HomeMy WebLinkAbout11/08/2016 02 Council Budget Review by DepartmentBUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDASTATEMENT
Item No. 2.
For Meeting of: November 8, 2016
ITEM TITLE: Council Budget Review by Department
Public Works
- Refuse
- Equipment Rental - City Hall Maintenance
- Transit
Utilities
-Water - Irrigation
- Wastewater - Stormwater
Engineering
- Arterial Street - RE ET 1 & 2
SUBMITTED BY: Cliff Moore, City Manager
Cindy Epperson, Finance & Budget Director
SUMMARY EXPLANATION:
We are pleased to submit for your review the 2017 Preliminary Budget and Strategic Initiatives
for the City of Yakima. Included in this presentation are the steps and recommendations currently
being taken to meet the fiscal challenges facing the City.
ITEM BUDGETED:
STRATEGIC PRIORITY:
APPROVED FOR 4 SUBMITTAL: ""'°City Manager
STAFF RECOMMENDATION:
BOARD /COMMITTEE RECOMMENDATION:
ATTACHMENTS:
Description
I Public Works - Continued
2 Utilities
3 Engineering
Upload Date
Type
1114/2016
Presentation
11/4/2016
Presentation
1114/2016
Presentation
+� iii
AW• • . . •
AW
•
A •' ��
00 r
Awl
AW
. r
• r
i
Council Budget Review
Public Works
2
K. WILKINSON
Parks and Recreation
Manager
PARKS &
RECREATION
21.30 Positions
Park Irrigation,
Development
and Maintenance
Research
Grants
Special Projects
Aquatic Programs
Pool Maintenance
Athletics
Youth Programs
Special Events
Senior Center Operation
Senior Programs
Golf Course Operations
Central Business District
Arborist
Major Repairs
Cemetery Maintenance
Burials • Volunteers
PUBLIC WORKS
2017 Budgeted Staffing Levels
S. SCHAFER
Director of Public Works
154.60 Positions
D. BROWN F. HEWEY
Public Works Safety & Training
Office Assistant Officer
J. ROSENLUND
A. MAXEY
L. ZAMMARCHI
R. WONNER
Street and Traffic
Transit
Solid Waste and
Fleet and Facilities
Operations Manager
Manager
Recycling Manager
Manager
STREETS &
TRANSIT
SOLID
EQUIPMENT ADMINISTRATIVE
TRAFFIC
SERVICES
WASTE
RENTAL SERVICES
30.00 Positions
55.30 Positions
20.00 Positions
13.00 Positions 6.00 Positions
Street Maintenance
Street Sweeping
Miscellaneous Street
Construction & Repairs
Sidewalk / Curb Repair
Utility Cut Patching
Snow and Ice Removal
Traffic Engineering
Traffic Signals
Street Lighting
Street Signs
Street Marking
Signal Design
Development Review
Traffic Studies / Analysis
Lighting Design and
Specifications
Traffic Operations
Fixed -route Bus System
ADA Eligibility
Dial -a -Ride
Dispatch
Route Supervision
Equipment Servicing
Project Planning
Grants and Projects
Administration
Marketing &
Programming
Administration
Vanpool Program
Commute Trip Reduction
Contract Administration
Customer Relations
Refuse and Recycling
Residential Collections
Bin Collections
Yard Waste Collections
Special Hauls
Cart / Bin Delivery and
Removal
Cart / Bin Maintenance
Fall Leaf Program
Special Event Recycling
Equipment Rental
and Replacement
Environmental Fund
Equipment
Maintenance
Shop Operation /
Maintenance
Equipment Specifications
Auto Parts Inventory
Facility
Maintenance
Public Works Facility
Transit Center
CITY HALL
FACILITY
2.0 Positions
Reception
Registration
Customer Relations
Accounts Payable /
Receivable Personnel /
Payroll Timekccping
Word Processing
Safety and Training
Committee / Commission
Support
The mission of the Solid Waste and Recycling Division is to protect the
public health and safety of the City and all residents of the City by
providing quality municipal solid waste services that are efficient, cost
effective and environmentally responsible. The Refuse Division is
responsible for collection and disposal of all garbage, yard waste and
other debris for 26,000 residential customers within the City of Yakima
and from all City-owned facilities.
F
Refuse - Authorized Personnel
2016
2017
Class
2015
Amended
Proposed
Code Position Title
Actual
Budget
Budget
1266 Solid Waste and Recycling Manager
1.00
1.00
1.00
7122 Department Assistant II
2.00
2.00
2.00
8433 Solid Waste Collector / Driver
13.00
13.00
13.00
8641 Solid Waste Maintenance Worker
3.00
3.00
3.00
14101 Solid Waste Supervisor M
1.00
2.00
2.00
Total Personnel
20.00
20.00
21.00
(1) One Solid Waste Supervisor was added mid -year 2016.
fjt
Refuse - Budget Overview
Dept 471 Refuse
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
% Chng
2015
Amended
Actual
Estimated
Projected
from
from
Exp Summary By Service Unit
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
4 to 5
472 Residential Routes Ops
$ 2,917,818
$ 3,164,400
$ 2,192,363
$ 3,107,340
$ 3,289,662
104.0%
105.9%
473 Special Containers
65,159
69,937
51,124
70,387
75,441
107.9%
107.2%
474 Facility Maintenance
42,884
43,956
21,978
43,956
45,055
102.5%
102.5%
475 Fall Leaf Program
80
-
-
-
-
n/a
n/a
476 Shop Operations
630,000
795,000
397,500
795,000
795,000
100.0%
100.0%
477 Refuse Taxes & Interfund
1,639,456
1,789,946
1,202,958
1,789,449
1,981,812
110.7%
110.7%
478 Administration
320,436
359,151
254,909
358,629
459,605
128.0%
128.2%
479 PW Insurance & Interfund
215,132
230,095
193,585
230,095
250,770
109.0%
109.0%
Total Expenditures
5,830,965
6,452,485
4,314,418
6,394,856
6,897,345
106.9%
107.9%
Rev Summary By Type
340 Chrgs f /Goods & Svcs
5,722,696
6,594,262
4,951,700
6,663,639
6,910,200
104.8%
103.7%
350 Non -Court Fines & Forf
1,100
-
571
-
-
n/a
n/a
360 Miscellaneous Revenues
50,420
1,000
2,453
1,000
1,000
100.0%
100.0%
Total Revenues
5,774,216
6,595,262
4,954,724
6,664,639
6,911,200
104.8%
103.7%
Fund Balance
Beginning Balance
116,314
59,564
59,564
59,564
329,347
552.9%
552.9%
Revenues Less Expenditures
(56,750)
142,777
640,307
269,783
13,855
9.7%
5.1%
Ending Balance
$ 59,564
$ 202,341
$ 699,871
$ 329,347
$ 343,202
169.6%
104.2%
0
Refuse Budget Overview
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
%
2015
Amended
Actual
Estimated
Projected
from
of
Exp Summary By Type Actual
Budget
09/30/16
Year -End
Budget
2 to 5
Total
100 Salaries & Wages $1,046,410
$1,102,770
$ 804,747
$1,104,770
$1,199,759
108.8%
17.4%
200 Benefits 431,083
452,000
331,876
458,568
512,929
113.5%
7.4%
Sub -Total Salaries & Benefits 1,477,493
1,554,770
1,136,623
1,563,338
1,712,688
110.2%
24.8%
300 Operating Supplies 287,420
431,027
295,932
376,027
288,700
67.0%
4.2%
400 Professional Svcs & Chgs 4,066,052
4,466,688
2,881,863
4,455,491
4,895,957
109.6%
71.0%
Total Expenditures $ 5,830,965
$ 6,452,485
$ 4,314,418
$ 6,394,856
$ 6,897,345
106.9%
100.0%
fjt
Refuse - Strategic
Initiative Summary
Strategic Initiative
Proposed
Personnel
Request / Justification
Funding Source
Salary / Benefits
Non - Personnel
Notes
Unbudgete
Refuse Rate Increase
Refuse Customers
2017 Revenue
d d
2017 - 7.0% 2019 — 2.5%
$473,000
2018 — 2.6% 2020 — 2.5%
------------------------------
Refuse Rate Increase
-------- - - - - --
Refuse Customers
-------- - - - - --
-------- - - - - --
2017 Revenue
--- - - - - --
Budgeted
2017 — 3.7% 2019 — 3.0%
$247,000
PS
2018 — 3.1% 2020 — 3.0%
fjt
a a a III " , iiiiiiiri i
Refuse
2015
Actual
2016
Prelim
2017
Proposed
Budget
Residential Cart Accounts Active
25,647
26,000
26,000
Bin Accounts Active
430
379
379
Yard Service Accounts Active
6,462
6,191
6,191
Tons of Refuse Collected Special Collection, etc
109
109
97
Tons of Refuse Collected Residential Automated Carts
25,969
26,791
26,792
Tons of Refuse Collected Bin
2,622
2,260
2,260
Tons of Refuse Collected Yard Service
3,695
3,825
3,826
Estimated Annual Cost Per Account Collected Special Collection
$11.70
$3.12
$3.12
Estimated Annual Cost Per Account Collected Residential Auto. Cart
$181.84
$208.27
$204.00
Estimated Annual Cost Per Account Collected Bin
$1,225.55
$1,548.00
$1,532.00
Estimated Annual Cost Per Account Collected Yard Service
$98.73
$137.43
$141.00
(1) Special collections include litter, illegal dumping, special hauls, fall leaf collection, etc. Due to budget cuts in the 2015
budget, 2016 numbers reflect the elimination of the fall leaf program, code enforcement officer and reduction in the
number of community clean ups. Activities in this area were significantly reduced.
0
IMMI
The purpose of the Equipment Rental Division is to acquire and maintain vehicles and equipment for all of
the
its divisions with the exception of Police and Fire. The City fleet consists of over 700 vehicles and
pieces of construction equipment valued in excess of $18 million.
• Productivity is measured in terms of billable hours. For the 2016 budget year, productivity
was
% of the mechanics and lubrication technicians available hours.
• Cost Effectiveness - The 2017 shop rate will continue to be $96.50/hour, a rate that has not
increased since 2015 and is lower than private sector shop rates
• Quality of Work Performed
• Customer Satisfaction Surveys have been conducted and, indeed, customer satisfaction
has improved and has been held at a high level for the past several years.
• Appropriate Outsourcing
10
(1) A Department Assistant II was replaced with an Automotive Services Assistant due to a mid -year reorganization.
(2) .15 FTE's are funded by Public Works Administration (560).
11
2016
2017
Class
2015
Amended
Proposed
Code
Position Title
Actual
Budget
Budget
1263
Fleet Manager
1.00
1.00
1.00
7122
Department Assistant II
1.00
1.00
0.00
8203
Fleet Maintenance Technician
2.00
2.00
2.00
8211
Mechanic I
7.00
7.00
7.00
8213
Automotive Storekeeper
1.00
1.00
1.00
8215
Automotive Services Assistant()
0.00
0.00
1.00
12102
Mechanic II (1)
1.00
1.00
1.00
12103
Equipment Supervisor
1.00
1.00
1.00
Total Personnel (2)
14.00
14.00
14.00
(1) A Department Assistant II was replaced with an Automotive Services Assistant due to a mid -year reorganization.
(2) .15 FTE's are funded by Public Works Administration (560).
11
Equipment Rental - Budget Overvievi
Dept 551 Equip Rental Revolving
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
% Chng
2015
Amended
Actual
Estimated
Projected
from
from
Exp Summary By Service Unit
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
4 to 5
551 Administration
$ 538,035
$ 334,376
$ 211,421
$ 348,061
$ 342,597
102.5%
98.4%
552 ER Reserves
1,687,160
1,560,000
1,752,031
1,674,815
1,457,000
93.4%
87.0%
553 Fleet Maintenance / Shop
887,952
1,022,842
755,861
991,792
1,008,664
98.6%
101.7%
554 Fleet Maintenance / Stores
1,497,010
1,629,205
588,066
1,226,362
1,563,987
96.0%
127.5%
559 Replacement Reserve
139,466
219,109
103,688
147,959
151,876
69.3%
102.6%
Total Expenditures
4,749,623
4,765,532
3,411,067
4,388,988
4,524,125
94.9%
103.1%
Rev Summary By Type
340 Chrgs f /Goods & Svcs
2,754,686
2,925,000
1,423,810
2,555,000
2,828,000
96.7%
110.7%
360 Miscellaneous Revenues
1,565,352
1,745,442
869,526
1,750,857
1,756,442
100.6%
100.3%
370 Prop & Trust Gains
(70,635)
-
-
-
-
n/a
n/a
390 Other Financing Sources
16,172
52,500
113,444
118,475
52,500
100.0%
44.3%
Transfers In
819
-
-
-
-
n/a
n/a
Total Revenues
4,266,394
4,722,942
2,406,781
4,424,332
4,636,942
98.2%
104.8%
Fund Balance
Beginning Balance
4,540,654
4,057,425
4,057,425
4,057,425
4,092,769
100.9%
100.9%
Revenues Less Expenditures
(483,229)
(42,590)
(1,004,286)
35,344
112,817
264.9%
319.2%
Ending Balance
$ 4,057,425
$ 4,014,835
$ 3,053,139
$ 4,092,769
$ 4,205,586
104.8%
102.8%
12
Equipment Rental - Budget Overvievi
Exp Summary By Type
(1)
2015
Actual
(2)
2016
Amended
Budget
(3)
2016
Actual
09/30/16
(4)
2016
Estimated
Year -End
(5)
2017
Projected
Budget
(6)
% Chng
from
2 to 5
(7)
%
of
Total
100 Salaries & Wages
$ 764,591
$ 947,062
$ 654,362
$ 867,756
$ 898,336
94.9%
19.9%
200 Personnel Benefits
310,002
328,657
253,215
336,538
360,759
109.8%
8.0%
Sub -Total Salaries & Benefits
1,074,594
1,275,719
907,578
1,204,294
1,259,095
98.7%
27.8%
300 Operating Supplies
1,427,711
1,502,800
523,691
1,138,300
1,390,800
92.5%
30.7%
400 Professional Svcs & Chgs
302,408
309,913
178,539
316,413
317,364
102.4%
7.0%
600 Capital Outlays
1,717,743
1,665,234
1,795,327
1,718,115
1,545,000
92.8%
34.2%
Transfers Out
227,168
11,866
5,932
11,866
11,866
100.0%
0.3%
Total Expenditures
$4,749,623
$4,765,532
$3,411,067
$4,388,988
$4,524,125
94.9%
100.0%
13
14
r kTA
Strategic Initiative
Request / Justification
Proposed
Funding Source
Personnel
Salary / Benefits
Non - Personnel
Notes
Fleet Vehicle Additions and
Replacements
Elgin Crosswind Sweeper - Streets
Equipment Rental
Budgeted
Automated Side - loading Truck - Refuse
Replacement Fund
$320,000
PT
Automated Side - loading Truck - Refuse
315,000
Small Automated Refuse Truck - Refuse
315,000
One Ton Flatbed Truck —
140,000
Water /Irrigation
130,000
Upgrade 5 Snowplows - Streets
75,000
1 Ton Flatbed Truck - Streets
45,000
3/4 Tone Pickup with Snowplow — Parks
40,000
Reel Mower - Parks
35,000
Trim Mower - Parks
35,000
Ford Ranger Pickup — Utilities
30,000
Taylor Dunn Utility Vehicle —
25,000
Wastewater
25,000
Taylor Dunn Utility Vehicle —
6,000
Wastewater
$1,536,000
Equipment Trailer - Parks
Total
Shop Equipment
Equipment Rental
$88,000
Budgeted
Operating
NC
Dept 555 Environmental Fund
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
% Chng
2015
Amended
Actual
Estimated
Projected
from
from
Exp Summary By Service Unit
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
4 to 5
561 Administration
$1,275,733
$ 1,247,950
$ 58,989
$ 247,950
$ 422,950
33.9%
170.6%
Rev Summary By Type
340 Chrgs f /Goods & Svcs
1,026,202
900,000
1,101
60,000
100,000
11.1%
166.7%
360 Miscellaneous Revenues
181,463
180,000
133,949
180,000
180,000
100.0%
100.0%
390 Other Financing Sources
6,202
100,000
100,000
100,000
100.0%
100.0%
Total Revenues
1,213,867
1,180,000
135,050
340,000
380,000
32.2%
111.8%
Fund Balance
Beginning Balance
627,147
565,281
565,281
565,281
657,331
116.3%
116.3%
Revenues Less Expenditures
(61,866)
(67,950)
76,061
92,050
(42,950)
63.2%
46.7%
Ending Balance
$ 565,281
$ 497,331
$ 641,342
$ 657,331
$ 614,381
123.5%
93.5%
15
C r-I 0
ity Hall Facility - General Fund
Primary services by this division include:
• Maintenance of facility needs: such as utties HVAC, electrical, plumbing, custodial
and grounds keeping.
• Perform and oversee construction,, alterations, painting and repair projects to City Hall,
Washington Fruit Community Center, Henry Beauchamp Community Center, Y-Pac,
MiCare.
• Provide clean, orderly and safe environment for the public and staff.
• Facilitate centralized City-wide electronic door locking system with security ID badge
processing.
• Supervision and maintenance of City Hall security video system.
• Purchase and inventory equipment parts, chemicals and supplies.
• Assist other departments with special events when needed.
16
%,ity Hall Facility - Budget Overview
Dept 221 City Hall Maintenance
Exp Summary By Service Unit
224 Facility Maintenance
(1) (2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
% Chng
2015 Amended
Actual
Estimated
Projected
from
from
Actual Budget
09/30/16
Year -End
Budget
2 to 5
4 to 5
$ 504,382 $ 505,447 $ 387,407 $ 495,696 $ 531,147 105.1% 107.2%
17
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
%
2015
Amended
Actual
Estimated
Projected
from
of
Expenditure Summary By Type
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
Total
100 Salaries & Wages
$155,215
$162,226
$106,673
$151,283
$165,699
102.1%
31.2%
200 Benefits
54,714
44,935
34,642
45,835
50,662
112.7%
9.5%
Sub -Total Salaries & Benefits
209,930
207,161
141,315
197,118
216,361
104.4%
40.7%
300 Operating Supplies
21,359
26,700
17,381
26,700
26,900
100.7%
5.1%
400 Professional Svcs & Chgs
273,093
271,586
228,710
271,877
284,886
104.9%
53.6%
Transfers Out
-
-
-
-
3,000
n/a
n/a
Total Expenditures
$ 504,382
$ 505,447
$ 387,407
$ 495,696
$ 531,147
105.1%
100.0%
17
Strategic Initiative Proposed Personnel
Request / Justification Funding Source Salary / Benefits Non - Personnel Notes
City Hall Facility Projects: REET 1 Budgeted
New NC
Elevator #1 and #2 Upgrade $1,075,000
Carryforward 217,000
Total $1,292,000
The Transit Division's primary task is to provide public transportation services in the cities of
Yakima and Selah (under contract). Those services include fixed-route bus, vanpool, and
paratransit services. Yakima Transit also contracts for and participates in funding a commuter bus
service between Yakima and Ellensburg that also serves the city of Selah.
0 Commuter
• Paratransit (Dial A Ride)
• Vanpool
19
Class
Code Position Title
1262
Transit Manager
14202
Transit Field Operations Supervisor
20101
Marketing and Program Administrator (2)
20102
Transit Project Planner
20103
Transit Operations Specialist
20110
Community Transportation Coordinator (2)
22101
Transit Operator
22102
Transit Dispatcher
22105
Transit Office Assistant (2)
23101
Transit Service Worker
23102
Transit Vehicle Cleaner (3)
23105
Transit Maintenance CrewLeader�l�
24101
Transit Department Assistant II (2)
Total Personnel(4)
(1) A Transit Maintenance Crew Leader and a Transit Field Operations Supervisor were added in the 2016 budget.
(2) A Marketing and Program Administrator and Transit Department Assistant II positons were converted to
Community Transportation Coordinator and Transit Office Assistant was added mid -year 2016.
(3) Mid -year 2016 the Transit Vehicle Cleaner positions were adjusted from .90 each to .75 each.
(4) Transit funds 1.00 FTE's in Police (031).
20
2016
2017
2015
Amended
Proposed
Actual
Budget
Budget
1.00
1.00
1.00
2.00
3.00
3.00
1.00
0.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
39.00
35.80
35.80
3.00
3.00
3.00
0.00
1.00
1.00
2.00
2.00
2.00
1.80
1.50
1.50
0.00
1.00
1.00
3.00
2.00
2.00
54.80
53.30
53.30
(1) A Transit Maintenance Crew Leader and a Transit Field Operations Supervisor were added in the 2016 budget.
(2) A Marketing and Program Administrator and Transit Department Assistant II positons were converted to
Community Transportation Coordinator and Transit Office Assistant was added mid -year 2016.
(3) Mid -year 2016 the Transit Vehicle Cleaner positions were adjusted from .90 each to .75 each.
(4) Transit funds 1.00 FTE's in Police (031).
20
Transit Operating
Budget Overview
Dept 462 Transit
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
% Chng
2015
Amended
Actual
Estimated
Projected
from
from
Exp Summary By Service Unit
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
4 to 5
453 Ellensburg Operations
$ 488,920
$ 470,597
$ 289,650
$ 479,206
$ 479,397
101.9%
100.0%
454 Transit Maintenance
1,590,691
1,396,607
974,727
1,320,978
1,611,408
115.4%
122.0%
455 Transit Center
23,160
33,897
14,991
16,716
63,404
187.0%
379.3%
459 Transit Administration
1,435,683
1,485,417
1,012,096
1,471,742
1,614,054
108.7%
109.7%
460 Transit Planning
-
4,000
807
1,179
4,000
100.0%
339.2%
461 Customer Svc /Marketing
110,996
96,000
83,320
112,715
220,350
229.5%
195.5%
462 Transit Operations
3,131,745
3,566,041
2,390,244
3,333,936
3,466,078
97.2%
104.0%
463 Van Pool Operations
116,011
118,000
59,144
65,390
96,796
82.0%
148.0%
464 Van Pool Insurance
57,530
63,283
63,283
63,283
70,877
112.0%
112.0%
465 Dial -a -Ride Operations
1,010,278
1,039,000
798,917
1,178,267
1,718,985
165.4%
145.9%
466 Dial -a -Ride Customer Svc
39
52,000
1,506
3,967
53,000
101.9%
1336.1%
467 Dial -a -Ride Insurance
40,190
43,923
44,114
44,114
49,194
112.0%
111.5%
Total Expenditures
8,005,242
8,368,765
5,732,797
8,091,493
9,447,544
112.9%
116.8%
Rev Summary By Type
310 Taxes
3,465,978
4,200,000
4,238,144
4,219,785
4,660,000
111.0%
110.4%
330 Intergov't Revenue
3,484,329
3,093,502
2,211,900
3,165,550
3,187,176
103.0%
100.7%
340 Chrgs f /Goods & Svcs
954,559
1,297,500
685,491
1,381,389
1,119,318
86.3%
81.0%
360 Miscellaneous Revenues
131,971
110,400
154,311
158,621
109,075
98.8%
68.8%
Total Revenues
8,036,838
8,701,402
7,289,845
8,925,345
9,075,569
104.3%
101.7%
Fund Balance
="
Beginning Balance
1,923,362
1,954,958
1,954,958
1,954,958
2,788,809
142.7%
142.7%
Revenues Less Expenditures
31,596
332,637
1,557,049
833,851
(371,975)
111.8%
44.6%
r
Ending Balance
$ 1,954,958
$ 2,287,595
$ 3,512,007
$ 2,788,809
$ 2,416,835
105.6%
86.7%
`j
22
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
%
2015
Amended
Actual
Estimated
Projected
from
of
Exp Summary By Type
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
Total
100 Salaries & Wages
$ 2,642,083
$ 2,791,728
$ 2,109,041
$ 2,769,543
$ 2,921,469
104.6%
30.9%
200 Benefits
1,245,589
1,331,027
878,218
1,374,472
1,417,988
106.5%
15.0%
Sub -Total Salaries & Benefits
3,887,672
4,122,755
2,987,259
4,144,015
4,339,457
105.3%
45.9%
300 Operating Supplies
701,393
835,000
435,048
528,478
770,050
92.2%
8.2%
400 Professional Svcs & Chgs
2,951,147
2,946,413
2,015,779
2,938,329
3,873,440
131.5%
41.0%
500 Intergovernmental Svcs
465,029
464,597
294,239
480,185
464,597
100.0%
4.9%
600 Capital Outlay
-
-
473
487
-
n/a
0.0%
Total Expenditures
$ 8,005,242
$ 8,368,765
$ 5,732,797
$ 8,091,493
$ 9,447,544
112.9%
100.0%
22
I a
23
Proposed
Personnel
Strategic Initiative Request / Justification
Funding Source
Salary / Benefits
Non - Personnel
Notes
Yakima Transit Marketing
Transit Operating
$100,000
Budgeted
ED
Purchase & Install 25 Passenger Counters
Transit Operating
$50,000
Budgeted
ED
Upgrade Cameras - Yakima Transit Center
Transit Operating
$40,000
Budgeted
ED
23
a
TRANSIT FIXED ROUTE
24
- Actual - -
2013 2014 2015
- Budget --
2016 2017
Amended Proposed
Ridership
1,270,755
1,145,712
1,096,221
1,052,610
1,098,181
Service Days
356
356
356
356
356
Vehicle Service Mileage
7291282
690,783
693,944
743,075
744,656
Vehicle Service Hours
53,550
49,480
49,571
52,052
50,368
Operating Expenses
$4,908,835
$4,899,728
$4,856,591
$4,785,524
$5,365,240
Fare Box Revenues (passes, tickets, & cash)
$639,501
$711,254
$595,671
$ 625,130
$ 684,950
Fare Box Return Ratio
0.13
0.15
0.12
0.13
0.13
Revenue / Passenger
0.50
0.62
0.54
0.59
0.62
Revenue / Mile
0.88
1.03
0.86
0.84
0.92
Revenue/ Hour
11.94
14.37
12.02
12.01
13.60
Passenger / Mile
1.74
1.66
1.58
1.42
1.47
Passenger / Hour
23.73
23.16
22.11
20.22
21.80
Operating Cost / Passenger (2)
3.86
4.28
4.43
4.55
4.89
Operating Cost / Mile (2)
6.73
7.09
7.00
6.44
7.20
Operating Cost / Hour (2)
91.67
99.02
97.97
91.94
106.52
24
a
TRANSIT DIAL -A -RIDE
25
- Actual - -
2013 2014 2015
- Budget --
2016 2017
Amended Proposed
Ridership
74,697
68,905
70,080
76,455
71,813
Service Days
356
356
356
356
356
Vehicle Service Mileage
400,765
368,747
368,608
366,599
367,440
Vehicle Service Hours
36,346
28,948
32,211
32,214
31,124
Operating Expenses
$1,067,515
$985,498
$1,050,507
$1,226,348
$1,821,179
Fare Box Revenues (passes, tickets, & cash)
$118,499
$125,862
$118,000
$140,000
$ 140,000
Fare Box Return Ratio
0.11
0.13
0.11
0.11
0.08
Revenue / Passenger
1.59
1.83
1.68
1.83
1.95
Revenue / Mile
0.30
0.34
0.32
0.38
0.38
Revenue/ Hour
3.26
4.35
3.66
4.35
4.50
Passenger / Mile
0.19
0.19
0.19
0.21
0.20
Passenger / Hour
2.06
2.38
2.18
2.37
2.31
Operating Cost / Passenger (2)
14.29
14.30
14.99
16.04
25.36
Operating Cost / Mile (2)
2.66
2.67
2.85
3.35
4.96
Operating Cost / Hour (2)
29.37
34.04
32.61
38.07
58.51
25
a
TRANSIT VANPOOL
26
- Actual
2013 2014 2015
- Budget
2016 2017
Amended Proposed
Ridership
73,817
67,142
65,659
47,693
60,165
Service Days
262
262
262
262
263
Vehicle Service Mileage
503,001
393,946
359,949
272,461
273,113
Vehicle Service Hours
11,120
8,701
7,896
6,080
7,559
Operating Expenses
$255,508
$160,055
$173,541
$128,673
$ 167,673
Fare Box Revenues (passes, tickets, & cash)
$255,610
$238,266
$209,074
$180,000
$ 170,000
Fare Box Return Ratio
1.00
1.49
1.20
1.40
1.01
Revenue / Passenger
3.46
3.55
3.18
3.77
2.83
Revenue / Mile
0.51
0.60
0.58
0.66
0.62
Revenue / Hour
22.99
27.38
26.48
29.61
22.49
Passenger / Mile
0.15
0.17
0.18
0.18
0.22
Passenger / Hour
6.64
7.72
8.32
7.84
7.96
Operating Cost / Passenger (2)
3.46
2.38
2.64
2.70
2.79
Operating Cost / Mile (2)
0.51
0.41
0.48
0.47
0.61
Operating Cost / Hour (2)
22.98
18.40
21.98
21.16
22.18
26
27
a
TRANSIT COMMUTER (3)
(1) Fare Box Return Ratio is calculated by dividing the fare box revenue by operating expenses.
(2) Program costs are based on an unallocated cost for each program
(3) 2013 service was operated by HopeSource. Commuter data only includes services provided by the City of Yakima under contract to
Central Washington Airporter which started mid -year 2014.
- Actual - -
2013 2014 2015
- Budget --
2016 2017
Amended Proposed
Ridership
38,644
28,385
25,274
29,512
Service Days
253
253
252
356
Vehicle Service Mileage
155,079
143,436
144,756
145,123
Vehicle Service Hours
5,089
4,795
4,790
4,891
Operating Expenses
$279,158
$488,920
$479,206
$ 479,496
Fare Box Revenues (passes, tickets, & cash)
$59,042
$140,695
$143,333
$ 119,243
Fare Box Return Ratio
0.21
0.29
0.30
0.25
Revenue / Passenger
1.53
4.96
5.67
4.04
Revenue / Mile
0.38
0.98
0.99
0.82
Revenue/ Hour
11.60
29.34
29.92
24.38
Passenger / Mile
0.25
0.20
0.17
0.20
Passenger / Hour
7.59
5.92
5.28
6.03
Operating Cost / Passenger (2)
7.22
17.22
18.96
16.25
Operating Cost / Mile (2)
1.80
3.41
3.31
3.30
Operating Cost / Hour (2)
54.86
101.96
100.04
98.03
(1) Fare Box Return Ratio is calculated by dividing the fare box revenue by operating expenses.
(2) Program costs are based on an unallocated cost for each program
(3) 2013 service was operated by HopeSource. Commuter data only includes services provided by the City of Yakima under contract to
Central Washington Airporter which started mid -year 2014.
w•
Transit Capital - Budget Overview
This fund is established for the purpose of budgeting Transit's capital improvements and procurements.
Dept 464 Transit Capital Rsv
(1)
(2)
(3)
(4)
(5)
88.9%
146.3%
2016
2016
2016
2017
69.0%
2015
Amended
Actual
Estimated
Projected
Exp Summary By Service Unit
Actual
Budget
09/30/16
Year -End
Budget
451 Transit Capital
$ 54,217
$ 3,610,336
$1,451,995
$1,680,420
$ 2,009,675
467 Dial -a -Ride Capital
-
723,869
679,335
594,000
-
Total Expenditures
54,217
4,334,205
2,131,330
2,274,420
2,009,675
Actual
Budget
09/30/16
Year -End
Budget
Rev Summary By Type
Total
36,390
-
-
-
310 Taxes
2,100,000
1,250,000
-
1,250,000
1,000,000
330 Intergov't Revenue
43,468
2,400,000
800,000
800,000
1,600,000
340 Chrgs f /Goods & Svcs
-
147,875
-
53,625
-
360 Miscellaneous Revenues
24,344
27,000
13,950
16,400
24,000
370 Prop & Trust Gains
31,465
-
-
-
-
390 Other Financing Sources
7,730
25,000
428,593
390,371
32,000
Total Revenues
2,207,007
3,849,875
1,242,543
2,510,396
2,656,000
Fund Balance
Beginning Balance
Revenues Less Expenditures
Ending Balance
Exp Summary By Type
500 Intergovernmental Svcs
600 Capital Outlay
Total Expenditures
(6) (7)
% Chng % Chng
fr om fr om
2 to 5 4 to 5
55.7% 100.0%
0.0% 0.0%
46.4% 88.4%
80.0%
80.0%
66.7%
200.0%
0.0%
0.0%
88.9%
146.3%
n/a
n/a
128.0%
8.2%
69.0%
105.8%
2,312,083
4,464,872
4,464,872
4,464,872
4,700,848
105.3%
105.3%
2,152,789
(484,330)
(888,787)
235,976
646,325
133.4%
273.9%
$ 4,464,872
$ 3,980,542
$ 3,576,085
$ 4,700,848
$ 5,347,173
134.3%
113.7%
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
%
2015
Amended
Actual
Estimated
Projected
fr om
of
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
Total
36,390
-
-
-
-
n/a
0.0%
17,827
4,334,205
2,131,330
2,274,420
2,009,675
46.4%
100.0%
$ 54,217 $ 4,334,205 $ 2,131,330 $ 2,274,420 $ 2,009,675 46.4% 100.0%
Transit Capital - Strategic Initiative Summarl
Strategic Initiative
Proposed
Personnel
Request / Justification
Funding Source
Salary / Benefits
Non - Personnel
Notes
Replace 3 Administrative Vehicles
Transit Capital
$100,000
Budgeted
ED
Purchase & Install 10 Solar Shelters
Transit Capital
$130,000
Budgeted
ED
Transit ADA Sidewalk Improvements
Transit Capital
100,000
Budgeted
ED
Transit Buses (2016 Strategic
Transit Capital
$1,885,000
Budgeted
Initiative)
ED
29
+� iii
AW• • . . •
AW
•
A •' ��
00 r
Awl
AW
. r
• r
i
Council Budget Review
Utilities &Engineering
UTILITIES & ENGINEERING
2017 Budgeted Staffing Levels
D. BROWN
Water /Irrigation
Manager
WATERARRIGATION
DIVISION
37.00 Positions
Fire Suppression
Operation, Maintenance
and Administration
Water Supply, Treatment
Operation and
Maintenance
Domestic Water
Distribution System,
Operation, Maintenance
and Administration
Water System
Improvements (CIP)
Irrigation System Operation
and Maintenance Irrigation
System Improvements (CIP)
2
VACANT
Utilities & Engineering Director
117.20 Positions
ENGINEERING
DIVISION
8.00 Positions
Prepare Contract Plans,
Specifications and
Estimates for
Municipal Projects
Contract Administration
Inspection and Testing
for Municipal Projects
Preparation and
Administration
of State and Federal Grant
Applications
Right -of- Way - Acquisition
LID Administration
M. PRICE
Wastewater/ Stormwater
Manager
WASTEWATER
DIVISION
70.20 Positions
Wastewater Treatment
Wastewater
Collection System
Food Processing
Collection and Treatment
Biosolids Recycling
Industrial Pre - treatment
Program
Facilities Operation,
Maintenance and
Construction
Stormwater
Surface Drainage
( Stormwater Collection)
Aw
Utilities & Engineering
This presentation focuses on the following departments:
I
a Go's
F
Im"I M a
(1) The Water Meter Infrastructure Crew Leader replaced the Water Device Crew Leader in 2015 due to a reorganization.
(2) Waterworks Specialist I is upgraded to Waterworks Specialist II upon passing performance exam.
(3) Water funds 1.50 FTE's in Codes (022) and Engineering (041) and 1.85 FTE's are funded by Irrigation, Wastewater
and Stormwater.
2016
2017
Class
2015
Amended
Proposed
Code
Position Title
Actual
Budget
Budget
1273
Water and Irrigation Manager
1.00
1.00
1.00
7151
Water /Irrigation Division Admin Specialist
1.00
1.00
1.00
8251
Waterworks Device Technician
2.00
2.00
2.00
8252
Water Device Crew Leader (1)
1.00
0.00
0.00
8253
Water Meter Infrastructure Crew Leader(')
0.00
1.00
1.00
8331
Water Treatment Plant Operator -in- Training
1.00
1.00
1.00
8332
Water Treatment Plant Operator II
2.00
2.00
2.00
8333
Water Treatment Plant Operator III
4.00
4.00
4.00
8335
Water Quality Specialist
1.00
1.00
1.00
8681
Storekeeper
1.00
1.00
1.00
8741
Waterworks Specialist I
3.00
6.00
5.00
8742
Waterworks Specialist II (2)
6.00
3.00
4.00
8744
Water Distribution Crew Leader
3.00
3.00
3.00
8745
Waterworks Drafting /Service Rep
1.00
1.00
1.00
8751
Utilities Locator /Safety Coordinator
1.00
1.00
1.00
11105
Water /Irrigation Engineer
1.00
1.00
1.00
13501
Water Distribution Supervisor
1.00
1.00
1.00
15201
Water Treatment Plant Supervisor
1.00
1.00
1.00
Total Personnel (4)
31.00
31.00
31.00
(1) The Water Meter Infrastructure Crew Leader replaced the Water Device Crew Leader in 2015 due to a reorganization.
(2) Waterworks Specialist I is upgraded to Waterworks Specialist II upon passing performance exam.
(3) Water funds 1.50 FTE's in Codes (022) and Engineering (041) and 1.85 FTE's are funded by Irrigation, Wastewater
and Stormwater.
=A4 a a
Dept 474 Water Operating
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
% Chng
2015
Amended
Actual
Estimated
Projected
from
from
Exp Summary By Service Unit
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
4 to 5
764 Water Distribution
$ 2,425,165
$ 2,512,877
$ 1,811,090
$ 2,522,119
$ 2,593,872
103.2%
102.8%
765 Potable Water Supply
1,673,214
1,870,539
1,297,892
1,957,866
2,016,267
107.8%
103.0%
771 Capital Administration
105,836
123,698
77,530
118,158
119,746
96.8%
101.3%
772 Potable Water Admin
4,317,540
4,034,238
2,699,827
4,393,514
4,512,779
111.9%
102.7%
Debt Service
863,426
832,505
818,732
827,983
823,174
98.9%
99.4%
Total Expenditures
9,385,180
9,373,857
6,705,071
9,819,639
10,065,838
107.4%
102.5%
Rev Summary By Type
340 Chrgs f /Goods & Svcs
8,824,977
8,615,000
6,473,588
8,850,000
8,882,000
103.1%
100.4%
350 Fines & Forfeits
63,112
-
20,092
25,000
25,000
n/a
100.0%
360 Miscellaneous Revenues
26,755
72,000
55,271
77,000
49,000
68.1%
63.6%
370 Prop /Trust Gains & Other
280,145
129,000
198,169
200,500
129,000
100.0%
64.3%
Transfers In
9,103
-
-
-
-
n/a
n/a
Total Revenues
9,204,092
8,816,000
6,747,120
9,152,500
9,085,000
103.1%
99.3%
Fund Balance
Beginning Balance
3,311,468
3,130,380
3,130,380
3,130,380
2,463,241
78.7%
78.7%
Revenues Less Expenditures
(181,088)
(557,857)
42,049
(667,139)
(980,838)
175.8%
147.0%
Ending Balance
$ 3,130,380
$ 2,572,523
$ 3,172,429
$ 2,463,241
$ 1,482,402
57.6%
60.2%
0
Water Operating Budget
Overview
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
%
2015
Amended
Actual
Estimated
Projected
from
of
Exp Summary By Type
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
Total
100 Salaries & Wages
$ 1,777,950 $
1,984,226
$ 1,399,058
$ 1,959,254
$ 2,033,594
102.5%
20.2%
200 Benefits
690,231
758,987
550,110
773,839
829,085
109.2%
8.2%
Sub -Total Salaries & Benefits
2,468,181
2,743,213
1,949,169
2,733,093
2,862,679
104.4%
28.4%
300 Operating Supplies
609,048
513,500
357,170
523,000
505,000
98.3%
5.0%
400 Professional Svcs & Chgs
4,253,847
3,920,979
2,823,705
4,368,343
4,508,165
115.0%
44.8%
500 Intergovernmental Svcs
-
32,939
-
33,000
33,000
100.2%
0.3%
600 Capital Outlay
-
170,000
159,624
173,500
177,000
104.1%
1.8%
700 Debt Service Principal
741,844
741,845
741,844
751,095
751,095
101.2%
7.5%
800 Debt Service Int /Other
121,581
90,660
76,887
76,888
72,079
79.5%
0.7%
Transfers Out
1,190,679
1,160,721
596,671
1,160,721
1,156,821
99.7%
11.5%
Total Expenditures
$ 9,385,180 $
9,373,857
$ 6,705,071
$ 9,819,639
$10,065,838
107.4%
100.0%
fjt
Strategic Initiative
Request / Justification
Proposed
Funding Source
Personnel
Salary /Benefits
Non - Personnel
Notes
Water Rate Increase
Water Customers
2017 Revenue
Unbudgeted
Program
$740,000
PS
2017 Water RTS 8.5%
2018 Water RTS 8.5%
-------------------------------
Water Rate Increase - Alternate
--------- - - - - --
Water Customers
-------- - - - - --
--------- - - - - --
2017 Revenue
--- - - - - --
Budgeted
Program
$434,750
PS
2017 Water RTS 5.0%
2018 Water RTS 4.7%
Economic Study — Yakima Basin
Water Operating
70% $3,963
Unbudgeted
Integrated Plan
Irrigation Operating
30% 1,698
PA
$5,661
Water Operating - Performance Statistics
Fire Suppression Administration
2015
Actual
2016
Prelim
2017
Proposed
Budget
Fire Hydrants Painted
279
1291
300
City Fire Hydrants Tested
628
565
650
Fire Hydrants Repaired
40
11
20
Fire Hydrants Replaced
15
15
25
New Fire Hydrants Installed
28
19
25
Potable Water Distribution
Water Meters in Place
18,750
18,780
18,800
New Water Services Installed
47
52
75
New Fire Services Installed
5
7
15
Water Service Meter Sets Replaced
160
119
150
Number of Water Meters Replaced
362
54
60
Number of Water Main Breaks
3
2
5
Potable Water Supply
Millions of Gallons of Water Produced
3,981
3,900
3,850
Number of Water Quality Complaints
6
10
8
Percent of Water Meeting Disinfection Requirement
100%
100%
100%
Percent of Water Below Maximum Contaminate Levels
100%
100%
100%
Percent of Water Meeting Treatment Optimization Performance Goal(')
100%
100%
100%
(1) Treatment Optimization Performance Goal. The Washington State Regulations require the Water Treatment Plant
effluent to be at or below 0.3 Nephelometric Turbidity Units in 95% of the samples. The Water Treatment Plant has
adopted the Treatment Optimization Performance Goal of keeping the Water Treatment Plant effluent at or below 0.1
9 Nephelometric Turbidity Units in 95% of the samples.
Water Capital - Budget Overview
This fund accounts for all the capital projects related
to drinking 2 S including
surface
water and
groundwater, water treatment the Naches River 2 2
the
wells,
water
transmission and
water S stations, water
storage at the reservoirs, fire suppression S 2 S and control
systems.
Dept 477 Water Capital (1)
(2) (3)
(4)
(5)
(6)
(7)
2016 2016
2016
2017
% Chng
% Chng
2015
Amended Actual
Estimated
Projected
from
from
Exp Summary By Service Unit Actual
Budget 09/30/16
Year -End
Budget
2 to 5
4 to 5
773 Capital Improvement $ 467,972
$ 2,257,738 $ 192,456
$ 506,000
$1,444,000
64.0%
285.4%
Rev Summary By Type
370 Prop & Trust Gains -
- -
50,200
-
n/a
0.0%
390 Other Financing Sources 408,181
250,000 -
250,000
-
0.0%
0.0%
Transfers In 750,000
750,000 375,000
750,000
750,000
100.0%
100.0%
Total Revenues 1,158,181
1,000,000 375,000
1,050,200
750,000
75.0%
71.4%
Fund Balance
Beginning Balance 3,320,734
4,010,943 4,010,943
4,010,943
4,555,143
113.6%
113.6%
Revenues Less Expenditures 690,209
(1,257,738) 182,544
544,200
(694,000)
55.2%
127.5%
Ending Balance $ 4,010,943
$ 2,753,205 $ 4,193,487
$ 4,555,143
$ 3,861,143
140.2%
84.8%
(1)
(2) (3)
(4)
(5)
(6)
(7)
2016 2016
2016
2017
% Chng
%
2015
Amended Actual
Estimated
Projected
from
of
Exp Summary By Type Actual
Budget 09/30/16
Year -End
Budget
2 to 5
t
Total ?
600 Capital Outlay $ 467,972
$ 2,257,738 $ 192,456
$ 506,000
$1,444,000
64.0%
100.0% =j
10
Water Capital- Strategic Initiative Summary
Strategic Initiative Request / Justification
Proposed
Funding Source
Personnel
Salary / Benefits
Non - Personnel
Notes
Water Capital
Budgeted
Modification River WTP Intake (AC2335)
700,000
PS
Water Main Repl. — Viola & I -82 (AC2262)
Water Capital
400,000
Water Main Replacement (AC2416)
125,000
Low Water Use Demo Gardens (AC3441)
74,000
Replace Meters /Actuators
40,000
Leak Detection
35,000
Water System Plan Update (AC2394)
30,000
Sludge Drying Analysis
25,000
Automated Meter Reading (2261)
15,000
Total
$1,444,000
11
low
12
(1) Irrigation Specialist I is an entry level position; upon certification there's an automatic upgrade to Irrigation Specialist II.
(2) Irrigation funds 1.54 FTE's in Codes (022), Engineering (041) and Water (474).
13
2016
2017
Class
2015
Amended
Proposed
Code
Position Title
Actual
Budget
Budget
8671
Irrigation Specialist I
2.00
2.00
2.00
8672
Irrigation Specialist 11
2.00
2.00
2.00
8673
Irrigation Crew Leader
2.00
2.00
2.00
13401
Irrigation Supervisor
1.00
1.00
1.00
Total Personnel (2)
7.00
7.00
7.00
(1) Irrigation Specialist I is an entry level position; upon certification there's an automatic upgrade to Irrigation Specialist II.
(2) Irrigation funds 1.54 FTE's in Codes (022), Engineering (041) and Water (474).
13
MA I
Igs
LM HE me a, RJ w:
Dept 475 Irrigation Operating
Exp Summary By Service Unit
782 Operations & Maintenance
(1) (2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
% Chng
2015 Amended
Actual
Estimated
Projected
from
from
Actual Budget
09/30/16
Year -End
Budget
2 to 5
4 to 5
$1,802,284 $1,802,149 $1,303,824 $1,828,709 $1,737,460 96.4% 95.0%
Rev Summary By Type
(2)
(3)
(4)
2016
2016
2016
340 Chrgs f /Goods & Svcs
1,861,439
1,803,040
1,434,558
1,803,000
1,803,000
100.0%
100.0%
360 Miscellaneous Revenues
8,482
500
31,342
500
500
100.0%
100.0%
Total Revenues
1,869,921
1,803,540
1,465,899
1,803,500
1,803,500
100.0%
100.0%
805,116
821,395
697,455
Fund Balance
240,000
177,000
15,000
200,000
Beginning Balance
829,790
897,427
897,427
897,427
872,218
97.2%
97.2%
Revenues Less Expenditures
67,637
1,391
162,075
(25,209)
66,040
4746.1%
262.0%
Ending Balance
$ 897,427
$ 898,818
$1,059,502 $
872,218
$ 938,258
104.4%
107.6%
Exp Summary By Type
100 Salaries & Wages
200 Benefits
Sub -Total Salaries & Benefits
300 Operating Supplies
400 Professional Svcs & Chgs
600 Capital Outlay
Transfers Out
Total Expenditures
(1)
(2)
(3)
(4)
2016
2016
2016
2015
Amended
Actual
Estimated
Actual
Budget
09/30/16
Year -End
$ 475,778
$ 514,907
$ 386,223
$ 515,812
199,270
207,347
158,207
211,694
675,048
722,254
544,430
727,506
82,120
81,500
46,938
80,000
805,116
821,395
697,455
821,204
240,000
177,000
15,000
200,000
(5)
2017
Projected
Budget
$ 530,106
226,415
756,521
81,500
866,439
3,000
30,000
$1,802,284 $1,802,149 $1,303,824 $1,828,709 $1,737,460
(6)
% Chng
from
2to5
103.0%
109.2%
104.7%
100.0%
105.5%
n/a
16.9%
96.4%
(7)
of
Total
30.5%
13.0%
43.5%
4.7%
49.9%
0.2%
1.7%
100.0%
III III � III 11111�� Ijillj� I Imin
I,
IfflTIP minui ill
Irrigation Supply
2015
Actual
2016
Prelim
2017
Proposed
Budget
Feet of Irrigation Main Replaced by Irrigation Crew
230
0
100
Number of Irrigation Services Replaced
309
230
150
Number of Irrigation Main Leaks
44
23
30
Number of Service Work Orders
687
900
800
15
The Irrigation Improvement Fund accounts for all the capital project expenditures related to
® water supply, distribution and transmission, storage, pumping stations and control
systems.
[Elm
Irrigation Capital - Budget Overview
Dept 479 Irrigation Capital
Exp Summary By Service Unit
783 Capital Improvement
(1) (2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
% Chng
2015 Amended
Actual
Estimated
Projected
from
from
Actual Budget
42643
Year -End
Budget
2 to 5
4 to 5
$ 939,442 $1,367,542 $ 283,322 $ 840,284 $ 8,367,542 611.9% 995.8%
Rev Summary By Type
340 Chrgs f /Goods & Svcs
1,216,869
1,240,000
944,521
1,217,000
1,217,000
98.1%
100.0%
360 Miscellaneous Revenues
9
60
1
60
60
100.0%
100.0%
390 Other Financing Sources
-
-
-
-
6,000,000
n/a
n/a
Transfers In
210,000
147,000
-
170,000
-
0.0%
0.0%
Total Revenues
1,426,877
1,387,060
944,521
1,387,060
7,217,060
520.3%
520.3%
Fund Balance
Beginning Balance
1,015,742
1,503,177
1,503,177
1,503,177
2,049,953
136.4%
136.4%
Revenues Less Expenditures
487,435
19,518
661,199
546,776
(1,150,482)
n/a
210.4%
Ending Balance
$1,503,177
$1,522,695
$ 2,164,376
$ 2,049,953
$ 899,471
59.1%
43.9%
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
%
2015
Amended
Actual
Estimated
Projected
from
of
Exp Summary By Type
Actual
Budget
42643
Year -End
Budget
2 to 5
Total
600 Capital Outlay
$ 621,700
$1,050,000
$ 124,452
$ 522,742
$ 8,050,000
766.7%
96.2%
Transfers Out
317,742
317,542
158,870
317,542
317,542
100.0%
3.8%
Total Expenditures
$ 939,442
$1,367,542
$ 283,322
$ 840,284
$ 8,367,542
611.9%
100.0%
17
Strategic Initiative
Proposed
Personnel
Request /Justification
Funding Source
Salary / Benefits
Non - Personnel
Notes
Irrigation Capital
Irrigation Capital
Budgeted
Irrigation System - Nelson Dam (2010)
$6.OM Revenue
$8,000,000
PS
Bond
In
Wastewater Operating
This division improves, operates and maintains the built environment for collection and treatment of
domestic and industrial wastewater facilities. These facilities protect the environment and public health
in compliance with federal, state and local regulatory requirements.
was conducted by FCS Group in 2014.
19
Wastewater
Operating - Authorized
Personnel
2016
2017
Class
2015
Amended
Proposed
Code
Position Title
Actual
Budget
Budget
1272
Wastewater Manager
1.00
1.00
1.00
4240
Instrument Technician
1.00
1.00
1.00
4250
WWTP SCADA /Telemetry Maint Tech
0.00
1.00
1.00
4260
WWTP Lead Maintenance Tech (2)
0.00
1.00
1.00
7123
Department Assistant III
0.50
0.50
0.50
8241
Industrial Maintenance Mechanic
4.00
3.00
3.00
8242
Preventive Maintenance Technician
1.00
1.00
1.00
8311
WWTP Operator I (3)
1.00
1.00
1.00
8312
WWTP Operator II (3)
7.00
7.00
7.00
8313
WWTP Operator III (3)
7.00
7.00
7.00
8321
Laboratory Technician
2.70
2.70
2.70
8322
Pretreatment Technician
3.00
3.00
3.00
8323
Pretreatment Crew Leader (4)
2.00
2.00
3.00
8324
Environmental Compliance Specialist
1.00
1.00
1.00
8326
Laboratory Chemist()
0.00
1.00
1.00
8542
Facility Maintenance Specialist (6)
1.00
2.00
2.00
8731
Wastewater Maintenance Specialist I (3)
3.00
1.00
1.00
8732
Wastewater Maintenance Specialist 1I (3)
11.00
12.00
12.00
8733
Wastewater Maintenance Crew Leader
9.00
9.00
9.00 ''
t
20
fjt
' y}
Wastewater Operating - Authorized Personnel
21
Class
Code Position Title
11102
Utility Engineer
11106
Surface Water Engineer
11108
Utility Project Manger
11615
Administrative Assistant for Wastewater
12201
Industrial Maintenance Supervisor
13201
Wastewater Maintenance Supervisor (7)
15102
WWTP Process Control Supervisor
15103
WWTP Chief Operator (1)
15104
Pretreatment Supervisor
15105
Wastewater Operations Superintendent
15301
Lab Coordinator
Total Budgeted
Personnel (9)
(1) An Industrial Maintenance Mechanic was changed to a WWTP SCADA/Telemetry Maintenance Technician mid -year 2015.
(2) A WWTP Lead Maintenance Tech was Added Mid -year 2015.
(3) WWTP Operator and Wastewater Maintenance Specialist positions vary due to the capability to be promoted during
the fiscal year to the next step.
(4) The addition of one Pretreatment Crew Leader is budgeted for 2017.
(5) The Laboratory Chemist position was reestablished mid -year 2015.
(6) A Facility Support Worker position was converted from temporary to a permanent Facility Maintenance Specialist
position at the end of 2015.
(7) The Wastewater Maintenance Supervisor position was deleted in 2015. The position is re- established in 2017.
(8) Elimination of one WWTP Chief Operator Position is proposed for 2017.
(9) Wastewater funds 1.05 FTE in Codes (022), 1.22 FTE's in Engineering (041) and .40 FTE in Water (474). 11.85 FTE's
are funded by Stormwater.
2016
2017
2015
Amended
Proposed
Actual
Budget
Budget
2.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
1.00
1.00
1.00
1.00
4.00
4.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
70.20
70.20
72.20
(1) An Industrial Maintenance Mechanic was changed to a WWTP SCADA/Telemetry Maintenance Technician mid -year 2015.
(2) A WWTP Lead Maintenance Tech was Added Mid -year 2015.
(3) WWTP Operator and Wastewater Maintenance Specialist positions vary due to the capability to be promoted during
the fiscal year to the next step.
(4) The addition of one Pretreatment Crew Leader is budgeted for 2017.
(5) The Laboratory Chemist position was reestablished mid -year 2015.
(6) A Facility Support Worker position was converted from temporary to a permanent Facility Maintenance Specialist
position at the end of 2015.
(7) The Wastewater Maintenance Supervisor position was deleted in 2015. The position is re- established in 2017.
(8) Elimination of one WWTP Chief Operator Position is proposed for 2017.
(9) Wastewater funds 1.05 FTE in Codes (022), 1.22 FTE's in Engineering (041) and .40 FTE in Water (474). 11.85 FTE's
are funded by Stormwater.
Wastewater Operating - Budget Overview
Dept 473 Wastewater Operating
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
% Chng
2015
Amended
Actual
Estimated
Projected
from
from
Exp Summary By Service Unit
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
4 to 5
726 Wastewater Collection
$ 7,374,526
$ 7,852,103
$ 5,005,811
$ 7,688,165
$ 8,131,804
102.9%
102.8%
729 Rudkin Road Lift Station
135,715
339,627
119,828
340,083
349,485
102.9%
102.8%
731 WW Treatment Operations
5,606,248
6,914,453
3,946,502
6,328,174
7,137,707
103.2%
112.8%
732 WW Treatment Equipment
51,598
250,000
-
250,000
250,000
100.0%
100.0%
734 WW Pre - Treatment
846,795
987,103
651,880
947,328
1,021,988
103.5%
107.9%
737 WW Treatment Chrg Trans
6,896,953
5,294,413
2,797,156
5,378,861
5,678,336
107.3%
105.6%
Debt Service
977,233
902,791
763,744
794,420
790,843
87.6%
99.5%
Total Expenditures
21,889,068
22,540,490
13,284,920
21,727,031
23,360,163
103.6%
107.5%
Rev Summary By Type
320 Licenses & Permits
958,016
951,000
980,973
986,000
1,125,600
118.4%
114.2%
340 Chrgs f /Goods & Services
20,060,019
20,226,986
14,590,313
20,833,986
21,303,551
105.3%
102.3%
360 Miscellaneous Revenues
16,458
13,700
466
13,700
13,700
100.0%
100.0%
370 Prop & Trust Gains
1,625,570
878,177
627,881
878,177
878,177
100.0%
100.0%
390 Other Financing Sources
-
-
5,924
-
-
#DIV /0!
#DIV /0!
Transfers In
43,512
32,621
32,621
32,621
32,621
100.0%
100.0%
Total Revenues
22,703,574
22,102,484
16,238,177
22,744,484
23,353,649
105.7%
102.7%
Fund Balance
Beginning Balance
3,494,824
4,309,330
4,309,330
4,309,330
5,326,784
123.6%
123.6%
Revenues Less Expenditures
814,506
(438,006)
2,953,257
1,017,454
(6,514)
1.5%
0.6%
Ending Balance
$ 4,309,330
$ 3,871,324
$ 7,262,587
$ 5,326,784
$ 5,320,270
137.4%
99.9%
22
Wastewater Operating - Budget Overview
Exp Summary By Type
100 Salaries & Wages
200 Personnel Benefits
Sub -Total Salaries & Benefits
300 Supplies
400 Other Services /Charges
600 Capital Outlays
700 Debt Service Principal
800 Debt Service Int /Other
Transfers Out
Total Expenditures
23
(1)
(2)
(3)
(4)
(5)
of
2016
2016
2016
2017
2015
Amended
Actual
Estimated
Projected
Actual
Budget
09/30/16
Year -End
Budget
$ 3,192,405
$ 4,034,768
$ 2,393,585
$ 3,474,982
$ 4,155,199
1,334,554
1,543,635
920,011
1,534,475
1,716,111
4,526,959
5,578,403
3,313,596
5,009,458
5,871,310
807,602
990,300
594,062
976,300
960,300
8,364,007
9,191,102
5,715,549
9,004,511
9,475,894
117,833
385,000
1,574
365,000
385,000
909,028
793,222
707,363
719,522
720,640
68,206
109,569
56,380
74,898
70,203
7,095,434
5,492,894
2,896,397
5,577,342
5,876,817
$ 21,889,068 $ 22,540,490 $ 13,284,920 $ 21,727,031 $ 23,360,163
(6)
(7)
% Chng
%
from
of
2 to 5
Total
103.0%
17.8%
111.2%
7.3%
105.3%
25.1%
97.0%
4.1%
103.1%
40.6%
100.0%
1.6%
90.8%
3.1%
64.1%
0.3%
107.0%
25.2%
103.6%
100.0%
Wastewater Operating -
Strategic
Initiative Summary
Personnel
Proposed
Strategic Initiative Request / Justification
Funding Source
Salary / Benefits
Non - Personnel
Notes
Wastewater Rate Increase
Wastewater /
2017 Revenue -
Unbudgeted
Program 2017 2018 -2021
Stormwater
Wastewater
PS
Stormwater 63% 2.5% annually
Customers
$577,000
WW Retail 3% 3.0% annually
Stormwater
WW BOD 16% 2.4% annually
$1,357,000
WW TSS 7% 2.4% annually
WW FOG 35% 2.4% annually
2017
Ind Waste /UASB $7.84 plus 60% RTS
plus 60% RVR plus
100% SWC
2017 -2019 2020 -2021
WW Pretreat 18% 4.5% annually
24
fjt
' y}
Wastewater Operating
Strategic
Initiative Summary
Personnel
Proposed
Strategic Initiative Request / Justification
Funding Source
Salary / Benefits
Non - Personnel
Notes
Wastewater Rate Increase - Alternative
Wastewater /
2017 Revenue -
Budgeted
Program 2017 2018 -2021
Stormwater
Wastewater
PS
Stormwater 27% Variable
Customers
$324,000
WW Retail 1.5% Variable
Stormwater
WW BOD 16% 2.4% annually
$580,500
WW TSS 7% 2.4% annually
WW FOG 35% 2.4% annually
2017
Ind Waste /UASB $7.84 plus 60% RTS
plus 60% RVR plus
100% SWC
2017 -2019 2020 -2021
WW Pretreat 18% 4.5% annually
$85,000
Budgeted
Add one Pretreatment Crew Leader Position
Wastewater
Operating
PS
25
+. 1
Wastewater Treatment
2015
Actual
2016
Prelim
2017
Proposed
Budget
Billion Gallons/Yr. Treated
3.37
3.60
3.65
Laboratory Tests /Month
1,720
1,750
1,750
Permitted Hydraulic Capacity (MG, average day peak month)
21.5
21.5
21.5
Average Day Peak Month
10.08
11.00
11.20
Percent of Permit Capacity
47
51
52
Peak Day
12.4
12.9
13.2
Pounds of Organic Pollutants Treated (BOD)
9,978,934
10,000,000
10,500,000
Permitted BOD Loading (Average Day /Max. Month)
53,400
53,400
53,400
Actual Load Average Day /Max. Month
33,594
34,200
34,200
Percent of Permit Capacity
63
64
64
Pounds of Total Suspended Solids (TSS)
7,458,106
7,500,000
7,600,000
Permitted Suspended Solids Loading (Avg Day /Max Month)
38,600
38,600
38,600
Actual Load Average Day /Max. Month
20,919
21,230
21,230
Percent of Permit Capacity
54
55
55
Biosolids (Dry Tons)
1,574
1,580
1,585
Treatment Costs
1 5,606,248
1 6,914,453
1 7,137,707
Total Facility Debt Service & Cash Contribution for Capital
1,410,669
1 2,570,000
1 5,040,000
Rudkin Road Pump Station
2015
Actual
2016
Prelim
2017
Proposed
Budget
Million Gallons/Yr. Pumped
620
635
640
Yakima
396
403
406
Union Gap
224
232
233
Total Million Gallons/Yr. Pumped
620
635
640
Pumping Costs
135,715
169,104
349,485
Cost Per Million Gallons Pumped
219
266
546
Capital Projects
Flow Treated (mg)
3,370
3,400
3,450
Cost Per Million Gallons Treated
2,082
2,790
3,530
27
M
Wastewater Capita-'I
Fund 472 - This fund is used for expenditures that are required for the purpose of moderate level
replacement, capital repair or capital improvements to the Wastewater Treatment Facility. 0
Fund 478 - The Yakima Wastewater Facilities Project Fund directs funds to provide payments for
costs associated with the planning, installation, rehabilitation, expansion and modification of the
Wastewater Treatment Facility and the Rudkin Road Lift Station.
Wastewater Capital - Budget
Dept 472 WW Capital Facilities
Exp Summary By Service Unit
739 Wastewater Capital $
(1) (2)
(3)
(4)
(5)
2016
2016
2016
2017
2015 Amended
Actual
Estimated
Projected
Actual Budget
09/30/16
Year -End
Budget
83,709 $ 700,000 $ 103,325 $ 700,000 $ 800,000
(6)
(7)
% Chng
% Chng
from
from
2to5
4to5
114.3% 114.3%
Rev Summary By Type
340 Chrgs f /Goods & Svcs 72,604 84,000 61,842 84,000 84,000 100.0% 100.0%
390 Other Financing Sources 527,400 616,000 308,000 616,000 616,000 100.0% 100.0%
Total Revenues 600,004 700,000 369,842 700,000 700,000 100.0% 100.0%
Fund Balance
Beginning Balance 1,452,514 1,968,809 1,968,809 1,968,809 1,968,809 100.0% 100.0%
Revenues Less Expenditures 516,295 - 266,517 - (100,000) n/a n/a
Ending Balance $1,968,809 $1,968,809 $ 2,235,326 $1,968,809 $1,868,809 94.9% 94.9%
(1) (2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
%
2015 Amended
Actual
Estimated
Projected
from
of
Exp Summary By Type Actual Budget
09/30/16
Year -End
Budget
2 to 5
Total
400 Professional Svcs & Chgs $ 83,709 $ 700,000 $ 103,325 $ 700,000 $ 800,000 114.3% 100.0%
29
Wastewater Capital - Budget
Dept 476 WW Capital Constr
Exp Summary By Service Unit
738 Capital Improvement $
Rev Summary By Type
Transfers In
(1) (2)
(3)
(4)
(5)
2016
2016
2016
2017
2015 Amended
Actual
Estimated
Projected
Actual Budget
09/30/16
Year -End
Budget
81,809 $ 5,710,000 $ 353,899 $ 960,000 $ 8,910,000
(6)
(7)
% Chng
% Chng
from
from
2to5
4to5
156.0% 928.1%
800,000 500,000 400,000 500,000 2,900,000 580.0% 580.0%
Fund Balance
Beginning Balance 6,156,576 6,874,767 6,874,767 6,874,767 6,414,767 93.3% 93.3%
Revenues Less Expenditures 718,191 (5,210,000) 46,101 (460,000) (6,010,000) 115.4% 1306.5%
Ending Balance $ 6,874,767 $1,664,767 $ 6,920,868 $ 6,414,767 $ 404,767 24.3% 6.3%
Exp Summary By Type
400 Professional Svcs & Chgs
600 Capital Outlay
Total Expenditures
M1
(1)
(2)
(3)
(4)
(5)
of
2016
2016
2016
2017
2015
Amended
Actual
Estimated
Projected
Actual
Budget
09/30/16
Year -End
Budget
$ 822
$ 10,000
$ 37,075
$ 10,000
$ 10,000
QC) aQQ
F Inn nnn
21 ti Q I F,
aFn nnn
Q ann nnn
61,bul) �) �),/IU,000 �) :il�):i,b" �) VbU,000 �)b ")IU,000
(6)
(7)
% Chng
%
from
of
2 to 5
Total
100.0%
0.1%
156.1%
99.9%
156.0%
100.0%
Wastewater Capita
Budge Uverview
Dept 478 WW Fac Cap Proj
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
% Chng
2015
Amended
Actual
Estimated
Projected
from
from
Exp Summary By Service Unit
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
4 to 5
739 Capital Improvement
$ 320,669
$ 1,380,000
$ 7,786
$ -
$ 3,750,000
271.7%
n/a
Rev Summary By Type
370 Prop /Trust Gains & Other
616,600
-
18,770
18,770
-
n/a
0.0%
390 Other Financing Sources
166,113
-
-
-
-
n/a
n/a
Transfers In
3,881,500
2,301,500
1,000,750
2,301,500
501,500
21.8%
21.8%
Total Revenues
10,807,003
6,142,790
3,841,290
2,821,770
501,500
8.2%
17.8%
Fund Balance
Beginning Balance
(9,072,982)
1,413,353
1,413,353
1,413,353
4,235,123
299.7%
299.7%
Revenues Less Expenditures
10,486,335
4,762,790
3,833,504
2,821,770
(3,248,500)
68.2%
115.1%
Ending Balance
$ 1,413,353
$ 6,176,143
$ 5,246,857
$ 4,235,123
$ 986,624
16.0%
23.3%
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
%
2015
Amended
Actual
Estimated
Projected
from
of
Exp Summary By Type
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
Total
400 Professional Svcs & Chgs
$ -
$ 180,000
$ -
$ -
$ 400,000
222.2%
10.7%
600 Capital Outlay
320,669
1,200,000
7,786
-
3,350,000
279.2%
89.3%
Total Expenditures
$ 320,669
$ 1,380,000
$ 7,786
$ -
$3,750,000
271.7%
100.0%
31
Wastewater Capital - Strategic Initiative Summary
Strategic Initiative
Request / Justification
Proposed
Funding Source
Personnel
Salary / Benefits
Non - Personnel
Notes
Wastewater Capital
Wastewater Capital
Budgeted
Carriage Hill Lift Station
472
$200,000
PS
Replace Disinfection Lamps
472
100,000
Refurbish Sharples Centrifuge
472
75,000
Speedway Lift Station
476
$7,000,000
Prioritized Collections Maintenance
476
750,000
Collections Repair Contingency
476
500,000
Collections Building Retrofit
476
350,000
Congdon Trunk Line
476
100,000
Primary Digester Improvements
478
2,500,000
Activated Sludge Clarifier
478
750,000
Biogas Conditioning
478
300,000
Replace Variable Frequency Drives
478
200,000
Total
$12,825,000
32
IN
111111111liq
The functions of this division include the ® and obligations set forth by the City"s
Eastern Washington Phase 11 Municipal Stormwater Permit (permit) and the State mandated
Underground Injection Control (UIC) Program (WAC 173-218). The mandated responsibilities include
collecting, transporting, and treatment of surface water (stormwater) to protect the environment,
public health and welfare, and assess and comply with regulatory agency requirements such as
providing education and outreach to the community related to permit compliance.
Stormwater Operating - Authorized Personnel
City of Yakima.
w
Dept 441 Stormwater Operating
Exp Summary By Service Unit
746 Administration
Rev Summary By Type
330 Intergovernmental
340 Chrgs f /Goods & Svcs
360 Miscellaneous Revenues
Total Revenues
(1) (2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
% Chng
2015 Amended
Actual
Estimated
Projected
from
from
Actual Budget
09/30/16
Year -End
Budget
2 to 5
4 to 5
$ 2,980,262 $ 2,638,104 $1,418,583 $ 2,647,375 $ 3,010,666 114.1% 113.7%
50,000 - - - -
- 1,000 2,555 2,555 1,000 100.0% 39.1%
2,273,092 2,150,000 1,706,667 2,272,000 2,885,000 134.2% 127.0%
2,323,092 2,151,000 1,709,222 2,274,555 2,886,000 134.2% 126.9%
Fund Balance
Beginning Balance 1,351,858 694,688 694,688 694,688 321,868 n/a n/a
Revenues Less Expenditures (657,170) (487,104) 290,639 (372,820) (124,666) 25.6% 33.4%
Ending Balance $ 694,688 $ 207,584 $ 985,327 $ 321,868 $ 197,202 95.0% 61.3%
IN
M Fill
11 IN
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
%
2015
Amended
Actual
Estimated
Projected
from
of
Exp Summary By Type
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
Total
100 Salaries & Wages
$ 2,642,083
$ 2,791,728
$ 2,109,041
$ 2,769,543
$ 2,921,469
104.6%
30.9%
200 Benefits
1,245,589
1,331,027
878,218
1,374,472
1,417,988
106.5%
15.0%
Sub -Total Salaries & Benefits
3,887,672
4,122,755
2,987,259
4,144,015
4,339,457
105.3%
45.9%
300 Operating Supplies
701,393
835,000
435,048
528,478
770,050
92.2%
8.2%
400 Professional Svcs & Chgs
2,951,147
2,946,413
2,015,779
2,938,329
3,873,440
131.5%
41.0%
500 Intergovernmental Svcs
465,029
464,597
294,239
480,185
464,597
100.0%
4.9%
600 Capital Outlay
-
-
473
487
-
n/a
0.0%
Total Expenditures
$ 8,005,242
$ 8,368,765
$ 5,732,797
$ 8,091,493
$ 9,447,544
112.9%
100.0%
Stormwater 1 Strategic Initiative Summary
6tormwater rate increases are included with the Wastewater strategic initiative
Strategic Initiative Request / Justification
Proposed
Funding Source
Personnel
Salary / Benefits
Non - Personnel
Notes
Wastewater Rate Increase
Wastewater /
2017 Revenue -
Unbudgeted
Program 2017 2018 -2021
Stormwater
Wastewater
PS
Stormwater 63% 2.5% annually
Customers
$577,000
WW Retail 3% 3.0% annually
Stormwater
WW BOD 16% 2.4% annually
$1,357,000
WW TSS 7% 2.4% annually
WW FOG 35% 2.4% annually
2017
Ind Waste /UASB $7.84 plus 60% RTS
plus 60% RVR plus
100% SWC
2017 -2019 2020 -2021
WW Pretreat 18% 4.5% annually
Is
Stormwater 1 Strategic Initiative Summary
6tormwater rate increases are included with the Wastewater strategic initiative
Strategic Initiative Request / Justification
Proposed
Funding Source
Personnel
Salary / Benefits
Non - Personnel
Notes
Wastewater Rate Increase - Alternative
Wastewater /
2017 Revenue -
Budgeted
Program 2017 2018 -2021
Stormwater
Wastewater
PS
Stormwater 27% Variable
Customers
$324,000
WW Retail 1.5% Variable
Stormwater
WW BOD 16% 2.4% annually
$580,500
WW TSS 7% 2.4% annually
WW FOG 35% 2.4% annually
2017
Ind Waste /UASB $7.84 plus 60% RTS
plus 60% RVR plus
100% SWC
2017 -2019 2020 -2021
WW Pretreat 18% 4.5% annually
M
I ILI
I r
6yelymme mm�M��
40
Stormwater Capital - Budget Overview
Dept 442 Stormwater Capital
Exp Summary By Service Unit
752 Capital Improvement
(1) (2)
(3)
(4)
(5)
2016
2016
2016
2017
2015 Amended
Actual
Estimated
Projected
Actual Budget
09/30/16
Year -End
Budget
$ 158,484 $ 2,400,000 $ 29,685 $ 700,000 $ 3,900,000
(6)
(7)
% Chng
% Chng
from
from
2to5
4to5
162.5% 557.1%
Rev Summary By Type
3,044,907
3,044,907
3,044,907
330 Intergovernmental Rev
42,568
- - - - n/a
n/a
370 Prop & Trust Gains
53,938
- - - - n/a
n/a
Transfers In
1,230,000
700,000 350,000 700,000 960,000 137.1%
137.1%
Total Revenues
1,326,506
700,000 350,000 700,000 960,000 137.1%
137.1%
Fund Balance
Beginning Balance
Revenues Less Expenditures
Ending Balance
Exp Summary By Type
400 Professional Svcs & Chgs
600 Capital Outlays
Total Expenditures
1,876,885
3,044,907
3,044,907
3,044,907
3,044,907
100.0%
100.0%
1,168,022
(1,700,000)
320,315
-
(2,940,000)
172.9%
n/a
$ 3,044,907
$1,344,907
$ 3,365,222
$ 3,044,907
$ 104,907
7.8%
3.4%
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
%
2015
Amended
Actual
Estimated
Projected
from
of
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
Total
$ 158,484
$ 400,000
$ 29,685
$ 300,000
$ 450,000
112.5%
11.5%
-
2,000,000
-
400,000
3,450,000
172.5%
88.5%
$ 158,484 $ 2,400,000 $ 29,685 $ 700,000 $ 3,900,000 162.5% 100.0%
Stormwater Capital- Strategic Initiat, Summarl
Strategic Initiative Request/ Justification
Proposed
I Funding Source
Personnel
I Salary/Benefits
I Non - Personnel
Notes
Stormwater Capital
Stormwater Capital
Budgeted
North 1St Revitalization (carried forward)
$1,790,000
PS
Flood Hazard Reduction
$1,000,000
Drainage Irrigation District Integration
950,000
DID Realignment
160,000
Total
$3,900,000
41
+� iii
AW• • . . •
AW
•
A •' ��
00 r
Awl
AW
. r
• r
i
Council Budget Review
Utilities &Engineering
UTILITIES & ENGINEERING
2017 Budgeted Staffing Levels
D. BROWN
Water /Irrigation
Manager
WATERARRIGATION
DIVISION
37.00 Positions
Fire Suppression
Operation, Maintenance
and Administration
Water Supply, Treatment
Operation and
Maintenance
Domestic Water
Distribution System,
Operation, Maintenance
and Administration
Water System
Improvements (CIP)
Irrigation System Operation
and Maintenance Irrigation
System Improvements (CIP)
2
VACANT
Utilities & Engineering Director
117.20 Positions
ENGINEERING
DIVISION
8.00 Positions
Prepare Contract Plans,
Specifications and
Estimates for
Municipal Projects
Contract Administration
Inspection and Testing
for Municipal Projects
Preparation and
Administration
of State and Federal Grant
Applications
Right -of- Way - Acquisition
LID Administration
M. PRICE
Wastewater/ Stormwater
Manager
WASTEWATER
DIVISION
70.20 Positions
Wastewater Treatment
Wastewater
Collection System
Food Processing
Collection and Treatment
Biosolids Recycling
Industrial Pre - treatment
Program
Facilities Operation,
Maintenance and
Construction
Stormwater
Surface Drainage
( Stormwater Collection)
Aw
Utilities & Engineering
This presentation focuses on the following departments:
Capital Improvement Cumulative
Reserve
3
plill osi 111111 11 q
ITO
• Responsible for the design and construction of Federal, State and Locally
Funded capital improvement projects, including acquisition of needed rights
of way.
• Review the plans for, and inspect the construction of, privately funded
projects, within the public rights of way to ensure that they meet City of
Yakima standards.
0
Engineering - Authorized Personnel
Class
Code Position Title
1170
Director of Utilities & Engineering
3120
Design Engineer (1)
4141
Construction Inspector
8701
Street Inspector
10601
Engineering Contracts Specialist
11101
Construction Supervisor
11104
Senior Engineer
11107
Chief Engineer
Total Personnel (2)
(1) Design Engineer eliminated mid -year 2016.
(2) 2.77 FTE's are funded by Stormwater (441), Wastewater (473), Water (474), and Irrigation (475).
5
2016
2017
2015
Amended
Proposed
Actual
Budget
Budget
1.00
1.00
1.00
3.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
10.00
9.00
9.00
(1) Design Engineer eliminated mid -year 2016.
(2) 2.77 FTE's are funded by Stormwater (441), Wastewater (473), Water (474), and Irrigation (475).
5
Engineering - Budget Overview
Dept 700 Engineering
Exp Summary By Service Unit
700 Eng Plans & Services
Exp Summary By Type
100 Salaries & Wages
200 Personnel Benefits
Sub -Total Salaries & Benefits
300 Supplies
400 Other Services /Charges
Transfers Out
Total Expenditures
R
(1) (2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
% Chng
2015 Amended
Actual
Estimated
Projected
from
from
Actual Budget
09/30/16
Year -End
Budget
2 to 5
4 to 5
$ 809,739 $ 833,710 $ 476,131 $ 728,578 $ 783,620 94.0% 107.6%
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
%
2015
Amended
Actual
Estimated
Projected
from
of
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
Total
$ 505,386
$ 567,005
$ 329,337
$ 481,000
$ 519,871
91.7%
66.3%
176,251
191,727
109,153
172,601
188,530
98.3%
24.1%
681,637
758,732
438,490
653,601
708,401
93.4%
90.4%
10,639
18,200
5,400
18,200
18,200
100.0%
2.3%
109,483
48,798
28,251
48,798
49,039
100.5%
6.3%
7,980
7,980
3,990
7,980
7,980
100.0%
1.0%
$ 809,739
$ 833,710
$ 476,131
$ 728,578
$ 783,620
94.0%
100.0%
a a a l
Personnel Changes Cap Outlay/Maint /Oper Changes
SU Fund Description Decrease FN Description Decrease
410 1110 Decreased Contract Specialist $ 9,900 F $ -
410 1110 Delay filling Design Engineer 38,700 V Copier /Plotter (18,000)
48,600 (18,000)
Grand Total $ 30,600
FN = Filled / Vacant
7
a a a a
Strategic Initiative
Proposed
Personnel
Request /Justification
Funding Source
Salary / Benefits
Non - Personnel
Notes
Full size Copier / scanner (can be funded
General Fund
$18,000
Unbudgeted
by Budget reduction proposal)
PT
E'3
Arterial Street Capital
The Arterial Street Capital Fund is used for street improvement projects listed in the
Six Year Transportation Improvement Program (STIP). The primary ongoing revenue in
this fund is an allocation of the gas tax. The fund is used to provide local match to
11111 101111
A
Arterial Street Capital - Budget Overview
Dept 142 Arterial Street
Exp Summary By Service Unit
711 Capital Improvement
712 Arterial Street Projects
713 Arterial Street Programs
Total Expenditures
Rev Summary By Type
330 Intergovernmental Rev
340 Chrgs f /Goods & Svcs
360 Miscellaneous Revenues
390 Other Financing Sources
Transfers In
Total Revenues
Fund Balance
Beginning Balance
Revenues Less Expenditures
Ending Balance
10
(1)
(2)
(3)
(4)
(5)
5,000
2016
2016
2016
2017
2015
Amended
Actual
Estimated
Projected
Actual
Budget
09/30/16
Year -End
Budget
$ 274,614
$ 325,875
$ 110,435
$ 325,875
$ 325,875
1,536,884
10,386,150
1,802,650
3,658,759
4,516,200
10,878
25,000
-
25,000
25,000
1,822,375
10,737,025
1,913,085
4,009,634
4,867,075
1,353,666
4,386,365
1,438,397 2,395,225
2,959,039
6,913
5,000
- 5,000
5,000
15,300
6,476
- 1,000
1,000
307,000
6,000,000
900,000 900,000
1,700,000
53,784
-
- -
-
1,736,663
10,397,841
2,338,397 3,301,225
4,665,039
(6)
(7)
% Chng
% Chng
from
from
2to5
4to5
100.0%
100.0%
43.5%
123.4%
100.0%
100.0%
45.3%
121.4%
67.5%
63.4%
100.0%
0.1%
15.4%
0.0%
28.3%
36.4%
n/a
0.0%
44.9%
100.0%
1,367,587
1,281,875
1,281,875
1,281,875
573,466
44.7%
44.7%
(85,712)
(339,184)
425,311
(708,409)
(202,036)
59.6%
28.5%
$1,281,875
$ 942,691
$1,707,186
$ 573,466 $
371,430
39.4%
64.8%
Arterial Street Capital - Budget Overview
Exp Summary By Type
400 Professional Svcs & Chgs
600 Capital Outlay
700 Debt Service Principal
800 Debt Service Int /Other
Transfers Out
Total Expenditures
11
(1)
(2)
(3)
(4)
(5)
of
2016
2016
2016
2017
2015
Amended
Actual
Estimated
Projected
Actual
Budget
09/30/16
Year -End
Budget
$ 10,953
$ 5,100
$ -
$ 5,100
$ 5,100
1,536,809
10,511,050
1,802,650
3,783,659
4,641,100
53,251
-
-
-
-
488
-
-
-
-
220,875
220,875
110,435
220,875
220,875
$1,822,375 $10,737,025 $1,913,085 $ 4,009,634 $ 4,867,075
(6)
(7)
% Chng
%
from
of
2 to 5
Total
100.0%
0.1%
44.2%
95.4%
n/a
0.0%
n/a
0.0%
100.0%
4.5%
45.3%
100.0%
Arterial Street Capital Strategic
Strategic Initiative Request / Justification
Proposed
Funding Source
Personnel
Salary / Benefits
Non - Personnel
Notes
Arterial Streets Capital Improvements
Arterial Streets
Budgeted
Spring Creek /36th Ave /Sorenson (SOZO)
Fund
$2,970,000
NC
Northside Alley Pavers
432,000
Adam /Washington Sidewalks (2412)
$1.7m Bonds
287,000
Powerhouse Road Sidewalk
247,000
Wide Hollow Creek Bridges (2388)
Grants
193,500
Cowiche Canyon Trail
170,000
Garfield Elementary Safety Impr. (2413)
Gas Tax
150,000
N 1st Street Revitalization, Phase I (2340)
45,000
Nob Hill & Fair Intersection (2143)
County SIED
16,600
N 1st Street Revitalization, Phase II (2390)
program
5,000
Total
$4,516,100
12
61
13
The Charter Amendment included an inflationary component which is deposited
into this fund. Currently the City is building this balance until a viable project is
identified
Street Capital - Budget Overview
Dept 344 Street Capital
Exp Summary By Service Unit
717 Capital Improvement $
Rev Summary By Type
360 Miscellaneous Revenues
390 Other Financing Sources
Transfers In
Total Revenues
Fund Balance
Beginning Balance
Revenues Less Expenditures
Ending Balance
(1)
(2)
(3)
(4)
(5)
from
2016
2016
2016
2017
2015
Amended
Actual
Estimated
Projected
Actual
Budget
09/30/16
Year -End
Budget
934,473
$ 5,000,000
$ 167
$ 167
$ -
(6)
(7)
% Chng
% Chng
from
from
2 to 5
4 to 5
0.0% 0.0%
76,770 50,000 42,004
50,000 50,000 100.0%
100.0%
- 5,000,000 -
- - 0.0%
#DIV /0!
20,811 45,306 -
45,306 74,159 163.7%
163.7%
97,581 5,095,306 42,004
95,306 124,159 2.4%
130.3%
931,057
94,164
94,164
94,164
189,303
201.0%
201.0%
(836,893)
95,306
41,837
95,139
124,159
130.3%
130.5%
$ 94,164 $
189,470
$ 136,001 $
189,303
$ 313,462
165.4%
165.6%
Exp Summary By Type
600 Capital Outlay $
14
(1)
(2)
(3)
(4)
(5)
of
2016
2016
2016
2017
2015
Amended
Actual
Estimated
Projected
Actual
Budget
09/30/16
Year -End
Budget
934,473
$ 5,000,000
$ 167
$ 167
$ -
(6)
(7)
% Chng
%
from
of
2 to 5
Total
0.0% 100.0%
Public Works Trust (REET 1)
This fund is used to track the debt service on capital improvement projects
funded with State Public Works Trust Fund loans and the first 1/4% Real
Estate Excise Tax (REET 1) moneys the City receives. It has also been
designated as the source for improvements made to City Hall.
15
Public Works Trust (REET 1) - Budget Overview
Dept 342 Pub Wks Trust REET 1
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
% Chng
2015
Amended
Actual
Estimated
Projected
from
from
Exp Summary By Service Unit
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
4 to 5
714 REET 1
$ 642,784
$1,011,385
$ 449,736
$ 951,833
$1,655,114
163.6%
173.9%
Rev Summary By Type
310 Taxes
977,070
800,000
587,915
900,000
750,000
93.8%
83.3%
360 Miscellaneous Revenues
2,000
2,000
-
2,000
2,000
100.0%
100.0%
Transfers In
84,448
-
-
84,448
84,448
#DIV /0!
100.0%
Total Revenues
1,063,518
802,000
587,915
986,448
836,448
104.3%
84.8%
Fund Balance
Beginning Balance
750,742
1,171,476
1,171,476
1,171,476
1,206,091
103.0%
103.0%
Revenues Less Expenditures
420,734
(209,385)
138,179
34,615
(818,666)
391.0%
n/a
Ending Balance
$1,171,476
$ 962,091
$1,309,655
$1,206,091
$ 387,425
40.3%
32.1%
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
%
2015
Amended
Actual
Estimated
Projected
from
of
Exp Summary By Type
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
Total
500 Intergovernmental Svcs
$ 60,300
$ 60,300
$ 60,300
$ 60,300
$ 60,300
100.0%
3.6%
600 Capital Outlay
54,701
611,500
29,295
375,000
1,075,000
175.8%
65.0%
700 Debt Service Principal
131,554
100,000
24,708
49,777
51,240
51.2%
3.1%
800 Debt Service Int /Other
60,394
7,500
17,516
34,671
33,208
442.8%
2.0%
Transfers Out
335,835
232,085
317,918
432,085
435,366
187.6%
26.3%
16 Total Expenditures
$ 642,784
$1,011,385
$ 449,736
$ 951,833
$1,655,114
163.6%
100.0%
Public Works Trust (REET 1) - Strategic Initiative Summary
This its was also discussed in the City all Facility strategic initiatives.
Strategic Initiative
Proposed
Personnel
Request /Justification
Funding Source
Salary / Benefits
Non-Personnel
Notes
City Hall Facility Projects:
REET I
Budgeted
New
NC
Elevator #1 and #2 Upgrade
$1,075,000
Carryforward
217,000
Total
$1,292,000
17
Real Estate Excise Tax (REET 2)
Fund 343 is used to track capital improvement projects funded with the second
1/4% Real Estate Excise Tax (REET 2) moneys the City receives.
City Council enacted this tax as described in the Revised Code of Washington
(RCW) to be used for capital improvement projects.
MOV
Real Estate Excise Tax 2 (BEET 2) - Budget Overview
Dept 343 Pub Wks Trust REET 2
Exp Summary By Service Unit
716 REET 2
Rev Summary By Type
310 Taxes
360 Miscellaneous Revenues
Total Revenues
Fund Balance
Beginning Balance
Revenues Less Expenditures
Ending Balance
Exp Summary By Type
300 Operating Supplies
700 Debt Service Principal
800 Debt Service Int /Other
Transfers Out
Total Expenditures
19
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2,000
2016
2016
2016
2017
% Chng
% Chng
2015
Amended
Actual
Estimated
Projected
from
from
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
4 to 5
$1,177,547
$ 978,250
$1,051,817
$ 977,372
$ 782,452
80.0%
80.1%
977,070
800,000
587,915
900,000
750,000
93.8%
83.3%
2,000
2,000
-
2,000
2,000
100.0%
100.0%
979,070
802,000
587,915
902,000
752,000
93.8%
83.4%
551,438
352,961
352,961
352,961
277,589
78.6%
78.6%
(198,477)
(176,250)
(463,902)
(75,372)
(30,452)
17.3%
40.4%
$ 352,961
$ 176,711
$ (110,941)
$ 277,589
$ 247,137
139.9%
89.0%
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
%
2015
Amended
Actual
Estimated
Projected
from
of
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
Total
$ 350,000
$ 350,000
$ 350,000
$ 350,000
$ 350,000
100.0%
44.7%
165,100
165,925
165,100
165,100
165,100
99.5%
21.1%
10,031
10,785
10,732
10,732
9,906
91.8%
1.3%
652,415
451,540
525,985
451,540
257,446
57.0%
32.9%
$1,177,547
$ 978,250
$1,051,817
$ 977,372
$ 782,452
80.0%
100.0%
This
20
r-11 *tal Improvement Cumulafive Reservl-4'0
..
21
22
Capital Improvement Cumulative Reserve - Budget Overview
Dept 392 Cum Res f/Cap Impr
Exp Summary By Service Unit
612 Finance Cap Impr
652 Utility Cust Svcs Cap Impr
712 Arterial Streets Cap Impr
Total Expenditures
Rev Summary By Type
330 Intergovernmental Rev
390 Other Financing Sources
Transfers In
Total Revenues
Fund Balance
Beginning Balance
Revenues Less Expenditures
Ending Balance
Exp Summary By Type
400 Professional Svcs & Chgs
600 Capital Outlays
Total Expenditures
(1)
(2)
(3)
(4)
(5)
(6)
(7)
150,000
2016
2016
2016
2017
% Chng
% Chng
2015
Amended
Actual
Estimated
Projected
from
from
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
4 to 5
$ 9,587
$ 115,000
$ -
$ -
$ -
0.0%
n/a
1,233,032
700,000
539,516
785,348
-
0.0%
0.0%
20,985
650,000
306,700
704,901
-
0.0%
0.0%
1,263,603
1,465,000
846,216
1,490,249
-
0.0%
0.0%
127,220
-
-
1,500
-
n/a
0.0%
150,000
-
-
-
-
n/a
n/a
200,000
300,000
300,000
300,000
-
0.0%
0.0%
477,220
300,000
300,000
301,500
-
0.0%
0.0%
2,403,431
1,617,047
1,617,047
1,617,047
428,298
26.5%
26.5%
(786,384)
(1,165,000)
(546,216)
(1,188,749)
-
0.0%
0.0%
$1,617,047
$ 452,047
$1,070,831
$ 428,298
$ 428,298
94.7%
100.0%
(1)
(2)
(3)
(4)
(5)
(6)
(7)
2016
2016
2016
2017
% Chng
%
2015
Amended
Actual
Estimated
Projected
from
of
Actual
Budget
09/30/16
Year -End
Budget
2 to 5
Total
$ 9,587
$ 60,000
$ -
$ -
$ -
0.0%
n/a
1,254,017
1,405,000
846,216
1,490,249
-
0.0%
n/a
$1,263,603
$ 1,465,000
$ 846,216
$1,490,249
$ -
0.0%
n/a
• • •
Distributed at the #z
Meeting �l-
Stormwater Operating - Budget Overview (Correct Budget)
Exp Summary By Type
100 Salaries & Wages
200 Benefits
Sub -Total Salaries & Benefits
300 Operating Supplies
400 Other Services /Charges
500 Intergovernmental Svcs
600 Capital Outlays
Transfers Out
Total Expenditures
36
(1)
2015
Actual
(2)
2016
Amended
Budget
(3)
2016
Actual
09/30/16
(4)
2016
Estimated
Year -End
(5)
2017
Projected
Budget
(6)
% Chng
from
2 to 5
(7)
%
of
Total
$ 559,035
$ 764,459
$ 464,253
$ 763,744
$ 793,415
103.8%
264%
221,055
301,349
188,394
313,620
346,664
115.0%
11.5%
780,090
1,065,808
652,647
1,077,364
1,140,080
107.0%
37.9%
26,399
40,000
26,936
37,000
40,000
100.0%
1.3%
654,746
723,296
329,887
724,011
761,586
105.3%
25.3%
29,027
34,000
29,112
34,000
34,000
100.0%
1 1%
-
15,000
-
15,000
15,000
100.0%
0.5%
1,490,000
760,000
380,000
760,000
1,020,000
134.2%
33.9%
$2,980,262
$2,638,104
$1,418,583
$2,647,375
$3,010,666
114.1%
100.0%
• • •
Distributed at the
Meeting IZ1,16
Stormwater Operating - Budget Overview (Correct Budget)
Exp Summary By Type
100 Salaries & Wages
200 Benefits
Sub -Total Salaries & Benefits
300 Operating Supplies
400 Other Services /Charges
500 Intergovernmental Svcs
600 Capital Outlays
Transfers Out
Total Expenditures
at
(1)
2015
Actual
(2)
2016
Amended
Budget
(3)
2016
Actual
09/30/16
(4)
2016
Estimated
Year -End
(5)
2017
Projected
Budget
(6)
%Chng
from
2 to 5
(7)
%
of
Total
$ 559,035
$ 764,459
$ 464,253
$ 763,744
$ 793,415
103.8%
264%
221,055
301,349
188,394
313,620
346,664
115.0%
11.5%
780,090
1,065,808
652,647
1,077,364
1,140,080
107.0%
379%
26,399
40,000
26,936
37,000
40,000
100.0%
1.3%
654,746
723,296
329,887
724,011
761,586
105.3%
25.3%
29,027
34,000
29,112
34,000
34,000
100.0%
11%
-
15,000
-
15,000
15,000
100.0%
0.5%
1,490,000
760,000
380,000
760,000
1,020,000
134.2%
33.9%
$ 2,980,262
$ 2,638,104
$1,418,583
$ 2,647,375
$ 3,010,666
114.1%
100.0%
l'. t
Distributed at the
Meeting
Transportation Benefit District Proposed Projects
In 2012, establishment of a Transportation Benefit District (TBD) was considered but not
implemented A list of 21 projects that amounted to an estimated cost of $10,171,000 was
submitted Eleven of the projects listed were eventually constructed as parts of the 2013
and 2014 Street Resurfacing Projects and are highlighted on the attached spreadsheet.
As we move forward, the remaining projects will be further evaluated for inclusion in future
projects
If a TBD was established at $20 /car, it would generate approximately $1 3 million annually
We recommend that the funds be used as follows
$300,000 for sidewalk repair and /or installation (priority given to school zones),
including tree removal (would provide approximately $100,000 of general fund
relief)
$500,000 to pay debt service on bonds for large projects (see list below)
$500,000 to pay for and /or supply match for smaller projects and local street
maintenance (would provide approximately $200,000 of general fund relief)
The list of projects from the City's Transportation Improvement Program (TIP)
recommended to be considered in the large project list, for which bonding would be
needed, includes
• North 1St Street Revitalization, Phase 2 - $8 5 Million
This project would improve N 1St Street from MLK Boulevard to'N' Street by rehabilitating
the pavement and lane markings, removing on- street parking, enhancing pedestrian and
street lighting, constructing median islands and installing various pedestrian and
decorative elements.
• E Nob Hill Boulevard Reconstruction - $9 5 Million
This project would improve Nob Hill Boulevard from 61h Street to 18th Street by
reconstructing and widening the roadway to five lanes with intersection improvements,
curb, gutter, sidewalk, street lighting and drainage system
• 16th Avenue and Tieton Drive Intersection Improvements - $5 8 Million
This project would reconstruct and widen 161h Avenue Tieton Drive by adding a left -turn
lane for all directions at the intersection, constructing larger radii at the corners and
updating the traffic signal
• 6th Avenue Roadway Improvements - $4 4 Million
This project would improve 611, Avenue from Walnut Street to River Road by
reconstructing the existing trolley rail and impacted roadway, grinding and overlaying the
remaining width of 611, Avenue and installing curb, gutter and sidewalk, where missing
The list of smaller projects from the City's TIP recommended to be considered as funds
are accumulated includes
• Washington Avenue and Longfiber Road Intersection Improvements - $1,023,000
This project would improve the Washington Avenue and Longfiber Road Intersection by
constructing a westbound left -turn lane on Washington and northbound left -turn lane on
Longfiber, installing or replacing curb, gutter, sidewalk, street lighting storm drainage and
safety flashing signal
• N 1611 Avenue and Fruitvale Boulevard Intersection Improvements - $806,000
This project would improve the 16th Avenue and Fruitvale Boulevard Intersection by
constructing larger radii at the corners, installing ADA ramps and upgrading the traffic
signal system
• 11 Street and Washington Avenue Intersection Improvements - $2,000,000
This project would improve the 1St Street and Washington Avenue Intersection by
widening Washington Avenue to accommodate an additional lane replace curb, gutter
and sidewalk and install an updated traffic signal system
• 4011 Avenue and Summitview Avenue Intersection Improvements - $1,100,000
This project would improve the intersection of 40th Avenue and Summitview Avenue by
widening Summitview Avenue to accommodate two eastbound left -turn lanes,
constructing larger corner radii and updating the traffic signal system
• Powerhouse Road and Englewood Avenue Intersection Improvements - $728,000
This project would improve the Powerhouse Road and Englewood Avenue Intersection
by realigning the intersection, installing curb, gutter, sidewalk and safety flashing signal
• Nob Hill Boulevard and Fair Avenue Intersection Improvements (match) - $256,000
This project would improve the Nob Hill Boulevard and Fair Avenue Intersection by
widening Nob' Hill Boulevard to provide for a left -turn lane at the intersection, replacing
the curb, gutter, sidewalk and street lighting, updating the storm drainage system and
upgrading the traffic signal system
• 18th Street Underpass (match) - $632,000
This project would replace the bridge on E. Yakima Avenue that crosses over 18th Street.
• Aquatic Center Roads - $700,000
This project would improve River Road from 34th Avenue to 40th Avenue by
reconstructing and widening the roadway to three lanes, installing curb, gutter, sidewalks
and street lights, as well as, making improvements to the intersection of 34th Avenue,
River Road and 34th Avenue
Original 2012 Transportation Benefit District
Proposed 5 -Year Project List
Street
From
To
Sq Ft
Treatment
Cost/
SF
Total Cost
Maint
Year
Year 1
3rd St
Arlington
Beech
95000
MITI & Overlay
$342
$324,90000
2013
Lincoln Av
56th Ave
66th Ave
68880
MITI & Overlay
$342
$235,56960
2013
Yakima Av
12th Ave
16th Ave
81200
CIR
$487
$395,44400
2013
$955,91360
Year 2
D St
1st St
5th Ave
122200
CIR
$487
$595,11400
2014
25th Av
Englewood
Castlevale
31050
Mill & Overlay
$342
$106,191 00
2014
Lincoln Av
40th Ave
46th Ave
77000
CIR
$487
$374,99000
2014
$1,076,295 00
Year 3
Pecks Canyon Rd
Scenic Dr
City Limit
4620
MITI & Overlay
$342
$15,80040
2015
Viola Av
1st St
Fair Ave
35100
Mill & Overlay
$342
$120,04200
2015
24th Av
Washington
Mead
122500
CIR
$487
$596,57500
2015
G St
3rd St
6th St
38400
MITI & Overlay
$342
$131,32800
2014
G St
1st St
3rd St
22400
MITI & Overlay
$342
$76,60800
2015
Walnut St
3rd Ave
5th Ave
36400
CIR
$487
$177,26800
2015
$1,117,621 40
Year 4
6th St
Yakima
Pacific
220000
MITI & Overlay
$342
$752,40000
2016
Scenic Dr
4202
Scenic
4615
Scenic
53406
MITI & Overlay
$342
$182,64852
2016
Walnut St
1st St
3rd St
36400
CIR
$487
$177,26800
2016
$1,112,316 52
Year 5
3rd Av
Yakima
Walnut
68000
CIR
$487
$331,160 00
2017
Lincoln Av
24th Ave
32nd Ave
109000
CIR
$487
$530,83000
2017
$861,99000
Unfunded
24th Av
Mead
Nob Hill
127400
CIR
$4 87
$620,43800
Walnut St
5th Ave
7th Ave
36400
CIR
$487
$177,26800
Pierce Av
Summitview
Lincoln
40000
Mill & Overlay
$342
$136,80000
Fruitvale Blvd
2100
Fruitvale
3000
Fruitvale
256000
HIR
$773
$1,978,880 00
Fruitvale Blvd
3000
Fruitvale
4000
Fruitvale
276000
HIR
$773
$2,133,480 00
$5,046,866 00
D Street is not an arterial but is critical for emergency response