R-2024-169 Resolution authorizing acceptance of a State of Washington Department of Ecology Grant Award Agreement for the Nelson Phase 2 Pipeline Conveyance Improvements Project IC2010
RESOLUTION NO. R-2024-169 A RESOLUTION authorizing an Agreement with the State of Washington Department of Ecology for a grant of $7,600,000 for the Nelson Phase 2 Pipeline Conveyance Improvements Project IC2010. WHEREAS, funding has been provided from the State of Washington's 2023-2025 biennial budget through Ecology from a request made as part of the Yakima Basin Integrated Plan; and WHEREAS, the City of Yakima owns the Nelson Diversion at West Powerhouse Road and South Naches Road in accord with applicable Federal, State and Local regulations; and WHEREAS, the City of Yakima operates and maintains the Nelson Diversion facilities and irrigation delivery system in accord with applicable Federal, State and Local regulations; and WHEREAS, the City, along with its consultant HDR Engineering, Inc. have designed an irrigation pipeline conveyance system from the Nelson Diversion east to the Hwy 12/North 40th Avenue interchange to replace the existing Fruitvale Canal and the Old Union Canal irrigation diversions: and WHEREAS, Ecology will provide a $7,600,000 grant to install a portion of the overall irrigation pipeline conveyance system through Agreement WRYBIP-2325-YaWalr- 00057, attached hereto and incorporated herein by this reference; and WHEREAS, the City Council finds and determines that approval of such Grant Agreement is in the best interests of residents of the City and the City of Yakima; now, therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Council approves the Agreement and authorizes the City Manager to enter into grant agreement WRYBIP-2325-YaWalr-00057 with the State of Washington Department of Ecology, attached hereto and incorporated by this reference, to fund the Nelson Phase 2 Pipeline Conveyance Improvements Project IC2010. ADOPTED BY THE CITY COUNCIL this 3rd day of September, 2024. 0A02 , ,p P:tncia Byers, ayor ATTEST: .. ,1/4,y t osKIM,q �1k it le i r*r v, LA° .44'd, V` iAJ ,.1 *r t osalinda Ibarra, City Clerk III4,;9SHINGA° Agreement No. WRYBIP-2325-YaWaIr-00057 WATER RESOURCES YAKIMA BASIN INTEGRATED PLANNING AGREEMENT BETWEEN THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY AND THE CITY OF YAKIMA This is a binding Agreement entered into by and between the state of Washington , Department of Ecology, hereinafter referred to as “ECOLOGY,” and The City of Yakima, hereinafter referred to as the “RECIPIENT,” to carry out with the provided funds activities described herein. Nelson Ph. 2 Pipeline GENERAL INFORMATION Project Title: Total Cost: Total Eligible Cost: Ecology Share: Recipient Share: The Effective Date of this Agreement is: The Expiration Date of this Agreement is no later than: Project Type: Project Short Description: The City of Yakima is installing new irrigation pipelines from Nelson diversion on the Naches River east along US 12, linking to city systems and Old Union Canal. This consolidation removes two old diversions, aiding The City of Yakima, County's floodplain restoration at Cowiche Creek and its Naches River confluence (Cowiche Confluence Complex Project). Project Long Description: With the recent completion of the Nelson Dam Removal Project (Ph. 1), which included a new irrigation diversion structure for the City of Yakima and the Naches Cowiche Canal Association , fish passage and flood conveyance have been greatly improved in the Naches River system. Nelson Ph. 2 will complete the project by installing new irrigation main pipelines along US 12 from the new diversion structure to two existing irrigation delivery systems for the City of Yakima: the “General” and the “Fruitvale” irrigation systems; and one for the “Old Union” irrigation system. Completion $7,600,000.00 $7,600,000.00 $7,600,000.00 $0.00 09/16/2024 11/30/2025 Yakima Basin Integrated Planning Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 2 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima of the new pipelines from the new Nelson diversion open the door for Yakima County to complete a long -planned project (Cowiche Confluence Complex) to restore Cowiche Creek and surrounding floodplain areas along the confluence with the Naches River. With the Nelson diversion and completed pipelines in place , removal of the existing Fruitvale and Old Union Diversions can be completed, improving spawning habitat and fish passage in Cowiche Creek for coho salmon and steelhead. The pipeline project was designed and permitted at the same time as the Nelson Dam, including NEPA and Cultural Resources. The City’s General pipeline and the new consolidated (Fruitvale/Old Union) pipeline will parallel the US 12 right-of-way and cross Cowiche Creek near the City’s General irrigation reservoir . The pipelines will be installed via open trench under Cowiche Creek and set at a depth that accommodates future Cowiche Creek restoration efforts planned by the Yakima County. The General reservoir will no longer be necessary for operation of the City’s irrigation system and will be demolished as part of the project. The pipeline improvements include: •Install a 42-inch HDPE “Consolidated” pipeline from the intake which will distribute water to the Fruitvale and Old Union canal systems. The pipeline will extend from the intake for a distance of approximately 7,000 feet along the eastbound Highway 12 right-of-way and terminate near the existing Fruitvale Canal. At this point, flow will be bifurcated using two valves and metered branches: one discharging into the existing Fruitvale Canal and the other extending north easterly and discharging into the existing Old Union Canal . •Install a 32-inch HDPE pipeline from the new intake to the City’s “General” pipeline system 3,000 feet to just downstream of its existing sedimentation pond, eliminating that which lies adjacent to US 12. Here, the new pipe will connect directly to the existing HDPE pipe at that location. The City currently has $400,000 in irrigation capital funding available in FY2024. In addition, the City of Yakima was awarded $7.6M as part of the state’s 2023-25 biennial budget from a request made through the Yakima Basin Integrated Plan. Securing the state funding will allow the City to move forward with a large portion of the project . Based on current 2024/25 FY funding, the project will be completed in two Stages. Construction of Stage 1 will take place September 2024 - June 2025 with the available $8M in funding (State and local). Construction of Stage 2 is anticipated to take place September 2025 – June 2026. Stage 2 is currently unfunded. Application has been made to Senator Murray’s office for $3M in Congressionally Directed Spending for FY2025. In addition, Yakima County (a partner agency in the Nelson project) has applied for a USBOR Water SMART AERP grant in January 2024 for the Cowiche Confluence Complex Project, which is a floodplain restoration project, but also includes the Nelson Ph. 2 pipeline. Announcement on project selection is expected in June 2024. If selected, an additional $5M in funding would become available. Additional City irrigation capital funding is expected to become available as part of the FY2025-27 biennial budget approval, allowing for the continued construction of the new pipelines and completion of Nelson Ph.2. Stage 2 is estimated at $10.265M. Nelson Ph. 2 total project cost is currently estimated at $18.265M (including construction management and project administration) Overall Goal: The completion of this Stage 1 of the overall Nelson Ph. 2 project will complete the General Irrigation system pipeline, and portions of the Naches Cowiche/Fruitvale consolidated pipeline, downstream of the Nelson diversion and allow for the removal of the General Irrigation Reservoir. In addition, completion of the Nelson Ph. 2 pipeline-Stage 1 Project, will allow Yakima County to complete their currently funded Cowiche Creek Levee Setback Project , restoring the floodplain and habitat along Cowiche Creek south of Hwy 12. Completion of the new levee will provide improved flood protection to the City of Yakima in the vicinity of N. 40th Ave. Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 3 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima RECIPIENT INFORMATION Organization Name: Federal Tax ID: Mailing Address: Physical Address: Contacts Organization Email: The City of Yakima 91-6001293 2301 Fruitvale Blvd. Yakima, WA 98902 2301 Fruitvale Blvd. Yakima, Washington 98902 mike.shane@yakimawa.gov Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 4 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima Mike Shane Water/Irrigation Manager 2301 Fruitvale Blvd. Yakima, Washington 98902 Email: mike.shane@yakimawa.gov Phone: (509) 576-6480 Authorized Signatory Kimberly Dominé Financial Services Manager 2301 Fruitvale Blvd. Yakima, Washington 98902 Email: kimberly.domine@yakimawa.gov Phone: (509) 576-6480 Billing Contact Project Manager Authorized Signatory Vicki Baker 129 North 2nd Street Yakima, Washington 98901 Email: vicki.baker@yakimawa.gov Phone: (509) 575-6000 Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 5 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima Contacts Project Manager Financial Manager Kevin Haydon 1250 W Alder St. Union Gap, Washington 98903-0009 Email: keha461@ecy.wa.gov Phone: (509) 823-6947 Ubaidullah Ahmadzai PO Box 47600 Olympia, Washington 98504-7600 Email: uahm461@ecy.wa.gov Phone: (564) 233-5157 ECOLOGY INFORMATION Mailing Address: Physical Address: Department of Ecology Office of the Columbia River PO BOX 47600 Olympia, WA 98504-7600 Office of the Columbia River 300 Desmond Drive SE Lacey, WA 98503 Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 IJUI.UAIyI I CI IVCIVIJC IU JOJOCO/C-I4o/-Y1:1oli-oucF-DOcvoouvuc I State of Washington Department of Ecology Page 6 of 22 Agreement No WRYBIP-2325-YaWalr-00057 Project Title Nelson Ph 2 Pipeline Recipient Name. The City of Yakima AUTHORIZING SIGNATURES RECIPIENT agrees to furnish the necessary personnel,equipment,materials,services,and otherwise do all things necessary for or incidental to the performance of work as set forth in this Agreement. RECIPIENT acknowledges that they had the opportunity to review the entire Agreement,including all the terms and conditions of this Agreement, Scope of Work,attachments, and incorporated or referenced documents, as well as all applicable laws, statutes,rules,regulations, and guidelines mentioned in this Agreement. Furthermore,the RECIPIENT has read, understood, and accepts all requirements contained within this Agreement. This Agreement contains the entire understanding between the parties, and there are no other understandings or representations other than as set forth, or incorporated by reference, herein. No subsequent modifications or amendments to this agreement will be of any force or effect unless in writing, signed by authorized representatives of the RECIPIENT and ECOLOGY and made a part of this agreement. ECOLOGY and RECIPIENT may change their respective staff contacts without the concurrence of either party. This Agreement shall be subject to the written approval of Ecology's authorized representative and shall not be binding until so approved. The signatories to this Agreement represent that they have the authority to execute this Agreement and bind their respective organizations to this Agreement. Washington State The City of Yakima Department of Ecology DocuSigned by ,—Signed by: G. 9/4/2024 6..„ Isb Vic{dvia tea c 9/4/2024 BY: A4CFA58672844B9 By:`-182B4B56A7D64AB G. Thomas Tebb, L.Hg., L.E.G. Date Vicki Baker Date Office of the Columbia River Director CITY CONTRACT NO (-)Oa4-1- I Leo.,(� RESOLUTION NO: '`- L I 4213 Template Approved to Form by Attorney General's Office Template Version 12/10/2020 Page 7 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima SCOPE OF WORK Task Number:1 Task Cost: $0.00 Task Title:Project Administration/Management Task Description: A. The RECIPIENT will administer the project. Responsibilities will include, but not be limited to: maintenance of project records; submittal of requests for reimbursement and corresponding backup documentation, progress reports and recipient closeout report (including photos); compliance with applicable procurement, contracting, and interlocal agreement requirements; application for, receipt of, and compliance with all required permits, licenses, easements, or property rights necessary for the project; and submittal of required performance items. B. The RECIPIENT must manage the project. Efforts will include: conducting, coordinating, and scheduling project activities and assuring quality control. Every effort will be made to maintain effective communication with the RECIPIENT 's designees; the DEPARTMENT; all affected local, state, or federal jurisdictions; and any interested individuals or groups. The RECIPIENT must carry out this project in accordance with any completion dates outlined in this agreement . Task Goal Statement: Properly managed project that meets agreement and Ecology administrative requirements. Task Expected Outcome: * Timely and complete submittal of requests for reimbursement , quarterly progress reports and recipient closeout report. * Properly maintained project documentation Recipient Task Coordinator: Mike Shane Deliverables Project Administration/Management Number Description Due Date 1.1 Progress Reports 1.2 Recipient Closeout Report 10/31/2025 Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 8 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima SCOPE OF WORK Task Number:2 Task Cost: $3,040,000.00 Task Title:Canal Systems Consolidated Pipeline Improvement Task Description: Install approximately 1,700 LF of 42-inch HDPE “Consolidated” pipeline. Pipeline will be extended from the intake for a distance of approximately 1,100 feet along W. Powerhouse Rd. to the eastbound Highway 12 right-of-way and just west of Ackley Rd. An additional 600 feet of pipeline will be installed on each side of and across Cowiche Creek and the General Irrigation Reservoir. The ends of the pipeline will be temporarily capped. With the completion of the pipeline as part of Stage 2, it will distribute water to the Fruitvale and Old Union canal systems. Task Goal Statement: The goal will be to complete as much of the Consolidated pipeline as available funding will allow. It will be necessary to complete the pipeline across Cowiche Creek and the General reservoir to allow the reservoir to be demolished as part of the Stage 1 project. Completion of the Consolidated pipeline as part of Stage 1 will provide the starting point for the Stage 2 project final completion of the Nelson Ph. 2 pipeline project. Task Expected Outcome: Completion of the Consolidated pipeline as part of the Stage 1 project will provide a new pipeline ready for future extension as part of the Stage 2 project. It will also allow for the demolition of the General reservoir and then Yakima County to move forward with their Cowiche Creek Levee Setback Project. Recipient Task Coordinator: Mike Shane Deliverables Canal Systems Consolidated Pipeline Improvement Number Description Due Date 2.1 Fruitvale and Old Union Canal Systems Consolidated Pipeline Improvements Construction Bid Documents 09/30/2024 2.2 Copies of Applicable Environmental and Cultural Permits 09/30/2024 2.3 Estimated Construction Timeline 10/31/2024 2.4 Project as-built documents 09/30/2025 2.5 Photos of site before, during and after project construction 09/30/2025 Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 9 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima SCOPE OF WORK Task Number:3 Task Cost: $4,560,000.00 Task Title:General Pipeline Improvement Construction Task Description: Install a 32-inch HDPE pipeline from the new intake to the City’s “General” pipeline system 3,000 feet to just downstream of the General Irrigation Reservoir adjacent to US 12 and allowing for the removal of the reservoir. Here, the new pipe will connect directly to the existing HDPE pipe at that location. Task Goal Statement: The goad is to provide a new pipeline for this portion of the General Irrigation system, which will replace an aging and leaking concrete pipeline. In 2011, the City replaced the concrete pipeline with HDPE downstream from the General Irrigation Reservoir. The new pipeline installed as part of this project will complete the replacement of the last portion of our entire General Irrigation system. Task Expected Outcome: Obtain final design of new canal. Completion of the new General pipeline will provide for a leak-proof, water-efficient and reliable pipeline for decades to come. Recipient Task Coordinator: Mike Shane Deliverables General Pipeline Improvement Construction Number Description Due Date 3.1 City of Yakima General Pipeline Improvements Construction Bid Documents 09/30/2024 3.2 Copies of Applicable Environmental and Cultural Permits 09/30/2024 3.3 Estimated Construction Timeline 10/31/2024 3.4 Project as-built documents 09/30/2025 3.5 Photos of site before, during and after project construction 09/30/2025 Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 10 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima BUDGET Funding Distribution EG250038 NOTE: The above funding distribution number is used to identify this specific agreement and budget on payment remittances and may be referenced on other communications from ECOLOGY. Your agreement may have multiple funding distribution numbers to identify each budget. Title: State State Building Construction Account (SBCA) (WRYBIP-2325) 100% Grants for the purpose to assess, plan, and develop projects under the Yakima River Basin Integrated Water Resource Management Plan or for any other actions designed to provide access to new water supplies within the Yakima River basin or any other actions to support the seven elements of the Yakima Basin Integrated Plan . Type: Funding Source %: Description: FDFund: Approved Indirect Costs Rate: Recipient Match %: InKind Interlocal Allowed: InKind Other Allowed: Is this Funding Distribution used to match a federal grant? No Approved State Indirect Rate: 0% 0% No No Funding Title: Funding Source: Funding Expiration Date: Funding Type: Funding Effective Date: Nelson Ph. 2 Pipeline 09/16/2024 11/30/2025 Grant Nelson Ph. 2 Pipeline Task Total Project Administration/Management 0.00$ Canal Systems Consolidated Pipeline Improvement 3,040,000.00$ General Pipeline Improvement Construction 4,560,000.00$ 7,600,000.00$Total: Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 11 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima Funding Distribution Summary Recipient / Ecology Share Recipient Share Ecology Share TotalRecipient Match %Funding Distribution Name $$$%7,600,000.00 7,600,000.000.000.00Nelson Ph. 2 Pipeline Total $$0.00 7,600,000.00 $7,600,000.00 AGREEMENT SPECIFIC TERMS AND CONDITIONS N/A SPECIAL TERMS AND CONDITIONS GENERAL FEDERAL CONDITIONS If a portion or all of the funds for this agreement are provided through federal funding sources or this agreement is used to match a federal grant award, the following terms and conditions apply to you. A. CERTIFICATION REGARDING SUSPENSION, DEBARMENT, INELIGIBILITY OR VOLUNTARY EXCLUSION: 1.The RECIPIENT/CONTRACTOR, by signing this agreement, certifies that it is not suspended, debarred, proposed for debarment, declared ineligible or otherwise excluded from contracting with the federal government, or from receiving contracts paid for with federal funds. If the RECIPIENT/CONTRACTOR is unable to certify to the statements contained in the certification, they must provide an explanation as to why they cannot. 2.The RECIPIENT/CONTRACTOR shall provide immediate written notice to ECOLOGY if at any time the RECIPIENT/CONTRACTOR learns that its certification was erroneous when submitted or had become erroneous by reason of changed circumstances. 3.The terms covered transaction, debarred, suspended, ineligible, lower tier covered transaction, participant, person, primary covered transaction, principal, proposal, and voluntarily excluded, as used in this clause, have the meaning set out in the Definitions and Coverage sections of rules implementing Executive Order 12549. You may contact ECOLOGY for assistance in obtaining a copy of those regulations . 4.The RECIPIENT/CONTRACTOR agrees it shall not knowingly enter into any lower tier covered transaction with a person who is proposed for debarment under the applicable Code of Federal Regulations, debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction. 5.The RECIPIENT/CONTRACTOR further agrees by signing this agreement , that it will include this clause titled “CERTIFICATION REGARDING SUSPENSION, DEBARMENT, INELIGIBILITY OR VOLUNTARY EXCLUSION” without modification in all lower tier covered transactions and in all solicitations for lower tier covered transactions. 6.Pursuant to 2CFR180.330, the RECIPIENT/CONTRACTOR is responsible for ensuring that any lower tier covered transaction complies with certification of suspension and debarment requirements. Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 12 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima 7.RECIPIENT/CONTRACTOR acknowledges that failing to disclose the information required in the Code of Federal Regulations may result in the delay or negation of this funding agreement, or pursuance of legal remedies, including suspension and debarment. 8.RECIPIENT/CONTRACTOR agrees to keep proof in its agreement file , that it, and all lower tier recipients or contractors, are not suspended or debarred, and will make this proof available to ECOLOGY before requests for reimbursements will be approved for payment. RECIPIENT/CONTRACTOR must run a search in <http://www.sam.gov> and print a copy of completed searches to document proof of compliance. B. FEDERAL FUNDING ACCOUNTABILITY AND TRANSPARENCY ACT (FFATA) REPORTING REQUIREMENTS: CONTRACTOR/RECIPIENT must complete the FFATA Data Collection Form (ECY 070-395) and return it with the signed agreement to ECOLOGY. Any CONTRACTOR/RECIPIENT that meets each of the criteria below must report compensation for its five top executives using the FFATA Data Collection Form . ·Receives more than $30,000 in federal funds under this award. ·Receives more than 80 percent of its annual gross revenues from federal funds. ·Receives more than $25,000,000 in annual federal funds. Ecology will not pay any invoices until it has received a completed and signed FFATA Data Collection Form . Ecology is required to report the FFATA information for federally funded agreements , including the required Unique Entity Identifier in www.sam.gov <http://www.sam.gov/> within 30 days of agreement signature. The FFATA information will be available to the public at www.usaspending.gov <http://www.usaspending.gov/>. For more details on FFATA requirements, see www.fsrs.gov <http://www.fsrs.gov/>. C. FEDERAL FUNDING PROHIBITION ON CERTAIN TELECOMMUNICATIONS OR VIDEO SURVEILLANCE SERVICES OR EQUIPMENT: As required by 2 CFR 200.216, federal grant or loan recipients and subrecipients are prohibited from obligating or expending loan or grant funds to: 1.Procure or obtain; 2.Extend or renew a contract to procure or obtain; or 3.Enter into a contract (or extend or renew a contract) to procure or obtain equipment, services, or systems that use covered telecommunications equipment, video surveillance services or services as a substantial or essential component of any system, or as critical technology as part of any system. As described in Public Law 115-232 <https://www.govinfo.gov/content/pkg/PLAW-115publ232/pdf/PLAW-115publ232.pdf>, section 889, covered telecommunications equipment is telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities ). Recipients, subrecipients, and borrowers also may not use federal funds to purchase certain prohibited equipment, systems, or services, including equipment, systems, or services produced or provided by entities identified in section 889, are recorded in the System for Award Management (SAM) <https://sam.gov/SAM/> exclusion list. Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 13 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 14 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima GENERAL TERMS AND CONDITIONS Pertaining to Grant and Loan Agreements With the state of Washington, Department of Ecology GENERAL TERMS AND CONDITIONS For DEPARTMENT OF ECOLOGY GRANTS and LOANS 07/01/2023 Version 1. ADMINISTRATIVE REQUIREMENTS a) RECIPIENT shall follow the "Administrative Requirements for Recipients of Ecology Grants and Loans – EAGL Edition ." (https://fortress.wa.gov/ecy/publications/SummaryPages/2301002.html) b) RECIPIENT shall complete all activities funded by this Agreement and be fully responsible for the proper management of all funds and resources made available under this Agreement . c) RECIPIENT agrees to take complete responsibility for all actions taken under this Agreement , including ensuring all subgrantees and contractors comply with the terms and conditions of this Agreement . ECOLOGY reserves the right to request proof of compliance by subgrantees and contractors. d) RECIPIENT’s activities under this Agreement shall be subject to the review and approval by ECOLOGY for the extent and character of all work and services. 2. AMENDMENTS AND MODIFICATIONS This Agreement may be altered, amended, or waived only by a written amendment executed by both parties. No subsequent modification(s) or amendment(s) of this Agreement will be of any force or effect unless in writing and signed by authorized representatives of both parties. ECOLOGY and the RECIPIENT may change their respective staff contacts and administrative information without the concurrence of either party. 3. ACCESSIBILITY REQUIREMENTS FOR COVERED TECHNOLOGY The RECIPIENT must comply with the Washington State Office of the Chief Information Officer , OCIO Policy no. 188, Accessibility (https://ocio.wa.gov/policy/accessibility) as it relates to “covered technology.” This requirement applies to all products supplied under the Agreement , providing equal access to information technology by individuals with disabilities, including and not limited to web sites/pages, web-based applications, software systems, video and audio content, and electronic documents intended for publishing on Ecology’s public web site . 4. ARCHAEOLOGICAL AND CULTURAL RESOURCES RECIPIENT shall take all reasonable action to avoid, minimize, or mitigate adverse effects to archaeological and historic archaeological sites, historic buildings/structures, traditional cultural places, sacred sites, or other cultural resources, hereby referred to as Cultural Resources. The RECIPIENT must agree to hold harmless ECOLOGY in relation to any claim related to Cultural Resources discovered , disturbed, or damaged due to the RECIPIENT’s project funded under this Agreement . RECIPIENT shall: a) Contact the ECOLOGY Program issuing the grant or loan to discuss any Cultural Resources requirements for their project : • Cultural Resource Consultation and Review should be initiated early in the project planning process and must be completed prior to expenditure of Agreement funds as required by applicable State and Federal requirements . * For state funded construction, demolition, or land acquisitions, comply with Governor Executive Order 21-02, Archaeological and Cultural Resources. Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 15 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima • For projects with any federal involvement, comply with the National Historic Preservation Act of 1966 (Section 106). b) If required by the ECOLOGY Program, submit an Inadvertent Discovery Plan (IDP) to ECOLOGY prior to implementing any project that involves field activities. ECOLOGY will provide the IDP form. RECIPIENT shall: • Keep the IDP at the project site. • Make the IDP readily available to anyone working at the project site . • Discuss the IDP with staff, volunteers, and contractors working at the project site. • Implement the IDP when Cultural Resources or human remains are found at the project site . c) If any Cultural Resources are found while conducting work under this Agreement , follow the protocol outlined in the project IDP. • Immediately stop work and notify the ECOLOGY Program, who will notify the Department of Archaeology and Historic Preservation at (360) 586-3065, any affected Tribe, and the local government. d) If any human remains are found while conducting work under this Agreement , follow the protocol outlined in the project IDP. • Immediately stop work and notify the local Law Enforcement Agency or Medical Examiner /Coroner’s Office, the Department of Archaeology and Historic Preservation at (360) 790-1633, and then the ECOLOGY Program. e) Comply with RCW 27.53, RCW 27.44, and RCW 68.50.645, and all other applicable local, state, and federal laws protecting Cultural Resources and human remains. 5. ASSIGNMENT No right or claim of the RECIPIENT arising under this Agreement shall be transferred or assigned by the RECIPIENT . 6. COMMUNICATION RECIPIENT shall make every effort to maintain effective communications with the RECIPIENT 's designees, ECOLOGY, all affected local, state, or federal jurisdictions, and any interested individuals or groups. 7. COMPENSATION a) Any work performed prior to effective date of this Agreement will be at the sole expense and risk of the RECIPIENT . ECOLOGY must sign the Agreement before any payment requests can be submitted . b) Payments will be made on a reimbursable basis for approved and completed work as specified in this Agreement . c) RECIPIENT is responsible to determine if costs are eligible. Any questions regarding eligibility should be clarified with ECOLOGY prior to incurring costs. Costs that are conditionally eligible require approval by ECOLOGY prior to expenditure . d) RECIPIENT shall not invoice more than once per month unless agreed on by ECOLOGY . e) ECOLOGY will not process payment requests without the proper reimbursement forms , Progress Report and supporting documentation. ECOLOGY will provide instructions for submitting payment requests . f) ECOLOGY will pay the RECIPIENT thirty (30) days after receipt of a properly completed request for payment. g) RECIPIENT will receive payment through Washington State’s Office of Financial Management’s Statewide Payee Desk . To receive payment you must register as a statewide vendor by submitting a statewide vendor registration form and an IRS W -9 form at website, https://ofm.wa.gov/it-systems/statewide-vendorpayee-services. If you have questions about the vendor registration process, you can contact Statewide Payee Help Desk at (360) 407-8180 or email PayeeRegistration@ofm.wa.gov. h) ECOLOGY may, at its sole discretion, withhold payments claimed by the RECIPIENT if the RECIPIENT fails to satisfactorily comply with any term or condition of this Agreement . i) Monies withheld by ECOLOGY may be paid to the RECIPIENT when the work described herein , or a portion thereof, has been completed if, at ECOLOGY's sole discretion, such payment is reasonable and approved according to this Agreement , as appropriate, or upon completion of an audit as specified herein. Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 16 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima j) RECIPIENT must submit within thirty (30) days after the expiration date of this Agreement, all financial, performance, and other reports required by this Agreement. Failure to comply may result in delayed reimbursement. 8. COMPLIANCE WITH ALL LAWS RECIPIENT agrees to comply fully with all applicable federal, state and local laws, orders, regulations, and permits related to this Agreement, including but not limited to: a) RECIPIENT agrees to comply with all applicable laws, regulations, and policies of the United States and the State of Washington which affect wages and job safety . b) RECIPIENT agrees to be bound by all applicable federal and state laws , regulations, and policies against discrimination. c) RECIPIENT certifies full compliance with all applicable state industrial insurance requirements . d) RECIPIENT agrees to secure and provide assurance to ECOLOGY that all the necessary approvals and permits required by authorities having jurisdiction over the project are obtained. RECIPIENT must include time in their project timeline for the permit and approval processes. ECOLOGY shall have the right to immediately terminate for cause this Agreement as provided herein if the RECIPIENT fails to comply with above requirements. If any provision of this Agreement violates any statute or rule of law of the state of Washington , it is considered modified to conform to that statute or rule of law. 9. CONFLICT OF INTEREST RECIPIENT and ECOLOGY agree that any officer, member, agent, or employee, who exercises any function or responsibility in the review, approval, or carrying out of this Agreement, shall not have any personal or financial interest, direct or indirect, nor affect the interest of any corporation, partnership, or association in which he/she is a part, in this Agreement or the proceeds thereof. 10. CONTRACTING FOR GOODS AND SERVICES RECIPIENT may contract to buy goods or services related to its performance under this Agreement . RECIPIENT shall award all contracts for construction, purchase of goods, equipment, services, and professional architectural and engineering services through a competitive process, if required by State law. RECIPIENT is required to follow procurement procedures that ensure legal, fair, and open competition. RECIPIENT must have a standard procurement process or follow current state procurement procedures . RECIPIENT may be required to provide written certification that they have followed their standard procurement procedures and applicable state law in awarding contracts under this Agreement . ECOLOGY reserves the right to inspect and request copies of all procurement documentation , and review procurement practices related to this Agreement. Any costs incurred as a result of procurement practices not in compliance with state procurement law or the RECIPIENT's normal procedures may be disallowed at ECOLOGY’s sole discretion . 11. DISPUTES When there is a dispute with regard to the extent and character of the work, or any other matter related to this Agreement the determination of ECOLOGY will govern, although the RECIPIENT shall have the right to appeal decisions as provided for below: a) RECIPIENT notifies the funding program of an appeal request . b) Appeal request must be in writing and state the disputed issue(s). c) RECIPIENT has the opportunity to be heard and offer evidence in support of its appeal . d) ECOLOGY reviews the RECIPIENT’s appeal. e) ECOLOGY sends a written answer within ten (10) business days, unless more time is needed, after concluding the review. Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 17 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima The decision of ECOLOGY from an appeal will be final and conclusive , unless within thirty (30) days from the date of such decision, the RECIPIENT furnishes to the Director of ECOLOGY a written appeal. The decision of the Director or duly authorized representative will be final and conclusive. The parties agree that this dispute process will precede any action in a judicial or quasi-judicial tribunal. Appeals of the Director's decision will be brought in the Superior Court of Thurston County . Review of the Director’s decision will not be taken to Environmental and Land Use Hearings Office . Pending final decision of a dispute, the RECIPIENT agrees to proceed diligently with the performance of this Agreement and in accordance with the decision rendered. Nothing in this Agreement will be construed to limit the parties’ choice of another mutually acceptable method , in addition to the dispute resolution procedure outlined above. 12. ENVIRONMENTAL DATA STANDARDS a) RECIPIENT shall prepare a Quality Assurance Project Plan (QAPP) for a project that collects or uses environmental measurement data. RECIPIENTS unsure about whether a QAPP is required for their project shall contact the ECOLOGY Program issuing the grant or loan. If a QAPP is required, the RECIPIENT shall: • Use ECOLOGY’s QAPP Template/Checklist provided by the ECOLOGY, unless ECOLOGY Quality Assurance (QA) officer or the Program QA coordinator instructs otherwise. • Follow ECOLOGY’s Guidelines for Preparing Quality Assurance Project Plans for Environmental Studies , July 2004 (Ecology Publication No. 04-03-030). • Submit the QAPP to ECOLOGY for review and approval before the start of the work . b) RECIPIENT shall submit environmental data that was collected on a project to ECOLOGY using the Environmental Information Management system (EIM), unless the ECOLOGY Program instructs otherwise. The RECIPIENT must confirm with ECOLOGY that complete and correct data was successfully loaded into EIM , find instructions at: http://www.ecy.wa.gov/eim. c) RECIPIENT shall follow ECOLOGY’s data standards when Geographic Information System (GIS) data is collected and processed. Guidelines for Creating and Accessing GIS Data are available at : https://ecology.wa.gov/Research-Data/Data-resources/Geographic-Information-Systems-GIS/Standards. RECIPIENT, when requested by ECOLOGY, shall provide copies to ECOLOGY of all final GIS data layers, imagery, related tables, raw data collection files, map products, and all metadata and project documentation. 13. GOVERNING LAW This Agreement will be governed by the laws of the State of Washington , and the venue of any action brought hereunder will be in the Superior Court of Thurston County. 14. INDEMNIFICATION ECOLOGY will in no way be held responsible for payment of salaries , consultant's fees, and other costs related to the project described herein, except as provided in the Scope of Work. To the extent that the Constitution and laws of the State of Washington permit , each party will indemnify and hold the other harmless from and against any liability for any or all injuries to persons or property arising from the negligent act or omission of that party or that party's agents or employees arising out of this Agreement . 15. INDEPENDENT STATUS The employees, volunteers, or agents of each party who are engaged in the performance of this Agreement will continue to be employees, volunteers, or agents of that party and will not for any purpose be employees, volunteers, or agents of the other party. Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 18 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima 16. KICKBACKS RECIPIENT is prohibited from inducing by any means any person employed or otherwise involved in this Agreement to give up any part of the compensation to which he/she is otherwise entitled to or receive any fee, commission, or gift in return for award of a subcontract hereunder. 17. MINORITY AND WOMEN’S BUSINESS ENTERPRISES (MWBE) RECIPIENT is encouraged to solicit and recruit, to the extent possible, certified minority-owned (MBE) and women-owned (WBE) businesses in purchases and contracts initiated under this Agreement . Contract awards or rejections cannot be made based on MWBE participation; however, the RECIPIENT is encouraged to take the following actions, when possible, in any procurement under this Agreement : a) Include qualified minority and women's businesses on solicitation lists whenever they are potential sources of goods or services. b) Divide the total requirements, when economically feasible, into smaller tasks or quantities, to permit maximum participation by qualified minority and women's businesses. c) Establish delivery schedules, where work requirements permit, which will encourage participation of qualified minority and women's businesses. d) Use the services and assistance of the Washington State Office of Minority and Women 's Business Enterprises (OMWBE) (866-208-1064) and the Office of Minority Business Enterprises of the U.S. Department of Commerce, as appropriate. 18. ORDER OF PRECEDENCE In the event of inconsistency in this Agreement, unless otherwise provided herein, the inconsistency shall be resolved by giving precedence in the following order: (a) applicable federal and state statutes and regulations; (b) The Agreement; (c) Scope of Work; (d) Special Terms and Conditions; (e) Any provisions or terms incorporated herein by reference, including the "Administrative Requirements for Recipients of Ecology Grants and Loans"; (f) Ecology Funding Program Guidelines; and (g) General Terms and Conditions. 19. PRESENTATION AND PROMOTIONAL MATERIALS ECOLOGY reserves the right to approve RECIPIENT’s communication documents and materials related to the fulfillment of this Agreement: a) If requested, RECIPIENT shall provide a draft copy to ECOLOGY for review and approval ten (10) business days prior to production and distribution. b) RECIPIENT shall include time for ECOLOGY’s review and approval process in their project timeline . c) If requested, RECIPIENT shall provide ECOLOGY two (2) final copies and an electronic copy of any tangible products developed. Copies include any printed materials, and all tangible products developed such as brochures, manuals, pamphlets, videos, audio tapes, CDs, curriculum, posters, media announcements, or gadgets with a message, such as a refrigerator magnet, and any online communications, such as web pages, blogs, and twitter campaigns. If it is not practical to provide a copy, then the RECIPIENT shall provide a description (photographs, drawings, printouts, etc.) that best represents the item. Any communications intended for public distribution that uses ECOLOGY’s logo shall comply with ECOLOGY’s graphic requirements and any additional requirements specified in this Agreement . Before the use of ECOLOGY’s logo contact ECOLOGY for guidelines. RECIPIENT shall acknowledge in the communications that funding was provided by ECOLOGY . 20. PROGRESS REPORTING Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 19 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima a) RECIPIENT must satisfactorily demonstrate the timely use of funds by submitting payment requests and progress reports to ECOLOGY. ECOLOGY reserves the right to amend or terminate this Agreement if the RECIPIENT does not document timely use of funds. b) RECIPIENT must submit a progress report with each payment request . Payment requests will not be processed without a progress report. ECOLOGY will define the elements and frequency of progress reports . c) RECIPIENT shall use ECOLOGY’s provided progress report format. d) Quarterly progress reports will cover the periods from January 1 through March 31, April 1 through June 30, July 1 through September 30, and October 1 through December 31. Reports shall be submitted within thirty (30) days after the end of the quarter being reported. e) RECIPIENT must submit within thirty (30) days of the expiration date of the project, unless an extension has been approved by ECOLOGY, all financial, performance, and other reports required by the Agreement and funding program guidelines . RECIPIENT shall use the ECOLOGY provided closeout report format. 21. PROPERTY RIGHTS a) Copyrights and Patents. When the RECIPIENT creates any copyrightable materials or invents any patentable property under this Agreement, the RECIPIENT may copyright or patent the same but ECOLOGY retains a royalty free , nonexclusive, and irrevocable license to reproduce, publish, recover, or otherwise use the material(s) or property, and to authorize others to use the same for federal, state, or local government purposes. b) Publications. When the RECIPIENT or persons employed by the RECIPIENT use or publish ECOLOGY information ; present papers, lectures, or seminars involving information supplied by ECOLOGY; or use logos, reports, maps, or other data in printed reports, signs, brochures, pamphlets, etc., appropriate credit shall be given to ECOLOGY. c) Presentation and Promotional Materials. ECOLOGY shall have the right to use or reproduce any printed or graphic materials produced in fulfillment of this Agreement , in any manner ECOLOGY deems appropriate. ECOLOGY shall acknowledge the RECIPIENT as the sole copyright owner in every use or reproduction of the materials . d) Tangible Property Rights. ECOLOGY's current edition of "Administrative Requirements for Recipients of Ecology Grants and Loans," shall control the use and disposition of all real and personal property purchased wholly or in part with funds furnished by ECOLOGY in the absence of state and federal statutes , regulations, or policies to the contrary, or upon specific instructions with respect thereto in this Agreement . e) Personal Property Furnished by ECOLOGY. When ECOLOGY provides personal property directly to the RECIPIENT for use in performance of the project, it shall be returned to ECOLOGY prior to final payment by ECOLOGY . If said property is lost, stolen, or damaged while in the RECIPIENT's possession, then ECOLOGY shall be reimbursed in cash or by setoff by the RECIPIENT for the fair market value of such property . f) Acquisition Projects. The following provisions shall apply if the project covered by this Agreement includes funds for the acquisition of land or facilities: 1. RECIPIENT shall establish that the cost is fair value and reasonable prior to disbursement of funds provided for in this Agreement. 2. RECIPIENT shall provide satisfactory evidence of title or ability to acquire title for each parcel prior to disbursement of funds provided by this Agreement. Such evidence may include title insurance policies, Torrens certificates, or abstracts, and attorney's opinions establishing that the land is free from any impediment, lien, or claim which would impair the uses intended by this Agreement. g) Conversions. Regardless of the Agreement expiration date , the RECIPIENT shall not at any time convert any equipment , property, or facility acquired or developed under this Agreement to uses other than those for which assistance was originally approved without prior written approval of ECOLOGY. Such approval may be conditioned upon payment to ECOLOGY of that portion of the proceeds of the sale, lease, or other conversion or encumbrance which monies granted pursuant to this Agreement bear to the total acquisition, purchase, or construction costs of such property. Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 20 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima 22. RECORDS, AUDITS, AND INSPECTIONS RECIPIENT shall maintain complete program and financial records relating to this Agreement , including any engineering documentation and field inspection reports of all construction work accomplished. All records shall: a) Be kept in a manner which provides an audit trail for all expenditures. b) Be kept in a common file to facilitate audits and inspections. c) Clearly indicate total receipts and expenditures related to this Agreement . d) Be open for audit or inspection by ECOLOGY, or by any duly authorized audit representative of the State of Washington , for a period of at least three (3) years after the final grant payment or loan repayment, or any dispute resolution hereunder. RECIPIENT shall provide clarification and make necessary adjustments if any audits or inspections identify discrepancies in the records. ECOLOGY reserves the right to audit, or have a designated third party audit, applicable records to ensure that the state has been properly invoiced. Any remedies and penalties allowed by law to recover monies determined owed will be enforced. Repetitive instances of incorrect invoicing or inadequate records may be considered cause for termination. All work performed under this Agreement and any property and equipment purchased shall be made available to ECOLOGY and to any authorized state, federal or local representative for inspection at any time during the course of this Agreement and for at least three (3) years following grant or loan termination or dispute resolution hereunder. RECIPIENT shall provide right of access to ECOLOGY, or any other authorized representative, at all reasonable times, in order to monitor and evaluate performance, compliance, and any other conditions under this Agreement . 23. RECOVERY OF FUNDS The right of the RECIPIENT to retain monies received as reimbursement payments is contingent upon satisfactory performance of this Agreement and completion of the work described in the Scope of Work . All payments to the RECIPIENT are subject to approval and audit by ECOLOGY , and any unauthorized expenditure(s) or unallowable cost charged to this Agreement shall be refunded to ECOLOGY by the RECIPIENT . RECIPIENT shall refund to ECOLOGY the full amount of any erroneous payment or overpayment under this Agreement . RECIPIENT shall refund by check payable to ECOLOGY the amount of any such reduction of payments or repayments within thirty (30) days of a written notice. Interest will accrue at the rate of twelve percent (12%) per year from the time ECOLOGY demands repayment of funds. Any property acquired under this Agreement , at the option of ECOLOGY, may become ECOLOGY's property and the RECIPIENT's liability to repay monies will be reduced by an amount reflecting the fair value of such property. 24. SEVERABILITY If any provision of this Agreement or any provision of any document incorporated by reference shall be held invalid , such invalidity shall not affect the other provisions of this Agreement which can be given effect without the invalid provision , and to this end the provisions of this Agreement are declared to be severable . 25. STATE ENVIRONMENTAL POLICY ACT (SEPA) RECIPIENT must demonstrate to ECOLOGY’s satisfaction that compliance with the requirements of the State Environmental Policy Act (Chapter 43.21C RCW and Chapter 197-11 WAC) have been or will be met. Any reimbursements are subject to this provision. 26. SUSPENSION When in the best interest of ECOLOGY, ECOLOGY may at any time, and without cause, suspend this Agreement or any portion thereof for a temporary period by written notice from ECOLOGY to the RECIPIENT . RECIPIENT shall resume performance on the next business day following the suspension period unless another day is specified by ECOLOGY. Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 21 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima 27. SUSTAINABLE PRACTICES In order to sustain Washington’s natural resources and ecosystems , the RECIPIENT is fully encouraged to implement sustainable practices and to purchase environmentally preferable products under this Agreement . a) Sustainable practices may include such activities as: use of clean energy, use of double-sided printing, hosting low impact meetings, and setting up recycling and composting programs. b) Purchasing may include such items as: sustainably produced products and services, EPEAT registered computers and imaging equipment, independently certified green cleaning products, remanufactured toner cartridges, products with reduced packaging, office products that are refillable , rechargeable, and recyclable, 100% post-consumer recycled paper, and toxic free products. For more suggestions visit ECOLOGY’s web page, Green Purchasing, https://ecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Sustainable-purchasing. 28. TERMINATION a) For Cause ECOLOGY may terminate for cause this Agreement with a seven (7) calendar days prior written notification to the RECIPIENT, at the sole discretion of ECOLOGY, for failing to perform an Agreement requirement or for a material breach of any term or condition. If this Agreement is so terminated, the parties shall be liable only for performance rendered or costs incurred in accordance with the terms of this Agreement prior to the effective date of termination . Failure to Commence Work. ECOLOGY reserves the right to terminate this Agreement if RECIPIENT fails to commence work on the project funded within four (4) months after the effective date of this Agreement, or by any date mutually agreed upon in writing for commencement of work, or the time period defined within the Scope of Work . Non-Performance. The obligation of ECOLOGY to the RECIPIENT is contingent upon satisfactory performance by the RECIPIENT of all of its obligations under this Agreement. In the event the RECIPIENT unjustifiably fails, in the opinion of ECOLOGY, to perform any obligation required of it by this Agreement , ECOLOGY may refuse to pay any further funds, terminate in whole or in part this Agreement, and exercise any other rights under this Agreement . Despite the above, the RECIPIENT shall not be relieved of any liability to ECOLOGY for damages sustained by ECOLOGY and the State of Washington because of any breach of this Agreement by the RECIPIENT . ECOLOGY may withhold payments for the purpose of setoff until such time as the exact amount of damages due ECOLOGY from the RECIPIENT is determined. b) For Convenience ECOLOGY may terminate for convenience this Agreement , in whole or in part, for any reason when it is the best interest of ECOLOGY, with a thirty (30) calendar days prior written notification to the RECIPIENT, except as noted below. If this Agreement is so terminated, the parties shall be liable only for performance rendered or costs incurred in accordance with the terms of this Agreement prior to the effective date of termination . Non-Allocation of Funds. ECOLOGY’s ability to make payments is contingent on availability of funding . In the event funding from state, federal or other sources is withdrawn, reduced, or limited in any way after the effective date and prior to the completion or expiration date of this Agreement, ECOLOGY, at its sole discretion, may elect to terminate the Agreement, in whole or part, or renegotiate the Agreement, subject to new funding limitations or conditions. ECOLOGY may also elect to suspend performance of the Agreement until ECOLOGY determines the funding insufficiency is resolved . ECOLOGY may exercise any of these options with no notification or restrictions, although ECOLOGY will make a reasonable attempt to provide notice. In the event of termination or suspension, ECOLOGY will reimburse eligible costs incurred by the RECIPIENT through the effective date of termination or suspension. Reimbursed costs must be agreed to by ECOLOGY and the RECIPIENT . In no Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Page 22 of 22State of Washington Department of Ecology Agreement No: Project Title: Recipient Name: WRYBIP-2325-YaWaIr-00057 Nelson Ph. 2 Pipeline The City of Yakima event shall ECOLOGY’s reimbursement exceed ECOLOGY’s total responsibility under the Agreement and any amendments . If payments have been discontinued by ECOLOGY due to unavailable funds , the RECIPIENT shall not be obligated to repay monies which had been paid to the RECIPIENT prior to such termination . RECIPIENT’s obligation to continue or complete the work described in this Agreement shall be contingent upon availability of funds by the RECIPIENT's governing body. c) By Mutual Agreement ECOLOGY and the RECIPIENT may terminate this Agreement, in whole or in part, at any time, by mutual written agreement. d) In Event of Termination All finished or unfinished documents, data studies, surveys, drawings, maps, models, photographs, reports or other materials prepared by the RECIPIENT under this Agreement, at the option of ECOLOGY, will become property of ECOLOGY and the RECIPIENT shall be entitled to receive just and equitable compensation for any satisfactory work completed on such documents and other materials. Nothing contained herein shall preclude ECOLOGY from demanding repayment of all funds paid to the RECIPIENT in accordance with Recovery of Funds, identified herein. 29. THIRD PARTY BENEFICIARY RECIPIENT shall ensure that in all subcontracts entered into by the RECIPIENT pursuant to this Agreement , the state of Washington is named as an express third party beneficiary of such subcontracts with full rights as such . 30. WAIVER Waiver of a default or breach of any provision of this Agreement is not a waiver of any subsequent default or breach , and will not be construed as a modification of the terms of this Agreement unless stated as such in writing by the authorized representative of ECOLOGY. End of General Terms and Conditions Template Version 12/10/2020 Docusign Envelope ID: 3B36E67E-1457-4B8C-852F-B5206BD00219 Certificate Of Completion Envelope Id: 3B36E67E14574B8C852FB5206BD00219 Status: Completed Subject: Complete with Docusign: WRYBIP-2325-YaWaIr-00057_Agreement_for Signature.pdf Source Envelope: Document Pages: 22 Signatures: 2 Envelope Originator: Certificate Pages: 2 Initials: 0 Ubaidullah Ahmadzai AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) P.O. Box 47600 Olympia, WA 98504 uahm461@ecy.wa.gov IP Address: 73.140.248.171 Record Tracking Status: Original 8/23/2024 10:04:27 AM Holder: Ubaidullah Ahmadzai uahm461@ecy.wa.gov Location: DocuSign Security Appliance Status: Connected Pool: StateLocal Storage Appliance Status: Connected Pool: Washington State Department of Ecology Location: DocuSign Signer Events Signature Timestamp Victoria Baker vicki.baker@yakimawa.gov City Manager Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 205.172.45.253 Sent: 8/23/2024 10:13:51 AM Viewed: 9/4/2024 9:34:04 AM Signed: 9/4/2024 9:34:52 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign G. Thomas Tebb gteb461@ecy.wa.gov Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 165.151.117.80 Sent: 9/4/2024 9:34:54 AM Viewed: 9/4/2024 9:35:19 AM Signed: 9/4/2024 9:35:49 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Jo-Anne Carlson joac461@ecy.wa.gov Security Level: Email, Account Authentication (None) Sent: 9/4/2024 9:34:53 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Carbon Copy Events Status Timestamp Haydon, Kevin keha461@ecy.wa.gov Security Level: Email, Account Authentication (None) Sent: 9/4/2024 9:35:50 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Mike Shane mike.shane@yakimawa.gov Security Level: Email, Account Authentication (None) Sent: 9/4/2024 9:35:51 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 8/23/2024 10:13:51 AM Certified Delivered Security Checked 9/4/2024 9:35:19 AM Signing Complete Security Checked 9/4/2024 9:35:49 AM Completed Security Checked 9/4/2024 9:35:51 AM Payment Events Status Timestamps \'....)-Lipir.....=r BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 9.B. For Meeting of: September 3, 2024 ITEM TITLE: Resolution authorizing acceptance of a State of Washington Department of Ecology Grant Award Agreement for the Nelson Phase 2 Pipeline Conveyance Improvements Project IC2010 SUBMITTED BY: Scott Schafer, Director of Public Works *Mike Shane, Water/Irrigation Manager SUMMARY EXPLANATION: The City of Yakima is moving forward with the construction of the Nelson Phase 2 Pipeline Conveyance Improvements Project IC2010. This Agreement sets forth the terms and conditions for the City of Yakima to utilize the $7,600,000 in funding that was made available from the State of Washington's 2023-2025 biennial budget through Ecology from a request made as part of the Yakima Basin Integrated Plan. The funds will be used to construct a portion of the overall pipeline project between October 2024 and April 2025. There is no additional match requirement as part of the funding agreement. ITEM BUDGETED: No STRATEGIC PRIORITY 24-25: A Resilient Yakima RECOMMENDATION: Adopt Resolution. ATTACHMENTS: Nelson Ph. 2 Ecology Grant Resolution.docx Agmnt. WRYBIP-2325-YaWalr-00057 for Signature.pdf 188 Docusign Envelope ID: 176F389C-8EF5-4CA8-8388-A2F072F8E395 DEPARTMENT OF ECOLOGY State of Washington AMENDMENT NO. 1 TO AGREEMENT NO.WRYBIP-2325-YaWaIr-00057 BETWEEN THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY AND The City of Yakima PURPOSE: To amend the above-referenced agreement(AGREEMENT)between the state of Washington Department of Ecology(ECOLOGY)and The City of Yakima(RECIPIENT)for the Nelson Ph.2 Pipeline(PROJECT). The purpose of this amendment is to modify the scope under tasks 2 and 3 to allow reimbursement of the City's contractor costs for construction contract oversight,management,and administration, and Washington State Department of Transportation inspection fees for infrastructure within their right-of-way.Previously it was anticipated that the construction bids would exhaust the entire grant budget.After receiving bids and awarding construction contracts,there is approximately$440,000 available to support the construction contract oversight,management, and administration work done by the City's contractor or inspection fees from WSDOT. IT IS MUTUALLY AGREED that the AGREEMENT is amended as follows: CHANGES TO SCOPE OF WORK Task Number: 2 Task Cost: $3,040,000.00 Task Title: Canal Systems Consolidated Pipeline Improvement Task Description: Install approximately 1,700 LF of 42-inch HDPE"Consolidated"pipeline. Pipeline will be extended from the intake for a distance of approximately 1,100 feet along W.Powerhouse Rd.to the eastbound Highway 12 right-of-way and just west of Ackley Rd. An additional 600 feet of pipeline will be installed on each side of and across Cowiche Creek and the General Irrigation Reservoir. The ends of the pipeline will be temporarily capped. With the completion of the pipeline as part of Stage 2, it will distribute water to the Fruitvale and Old Union canal systems. Work under this task includes construction and construction contract administration and oversight performed by the City's contractor and inspection fees from WSDOT for infrastructure built within their right-of-way. Task Goal Statement: The goal will be to complete as much of the Consolidated pipeline as available funding will allow. It will be necessary to complete the pipeline across Cowiche Creek and the General reservoir to allow the reservoir to be demolished as part of the Stage 1 project. Completion of the Consolidated pipeline as part of Stage 1 will provide the starting point for the Stage 2 Template Version 10/30/2015 Docusign Envelope ID. 176F389C-8EF5-4CA8-8388-A2F072F8E395 State of Washington Department of Ecology Page 2 of 4 The City of Yakima Nelson Ph 2 Pipeline Project Agreement No WRYBIP-2325-YaWaIr-00057 project final completion of the Nelson Ph.2 pipeline project. Task Expected Outcome: Completion of the Consolidated pipeline as part of the Stage 1 project will provide a new pipeline ready for future extension as part of the Stage 2 project. It will also allow for the demolition of the General reservoir and then Yakima County to move forward with their Cowiche Creek Levee Setback Project. Recipient Task Coordinator: Mike Shane Deliverables Number Description Due Date 2.I Fruitvale and Old Union Canal Systems Consolidated Pipeline 09/30/2024 Improvements Construction Bid Documents 2.2 Copies of Applicable Environmental and Cultural Permits 09/30/2024 2.3 Estimated Construction Timeline 10/31/2024 2.4 Project as-built documents 09/30/2025 2.5 Photos of site before,during and after project construction 09/30/2025 CHANGES TO SCOPE OF WORK Task Number: 3 Task Cost: $4,560,000.00 Task Title: General Pipeline Improvement Construction Task Description: Install a 32-inch HDPE pipeline from the new intake to the City's"General"pipeline system 3,000 feet to just downstream of the General Irrigation Reservoir adjacent to US 12 and allowing for the removal of the reservoir. Here,the new pipe will connect directly to the existing HDPE pipe at that location. Work under this task includes construction and construction contract administration and oversight performed by the City's contractor and inspection fees from WSDOT for infrastructure built within their right-of-way. Task Goal Statement: The goad is to provide a new pipeline for this portion of the General Irrigation system,which will replace an aging and leaking concrete pipeline. In 2011,the City replaced the concrete pipeline with HDPE downstream from the General Irrigation Reservoir. The new pipeline installed as part of this project will complete the replacement of the last portion of our entire General Irrigation system. Task Expected Outcome: Obtain final design of new canal. Completion of the new General pipeline will provide for a leak-proof,water-efficient and reliable pipeline for decades to come. Template Version 10/30/2015 Docusign Envelope ID 176F389C-8EF5-4CA8-8388-A2F072F8E395 State of Washington Department of Ecology Page 3 of 4 The City of Yakima Nelson Ph 2 Pipeline Project Agreement No WRYBIP-2325-YaWalr-00057 Recipient Task Coordinator: Mike Shane Deliverables Number Description Due Date 3.1 City of Yakima General Pipeline Improvements Construction Bid 09/30/2024 Documents 3.2 Copies of Applicable Environmental and Cultural Permits 09/30/2024 3.3 Estimated Construction Timeline 10/31/2024 3.4 Project as-built documents 09/30/2025 3.5 Photos of site before,during and after project construction 09/30/2025 Template Version 10/30/2015 Docusign Envelope ID' 176F389C-8EF5-4CA8-8388-A2F072F8E395 State of Washington Department of Ecology Page 4 of 4 The City of Yakima Nelson Ph 2 Pipeline Project Agreement No WRYBIP-2325-YaWalr-00057 AUTHORIZING SIGNATURES All other terms and conditions of the original Agreement including any Amendments remain in full force and effect,except as expressly provided by this Amendment. The signatories to this Amendment represent that they have the authority to execute this Amendment and bind their respective organizations to this Amendment. This amendment will be effective 11/30/2025. IN WITNESS WHEREOF:the parties hereto,having read this Amendment in its entirety,including all attachments,do agree in each and every particular and have thus set their hands hereunto. Washington State The City of Yakima Department of Ecology p-lhcuspned by Signed by a, aS 4 11/19/2024 B L i.1� bakt,, 11/19/2024 B- Lf`ceSna77AAAno $y. VU� 1/ 16120"GCC"717C.Ag G.Thomas Tebb,L.Hg.,L.E.G. Date Vicki Baker Date Office of the Columbia River �,^(� /� Director CITY CONTRACT NO.��01911—1( ! 4► j RESOLUTION NO.R� Y4C1 Template Approved to Form by Attorney General's Office Template Version 10/30/2015 L�docusign Certificate Of Completion Envelope Id. 176F389C8EF54CA88388A2F072F8E395 Status Completed Subject.Complete with Docusign.WRYBIP-2325-YaWalr-00057_Amendment pdf Source Envelope: Document Pages.4 Signatures 2 Envelope Originator. Certificate Pages.2 Initials 0 Ubaidullah Ahmadzai AutoNav:Enabled P.O.Box 47600 Envelopeld Stamping.Enabled Olympia,WA 98504 Time Zone.(UTC-08.00)Pacific Time(US&Canada) uahm461@ecy.wa.gov IP Address.73.140.248.171 Record Tracking Status.Original Holder:Ubaidullah Ahmadzai Location DocuSign 11/14/2024 1 41 34 PM uahm461@ecy.wa gov Security Appliance Status:Connected Pool:StateLocal Storage Appliance Status.Connected Pool:Washington State Department of Ecology Location DocuSign Signer Events Signature Timestamp Victoria Baker /—Si9"edby Sent: 11/14/2024 1:44:23 PM vicki.baker@yakimawa gov VI,tOVta bob% Viewed. 11/19/2024 9.02.10 AM 162B41366A7D64AB City Manager Signed 11/19/2024 9 02 27 AM Security Level.Email,Account Authentication (None) Signature Adoption:Pre-selected Style Using IP Address.205.172.45.253 Electronic Record and Signature Disclosure: Not Offered via DocuSign G Thomas Tebb r—DocuSi7nedby Sent. 11/19/2024 9:02:30 AM gteb461@ecy.wa.gov G. I uo$'aS fit,GI, Viewed 11/19/2024 9 11.29 AM Security Level.Email,Account Authentication 1/4,—A4CFA58672644B9 Signed: 11/19/2024 9 11 43 AM (None) Signature Adoption Pre-selected Style Using IP Address 98 97 43 147 Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Jo-Anne Carlson COPIED Sent. 11/19/2024 9:02.29 AM joac461@ecy.wa.gov Security Level Email,Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Carbon Copy Events Status Timestamp Haydon,Kevin COPIED Sent 11/19/2024 9 11 45 AM keha461 @ecy wa gov Security Level Email,Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Mike Shane I Sent 11/19/2024 9 11 46 AM mike shane@yakimawa.gov COPIED Security Level.Email,Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 11/14/2024 1 44 23 PM Certified Delivered Security Checked 11/19/2024 9 11 29 AM Signing Complete Security Checked 11/19/2024 9:11.43 AM Completed Security Checked 11/19/2024 9.11.46 AM Payment Events Status Timestamps Docusign Envelope ID: 277B6872-FD37-4343-BC5B-92B2C013E9DB DEPARTMENT OF ECOLOGY State of Washington AMENDMENT NO. 2 TO AGREEMENT NO. WRYBIP-2325-YaWair-00057 BETWEEN THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY AND The City of Yakima PURPOSE: To amend the above -referenced agreement (AGREEMENT) between the state of Washington Department of Ecology (ECOLOGY) and The City of Yakima (RECIPIENT) for the Nelson Ph. 2 Pipeline (PROJECT). The purpose of this amendment is to modify the scope under tasks 2 and create new task 4, Task 2 scope is reduced, and a portion of the budget is redistributed to support Task 4. This amendment is necessary due to a recent change in additional project funding anticipated from Federal entities as well as unanticipated challenges experienced during execution of the current work. The intent of this amendment is to redistribute effort and existing funds to portions of the project that best balances it's future overall success as additional phases of work are executed. The cost efficiency of the overall project will benefit by utilizing the existing funds for the procurement of materials for future construction phases that are anticipated to increase in cost if not purchased in the near future. IT IS MUTUALLY AGREED that the AGREEMENT is amended as follows: CHANGES TO THE BUDGET Funding Distribution EG250038 Funding Title: Nelson Ph. 2 Pipeline Funding Type: Grant Funding Effective Date: 09/16/2024 Funding Expiration Date: 11/30/2025 Funding Source: Title: State Building Construction Account (SBCA) (WRYBIP-2325) Fund: FD Type: State Funding Source %: 100% Description: Grants for the purpose to assess, plan, and develop projects under the Yakima River Basin Integrated Water Resource Management Plan or for any other actions designed to provide access to new water supplies within the Yakima River basin or any other actions to support the seven elements of the Yakima Basin Integrated Plan, Template Version 10/30/2015 Docusign Envelope ID: 277B6872-FD37-4343-BC5B-92B2C013E9DB State of Washington Department of Ecology The City of Yakima Nelson Ph. 2 Pipeline Project Agreement No, WRYBIP-2325-YaWalr-00057 Approved Indirect Costs Rate: Recipient Match %: InKind Interlocal Allowed: InKind Other Allowed: Approved State indirect: 0% 0% No No Is this Funding Distribution used to match a federal grant? No Nelson Ph. 2 Pipeline Task Total Project Administration/Management 0.00 Canal Systems Consolidated Pipeline Improvement General Pipeline Improvement Construction 42-Inch Pipleline and Material Procurement CHANGES TO SCOPE OF WORK Task Number: 2 $ 1,940,000.00 $ 4,560,000.00 $ 1,100,000.00 Total: $ 7,600,000.00 Task Cost: S1,940,000.00 Task Title: Canal Systems Consolidated Pipeline Improvement Page 2 of 7 Task Description: Task 2 — Modifies the existing scope under Task 2 to adjust the limits of installation of the 42-inch consolidated pipeline. Although not explicitly stated in previous versions of Task 2, installation and completion of a 54-inch steel casing carrier pipe from STA 2+00 to 3+60 for the 42-inch consolidated pipeline was originally planned for as part of Task 2. As part of the casing installation, 42-inch consolidated pipeline will also be installed within the casing from STA 1+60 and end at STA. 3+70. Unknown obstructions may increase the cost of installing the steel casing, which could impact the amount of 42-inch pipeline that can be installed within the available funding. Task 2 will now include installation of 900 feet of 42-inch pipe via open -cut trench (STA 17+00 to 26+00). The installation of 42-inch pipe between STA 26+00 & 32+60 will remain in the original scope of Task 2. Up to an additional 1,000 feet of pipe may be installed from STA 32+60 to 42+60 as existing project funds allow. It is likely that a greater length of 42-inch pipe may be installed through this amendment by shifting installation locations from areas that require highly complex construction processes (road crossings and deep excavation with multiple levels of mechanical shoring) to those that are less complex and more standard (WSDOT shoulder and shallow excavation). Installation of 42" pipe from STA 3+70 to 13+50 is removed from this Task and will now be performed as part of a future phase of the project outside of this grant. Task Goal Statement: The goal will be to complete as much of the Consolidated pipeline as available funding will allow, as well as completion of the 54-inch steel casing carrier pipe. It will be necessary to complete the pipeline across Cowiche Creek and the General Template Version l0/30//20t5 Docusign Envelope ID:277B6872-FD37-4343-BC5B-92B2C013E9DB State of Washington Department of Ecology The City of Yakima Nelson Ph. 2 Pipeline Project Agreement No. WRY8IP-2325-YaWalr-00057 Page 3 of 7 reservoir to allow the reservoir to be demolished as part of the Stage 1 project. Completion of the Consolidated pipeline as part of Stage 1 will provide the starting points for the Stage 2 project final completion of the Nelson Ph. 2 pipeline project. Task Expected Outcome: •The proposed modification to Task 2 will likely result in a greater length of 42-inch pipe being installed by postponing installation from STA 3+70 through 13+50 to a later phase. There are significant costs associated with this portion of pipe installation due to its proximity to multiple utilities, a road crossings, including the installation of 160 feet of 54-inch steel casing beneath South Naches Road. The casing installation will be added to Task 2. Due to difficult soil conditions, the final cost of the horizontal boring process required for the installation of the 54-inch is unknown at this time. . 3+70-13+50 — This section will be removed from Task 2. Construction costs associated with this section will be applied to the additional cost for the steel casing and newly proposed locations for 42-inch pipe installation. • 17+00-26+00 — This section of pipe will be added to Task 2, Construction cost through this section is anticipated to be significantly less than 3+70-13+50_ Finishing construction will eliminate expenses associated with the long-term need for a construction easement required from an adjacent private landowner. . 32+60-42+60 — This section of pipe will be added to Task 2 as a placeholder to expend the remaining construction funds once the above subtasks have been completed. Up to 1,000 feet of additional pipe may be installed with the remaining construction grant funds once a final cost for the installation of the 54-inch casing has been established. Recipient Task Coordinator: Mike Shane Deliverables Number Description Due Date 2.1 Fruitvale and. Old Union Canal. Systems Consolidated Pipeline Improvements Construction Bid Documents 09/30/2024 2,2 Copies of Applicable Environmental and Cultural Permits 09/30/2024 2.3 Estimated Construction Timeline 10/31/2024 2.4 Memorandum summarizing final quantity and location of 42-inch pipe installed and interim as-builts as available, 09/30/2025 2.5 Photos of site before, during and after project construction 09/30/2025 CHANGES TO SCOPE OF WORK Task Number: 4 Task Title: 42-Inch Pipleline and Material Procurement Task Description: Procure long -lead materials and equipment needed for completion of the consolidated pipeline. Materials and equipment include various sizes of HDPE pipe and fittings, large diameter gate and plug -type throttling valves, motor operators for large Template Version 10/30/2015 Task Cost: $1,100,000.00 Docusign Envelope ID:277B6872-FD37-4343-BC5B-92B2CO13E9DB State of Washington Department of Ecology The City of Yakima Nelson Ph, 2 Pipeline Project. Agreement No, WRYBIP-2325-YaWalr-00057 valves, and CARV valves. Page 4 of 7 1. HDPE pipe and fittings. The pricing of the 42-inch HDPE pipe is locked in at 2024 levels and is anticipated to increase. The cost for the remaining pipe and fittings is also anticipated to increase. Task 4 will procure the following HDPE pipe and fittings; a. Approximately 5,350 LF of 42-inch DR 32.5 HDPE pipe b. Approximately 200 LF of 36-inch DR 32.5 HDPE pipe c. Approximately 1,00 LF of 24-inch DR 32.5 HDPE pipe d. Eight 42-inch HDPE, manufactured Tee fittings e. Five 36-inch HDPE manufactured Tee fittings f. Seven 24-inch HDPE manufactured Tee fittings 2. Long -lead equipment to support completion of subsequent phases of work for this project. Early procurement of long -lead items will benefit the project in both cost effectiveness and construction efficiency by avoiding anticipated cost increases and easing challenges with construction sequencing for future project phases. Long -lead items include: a, 36-inch eccentric plug valve with motor operator b. 24-inch eccentric plug valve with motor operator c, 36-inch gage valve d. Eight 4-inch CARV valves e. Five 3-inch CARV valves Task Goal Statement: Leverage existing grant funds to procure long -lead items required to complete installation of the Fruitvale and Old Union Pipeline. These materials and equipment are required as part of project completion but originally funded under separate grant sources. Those grants have been delayed which has interrupted the supply chain and overall construction sequencing of the project. Purchasing long -lead items at a 2024 locked price improves cost effectiveness and eases challenges with construction sequencing for future project phases. Task Expected Outcome: Due to the pause in anticipated additional Federal funding, and the unknown amount and timing of additional State funding, future construction phases beyond those that are currently funded by DOE are on -hold. Future construction phases include several thousand feet of HDPE pipe and long -lead items that may not be available for several months once an order has been placed. By utilizing DOE funds to purchase pipe and long -lead items, once additional funding becomes available the Contractor will be able to immediately proceed to installation of these items as opposed to waiting several months to re -initiate on -site construction activities. The immediate procurement of the HDPE pipe and other materials is also anticipated to provide cost efficiency to the project by; 1. Procuring materials at current pricing, eliminating the risk of exposure to future price increases. 2, Eliminating potential construction scheduling difficulties and conflicts associated with long lead material procurement. Recipient Task Coordinator: Mike Shane Deliverables Number Template Version 10!3©=2015 Description Due Date Docusign Envelope ID: 277B6872-FD37-4343-BC5B-92B2C0 State of Washington Department of Ecology The City of Yakima Nelson Ph. 2 Pipeline Project Agreement No. WRYBIP-2325-YaWa1r-00057 4.1 Template Version i0130/2015 Con E9DB ctor invoices for the Task 4 procurement items 09/30/2025 Page 5 of 7 Docusign Envelope ID. 27766672-FD37-4343-BC5B-92B2C013E9DB State of Washington Department of Ecology The City of Yakima Nelson Ph. 2 Pipeline Project Agreement No. WRY131P-2325-YaWalr 00057 Recipient / Ecology Share Page 6 tr£7 Funding Distribution Name Recipient Match % R Recipient Share Ecology Share Total Nelson Ph. 2 Pipeline 0 °10 $ 0.00- $ 7,600,000.00 $ 7,600,000.00 T Total S S 0 0.00 7,600,000.00 7,600,000.00 Docusign Envelope ID::277B6872-FD 7-4343-BC5B-92B2C013E9DB State of Washington Department of Ecology Page 7 af7 The City of Yakima Nelson Ph, 2 Pipeline Project Agreement No. WRYBIP-2325-Ya r- Wal 00057 AUTHORIZING SIGNATURES All other terms and conditions of the original Agreement including any Amendments remain in full force and effect, except as expressly provided by this Amendment. The signatories to this Amendment represent that they have the authority to execute this Amendment and bind their respective organizations to this Amendment. This amendment will be effective 09/16/2024. IN WITNESS WHEREOF: the parties hereto, having read this Amendment in its entirety, including all attachments, do agree in each and every particular and have thus set their hands hereunto. Washington State Department cif Ecology d by: Fay- 9/2025 *.� 49i;4C74i-.A4LU:...... Larry Mattson Office of he Columbia Riv Director Tcrrtplate; Approved to Form by Attorney General's Office Template Version 10/30120 ate The City of Yakima S gn by; By: 9/202 Vicki Baker Date CITY CONTRACT No: �02." 1o+2,A RESOLUTION NO: = �I� Certificate Of Completion Envelope Id: 277B6872-FD37-4343-BC5B-92B2C013E9DB Subject: Complete with Docusign: WRYBIP-2325-YaWalr-00057 Amendment 2.pdf Source Envelope: Document Pages: 7 Signatures: 2 Certificate Pages: 2 Initials: 0 AutoNav: Enabled Envelopeld Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) Record Tracking Status: Original 5/7/2025 10:25:44 AM Security Appliance Status: Connected Storage Appliance Status: Connected Signer Events Victoria Baker vicki,baker@yakimawa,gov City Manager Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via Docusign Lauris C. Mattson lama461@ecy.wa.gov Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via Docusign In Person Signer Events Editor Delivery Events Agent Delivery Events Intermediary Delivery Events Certified Delivery Events Carbon Copy Events Mike Shane mike.shane@yakimawa.gov Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via Docusign Holder: Ubaidullah Ahmadzai uahm461@ecy,wa.gov Pool: StateLocal Pool: Washington State Department of Ecology Signature spud by: i/u6Yla bath �>H.dae�sti-Cnnp,F Signature Adoption: Pre -selected Style Using IP Address: 205.172.45.253 f-^-$ d by: a 97e:oow --49CCO4 A$ 3C 2 Signature Adoption: Pre -selected Style Using IP Address: 165.151.117.73 Signature Status Status Status Status Status COPIED 0 docusign. Status: Completed Envelope Originator: Ubaidullah Ahmadzai P.O. Box 47600 Olympia, WA 98504 uahm461@ecy.wa.gov IP Address: 73.140.248.171 Location: DocuSign Location: Docusign Timestamp Sent: 5/7/2025 10:30:16 AM Resent: 5/14/2025 3:49:54 PM Resent: 5/14/2025 3:50:08 PM Resent: 5/19/2025 1:26:18 PM Viewed: 5/19/2025 1:45:07 PM Signed: 5/19/2025 2:51:42 PM Sent: 5/19/2025 2:51:43 PM Viewed: 5/19/2025 3:14:46 PM Signed: 5/19/2025 3:18:11 PM Timestamp Timestamp Timestamp Timestamp Timestamp Timestamp Sent: 5/19/2025 3:18:12 PM Carbon Copy Events Haydon, Kevin keha461@ecy.wa.gov Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via Docusign knees Events ataxy Events Envelope Summary Events Envelope Sent Certified Delivered Signing Complete Completed Payment Events Status C©PIE© Signature Signature Status Hashed/Encrypted Security Checked Security Checked Security Checked Tlmestamp Sent: 5/19/2025 3:18:12 PM Timestamp Timestamp Timestamps 5/7/2025 10:30:16 AM 5/19/2025 3:14:46 PM 5/19/2025 3:18:11 PM 5/19/2025 3:18:12 PM Status Timestamps Docusign Envelope ID: C318AD6E•1t58-4 3C--A0D5-D37FFA65C830 DEPARTMENT OF ECOLOGY State of Washington AMENDMENT NO. 3 TO AGREEMENT NO. WRIBIP-2325-YaWair-00057 BETWEEN THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY AND The City of Yakima PURPOSE: To amend the above -referenced agreement (AGREEMENT) between the state of Washington Department of Ecology (ECOLOGY) and The City of Yakima (RECIPIENT) for the Nelson Ph. 2 Pipeline (PROJECT), The following amendment extends the expiration date, modifies Task 3 budget, as well. as Task 4 scope and budget to redistribute funds from Task 3 and Task 4 to Task 2. This amendment is necessary due to: • Contractor bid pricing for Task 2 and Task 3 items were inverse to what was originally estimated prior to project and bidding. This has [eft Task 2 with a current shortfall of approximately S1.3M with additional work remaining, and Task 3 with approximately $1.7M in excess budget with very minor work remaining. • Additional 42" pipeline is required to be installed. in advance of WSDOT improvements along Fiwy 12 cast of Ackley Rd. • Items identified for procurement in Task 4 will be reduced to provide additional budget for the remaining work in Task 2.. •The extended expiration date will provide additional time to ensure scope is complete without the need for an additional amendment. • Final deliverable due dates for each task are tnc dified to reflect the proposed grant extension_ IT IS MUTUALLY AGREED that the AGREEMENT is amended as follows: Expiration Date: Original: 11/30/2025 Amended: 03/31/2026 CHANGES TO THE BUDGET Funding Distribution EG250038 Funding Title: Nelson Ph., 2 Pipeline Funding Type: Grant Funding Effective Date: 09/16/2024. Funding Expiration Date: 03/31/2026 Funding Source: Title: ers ion 10/30/2015 State Building Construction Account (SBCA) (WRYBIP-2325) Docusign Envelope ID: C318AD6E-1058-433C-AOD5-D37FFA65CB30 State of Washington Department of Ecology The City of Yakima Nelson Ph, 2 Pipeline Project Agreement No, WRYnIP-2325-YaWair-00057 Fund: FD Type: State Funding Source %: 100% Page 2 of 7 Description: Grants for the purpose to assess, plan, and develop projects under the Yakima River Basin Integrated Water Resource Management Plan or for any other actions designed to provide access to new water supplies within the Yakima River basin or any other actions to support the seven elements of the Yakima Basin Integrated Plan. Approved Indirect Costs Rate: Recipient Match °'%: lnKind lnterlocal Allowed: InKind Other Allowed: Approved State Indirect: 0% No No Is this Funding Distribution used to match a federal grant? No Nelson Ph, 2 Pipeline Project Administration/Management. Canal Systems Consolidated Pipeline Improvement General Pipeline Improvement Construction 42-inch Piplcline and Material Procurement CHANGES TO SCOPE OF WORK Task. Number: '2 Task Title: t<anal Systems Consolidated Pipeline Improvement Task Total 0.00 $ 4,100,000.00 $ 2,900,000,00 600,000.00 Total: $ 7,6 0 00 Task Cost: $4,100,000.00 Task Description: Task 2 - Modifies the existing scope under Task 2/Amendment 2 to include the installation of42-inch pipeline from approximately STA 16+00 to STA- 19+00, The alignment along this stationing is also being modified from within WSDOT ITwy 12 right of way to within a private utility easement adjacent to Ackley Rd. The end of this installation will provide the starting point for future installation of the 42-inch pipeline in W. Powerhouse Rd. and connect to the newly installed 42-inch pipeline at S. Naches Rd. and the Nelson. diversion site (start of the project). WSDOT recently indicated their intention to install a new eastbound acceleration lane east of Ackley Rd, in spring of 2026. Installation along this new alignment is necessary to complete our improvements prior to the WSDOT construction. This modification also allows for redistribution of funds from Task 3 and Task 4 to Task 2, Original Task estimate, based on. industry pricing, versus the contractor's bidpricing, resulted in underfunding of Task 2 and overfunding of Task 3. Additionally, Template Version 10/30/2015 Docusign Envelope ID: C318AD6E-1058-433C-A©D5-D37FFA65C830 Stale of Washington Department of Ecology The City of Yakima Nelson Ph.. 2 Pipeline Project Agreement No. WRYBIP-2325-YaWalr-OOO57 redistribution of funds from Task 4 to Task 2 is necessary to fully account for work completed in Task 2, including the additional 42-inch pipeline as previously described. Page 3 of 7 Task Goal Statement: The goal will be to complete as much ofthe Consolidated pipeline as available funding allows, including pipeline in the vicinity of Ackley Rd. due to upcoming WSDOT improvements. Completion of the Consolidated pipeline as part of Phase 2A will provide the starting points for Phase 2B project and completion of the Consolidated pipeline in W. Powerhouse Rd, up to S. Naches Rd, (Nelson diversion site). Task Epected Outcome: The proposed modification to Task 2 will result in completion of 42-inch pipeline installation from STA 16+00 to STA, 19+00. The alignment along this stationing will be within a private utility casement adjacent to Ackley Rd, and will complete the pipeline improvements within the WSDOT right of way in advance of their upcoming improvements. The end of this installation will provide the starting point for future installation of the 42-inch pipeline in W, Powerhouse Rd. and connect to the newly installed 42-inch pipeline at'S, Naches Rd. and the Nelson diversion site (start ofthe project). The modification will also distribute funds from Task 3 and Task 4 to Task 2 to provide for funding reimbursement fo 42-in.ch. pipeline work completed. Recipient Task C©t+t'dinat©r�: Mike Shane Deliverables Number 2.1 ? Description Frtlitvale and Old Union Canal Systems Consolidated Pipeline Improvements Construction Bid Documents Due Date 09/30/2024 Copies of Applicable Environmental and Cultural Permits 09/30/2024 a d Construction Timeline '2024 2.4 2,5 Memorandum summarizing final quantity and location of 42-inch pipe installed and interim as-huilts as available. Photos of site before, during and after project constructs C[IANGES TO SCOPE OF WORK. Task Number: Task Cost: S2,900,000,00 Task Title: General Pipeline lmprovcmcnt Construction //2026 2026 Task Description; This modification also allows for redistribution of funds from Task 3 to Task 2. Original Task estimate, based on industry pricing, versus the contractor's bid pricing, resulted in underfunding of Task 2 and overfunding of Task 3. Additional budget in Template Version 1030r'20t5 Docusign Envelope ID; C318AD6E-1058-433C-A01D5-b37FFA65C830 State of Washington Department of Ecology The City of Yakima Nelson Ph, 2 Pipeline Project Agreement No, WRYBIP-2325-YaW'aIr-00057 Page 4 of 7 Task 2 is necessary fully account for work completed in Task 2, including the additional 42-inch pipeline as previously described. With nearly all work completed in Task 3, excess budget is available to support work completed as part of Task 2. Task Goal Statement: The goal will be to complete all work required for the General Pipeline improvements and redistribute excess remaining budget to fund work required as part of Task 2 — Canal Systems Consolidated Pipeline Improvements. Task Expected Outcome: Provide adequate and appropriate funding to both Task 2 and Task 3 budgets for all work completed in each. Recipient Task Coordinator: Mike Shane Deliverables • N umber iescr 3.1 3.3 3.4 3.5 iption City of Yakima General Pipeline Improvements Construction Bid Documents Copies ofApp'licabie Environmental and Cultural Permits Estimated Construction Timeline Project as -built documents Due Date 09/30/2024 09/30/2024 10/31/2024 01 /31 /2026 Photos of site before, during and after project construction 1/2026 CHANGES TO SCOPE OF WORK Task. Number: 4 Task Cost: S600,000,00 Task Title: 42-1nch Pipleline and Material Procurement Task Description, Task 4— Modifies the existing scope to remove specific items from advance procurement. Modified procurement schedule will include the purchase of.' l., HDPE pipe and fittings. The pricing of the 42-inch.1-1DPE pipe is locked in at 2024 levels and is anticipated to increase, The cost for the remaining pipe and fittings is also anticipated to increase. Task 4 will procure the following HDPE pipe and fittings; a. Approximately 3,800 LF of 42-inch DR 32.5 FUUI)PE pipe b. Approximately 200 LF of 36-inch DR 32,5 .EIDPE pipe c. Approximatel.y 1,000 LF of 24--inch DR 32.5 ITDPE pipe d. Various HDPF fittings ?. Long -lead equipment to support completion. of subsequent phases of work for this project. Early procurement of long -lead items will benefit the project in both cost effectiveness and construction efficiency by avoiding anticipated cost increases and Template. Version 10130/2015 ©ocusign Envelope ID: C318A©6E-1058-433C-A0©5-D37FFA65C830 State of Washington Department of Ecology The City of Yakima Nelson Ph. 2 Pipeline Project Agreement No. WRYBIP-2325-YaWa1r-00057 easing challenges with valves, Page 5 of 7 nstruction sequencing for future project Oases, Long -lead items are anticipated to include various Task Goal Statement: The goal will be to purchase as much material in advance as overall project budget and funding budget from Task 4 to Task 2 to cover costs associated with Task 2 modifications. allow, while redistributing Task Ex tc'tcd Outcome: Provide adequate and appropriate funding to both Task 2 and Task 4 budgets for all work completed and materials purchased in each. 1. Procuring materials at current pricing, eliminating the risk of exposure to future price increases. 2. Eliminating potential construction scheduling difficulties and conflicts associated with long lead material procurement. Recipient Task Coordinator: Mike Shane Deliverables Number 4.I Template sion 10/30/2015 Description Contractor invoices for .the Task 4 procurement items Due Date 01 /31 /2026 Docusign Envelope ID: C318AD6E-1058-433C-AOD5-D37FFA65C830 State of Washington Department of Ecology The City of Yakima Nelson Ph, 2 Pipeline Proleet Agreement No, WR,Y I3[P-2325-Y'aWalr-OOO57 Funding Distribution Summary Recipient I Ecology Share Funding Distribution Name Nelson Ph. 2 Pipeline Total Template Version 1 O/'30/2015 Recipient Match 0 Recipient Share 0,00 0.00 Ecology Share 7,600,000.00 7,600,000.00 Page 6 of 7 Total 7,600,000.00 7,600,000.00 Docusign Envelope ID: C318AD6E-1058-433C-A©D5-D37FFA65C830 State atWashington Department or Ecology The City orYaktrna Nelson Ph. 2 Pipeline Prof ct Agreement No. WRYB'IP-2325-VaWa1r-OOO57 AUTHORIZING SIGNATURES Page 7 of 7 All other terms and conditions of the original Agreement including any Amendments remain in full force and clTect, except as expressly provided by this Amendment. The signatories to this Amendment represent that they have the authority to execute this Amendment and bind their respective organizations to this Amendment. This amendment will be effective 09/16/20024. IN WITNESS WHEREOF: the parties hereto, having read this Amendment in its entirety, including all attachments, do agree in. each and every particular and have thus set their hands hereunto. Washington State Department of Ecology Signed by' By; arrei®€ai lRf 1a1x 8I11 /2025 The City of Yakima. Signed by: FACt6ViA. bald. 1 Y: - a2a4B56aa[,b4rs._ /2025 Larry Mattson Date Victoria Baker Office of the Columhia River City Manager ctor Template Approved • Attorney General's ( Template Vcr aon by, Date CITY CONTRACT Nf3' H". ,Aftl<, RESOLUTION NO' —� Change Order No. 003 Date of Issuance: 07/20/2026 Owner: City of Yakima Contractor: Interwest Construction, Inc. Engineer: HDR Engineering, Inc. Project: Nelson Dam Removal Phase 2 Effective Date: 07/20/2026 Owner's Contract No.: IC2010 Contractor's Project No.: 1480 Engineer's Project No.: 10415845 Contract Name: Nelson Dam Removal Phase 2 The Contract is modified as follows upon execution of this Change Order: Description: CPR 009 SUBTOTAL CPR 010 SUBTOTAL CO 003 003 003 003 003 SUBTOTAL TOTAL SALES TAX (8.5%) Description WSDOT ILLUMINATION SYSTEM Description MATERIAL PROCUREMENT Description ACKLEY WORK - ASPHALT REPAIR CREDIT ACKLEY WORK — SPOIL REMOVAL CREDIT ACKLEY WORK —SEEDING CREDIT ACKLEY WORK- FINAL GRADING CREDIT ACKLEY WORK- PIPELINE PRESSURE TEST CREDIT Cost Time $ 16,185.32 0 Days $ 16,185.32 0 Days $ Cost Time 19,595.37 $ 19,595.37 0 Days 0 Days Cost Time $ (4,000.00) 0 Days $ (4,000.00) 0 Days $ (4,000.00) 0 Days $ (4,000.00) 0 Days $ (4,000.00) 0 Days $ (20,000.00) 0 Days $ 15,780.69 0 Days $ 1,341.36 0 Days CHANGE ORDER TOTAL (W/ SALES TAX) $ 17,122.05 0 Days MATERIAL PROCUREMENT Remaining funds in the Ecology grant are being used to purchase long lead items for Phase 2B. ACKLEY WORK CREDITS The Ackley work credit items listed above are identified to be deferred from Phase 2A to Phase 2B based on phasing, sequencing, contract requirements, and seasonable availability. The Ackley work items will be included in the Phase 2B schedule of values and will have the same dollar amounts listed above. Attachments: CPR 009 — WSDOT Illumination System CPR 010 — Material Procurement EJCDC' C-941, Change Order. Prepared and published 2013 by the Engineers Joint Contract Documents Committee. Page 1 of 2 EJCDC £f,GIN€£N9 TObit CONTEXT DOCUMENTS COIMarrE6 CHANGE IN CONTRACT PRICE Original Contract Price (w/ Sales Tax): $ 7,158,631.08 CHANGE IN CONTRACT TIMES (note changes in Milestones if applicable) Original Contract Times: Substantial Completion: February 1, 2026 Ready for Final Payment: April 1, 2026 days or dates [Increase] {Deereese} from previously approved Change Orders No. 0 to No. 2 : $ 159,367,06 [Increase] {Dccrmsc] from previously approved Change Orders No. 0 to No. 2 Substantial Completion: February 1, 2027 Ready for Final Payment: April 1, 2027 days or dates Contract Price (w/ Sales Tax) prior to this Change Order: $ 7,317,998.14 Contract Times prior to this Change Order: Substantial Completion: February 1, 2027 Ready for Final Payment: April 1, 2027 days or dates [Increase] {Decrease} of this Change Order (w/ Sales Tax): $ 17,122.05 {Lase} [Decrease] of this Change Order: Substantial Completion: February 1, 2027 Ready for Final Payment: April 1, 2027 days or dates Contract Price incorporating this Change Order (w/ Sales Tax): $ 7,335,120.19 By: EC Engineer (if r wired) Title: Project Manager Date: 07/20/2026 Title Date Contract Times with all approved Change Orders: Substantial Completion: February 1, 2027 Ready for Final Payment: April 1, 2027 days or dates ACCEPTED By; Roy W Swiihart' Contractor {Authorized Signature Title President Date CITY CONTRACT NO: RESOLUTION NO: , - LS:2l July 31, 2026 EJCDC' C-941, Change Order. Prepared and published 2013 by the Engineers Joint Contract Documents Committee. Page 2 of 2 May 11, 2026 Interwest Construction, Inc. 609 North Hill Blvd.. Burlington, WA 98233 Attn: Zach Rose, Project Manager Re: City of Yakima Nelson Dam Removal Phase 2 CPR 009 — WSDOT illumination System Engineer's Decision Zach, We have reviewed your cost proposal for CPR 009 — WSDOT Illumination System. We have found your submitted cost proposal to be acceptable. A total cost of $16,185.32 and a total of 0 calendar days will be included in a forthcoming Change Order. Sincerely, HDR Engineering, Inc. Troy Gibbs, PE Construction Manager cc: Daniel Tiliano — City of Yakima Jeff Bond — City of Yakima Chad Redick - City of Yakima Rich Sanislo — City of Yakima Ryan Roberts — HDR Mike Garello -- HDR 4717 St, (Fag Harbor, 1N,198332 i253j 32-5024 INTERWEST CONSTRUCTION INC. May 11, 2026 Troy Gibbs, P.E. Construction Manager HDR Engineering, Inc. 835 N Post Street Spokane, WA 99201 RE: CPR No. 009Rev — WSDOT Illumination System Relocation Nelson Dam Removal Phase II - Conveyance Improvements Contract Number IC2010 HDR Project No, 10173276 Mr. Gibbs: Change Proposal Request 009REV Interwest Construction, Inc. (Interwest) submits this Change Proposal Request (CPR) to provide the cost associated with relocating the existing power pole and electrical service near STA 18+00 adjacent to US 12. Originally, the power pole and associated service was believed to provide electrical service to the Hollingberry property. However, subsequent investigation confirmed, this setup serves as the main power feed for the WSDOT illumination system at the US 12 and Ackley Road intersection. As a result, unforeseen coordination was required with WSDOT, PPL, and the City to properly relocate the existing electrical system. This CPR captures the additional labor, equipment and material costs necessary to complete this work in accordance with applicable standards and local justification requirements. A cost breakdown is attached for reference. CPR No. O09REV — WSDOT Illumination System Relocation S16,185.32 Lump Sum Should you have any comments, concerns, or questions regarding this proposal, please feel free to contact the undersigned at 360-391-6 E 40. Respectfully Submitted, INTERWEST CONSTRUCTION, INC. Zach Rose Project Manager (360) 757-7574 Fax (360) 757-6464 609 North htiil 1i yd.. uurlin.aton. Au Equaippurtttnity Emp Contractor 'INTERC r NTEBWEST ONSTBUCTION NC. 609 North Hill Blvd, Burlington, WA 98233 360-757-7574 Phone - 360.757.6464 Fax Cost Proposal Summary Project Number 1480 Project Name Nelson Dam Phase 2 Client! General Contractor Date of the Work TBD Item Number Item Name Change Proposal Request #08 Description of Work Performed CPR #09 - WSDOT Illumination system relocation along US 12 near Ackley Road. Time Worked Record Labor Name of Workers Occupation Hours Worked Reg. Rate Q.T. Rate D.T. Rate Amount Reg, OT DT Hayden Winn Operator Foreman 6 4 4 $ 106.70 $ 144.62 $ 182.55 $ 1,948.88 Nickolis Fordham Equip Operator - Group 2 2 $ 99,66 $ 134,13 $ 168,61 $ 199,32 Alfredo Cele Laborer- Group 4 2 $ 63,40 $ 85,88 $ 108,36 $ 126.80 Andrew Clayton Equip Operator - Group 2 4 $ 99,66 $ 134,13 $ 168,61 $ 398.64 Cart Engle Superintendent 8 $ 123,61 $ 170.56 3 217.52 $ 988,88 $ Labor Subtotal Markup @ 15% Labor Total $ 3662,52 $ 549.38 $ 4,211.90 Equipment Equipment # 1 Type!Sixe Hours Worked Reg. Rate SB Rate Amount Req. Standby 08-179 2023 4X2 30KGVW DSL Flatbed Truck 14 $ 50.78 $ 8.30 $ 710,92 06-113 2018 Caterpillar 305.5EL CR 6 S 59.81 $ 17.50 $ 358.86 14-21 2016 Multiquip/Whpsper aft DGA-25USI2C 50 $ 17.82 8 3,08 5 891,00 32-11 1995 Ford F800 TMA Truck 35 5 52.87 $ 8.14 $ 1,850.45 $ Materials) Description Supplser Invoice Equipment Subtotal Markup @ 15% Equipment Total Quantity Unit Unit Price $ 3,811.23 $ 571.68 $ 4,382.91 Amount iatenals Subtota Markup @ 15% Materials Total Subcontractor Work Description of Work Subcontractor Invoice Unit Price Amount Quantity Unit Electrical 509 Electric 1 LS $ 7,229.05 5 7,229.06 5 $ $ $ Subcontractor Subtotal Markup @ 5% Subcontractor Total 7,229.06 351,45 7,590.51 HEET TOTA 2 Notes: lntenvest Construction, Inc. Job Nome: Nelson Dam Phase 2 Cost Code: 9004 Code Production Quan WINNHAYR 08-179 06-113 FQRDNICA CEJAALFR 14-21 32-11 ENGLCARE n ies: 0,000 Hayden R Winn 2023 Ford F450 XLT Caterpillar 305,5EL CR Nickolis A Fordham 02 Alfredo Ceja L4 2016 Multiquip/Wbisperwatt DC 1995 Ford F800 TMA Truck Carl E Engle OSA Cost Code Review WSDOT Temp Lighting s OF Reg flours 2,00 2.00 200 2.00 2.00 10.00 10.00 4,00 Labor Totals: Equip Totals: Job Code: 14$O Other Hours Rase Rate* 0,00 0,00 0,00 0.00 0,00 0.00 0.00 0,00 0.00 0.00 0,00 0,00 0.00 0.00 0.00 0,00 Hours - 10.0 Hours - 24,0 Slot: 2 Company Note: Set up generator for new temp power location for WSDOT lumen airs. Cost - Cost - 499 512 Dig 6" ditch for s.o, Cord to be direct buried to keep protected and safe from theft in area, Remove existing phone pole for service drop from mainline path and place in export pile after removal of panel and meter. After connections to generator and lights backfill s,o, Cord. Will need to turn on and off lights daily over the weekend, Indexes: Inspector Note: Set up generator for new temp power location for WSDOT lumen airs. Dig 6" ditch for s.o, Cord to be direct buried to keep protected and safe from theft in area, "-Base Rate os Lined and does NOT Printed on, 05/04/2026 13-32 50 inc9ude nixes, fringes. workers camp , etc. x Date: A9eneance/Non-Use Codes included in Hours None t None Page 1 Interwest Construction, Inc. Job Same: Nelson Darn Phase 2 Cost Code Review Job Code: 1.480 Cost Code: 9004 WSDOT Temp Lighting Code Description Class Reg,,,Itours OT Hours Other Doors Rase Rate * Cost Remove existing phone pole for service drop from mainline path and place in export pile after removal of pan& and meter. After connections to generator and tights backfill s.o, Cord. Will need to turn on and off lights daily over the weekend, (041‘,.0101MOS Time ard: Production Ouantities 0,000 WINNHAYR Hayden R Winn 08-179 2023 Ford F450 XLT 14-21 32-11 NN OF 2016 Multiquip/Whisperwatt DC 1995 Ford F800 TMA Truck 0,00 4,00 10,00 10,00 Labor Totals: Equip Totals: 4,00 0.00 0,00 0,00 0,00 0,00 0,00 0.00 Hours 4.0 Hours - 24.0 Cost - Cost - 517 476 Totas for 03/0712026 WINNHAYR: No Production Quant!tes hsted Today. Total Cost: 993 CosIcone.Notast. Slot. 1 Company Note: Fuel generator and shuts down power to lights. Safety check for shoulder closure due to pole hold on ppl pole. Retum in afternoon to power on lights and another safety check for all traffic control devices. Indexes: Inspector Note: Fuel generator and shuts down power to lights. Safety check for shoulder closure due to pole hold on ppl pole. Return in afternoon to power an lights and another safety check for all traffic control devices. • Base Rate is Unturdened and does NOT include taxes, fringes, worker's comp,, etc. Attentlance/Non-Use Codes included in HoursNone / None Printed on: 04/08/2026 14 31:12 Page 2 x Date: Interwest Construction, Inc. Joh Name: Nelson Dam Phase 2 Cost Code: 9004 Code Description Cost Code Review WSDOT Temp Lighting Class Regtliours OT Hours Production Quaotities OE000 WINNHAYR Hayden R Winn OF 08-179 2023 Ford F450 XLT 14-21 2016 Multiguip/Whisperwatt DC 32-11 1995 Ford F800 TMA Truck 0,00 4,00 10,00 10,00 Labor Totals: Equip Totals: Job Code: 1480 Other Flours Base Rate * Cost 0.00 4.00 000 0.00 0,00 0,00 0.00 0,00 Hours - 4,0 Cost - 661 Hours - 24.0 Cost - 476 Totals for 03100026 WINNHAYR; No Production Quantftes listed Today. Total Cost. 1,137 Cost Cods Notes: Slot: Company Note: Fuel generator and shuts down power to lights. Safety check for shoulder closure due to pole hold on ppl pole. Return in afternoon to power on hghts and another safety check for all traffic control devices. Indexes: Inspector Note: Fuel generator and shuts down power to lights, Safety check for shoulder closure due to pole hold on ppl pole. Return in afternoon to power on lights and another safety check for all traffic control devices, Rate is Unburdened and doeAiOT Printed on: 04A28/2026 1431:12 include taes, fringes, workers comp., etc, Date: Altendence/Non•Use Codas floluclecl in Hours None 1 None Page 3 Interwest Construction, Inc. Joh Name: Nelson Dam Phase 2 Cost Code: 9004 Code Production Quant WINNHAYR 08-179 ENGLCARE CLAYANDN 06-113 14-21 32-11 Lion es: 0.000 Hayden R Winn 2023 Ford F450 XLT Carl E Engle Andrew N Clayton Caterpillar 305,5EL CR 2016 Iv ultiquip/Whisperwatt DC 1995 Ford F800 TMA Truck Cost Code Review WSDOT Temp Lighting Class Kett. lion OF 2.00 2,00 OSA 2.00 02 2 00 2.00 10.00 5.00 Labor Totals: Equip Totals: Tot tis;for 0310W026NNHA No Production Quart�: OT Job Code: 1M88 her hours Itasc Kate 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0,00 0.00 0.00 0.00 0,00 0.00 0.00 Hours - 6.0 Hours - 19.0 rst Code Neter: Slut: Company Note: 509 on site to begin install for temp breakaway poles for wsdot lumen air lighting. On site Dig out around existing j-box for re -location and install. Dig holes for breakaway poles and conduit trench along with jbox. 4-011. Cost - Cost - iota i t 8am to begin work, 364 382 509 set poles and began make final installation with new meter box and re used existing power control panel. 509 needed to make some corrections and will complete for backfill tomorrow. Indexes: Inspector Note: 509 on site to begin install for temp breakaway poles for wsdot lumen air lighting, On site at Sam to begin work. Dig out around existing j-box for re -location and install. * • Base Rate rs Unburdened acid does NOT include taxes, innges. evritsYs stamp, etc Attendance/Non-Use Code s,tSCitt4ed rn Hour None; None Pnnfed on, 0504/2025 13 34:58 Page t x Date: Interest Constructitrn, tnc. Job Name: Nelson Dam Phase 2 Cost Code: 9004 Code Production Quanti WINNHAYR 09-179 ENGLCARE CLAYANDN 06-113 14-21 ies: 0,000 Hayden R Winn 2023 Ford F450 XLT Carl E Engle Andrew N Clayton Caterpillar 305.5EL CR 2016 MultiquipPWhisperwatt DC Cost Code Review WSDOT Temp Lighting chss TOWN for OM OF OSA ©2 Hours OT flours 2.00 2,00 2.00 2,00 2,00 10.00 Labor Totals: Equip Totals: twier Prrad t Cede' Notes: Slot: 2 Company Note: 509 electric on site to finish temp fighting install for lumen airs. After fixing a few things called in for inspection. After inspection it was approved to be backfilled, 6ackfitl open trenches, Generator pulled off line and shut down, Ppl on site to reconnect Power at 2pm, 509 on site to finish what was needed and off site at 4pm Indexes: Base Rate is Un©erderaed and does 01 Include taxes, ranges, uorker"s Camp, etc A3tendancefNon-Use Codes included ,n Hours, None 1 None Pnnfed on 0 Page 7 s 0.00 0.00 0.00 0.00 0.00 0,00 Hours - Hours - Oth 0.00 0,00 0.00 0.00 0.00 0.00 6.0 14.0 Ba Job Code: 1480 Rate ws�+ Cost - Cost - Total Cost:,. Cost 364 252 x Date: ���~ �~���U Proposal ��K����� ��K��� ���������U Contractor: |nterwest Construction, Inc Change Order #b 1 Project Name: Nelson Dam Date Submitted: 4/3/2026 Requested By: 50SElectric, Inc. Date Reply Due: ASAP Description of Change (Scope of Additional Work) * Provide all tabor, supervision, equipment, material, coordination, and incidental time - and -material work required for the temporary power setup and permanent service re|ocationfortheHighxvay12'WSDOTh|ghvVoy||ghtingsyatmmn(4|ighta),oaout|ined inthe Temporary Power + Service Relocation Plan dated 3/3/2O26. * Disconnect the existing nnmtmr base and control cabinet serving the highway lights, furnish and set a temporary generator, run temporary 8/4 SO cord to the lighting circuit, modify the light pole base handhole cover for cord entry, install cord grip protection, and tap/isolate the existing feed so the lighting circuit can be temporarily re -fed at340Vfrom the generator. * Furnish and install a new 6"xB" x 20' pressure -treated post, new GQAdisconnect, new meter base, and install the control panel at the relocated service location. * Provide grounding for the relocated service, including installation of (2) new ground rods and all required bond ine/termnination work, and coordinate WA State L&| inspection for the new service prior toeneggication. * Relocate the existing WSDOTType 1junction box, locate and intercept the existing rigid conduit, install new PVC/rigid conduit as required from the new service/control location to the relocated junction box, reuse existing conductors where feasible, and furnish/install anew #8 green equipment grounding conductor from the control box tothe relocated junction box. w Modify the new post installation to comply with Timber Sign Support / breakaway requirements, including drilling (2) 3-inch holes through the 6x8 post and maintaining required post spacing per the referenced WS0QTdwtai|. • Pricing for this change is on a time -and -material basis. Supporting daily records, labor/equipment/material backup, and any applicable vendor invoices can be provided/attached. Cost Summary Total Proposed Amount: $7,229.06 Itemized Breakdown Description Qty Service Entrance Caps - Metallic; Clamp -On; 1 In.; 7 H X 5-3/4 L In. 1 EMT Steel Conduit -Straight; 1 In.; 10 FL; Hot Dipped Galvanized; Steel 20 Conduit Strut Clamp - EMT; 1 In.; Steel; Zinc Electroplated; 14 Ga. 3 EMT Compression Connector - Insulated; 1 In.; Steel; Zinc Plated; Raintight 4 Meter Socket With Bypass; Ring; 100 A; 600 VAC; 4 Jaws 1 Metering & Temp Power; Hub; Hub; 1 In, 1 BLINE AWCAP 1 Offset Nipple; 1 In.; Die Cast Zinc; Threaded Male 2 Steel Locknut; 1 In.; Threaded 4 Grounding Bushing; Threaded; 1 In.; Die Cast Zinc 2 Safety SwitchiDisconnect; General Duty; Fused; 60 A; 240 VAC; 3 Pole; Cartridge 1 Fuse; GP; Class RK5; Time Delay; 0.56x2 In.; 30 A; 250 VAC 2 Fuse Reducer, 60 A; 30 A; 250 VAC; 0.057 Lbs. 2 STRUT SHALLOW STRUT 30 Top Grip Nut; 3/8 In.; 16 TPI; Steel; Zinc Electro-Plated 12 Galvanized Ground Rod; 5/8"; 8'; 80000 psi 2 GROD G5 2 Bare Wire; Copper, SOL; 6 AWG; 1 Conductor; 315 Ft.; Ree 40 CCC S08/3 60 50 Amp California Style Plugs; 125/250 VAC; 3 Pole; 4 Wire; BlackNVhite 1 Cord Grip; Connector Kit; 3/4 In.; Steel 1 Steel Locknut; 3/4 In.; Threaded; Zinc -Plated 1 Multi -Tap Connector; 3-Port; Clear; 4-14 AWG; Plastisol 3 Straight Rigid Conduit; 1 In.; 10 Ft.; Galvanized; Steel 10 Conduit Strut Clamp - Rigid; 1 In.; Steel; Zinc Electroplated; 14 Ga. 2 Conduit Hub; Threaded; 1 In.; Zamak; Natural 1 Conduit - PVC Straight - Schedule 40; Heavy Wall; 1 In.; 10 Ft. 40 PVC ELL901 2 PVC Female Terminal Adaptor; 1 In.; Gray 1 PVC Coupling; 1 In.; Gray 3 PVC - Bell End; 1 In.; Molded; Non -Metallic; Gray 1 Building Wire; THHN STR; 8 AWG; 1 Conductor; Copper; Green 40 Building Wire; THHN STR; 6 AWG; 1 Conductor; Copper; Black 40 Building Wire; THHN STR; 6 AWG; 1 Conductor, Copper; Red 40 Building Wire; THHN STR; 6 AWG; 1 Conductor; Copper, White 40 LABOR 1 Totals 417 General Materials 2,182.77 Material Markup (@ 15.000 %) 327.42 Total Material 2,510.19 JOURNEYMAN (35.00 Hrs @ $92.97) 3,253.95 SHOP DRAWINGS (4.00 Hrs @ $92.97) 371.88 SITE MEETING (4.00 Hrs @ $92.97) 371.88 Labor Markup (@ 15.000 %) 599.66 INSPECTION PERMIT (1.00 @ 0.00 @ $121.50 + 0.000 % + 0.000 % + 0.000 %) 121.50 Final Amount $7,229.06 Customer Quote For: 509 ELECTRIC LLC CED - YAKIMA Quote: Q1054767 Revision : 002 CE 21 W WASHINGTON AVE YAKIMA WA 98903 Tel: (509)248-0872 Fax: (509)248-1633 Job Name: Attn: Ship To: 509 ELECTRIC LLC 21 W WASHINGTON AVE YAKIMA, WA 98903-0000 Contact Name: BRENTLY ASHBAUGH Quote Date: 03/05/26 Updated On: 03/05/26 Expires On: 03/15/26 Customer PO #: 10260 Customer PO Date: FOB: SHIPPING POINT Freight: PREPAID LN 01 02 03 04 ©5 06 07 Product 4yiE E�iE� 1IN EMT/RGD CLMP CAP SET 1 EMT/RGD CLMP SE CAP GQN© EMT1 EMT CONDUIT Qty Avail Qty 3 1 Price $676,97 Per * Ext Price 6750 20 5208.08 0 $41,62 STEEL MATERIAL; HOT DIP GALVANIZED FINISH; 10 FOOT; 1,163 INCH OUTER DIAMETER; UL 797 APPROVAL; ANSI C80.3 APPLICABLE STANDARD; 67 POUND PER 100 FOOT WEIGHT; 1 INCH TRADE SIZE; 0.057 INCH WALL THICKNESS; PLAIN ENO STYLE RUNE 82003P4 309 3 $283,01 PLTO EMTCLAMP- EATON 8-LINE SERIES PRE -ASSEMBLED THINWALL CONDUIT CLAMP, 0,07051N H X 2.75401N L X 1,251N W, STEEL BPT 2$25RTI 228 4 S496,24 1" INSUL HT COMP CONN 11N STEEL RAINTIGHT CONN, INS, BOX OF 10 BLINE,114T8 100A 4T SFTY SKI BOX $8.49 C $543.03 E $543.03 RING TYPE; 12 INCH W X 4.5/8 INCH D X 2,4 INCH H SIZE; 14 TO 2/0 AWG (LINE/LOAD), 14 TO 1/0 AWG (NEUTRAL) WIRE SIZE; UL 414 APPROVAL; SURFACE MOUNTING; NEMA 3R ENCLOSURE; 100 AMPERE CURRENT RATING; 1-PHASE 3.WIRE CIRCUIT CONFIGURATION BLINEAW100 1°IN BASE HUB BLINE2 A4V100 BLINE AWCAP HUB PLT, GRY MTR MTG HUB CAP 4 1 $'18.75 E 516.75 20 1 $13.96 E $1395 PLEASE NOTE: THIS IS NOT AN OFFER TO CONTRACT, BUT MERELY A QUOTATION OF CURRENT PRICES FOR YOUR CONVENIENCE AND INFORMATION. ORDERS BASED ON THIS QUOTATION ARE SUBJECT TO YOUR ACCEPTANCE OF THE TERMS AND CONDITIONS LOCATED AT SALES.OUR-TERMS.COM, WHICH WE MAY CHANGE FROM TIME TO TIME WITHOUT PRIOR NOTICE. WE MAKE NO REPRESENTATION WITH RESPECT TO COMPLIANCE WITH JOB SPECIFICATIONS. Per E = Each, C = Hundred, M = Thousand Terms and Conditions 1 OF 5 LN OB 10 12 13 14 15 16 Product CHE 302DC 1•IN D/C OFFSET NIP I RG0 OFSET COND NIPPLES DC CHE 13 1-IN STEEL LOCKNUT 1 UT LOCKNUT Qty Avail Qty 7 2 Price $754.95 Per 0 Ext Price $15.10 118 4 $61.33 C $2.45 BPI383DC ..... ...... 8 2 $809.02 C 516,18 1-IN INS GRD BUSH 1 GRND. BUSH, IN5.14-4 2INC, BOX OF 25 EATONDG322NR8 60A 240V 45N SW NEMA3R EATON GENERAL DUTY CARTRIDGE FUSE SAFETY SWITCH, 60 A, NEMA 3R, PAINTED GALVANIZ BUSSFRN830 33 2 410176 250V RKS TD FUSE FUSETRON DUAL -ELEMENT CLASS RK5 BUSS NO.263R 15 60/30A R REDUCER S384.57 4 E 5384,57 E $22.90 73 E $59.46 BUSS CLASS R REDUCER FUSE STRUT SHALLOW STRUT ... ..... 3930 30 5287.24 C $B6.17 7/8" SHALLOW SLOTTED GALV STRUT BLINET11228 275 12 5455.56 PLTD TWIRL NUT - 3/8' C $54.67 EATON 8-LINE SERIES TWIRL -NUT NUT, 0.37501N HX1.37S01N LX0.851N W, STEEL, ELECTROPLATED, 3/8-16 BOLT SIZE, 800 LBS LOAD, 800 LBS LOAD GRO© 5/8X8GALV 164 2 $19,20 E $38,40 8815880 5/8X8 GALV GRND ROD GALVANIZED GROUND ROD, POINTED, 5/81N DIA, BFT, 8,4 LB PLEASE NOTE: THIS IS NOT AN OFFER TO CONTRACT„ BUT MERELY A QUOTATION OF CURRENT PRICES FOR YOUR CONVENIENCE AND INFORMATION. ORDERS BASED ON THIS QUOTATION ARE SUBJECT TO YOUR ACCEPTANCE OF THE TERMS AND CONDITIONS LOCATED AT SALES.OUR-TERMS.COM, WHICH WE MAY CHANGE FROM TIME TO TIME WITHOUT PRIOR NOTICE. WE MAKE NO REPRESENTATION WITH RESPECT TO COMPLIANCE WITH JOB SPECIFICATIONS. ` Per E = Each, C = Hundred, M = Thousand Terrns and Conditions 2 OF 5 Customer 4uate For: 509 ELEC'i°RIC LLC CED - YAKIMA Quote: Q1054767 Revision #: 002 LN 17 18 19 20 21 22 23 Product GROD GS __.._. ACORN CLAMP WIRE BARE6S01 BARE COPPER 315 FOOT; 162 MIL OUTER 1000 FOOT WEIGHT; 6 AWG ccc 808/3 .. .. 8/3 SO CORD 8/3 SEOOW SEOPRENE 250R HU9WD C56365C LKG PLUG 505250A QtyAvail Qty 366 2 1825 40 Price 52.40 67.48 Ext Price $4.80 554.70 METER; SOFT DRAWN ANNEALED BARE COPPER CONDUCTOR MATERIAL; 125 AMP CURRENT RATING; 79.4 POUND PER INDUCTOR SIZE; REEL PACKAGE TYPE; SOLID STRANDING; RATED STRENGTH 762.9 POUND LKG PLUG, 50A 125/250V, 3P4W AMFI CG75K, 3/4 CONN KIT CORD GRIP KIT CABLE RANGE .3.25-.880 STEEL USA 411 E 3/4 STEEL LOCKNUT 3/4 UL LOCKNUT NSIIPL43C 4-14AWG TAP CONN POLARIS VI 24 CONS GALV1 25 186 60 53,625.87 M 5217.55 $139.00 E 5139.0 186 1 $4.69 54.69 535.99 C 50.36 564.74 N TAP (CLEAR) 4-14 AWG POLARIS NSULATED MULTI -TAP CONN 3 PORT (SINGLE SIDED ENTRY) 60 10 $675.20 C $67.52 GALV STEEL CONDUIT STEEL MATERIAL; GALVANIZED FINISH; 10 FOOT; 1,315 INCH OUTER DIAMETER; UL 6 APPROVAL; ANSI C80.1 APPLICABLE STANDARD; 161 POUND PER 100 FOOT WEIGHT; 1 INCH TRADE SIZE; 0.126 INCH WALL THICKNESS; THREADED END STYLE BONE 82010PA ................... 298 2 $274.72 C $5,49 PLTD COND CLAMP - 1" PLEASE NOTE: THIS IS NOT AN OFFER TO CONTRACT, BUT MERELY A QUOTATION OF CURRENT PRICES FOR YOUR CONVENIENCE AND INFORMATION. ORDERS BASED ON THIS QUOTATION ARE SUBJECT TO YOUR ACCEPTANCE OF THE TERMS AND CONDITIONS LOCATED AT SALES.OUR-TERMS.COM, WHICH WE MAY CHANGE FROM TIME TO TIME WITHOUT PRIOR NOTICE. WE MAKE NO REPRESENTATION WITH RESPECT TO COMPLIANCE WITH JOB SPECIFICATIONS. Per E = Each, C = Hundred, M 7 Thousand Terms andConditions 3 OF 5 LN 26 Product Qty Avail qty Price Per * EATON B-LINE SERIES PRE -ASSEMBLED 0,D. PIPE AND CONDUIT CLAMP, 0.07051N H x 2.95101N L 8 1.251N W, STEEL GHE ST3 287 1 1-IN ZINC INS HUB CH MYERS 1 ZINC CONDUIT HUB 27 PVC 1 SCHEDULE-40 CONDUIT 28 29 31 32 26.37 Ext Price C $13.26 3940 40 $70,49 C 528.20 HEAVY WALL TYPE,; PVC MATERIAL; 10 FOOT; 1-004 INCH INNER DIAMETER; 1,315 INCH OUTER DIAMETER; DIRECT BURIAL/CONCRETE ENCASEMENT INSTALLATION; 405 SCHEDULE; UL 651, ETL APPROVAL; NEMATC-2, WC1094A APPLICABLE STANDARD; 1 INCH TRADE SIZE PVC_ELl9©1 -.- 748 2 $284-87 C 55.70 90D PVC ELL STANDARD RADIUS TYPE; PVC MATERIAL; GRAY FINISH; 40 5 SCHEDULE, UL 651, ETL APPROVAL; 1 INCH TRADE SIZE; 90 DEGREE BEND ANGLE; PLAIN END STYLE; 5.3/4 INCH BEND RADIUS PVC FA1, FEMALE ADPT 678 $120.44 C $1.20 THREADED FEMALE TYPE, PVC MATERIAL, GRAYFINISH, NON-METALLIC CONDUIT TO THREADED FITTING, METALLIC SYSTEM CONNECTION TYPE; 40 S SCHEDULE; UL, CSA APPROVAL; 1 INCH TRADE SIZE, USED ON 40/80 5 CONDUIT PVC CPLl CONDUIT CPLG 1705 3 569.66 C 52.09 STANDARD TYPE; PVC MATERIAL; GRAY FINISH, 2 INCH; UL, CSA APPROVAL, 1 INCH TRADE SIZE; SOCKET END STYLE, USED ON 40/80 5 RIGID CONDUIT PVC 13E1 119 1 5547.08 C 55.47 BELL END PVC MATERIAL; GRAY FINISH, UL, CSA APPROVAL, 1 INCH TRADE SIZE; USED ON 40/80 5 RIGID CONDUIT WIRE THHN8STRGRN2500R 7270 40 $1.,011.33 p8 THHN GREEN 2500" REEL $40:45 THHN TYPE, 2500 FT, 0,216INCH OUTER DIAMETER; ANNEALED BARE COPPER CONDUCTOR MATERIAL; UL 83,CUL APPROVAL; 600 V VOLTAGE RATING, 40 AMPERE (60 DEG CI, 50 AMPERE (75 DEG C), 55 AMPERE (90 DEG C) CURRENT RATING; 90 DEG C (DRY/WET) TEMPERATURE RATING PLEASE NOTE: THIS IS NOT AN OFFER TO CONTRACT, BUT MERELY A QUOTATION OF CURRENT PRICES FOR YOUR CONVENIENCE AND INFORMATION. ORDERS BASED ON THIS QUOTATION ARE SUBJECT TO YOUR ACCEPTANCE OF THE TERMS AND CONDITIONS LOCATED AT SALES.OUR-TERMS.COM, WHICH WE MAY CHANGE FROM TIME TO TIME WITHOUT PRIOR NOTICE, WE MAKE NO REPRESENTATION WITH RESPECT TO COMPLIANCE WITH JOB SPECIFICATIONS. Per E = Each, C = Hundred, M = Thousand Terms and Conditions 4 OF 5 LN 34 35 Product WIRE THHN6STRBLK2SOOR 46 THHN BLACK 2.500° REEL Qty Avail Qi 4287 30 Price $1,605, 35 Quote: Q1054767 Revision #: 002 Per * Ext Price $48,16 THHN TYPE; 2500 FT; 0.253 INCH OUTER DIAMETER; ANNEALED BARE COPPER CONDUCTOR MATERIAL; UL 83, CUL APPROVAL; 600 V VOLTAGE RATING; 55 AMPERE (60 DEG C), 65 AMPERE (75 DEG C), 75 AMPERE (90 DEG C) CURRENT RATING; 90 DEG C (DRY/WET) TEMPERATURE RATING WIRE THHN6STRRED1000R 1006 30 $1,605.35 M $48.16 86 THHN RED 1000' REEL THHN TYPE; 1000 FOOT; 249 MIL OUTER DIAMETER; COPPER CONDUCTOR MATERIAL; UL 83/758/1063/1581, UL. (CANADA AND U5), C5A C22.2 APPROVAL; 600 VOLT VOLTAGE RATING; 55 AMP {60 DEG C), 65 AMP (75 DEG C), 75 AMP (90 DEG C) CURRENT RATING WIRETHHN65TRWHT1060R 899 30 $1,605.35 M $48.16 16 THHN WHITE 1000° REEL THHN TYPE; 1000 FT; 0,253 INCH OUTER DIAMETER; ANNEALED BARE COPPER CONDUCTOR MATERIAL; UL 83, CUL APPROVAL; 600 V VOLTAGE RATING; 55 AMPERE (60 DEG C), 65 AMPERE (75 DEG C), 75 AMPERE (90 DEG C) CURRENT RATING; 90 DEG C (DRY/WET) TEMPERATURE RATING Merchandise: $2,132.07 Additional Sales Tax May Apply: Total:. $2,132.07 PLEASE NOTE: THIS IS NOT AN OFFER TO CONTRACT, BUT MERELY A QUOTATION OF CURRENT PRICES FOR YOUR CONVENIENCE AND INFORMATION. ORDERS BASED ON THIS QUOTATION ARE SUBJECT TO YOUR ACCEPTANCE OF THE TERMS AND CONDITIONS LOCATED AT SALES OUR-TERMS,COM, WHICH WE MAY CHANGE FROM TIME TO TIME WITHOUT PRIOR NOTICE. WE MAKE NO REPRESENTATION WITH RESPECT TO COMPLIANCE WITH JOB SPECIFICATIONS. Per E = Each, C = Hundred, M = Thousand Terms and Conditions 5 OF 5 Receipt Washington State Department of Labor and Industries Fiscal Transaction Receipt -- Transaction Type: Sale Fiscal Transaction: 111212826 Created: 03/05/2026 Payments: $121.50 -- Payments -- Type Amount 1 Payer Reference EC $121.50 10782617 - Services -- Description Reference Quantity Price New Service or Largest Feeder - 1 - 100 AMP 4786525E 1 $121.50 EquopmentWatch. www.equlpmentwat All prices shown in US dollars ($) Adjustments for '08-179 in All Saved Models Miscellaneous 4X2 30KGVW DSL On -Highway Flatbed Trucks Size Class: 26,001 - 33,000 Ibs Weight° 8994Ibs January 5, 2026 Configuration for 4X2 3OKGVW DSL Axle Configuration 4X2 Maximum Gross Vehicle Weight 30000.0 lbs Blue Book Rates Horsepower 217,0 hp Power Mode Diesel FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cast. Ownership Costs Monthly Weekly Daily Hourly Published Rates USD $2,000.00 USE) S785.00 USD $195.00 USD 529,00 Adjustments Region USD $170.80 USD 547.88 USD 511.90 USD 51.77 (Washington; 106,1%) Model Year (2023: 99.94%) (USD S1,65) (USD $0.46) (USD $0.11) (USD:S6,02) Adjusted Hourly Ownership - - - - Cost (100%) Hourly Operating Cost (100%) Total: USD 52,969.15 USD 5032.42 USD 5206.78 USD 530.75 Estimated operating Casts Hourly USD 535,15 USD 535.15 FHWA Rate'"' Hourly USD $51, USD $52.0 Non -Active Use Rates Standby pate Idling Rate Hourly USD 58.44 USD 542.14 Rate Element Allocation Element Percentage Value Depreciation (ownership) 24.4495 USD 5584.47/mo Overhaul (ownership) 56.817 USD 51590.77/mo CFC (ownership) 9.54% USD $239.10/mo Indirect (ownership) 10.245 USD 5285.71/mo Fuel (operating) @ USD 3.83 71.89% USD 525.27/hr Revised Dare: 1st quarter 2026 These are the most accurate rates for the selected Revision Date(s). However, due to more frequent online updates, these rates may not match Rental Rate Slue Book, Print, Visit the Cost Recovery Product Guide on our Help page for more information, The equipment represented in this report has been exclusively prepared for (rory@interwest.biz) All material herein 7.> 2003-2026 Rantlall-Reilly Ali r4ghts reserved, R EquipmentlNatch_ www,equ ipmen(watch. cam Rental Rate Blue Book, O&O Rates Report for '14-21 in CURRENT INTERWEST FLEET January 9, 2026 Multiquip DCA25SSIU (disc. 2018) Large Generaler Sets Size Class: 20.50kW Weight N/A Configuration for DCA25SSIU (disc. 201B) Enet©sure Enclosed Horsepower Power Mode Diesel Prime Output 30.6 hp 20000 W Blue Book Rates FHWA Rate is equal to the monthly ownership cost. divided by 176 plus the hourly estimated operating cost. Ownership Costs Monthly Weekly Daily Hourly Published Rates USD $1,040.00 USD $290.00 USD 573.00 USD $11.00 .Adjustments Region USD $45.76 USD $12.76 USD S3.21 USD $0.48 . (Wa.shult)ton: 104.4%) Model Year (201,5. 99.94%) (USD 50.63) (USD 50.17) (USD 50.04) (USD $0.01) Adjusted Hourly Ownership Cost (LOON Hourly Operating Cost (100%) Total. USD $1,085.13 USD 5302.59 USD S76.17 USO 511.48 Estimated Opera ing Costs Hourly USD S11.65 USD 511,65 FHWA Rate Hourly USD $17,56 USD 517,82 Non -Active Use Rates Standby Rate Idling Rare Hourly USD 53.08 USD $12.50 Rate Element Allocation Element Depreciation (ownership) Overhaul (ownership) CFC (ownership) Indirect (ownership) Fuel (operating) @ USD 3.83 Revised Date: 1st quarter 2026 Percentage Value 38.54% USD $400-84/mo 34.36 % USD 5357.351mo 12.99% USD $135.09/mo 14.11% USD 5146.71/mo 54.33 % USD $6,331hr 62 material here,n „ 2003-2026 Ran1Jl-Reilly All righrs reserved. Page 1314 ©f 1122 EquipmentWatch.. www.equipmentwatch. cam All prices shown in US dollars ($) Adjustments for `06-113 in undefined Caterpillar 305.5E CR (disc. 2017) Crawler Mounted Compact Excavators Size Class: 5.5.6.4mt Weight: NIA April 7, 2025 Configuration for 305.5E CR (disc. 2017) Horsepower 44.2 hp Operating Weight Operator Protection ROPS Power Mode Blue Book Rates FHWA Rate is equal to the monthly ownership cast divided by 176 plus the hourly estimated operating cost. ownership Costs Monthly Weekly Daily Hourly Published Rates USD 53.790,00 USD 51,060.00 USD 5265.00 USD 540.00 Adjustments Region ( Washington; USD $151.60 USD 542.40 USD 510,60 USD 51,60 104%) Model Year (2017: 100%) - - Adjusted Hourly Ownership - - - Cosi (100%) Hourly Operating Cosi (100%) Total: USD 53,941.60 USD 51,102.40 USD 5275,60 USD 571,60 5.81 nit Diesel Estimated Operating FHWA Rate^ Costs. Hourly Hourly USD $18.77 USD 540.30 USD 518,771 USD 54L17 Non -Active Use Rates Standby Rate Idling Rate Hourly USD 511.20 USD 528.45 Rate Element Allocation Element Depreciation (ownership) Overhaul (ownership) CFC (ownership) Indirect (ownership) Fuel (operating) USD 3.70 Revised Date: 2nd quarter 2025 Percentage Value 26.49% USD 51,022.841mo 38.05% USD 51,442.21/mo 16,74 % USD 5634,55rmo 18.22% USD $G90.401m0 32.23% USD 5G.05hr These are the most accurate rates for the selected Revision Date(s). However, rlue to more frequent. online updates, these rates may not match Rental Rate Blue Book' Print. Visit the Cost Recovery Product Guide on our Help page for more information. The equipment represented in this report has been exclusively prepared for (rory@interwest.biz) Alt material herein 5 2003.262.5 Randall-Re&E,y All rights reserved. Page 1 of 1 EquipmentWatch _ www.equipmentwatch,ccm All prices shown in US dollars ($) Adjustments for'06-113lrthumb in undefined Miscellaneous SHT1NL Hydraulic Bucket Thumbs Size Class: All Weight: NIA April 7, 2025 Configuration for BHTWL Power Mode Hydraulic Type Wide Blue Book Rates Recommended Machine Weight 6.0.8.0 mt FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating c Ownership Costs Monthly Published Rates USD $1,085,00 Adjustments Region ( Washington: USD $74.86 106.9'A) Model Year (2018: 99,87%) (USD $1.54) Adjusted Hourly Ownership Cost (100%) Hourly Operating Cost (10€ 54) Total: USD 51,15(3.33 Weekly USD S305.00 USD 621.05 USD $5,24 (USD S0.43) (USD $0.11) USD 5325,61 USD 581.14 Daily Hourly USD 576.00 USD 511,00 USD 50,76 USD $11,74 Estimated Operating Casts Hourly USD S2,27 USD 52.27 FHWA Rate — Hourly USD $8,43 USD 58.85 Non -Active Use Rates Standby Rate Idling Rate Hourly USD $3.29 USD $6.58 Rate Element Allocation Element Percentage Value Depreciation (ownership) 18.9944 USD ,$206.029mo Overhaul (ownership) 68.7350 USDS745,681ma CFC (ownership) 5,44^s6 USD 559,01lmo indirect (ownership) 6,85% USD $74.28Imo Fuel cost data is not ava I55le for these rates. Revised Date: 2nd quarter 2025 These are the most accurate rates for the selected Revision Date(s). However, due to more frequent onl€ne updates, these rates may not match Rental Rate Blue Book, Print, Visit the Cost Recovery Product Guide on our Help page for more information. The equipment represented in this report has been exclusively prepared for (rory@interwesibiz) All ma rat herein O 2003-2025 R illy All rights reserved, Page 1 sl 1 EquipmentWatch.. www,equipme ntwatch,com Al prices shown in US dollars (S) Adjustments for '06-113/1 in undefined Miscellaneous GP.25 General Purpose Excavator Buckets Site Class: All Weight: N)A April 7, 2025 Configuration For GP.25 Rated Capacity 0,25 cu yd Width 18'•-30' Power Mode Manual Blue Book Rates •• FHWA Rale is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost. Ownership Costs Monthly Weekly Daily Published Rates USD Sa45.00 USD $125.00 USD $31.00 Adjustments Region ( Washington USD $29,37 USD $6„25 USD 52,05 105.6%) Model Year (2010: 94.69%) (USD 3050) (USD 50.1(l) (USD S0,03) Adjusted Hourly Ownership - - Cosi (100%) Hourly Operating Cosl (100%Yt) "fatal: USD 5473.87 USD 5133.11 USD S33.01 Hourly USD $5.00 USD $0.33 (USD 50.01) Estimated Operating CO6ta Hourly USD S1.B1 USD 51.81 FHWA Rate" Hourly USD USD 54.50 Non -Active Use Rates Standby Rate Idling Rale Hourly USD $1.35 USD S2.69 Rate Element Allocation Element Deprectalion (nwnershtp) Overhaul (ownership) CFC (ownership) Revised Date: 2nd quarrel- 2025 Percentage Value 21.15% USD $94.10/m© 65,85% USD $293,10/mn 5.75'':5 USD 525.591mo 7,2435 USD 532.211m© Fuel cosi data .s not available for these rates. These are the most accurate rates for the selected Revision Dare(s). However, due to more frequent online ups, these rates may nor match Rental Rate Blue Book' Print, Visit the Cost Recovery Product Guide on our Help page for more information. The equipment represented in this report has been exclusively prepared for Crory@intery+rest.biz Alt material herein 2903.2025 Randall -Reilly A01 rights reserved. rage 1 of 1 EquipmentWatch.. www,equipmenewatch.corn All prices shown in US dollars (5) Adjustments for'©6-11312 in undefined Miscellaneous GP.875 General Purpose Excavator Buckets Size Class' All Weight: 1214 Ibs April 7, 2025 Configuration for GP.875 Rated Capacity 0.875 cu yd Width 24'--41' Power Mode Manual Blue Book Rates FHWA Rate is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cosi, Ownership Costs Monthly Weekly Daily Hourly Published Rates USD 5550,00 USD 5155.00 USD 539.00 USD'$6.00 Adjustments Region: ( Washington: USD $36.30 USD S10.23 USD 52,57 USD 50.40 106,E %) Model Year (2018: 99,89%) (USD 50.62) (USD 50.17) {USD 50,04) (USD 50,01} Adjusted Hourly Ownership - Cast. (10016) Hourly Operating Cost (10€46) Total: USD S585.68 USD S165.06 USD S41.53 USD S6.39 Estimated Operating Costs Hourly USD 51.96 U5D 51,96 FHWA Rate-" Hourly USD 55.09 USD 55.29 Non -Active Use Rates Standby Rine Idling Rate Hourly USD S1.66 USD S.3.33 Rate Element Aiiocation Element Depreciation (ownership} Overhaul {ownership) CPC (ownership) Indirect )whip) Fuel cost cat Percentage 21,15% 65,86% 5.75% 7,241/r Value USD 5116,30/m© USD 5362.26/me USD 531,63/mo USD 539.51/mo Revised Date: 2nd quarter 2025 These are the most accurate rates for the selected Revision Date(s), However, due to more frequent online updates, these rates shay not match Rental Rate Blue Booke Print. Visit the Cost Recovery Product Guide on our Help page for more information. The equipment represented in this report has been exclusively prepared for (rary(Olnterwest.biz) All material hcro,n 0 2003.2025 Randall -Reilly 4.11 r,grsa reserved. Page 1 al 1 EquipmentWatch.. www.equipmentwatch.com All prices shown in US dollars (S) Adjustments for '08-179 in undefined Miscellaneous 4X2 30KGVW DSL On -Highway Flatbed Trucks Size Class: 26,001. 33,000 Ibs Weight: 8894 Ibs April 7, 2025 Configuration for 4X2 30KGVW DSL Axle Configuration 4X2 Horsepower Maximum Gross Vehicle Weight 30000.0 Ibs Power Mode Blue Book Rates " FHWA Rale is equal to the monthly ownership cost divided by 176 plus the hourly estimated operating cost. Ownership Costs Monthly Weekly Daily Hourly Published Rates USD S2,800,00 USD S785.00 USD S195.00 USD $23.00 Adjustments Region ( Washington: USD S123.20 USD S34.54 USD $8.56 USD S1:28 104.4 5) Model Year (2023! 99.95s5) (USD 51.58) (USD S0.44) (USD 00.11) (USD S0,02) Adjusted Hourly Ownership - - Cost (100%h) Hourly Operating Cost (1004h) Total: USD $2,921,52 USD 5819.10 USD S203.47 USD S30.26 217.0 hp Diesel Estirnafed Operattn Hourly USD S34.18 USD S34.16 FHWA Rate" Hourly USD 550.09 USD $50,78 Non -Active Use Rates Stantiby Rate Idling Rate Hourly USD S8,30 USD S40.99 Rate Element Allocation Element Percentage Value Depreciation (ownership) '24,44% USD 5484.421mo Overhaul (ownership) 56.81'% USD S1,590.77hno CFC (ownership) 8.541,c USD 5239.10/mo Indirect (ownership) 10,235 USD 5285.71/"mo Fuel (operating) °a USD 3.70 71,35% USD 524,39ihr Revised Date: 2nd quarter 2025 These are the most accurate rates for the selected Revision Date(s). However, due to more hequenl online upriates, these rates may not match Rental Rate Blue Bonk" Print. Visit the Cost Recovery Product Guide on our Help page for more information. The equipment represented in this report has been exclusively prepared for (rory@interwestt.biz) All material herein 41 20333.2025 Randall -Really All rights reserved. Page 1 of 1. July 14, 2026 Interwest Construction, Inc, 609 North Hill Blvd, Burlington, WA 98233 Attn: Zech Rose, Project Manager Re: City of Yakima Nelson Dam Removal Phase 2A CPR 010 — Material Procurement Engineer's Decision Zach, We have reviewed your cost proposal for CPR 010 — Material Procurement. We have found your submitted credit proposal to be acceptable. A total credit of $19,595.37 and a total of 0 calendar days will be included in a forthcoming Change Order. Sincerely, HDR Engineering, Inc. Troy Gibbs, PE Construction Manager cc: Daniel Tiliano — City of Yakima Chad Redick — City of Yakima Ryan Roberts — HDR Mike Garello — HDR .4 71 7 97`" St, Gig Harbor, lr/A 98332 (253) 432,5024 Gibbs, Troy From: Sent: To: Subject: Attachments: Zach Rose <ZachRose@interwestbiz> Thursday, July 16, 2026 12:01 PM Gibbs, Troy Nelson Dam 42-Inch Flg Adapter Pricing.pdf CAUTIOIC XTERNAL1 This achments unless you recogni- Troy, om out ide of the organization. Do not click nd know the content is safe. See attached quote for the 42-inch flange adapter parts & pieces. I played around with the combination of items to get as dose to $20,024 and below is what I arrived at. Any questions let me know. bolt kit $ 3,540.56 1 s 3,540.56 gasket 594.76 2 $ 1,189.52 fig. adp. $ 5,874.88 2 s 11,749.76 backup ring S 1,865.53 1 $ 1,865.53 freight $ 1,250.00 1 $ 1,250.00 total $ 19,595.37 Thank you, Zach Rose I Project Manager INTERWEST CONSTRUCTION INC. 609 North Hill Blvd. Burlington, WA 98233 Office: (360) 757-7574 Mobile: (360) 391-6140 This message contains information and or files from Irterwest CQnstructicta 8nc., which may be Zontidentlal, proprietary or privileged mf©rmati©n. [f au are not the Intended recipient, be aware that disclosure, copying, distribution. or use o3 the contents of ; ¢s esea e is prohibited. If you hate received this transmissic n 6n error please no ify rrre in r ediately by telephone or e-mail FERGUSON® FEL - PASCO INW #1620 1130A WEST WASHINGTON WATERWORKS PASCO, WA 99301-0000 Phone: 509-544-2245 Fax: 509-544-9222 Deliver To: From: Joseph Contreras joseph.contrerastaferguson.com Comments: 14:22:27 JUL 16 2026 Bid No: B045267 Bid Date: 05/13/26 Quoted By: SWM Customer: INTERWEST CONSTRUCTION INC NELSON DAM REMOVAL PH 2 609 NORTH HILL BLVD BURLINGTON, WA 98233 Cust PO#: 42" TERM, FLG ASSY FERGUSON ENTERPRISES LLC #3156 Price Quotation Phone: 509-544-2245 Fax: 509-544-9222 Cust Phone: 360-757-7574 Terms: NET 10TH PROX Ship To: INTERWEST CONSTRUCTION INC NELSON DAM REMOVAL PH 2 609 NORTH HILL BLVD BURLINGTON, WA 98233 Job Name: NELSON DAM REMOVAL PH 2 Page 1 of 2 Item Description Quantity 1-2 WEEK LEAD TIME SP-150#ZHDPESTUD42 42 150# ZN HDPE STUD KIT W/DBL NUT HDPE X CLS D STL FLG ATSGA42 42 FF 1/8 TORUSEAL NSF61 FLG GSKT 4-5 WEEK LEAD TIME PRICE INCLUDES LIMITED QTY RUN CHARGE. PEI32FLA42 42 IPS PC63 DR32.5 FLG ADPT SP-IBUPSDR2142 42 SOR21 100 PSI DI BU RNG cr CZT13142K FFREIGHT 6-8 WEEK LEAD TIME 42X2 1Z0# CLS D CS TA r or BARE FRT CHARGE FEE Net Price UM Total 3540.560 EA 594.760 EA 3540.56 594.76 1 5874.880 EA 5874.88 1 1865.530 EA 1865.53 1 13142.240 CA 13142.24 1 1250.000 EA 1250.00 Net Total: Tax: Freight: Total: $26267.97 $0.00 $0.00 $26267.97 HOW ARE WE DOING? WE WANT YOUR FEEDBACK! Scan the QR code or use the link below to complete a survey about your bids: https://survey.medallia.com/?bidsorder&fc=1539&on=10256 fd FERGUSON® FERGUSON ENTERPRISES LLC #3156 WATERWORKS Price Quotation Fax: 509-544-9222 14:22:27 JUL 16 2026 Reference No: B045267 Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERVVISE, QUOTES FOR PRODUCTS SHIPPED FOR RESALE ARE NOT FIRM UNLESS NOTED OTHERWISE. Page 2 of 2 Due to the uncertain impact of potential tariffs, Ferguson's quotation/proposal has not included any provision or contingency for future tariffs or increase of existing tariffs. Ferguson reserves the right to adjust prices to reflect the impact of any new or increased tariffs that affect our costs at the time of shipment. Ferguson will provide notice of any such adjustments along with documentation supporting the changes. CONTRACTOR CUSTOMERS: IF YOU HAVE DBE/MBEMBE/NBE/SDVBE/SBE GOOD FAITH EFFORTS DIVERSITY GOALS/ REQUIREMENTS ON A FEDERAL, STATE, LOCAL GOVERNMENT PRIVATE SECTOR PROJECT, PLEASE CONTACT YOUR BRANCH SALES REPRESENATIVE IMMEDIATELY PRIOR TO RECEIVING A QUOTE/ORDER. Seller not responsible for delays, lack of product or Increase of pricing due to causes beyond our control, and/or based upon Local, State and Federal laws goveming type of products that can be sold or put into commerce. This Quote is offered contingent upon the Buyers acceptance of Sellers terms and conditions, which are incorporated by reference and found either following this document, or on the web at htlps://www.ferguson.com/content/website-info/terrns-of-sale Govt Buyers: All items are open market unless noted otherwise. HOW ARE WE DOING? WE WANT YOUR FEEDBACK! Scan the QR code or use the link below to complete a survey about your bids: https://survey.medallia.com/?bidsorder&fc=153984on=10256