HomeMy WebLinkAbout10/18/2016 06D 2282 S. 64th Ave & Tieton Drive Signal; Project Completion I�, t € xs 1 s. n. BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDASTATEMENT Item No. 6.D. For Meeting of: October 18, 2016 ITEM TITLE: Project Completion and Contract Acceptance for Granite Construction Company - Project 2282 S. 64th Ave & Tieton Drive Signal (Standard Motion V -B- Accept the project and approve) SUBMITTED BY: Brett Sheffield - Chief Engineer - 509 - 576 -6797 SUMMARY EXPLANATION: A final payment of $30,445.67 is recommended for Granite Construction Company for (City Project.: 2282) that provided improvements to an existing intersection of S. 64th Ave & Tieton Drive by constructing a left -turn lane on Tieton Drive and installing a traffic signal at the intersection. Final inspection for this project was made and the recommendation is that the project be accepted. This Council action is to accept the project and approve the final construction costs. Project Manager: Brett Sheffield Contractor: Granite Construction Company Contract Awarded: 9/24/2015 Contract Cost: $608,913.48 Retainage Due: $30,445.67 The above total contract cost is for construction only and does not include engineering and other costs. ITEM BUDGETED: STRATEGIC PRIORITY: APPROVED FOR SUBMITTAL: Ci ty Manager STAFF RECOMMENDATION: Accept Project BOARD/COMMITTEE RECOMMENDATION: ATTACHMENTS: Description Upload Date Type D Agenda Final 9/29/2016 or Memo City of Yakima PROJECT TITLE S. 64th Ave & Tieton Drive Intersection Improvements City Engineering Division 129 N 2nd Street City Project No.: 2282 Yakima, WA 98901 TO: Granite Construction Company Progress Estimate No.: FINAL Total Item Unit Bid Contract To Date % of Amount Previous Previous Quantity Amount Acct No. Description QTY UNIT Price Amount Quantity Contract Quantity Payments this period Due Def 1 SPCC Plan 1 LS $50.00 $ 50.00 1 100% $ 50.00 1 $ 50.00 0 $ - 30 2 Mobilization 1 LS $34,397.75 $ 34,397.75 1 100% $ 34,397.75 1 $ 34,397.75 0 $ - 30 3 Project Temporary Traffic Control 1 LS $33,700.00 $ 33,700.00 1 100% $ 33,700.00 1 $ 33,700.00 0 $ - 30 4 Clearing and Grubbing 1 LS $13,500.00 $ 13,500.00 1 100% $ 13,500.00 1 $ 13,500.00 0 $ - 30 5 Removal of Structure and Obstruction 1 LS $3,950.00 $ 3,950.00 1 100% $ 3,950.00 1 $ 3,950.00 0 $ - 30 6 Removal of Cement Conc. Sidewalk 441 SY $13.00 $ 5,733.00 438 99% $ 5,694.00 438 $ 5,694.00 0 $ - 30 7 Removal of Cement Conc. Curb 785 LF $1.00 $ 785.00 778 99% $ 778.00 778 $ 778.00 0 $ - 30 8 Sawcut 40 LF $5.50 $ 220.00 205 513% $ 1,127.50 205 $ 1,127.50 0 $ - 30 9 Roadway Excavation Incl. Haul 150 CY $140.00 $ 21,000.00 150 100% $ 21,000.00 150 $ 21,000.00 0 $ - 30 10 Structure Excavation Class B Incl. Haul 11 CY $50.00 $ 550.00 11 100% $ 550.00 11 $ 550.00 0 $ - 40 11 Driveway Construction 1 LS $12,900.00 $ 12,900.00 1 100% $ 12,900.00 1 $ 12,900.00 0 $ - 30 12 Crushed Surfacing Base Course 187 TON $70.00 $ 13,090.00 188.64 101% $ 13,204.80 188.64 $ 13,204.80 0 $ - 30 13 HMA CI 1/2" PG 64 -28 600 TON $135.00 $ 81,000.00 796.09 133% $ 107,472.15 796.09 $ 107,472.15 0 $ - 30 14 Planing Bituminous Pavement 3625 SY $3.75 $ 13,593.75 3961 109% $ 14,853.75 3961 $ 14,853.75 0 $ - 30 15 Corrugated Polyethylene Storm Sewer Pipe, 12in 35 LF $95.00 $ 3,325.00 35 100% $ 3,325.00 35 $ 3,325.00 0 $ - 40 16 Catch Basin Type 1 1 EA $4,000.00 $ 4,000.00 1 100% $ 4,000.00 1 $ 4,000.00 0 $ - 40 17 Adjust Manhole 4 EA $750.00 $ 3,000.00 4 100% $ 3,000.00 4 $ 3,000.00 0 $ - 30 18 Adjust Monument Case 1 EA $525.00 $ 525.00 1 100% $ 525.00 1 $ 525.00 0 $ - 30 19 Crushed Surfacing Top Course (trench backfill) 15 TON $28.00 $ 420.00 13.76 92% $ 385.28 13.76 $ 385.28 0 $ - 30 20 Adjust Valve Box 4 EA $500.00 $ 2,000.00 7 175% $ 3,500.00 7 $ 3,500.00 0 $ - 30 21 Cement Conc. Traffic Curb & Gutter 770 LF $20.00 $ 15,400.00 752 98% $ 15,040.00 752 $ 15,040.00 0 $ - 30 22 Dual Faced Cement Conc. Traffic Curb 95 LF $24.00 $ 2,280.00 100 105% $ 2,400.00 100 $ 2,400.00 0 $ - 30 23 Chain Link Fence, Type 1 6 Foot 570 LF $18.00 $ 10,260.00 575 101% $ 10,350.00 575 $ 10,350.00 0 $ - 30 24 Chain Link Fence, Type 1 12 Foot 70 LF $30.00 $ 2,100.00 71 101% $ 2,130.00 71 $ 2,130.00 0 $ - 30 25 Temporary Fencing 500 LF $2.50 $ 1,250.00 0 0% $ - 0 $ - 0 $ - 30 26 Cement Concrete sidewalk - 4 inch thick 365 SY $51.00 $ 18,615.00 399 109% $ 20,349.00 399 $ 20,349.00 0 $ - 61 27 Cement Conc. Curb ramp type parallel A 5 EA $1,725.00 $ 8,625.00 4 80% $ 6,900.00 4 $ 6,900.00 0 $ - 61 28 Traffic Signal System Complete 1 LS $220,000.00 $ 220,000.00 1 100% $ 220,000.00 1 $ 220,000.00 0 $ - 64 29 Remove Street Light Arm & Fixture 1 EA $2,550.00 $ 2,550.00 1 100% $ 2,550.00 1 $ 2,550.00 0 $ - 63 30 Permanent Signing 1 LS $1,550.00 $ 1,550.00 1 100% $ 1,550.00 1 $ 1,550.00 0 $ - 30 Item Unit Bid Contract To Date % of Amount Previous Previous Quantity Amount Acct No. Description QTY UNIT Price Amount Quantity Contract Quantity Payments this period Due Def 31 Paint Line 2200 LF $0.55 $ 1,210.00 2487 113% $ 1,367.85 2487 $ 1,367.85 0 $ - 30 32 Plastic Stop Line 92 LF $4.00 $ 368.00 82 89% $ 328.00 82 $ 328.00 0 $ - 30 33 Painted Wide Lane Line 105 LF $0.50 $ 52.50 180 171% $ 90.00 180 $ 90.00 0 $ - 30 34 Plastic Traffic Arrow 4 EA $100.00 $ 400.00 4 100% $ 400.00 4 $ 400.00 0 $ - 30 35 Plastic Crosswalk Line 400 SF $4.50 $ 1,800.00 352 88% $ 1,584.00 352 $ 1,584.00 0 $ - 30 36 Modular Block Wall 660 SF $45.00 $ 29,700.00 537 81% $ 24,165.00 537 $ 24,165.00 0 $ - 30 37 Modify Water Fall Features 1 LS $4,000.00 $ 4,000.00 1 100% $ 4,000.00 1 $ 4,000.00 0 $ - 30 38 Repair or Replacement 1 FA $15,000.00 $ 15,000.00 17796.4 119% $ 17,796.40 17796.40 $ 17,796.40 0.00 $ - 30 TOTALS $ 582,900.00 104% $ 608,913.48 $ 608,913.48 TOTAL $0.00 5% Retainage $0.00 AMOUNT NOW DUE $0.00 I hereby certify that the foregoing is a true and correct statement of the work performed under this Contract. CITY ENGINEER /s/ Brett Sheffield