HomeMy WebLinkAboutR-1998-065 1998-2003 Six Year TransportationRESOLUTION NO. R-98 - 65
A RESOLUTION adopting an amended Six Year Transportation Improvement
Program for the period of 1998 through. 2003 for the
construction of streets and arterial streets in the City of
Yakima.
WHEREAS, the City of Yakima annually prepares, reviews and
adopts a Six Year Program for the construction of streets and arterial streets in
the City of Yakima for theensuing six year period, all as contemplated and
required by State and Federal law, and
WHEREAS, the City of Yakima has identified a need to amend the
current Six Year Program for the construction of streets and arterial streets in
the City of Yakima for 1998; and
WHEREAS, after a public hearing on the matter, held at a regular
meeting of the Yakima City Council on May 19, 1998 the City Council finds that
the plan attached hereto should be adopted as the Six Year Transportation
Improvement Program for the period of 1998 through 2003 for the construction
of streets and arterial streets in the City of Yakima, now, therefore.
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
YAKIr1A:
• The Six -Year Construction Program for the period of 1998 through
2003, a copy of which is attached hereto and by this reference made a part
hereof, is hereby adopted as the official Six Year Transportation Improvement
Program for the City of Yakima.
ADOPTED BY THE CITY COUNCIL this 19th day of May, 1998
ATTEST:
City Clerk
•
Mayor
Proposed Amendment
Q.LiginaLast to SMALY 1 1927 bl of o ,1,JQ. R-97-90
5/13/98
CITY OF YAKIMA
AMENDED SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1998 TO 2003
TOTAL
Federal
State
LOCAL
Pnony
FC
' Length ,,
Total
1998 1999 12000 1 2001 I 2002 1 2003
Fed R
St Art
$
$
coy
Envar
RAN
$
Ana
$
1 1
11
Yakim
2.13 F
700
700'
PE
35
25
Yes
10
InterchangeAl Area Et AlPhase ICInterchange
ROW
30
21
-94
I
May -95
CONST
635
445__
STP
— —Jan
EA
191
TOTAL
700
491
—
210
2
16
Fair AvenueWiden/Reconstruct
0.69
F
1.125
1,125
4611
Apr -94
PE
113
97
STP(U)
EA
Yes
16
Pacific Avenuer
eb 97
ROW
100
86
Jut -96
14
to (north) Spruce Street
Mar -97
CONST
912
784
128
TOTAL
1,125
968
158
3
14
Nob Hill Boulevard
Widen/Reconstruct___
SIG
F
628
628
4558
Apr -93
PE
63
54
STP(U)
CE
Yes
9
17
at S 48th Avenue
4587
Feb -97
ROW
100
86
14
New Signal;
Apr -97
CONST
465
400
65
TOTAL
628
540
88
4
14
South 1st Street:
Rehabilitate Pavement
0.54
F
267
267
4579
Apr -98
PE
16
0
CE
16
Mead Avenue
Amendment for
Apr -98
ROW
0
0
Yea
0
to Washington
1998 Overlay Program
Jut -98
OONST
251
50
STP
201
-
—
I
TOTAL
267
50
217
5
Walnut Street
Rehabilitate Pavement
0.57
F
147
147
4596
Apr -98
PE
9
0
CE
9
1st Street
Amendment for
Apr -98
ROW
0
0
Ys
0
to 5th Avenue
1998 Overla P .. ram
Jut -98
CONST
138
28
STP
110
TOTAL
147
28
119
6
14
Lincoln Avenue
Rehabilitate Pavement
1 13
F
40.1
401
4648
Apr -9e
PE
24
0
CE
_24
16th Avenue
Amendment for
Apr -98
ROW
0
0
Yes
0
r.-
to North 1st Street
1998 Overla Pr.. ram
Jul -98
CONST
377
75
STP
302
TOTAL
401
75
326
7
8th Street 'Reconstruct
Pavement
0.18
F
191
191
..
4684
Apr -98
PE
11
0
CE
11
Amendment for
Apr _98
ROW
0
0
Yes
0
l
1998 Overly Pr.. ram
Jul -98
CONST
180
36
STP
144
_
TOTAL
191
36
155
8
14
West Lincoln Avenue
Rehabilitate Pavement
0.53
F
198
198
�.
4648
Apr -98
PE
12
0
CE
12
16th Avenue
Amendment for
Apr -98
ROW
0
0
Yes
0
to North 24th Avenue
1998 Overia Pr. . ram
Jut -98
CONST
186
37
STP
149
_
_ _
TOTAL
198
37
161
9
14
Nob Hill Boulevard:
Rehabilitate Pavement
0.95
F
365
365
.
4566
Apr -98
PE
22
0
CE
22
1st Streetk
r
Amendment for
Apr -98
ROW
0
0
Ys
0
to 18th_Street
1998 r.>lerta Pr.. ram
Jut -98
CONST
343
69
STP
274
_
_ __
TOTAL
326
60
L
296
10
14
Washington Avenue:
Rehabilitate Pavement
1 12
F
438
438
4558
Apr -98
PE
26
0
CE
26
2nd Street
Amendment for
Apr 98
ROW
0
0
Yes
0
to 4th Avenue
1998 Overla Pr.. ram
T
Jul -98
CONST
412
82
STP
330
TOTAL
438
82
356
11
16
South 16th Avenue:
Rehabilitate Pavement
0.53
F
124
124
.
4555
Apr -98
PE
7
0
CE
Washington Avenue
Amendment for
Apr -98
ROW
0
0
_I—
Yes
0
to Bachelor Creek
1998 Overla Pr.. ram
Jut -98
CONST
117
23
srP
94
TOTAL
124
23
101
12
14
16th Avenue:
Rehabilitate Pavement
0.08
» F
69
69
4555
Apr -98
PE
4
0
CE
4
Lincoln Avenue
_
Amendment for
Apr -98
ROW
0
0
Ys
0
to Roosevelt
1998 Overla Pr.. ram
Jul -98
CONST
65
13
STP
52
- -- -
----
-- _.--
--
-
-----
- --
TOTAL
69
--
I
13
56
Proposed Amendment
gljainsillig4:6=LOLIMILLUWZ1501091401-11(4-13z.92,22.
5/13/98
CITY OF YAKIMA
AMENDED SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1998 TO 2003TOTAL
Total
1998
184
1999 20-100 2001
I i 1
Federal
State
LOCAL
PrtorItyl FC
Length 1 t,t,
—02 2003
Fed 0
4648
Start
Apr -98
Apr -98
Jut -98
ROW
CX)NST
TOTAL
$
11
0
173
184
$
0
0Yes
35
35
cnto
STP
Emir
CE
R/W
L
$
,-,,,
_
$
11
0
13
14
Lincoln Avenue
North 1st Street
to 8th Street
Rehabilitate Pavement
0 55
F
184
Amendment for
[ 1998 Overlay Program
—1:-8
,
l 1
149
14
14
B Street _
Lincoln
to B Street
Rehabilitate Pavement
0 15
_
F
189
189
1 i 1
4694
_
Apr -98
Apr -980
Jul -98
PE..
CONST
TOTAL
11
0
178
189
0
STP
CE
'
Yes
11
Amendment for
1998 OverlaProgr,am
0
36
0
142
153
36
15
16 th Avenue
Rehabilitate Pavement
0 15
F
,
151
_ _
151
4555
.
Apr -98
_ Apr -98
Jul -98
PE
ROW
CONST
9
0
0
28
CE
9
al FruitvaleAmendment
for
1998 Overla Pr • !ram
0
STP
Yes
0
142
114
123
TOTAL
151
28
16
-
5th Avenue
-DStreetj
to Yakima Avenue
Rehabilitate Pavement
0.56
F
74
741
4641
Apr -98
Apr -98
Jul -98
PEE
ROW
CONST
TOTAL
4
0
OE
Amendment for
'19,38 Overla Pr.. ram
0
--1
70
0
14
— 14
Yes
0
56
60
STP
74
17
SummitviewAvenue Rehabilitate Pavement
1.36
, F
231
231
j_
4596
Apr -98
Apr -98
Jul -98
PIE
RCM
OONST
14
0
STP
CE
Yes
14
16th Avenue
to 381h Avenue
Amendment for
19913 Overlay Program
0
_L
0
0
217
43
43
174
TOTAL
231
188
18
South First Street Rehabilitate Pavement
0.54
F
192
192
4579
Apr -98
Apr -98
Jul -98
PE
12
0
CE
Yes
12
Walnut Street
to Arlington Street
.,_
Amendment for
1998 Overlay Programi
ROW
CONST
4-
0
0
0
—144
156'
180
36
1
36
STP
TOTAL
192
19
14
Yakima Avenue Rehabilitate Pavement
0.23 _
F
772
772
4628
-4—
PE
KOw
77
66
STP
11
6th Street
to 10th Street
0
0 _..
97
CONST
TOTAL
695
598
664
772
108
20
16
South Third Avenue Joint Proj w/Crty ot Union CLAP
ValleLIVIall Blvd
to Washington
0.25
F
1
1
4559
PE
ROW
0
0
137.i
1
0
CONST
1
TOTAL
1
1
21
14
Valley Melt Boulevard Joint Prei wletty of Union Gap
2.50
100
100
PE
ROW
10
10
1st Street and Yakima County
to 3rd Avenue
0
90
0
I
CONST
90
TOTAL
100
100
22
17
Englewood Avenue Remove Existing Bridge
0.05
F
85
85
4652
PE
9
8
at the bride near
---,
FIOW
1
1
,.....0
_
Powerhouse Road
CONST
75
65
11
TOTAL
85
73
12
23
00
Sidewalks N/A
F
155
65
10
10
10
10
10
PE
16
8
0
8
0
city Wide
ROW
0
CONST
139
70
78
70
le
TOTAL
155
24
14
Nob Hill Boulevard New Signal
0.00
F
50
50
50
at 6th Street
--P5
ROW
0
0
CONST
450
450
—
TOTAL
500
500
Proposed Amendment
5/13/98
CITY OF YAKIMA
AMENDED SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1998 TO 2003
TOTAL
Federal
State
LOCAL
Priority
FC I Length 4 i,. ,.
Total
1998 1999
2000
I,2001
- _
1 2002_1 2003
Fed I
4648
Start
PE
Pow —
CONST
TOTAL
$
1840
0
16,560
18,400
$
1,582
0_
14,242
15,824
cr.
Emir
RNJ
$
184
0
ca.
$
74
0
25
14
Lincoln Avenue
1st Street
to 3rd Avenue
Grade Separated
RR Crossing
0 38
i
-
r. U
18,400
18,400
_
1656
1840
662
736
26
14
B street
1st Street
to 3rd Avenue
Grade Separated
RR Crossing
0.38
U
18400
18,400
4694
PE
Row
CONST
TOTAL
1840
0
16,560
18,400
1,582
0
14,242
15,824
__
_
1.84
o
1656
1840
_ _
74
0
662
736
27
14
Noh Hill Boulevard
at Fair Avenue
Upgrade Signal
0.00
U
250
250
4695
PE
25
,.CONST
I --
-
25
0
225
POw
0
TOTAL
225
250
250
28
14
Greenway Path and Dikes
near SR12&182
--
improvepath and dikes
0.00
U
220
220
-
PE
22
0
22
0
ROW
+
CONST
TOTAL
198
220
198
220
29
00
Bus Stop Zones -- Transit
Bus Stops
N/A
- _
U
I
150
50
50
50
_
PE
15
13
0
2
ROW
coNsT
TOTAL
0
, 0
135
150
116
19
129
21
30
00
Traffic Signs
N/A
U
450
90
90
90
90
90
PE
0
0
0
Upgrade to meet new,.-
standards
ROW
0
0
I.
0
CONST
450
387
63
TOTAL
450
387
63
31
00
Storm Drains
Ci#y Wide
N/A
P
800
200
y
200
200
200
PE
80
80
ROW
0
0
CONST
TOTAL
720
800
720
800
32
19
Yakima Avenue:
1st Street
Rehabilitate Pavement
0.4
F
703
703
_ _
PE
70
70
0
ROW
0
to 6th Street
CONST
TOTAL
633
703
633
703
33
00
Fruitvale Canal Pathway_
North 20th Avenue
Install Pathway
N/A
U
272
272
Jan -94
PE
27
23
CE
4
ROW
to North 34th Avenue
CONST
245
211
34
TOTAL
27
234
38
34
14
Yakima Avenue
1st Street
Rehabilitate Pavement
0.6
F
1,060
1,060
4690
PE
106
91
STP
15
Row
0
0
0
--_— to 7th Avenue
T
CONST
954
820
133
TOTAL
1,060
911
148
35
16
Yakima Avenue:
7th Avenue
Rehabilitate Pavement
0.6
F
709
709
4690
PE
71
61
10
Row
CONST
0
0
0
89
to 16th Avenue
638
549
TOTAL
709
610
99
36
14
North 16th Avenue
New Signal
SIG
P
-----
238
— '-
10
-
4555_
4666
PE
24
at River Road
--
ROW
-
CONST
TOTAL
214
238
-- - — — --- ---
Proposed Amendment
._1
5/13/98
CITY OF YAKIMA
AMENOED SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1998 TO 2003
--�TOTAL:
Federal
State
LOCAL
,"""* FC
Length
0 0
| .4.
| U
Total
400
1998 1999
2000 2001
2002
2003
'
Feu*
Start
PE
ROW
$
*n40
150--
$
"..
---_
Envir
_____150
RN/
$ !
400
37
14
16th Avenue
ats»n/°°°o6_Avenue
New Signal
`'`
'
CONST
TOTAL
210
400
38
- '
14
�a
South 1omAvenue
at Mead
w�/a�" ^
- ---
SIG*ss
u
192
457
"E
ROW
19
0
_
CON:ST
TOTAL
173
192
39
-
14_
-
40th Avenue �
m
-- - ---
New Signal
'___`_'
------ -------
0.00
_
-
U
250
�
--
-
_`
-- -
PE
ROW
CONST
TOTAL
25
25
0
225
225
250
250
40
14
Lincoln
New Signal
-'
mm U
—'
350
-
1
---
-
PE
35
35
m
---
- RCM
100
215
--
215
'
- --
^_-�m,��
TOTAL
350
350
41
-First
_
Tamarac
---- -----
0m y
-
1,556
___
_
_
---
�
ROW
���sr
TOTAL
156m
0
-__ �b"m°n���
--
1,400
1,56
_
42
-
` - --
00
---
r��=��
New Street
0.25
U
18,000
|
/
]
i___�_
PE
1800
GordonRoad
- -
to
-�— -
New alignment
ncW
0
RR
nnw�
TOTAL
16,200
18,000
43
w_
South 1st
Washington Avenue
n"�mn
to South ��u
Rehabilitate Pavement
0.56
o
'
:,40
_
`
__
.,___.
__'__
-__
4579__PE
�
_ __
ROW
241
0
'cOwST
:'1e6
TOTAL
2,407
44
17
-
River Roa
Widen/Reconstruct
0.51
o
1,395
^
|
4666
pc
�on
6th Avenue
Pow
v.
m1om�wn�
__
m�sr
1�se.
TOTAL
1,395'
ws
w
e�pm/
Rehabilitate Pavement
0.53y
1,501
*694
PE
mnv
150
---- Pierce Street,
0
to North 1st St^*w__4
TOTAL
1,351
-1
,
46
nw�x��
Widen/Reconstruct
1.6
o
5,149
4587
PE
292
Wide HoIlow Creek
Row
o
m�m�w���
CONST167-----
TOTAL
292
47
--
19
18th Street & BeecStreet:
Widen/Reconstruct
110
_ 2,986
_
pc
125
os
Terrace�
__
Row
to Fair Avenue
umwsr
0
TOTAL
125
48
1n
Mead Avenue
Widen/Reconstruct
usu
��y
_
4570
PE
112
16th Avenue
��
ocwsr
��
|
to 111h Avenue
875
_-_
Proposed Amendment
QpginJJ Ad91394 1997 by Resolution No a i 90
5/13/98
CITY OF YAKIMA
AMENDED SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1998 TO 2003
TOTAL
Federal
State
LOCAL
Prouty
FC{
Length 1.,,,,
Total
1998 1999 2000 I 2001 2002 2003
Fed R
Start
$
$
rro«
Env -1r
RNV
$
..+m
$
49
16 Summitview Avenue I
New Signal
SIG U
324
4596
PE
32
i
17
at North 48th Avenue
,
4587
ROW
0
1
CONST
292
- --
-----
-----
-----
TOTAL
324
50
00
Gilh0d Parking Lot
Rebuild -
U
121
I
PE
ROW_
_ 12
--
--
.--
_
_—
CONST
._ _
109
—_—_
T.
TOTAL
121
_ _.— —
—__._._
51
17
Englewood Avenue:
Widen/Reconstruct
0.68
U
1,563
4652
PE
156
Powerhouse Road
F
ROW
—
—
----
—
1,407
to 40th Avenue
4
CONST
----
-
--
-
-- -"
TOTAL
1563
52
16
North 5th Avenue:
Rehabilitate Pavement
0.85
U
1,143
4641
PE
114
Lincoln Avenue
ROW
to "r Street
CONST
1,029
TOTAL
1143
53
17
West Lincoln Avenue
,Widen/Reconstruct
1.21
U
2,549
4648
PE
255
40th AvenueROW
to 66th Avenue
CONST
2,294
TOTAL
2549
54
16
South 3rd Avenue:
Washington Avenue
Rehabilitate Pavement
1
U
1,455
4559
PE
146,
ROW
to Nob Hill Boulevard
CONST
1,309
TOTAL
1455
55
19
Neches Avenue
Rehabilitate Pavement
0.95
U
411
PE
41
_
Walnut Street
ROW
to Lincoln Avenue
CONST
370
-
- - -- - - -
-
—
-
-
- -
-- -
--
-----
ITOTAL
411
—
56
14
Washington Avenue:
Widen/Reconstruct
1.88
U
3,011
-
4558
PE
16th Avenue1
-
ROW
—301`
—
to 451h Avenue,
CONST
2,710
TOTAL
3011
57
19
Pacific Street
Widen/Reconstruct
0.6
U
441
4608
PE
44
South 3rd StreetROW
to Fair Avenue
_ ___-
-"
CONST
397
TOTAL
441
58
16
I Street
Widen/Reconstruct
0.32
U
821
1
4641
PE
82
North 1st Street
ROW
to 5th Avenue
CONST
739
TOTAL
821
59
16
North & South 81h Street:
Rehabilitate Pavement
0.85
U
716
4684
PE
72
D Street
ROW
—
to Chestnut Avenue
-
CONST
644
—
_ _
TOTAL
716
60
14
B Street
Realign/ Rehabilitate
0.65
U
900
4694
PE
90
Pierce Street
ROW
to North 1st Street
CONST
810
TOTAL
900
"
---"----_-
Proposed Amendment
Qdgiatildizattsrulliti-LleaDalistzaagall9.E212Q- -
5/13198
CITY OF YAKIMA
AMENDED SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1998 TO 2003
'TOTAL
Federal
Stele
LOCAL
prionty
FC
Length TA,.
Total
1998 1999
2000
2001
2002 1 2003
Fed f
Start
$
$
Cr&
Envir
RNV
$
(on.,
61
14
B Street
Rehabilitate Pavement _
08
U
673
_
4694
PE
67
North 1st Street
10 10th Street
ROW
CONST
TOTAL
606
673
62
16
16
South 3rd Avenue
at Division
New Signal
SIG
U
268
4559
4641
PE
ROW
27-
CONST
241
TOTAL
268
63
14
Lincoln Avenue at
New Signal
SIG'
214
4648
PE
21
North 28th Avenue
RCAN
COAST
193
TOTAL
214
64
17
Powerhouse Road:
Lincoln Avenue
Widen/Reconstruct
04
1,362
4660
PE—t
ROW
136
to Englewood
COAST
1,226
1362
1362
TOTAL
65
17
Englewood Avenue:
Widen/Reconstruct
1 63
U
3,329
4652
PE
333
40th Avenue
ROMP
to 66th Avenue
CONST
2,996
3329
TOTAL
86
19
Yakima Avenue:
Rehabilitate Pavement
1,486
.
PE
ROW
149
16th Avenue
to 32nd 32nd Avenue
CONST
1,337
TOTAL
1486
67
17
_
East "3-' Street:
Rehabilitate Pavement
0.53
U
845
4684
PE
85
North 1st Street
Row
to North 8th Street
COAST
780
TOTAL
845
68
17
South 6th Street:
Rehabilitate Pavement
1.55
U,_
2,345
4637
PE
234
Yakima Avenue
ROW
to South 1st Street
A
CONST
2,111
TOTAL
2345
69
17
Fechter Road:
Widen/Reconstruct
0.42
U
1,637,
4669
PE
164
North 40th Avenue
Row
to Scenic Drive
COAST
1,473
1637
TOTAL.
70
_
16
Fruitvale Boulevard:
Rehabilitate Pavement
218
U
5,088
4606
PE
509
5th Avenue
ROW
to North 40th Avenue
CONST
4,579
TOTAL
5088
, 71
17
Washington Avenue:
Widen/Reconstruct
0.22
2,574
4558
PE
257
lst Street
ROW
to South 14th Street
CONST
2,317
TOTAL
2574
72
19
Chestnut Avenue:
Rehabilitate Pavement
0.4
U
382PE
38
1st Street
ROW
to 6th Street
CONST
344
_
TOTAL
382
Proposed Amendment
Original AdoQted on July 1. 1997 by Resolution (1,pM
5/13/98
CITY OF YAKIMA
AMENDED SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1998 TO 2003
TOTAL
Federal
State
LOCAL
Pnonty
FC
Length I ,,„,,
Total
1998
1999 2000
20011 2002 1 2003
Fed N
Chart
$
$
ct.
Env,r
R/W
$ , .'.n
$ _- -
73
19
North 2nd Avenue:
Rehabilitate Pavement
0 1 U
79
PE
8
Lincoln Avenue
ROW
—
_
to "D” Street
CONST _
71
--
_
_ '-
--
- -
-
- - - - --
I
TOTAL
79
74
19
,
2nd Avenue
Rehabilitate Pavement
0 47
U
482
PE
48
___ __
-
Lincoln Avenue
Row
__ -
to Walnut Avenue
_
CONST
434
-
- -- - - ---- - - -
-
TOTAL
482
-_
75
14
North 40th Avenue:
-- - --
Fruitvale Boulevard
Rehabilitate Pavement
- - -- - -
0.51
-
U
-
1508
-
--
4583
PE
How_
151
to Powerhouse Road
CONST
TOTAL
1,357
1508
—
76
14
North 40th Avenue:_Widen/Reconstruct
--- -- -----
-to
0 45
-
U
1,699
4583
PE
ROW
170
L.--
;
Powerhouse Road
to Englewood Avenue
CONST
---
--
--
1,529
--
-
_
TOTAL
1699
-
77
19
4th Street:
Pavement
0.61
U
428
PE
43
_
Walnut Street
,Rehabilitate
_
ROW
-
-
-- to Pacific Street
- - --
- --
-
__
-
-
--_
CONST
385'
_
--
TOTAL
428
78
19
I Street
Widen/Reconstruct
0.58
U
1,300
PE
130
5th AvenueROW
---I--
---
+--- -
-
CONST
1,170
to 16th Avenue
TOTAL
1300
79
19
North 6th Avenue
Widen/Reconstruct
0.92
U
2,274
PE
227
Gordon Road
ROW
---_--
to Fruitvale Blvd.
_. __ _
_L-_
_._
-.--
------
CONST
TOTAL
2,047
2274
- _______-_.-- -_
_
80
19
Gordon Road
Widen/Reconstruct
0.55
U
3,943
PE
394
North 1st Street
ROW
CONST
3,549
tree
to North 6th-Streettr
TOTAL
3943
81
19
Chestnut Avenue
Rehabilitate Pavement
0.51
U
517
PE
52
-._
,____
81h Street
ROW
--
— - -
to Fair Avenue
CONST
485
_
TOTAL
517
82
19
Front Street
Rehabilitate Pavement
0.10
U
121
PE
12
Yakima Avenue
to A Street
Row__--.--.-----------
CONST
109
---
I
TOTAL
121
Total
130,253
44,277 1,325 1,410 1,009
100 100
Funded 7,287 6,747 10 10 10
10 10 37,260
Unfunded 122,967 37,530 1,315 1,400 999
90 90
Proposed Amendment
Qca na. Adopted n .IL 1-1,997_Dyf?v59luigNv
5113198
CITY OF YAKIMA
AMENDED SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1998 TO 2003
TOTAL
Federal�
—
r'r�"
State
LC/CAL
Priority FCI Length st.�Total
1998 1999 2000 2001 2002 2003
Fed!
Start
$
$
cod.
Errvir 1
$ coa.
$
GMA TRANSPORTATION PLAN 1996 - 2001 (CAPACITY IMPROVEMENTS)
Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6
,,
116
Tieton Drive
7th Avenue
to 3rd Street
Realignment
0.92
U
3557
4562
PE
'Prow
CONST
TOTAL
1
14
16th Avenue
Widen/Reconstruct
3.58
U
8,901
4555
PE
SR 12
to Washington Avenue
now
_ _
CONST
TOTAL
14
North 40th Avenue:
Widen/Reconstruct _
2.25
U
8,348
-
- -
—
--
4583
-
PE
Englewood Avenue
to Washington Avenue
Raw
-
CONST
TOTAL
14
16
Fruitvate Boulevard:
Realignment
0 41
U
3,139
_
4606
PE
_ _
5th Avenue
to N. 1st Street
ROW
O)NST
TOTAL
17
--
East "G" Street:
Widen/Reconstruct
0.53
U
3,139
--
-
- -
4684
-
PE
North 1st Street
to North 8th Streety
- -
-----
Row
OONST
`— —---------
TOTAL
- ----
17
-------------
Pacific Street
Widen/Reconstruct
0.6
U
3,139
-
- --
--
—
4608
---
PE
South 3rd Street
to Fair Avenue
ROW
CONST
– ---
—
TOTAL
Total for 1996 -2001
30 223
0 0 0 0 0 0
1.111•••••••=111•91. IMMINMSIMIIMINIMEMMIIMIIIIMMMIONIBMIll
rage 8
Proposed Amendment
Origin optvd_s July.L. 17 by Resolution No R-97-90
5/13/98
CITY OF YAKIMA
AMENDED SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
1998 TO 2003
TOTAL
Federal
State
LOCAL
Priority' FC1 I Length 1 .i
Total
1998 I 1999 I 2000 ( 2001 2002 2003
Fed I
Start
$
$
c
,,
Envir
RIW
$
GMA TRANSPORTATION PLAN 2002 - 2007 (CAPACITY IMPROVEMENTS)
Yr 7 Yr 8 Yr 9 Yr 10 Yr 11 Yr 12
' 16
1 17
North 8 South 8th Street
H Street
to Walnut Avenue
Widen/Reconstruct '
095
U
1,988
I
4684
PE
CONST
TOTAL
17
18th Street
Pacific Avenue
to Valley Mall Blvd
U
0
i
4608
PE
ROW
CONST
TOTAL
-------
- --- ---
'
--
-----
-
14
16
19
South 6th Street:
H Street
to Yakima Avenue
Rehabilitate Pavement
0 75
U
1,949
4637
PE
Row
CONST
TOTAL
14
16
5th Avenue: m
"I" Street'
to Tieton Drive
Widen/Reconstruct
1.64
U
E
1,789
4641
PE—
CONST
TOTAL
—
1
16
3rd Avenue
Yakima Avenue
to Washington Avenue_
Rehabilitate Pavement
2.15
-
U
7,428
--
4559
–
--
PE
ROW
`CONST.
TOTAL
19
32nd Avenue
Englewood Avenue
to Washington AvenueTOTNSAL
Widen/Reconstruct
2.25
-
U
5,754
- -
-
-
-
- -
- - ---
-
--
PE
ROW
T
----
-----
—
---
---
19
17
10th Avenue
Summitview Avenue
- to Washington Avenue
Widen/Reconstruct
2.01
_
U
4,185
_ -
_
_ - -
-
- _ _-_
4553
._
PE
ROW
CONST
TOTAL
_.
-_
-_—
17
48th Avenue
Summitview Avenue
to Washington Avenue
Widen/Reconstruct
2 01
U
4,499
-
- -
-
4587
- -
_
----
PE
ROW
(.)NST
TOTAL
-
-
- -
-
16
56th Avenue
Widen/Reconstruct
1.50
U
3,453
4681
PE
—
—
Englewood Avenue
Nob Hill Blvd
CONST
TOTAL
Total for 2002- 2007
31,045
Page 9
Proposed Amendment
5/13/98
CITY OF ¥AKIMA
AMENDED SIX YEAR IMPROVEMENTpnman^m
TRANSPORTATION
TOTAL
Federal
State
LOCAL�emrozooa
p�"tylrc\
Length qua,
Total
1e8, 1999 2000 2001 2002 2033
Yr 13 Yr 14 Yr 15 Yr 16 Yr 17 Yr 18
Fed
Start
$
$
"_
Ewa
mw
$
^~
n
aw^TRANSPORTATION PLAN 20m 2015
CAPACITY IMPROVEMENTS1
16
Tieton Drive
Widen/Reconstruct
_nA/
U
w�a
_ _
4562
PE
_ 5th Avenue
to 56th Avenue
__
ncW
CONST
TOTAL
w
16
Washington Avenue
Widen/Reconstruct
*m_o
7,32
4558
PE
ncrw
` lst Street
to 561h Avenue
CONST
TOTAL
.__1*
Summitview Avenue
Widen/Reconstruct
3.07
U
L
10/881^
_
�
4596
PE
Yakima Avenue
to 56th Avenu
RCW
CONST
_
TOTAL
17
River Roa
Widen/Reconstruct
1s3 _y
3,839
--''
4
4666
PE
16th�moo
RCW
to 40th Avenue
CONST
TOTAL
---
17
i§
3rd Street
Rehabilitate Pavement
---
1.91
u
�or�
4653PE
/ Street
��
m5��omm
c�w�
_`____
TOTAL
Total for 2008- 2015
4,248
7,287 6,747 10 10 10 10
224,482 37,530 131e 1,400 999 90
10
90
FUNDED
UNFUNDED
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No.
For Meeting of May 19, 1998
ITEM TITLE: 1998 - 2003 Six -Year Transportation Improvement Program
SUBMITTED BY: Department of Community and Economic Development
Engineering Division
CONTAC'I PERSON/TELEPHONE: Fred French, City Engineer / 575-6096
SUMMARY EXPLANATION:
Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six
Year Transportation Improvement Program (TIP) for submittal to the Washington
State Department of Transportation. This plan must include all transportation projects
for which state gas tax revenue or federal revenue will be used.
The existing approved plan for 1998 - 2003 does not list the 1998 Street Overlay
projects as funded. The existing plan must be amended to allow expenditure of
Federal Funds on these projects. This proposed amendment to the Six -Year
Transportation Improvement Program (TIP) changes only the overlay projects to
"FUNDED".
(continued)
Resolution X Ordinance Contract _Other (Specify) City of Yakima 1995-2000 Six Year TIP
Funding Source
APPROVED FOR SUBMII'IAL: ``►\
City Manager
STAFF RECOMMENDATION: Adopt the attached resolution approving the Amended
1998 - 2003 Six Year Transportation Improvement
Program
BOARD/COMMISSION RECOMMENDATION:
COUNCIL AL'I'ION:
May 13. 1998