Loading...
HomeMy WebLinkAboutR-1998-065 1998-2003 Six Year TransportationRESOLUTION NO. R-98 - 65 A RESOLUTION adopting an amended Six Year Transportation Improvement Program for the period of 1998 through. 2003 for the construction of streets and arterial streets in the City of Yakima. WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program for the construction of streets and arterial streets in the City of Yakima for theensuing six year period, all as contemplated and required by State and Federal law, and WHEREAS, the City of Yakima has identified a need to amend the current Six Year Program for the construction of streets and arterial streets in the City of Yakima for 1998; and WHEREAS, after a public hearing on the matter, held at a regular meeting of the Yakima City Council on May 19, 1998 the City Council finds that the plan attached hereto should be adopted as the Six Year Transportation Improvement Program for the period of 1998 through 2003 for the construction of streets and arterial streets in the City of Yakima, now, therefore. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIr1A: • The Six -Year Construction Program for the period of 1998 through 2003, a copy of which is attached hereto and by this reference made a part hereof, is hereby adopted as the official Six Year Transportation Improvement Program for the City of Yakima. ADOPTED BY THE CITY COUNCIL this 19th day of May, 1998 ATTEST: City Clerk • Mayor Proposed Amendment Q.LiginaLast to SMALY 1 1927 bl of o ,1,JQ. R-97-90 5/13/98 CITY OF YAKIMA AMENDED SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1998 TO 2003 TOTAL Federal State LOCAL Pnony FC ' Length ,, Total 1998 1999 12000 1 2001 I 2002 1 2003 Fed R St Art $ $ coy Envar RAN $ Ana $ 1 1 11 Yakim 2.13 F 700 700' PE 35 25 Yes 10 InterchangeAl Area Et AlPhase ICInterchange ROW 30 21 -94 I May -95 CONST 635 445__ STP — —Jan EA 191 TOTAL 700 491 — 210 2 16 Fair AvenueWiden/Reconstruct 0.69 F 1.125 1,125 4611 Apr -94 PE 113 97 STP(U) EA Yes 16 Pacific Avenuer eb 97 ROW 100 86 Jut -96 14 to (north) Spruce Street Mar -97 CONST 912 784 128 TOTAL 1,125 968 158 3 14 Nob Hill Boulevard Widen/Reconstruct___ SIG F 628 628 4558 Apr -93 PE 63 54 STP(U) CE Yes 9 17 at S 48th Avenue 4587 Feb -97 ROW 100 86 14 New Signal; Apr -97 CONST 465 400 65 TOTAL 628 540 88 4 14 South 1st Street: Rehabilitate Pavement 0.54 F 267 267 4579 Apr -98 PE 16 0 CE 16 Mead Avenue Amendment for Apr -98 ROW 0 0 Yea 0 to Washington 1998 Overlay Program Jut -98 OONST 251 50 STP 201 - — I TOTAL 267 50 217 5 Walnut Street Rehabilitate Pavement 0.57 F 147 147 4596 Apr -98 PE 9 0 CE 9 1st Street Amendment for Apr -98 ROW 0 0 Ys 0 to 5th Avenue 1998 Overla P .. ram Jut -98 CONST 138 28 STP 110 TOTAL 147 28 119 6 14 Lincoln Avenue Rehabilitate Pavement 1 13 F 40.1 401 4648 Apr -9e PE 24 0 CE _24 16th Avenue Amendment for Apr -98 ROW 0 0 Yes 0 r.- to North 1st Street 1998 Overla Pr.. ram Jul -98 CONST 377 75 STP 302 TOTAL 401 75 326 7 8th Street 'Reconstruct Pavement 0.18 F 191 191 .. 4684 Apr -98 PE 11 0 CE 11 Amendment for Apr _98 ROW 0 0 Yes 0 l 1998 Overly Pr.. ram Jul -98 CONST 180 36 STP 144 _ TOTAL 191 36 155 8 14 West Lincoln Avenue Rehabilitate Pavement 0.53 F 198 198 �. 4648 Apr -98 PE 12 0 CE 12 16th Avenue Amendment for Apr -98 ROW 0 0 Yes 0 to North 24th Avenue 1998 Overia Pr. . ram Jut -98 CONST 186 37 STP 149 _ _ _ TOTAL 198 37 161 9 14 Nob Hill Boulevard: Rehabilitate Pavement 0.95 F 365 365 . 4566 Apr -98 PE 22 0 CE 22 1st Streetk r Amendment for Apr -98 ROW 0 0 Ys 0 to 18th_Street 1998 r.>lerta Pr.. ram Jut -98 CONST 343 69 STP 274 _ _ __ TOTAL 326 60 L 296 10 14 Washington Avenue: Rehabilitate Pavement 1 12 F 438 438 4558 Apr -98 PE 26 0 CE 26 2nd Street Amendment for Apr 98 ROW 0 0 Yes 0 to 4th Avenue 1998 Overla Pr.. ram T Jul -98 CONST 412 82 STP 330 TOTAL 438 82 356 11 16 South 16th Avenue: Rehabilitate Pavement 0.53 F 124 124 . 4555 Apr -98 PE 7 0 CE Washington Avenue Amendment for Apr -98 ROW 0 0 _I— Yes 0 to Bachelor Creek 1998 Overla Pr.. ram Jut -98 CONST 117 23 srP 94 TOTAL 124 23 101 12 14 16th Avenue: Rehabilitate Pavement 0.08 » F 69 69 4555 Apr -98 PE 4 0 CE 4 Lincoln Avenue _ Amendment for Apr -98 ROW 0 0 Ys 0 to Roosevelt 1998 Overla Pr.. ram Jul -98 CONST 65 13 STP 52 - -- - ---- -- _.-- -- - ----- - -- TOTAL 69 -- I 13 56 Proposed Amendment gljainsillig4:6=LOLIMILLUWZ1501091401-11(4-13z.92,22. 5/13/98 CITY OF YAKIMA AMENDED SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1998 TO 2003TOTAL Total 1998 184 1999 20-100 2001 I i 1 Federal State LOCAL PrtorItyl FC Length 1 t,t, —02 2003 Fed 0 4648 Start Apr -98 Apr -98 Jut -98 ROW CX)NST TOTAL $ 11 0 173 184 $ 0 0Yes 35 35 cnto STP Emir CE R/W L $ ,-,,, _ $ 11 0 13 14 Lincoln Avenue North 1st Street to 8th Street Rehabilitate Pavement 0 55 F 184 Amendment for [ 1998 Overlay Program —1:-8 , l 1 149 14 14 B Street _ Lincoln to B Street Rehabilitate Pavement 0 15 _ F 189 189 1 i 1 4694 _ Apr -98 Apr -980 Jul -98 PE.. CONST TOTAL 11 0 178 189 0 STP CE ' Yes 11 Amendment for 1998 OverlaProgr,am 0 36 0 142 153 36 15 16 th Avenue Rehabilitate Pavement 0 15 F , 151 _ _ 151 4555 . Apr -98 _ Apr -98 Jul -98 PE ROW CONST 9 0 0 28 CE 9 al FruitvaleAmendment for 1998 Overla Pr • !ram 0 STP Yes 0 142 114 123 TOTAL 151 28 16 - 5th Avenue -DStreetj to Yakima Avenue Rehabilitate Pavement 0.56 F 74 741 4641 Apr -98 Apr -98 Jul -98 PEE ROW CONST TOTAL 4 0 OE Amendment for '19,38 Overla Pr.. ram 0 --1 70 0 14 — 14 Yes 0 56 60 STP 74 17 SummitviewAvenue Rehabilitate Pavement 1.36 , F 231 231 j_ 4596 Apr -98 Apr -98 Jul -98 PIE RCM OONST 14 0 STP CE Yes 14 16th Avenue to 381h Avenue Amendment for 19913 Overlay Program 0 _L 0 0 217 43 43 174 TOTAL 231 188 18 South First Street Rehabilitate Pavement 0.54 F 192 192 4579 Apr -98 Apr -98 Jul -98 PE 12 0 CE Yes 12 Walnut Street to Arlington Street .,_ Amendment for 1998 Overlay Programi ROW CONST 4- 0 0 0 —144 156' 180 36 1 36 STP TOTAL 192 19 14 Yakima Avenue Rehabilitate Pavement 0.23 _ F 772 772 4628 -4— PE KOw 77 66 STP 11 6th Street to 10th Street 0 0 _.. 97 CONST TOTAL 695 598 664 772 108 20 16 South Third Avenue Joint Proj w/Crty ot Union CLAP ValleLIVIall Blvd to Washington 0.25 F 1 1 4559 PE ROW 0 0 137.i 1 0 CONST 1 TOTAL 1 1 21 14 Valley Melt Boulevard Joint Prei wletty of Union Gap 2.50 100 100 PE ROW 10 10 1st Street and Yakima County to 3rd Avenue 0 90 0 I CONST 90 TOTAL 100 100 22 17 Englewood Avenue Remove Existing Bridge 0.05 F 85 85 4652 PE 9 8 at the bride near ---, FIOW 1 1 ,.....0 _ Powerhouse Road CONST 75 65 11 TOTAL 85 73 12 23 00 Sidewalks N/A F 155 65 10 10 10 10 10 PE 16 8 0 8 0 city Wide ROW 0 CONST 139 70 78 70 le TOTAL 155 24 14 Nob Hill Boulevard New Signal 0.00 F 50 50 50 at 6th Street --P5 ROW 0 0 CONST 450 450 — TOTAL 500 500 Proposed Amendment 5/13/98 CITY OF YAKIMA AMENDED SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1998 TO 2003 TOTAL Federal State LOCAL Priority FC I Length 4 i,. ,. Total 1998 1999 2000 I,2001 - _ 1 2002_1 2003 Fed I 4648 Start PE Pow — CONST TOTAL $ 1840 0 16,560 18,400 $ 1,582 0_ 14,242 15,824 cr. Emir RNJ $ 184 0 ca. $ 74 0 25 14 Lincoln Avenue 1st Street to 3rd Avenue Grade Separated RR Crossing 0 38 i - r. U 18,400 18,400 _ 1656 1840 662 736 26 14 B street 1st Street to 3rd Avenue Grade Separated RR Crossing 0.38 U 18400 18,400 4694 PE Row CONST TOTAL 1840 0 16,560 18,400 1,582 0 14,242 15,824 __ _ 1.84 o 1656 1840 _ _ 74 0 662 736 27 14 Noh Hill Boulevard at Fair Avenue Upgrade Signal 0.00 U 250 250 4695 PE 25 ,.CONST I -- - 25 0 225 POw 0 TOTAL 225 250 250 28 14 Greenway Path and Dikes near SR12&182 -- improvepath and dikes 0.00 U 220 220 - PE 22 0 22 0 ROW + CONST TOTAL 198 220 198 220 29 00 Bus Stop Zones -- Transit Bus Stops N/A - _ U I 150 50 50 50 _ PE 15 13 0 2 ROW coNsT TOTAL 0 , 0 135 150 116 19 129 21 30 00 Traffic Signs N/A U 450 90 90 90 90 90 PE 0 0 0 Upgrade to meet new,.- standards ROW 0 0 I. 0 CONST 450 387 63 TOTAL 450 387 63 31 00 Storm Drains Ci#y Wide N/A P 800 200 y 200 200 200 PE 80 80 ROW 0 0 CONST TOTAL 720 800 720 800 32 19 Yakima Avenue: 1st Street Rehabilitate Pavement 0.4 F 703 703 _ _ PE 70 70 0 ROW 0 to 6th Street CONST TOTAL 633 703 633 703 33 00 Fruitvale Canal Pathway_ North 20th Avenue Install Pathway N/A U 272 272 Jan -94 PE 27 23 CE 4 ROW to North 34th Avenue CONST 245 211 34 TOTAL 27 234 38 34 14 Yakima Avenue 1st Street Rehabilitate Pavement 0.6 F 1,060 1,060 4690 PE 106 91 STP 15 Row 0 0 0 --_— to 7th Avenue T CONST 954 820 133 TOTAL 1,060 911 148 35 16 Yakima Avenue: 7th Avenue Rehabilitate Pavement 0.6 F 709 709 4690 PE 71 61 10 Row CONST 0 0 0 89 to 16th Avenue 638 549 TOTAL 709 610 99 36 14 North 16th Avenue New Signal SIG P ----- 238 — '- 10 - 4555_ 4666 PE 24 at River Road -- ROW - CONST TOTAL 214 238 -- - — — --- --- Proposed Amendment ._1 5/13/98 CITY OF YAKIMA AMENOED SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1998 TO 2003 --�TOTAL: Federal State LOCAL ,"""* FC Length 0 0 | .4. | U Total 400 1998 1999 2000 2001 2002 2003 ' Feu* Start PE ROW $ *n40 150-- $ ".. ---_ Envir _____150 RN/ $ ! 400 37 14 16th Avenue ats»n/°°°o6_Avenue New Signal `'` ' CONST TOTAL 210 400 38 - ' 14 �a South 1omAvenue at Mead w�/a�" ^ - --- SIG*ss u 192 457 "E ROW 19 0 _ CON:ST TOTAL 173 192 39 - 14_ - 40th Avenue � m -- - --- New Signal '___`_' ------ ------- 0.00 _ - U 250 � -- - _` -- - PE ROW CONST TOTAL 25 25 0 225 225 250 250 40 14 Lincoln New Signal -' mm U —' 350 - 1 --- - PE 35 35 m --- - RCM 100 215 -- 215 ' - -- ^_-�m,�� TOTAL 350 350 41 -First _ Tamarac ---- ----- 0m y - 1,556 ___ _ _ --- � ROW ���sr TOTAL 156m 0 -__ �b"m°n��� -- 1,400 1,56 _ 42 - ` - -- 00 --- r��=�� New Street 0.25 U 18,000 | / ] i___�_ PE 1800 GordonRoad - - to -�— - New alignment ncW 0 RR nnw� TOTAL 16,200 18,000 43 w_ South 1st Washington Avenue n"�mn to South ��u Rehabilitate Pavement 0.56 o ' :,40 _ ` __ .,___. __'__ -__ 4579__PE � _ __ ROW 241 0 'cOwST :'1e6 TOTAL 2,407 44 17 - River Roa Widen/Reconstruct 0.51 o 1,395 ^ | 4666 pc �on 6th Avenue Pow v. m1om�wn� __ m�sr 1�se. TOTAL 1,395' ws w e�pm/ Rehabilitate Pavement 0.53y 1,501 *694 PE mnv 150 ---- Pierce Street, 0 to North 1st St^*w__4 TOTAL 1,351 -1 , 46 nw�x�� Widen/Reconstruct 1.6 o 5,149 4587 PE 292 Wide HoIlow Creek Row o m�m�w��� CONST167----- TOTAL 292 47 -- 19 18th Street & BeecStreet: Widen/Reconstruct 110 _ 2,986 _ pc 125 os Terrace� __ Row to Fair Avenue umwsr 0 TOTAL 125 48 1n Mead Avenue Widen/Reconstruct usu ��y _ 4570 PE 112 16th Avenue �� ocwsr �� | to 111h Avenue 875 _-_ Proposed Amendment QpginJJ Ad91394 1997 by Resolution No a i 90 5/13/98 CITY OF YAKIMA AMENDED SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1998 TO 2003 TOTAL Federal State LOCAL Prouty FC{ Length 1.,,,, Total 1998 1999 2000 I 2001 2002 2003 Fed R Start $ $ rro« Env -1r RNV $ ..+m $ 49 16 Summitview Avenue I New Signal SIG U 324 4596 PE 32 i 17 at North 48th Avenue , 4587 ROW 0 1 CONST 292 - -- ----- ----- ----- TOTAL 324 50 00 Gilh0d Parking Lot Rebuild - U 121 I PE ROW_ _ 12 -- -- .-- _ _— CONST ._ _ 109 —_—_ T. TOTAL 121 _ _.— — —__._._ 51 17 Englewood Avenue: Widen/Reconstruct 0.68 U 1,563 4652 PE 156 Powerhouse Road F ROW — — ---- — 1,407 to 40th Avenue 4 CONST ---- - -- - -- -" TOTAL 1563 52 16 North 5th Avenue: Rehabilitate Pavement 0.85 U 1,143 4641 PE 114 Lincoln Avenue ROW to "r Street CONST 1,029 TOTAL 1143 53 17 West Lincoln Avenue ,Widen/Reconstruct 1.21 U 2,549 4648 PE 255 40th AvenueROW to 66th Avenue CONST 2,294 TOTAL 2549 54 16 South 3rd Avenue: Washington Avenue Rehabilitate Pavement 1 U 1,455 4559 PE 146, ROW to Nob Hill Boulevard CONST 1,309 TOTAL 1455 55 19 Neches Avenue Rehabilitate Pavement 0.95 U 411 PE 41 _ Walnut Street ROW to Lincoln Avenue CONST 370 - - - -- - - - - — - - - - -- - -- ----- ITOTAL 411 — 56 14 Washington Avenue: Widen/Reconstruct 1.88 U 3,011 - 4558 PE 16th Avenue1 - ROW —301` — to 451h Avenue, CONST 2,710 TOTAL 3011 57 19 Pacific Street Widen/Reconstruct 0.6 U 441 4608 PE 44 South 3rd StreetROW to Fair Avenue _ ___- -" CONST 397 TOTAL 441 58 16 I Street Widen/Reconstruct 0.32 U 821 1 4641 PE 82 North 1st Street ROW to 5th Avenue CONST 739 TOTAL 821 59 16 North & South 81h Street: Rehabilitate Pavement 0.85 U 716 4684 PE 72 D Street ROW — to Chestnut Avenue - CONST 644 — _ _ TOTAL 716 60 14 B Street Realign/ Rehabilitate 0.65 U 900 4694 PE 90 Pierce Street ROW to North 1st Street CONST 810 TOTAL 900 " ---"----_- Proposed Amendment Qdgiatildizattsrulliti-LleaDalistzaagall9.E212Q- - 5/13198 CITY OF YAKIMA AMENDED SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1998 TO 2003 'TOTAL Federal Stele LOCAL prionty FC Length TA,. Total 1998 1999 2000 2001 2002 1 2003 Fed f Start $ $ Cr& Envir RNV $ (on., 61 14 B Street Rehabilitate Pavement _ 08 U 673 _ 4694 PE 67 North 1st Street 10 10th Street ROW CONST TOTAL 606 673 62 16 16 South 3rd Avenue at Division New Signal SIG U 268 4559 4641 PE ROW 27- CONST 241 TOTAL 268 63 14 Lincoln Avenue at New Signal SIG' 214 4648 PE 21 North 28th Avenue RCAN COAST 193 TOTAL 214 64 17 Powerhouse Road: Lincoln Avenue Widen/Reconstruct 04 1,362 4660 PE—t ROW 136 to Englewood COAST 1,226 1362 1362 TOTAL 65 17 Englewood Avenue: Widen/Reconstruct 1 63 U 3,329 4652 PE 333 40th Avenue ROMP to 66th Avenue CONST 2,996 3329 TOTAL 86 19 Yakima Avenue: Rehabilitate Pavement 1,486 . PE ROW 149 16th Avenue to 32nd 32nd Avenue CONST 1,337 TOTAL 1486 67 17 _ East "3-' Street: Rehabilitate Pavement 0.53 U 845 4684 PE 85 North 1st Street Row to North 8th Street COAST 780 TOTAL 845 68 17 South 6th Street: Rehabilitate Pavement 1.55 U,_ 2,345 4637 PE 234 Yakima Avenue ROW to South 1st Street A CONST 2,111 TOTAL 2345 69 17 Fechter Road: Widen/Reconstruct 0.42 U 1,637, 4669 PE 164 North 40th Avenue Row to Scenic Drive COAST 1,473 1637 TOTAL. 70 _ 16 Fruitvale Boulevard: Rehabilitate Pavement 218 U 5,088 4606 PE 509 5th Avenue ROW to North 40th Avenue CONST 4,579 TOTAL 5088 , 71 17 Washington Avenue: Widen/Reconstruct 0.22 2,574 4558 PE 257 lst Street ROW to South 14th Street CONST 2,317 TOTAL 2574 72 19 Chestnut Avenue: Rehabilitate Pavement 0.4 U 382PE 38 1st Street ROW to 6th Street CONST 344 _ TOTAL 382 Proposed Amendment Original AdoQted on July 1. 1997 by Resolution (1,pM 5/13/98 CITY OF YAKIMA AMENDED SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1998 TO 2003 TOTAL Federal State LOCAL Pnonty FC Length I ,,„,, Total 1998 1999 2000 20011 2002 1 2003 Fed N Chart $ $ ct. Env,r R/W $ , .'.n $ _- - 73 19 North 2nd Avenue: Rehabilitate Pavement 0 1 U 79 PE 8 Lincoln Avenue ROW — _ to "D” Street CONST _ 71 -- _ _ '- -- - - - - - - - -- I TOTAL 79 74 19 , 2nd Avenue Rehabilitate Pavement 0 47 U 482 PE 48 ___ __ - Lincoln Avenue Row __ - to Walnut Avenue _ CONST 434 - - -- - - ---- - - - - TOTAL 482 -_ 75 14 North 40th Avenue: -- - -- Fruitvale Boulevard Rehabilitate Pavement - - -- - - 0.51 - U - 1508 - -- 4583 PE How_ 151 to Powerhouse Road CONST TOTAL 1,357 1508 — 76 14 North 40th Avenue:_Widen/Reconstruct --- -- ----- -to 0 45 - U 1,699 4583 PE ROW 170 L.-- ; Powerhouse Road to Englewood Avenue CONST --- -- -- 1,529 -- - _ TOTAL 1699 - 77 19 4th Street: Pavement 0.61 U 428 PE 43 _ Walnut Street ,Rehabilitate _ ROW - - -- to Pacific Street - - -- - -- - __ - - --_ CONST 385' _ -- TOTAL 428 78 19 I Street Widen/Reconstruct 0.58 U 1,300 PE 130 5th AvenueROW ---I-- --- +--- - - CONST 1,170 to 16th Avenue TOTAL 1300 79 19 North 6th Avenue Widen/Reconstruct 0.92 U 2,274 PE 227 Gordon Road ROW ---_-- to Fruitvale Blvd. _. __ _ _L-_ _._ -.-- ------ CONST TOTAL 2,047 2274 - _______-_.-- -_ _ 80 19 Gordon Road Widen/Reconstruct 0.55 U 3,943 PE 394 North 1st Street ROW CONST 3,549 tree to North 6th-Streettr TOTAL 3943 81 19 Chestnut Avenue Rehabilitate Pavement 0.51 U 517 PE 52 -._ ,____ 81h Street ROW -- — - - to Fair Avenue CONST 485 _ TOTAL 517 82 19 Front Street Rehabilitate Pavement 0.10 U 121 PE 12 Yakima Avenue to A Street Row__--.--.----------- CONST 109 --- I TOTAL 121 Total 130,253 44,277 1,325 1,410 1,009 100 100 Funded 7,287 6,747 10 10 10 10 10 37,260 Unfunded 122,967 37,530 1,315 1,400 999 90 90 Proposed Amendment Qca na. Adopted n .IL 1-1,997_Dyf?v59luigNv 5113198 CITY OF YAKIMA AMENDED SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1998 TO 2003 TOTAL Federal� — r'r�" State LC/CAL Priority FCI Length st.�Total 1998 1999 2000 2001 2002 2003 Fed! Start $ $ cod. Errvir 1 $ coa. $ GMA TRANSPORTATION PLAN 1996 - 2001 (CAPACITY IMPROVEMENTS) Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 ,, 116 Tieton Drive 7th Avenue to 3rd Street Realignment 0.92 U 3557 4562 PE 'Prow CONST TOTAL 1 14 16th Avenue Widen/Reconstruct 3.58 U 8,901 4555 PE SR 12 to Washington Avenue now _ _ CONST TOTAL 14 North 40th Avenue: Widen/Reconstruct _ 2.25 U 8,348 - - - — -- 4583 - PE Englewood Avenue to Washington Avenue Raw - CONST TOTAL 14 16 Fruitvate Boulevard: Realignment 0 41 U 3,139 _ 4606 PE _ _ 5th Avenue to N. 1st Street ROW O)NST TOTAL 17 -- East "G" Street: Widen/Reconstruct 0.53 U 3,139 -- - - - 4684 - PE North 1st Street to North 8th Streety - - ----- Row OONST `— —--------- TOTAL - ---- 17 ------------- Pacific Street Widen/Reconstruct 0.6 U 3,139 - - -- -- — 4608 --- PE South 3rd Street to Fair Avenue ROW CONST – --- — TOTAL Total for 1996 -2001 30 223 0 0 0 0 0 0 1.111•••••••=111•91. IMMINMSIMIIMINIMEMMIIMIIIIMMMIONIBMIll rage 8 Proposed Amendment Origin optvd_s July.L. 17 by Resolution No R-97-90 5/13/98 CITY OF YAKIMA AMENDED SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1998 TO 2003 TOTAL Federal State LOCAL Priority' FC1 I Length 1 .i Total 1998 I 1999 I 2000 ( 2001 2002 2003 Fed I Start $ $ c ,, Envir RIW $ GMA TRANSPORTATION PLAN 2002 - 2007 (CAPACITY IMPROVEMENTS) Yr 7 Yr 8 Yr 9 Yr 10 Yr 11 Yr 12 ' 16 1 17 North 8 South 8th Street H Street to Walnut Avenue Widen/Reconstruct ' 095 U 1,988 I 4684 PE CONST TOTAL 17 18th Street Pacific Avenue to Valley Mall Blvd U 0 i 4608 PE ROW CONST TOTAL ------- - --- --- ' -- ----- - 14 16 19 South 6th Street: H Street to Yakima Avenue Rehabilitate Pavement 0 75 U 1,949 4637 PE Row CONST TOTAL 14 16 5th Avenue: m "I" Street' to Tieton Drive Widen/Reconstruct 1.64 U E 1,789 4641 PE— CONST TOTAL — 1 16 3rd Avenue Yakima Avenue to Washington Avenue_ Rehabilitate Pavement 2.15 - U 7,428 -- 4559 – -- PE ROW `CONST. TOTAL 19 32nd Avenue Englewood Avenue to Washington AvenueTOTNSAL Widen/Reconstruct 2.25 - U 5,754 - - - - - - - - - --- - -- PE ROW T ---- ----- — --- --- 19 17 10th Avenue Summitview Avenue - to Washington Avenue Widen/Reconstruct 2.01 _ U 4,185 _ - _ _ - - - - _ _-_ 4553 ._ PE ROW CONST TOTAL _. -_ -_— 17 48th Avenue Summitview Avenue to Washington Avenue Widen/Reconstruct 2 01 U 4,499 - - - - 4587 - - _ ---- PE ROW (.)NST TOTAL - - - - - 16 56th Avenue Widen/Reconstruct 1.50 U 3,453 4681 PE — — Englewood Avenue Nob Hill Blvd CONST TOTAL Total for 2002- 2007 31,045 Page 9 Proposed Amendment 5/13/98 CITY OF ¥AKIMA AMENDED SIX YEAR IMPROVEMENTpnman^m TRANSPORTATION TOTAL Federal State LOCAL�emrozooa p�"tylrc\ Length qua, Total 1e8, 1999 2000 2001 2002 2033 Yr 13 Yr 14 Yr 15 Yr 16 Yr 17 Yr 18 Fed Start $ $ "_ Ewa mw $ ^~ n aw^TRANSPORTATION PLAN 20m 2015 CAPACITY IMPROVEMENTS1 16 Tieton Drive Widen/Reconstruct _nA/ U w�a _ _ 4562 PE _ 5th Avenue to 56th Avenue __ ncW CONST TOTAL w 16 Washington Avenue Widen/Reconstruct *m_o 7,32 4558 PE ncrw ` lst Street to 561h Avenue CONST TOTAL .__1* Summitview Avenue Widen/Reconstruct 3.07 U L 10/881^ _ � 4596 PE Yakima Avenue to 56th Avenu RCW CONST _ TOTAL 17 River Roa Widen/Reconstruct 1s3 _y 3,839 --'' 4 4666 PE 16th�moo RCW to 40th Avenue CONST TOTAL --- 17 i§ 3rd Street Rehabilitate Pavement --- 1.91 u �or� 4653PE / Street �� m5��omm c�w� _`____ TOTAL Total for 2008- 2015 4,248 7,287 6,747 10 10 10 10 224,482 37,530 131e 1,400 999 90 10 90 FUNDED UNFUNDED BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. For Meeting of May 19, 1998 ITEM TITLE: 1998 - 2003 Six -Year Transportation Improvement Program SUBMITTED BY: Department of Community and Economic Development Engineering Division CONTAC'I PERSON/TELEPHONE: Fred French, City Engineer / 575-6096 SUMMARY EXPLANATION: Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six Year Transportation Improvement Program (TIP) for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue or federal revenue will be used. The existing approved plan for 1998 - 2003 does not list the 1998 Street Overlay projects as funded. The existing plan must be amended to allow expenditure of Federal Funds on these projects. This proposed amendment to the Six -Year Transportation Improvement Program (TIP) changes only the overlay projects to "FUNDED". (continued) Resolution X Ordinance Contract _Other (Specify) City of Yakima 1995-2000 Six Year TIP Funding Source APPROVED FOR SUBMII'IAL: ``►\ City Manager STAFF RECOMMENDATION: Adopt the attached resolution approving the Amended 1998 - 2003 Six Year Transportation Improvement Program BOARD/COMMISSION RECOMMENDATION: COUNCIL AL'I'ION: May 13. 1998