Loading...
HomeMy WebLinkAboutR-1998-144 Wastewater Connection Charge Study UpdateRESOLUTION NO. R-98- 14 4 A RESOLUTION Adopting the Revised Wastewater Connection Charge Study Update, dated October 1998, for the City of Yakima, Washington WHEREAS, a financing plan is one element necessary under RCW 36.70A.070(3) to provide for the wastewater needs of the area for the health, safety and well being of the people, as well as complying with State and Federal environmental laws and regulations; and WHEREAS, the City of Yakima is required to identify the financial plan necessary to implement the projected growth capital needs of its wastewater service area and this is accomplished in the attached document titled "Revised Wastewater Connection Charge Study Update", hereafter known as the "Study"; and WHEREAS, The City of Yakima is authorized to require, operate, manage and fix the price for service from a system of sewerage under RCW 35.67.020, RCW 35.92.020 and Article IX of the Charter of the City of Yakima; and WHEREAS, the City Council, through deliberation, has made changes in and additions to such Study, all of which are incorporated into such Study and Appendices as are adopted by this Resolution; and WHEREAS, the City Council finds and determines that adoption of the Study will promote the goals of the Growth Management Act, RCW Chapter 36.70A, that the conclusions of the Study are fair, just and reasonable, and that adoption of the Study will serve the public interest; now therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The document entitled "Revised Wastewater Connection Charge Study Update", dated October 1998, a true copy of which Study and Appendices are on file in the City Clerk's Office and are incorporated by reference herein, is hereby adopted by the City of Yakima. ADOPTED BY THE CITY COUNCIL this • h d4t-of-OetebeG, 1998 ATTEST: City Clerk Mayor John Puccinelli REVISED WASTEWATER CONNECTION CHARGE STUDY UPDATE OCTOBER 1998 Includes Revisions due to new NPDES Permit, recently adopted GMA Comprehensive Plan, and updated data. Also addresses County Concerns. jntroduction: The Wastewater Treatment Facility currently has capacity committed to serve four areas: City of Yakima, Yakima Urban Area, Terrace Heights Sewer District, and the City of Union Gap. Under City policy, prior to June 1997, new connections to the wastewater system, within Yakima's service area, were faced with a Sewer Connection Charge (SCC) which was applied toward the cost of the collection system (<12" Dia.) and a Capital Cost Recovery Charge (CCRC) which was applied toward a limited portion of the historic construction cost of the Treatment Facility and the Trunks/ Interceptors. These charges varied from area to area within the City and surrounding unincorporated area. On July 3, 1997, a revised Wastewater Connection Fee program was instituted by Ordinance # 97-38. Circumstances since that time have brought the City to closely review the new program charges. That review has brought into the charge analysis consideration of: updated data (previous data was through 1995), impacts of the City's new NPDES permit (October 1997), and consideration of the adopted GMA Comprehensive Plan (1997). The City has also met several times with County representatives to discuss their concerns which have been given due consideration. The following report incorporates the results of this review into the previously adopted study and rate schedule by making modifications deemed appropriate by staff in consultation with expert technical and legal counsel. Current State statutes authorize the City to impose two types of charges upon new connectors to the wastewater system. Revised Connection Charge Update Page 1 September 16, 1998 1) An "equitable share" of the cost of the existing system. RCW 35.92.025 authorizes a charge designed to make connecting property owners: bear their equitable share of the cost of [the sewerage] system. The equitable share may include interest charges from the date of construction of the ... system until the connection, or for a period not to exceed ten years, at a rate commensurate with the rate of interest applicable to the city . 2) The "actual cost" of connecting the new customers. Under RCW 35.6 7.020, 35.5 7.190, and 35.92.020, a city has full _L although �L be jurisdiction to fix sewer rates and charges, aluwugh ratesmust be uniform for each class of service; in classifying, the city may consider, among other factors, differences in capital contributions made to the system and location (within or outside the City limits). All actual costs, including the cost of adding treatment and transmission capacity to serve growth, may be included in this charge. Staff proposed, in the June 1997 Study, that the previous system of calculating and applying the CCRC and SCC charges be updated to more precisely match what is allowed by the above mentioned statutes. The proposal to revise the system for determining utility connection charges expanded the concept implemented in the previous C.C.R.C. to include cost recovery for expansions to the wastewater system from all new connectors. The amended charge schedule (1997) updated, consolidated and provided uniformity, within Zones, to a Wastewater Connection Charge. The 1997 report recommended that, for the purpose of calculating and charging a Wastewater Connection Charge, the Yakima Sewer Service Area be divided into three investment zones. The remainder of the report utilized this recommendation. The first zone (Zone 1) is the area within the Yakima City Limits. This boundary would change with any annexations. The second zone (Zone 2) is the area between the City limits and the present Urban Area (U.A.) boundary. The third zone (Zone 3) is the area between the present U.A. boundary and the Interim Urban Area (I.U.A.) boundary. Staff researched the historic cost of the Wastewater system's existing facilities (treatment, trunkage, and collection) allocated to serve each of these three Zones. Staff also projected the level of capital Revised Connection Charge Update Page 2 September 16, 1998 investment necessary, during the next twenty years, to adequately service increased population and related industry, within each Zone, and maintain an adequate level of reserve treatment capacity. The proposal relies on a comprehensive system analysis for each investment area (Zone) and develops charges based on the existing and future costs to provide service. Under the method of computation utilized prior to July 1997, a Capital Cost Recovery Charge was calculated on the square feet of the parcel being developed. In lieu of parcel size. staff recommends that the portion of the Connection Charge derived from historic and future treatment facility expansion expenses should be determined on the quantity of flow generated by the new connection. This would be more equitable, as flow generated, not parcel size, is more directly related to the impact on the treatment facility. Average flows for a Single Dwelling Unit (SDU) and each size water meter were generated from billing records. For the 1997 report, the trunkage and collection portion of the Connection Charge remained a function of the entire size of the parcel connecting to the system. This proposal recommends that a maximum of 20,000 sf be used when calculating charges for single dwelling units (SDUs). Existing and Projected Connections: City staff have projected the residential growth anticipated, within all three Zones, during the next twenty years (1996-2016). These projections are in accordance with the adopted GMA Comprehensive Plan. Staff have further projected the increase in connections to the wastewater system from the new single dwelling units (SDUs) and from existing dwelling units which may connect, within that time period. TABLE 1 displays the projected increase in dwelling units and population, within each of 14 areas, within the Interim Urban Boundary, during the planning period (20 years). TABLE 1 also shows that, within Yakima's service area, there are 26,424* existing connected dwelling units. Within the next twenty years, staff projects an additional 2,212 connections from existing dwellings and 6,614 new connections from new dwellings, within Yakima's service area; a total of 8,826 new SDU connections. ( * This number exceeds Revised Connection Charge Update Page 3 September 16, 1998 the actual number of residential accounts because several accounts service more than one dwelling unit.) These numbers do not include the Terrace Heights or Union Gap service areas. Projections on TABLE 1 anticipate, at the end of the planning period, that 64.91% of all dwelling connections will be in Zone 1 11.29% in Zone 2, and 6.12% within Zone 3; with the remaining (17.68%) in either the Terrace Heights or Union Gap service areas. Note: Terrace Heights and Union Gap combined presently are allocated (and are paying for) 12.1% of the capacity of the Treatment Facility. They currently are utilizing less than 50% of their dedicated capacity Therefore, it is quite possible that by maintaining their existing percentage allocation (12.1%) as the Facility expands, they will be able to accommodate their growth, over the next 20 years, without purchasing a higher allocation percentage. This report assumes that their percentage allocation remains at the current 12.1% level. 1) Equitable Share of Existing Facilities Historic Treatment Facility CQsts: On TABLE 2, the historic construction costs of the treatment facility is shown in column "A". This cost is then allocated to the customers within the 1977 service area (City, Urban Area, Terrace Heights, and Union Gap) in column "B" and the area outside the 1977 service area (Interim Urban Area) in column "C" based upon the percentage of connections each is projected to contain at the end of the planning period; Column "B" at 93.88% and Column "C" at 6.12%. All applications and support documents utilized to secure Federal and State Wastewater grants, since the mid -1970's, have shown the 1977 Urban Area Boundary as the limit of the facility's service area (Zone 1, Zone 2, Terrace Heights, and Union Gap). The Grant eligibility of past construction has been based upon existing and projected flows generated from within this area. Federal > and [+� /'�_..... L,:,.L. assisted F' the historic Ali Federal State Grants which financing historic construction were then deducted from column "B" to establish the "local cash" contributed by the City to finance the portion of the facility allocated to customers within the 1977 service area. This cost is shown in column "E". Revised Connection Charge Update Page 4 September 16, 1998 None of the grants were credited toward the "local cash" contributed by the City to finance the portion of the facility allocated to customers outside the 1977 service area (Zone 3). The "local cash" paid by City retail customers on behalf of future customers in Zone 3 is shown in column "F". Each "local cash" historic cost was adjusted at an appropriate interest rate from the date of construction to year-end 1997. The interest rate used was the average of the revenue bonds issued by the Wastewater Division during the designated time periods. By statute, an upper limit of ten years and a maximum factor of 2.0 was used for this adjustment. Several projects have been completed since the 1995 report was prepared. Costs of these projects are included on this Table. Each capital project was reviewed as to what percentage was for facility expansion as opposed to rehabilitation or implementing new mandates. The expansion percentage is shown in column "J". Finally, TABLE 2 shows the expansion allocation of the adjusted historic "local cash" cost for the customers within the 1977 service area (column "K") and for the customers outside that service area (column "L"). The total existing capacity of the Treatment Facility is rated by the new NPDES Permit at 22.3 million gallons of domestic strength wastewater per day. The limiting treatment process is ammonia removal and the limiting treatment components are the secondary clarifiers and the aeration basins. Some of the facility's other treatment components already have the additional capacity required for the flow increases projected in this report. For Zone 1 and Zone 2: The adjusted value of the "Local Cash" investment for expansion of the facility is shown, in column "K", to be $13.35 million. The capacity of the existing treatment facility allocated to these customers is 20.9 million gallons (93.88% of 22.3 million gallons). The bottom of column "K" on TABLE 2 shows the existing Treatment Facility adjusted value for 1.0 gallon per day of treatment capacity. For Zone 1 and Zone 2, this value is $13.35 million/20.9 million gallons per day capacity = $0.638 per gallon per day capacity. Revised Connection Charge Update Page 5 September 16, 1998 For Zone 3: The adjusted value of the "Local Cash" investment for expansion of the facility is shown in column "L" to be $3.88 million. The capacity of the existing treatment facility allocated to this customer class is 1.36 million gallons (6.12% of 22.3 million gallons). This yields a unit cost of = $2.845 per gallon per day capacity. Staff reviewed past billing records for residential accounts both within Zone 1 (CITY) and Zone 2 (Urban Area). The results of this review, as displayed on TABLE 3, show that, at the present time, the average Zone 2 residential account discharges approximately the same quantity of wastewater as the average Zone 1 residential account. A factor of 1.0 is then applied toward the existing and projected Zone 2 and Zone 3 Single Dwelling Unit connections to calculate the equivalent City Single Dwelling Unit (CSDU) connections. This factor (1.0) is also utilized when calculating charges of Flow Based elements of the Connection Charge. The relationship between the flows from these two user classes will be monitored and this factor may be adjusted if conditions warrant. For TABLE 4, staff reviewed past plant flow and billing records. Records show that approximately 62.4% of the billed flow, within the Yakima service area, is from residential accounts as opposed to industrial or commercial accounts. By using the flow billed by residential accounts plus a pro -rata share of the Infiltration/Inflow flow, staff determined the total loading on the facility from residential accounts. This quantity, divided by the total equivalent connected City Single Dwelling Units (CSDU), determined that the average flow per existing equivalent CSDU, within the Yakima service area, was 384 gallons per day. (321 million gallons per month/26,910 CSDU). The flow for Zone 2 and Zone 3 SDU's were the same. Staff then researched billing records to find the average billed flow for each size water meter. This flow plus a pro -rata share of the system's Infiltration and Inflow (I/I) is shown near the bottom of TABLE 4. Note: the designation 3/4" meter is used for small business with that sized meter. Small businesses typically discharge less Revised Connection Charge Update Page 6 September 16, 1998 water that a SDU because of the nature of their water use (no dishes or clothes to wash). The City's current equity position in the Treatment and Trunkage elements of the System was then reviewed. The results are shown on TABLE 7. New customers are required to pay their share of the historic system costs to the City's equity position. The remaining capital debt is included in monthly service rates. Staff then combine the flow information on TABLE 4, the Historic Cost information from TABLE 2, and the Equity position from TABLE 7. The results, as shown at the bottom of TABLE 4, are the equitable share of the adjusted historic cost of the existing Treatment Facilities for Single Dwelling Units (SDU) and each water meter size within each Zone. Historic Trunks/Interceptors Cost: Unlike the treatment facility, the Trunks/Interceptors serve specific service areas within the Zones. On TABLE 5, staff determined the Historic Cost, as adjusted by interest, of the existing system Trunks/Interceptors and allocated each to the Zones they serve. The trunk line adjusted Cost for Zone 1 (City) is $3.7 million, for Zone 2 (UA) $3.0 million, and for Zone 3 (IUA) $1.0 million. On the bottom of TABLE 5, these costs are spread across the total square footage of parcels projected to be connected by the end of the planning period (20 years). A separate unit cost per square foot was established for each Zone. Historic Collection System Cost: The collection system consists of the 6", 8", and 10" pipes. On TABLE 6, staff determined the Historic Cost, as adjusted by interest, of the existing collection system and allocated each to the Zones they serve. Staff determined the collection system adjusted Cost for Zone 1 (City) is $13.1 million, and for Zone 2 (UA), $9.3 million. There is no allocated capacity in any existing collection lines to serve Zone 3 (IUA). On the bottom of TABLE 6, these costs are spread across the total square footage of parcels projected to be connected by the end of the planning period (20 years). This includes existing and future Revised Connection Charge Update Page 7 September 16, 1998 connected area. A separate unit cost per square foot was established for each Zone. City's Equity Position: TABLE 7 looks at the historical cost of the treatment and trunkage elements of the Wastewater system and the outstanding debt principal allocated to each. This information is used to establish the current equity position that the City has in the Treatment and Trunkage elements of the System. This information is utilized on TABLES 4 and 5 of this report to determine the share of Historic Costs to be allocated to new customers so that they will have paid an equivalent amount toward past debt as existing customers. 2) Future Facility Requirements: Future Treatment Facility: In TABLE 8, staff projects the total increase in the average -day maximum -month treatment facility flow from the projected increased connections. Records show that approximately 62.4% of the presently billed flow, within the Yakima service area, is from residential accounts as opposed to industrial or commercial accounts. Projected flows shown are based upon the assumption that this ratio will be maintained over the next twenty years. The flows projected from Union Gap and Terrace Heights are also increased based upon a projected increase in residential customers within their respective service areas. This analysis determines that, to adequately accommodate the 20 year projected growth within the expanded service area, the treatment facility capacity must be increased to 3337 million gallons. This requires a capacity expansion of 11.47 million gallons per day of which 9.63 mgd would be allocated to customers within Yakima's service area. TABLE 9 identifies the estimated cost of Treatment Facility construction currently believed necessary to accommodate projected increase in flow, meet new mandated regulatory permit (NPDES) requirements, and maintain/rehabilitate the existing facility. Revised Connection Charge Update Page 8 September 16, 1998 The projected cost of expansion, to serve Yakima's service area, is shown at $10.4 million. Using the required increase in facility capacity from TABLE 8 of 9.63 mgd, staff developed the unit cost of future expansion per 1.0 gallon of allocated treatment capacity of $1.079. The cost of capital projects required by new mandates and rehabilitation to the existing facility will continue to be included in monthly service rates charged to existing customers. TABLE 10 combines the flow, per day, per dwelling unit, and for different water meter sizes as established on TABLE 4, with the unit costs established on TABLE 9. This yields the share of the cost of future treatment facility construction to accommodate projected growth for SDU's and each meter size for each Zone. Future Trunks and Interceptors: The wastewater division, in conjunction with City engineering and outside consultants, is currently proceeding with a Department of Ecology mandated update to their Comprehensive Sewer Plan. One element of this plan is to identify additional Trunks and any rehabilitation/upsizing to existing Trunks required to adequately serve the service area. Staff has concluded that, to complete service to the expanded service area, new Trunks will be required to serve the following areas: 1) Suntides/Gleed 2) Cowiche Canyon 3) Summitview Extension 4) Washington/Coolidge 5) Ahtanum 6) Wiley City 7) South Airport Area Staff has further determined that rehabilitation, including upsizing of existing lines and possible cross ties, will be required on the following existing Trunks: 1) West Valley Interceptor 2) Race Street Connection Revised Connection Charge Update Page 9 September 16, 1998 TABLE 11 lists costs to construct trunk lines adequately sized to handle total build out of each subbasin listed above. TABLE 11 then separates the cost of each trunk which would be required to handle the development anticipated during the planning period (20 years) and allocates only that cost to the Zone which will utilize the increased capacity to accommodate future (20 year) development. TABLE 11 further distributes the cost for each Zone across the area of the new parcels projected to be connected within each Zone. This results in a unit price per square foot to be assessed against new connectors for future Trunk construction. Future Collection Systems: As previously mentioned, the City does not typically install or fund the design and installation of collection pipes (6", 8", 10"). The most common methods of funding the installation of collection pipes are: a) in conjunction with a new subdivision or other new development extension; b) by private funding, due to the need for sewer service for an existing building or other development; or c) by Local Improvement District (L.I.D.). Through the use of any of these methods, the new connector pays directly for its collection system. Recent records indicate that collection system construction is costing approximately $78.00 per lineal foot. A typical development contains about 210 lineal feet of collection pipe per acre. Therefore, current costs of collection systems are $78 X 210 if = $16,380 per acre or $0.376 per square feet of parcel size. This is the single most expensive element of the entire wastewater system. However, as stated before, the City does not typically participate in this expense. TABLE 12 uses the Existing and Future Connected Acreage from TABLE 5 and the Unit Cost, per square foot, of parcel size from TABLE 6 to develop a "Composite" cost of the total collection piping anticipated to exist at the end of the planning period for each Zone. The result is a unit price per square foot to be assessed againstgtnew l.uliiicl.tOrS that connect to existing collection pipes. The "Collection" element of the charge would not be assessed if: 1) the parcel is within a "developer" built collection system area, 2) the parcel owner extends a collection pipe (of the size required by Wastewater Revised Connection Charge Update Page 10 September 16, 1998 Planning) from the existing system through or along the entire length of the parcel, or 3) the parcel is within a new LID. ZONE ONE (within Yakima City Limits) 1) Equitable Share of Existing Facilities: A) Existing Treatment Facility: TABLE 4 shows that, for 1997, the share of the historic cost of the existing facility, as adjusted for interest and equity, is $176.73 per single dwelling unit. Charges for City connections based upon water meter size for other than single family dwellings are displayed at the bottom of TABLE 4. B) Existing Trunk/Interceptor Facilities: The total area of Zone 1 is 11,406 acres, with 9,399 acres of parcel area. Of the parcel acreage, 5,884 acres are currently connected to sewer. At the bottom of TABLE 5, staff calculated the current density of 4.08 Single Dwelling Units per connected acre. Staff reviewed data prepared for the GMA Comprehensive Plan. This review results in the total acres believed likely to be connected at the end of the 20 year planning period to be 6,523 acres, an increase of 639 acres over this period. This includes currently connected plus future connected parcels. TABLE 5 shows that the adjusted historic cost, less Federal and State Grants, of the existing Trunks which serve Zone 1 (City) is $3.7 million. With a total of 6,523 acres to be connected in the future, the cost per acre is $564.40; this figure is then adjusted for the City's equity position from TABLE 7. The resultant investment required of new customers is $416.02 per acre or $0.010 psf. C) Existing Collection System: TABLE 6 shows that the adjusted historic cost, less Federal and State Grants, of the existing Collection System which serve Zone 1 (City) is $13.1 million. With a total of 6,523 acres to be connected in the future, the historic cost per acre is $2,010.66 or $0.046 psf for new connectors. There is no outstanding debt for any collection projects. Therefore, the City's equity position for collection piping is 100%. Revised Connection Charge Update Page 11 September 16, 1998 A new customer would be subject to this element of the Connection Charge if its parcel were not within an L.I.D. or private development which constructed its own collection system. Customers would remain subject to this element of the Connection Charge regardless of the classification of the sewer pipe to which they actually connect (see section 2, page 4). 2) Actual Connection Costs Including Share of Future Required Facilities: A) Future Treatment Expansion: TABLE 10 uses the unit cost determined on TABLE 9 and flow records to calculate the Share of Future Expansion to allocate to new connectors. The charge for a new City Single Dwelling Unit (SDU) is $414.58. Charges for new Zone 1 connections based on water meter size for other than Single Dwelling Units are also shown. B) Future Trunkage/Interceptor Expansion: TABLE 11 displays the anticipated cost of those future trunks identified as required to serve future development in each Zone. The cost assigned to each Zone, for the next 20 years development, is divided by the new acreage projected to connect. For Zone 1, the projected expense of $722,586 is divided by the projected additional acreage of 639. This results in a cost of $1,130.81 per acre or $0.026 per square foot. C) Future Collection System: TABLE 12 demonstrates that, for 1997, this cost would be $0.032 per square foot. A new customer would be subject to this element of the Connection Charge if its parcel were not within an L.I.D. or private development which constructed its own collection system. Customers would remain subject to this element of the Connection Charge regardless of the classification of the sewer pipe to which they actually connect (see section 2, page 4). D) City Services Charges are set each year during the budget process. They currently are at 6% of the division's revenue. E) Engineering Charges are set at $25.00 per parcel. This reimburses the City for the Engineering Department's time spent administrating Revised Connection Charge Update Page 12 September 16, 1998 the Wastewater System Connection Charge program. Any required inspection, permit, or plan review fees are in addition to this amount. F) Utility Tax is set by Section 7.64.010-C. 1. of the City Municipal Code. The tax rate is presently set at 14% of the gross revenue. Therefore, as shown on TABLE 13, for 1997, the Consolidated Wastewater Connection Charges for a Single Dwelling Unit within Zone 1 of a typically sized parcel of 12,000 square feet with developer installed collection system would be: Historic Treatment Facility Cost = $176.73 Actual/Future Treatment Facility Cost = $414.58 Historic Trunk/Interceptor = 12,000sf X $0.010/sf = $120.00 Actual/Future Trunk/Inter. = 12,sf X $0.026/sf = $312.00 Historic Collection System = 12.000sf X $0.000/sf = $ 0.00 Subtotal (wastewater cost) $1,023.31 City Services @ 6% $ 61.40 Engineering $ 25.00 Utility Tax Cad 14%(of wastewater cost only) $ 143.26 TOTAL $1,252.97 Wastewater Connection Charges for other new Zone 1 (City) customers would be a function of their water meter size, the total size of their parcel, and the financing mechanisms used for their collection system. ZONE TWO (Urban Area) In Section 2 of the 1994 Cost of Service and Rate Study, it was explained that sewer rates for non -owner (Urban Area) retail customers are calculated on a Utility Rate Basis. Under this method of accounting, the customer's monthly sewer service charge pays for Operations and Maintenance, Depreciation, and Return on the Owner's Investment. 1) Equitable Share of Existing Facilities: A) Existing Treatment Facility: TABLE 4 shows that, for 1997, the share of the historic cost of the existing facility, as adjusted for interest and equity, is $176.73 per single dwelling unit. Revised Connection Charge Update Page 13 September 16, 1998 Charges for Urban Area connections, based upon water meter size, for other than single family dwellings are displayed at the bottom of TABLE 4. B) Existing Trunk/Interceptor Facilities: The total area of Zone 2 is 7,468 acres, with 5,523 acres of parcel area. Of the parcel acreage, 568 acres are currently connected to sewer. At the bottom of TABLE 5, staff calculated the current density of 4.27 Dwelling Units per connected acre. Currently within Zone 2, most of the connected parcels are within relatively high density housing developments. Staff reviewed data prepared for the GMA Comprehensive Plan. This review results in the total acres believed likely to be connected at the end of the 20 year planning period to be 1,260 acres, an increase of 692 acres over this period. This includes currently connected and future connected parcels. TABLE 5 shows that the adjusted historic cost, less Federal and State Grants, of the existing Trunks which serve Zone 2 (Urban Area) is $3.0 million. With a total of 1,260 acres to be connected in the future, the cost per acre is $2,341.67; this figure is then adjusted for the City's equity position from TABLE 7. The resultant investment required of new customers is $1,726.05 per acre or $0.054 psf. C) Existing Collection System: TABLE 6 shows that the adjusted historic cost, less Federal and State Grants, of the existing Collection System which serve Zone 2 (Urban Area) is $9.3 million. With a total of 1,260 acres to be connected in the future, the historic cost per acre is $7,375.11 or $0.169 psf for new connectors. There is no outstanding debt for any collection projects. Therefore, the City's equity position for collection piping is 100%. A new customer would be subject to this element of the Connection Charge if their parcel was not within an L.I.D. or private development which constructed its collection system. Customers would remain subject to this element of the Charge regardless of thR sewer nine to which they actually connect. Revised Connection Charge Update Page 14 September 16, 1998 2) Actual Connection Costs Including Share of Future Required Facilities: A) Future Treatment Expansion: TABLE 10 uses the unit cost determined on TABLE 9 and flow records to calculate the Share of Future Expansion to allocate to new connectors. The charge for a new Zone 2 Single Dwelling Unit (SDU) is $414.58. Charges for new Zone 2 (Urban Area) connections, based upon water meter size, for other than single family dwellings are displayed at the bottom of TABLE 10. B) Future Trunkage/lnterceptor Expansion: TABLE 11 displays the anticipated cost of those future trunks identified as required to serve future development in each Zone. The cost assigned to each Zone, for the next 20 years development, is divided by the new acreage projected to connect. For Zone 2, the projected expense of $4,685,117 is divided by the projected additional acreage of 692. This calculates a cost of $6,770.40 per acre or $0.155 per square foot. C) Future Collection System: TABLE 12 demonstrates that, for 1998, this cost would be $0.114 per square foot. New customers would be subject to this element of the Connection Charge if its parcel were not within an L.I.D. or private development which constructed its own collection system. Customers would remain subject to this element of the Connection Charge regardless of the classification of the sewer pipe to which they actually connect (see section 2 page 4). D) City Services Charges are set each year during the budget process. They currently are at 6% of the division's revenue. E) Engineering Charges are set at $25.00 per parcel. This reimburses the City for the Engineering Department's time spent administrating the Wastewater System Connection Charge program. Any required inspection, permit, or plan review fees are in addition to this amount, F) Utility Tax is set by Section 7.64.010-C. 1. of the City Municipal Code. The tax rate is presently set at 14% of the gross revenue. Revised Connection Charge Update Page 15 September 16, 1998 Therefore, as shown on TABLE 13, for 1998, the Consolidated Wastewater Connection Charges for a Single Dwelling Unit within Zone 2 of a typically sized parcel of 12,000 square feet with developer installed collection system would b..e_: Historic Treatment Facility Cost = $ 176.73 Actual/Future Treatment Facility Cost = $ 414.58 Historic Trunk/Interceptor = 12,000sf X $0.040/sf = $ 480.00 Actual/Future Trunk/Inter. = 12,000sf X $0.155/sf = $1,860.00 Historic Collection System = 12,000sf X $0.000/sf = $ 0.00 Subtotal (wastewater cost) $2,931.31 City Services @ 6% $ 175.88 Engineering $ 25.00 Utility Tax 0 14%(of wastewater cost only) $ 410.38 TOTAL $3,542.57 Wastewater Connection Charges for other new Zone 2 (Urban Area) customers would be a function of their water meter size, the total size of their parcel, and the financing mechanisms used for their collection system. ZONE THREE (Interim Urban Area) The 1976 "Four Party" Agreement includes a map of the service area covered by that agreement. That service area, so designated, was included in all documents and applications for State and Federal Grants received. Zone 3 is outside of that service area. Therefore, credit for those Grants is not extended to this Zone. Wastewater service to Zone 3, by the City of Yakima, is not precluded by the 1976 Agreement. In Section 2 of the 1994 Cost of Service and Rate Study. it was explained that sewer rates for non -owner (Urban Area) retail customers are calculated on a Utility Rate Basis. This report assumes the same would hold for customers within the Interim Urban Area. Under this method of accounting, the customer's monthly sewer service charge pays for Operations and Maintenance, Depreciation, and Return on Investment. Revised Connection Charge Update Page 16 September 16, 1998 1) Equitable Share of Existing Facilities: A) Existing Treatment Facility: The existing capacity of the Treatment Facility available for use by customers from Zone 3 was financed entirely by City cash. The applicable unit costs are shown at the bottom of column "L", TABLE 2 as $2.845 per gallon of treatment capacity. TABLE 4 shows that, for 1997, the share of the historic cost of the existing facility, as adjusted for interest and equity, is $788.09 per single dwelling unit. Charges for other Zone 3 (Interim Urban Area) connections, based upon water meter size, are displayed at the bottom of TABLE 4. B1 Existing Trunk/Interceptor Facilities: The total area of Zone 3 is 5,954 acres, with 5,525 acres of parcel area. Of the parcel acreage, 1.6 acres (1 account) are currently connected to sewer. Staff reviewed data prepared for the GMA Comprehensive Plan. This review results in the total acres believed likely to be connected at the end of the 20 year planning period to be 863 acres, an increase of 861 acres over this period. This includes currently connected and future connected parcels. As indicated on TABLE 5, there is limited capacity allocated in any existing trunks for customers in Zone 3. Therefore, the adjusted historic cost, of the existing Trunks which serve Zone 3 (Interim Urban Area) is $1.0 million. With a total of 863 acres to be connected in the future, the cost per acre is $1,114.90; this figure is then adjusted for the City's equity position from TABLE 7. The resultant contribution required of new customers is $821.79 per acre or $0.019 psf for new connectors. C) Existing Collection System: There is only one collection line in Zone 3, a private side sewer to West Valley High School. Revised Connection Charge Update Page 17 September 16, 1998 2) Actual Connection Costs Including Share of Future Required Facilities: A) Future Treatment Expansion: TABLE 10 uses the unit cost determined on TABLE 9 and flow records to calculate the Share of Future Expansion to allocate to new connectors. The charge for a new Single Dwelling Unit (SDU) is $414.58 Charges for other Zone 3 (Interim Urban Area) connections, based upon water meter size, are displayed at the bottom of TABLE 10. B) Future Trunkage/Interceptor Expansion: TABLE 11 displays the anticipated cost of those future trunks identified as required to serve future development in each Zone. The cost assigned to each Zone, for the next 20 years development, is L_ projected connect. For Zone 3, the divided by t11G clew aLlGage to For projected expense of $9,122,056 is divided by the projected acreage of 861. This calculates a cost of $10,582.43 per acre or $0.243 per square foot. C) Future Collection System: TABLE 12 demonstrates that, for 1998, this cost would be $0.376 per square foot. A new customer would be subject to this element of the Connection Charge if their parcel was not within an L.I.D. or private development which constructed its own collection system. Customers would remain subject to this element of the Connection Charge regardless of the classification of the sewer pipe to which they actually connect (see section 2 page 4). D) City Services Charges are set each year during the budget process. They currently are at 6% of the division's revenue. E) EngineeringCharges are set at $25.00 per parcel. This reimburses �.,, �,, g the City Engineering Department for the time spent administrating the Wastewater System Connection Charge program. Any required inspection, permit, or plan review fees are in addition to this amount. F.) Utility Tax 7 6.n n1 n C 1. the Municipal r) Utility is set by Section i.v�r.vav-�.. of City ..a.....a..al.,a Code. The tax rate is presently set at 14% on the gross revenue. Revised Connection Charge Update Page 18 September 16, 1998 Therefore, as shown on TABLE 13, for 1998, the Consolidated Wastewater Connection Charges for a Single Dwelling Unit within Zone 3 of a typically sized parcel of 12,000 square feet with developer installed collection system would be: Historic Treatment Facility Cost = $ 788.09 Actual/Future Treatment Facility Cost = $ 4145.58 Historic Trunk/Interceptor= 12,000sf X $0.026/sf = $ 228.00 Actual/Future Trunk/Inter. = 12,000sf X $0.243/sf = $2,916.00 Historic Collection System = 12,000sf X $0.000/sf = $ 0.00 Subtotal (wastewater cost) $4,346.67 City Services @ 6% $ 260.80 Engineering $ 25.00 Utility Tax Cad 14%(of wastewater cost only) $ 608.53 TOTAL $5,241.00 Wastewater Connection Charges for other new Zone 3 (Interim Urban Area) customers would be a function of their water meter size, the total size of their parcel, and the financing mechanisms used for their collection system. NOTE: Costs due to future expansion of the Terrace Heights and Union Gap service areas are not included within the above discussion. TABLE 14 consolidates and summarizes the Existing and Future charges of each element (Treatment, Trunkage, and Collection) of the proposed connection charge for all meter sizes within each Zone. Revised Connection Charge Update Page 19 September 16, 1998 TABLE 1 Existing plus Projected New Wastewater Accounts Page 1 of 2 Neighborhood 1990 Census 1990 Census 1997 % Existing Population Served Projected New Population ' (1997-2016) 49 Projected New SDU's • 20 Projected % New DU Connected 100% New Dwellings New Accounts 20 New Population Served 49 Population Housing Units # Dwelling Units Existing DU Connected 1,151 Connected CBD C 2,430 Northeast C 4,217 1,722 316 127 95% 1121 300 North Central C 12,444 5,525 1,246 724 498 289 95% 95% 473 275 1,184 688 Southeast C 8,032 2.972 Southcentral C 14,386 6,274 312 125 98% 123 306 Summitview C 10,606 4,518 153 61 100% 61 153 Scenic 6,354 2,553 3 767 1,507 City 60% 3,812 2,542 1,532 1,021 2,260 1,507 904 603 95% 85% 859 512 2,147 1,281 UA 40% Wide Hollow 7,935 3,029 4,949 1,980 City 40% 3,174 1,212 1,980 792 1,188 95% 85% 752 1,010 1,881 2,524 UA60% 4,761 1,817 2,969 South Nob Hill 5,874 2,283 1,931 773 City 50% 2,937 1,142 966 387 95% 367 917 UA 50% 2,937 1,142 966 387 85% 329 821 Suntides IUA 1,441 544 634 254 50% 127 317 West Valley IUA 1.864 655 3,224 1,290 50% 645 1,612 Ahtanum IUA 2,844 1,067 4,702 1,881 50% 941 2,351 Terrace Heights 6,581 2,572 1,550 60.3% 3,966 11,064 4,426 80% 90% 3,541 694 8,851 1,733 Union Gap 5.226 2,192 1,203 54.9% 2,868 1,926 771 ' Based upon a capacity analysis which concerned existing vacant land and assumed land uses. EXISTING CONDmONS TOTAL 90,234 37,057 29,177 78.7% 70,234 City 62,038 26,047 23,998 92.1% 57,154 UA 10,240 3,980 2,427 81.0% 6,244 IUA 6,149 2,286 1 0.0% 3 TFVUG 11,807 4,764 2,753 57.8% 6,834 Projected NEW Projected Total Projected Population Served % Total Connections PROJECTED CONDITIONS Connections Connections Additional Accounts from Exis rg SOU's at Projected 31,971 percen 86% age 77,341 34,997 Additional 14,002 accounts from 77% new SDU's 10,848 27,115 13,642 _ 42,819 104,455 TOTAL 90,234 37,057 City 62,038 26,047 24,745 95% 58,936 8,005 3,203 95% 3,050 7,624 3,799 27,795 66,561 64.91% UA 10,240 3,980 2,266 2,985 908 75% 40% 7,680 2,460 5,442 8,560 2,177 3,425 85% 50% 1,851 1,713 4,625 4,280 2,409 2,818 4,836 12,305 2,619 6,740 11.29% 6.12% IUA 6,149 THIUG 11,807 4,764 3,335 70% 8,265 12,990 5,197 81% 4,235 10,585 4,817 7,570 18,850 17.68% The Following data does NOT Include Terrace Heights and Union Connections 2.212 Gap service areas. Population 5.678 Terrace Heights and Union Gad service areas Connections 582 4,235 4,817 Pseulstton 1,4311 10,585 12,015 Additional from Existing SDU's Additional from Additional from Existing SDU's New SDU's NEW Additional from New SDU's 8 614 16,530 _ TOTAL from NEW 8,828 22,205 TOTAL from Existing from ExlstiSDU's 26 424 63,400 Existing from Ex-�istl_ng SDU's TOTAL 1 2,753 7,570 6,834 18,850 TOTAL r 35,250 85,606 9/16/98 TABLE 1 Page 2 of 2 Existing plus Projected New Wastewater Accounts Neighborhood 14,000 new SDU Build out Build out Vacant Acres 22,109 total build out SOU Po.ulation less R/W 0.6332 CBD C 31 200 78 499 3.59 24.83 98.44 71 60 8.64 8.05 7.99 6 38 ___ --� -_ --- Northeast C North Central C 787 1,967 Southeast C 457 1,143 Southcentral C 197 493 38.53 21 70 575.95 5.11 4 47 4.13 Summitview C 97 242 Scenic 2,380 5,949 Cit 60% 0 60 UA 40% 0 40 Wide Hollow 3,127 7,816 675.25 4.63 Cit 40% 0 40 UA 60% 0.60 South Nob Hill 1,220 3,049 269 76 4 52 City 50% 0.50 UA 50% 0.50 1,002 100.20 509.18 4 00 4.00 --_ __ Suntkies IUA 401 West Valley IUA 2,970 7,426 Ahtanum IU 2,970 7,426 73713 4.03 Terrace Heights 6,989 17,473 1,554 10 4.50 Union Gap 1,217 3,042 292.00 4.17 Existin. Total 20 ear Connected Future Future SDU/Acre Acres Acres Acres City 5,058 12,642 1,009 5.01 5,884 6.893 6,523 UA 3,438 8,594 770 4.46 772 1,542 1,260 IUA 5,408 13,520 1,347 4.02 10 1,357 863 new 3,126 8,826 %new 3,799 43.0% 3,126.16 2,409 27.3% 2,618 29.7% 9/16/98 TABLE 2 EXISTING TREATMENT FACILITY HISTORIC COSTS adjusted for interest 9/18/96 A B C 0 E F Ci H 1 .1 IR L Year Historical Zone 1 2 Zone 3 Less Grants Local Cash Local Cash Interest to 1997 max 10 yrs Adjusted Value Local Cash Z I, Z2, TH1UG (. E'GI Adjusted Value Local Cash Zone 3 (. F'G) Expansion % Expansion 5 Zone 1,, Zona 2 TH IL UG (_H•J) Expansion 5 Zone 3 (= PJ) Description Cost Existing TH 8 UG Share of (HC) @ Share of (HC) @ Zone 1, 2 11-18 UG Zone 1, 2 TH 8 UG Zone 3 Plant (HC) 93 8891. 6.12% (- B -D) (- C Sanitary Sewer Treatment Facility 3.40% Structure & Improve (1945-1975/ 50yr) 1959 321,147 519,853 51,294 SO 519,853 51 294 1.40 527794 St 812 80.00% 322 235 $1`449 517,153 579,723 5179 Structure & Improve (1945-1975/ 50y0 1967 1967 1970 5250 248 51,163,089 52,617 5234,933 51,091,908 52,457 515,315 571,181 5160 51) 5584,160 51) 5234 933 5507,748 52 457 515,315 571,181 5160 1.40 1.40 1.40 5328,906 5710,847 53 440 521,441 599,653 5224 80.00% 80.00% 80.00% 5263325 5568„678 52,752 Structure & Improve (1945-1975/ 25yr) Structure 8 Improve (1945-1975/ 50yr) subtotal pre -1976 51,437,101 51,349,150 587,951 5584,161) 5764,990 587,951 31,070,987 5123,131 80.00% 5856,709 598,505 7.60% Structure & Improve (Mullen -1982) 1981 516,180,105 515,189,883 5990,222 514,526,425 5663,458 5990,222 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 1.93 1.80 51,326 915 $1,805935 546,712 516,098 514,343 523822 3154_674 $12 255 535,614 553,366 5864,195 51,980445 51,342,963 53,045 51,049 5935 51,553 SII 022 5799 52,322 53,479 556,337 90.00% 90.00% 5000% 50.00% 50.00% 5000% 50.00% 50.00% 50.00% 50.00% 0 00% 51,194,224 51,325 341 $23,356 58 049 S7 171 511 911 57,837 56,127 '11 7807 526,683 SO 51.782,400 S1,208,567 51`23 5525 5467 5776 5511 5399 51 161 51 739 SO Structure 8 Improve (Kiewh-1985) 1985 510,971,921 510,300,439 5671,482 59,3974772 5902,967 $671 482 Tools Shop& GarageEqupment 1985 $24,879 523,356 51,523 SO 523 356 51 523 Laboratory Equipment 1985 1985 1985 1987 1987 1987 1988 1989 58,574 $7,639 $12,687 58,348 56,527 518,968 529,402 5512,319 58,049 57,171 511,911 57,837 56,127 517,807 527,603 5480 965 5525 5467 5776 5511 5399 51,161 51 799 531,354 SO 50 SO SAO SO SO 30 30 58 049 $7 171 511,911 57,837 56,127 517 807 527 603 5480 965 5525 5467 $776 5511 5399 31 161 31 799 531 354 Power Operated Egolpmont Miscellaneous Eqr m.nt Electrician's Office Equipment Office Equpment Communications Equipment L�o0n Cleanout Structure 8 Improve (Pease -1989) 1989 52,553 282 52,397,021 5156,261 SO 52 397 021 5156 261 1.80 1.80 54,306,951 S8 330 5280,768 5543 35 00% 50.00% 51,507,433 34,165 598269 5272 Office Equipment 1989 54,938 54,636 5302 SO 54,636 $302 subtotal 1977-1989 530,339 588 528,482,805 51,856,783 523,923,897 54,558,908 31,856 783 58,530,209 53,675,260 61.75% 54,440,105 53,096 710 6.14% Tools, Shop 8 Garage Equipment 1990 53,353 53,148 5205 S0 53 148 5205 1.52 54 778 5311 35 00% 31,672 5109 5635 3227 53,010 5371 233 547 590 50 S2 146 512,956 59 342 5111 300 531,504 57y289 51851 020 5687,361 Laboratory Equipment 1990 1991 1991 1993 519,542 37,410 598,274 513,655,606 518,346 56,956 592,259 512,819,883 5763,145 51,016,749 591,773 5166,214 51,196 5453 36 014 5835,723 549,749 566281 $5,983 510,835 SO 50 50 35,615,077 50 50 SO 50 518 346 $6 956 592 259 57,204,806 5763 145 51,016,749 591 773 3166,214 51 196 5453 56 014 5835,723 349 749 566,281 55 983 510 835 1.52 1.43 1.43 1.27 1.20 1.20 1.20 1.20 1.20 1.13 1.06 1.00 1.00 527841 59,946 5131 912 59,144 051 5915!.,524 51,215768 51097 37 5198,748 5179,141 5350,900 5536,961 3186 352 57,018.750 520027409 51,815 5648 58,599 31 060_666 559,487 579,255 37,154 312 956 511,678 322,875 535,004 512 148 5457 550 51,770,148 35 00% 35.00% 35.00% 35.00% 80.00% 000% 30.00% 100.00% 80.00% 80.00% 90.00% 60.00% 40.00% 40.08% 59,744 53,481 546 169 53 200,418 5730 019 50 532,921 3198,748 3143,313 3280,720 5483,265 3111,811 52,807.500 58,849,782 Storage Building Industrial Coating/Secondary Digester Structure 8 improve (Humphrey -1993) Olosolids Storage Area 1994 1994 1994 1994 5812 894 51,083,030 597 756 ;177,049 BlosolldsLagoon Cleanout and Hauling Landscaping Comprehensive Plan Update Facility Plan Update 1994 1995 1996 1997 1997 5159,582 5331,781 3538,878 5198,500 57,476,300 5149,816 3311,476 3505,899 3186,352 37,018,750 59,766 320,305 332,979 512,148 3457,550 , SO SO 50 SO SO 5149,816 5311 476 5505 899 5186,352 57,018,750 59,766 520 305 532 979 312 148 5457 550 SCADAUpgrade Mechanical Improvements Equipment Prepurchase Headworks/Dgester Improvements subtotal 1991-97 524,659,955 523,150,765 51,509,189 55 615 077 517.535.688 51509189 Total Existing Treatment Facility $56,436,644 552,962,721 $3,453,923 $330123,134 522,659,567 53,453,923 529 6211,606 55,568,539 48,95% 513,346,675 $ 682 575 Aduafod Historic Cost of Faell sr 10 ,lion er d Expansion Portion Adjusted Historic per 1.0 • alion • Cost or da % AllocationAllocated Capacity, Existing Facility requiroment based u. on projected accounts from TABLE 1 11= (sire Table 3) 20,935,240 gallons per da II 50.630 ZONE 1, ZONE 2, TH, 00 93.88% III 82.645 ZONE 3 HUM 8.12% 1,384,760 galions_par dot • II 22.300,000 11 EnIdng eapadty of Wilily Nations), ammo maximum month 9/18/96 TABLE 3 Equivalent Number City Single Dwelling Units (CSDU) 8/27/98 Equivalent City Single Dwell ng Units (CSDU) Existing EXISTING Connections factor Equivalent (1997) Connections Zone 1 (City) 23,996 1 23,996 Zone 2 (Urban Area) 2,427 1.00 2,427 Zone 3 (Interim Urban Area) 1 1.00 1 TOTAL 26,424 26,424 Projected Equivalent Equivalent Equivalent PROJECTED NEW New factor New TOTAL % AlI Connections Connections Connections Connections TABLE 1 Yak Sery Area inc. TH/UG Zone 1 (City) 3,798 1 3,798 27,794 64.91% Zone 2 (Urban Area) 2,409 1.00 2,409 4,836 11.29% Zone 3 (Interim Urban Area) 2,618 1.00 2,618 2,619 6.12% TOTAL 8,825 8,825 , 35,249 82.32% 8/27/98 TABLE 4 Equitable Share of EXISTING TREATMENT FACiLITV per New Single Dwelling Unit (SDU) and by Meter Size 1996 August (Max.Month) Flow 1 62.4% 225.77 mgm Billed Rowrsesideniiai Customers ��,V_k (Yakima sQnlico area only) 37.6%37.6% 136.28 mgm Billed Flow Commercial/Industrial (Yakima service area only) 151.96 mgm I/1 (Yakima service area only) 49.69 mgm TH&UG ( Their I/1 is included in their me ered flow) 563.70 Total Facility Flow million gallons per month (mgm) I Calculate daily flow per existing City SDU = billed flow + pro rata share of I/1 (see Table 3) = 225.77 + .624 X 152 = 321 /26,910 CSDU = 384 gallons per day per City SDU 1 1 I PER SINGLE DWELLING UNIT (SDU) Zone 1 Zone 2 Zone 3 See unit costs on TABLE 2 Adjusted Adjusted Adjusted See factors on TABLE 3 Historic Cost Historic Cost Historic Cost Capital Cost per new Dwelling Unit for Existing FacilitX 21 384 X 1.00 X $0.638 = $245.19 -InZ2 384 X 1.00 X $0.638 = $245.19 Z3 384 X 1.00 I X $2.845 = $1,093.35 _ Equitable Share Treatment Facility $245.19 $245.19 $1,093.35 PER 1.0 GALLON PER DAY Zone 1 Zone 2 Zone 3 Adjusted Adjusted Adjusted See unit costs on TART E 2 Historic Cost Historic Cost Historic Cost Capital Cost per 1.0 gallon per day for Existing Facilit' 21 $0.638 = $0.638 Z2 Y $0.638 = $0.638 -� 23 $2.845 = $2.845 E• i .'• - - re: It - i t - Tt - $0.638 $0.638 $2.845 Zone 1 Zone 2 Zone 3 -_- E•uitable E•uitable E•uitable --_ Avera • e 11111111111111.111111WIMMIlli• . = Share of Water - Gallons Position Ad'usted Ad'usted Ad'usted Meter •er Da. 72.08% Historic Cost Historic Cost Historic Cost Size (from bills CITY UA SDU see above $176.73 $176.73 $788.09 * 3/4" 250 $114.97 $114.97 $512.67 1" 900 $413.88 $413.88 $1,845.61 1.5" 2,700 $1,241.65 $1,241.65 $5 536.83 2 " 4,200 $1,931.46 $1,931.46 38,612.84 3" 5,250 $2,414.32 $2,414.32 $10,766.05 4" 6,750 $3,104.13 $3,104.13 $13,842.06 6" 9,000 $4,138.83 $4,138.83 $18,456.08 * Represents connection other than SDU utilizing 3/4" meter; ie small business. 9/16/98 TABLE 5 EXISTING TRUNKS INTERCEPTORS HISTORIC COST adjusted for Interest 8127/98 Historical Less Local Interest Adjusted % Zone 1 % Zone 2 % Zone 3 Description Year Cost Existing Pipe (HC) Federal/State Grants (Gr) Cash (LC) LC. HC -Gr -1.. to 1997 max 10 yrs Value Local Cash LC9nt City City UA Urban Area ILIA interim Urban Area Sanitary Sower Trunks/Interceptors 1958 1960 548,014 526,131 548014 526,131 3.40% 1.40 1.40 567,219 536,584 100% 100% 567,219 536,584 0% 0% SO 50 0% 0% SO 50 Tnrnks (1957.1959) Trunks (1960) Trunks (1957.1984) 1980 5665,840 5665,840 1.40 5932,176 9916 5922,854 1% 59,322 0% 50 Land and Land_gI hts 7.60% W.V. Intercepter (2) 1985 1985 581,426 510,026 581,426 510,026 2.00 2.00 5162,852 520,052 15% 70% 524,428 514,036 70% 25% 5113,996 55,013 15% 5% 524,428 51,003 S. Frultvale Interceptor (3) River Road Interceptor 1985 1985 1985 56,110 57,891 53,661,042 53,239,992 56,110 57,891 1421,050 2.00 2.00 2.00 112,220 515,782 5842 099 100% 8% 15% 512,220 51,263 5126,315 5143,639 5113,309 0% 10% 70% 25% 0% 50 51,578 5589,469 551,300 50 0% 0% 15% 5% 0% SO 50 5126 315 510,260 50 S. Bradwaj ter (1811.) (4) Trunks (1985 W.V. Interceptor) (2) Trunks (1985 S. Fruitvale Inter) (3) 1985 1985 5714,500 5435,528 5611,900 5378,874 5102,600 556,654 2.00 2.00 5205,199 5113,309 70% 100% Trunks (1985 River Rd. Inter) Trunks (1985 Fairview -Sumac) (5) 1985 5342,418 5264,188 178,230 2.00 5156,460 95% 5148,637 5% 57,823 0% SO Trunks (1985 83rd. Ave) 1985 536,159 536,159 2.00 572,318 0% 50 100%_ 10011. 572,318 5157,844 0% 0% 50 SO Trunks (1985 72nd. Ave) 1985 578,922 578,922 2.00 5157,844 011. SO Trunks (1985 S. Broadway Inter) (4) 1985 5211,620 533,356 5178,264 2.00 5356,528 8% 528,522 10% 535,653 0% 50 6.14% Land and LandRfghts (Don YoungProperty'1992 5350,162 5350,162 1.35 5471,698 65% 5306,604 11% 553,302 6% 528,774 Structure (Don Young Property) 1993 1993 1995 5900,000 51,805,500 5900,000 51,805,500 1.27 1.13 51,142,244 52,034,022 65% 25% 5742,459 5508,506 11% 70% 5129,074 51,423,815 6% 5% 569,677 1101,701 SO Trunk 7th. Ave Interceptor 1995 Pierce Ave 1997 5185,000 5185,000 1.00 5185,000 100% 5185,000 0% SO 0% N. 1st Str! 6th Avo.lntercept 1997 51,200,000 51,200,000 1.00 51,200,000 25% 5300,000 25% 5300,000 50% 5600,000 Total Trunks/Interceptors 510,766,288 54,528,310 56_237,978 58,183,606 53,681,594 52,950,507 5962,157 Zone 1 (City) 53,681,594 (2) W.V. Interceptor allocated per 1978 West Valle City and Sewer Comprehensive Plan 75% Urban Area Zonis 2 (Urban Ana) 52,950,507 (3) S. Fruitvato Interceptor Is allocated 25% (4) S. Broadway was allocated 82% Union Gap, 8%City and 10% Urban Area Zone 3 Interim Urban Area) 5962,157 (5) Fairview Sumac was allocated 95.0% to City, 5% to Urban Area and 0% to Union Gap. Total parcel acres 9,399 5,523 5,525 Future connected parcel acres 69% 6,523 23% 1,260 16% 863 5 per acre glowered 5564.40 52,341.67 51,114.90 Equity Position 73.71% 5416.02 51,726.05 5821.79 i 5 Cost per per square loot 12,000s1 parcel $0.010 5120.00 50.040 5480.00 50.019 5228.00 j Zone 1 Existing 23,996 SDU connected. 4.08 SDUs/acro 5,884 connected acres Future, 27,794 SDU connected . 4.26 SOUs/acro projected density 6,523 connected acres Zone 2 Existing 2.427 SDU connected . 4.27 SOIJs/acre 568 connected acres Futon @ projected density 4,835 1,260 SDU connected . connected acres 3.84 SDUWacre Z3 Future. prolected density 2.618 863 SDU connected . connected acres 3.03 SOUs/acre 8127/98 TABLE 6 EXIST(NGi COLLECTION SYSTEM HISTORIC COST adjusted for Interest 8/27/98 Historical Less Local Interest Ad usted % Zone 1 % Zone 2 % Zone 3 Description Year Cost ExistIn. Cash to Value City City UA Urban Area IUA Interim Urban Area Pi.:Grants LC 1997 Local Cash HC LC=HC Gr max 10 rs LC'Int 1970,116 Sanitary Sewer Collection System. 3.40% Laterals (1969-1971) $14,1161.40 100% $19,762 0% $0 0% $0 Laterals (1961-1975) 1975$444 719 • 1.40 $622,607 95% $591,1176 5% $31,130 0% $0 Laterals (1962-1985) 1985 $4,495,797 $0 2.00 $8,991,594 86% $7,732,771 14% $1,258,823 0% $0 Laterals 1965-1990 1988 $4 410 420 $0 $4 410,4201.93$8 526,885 $4 247 311 45% 22% $3,837,098 $934,108 55% 78% $4,689,787 $3,312,902 0% 0% $0 $0 Laterals (1987-1990) 1989 $2 363 828 • $11,728,880 1.80 Total Collection system $11,728,880 $22,408,159 $13,115,516 $9,292,643 $0 Zone 1 Cit) $13,115,516 Zone 2 (Urban Area) $9,292,643 Zona 3 (Interim Urban Ana) $ 0 See Table 5 Future connected parcel acres $ :er acre sewered 6,523 $2,010.66 $0.048 1,260 $7,375.11 $0.189 863 $0.00 $0.000 $ per s. oars toot Cast .sr 12,000x1 parcel $552.00 $2,028.00 $0.00 8/27/98 TABLE 7 City EQUITY In WASTEWATER SYSTEM Historical Historical Description Cost Existing Plant Cost Existing Trunks/Interceptors as of December 1997 Sanitary Sewer Treatment Facility see table 2 $56,436,644 Sanitary Sewer Trunks/Interceptors see table 5 $10,768,288 TOTAL System $56,436,644 $10,768,288 Outstanding Debt Principal $ 0 1956 Revenue Bond 1964 Revenue Bond $ 0 1978/96 Revenue Bond 211, 215, 232 $2,332,470 $552,196 1983 Revenue Bond $0 1991 Revenue Bond SU232 $5,459,125 1991 SRF Loan SU232 $1,717,389 1988 PWTF (1300) SU232 $613,349 1992 PWTF (1497) SU 211 $925,965 1993 PWTF (1566) SU232 $2,728,096 1994 PWTF (1616) SU 211 $1,352,482 1995 PWTF (1638) SU232 $2,903,962 Outstanding Principal $15,754,391 $2,830,643 Equity of Historic Cost 72.08% 73.71 % -T ®m8 r €i Required Additional Treatment Facility Capacity 1996 Maximum Monthly Flow 362.05 mgm Yakima Service Area Total Billed Fiow 151.96 mgm 1/1 (Yakima service area only) 49.69 mgm Terrace Heights & Union Gap (Includes their 1/1) TOTAL 563.70 Total Facility Flow million gallons per month (mgm) Calculate total daily facility flow per existing City Single Dwelling Unit (CSDU within the Yakima service areas. I( 362,05 151.96 (existing CSDUs connected) 514.01 / 26,424 = 638 gals per day per DU (see TABLE 3) Calculate projected additional total new flow. (new CSDUs connected) 638 X 8,825 = 172 million gallons per month (see TABLE 3) Projected Total Flow (Maximum month) Existing Base Flow 514 mgm New Accounts 1 72 mgm TH&UG (Existing+New) 1 38 mgm TOTAL 824 = 27.01 million gallons per day (mgd) I Maintain Adequate Reserve (25%) + 6.75 mgd for TOTAL Service Area (incl TH&UG) Future Required Capacity = 33.77 mgd for TOTAL Service Area Existing Capacity - (22.30) mgd for TOTAL Service Area Required Expansion = 11.47 mgd for TOTAL Service Area - (1.83) lessTH&UG Required Expansion = 9.63 mgd for Yakima Service Area 8/27/98 TABLE 9 Estimated Wastewater Capital Improvement Projects Allocation of Future Costs 8/27/98 1997 Estimated % Expansion % NEW Mandates % Rehabilitation Other ELEMENT Cost Expansion Cost NEW Mandates Cost Rehabilitation Cost NEW Mandates Industrial Coating $390,000 0% $0 0% $0 100% $390,000 Aeration Basin Repair $175,000 0% $0 0% $0 100% $175,000 Additional Final Clarifiers $5,000,000 50% $2,500,000 50% $2,500,000 0% $0 Aeration Basin & Blower capacity $3,500,000 43% $1 ,500,000 57% $2,000,000 0% $0 RAS Piping and Pump $1,000,000 $2,000,000 100% 100% $1,000,000 $2,000,000 0% 0% $0 $0 0% 0% $0 $0 New Primary Digester Site Work $1,500,000 60% $900,000 40% $600,000 0% $0 Contingency $2,600,000 62% $1,600,000 38% $1,000,000 0% $0 Engineering, Admin, Legal $2,600,000 62% $1,600,000 38% $1,000,000 0% $0 Administration Building Expansion $350,000 $2,050,000 50% 0% $175,000 $0 50% 100% $175,000 $2,050,000 0% 0% $0 $0 Alternative Disinfection (UV light) Clean Air Mandates (VOC control) $2,050,000 0% $0 100% $2,050,000 0% $0 Composting Facility $2,500,000 20% $500,000 80% $2,000,000 0% $0 Activated Sludge Lab $100,000 50% $50,000 30% $30,000 20% $20,000 Cogeneration " $1,460,000 $1,460,000 industrial Waste Program " $1,030,000 $1,030,000 Subtotal $28,305,000 $11,825,000 $13,405,000 $585,000 $2,490,000 less TH&UG @ 12.1% $3,123,615 $1,430,825 $1,622,005 $70,785 $0 TOTAL Yakima Service Area $25,181,385 $10,394,175 $11,782,995 $514,215 $2,490,000 " Th & UG were not assigned a share of the ex•ense of these protects. Capital Cost per 1.0 gallon per day of Required Facility ExpansionCapital Cost per 10 gallon per day of Required Facil ty Expansion (see TABLE 7) Share of Expansion Costs $10,394,175 9.63 $1.079 Share of New Mandates Included In Monthly Rates n/a Share Rehabilitation Included In Monthly Rates n/a TOTAL $1.079 per gallon per day treatment capacity 1 8/27/98 TABLE 10 Actual Cost FUTURE TREATMENT FACILITY per New Single Dwelling Unit (SDU) and by Meter Size 1996 August (Max.Month), Flow I 62.4% 225.77 mgm Billed Flow Residential Customers (Yakima service area only) 37.6% 136.28 mgm Billed Flow Commercial/Industrial JYakima service area only) 151.96 mgm I/I (Yakima service area only) 49.69 mgm TH&UG I( Their I/1 is included in their metered flow) 563.70 Total Facility Flow million gallons per month (mgm) Calculate daily flow per existing City SDU = billed flow + pro rata share of I/1 (see Table 3) = 225.77 1 + 1.62 X 152 = 321 /26910 CSDU = 384 gallons per day per City SDU PERI SINGLE DWELLING UNIT (SDU) Zone 1 Zone 2 Zone 3 See unit costs on TABLE 2 Adjusted Adjusted Adjusted See factors on TABLE 3 Historic Cost Historic Cost Historic Cost Capital Cost per new Dwelling Unit for Existing Facilit Z1 384 , X 1.00 X $1.079 = $414.58 Z2 [ 384 1 X I 1.00 X $1.079 = $414.58 Z3 1 384 1 X ! 1.00 X I $1.079 = $414.58 i Equitable Share Treatment Facility $414.58 $414.58 $414.58 1 1 1 PER 1.0 GALLON PER DAY Zone 1 Zone 2 Zone 3 fSee unit costs on TABLE 8 Future Future Future I Expansion Expansion Expansion Capital Cost per 1.0 gallon per day for Necessary Expansion to Facility Z1 $1.079 = $1.079 Z2 $1.079 = $1.079 Z3 ! 1 I $1.079 = $1.079 Total Treatment Facility Fee $1.079 $1.079 $1.079 ' i I —I Zone 1 Zone 2 Zone 3 Water Average Future Future Future Meter Gallons Expansion Expansion Expansion Size per Day (City) (UA) (IUA) SDU see above $414.58 $414.58 $414.58 ' 3/4" 250 $269.75 $269.75 $269.75 1" 900 $971.10 $971.10 $971.10 1.5" 2,700 $2,913.30 $2,913.30 $2,913.30 2" 4,200 $4,531.80 $4,531.80 $4,531.80 3" 5,250 $5,664.75 $5,664.75 $5,664.75 + 4" 6,750 $7,283.25 $7,283.25 $7,283.25 6" 9,000 $9,711.00 $9,711.00 $9,711.00 ' Represents connection other than SDU utilizing 3/4" meter; ie small business. 9/16/98 TABLE 11 FUTURE TRUNKS / INTERCEPTORS ZONE ALLOCATION 8/27/98 Total Less Planning Period Interest to Adjusted Value % City Zone 1 City % UA Zone 2 Urban Area % $JA Zone 3 Interim Urban Area Description Year Cost Oversize New Plpe beyond 20yr Cost 1997 LoCal Cash planning period max 10 yrs (LC'Int) Uplifts Existing Trunks/interceptors $0 *0 1.00 30 0% *0 65% *0 35% SO Fruitvale Connection (to Suntides pipe) West Valley Interceptor *732,881 $79,149 5653,712 1.00 3653,712 0% *0 40% $261,485 60% *392,227 Race Street Connection *2,346,000 *253,368 *2,092,632 1.00 *2,092,632 0% *0 40% $837,053 60% 51,255.579 Subtotal Upsize Existing *3,078,861 *332,517 52,746,344 $2.746,344 00 $1,098,538 $1,647,806 New Trunks/Interceptors Suntides/Gieed *4,879,820 *1,402,872 52,329,182 $619,620 553,960 *258,781 24,260,200 $1,348,912 $2,070,401 1.00 1.00 1.00 *4,260,200 51,348.,912 *2,070,401 10% 10% 0% 5428,020 *134,891 *0 30% 70% 40% *1,278,060 *944,238 5828,160 60% 20% 60% $2,556,120 *269,782 31,242,241 Cowlche Canyon Summllview Extension Coolidge 51,285,430 561,520 *1,203,910 1.00 51.203,910 0% SO 0% SO 100% $1,203,910 Ahtanum *1,693,774 5275,302 51,418,472 1.00 *1,418,472 0% $0 16% $212,771 85% 51,205,701 Wiley Extension 0919,380 $725,000 584,560 078,,300 *834,820 $646,700 1.00 1.00 *834,820 *646,700 0% 25% *0 $161,875 0% 501/4 *0 5323,350 100% 25% 5834,820 *161,675 Airport Extension Subtotal New Trunks/Interceptors 513,215,458 31,432.043 *11,783,415 $11,783,415 87224686 53,586,580 57,474,249 % oversize $ 10.8% TOTAL New Construction $16,294,319 *1,764,560 *14,529,759 514,529,759 $722,586 *4,685,117 *9,122,056 Zone 1 (CityL 0722,586 Note: None of these pipes will be used by TH or UG. Zone 2 (Urban Area) $4,685,117 Zone 3 (Interim Urban Area) $9,122,058 (see Table 5) Future Total Connected Parcel Acres 6,523 5,884 1,260 568 863 2 Existing Connected Parcel Acres New Connected Parcel Acres 639 692 861 $ per acre connected a uare toot $1,130.81 30.028 $6,770.40 50.155 010,594.72 50.243 `per Cost per 12,000x1 parcel 3312.00 51,860.00 02,916.00 I 8/27/98 TABLE 12 FUTURE COLLECTION ZONE ALLOCATION 8/27/98 Zone 1 (City) Zone 2 (Urban Area) Zone 3 (Interim Urban Area) Description Acreage see TABLE 5 Unit Cost per sf see TABLE 6 Acreage see TABLE 5 Unit Cost per sf see TABLE 6 Acreage see TABLE 5 Unit Cost per sf see TABLE 6 and Text and Text and Text Existing Connected Parcel Acres 5,884 $0.046 568 $0.169 2 $0.000 Future Connected Parcel Acres 639 $0.376 692 $0.376 861 $0.376 6,523 Composite $0.078 1,260 Composite $0.283 863 Composite $0.376 Future Total Connected Parcel Acres less share of existing $0.046 $0.169 $0.000 (see TABLE 6) Share of Future Cost $0.032 /sf $0.114 /sf $0.376 /sf 8/27/98 TABLE 13 TOTAL PROPOSED WASTEWATER CONNECTION CHARGE 8/27/98 FLOW BASED PARCEL SIZED BASED ADMINISTRATION and TAXES A B C D E F G H I J K L M N TOTAL Meter Existing Treatment Future Treatment Total Treatment Existing Trunks Existing Collection Future Trunks Future Collection City Services @6% of Engineering $25.00 Utility Tax @ 14% of WASTEWATER CONNECTION Size Table 4 Table 10 Table 5 Table 6 Table 11 Table 12 (D+F+G+I+J) per Parcel (D+F+G+I+,I) CHARGE ZONE 1 (CITY) SOU $176.73 $414.58 $591.31 $0.010/sf $0 046/si $0 026/s1 $0 032/sf 3/4" $114.97 $269.75 $384.72 $0.010/sf $0.0461s1 $0 026/s1 $0.032/sf 1" $413.88 $971.10 $1,384.98 $0 010/sl $0.046/sf $0.026/sf $0 032/sf 1.5" $1,241.65 $2,913.30 $4,154.95 $0.010/s1 $0 0461st 80.026/s1 $0.032/s1 2" $1,931.46 84,531.80 $6,463.26 $0 010/sl $0.046/s1 $0.0261s1 $0 032/s1 3" $2,414.32 85,664.75 $8,079.07 $0 010/sf $0 046/sf $0 026/s1 $0.032/s1 4' $3,104.13 $7,283.25 $10,387.38 $0 010/st $0.046/st $0.0261s1 $0.032/s1 6" $4,138 83 $9,711.00 $13,849.83 $0.010/sf $0.046/sf $0 026/sf $0.0321s1 Example 1: SDU on 12,000 sf yarcel with developer installed collection system. 8176.73 $414.58 ( 8591.31 $120.00 L 80 00 $312.00 $0.00 $61.40 $25.00 $143.26 81,252.97 Example 2: SDU on 10,000 sf parcel connecting to City installed collection s stem or Trunk. $176.73 $414.58 $591.31 $100 00 $460 00 $260.00 $320.00 $103.88 $25.00 $242.38 82,102.57 ZONE 2 (URBAN AREA) SOU $176.73 $414.58 $591.31 $0 040/s1 $0 1691st 0.155/s1 $0.114/sf 3/4' $114.97 $269.75 $384.72 $0.040/sf $0 169/s1 0 155/s1 $0.114/st 1" $413.88 $971.10 $1,384 98 $0.0401s1 $0.169/si 0 155/s1 $0.114/s1 1.5" $1,241.65 $2,913.30 $4,154.95 $0.040/s1 $0 169/s1 0155/s1 $0.114/sf 2" $1,931.46 $4,531.80 $6,463.26 $0 040/51 $0 1691st 0.155/s1 $0.114/s1 3' $2,414.32 $5,664.75 $8,079.07 $0 040/01 $0 169/s1 0 155/s1 $0 114/01 4" $3,104.13 $7,283.25 $10,387.38 $0.040/5/ $0 169/s1 0155/s1 $0114/sl 6" $4,138.83 $9,711.00 $13,849 83 $0 040/st $0 169/sf 0 155/s1 $0.114/s1 Example 1: SDU on 12,000 sfyarcel with developer instalted collection system. $176.73 8414.58 1 $591.31 $480.00 $0.00 $1,860 00 80.00 $175.88 $25.00 $410.38 $3,542.57 Example 2: SDU on 10,000 sf parcel connect'n! to City installed collection s stem or Trunk. $176.73 $414.58 $591.31 $400.00 $1,690 00 $1,550.00 $1,140 00 $322.28 $25.00 $751.98 $6,470.57 ZONE 3 (INTERIM URBAN AREA) SOU $788.09 $414.58 $1,202.67 $0 019/sf none $0.243/s1 $0.376/sf 3/4" $512.67 $269.75 $782 42 $0 019/51 none $0.243/s1 $0 376/s1 1" $1,845.61 $971 10 $2,816.71 $0 019/sf none $0.243/s1 $0.376/s1 1.5' $5,536.83 $2,913.30 $8,450.13 $0 019/sf none $0.243/sf $0.376/s1 2" $8,612.84 $4,531.80 $13,144.64 $0 019/s1 none $0.243/st $0.376/sl 3' $10,766.05 $5,664.75 $16,430 80 $0 019/sf none $0.243/sf $0.376/s1 4" $13,842.06 $7,283.25 $21,125.31 $0 019/sf none $0.243/sf $0.376/s1 6" $18,456.08 $9,711.00 $28,167.08 $0 019/st none $0.243/s1 $0.376/sf Example 1. SDU on 12,000 sf parcel with dever installed collection system. $0.00 $260.80 $25.00 $608.53 $5,241.00 $788.09 $414.58 81,202.67 j8228 00 $0 00 $2,916.00 Example 2: SDU on 10,000 slyercel connecting to City installed collection system or Trunk. $788.09 1 $414.58 1 $1,202.67 1 1 $190.00 ( $0.00 1 1 $2,430.00 $3,760.00 $454.96 $25.00 $1,061.57 $9,124.20 8/27/98 TABLE 14 SUMMARY PROPOSED WASTEWATER CONNECTION CHARGE 9/16/98 FLOW BASED PARCEL. SIZED BASED ADMINISTRATION and TAXES A B C D E F G H i J TOTAL Meter Total Total Total City Services Engineering Utility Tax WASTEWATER Size Treatment Trunkage Collection @6% of $25.00 @ 14% of CONNECTION (B+D+F) per Parcel (B+D+F) CHARGE ZONE 1 (CITY)��- SDU $591.31 1 $0.036/sf $0.078/sf • De•endant De•endent De•endent SUM OF 3/4" $384.72 • $0.036/sf $0.078/sf $ u••n •• u ALL 1" $1,384.98 $ $0.036/sf $0.078/sf flow based number sum of CHARGE 1.5" $4,154.94 $0.036/sf $0.078/s1 • and of other ELEMENTS 2" $6,463.26 $0.036/sf $0.078/sf parte! size parcels charges 3" $8,079.07 $0.036/sf $0.078/sf based 4"_+_ $10,387.38 $0.036/sf $0.078/sf charges 6" $13,849.83 I I $0.036/sf $0.078/sf k ZONE 2 (URBAN AREA) SDU $671.83 $0.195/sf $0.283/sf Dependant Dependent Dependent SUM OF 3/4" $384.72 $0.195/sf $0.283/sf upon upon upon ALL 1" $1,384.98 $0.195/sf $0.283/sf flow hacod number sum of CHARGE 1.5" $4,154.94 $0.195/sf $0.283/s1 and of other ELEMENTS 2" $6,463.26 $0.195/sf $0.283/sf parcel size parcels charges 3" $8,079.07 $0.195/sf $0.283/sf based 4" $10,387.38 $0.195/sf $0.283/sf charges 6" $13,849.83 $0.195/sf $0.283/sf ZONE 3 (INTERIM URBAN AREA) SDU $1,202.67 $0.262/sf $0.376/sf Dependant Dependent Dependent SUM OF 3/4" $782.42 $0.262/sf $0.376/sf upon upon upon ALL 1" $2,816.71 $0.262/sf $0.376/sf flow based number sum of CHARGE 1.5" $8,450.13 $0.262/sf $0.376/sf and of other ELEMENTS 2" $13,144.64 $0.262/sf $0.376/sf parcel size parcels charges 3" $16,430.80 $0.262/sf $0.376/sf based _ 4" $21,125.31 $0.262/sf $0.376/sf charges 6" $28,167.08 i $0.262/sf $0.376/sf 9/16/98 BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. ,-`_.7 3 For Meeting Of 10/6/98 ITEM i'1"TLE: Consideration of Resolution Adopting Revised Wastewater Connection Charge Study Update and Approving Ordinance Revising Wastewater Connection Rates and Charges. SUBMIUTED BY: Dick Zais, City Manager Glenn Rice, ACM Doug Mayo, Utility Engineer CONTACT PERSON/TELEPHONE: Doug Mayo/575-6077 SUMMARY EXPLANATION: The Wastewater Connection Charge Ordinance (#97-38), approved in June of 1997, consolidated the then existing Capital Cost Recovery Charge and Sewer Connection Charge provisions of the Yakima Municipal Code into a single charge. During consideration of and since adoption of that ordinance, City Council has been very clear in its stated position that City staff should closely review its work, entertain serious public comment and, where adjustments are merited, directed that those changes be (...continued...) Resolution X Ordinance Contract _Other (Specify) Revised Wastewater Connection Charge Study Update. Funding Source Revenues from this program would be allocated to either the wastewater collection system project fund (476) or the wastewater facilities project fund (478) APPROVED FOR SUBMITTAL• City Manager STAFF RECOMMENDATION: Staff respectfully requests City Council adopt, by attached resolution, the Revised Wastewater Connection Charge Study Update and approve the attached ordinance revising wastewater connection rates and charges. BOARD/COMMISSION RECOMMENDATION: COUNCIL ACTION: (...continued. from front page...) brought before City Council. Wastewater staff, with valuable technical assistance by Gary Saleba, EES Consulting, Inc., and legal review by Preston, Gates and Ellis, have, at City Council's direction, revised the Wastewater Connection Charge Study Update and Rate ordinance. This review and revision process was deemed appropriate because of the following circumstances: A) the City received its new National Pollutant Discharge Elimination System (NPDES) wastewater discharge permit in October of 1997 -- with its attendant capital obligations discussed previously under a separate report; B) the City recently adopted its Comprehensive Plan required under the Growth Management Act (GMA); and C) two years additional data was available to supplement the data set which the original report was based upon. In summary, items reviewed which affected revisions in the report submitted in February of this year and remain pertinent in the attached report and rate ordinance included: 1) revised capacity of existing treatment facility per new NPDES permit; 2) updated future "Treatment" expense due to NPDES mandates and expansion requirements; 3) updated projection of new accounts based upon adopted City Comprehensive Plan; 4) updated projection of future connected area based upon adopted City Comprehensive Plan; 5) re -allocation of future and existing trunks due to most recent GMA population projections; 6) allocated portion of existing trunkage to Zone 3; 7) update of number of existing accounts per current information; 8) update t....� cost (projects not closed at time of original a or�rt) of estimated historic c1VJeU in 1995 VrigillGll report) with actual costs; 9) transfer of some 1995 future costs to 1997 historic costs (projects completed since 1995); and 10) inclusion of 20,000 square foot "cap" on residential lots for the purposes of calculating the trunkage and collection elements of the charge. At the February 3, 1998 Council Meeting, concern over the proposal was raised by Yakima County. A l 1h.. r',. ra1..'r request, the Council delayer' action on the prnrar�cel to lower \..V Ulll�. AL the V lAlll,' J 1CLiNGJL, the a... JL4ala_aa delayer' action Val Lala. yaVVVJLL* LV lower charges. Over the past several months, the City has held a series of meetings with County representatives and their consultants during which their concerns with the Study were discussed. In response to their concerns, the following revisions were incorporated into the attached report and rate ordinance: 11) adjustment of rates to accommodate the City's current Wastewater debt service equity position; 12) update of average consumption of Inside and Outside retail residential customers per current information. In addition to the adjustment to the charges, the proposed Ordinance also address: 1) a modification to the date which cuts off Local Improvement Districts (LID's) from the old charge system (see section 7.58.030.A.) This affects a very few potential customers within some newly formed LID's.; 2) section 7.58.060 clarifies that only the future element of the Base Trunk Charge may be waived; 3) section 7.58.075 limits to 20,000 square feet the parcel size to be utilized in calculating charges for Single Dwelling Units; 4) finally, section 7.58.090. C. clarifies language. Please note that in every case, in every Zone, for each lot size illustrated, a reduction is proposed. The reduction ranges from 1.3% to 32.1% depending on Zone and lot size. However, the reduction for an average sized lot is about 10% for each zone. These revised rates represent a significant and substantial decrease while still preserving the City's objective of requiring growth to pay its own way. HISTORY: The 1987 Comprehensive Plan for Sewerage System recognized the shortfall of the existing Capital Cost Recovery Charge. That report recommended the charge be; 1) extended to "all properties connecting to the sewer system", and 2) the rate be adjusted to accommodate trunk sewer construction to future sub basins. Neither of these recommendations was acted on at that time. The adopted 1994 Cost of Service and Rate Study proposed and, subsequent to Council approval in December of 1994, implemented a rate setting philosophy which reduced existing City Retail customer subsidies of other user classes. This updated study continues that philosophy by assigning, where appropriate, the capital costs of necessary system growth to new customers. The Wastewater Connection Charge Ordinance (#97-38), approved in June of 1997, consolidated the existing Capital Cost Recovery Charge and Sewer Connection Charge systems codified in the Yakima Municipal Code, into a single charge based on 1) the volume of wastewater estimated to be generated by a new connection, and 2) the area of the lot connecting the wastewater system. Rates were established for each of three geographical zones. The intent of Ordinance #97-38 was to ensure that new customers shoulder a more equitable share of the cost of the system and reduce City retail customer's current and future subsidy burden. Those revenues not sufficiently recovered from a connection charge program will ultimately come from another source -- monthly City user rates. City Retail rate payers had historically borne the burden of the financial under -performance of the pct. C'C'RC' and Connection C'harve cvctemc_ In a previous transmittal memorandum, dated June 1, 1995, staff estimated, for comparison purposes only, that City Retail rates would need to be increased 15 percent to recover the same annual revenue which this program identified it would generate given connection trends at that time. We believed, and still believe, a rate increase of this size for new growth would not be acceptable to existing customers. The conclusion, therefore, was that without the Wastewater Connection Charge program to recover the cost of new growth, we would not have sufficient resources to build the pipe and treatment facilities necessitated by growth. Current City policy directs that there be minimal subsidy of future growth by the citizens of Yakima. While we pursue funding for capital needs, these sources are very limited and uses restricted. Accordingly, growth must find a way to pay for itself. Previous Wastewater Connection Charge proposal transmittals to City Council and the City Mangers Office have included estimated connection charges for discussion purposes. The following Attachment 1 provides the latest estimates of average connection charges for the three zones when the developer constructs the collection system. The dollar amounts shown will change over time with construction cost indices (CCI) and the actual costs of facilities projects for growth related expansion. The enclosed table "Attachment 1; Wastewater Connection Charge Comparison" provides a comparison between 1997 adopted rates, the February 1998 proposed rates arrived at through the update analysis of items 1-10 discussed above, rates which include the debt service credit (City equity position) listed as item #11 above, and rates which include adjustment for a usage factor of 1.0 between Inside and Outside retail residential customers, listed as item #12 above. Attachment 11 Wastewater Connection Charge Comparison 9/29198 I The purpose of the Wastewater Connection Charge Rates is to ensure that new customers shoulder an equitable share of the historic cost of the system, as well as the actual cost of the connecting: ZONE 1 ZONE 2 ZONE 3 . . proposed ,4ititqtrilf .•:. Usage] Adopted proposed teiy.pqtiiii 000 Adopted proposed •OliY.:tqliity: Usage lot size Adopted on 2/3/98 :ii4iit:.SiirVit#:.0i00. (1...0) Jun -97 on 2/3/98 sii.6bi tor.00:.rootot (1.,o) Jun -97 on 2/3/98 ..ki60::*i.jrilfri.:#6Cloi, .:(1.0) (square feet) Jun -97 .!ii.,i.... .. $1,148.24 'i.:4•1.*P24 .$.1..,66601: . $3.419.92 $2,930 02 it......60366 :$;666:t7: $5,163.77 $4,740.65. :.$4•i24612ii.. l.**ii.ii -46 . .. 8,000 81,249.38 -8.1% ..161%. 4.43%, -14.3% ..'s.*1.i4 ,,3:,24k -8.2% . .., -i.1.090. ..16.24ii;.: . % change --40.3%: -,.s::9%., .. . ..;0'.4. .,1*9.,%. 10 5% .f,..ik(i%. % change from proposed :47i,",..4*•.'4..: . ..1:.:•:.04-. :0,6%. . ..i.i.110)...'A. 22 9% % change from adopted ..i.:i" .__ .: ..,. .. ,• . ....: • • : ..i. 81,335.44 ''....:,gt*.i*:•..t.i-,..400,3it.• $4,241.49 $3,933.22 $,624 80 *04.0:' 86,065.01 86,031 85 :.4$0.00..*1.i $0::241.;00, 12,000 81,398.71 -4.5% ' ..40.)*:.. :4A5t«:: . -7.3% .j.7i;004:: 4:0.04, •i -0.5% qiIi.4.6;6tk.. :4 ,iA-.. • % change 10 1% ..i.0&34:. • ..4Adk.. ..4:6%:,i ::.. 15*. :::::; 4..,6* • 43 •*)t I % change from proposed -14 1% .1.0,4%.. ' .A4..',6•% ..,I*654.... ' ...0.**: 13 6% % change from adopted • ir. :,.:i11::'.. . ..i.::. .i• *1,709.83 :$'1':;636*i. i*.f:506.:.5.7: 85,884.63 ... 85,939 62 .46;46.1...10. 1.6414-:4'. $7,867 49 88,614.25 1 56:;.61641. *7;:758.,26 20,000 $1,697.46 0.7% 4.:.1:6'.;:t :4:;04: 0.9% -4:6% '....i.::J0*- 9.5%,.4;* ... ..7.4.0. % change ji:10i1i.4: ...*.$.t* :+1:0t; 44ki.: . . ...... :6-0,k •:.1.6.#1... % change from proposed .*** 4%....4i'Vk . ....0..::6* ..4440* ::t9.4k. ..4.A.* % change from adopted ..ii,. •:,ii, iii!ii. 81,709.83 i*t 53582 81 06:61. $7,938.57 85,939 62 :$5--4467 26 85414 57 810,120.59 *8,614.25 4604.'0* -87:66..0 30,000 • 82,070.90 -17.4%...:41*., .44K . -25.2% ..4" ..1*. -14.9% ..4.-.0/4, A..* %change .,...,. ..1K4104, ..**. ..4 6% .4.:,0', ... .... :G.0.4.:. 10 0% .... % change from proposed .j..2...,0%. ., .22 8% ,4*1%. . 31 9% . -... • ..0,0%;.- •••434'.4.,. % change from adopted 1 • Maximum lot size of 20,000 per SDU proposed. As explained In the report, parcel size was the criterion used 10 distribute costs of pipes. The length (cost) of the pipes is direct related to the size of parcels served. Adjustments tollcnvIng City/County d scusslons. — Rates for all Zones credited for City Debt Service Equity Position. 1- L "' SDU usage for all Zones considered to be equal; this shall be reconsidered with each update per consumption records. 9/29198