HomeMy WebLinkAboutR-2024-195 Resolution authorizing contract with Knobel's Electric Inc. for the S 3rd Ave & Division St Signalization Project 2598 RESOLUTION NO. R-2024-195
A RESOLUTION authorizing an agreement with Knobel's Electric Inc. for the S 3rd Avenue
& Division Street Signalization Project 2598.
WHEREAS, the City of Yakima (CITY) desires to enter into a contract with Knobel's
Electric Inc. to perform construction for pedestrian safety improvements, including excavation,
curb, gutter and sidewalk, ADA ramps, traffic signal system, and illumination; and
WHEREAS, the S 3"Avenue & Division Street Signalization Project 2598 will utilize the
funding received of $312,500 SIED grant, $312,500 SIED loan, and local funds for the
construction; and
WHEREAS, the City used the procedure established by Washington State law for the
bidding and awarding of public capital improvement projects; and
WHEREAS, Knobel's Electric Inc. was determined to be qualified to perform the needed
construction work; and
WHEREAS, the contract will be null and void if bond, certificate, and required insurance
certificate and endorsement are not received within specified timeframe; and
WHEREAS, the Scope of Work and Budget included in this contract meets the needs
and requirements of the City of Yakima for this project; and
WHEREAS, the City Council of the City of Yakima finds that entering into the contract
with Knobel's Electric Inc. for construction on the S 3" Avenue & Division Street Signalization
Project 2598 is in the best interests of the City and its residents; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute a contract with Knobel's Electric Inc.,
attached hereto and incorporated herein by this reference, not to exceed Seven Hundred
Twenty-Five Thousand Two Hundred and Fifty Dollars ($725,250) to provide construction
services outlined in the contract.
ADOPTED BY THE CITY COUNCIL this 4th day of November, 2024.
Patrici Byers, Mayor
ATTEST: ypK�MgY``4h ((
• '►
f ..*' ' : 1\\\
t : *�
•
* : SEAL . �;
II . I�11 • *�. i
�. 11 . �, . i. i ,//14 h. • . �p?s
-osalinda Ibarra, City Clerk �h�t'�sHiNc.
CONTRACT
THIS AGREEMENT, made and entered into in triplicate, thi day of NOV , 20.a4by and between
the City of Yakima, hereinafter called the Owner, and Knobel's Electric, Inc., a Washington Corporation,
hereinafter called the Contractor.
WITNESSETH:
That in consideration of the terms and conditions contained herein and attached and made a part of this agreement,
the parties hereto covenant and agree as follows:
I. The Contractor shall do all work and furnish all tools, materials, labor and equipment for THE BID AMOUNT OF:
$725,250.00,for S. 3rd Avenue and Division St. Signalization Project, Project No. 2598, all in accordance with,
and as described in the attached specifications and the 2024 Standard Specifications for Road, Bridge, and
Municipal Construction which are by this reference incorporated herein and made a part hereof, and shall perform
any alterations in or additions to the work provided under this contract and every part thereof.
Contract time shall begin on the first working day following the Notice to Proceed Date and shall be completed in
Forty-five (45)working days. If work has not commenced within the ten (10) days after the notice to proceed, the
first chargeable working day shall be the eleventh (11th) working day after the date on which the City issues the
Notice to Proceed.
If said work is not completed within the time specified, the Contractor agrees to pay to the Owner the sum specified
in the Standard Specifications for each and every day said work remains uncompleted after expiration of the
specified time, as liquidated damages.
The Contractor shall provide and bear the expense of all equipment; work and labor of any sort whatsoever that
may be required for the transfer of materials and for constructing and completing the work provided for in this
contract and every part thereof, except such as are mentioned in the specifications to be furnished by the City of
Yakima.
II. The City of Yakima hereby promises and agrees with the Contractor to employ, and does employ the Contractor
to provide the materials and to do and cause to be done the above described work and to complete and finish the
same according to the attached plans and specifications and the terms and conditions herein contained and hereby
contracts to pay for the same according to the attached specifications and the schedule of unit or itemized prices
hereto attached, at the time and in the manner and upon the conditions provided for in this contract
III. The Contractor for himself, and for his heirs, executors, administrators, successors, and assigns, does hereby
agree to the full performance of all the covenants herein contained upon the part of the Contractor.
IV. It is further provided that no liability shall attach to the City of Yakima by reason of entering into this contract,
except as expressly provided herein.
IN WITNESS WHEREOF the parties hereto have caused this agreement to be executed the day and year first
herein above written.
Countersigned: CITY OF YAKIMA CONTRACTOR
this •- . day of N O V . 2024.
Knobel's Electric, Inc. a S Corporation
Construction Company
CONTRACT—S.3`d Avenue and Division St.Signalization Project#2598
1 of 2
2-
9) )
By. J_
City Manager Sign re Contractor Signature
i Gt r i i � ' Steve Soderstrom
(Printed Name) (Printed Name)
CITY CONTRACT NO: 94 (9
RESOLUTION NO: t 9S
PKIMq
Attest: • I
5* : SEAL
•
•i •
= *0
/, O i i '�. •• Estimator
City Clerk h� Estimator
_ (President, Owner,etc.)
Address 801 Tennant Ln.
Yakima Wa. 98901
CONTRACT—S.3rd Avenue and Division St.Signalization Project#2598
2 of 2
i4
=+
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 7.C.
For Meeting of: November 4, 2024
ITEM TITLE: Resolution authorizing contract with Knobel's Electric Inc. for the S 3rd
Ave & Division St Signalization Project 2598
SUBMITTED BY: Bill Preston, Acting City Engineer
SUMMARY EXPLANATION:
The City of Yakima S 3rd Ave & Division St Signalization Project 2598 includes pedestrian safety
improvements. The project will include roadway excavation, curb, gutter and sidewalk, ADA ramps, traffic
signal system, and illumination.
The City used the procedure established by Washington State law for the bidding and awarding of public
capital improvement projects with Knobel's Electric Inc. being selected to provide construction on the
project in the amount not to exceed $725,250.00
The project is funded with a SIED grant, SIED loan, and Transportation Benefit District funds.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY 24-25: A Resilient Yakima
RECOMMENDATION: Adopt Resolution.
ATTACHMENTS:
Resolution Knobels 2598
Knobel's Contract 2598