1 11 181 181 1 9 1411 1 1 61 1471 1471 1 CE Yes Totals 167 8 175 175 Report Date June 15, 2000 Supersedes previous editions Washington State Department of Transportation Agency: Yakima Co. No.: 39 Co. Name: Yakima Co City No.: 1485 MPO/RTPO: Page 6 Six Year Transportation Improvement Program From 2002 to 2007 Hearing Da e• 6/19/2001 Amend Date: Adoption Date: Resolution No.: Report Date June 15, 2000 Supersedes previous editions Priority Number Project Identification A. Federal Aid No. B. Bridge No. C. Project Title Improvement Type(s) cn Status a Total Length , Utility Codes I Project Phase Project Costs in Thousands of Dollars Expenditure Schedule Locai A9 ency) Y) Federally Projects Funded Only RAN Fund Federal Funding Source Information 0 D Street/Road Name or Number Phase Federal Federal State 4th Required ri E. Beginning MP or road - Ending MP or road Start Fund Cost hy Fund State Local Total Envir Date F Describe Work to be Done lrrrmidahvlY) Code Phase Code Funds Funds Funds 1st 2nd 3rd 61b i Type (MMivv) 1 2 3 9 10 11 12 13 14 15 16 17 2.0 21 18 19 17 31 03 P 76 C I'0 9/t12u0= STP 97 urHER 18 6 121 121 CE East Mead Avenue Reconstruction East Mead Avenue from: Rudkin Road to: South 10th Street 06 G p P CN 1 4/1/2005 STP 873 OTHER 163 55 1091 10911 No Reconstruct, excavate ballast, top course, curb, gutter storm S T Totals 970 181 61 1212 1212 00 32 06 P N/A S PE 4/1/2002 i 1 5 51 5 1 CE �- Intersection Improvements G CN 7/1/2002 I I 451 451451 No Selected on Local Priority from: N/A to: N/A C Curb, gutter, sidewalk, safety Improvements, striping. signs totals 50 50 50 11 33 04 P 1 C 99 1 1/1/2002 ! RW 3/1/2002 STP(U)13 1 21 15 151 1 CE South 18th Street & East Nob Hell Blvd South 18th Street from: South 18th Street to: East Nob Hill Blvd 01 3 S W : CN 1/1/2003 STP(U)8 STP(U) 1 140 z 20 1 1 251 165 201 1 1 1651 No Widen south leg for Double LT from west bound Nob Hill: (Tie to WSDOT Project) possible curb, gutter, and sidewalk Totals 171 29 200 35 165 16 34 01 N/A CN 1 2/1/2005 I STP 1 1001 1 1 501 1501 1501 1 CE South 6th Street - Signals @ 8 Street & Lincoln No South 6th Street from: B Street to: Lincoln Install Signals at B Street and Lincoln Totals 100 50 150 150 16 35 01 P N/A CN 1 2/1/2005 1 SIP 1 1001 ---- -------- 501 1501 1501 ( 1 CE - -- - South 8th Street - Signals @ B Street & Lincoln No South 8th Street from: B Street to: Lincoln Install Signals @ E Street and Lincoln Totals 100 50 150 150 Grand Totals for Yakima 60051 19825 9872 89748 52750 10897 2731 24270 Report Date June 15, 2000 Supersedes previous editions BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. For Meeting of January 15, 2002 ITEM TITLE: Public Hearing to Amend Six-year Transportation Improvement Program (STIP) to include recently annexed projects. SUBMITTED BY: Department of Community and Economic Development - Engineering Division CONTACT PERSON/TELEPHONE: William R. Cook, CED Department Director, 575-6227. SUMMARY EXPLANATION: Attached is a copy of the proposed amended Six -Year Transportation Improvement Plan (STIP) for the 2002 — 2007 planning years. After the recent annexation, Washington Avenue from 48th Avenue to 72nd Avenue and Nob Hill Widening from 68th Avenue to 80th Avenue were dropped from the County' s STIP and need to be included in the City of Yakima STIP. This amendment will allow roadway improvement projects within the recently annexed area to be consistent with the approved City Budget and the following years' proposed budget for these projects. This will also make the City' s agreement with Congdon match the required agreed upon improvements. Resolution X Ordinance Contract Other (Specify) STIP Funding Source APPROVED FOR SUBMITTAL: City Manager STAFF RECOMMENDATION: Adopt the amended STIP. BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION: Hearing conducted. Resolution adopted. RESOLUTION NO. R-2002-05