HomeMy WebLinkAbout10/18/2016 06E 2344 Lincoln Avenue Corridor Safety; Project Completion ,.„ . s. n. BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDASTATEMENT Item No. 6.E. For Meeting of: October 18, 2016 ITEM TITLE: Project Completion and Contract Acceptance for KRCI, LLC - Project 2344 Lincoln Avenue Corridor Safety (Standard Motion V -B- Accept the project and approve) SUBMITTED BY: Brett Sheffield - Chief Engineer - 509 - 576 -6797 SUMMARY EXPLANATION: This project (City Project No.: 2344) includes improvements on Lincoln Avenue by constructing sidewalks north of Lincoln in various locations from 16th Avenue to 32nd Avenue, constructing ADA compliant curb ramps, repairing areas of damaged sidewalk, replacing signal heads at Lincoln Avenue & 5th Avenue and Lincoln Avenue and 16th Avenue, constructing a pedestrian crossing signal near Robertson Elementary School, and improving the signage for the Pierce Avenue couplet, and is paid in full with federal Highway Safety Improvement Program funds. Final inspection for this project was made and the recommendation is that the project be accepted. This Council action is to accept the project. Project Manager: Randy Tabert Contractor: KRCI, LLC Contract Award: 2/3/16 Contract Cost: $277,634.25 Total Due $0.00 The above total contract cost is for construction only and does not include engineering and other costs. ITEM BUDGETED: STRATEGIC PRIORITY: APPROVED FOR SUBMITTAL: Ci ty Manager STAFF RECOMMENDATION: Accept project. BOARD /COMMITTEE RECOMMENDATION: ATTACHMENTS: Description Upload Date Type D Agenda Final 10/6/2016 Co■er Memo City of Yakima PROJECT TITLE Lincoln Avenue Corridor Safety Project City Engineering Division 129 N 2nd Street City Project No.: 2344 Yakima, WA 98901 TO: KRCI, LLC Progress Estimate No.: Agenda Final Date Total Item Unit Bid Contract To Date % of Amount Previous Previous Quantity Amount Acct No. Description QTY UNIT Price Amount Quantity Contract Quantity Payments this period Due Def 1 SPCC Plan 1 LS $500.00 $ 500.00 1 100% $ 500.00 1 $ 500.00 0 $ - 30 2 Mobilization 1 LS $14,000.00 $ 14,000.00 1 100% $ 14,000.00 1 $ 14,000.00 0 $ - 30 3 Project Temporary Traffic Control 1 LS $24,000.00 $ 24,000.00 1.00 100% $ 24,000.00 1.00 $ 24,000.00 0.00 $ - 30 4 Clearing and Grubbing 1 LS $16,000.00 $ 16,000.00 1 100% $ 16,000.00 1 $ 16,000.00 0 $ - 30 5 Removal of Structure and Obstruction 1 LS $2,500.00 $ 2,500.00 1 100% $ 2,500.00 1 $ 2,500.00 0 $ - 30 6 Removal of Cement Conc. Sidewalk 14 SY $175.00 $ 2,450.00 15 107% $ 2,625.00 15 $ 2,625.00 0 $ - 61 7 Removal of Cement Conc. Curb 490 LF $6.00 $ 2,940.00 409 83% $ 2,454.00 409 $ 2,454.00 0 $ - 30 8 Sawcut 300 LF $1.15 $ 345.00 950 317% $ 1,092.50 950 $ 1,092.50 0 $ - 30 9 Roadway Excavation Incl. Haul 150 CY $45.00 $ 6,750.00 150 100% $ 6,750.00 150 $ 6,750.00 0 $ - 30 10 Structure Excavation Class B Incl. Haul 11 CY $75.00 $ 825.00 5.20 47% $ 390.00 5.20 $ 390.00 0 $ - 30 11 Crushed Surfacing Base Course 71 TON $50.00 $ 3,550.00 115.36 162% $ 5,768.00 115.36 $ 5,768.00 0 $ - 30 12 HMA CI 1/2" PG 64 -28 10 TON $400.00 $ 4,000.00 0 0% $ - 0 $ - 0 $ - 30 13 HMA CL 1/2" PG 64 -28 for Driveway Approach 5 TON $700.00 $ 3,500.00 14.94 299% $ 10,458.00 14.94 $ 10,458.00 0.00 $ - 30 14 Canal Sidewalk Structure and Railing 1 EA $3,550.00 $ 3,550.00 1 100% $ 3,550.00 1 $ 3,550.00 0 $ - 61 15 Cement Conc. Traffic Curb and Gutter 300 LF $38.00 $ 11,400.00 409 136% $ 15,542.00 409 $ 15,542.00 0 $ - 30 16 Commercial Driveway Approach 3 EA $5,800.00 $ 17,400.00 3 100% $ 17,400.00 3 $ 17,400.00 0 $ - 61 17 Cement Conc. Driveway Apron 28 SY $88.00 $ 2,464.00 79 282% $ 6,952.00 79 $ 6,952.00 0 $ - 61 18 Chain Link Fence Type 6, 4 Foot Height 67 LF $60.00 $ 4,020.00 67 100% $ 4,020.00 67 $ 4,020.00 0 $ - 30 19 Cement Concrete Sidewalk - 4 inch Thick 615 SY $70.00 $ 43,050.00 595 97% $ 41,650.00 595 $ 41,650.00 0 $ - 61 20 Cement Concrete Sidewalk - 6 inch Thick 105 SY $78.00 $ 8,190.00 214 204% $ 16,692.00 214 $ 16,692.00 0 $ - 61 21 Cement Conc. Curb Ramp Type Parallel A 1 EA $2,400.00 $ 2,400.00 1 100% $ 2,400.00 1 $ 2,400.00 0 $ - 61 22 Cement Conc. Curb Ramp Type Single Direction 6 EA $1,650.00 $ 9,900.00 10 167% $ 16,500.00 10 $ 16,500.00 0 $ - 61 23 Remove & Replace Signal Head 18 EA $1,000.00 $ 18,000.00 18 100% $ 18,000.00 18 $ 18,000.00 0 $ - 64 24 Pedestrain Crossing System Complete 1 LS $8,000.00 $ 8,000.00 1 100% $ 8,000.00 1 $ 8,000.00 0 $ - 64 25 Permanent Signing 1 LS $1,500.00 $ 1,500.00 1 100% $ 1,500.00 1 $ 1,500.00 0 $ - 30 26 Modular Block Wall 170 SF $25.00 $ 4,250.00 601.50 354% $ 15,037.50 601.50 $ 15,037.50 0 $ - 30 27 Repair or Replacement EST DOL $10,000.00 $10,000.00 23853.25 239% $ 23,853.25 23853.25 $ 23,853.25 0.00 $ - 30 TOTALS $ 225,484.00 123% $ 277,634.25 $ 277,634.25 Item Unit Bid Contract To Date % of Amount Previous Previous Quantity Amount Acct No. QTY UNIT Price Amount Quantity Contract Quantity Payments this period Due Def SUB TOTAL $0.00 NO RETAINAGE FED AID NO. HSIP -4648 (002) AMOUNT NOW DUE $0.00 I hereby certify that the foregoing is a true and correct statement of the work performed under this Contract. CITY ENGINEER /s/ Brett Sheffield