HomeMy WebLinkAboutR-2024-123 Resolution to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to incorporate the Six-year Transportation Improvement Program (TIP) for the period of 2025 through 2030. RESOLUTION NO. R-2024-123
A RESOLUTION to amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to incorporate the Six-year Transportation Improvement Program
(TIP) for the period of 2025 through 2030.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year
Transportation Improvement Program for transportation improvements to arterial streets in the
City of Yakima for the ensuing six-year period, all as contemplated and required by the State
RCW 35.77.010 and applicable Federal law; and
WHEREAS, the City of Yakima desires to amend the Yakima Urban Area
Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six-year TIP, as
contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and,
WHEREAS, this amendment is limited to incorporation of the projects listed in the Six-
Year Transportation Improvement Plan for the period of 2025 to 2030 to the Capital Facilities
Element of the Yakima Urban Area Comprehensive Plan, which is required under RCW
36.70A.130(2B) and RCW 35.77.010; and,
WHEREAS, a public hearing was held by the Yakima City Council on the Six-year TIP
on July 2, 2024 with the proper public notice as required by RCW 35.77.010; and
WHEREAS, the City Council of the City of Yakima, after reviewing the information and
holding the public hearing, finds that amending the Yakima Area Comprehensive Plan Capital
Facilities Element is in the best interest of the City and its residents; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted Six-year Transportation Improvement Program for the period of 2025
through 2030 for the City of Yakima shall be incorporated as an amendment to the Capital
Facilities Element of the Yakima Urban Area Comprehensive Plan.
ADOPTED BY THE CITY COUNCIL this 2nd day of July, 2024.
e.e
Jr-siA y11 Patricia Bye , Mayor
ATTEST: s ��
(SEAL %
•
Rosalinda Ibarra, City Clerk
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
5.
c o < c � c x
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' x
n 0. c D.Road Name or Number C c Q. 0' ' n m °' c
�, a E.Begin&End Termini Z ,< Q. co ,<
H E - F.Project Description G.Structure ID 2 Q. o m CD m Q.
14 YAK84 07/02/24 07/02/24 R-2024-XXX 04 C G O P S 0.400 CE Yes
TW
16th Avenue and Tieton Drive Intersection Improvements
16th Avenue
16th Avenue to Tieton Drive
Reconstruct and widen 16th Avenue and Tieton Drive by adding left-turn lanes for all
movements at the intersection. Upgrade the traffic signal.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2029 0 OTHER 358,512 53,592 412,104
P RW 2029 0 OTHER 1,498,607 233,893 1,732,500
P CN 2030 0 OTHER 1,640,683 252,483 1,893,166
Totals 0 3,497,802 539,968 4,037,770
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 0 0 412,104
RW 0 0 0 0 1,732,500
CN 0 0 0 0 1,893,166
Totals 0 0 0 0 4,037,770
Report Date: June 12, 2024 Page 1 91
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c o < c � ' x
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' C
n 0 c D.Road Name or Number a cr. Q. 0' ' c) m °' c
i,g a E.Begin&End Termini m Z a
H F.Project Description G.Structure ID a c P m CD 3 m a
14 YAK57 07/02/24 07/02/24 R-2024-XXX 11 CPT 0.010 CE No
18th Street Underpass
Yakima Avenue
Yakima Avenue to 18th Street
Replace the bridge on E.Yakima Avenue that crosses over 18th Street.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2025 BR 311,970 0 77,970 389,940
P CN 2026 BR 2,974,360 0 743,590 3,717,950
Totals 3,286,330 0 821,560 4,107,890
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 354,490 0 0 0 0
CN 0 337,995 0 0 0
Totals 354,490 337,995 0 0 0
Report Date: June 12, 2024 Page 2 92
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c 0) < C -I ' x
A.PIN/Project No. B.STIP ID 3 0 3 c o m
c z C.Project Title D m E co z' °' x
n 0 c D.Road Name or Number a cr. Q. 0' ' c) m °' c
i,g a E.Begin&End Termini 3 Z a
H F.Project Description G.Structure ID a c o m CD 3 m a
04 YAK 111 07/02/24 07/02/24 R-2024-XXX 04 C G P S T 1.500 CE No
W
6th Avenue Roadway Improvements
6th Avenue
Walnut Street to River Road
Reconstruct roadway including trolley provisions.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2026 0 0 7,935,000 7,935,000
Totals 0 0 7,935,000 7,935,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 0 7,935,000 0 0 0
Totals 0 7,935,000 0 0 0
Report Date: June 12, 2024 Page 3 93
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c o < c -1 ' x
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' C
n 0 c D.Road Name or Number a cr. Q. 0' ' c) m °' c
i,g a E.Begin&End Termini m Z a
H F.Project Description G.Structure ID a c P m CD 3 m a
07 YAK 107 07/02/24 07/02/24 R-2024-XXX 28 C G P S T 0.450 CE No
W
88th Avenue Sidewalk
88th Avenue
Tieton Drive to Summitview Avenue
Construct sidewalk on east side of roadway.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2025 0 SRTS 591,000 0 591,000
Totals 0 591,000 0 591,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 591,000 0 0 0 0
Totals 591,000 0 0 0 0
Report Date: June 12, 2024 Page 4 94
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c Of < C -I ' x
A.PIN/Project No. B.STIP ID 3 0 3 c o m
c z C.Project Title D m E co z' °' x
n 0. c D.Road Name or Number C c Q. 0' ' c) m °' c
�, a E.Begin&End Termini Z ,< Q. co ,<
H E F.Project Description G.Structure ID 2 Q. o m CD m Q.
04 YAK11 07/02/24 07/02/24 R-2024-XXX 01 O P S T W 0.280 EA No
Bravo Company Boulevard, Phase 1
Bravo Company Blvd
Railroad Tracks to'D'Street
Construct four-lane roadway section with median,bike lanes and roundabouts,install
curb,gutter,sidewalk,street lighting and storm drainage system,along with water
and sewer systems.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2025 0 0 6,000,000 6,000,000
Totals 0 0 6,000,000 6,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 2,000,000 4,000,000 0 0 0
Totals 2,000,000 4,000,000 0 0 0
Report Date: June 12, 2024 Page 5 95
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c o < c � ' x
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' C
n 0. c D.Road Name or Number C c Q. 0' ' c) m °' c
�, a E.Begin&End Termini Z ,< Q. co ,<
H E F.Project Description G.Structure ID 2 Q. o m CD m Q.
04 WA-13520 07/02/24 07/02/24 R-2024-XXX 01 S W 0.280 EA No
Bravo Company Boulevard, Phase 2
Bravo Company Boulevard
"H"Street to Railroad Tracks
Construct four-lane roadway section with median,bike lanes and roundabouts,install
curb,gutter,sidewalk,street lighting and storm drainage system,along with water
and sewer systems.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2025 0 OTHER 6,500,000 0 6,500,000
Totals 0 6,500,000 0 6,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 6,500,000 0 0 0 0
Totals 6,500,000 0 0 0 0
Report Date: June 12, 2024 Page 6 96
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c CD < C -I ' x
A.PIN/Project No. B.STIP ID 3 0 3 c o m
c z C.Project Title D m E co z' °' x
n 0 c D.Road Name or Number a cr. Q. 0' ' c) m °' c
i,g a E.Begin&End Termini m Z a
H F.Project Description G.Structure ID a c P m CD 3 m a
07 WA-13522 07/02/24 07/02/24 R-2024-XXX 28 C G P S T 0.530 CE No
W
Browne Avenue Sidewalk
Browne Avenue
7th Avenue to 16th Avenue
Replace damaged sidewalk panels.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2029 0 0 443,900 443,900
Totals 0 0 443,900 443,900
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 0 0 0 443,900
Totals 0 0 0 0 443,900
Report Date: June 12, 2024 Page 7 97
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
5.
c o < c � ' x
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' C
n 0. c D.Road Name or Number a c Q. 0' ' c) m °' c
i,g a E.Begin&End Termini m Z a
H F.Project Description G.Structure ID a c P m CD 3 m a
05 WA-14955 07/02/24 07/02/24 R-2024-XXX 04 0.750 CE Yes
Coolidge Road from 72nd Ave to 84th Ave-Roadway Improvements
Coolidge Road
72nd Avenue to 84th Avenue
Rehabilitate existing pavement and update roadway to current city standards.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2026 0 0 200,000 200,000
P RW 2027 0 0 200,000 200,000
P CN 2028 0 0 1,100,000 1,100,000
Totals 0 0 1,500,000 1,500,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 200,000 0 0 0
RW 0 0 200,000 0 0
CN 0 0 0 1,100,000 0
Totals 0 200,000 200,000 1,100,000 0
Report Date: June 12, 2024 Page 8 98
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
5.
c o < c � ' x
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' x
n 0. c D.Road Name or Number C c Q. o' ' n m °' c
�, a E.Begin&End Termini Z ,< Q. co ,<
H E - F.Project Description G.Structure ID 2 Q. o m CD m Q.
16 YAK10 07/02/24 07/02/24 R-2024-XXX 01 O P S T W 0.550 EA Yes
E."H"Street Extension, Phase 1
E."H"Street
1st Street to 7th Street
Construct new roadway inlcuding water,sewer,curb,gutter,sidewalk,street lighting
and storm drainage system.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2025 0 OTHER 566,500 0 566,500
P RW 2025 0 OTHER 150,000 0 150,000
P CN 2026 0 OTHER 6,758,400 0 6,758,400
Totals 0 7,474,900 0 7,474,900
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 566,500 0 0 0 0
RW 150,000 0 0 0 0
CN 0 6,758,400 0 0 0
Totals 716,500 6,758,400 0 0 0
Report Date: June 12, 2024 Page 9 99
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
5.
c 0) < C -I ' x
A.PIN/Project No. B.STIP ID 3 0 3 c o m
c z C.Project Title D m E co z' °' x
n 0 c D.Road Name or Number a c Q. 0' ' c) m °' c
i,g a E.Begin&End Termini m Z a
H F.Project Description G.Structure ID a c P m CD 3 m a
04 YAK 109 07/02/24 07/02/24 R-2024-XXX 28 C G P S T 0.500 CE Yes
W
Fair Avenue Sidewalk
Fair Avenue
Pacific Avenue to Nob Hill Boulevard
Construct sidewalk on west side of roadway.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2029 0 0 488,750 488,750
Totals 0 0 488,750 488,750
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 0 0 0 488,750
Totals 0 0 0 0 488,750
Report Date: June 12, 2024 Page 10 100
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c o < c � ' x
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' x
n 0. c D.Road Name or Number C c Q. o' ' n m °' c
�, a E.Begin&End Termini Z ,< Q. co ,<
H E - F.Project Description G.Structure ID 2 Q. o m CD m Q.
03 WA-15117 07/02/24 07/02/24 R-2024-XXX 15 C O P S T 0.200 CE Yes
W
Fred Meyer Active Transportation Pathway-40th Ave& Fruitvale Blvd Roundabout
Various to Various
Roundabout, Rectangular Rapid Flashing Beacons(RRFB), New Marked Crosswalk,
Green Pavement/Bicycle Intersection Crossing Markings,ADA Curb Ramps,Audible
Pedestrian Signal, Bicycle Wayfinding Signs/Markings,Shared-use Path/Trail
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S RW 2025 0 Ped/Bike Program 100,000 0 100,000
S CN 2026 0 Ped/Bike Program 1,230,904 0 1,230,904
Totals 0 1,330,904 0 1,330,904
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
RW 100,000 0 0 0 0
CN 0 1,230,904 0 0 0
Totals 100,000 1,230,904 0 0 0
Report Date: June 12, 2024 Page 11 101
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c o < c � ' x
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' C
n 0. c D.Road Name or Number a cr. Q. 0' ' c) m °' c
i,g a E.Begin&End Termini m Z a
H F.Project Description G.Structure ID a c o m CD 3 m a
04 YAK 113 07/02/24 07/02/24 R-2024-XXX 28 C G P S T 0.010 CE No
W
Mead Avenue Pedestrian Signal
Mead Avenue
10th Avenue to 12th Avenue
Install school zone flashers and pedestrian signal RRFBs.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2028 0 OTHER 50,000 0 50,000
P CN 2029 0 OTHER 346,750 0 346,750
Totals 0 396,750 0 396,750
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 0 50,000 0
ALL 0 0 0 0 346,750
Totals 0 0 0 50,000 346,750
Report Date: June 12, 2024 Page 12 102
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c o < c � ' x
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' C
n 0 c D.Road Name or Number a cr. Q. 0' ' c) m °' c
i,g a E.Begin&End Termini 3 Z a
H F.Project Description G.Structure ID a c P m CD 3 m a
16 YAK102 07/02/24 07/02/24 R-2024-XXX 21 P T 0.030 CE No
N 1st St& R St Signal
N. 1st St.
R Street to R Street
Install traffic signal at the intersection.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2027 0 OTHER 66,990 10,395 77,385
P CN 2028 0 OTHER 401,709 62,722 464,431
Totals 0 468,699 73,117 541,816
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 77,385 0 0
CN 0 0 0 464,431 0
Totals 0 0 77,385 464,431 0
Report Date: June 12, 2024 Page 13 103
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
5.
c 0) < C -I ' x
A.PIN/Project No. B.STIP ID 3 0 3 c o m
c z C.Project Title D m E co z' °' x
n 0 c D.Road Name or Number a c Q. 0' ' c) m °' c
i,g a E.Begin&End Termini m Z a
H F.Project Description G.Structure ID a c o m CD 3 m a
04 YAK 114 07/02/24 07/02/24 R-2024-XXX 28 C G P S T 0.310 CE Yes
W
N. 16th Avenue Sidewalk
N. 16th Avenue
River Road to US 12 Off-Ramp
Construct sidewalk on west side of roadway.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2029 CRP(UM) 237,197 0 209,022 446,219
Totals 237,197 0 209,022 446,219
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 0 0 0 446,219
Totals 0 0 0 0 446,219
Report Date: June 12, 2024 Page 14 104
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c o < c —1 ' x
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' x
n 0. c D.Road Name or Number a cr. Q. o' ' n m °' 2
i,g a E.Begin&End Termini m Z a
H F.Project Description G.Structure ID a c P m CD 3 m CD
03 WA-15735 07/02/24 07/02/24 R-2024-0XX 05 C G O P S 0.670 CE No
TW
Nob Hill Blvd 28th Ave to 40th Ave Paving
Nob Hill Boulevard
28th Avenue to 40th Avenue
This project will rehabilitate the pavement on Nob Hill Blvd by milling and paving,
ADA curb ramp replacement,adjust utilities, restripe the road,and other work as
needed to rehabilitate the pavement.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2025 N H P P 1,414,000 0 0 1,414,000
Totals 1,414,000 0 0 1,414,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 1,414,000 0 0 0 0
Totals 1,414,000 0 0 0 0
Report Date: June 12, 2024 Page 15 105
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
5.
c 0) < C -I ' x
A.PIN/Project No. B.STIP ID 3 0 3 c o m
c z C.Project Title D m E co z' °' x
n 0 c D.Road Name or Number a c Q. 0' ' c) m °' c
i,g a E.Begin&End Termini m Z a
H F.Project Description G.Structure ID a c o m CD 3 m a
04 YAK 110 07/02/24 07/02/24 R-2024-XXX 28 C G P S T 1.500 CE Yes
W
Nob Hill Boulevard Sidewalk
Nob Hill Boulevard
12th Street to 14th Street
Construct sidewalk on south side of roadway.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2029 0 0 172,500 172,500
Totals 0 0 172,500 172,500
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 0 0 0 172,500
Totals 0 0 0 0 172,500
Report Date: June 12, 2024 Page 16 106
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c o < c � ' x
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' x
n 0. c D.Road Name or Number a cr. Q. o' ' n m °' 2
i,g a E.Begin&End Termini m Z a
H F.Project Description G.Structure ID a c P m CD 3 m CD
07 YAK103 07/02/24 07/02/24 R-2024-XXX 28 C O P T 0.500 CE No
Nob Hill Elementary School Safety Improvements
various streets
various locations to various locations
This project will make various pedestrian safety improvements in the vicinity of Nob
Hill Elementary School,such as new sidewalk and constructing ADA ramps.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2026 0 SRTS 101,200 0 101,200
P CN 2027 0 SRTS 674,520 0 674,520
Totals 0 775,720 0 775,720
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 101,200 0 0 0
CN 0 0 674,520 0 0
Totals 0 101,200 674,520 0 0
Report Date: June 12, 2024 Page 17 107
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c o < c � ' x
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' x
n 0. c D.Road Name or Number a cr. Q. o' ' n m °' 2
i,g a E.Begin&End Termini m Z a
H F.Project Description G.Structure ID a c P m CD 3 m CD
03 WA-15881 07/02/24 07/02/24 47 0.160 CE No
Nob Hill RR#2 and 72nd Ave S#87 Bridges-Joint Replacement
Nob Hill Boulevard,72nd Avenue
Nob Hill Blvd to 72nd Avenue
Replace expansion joints on the Nob Hill RR#2 bridge and expansion joints and 8548900,839000
girder grout channels on the 72nd Ave S#87 bridge.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2026 0 OTHER 189,390 0 189,390
P CN 2027 0 OTHER 1,172,552 0 1,172,552
Totals 0 1,361,942 0 1,361,942
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 189,390 0 0 0
CN 0 0 1,172,552 0 0
Totals 0 189,390 1,172,552 0 0
Report Date: June 12, 2024 Page 18 108
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c CD < C -I ' x
A.PIN/Project No. B.STIP ID 3 0 3 c o m
c z C.Project Title D m E co z' °' x
n 0 c D.Road Name or Number a cr. Q. 0' ' c) m °' c
i,g a E.Begin&End Termini m Z a
H F.Project Description G.Structure ID a c o m CD 3 m a
05 YAK 112 07/02/24 07/02/24 R-2024-XXX 04 C G P S T 0.030 CE No
W
Powerhouse Road and Englewood Avenue Intersection Improvements
Powerhouse Road
Englewood Avenue to Englewood Avenue
Intersection improvements.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2029 0 0 1,014,431 1,014,431
Totals 0 0 1,014,431 1,014,431
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 0 0 0 1,014,431
Totals 0 0 0 0 1,014,431
Report Date: June 12, 2024 Page 19 109
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
5.
c o < c � ' x
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' C
n 0. c D.Road Name or Number a c Q. 0' ' c) m °' c
i,g a E.Begin&End Termini m Z a
H F.Project Description G.Structure ID a c P m CD 3 m a
17 YAK93 07/02/24 07/02/24 R-2024-XXX 38 COT 0.600 CE Yes
Powerhouse Road Multi-Use Path
Powerhouse Road
Mobile Home Park 800'W of Pecks Canyon Rd to Cowiche Canyon Rd.
Construct multi-use path.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2027 0 Ped/Bike Program 44,500 5,500 50,000
P RW 2028 0 Ped/Bike Program 133,500 16,500 150,000
P CN 2029 0 Ped/Bike Program 341,835 42,250 384,085
Totals 0 519,835 64,250 584,085
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 50,000 0 0
RW 0 0 0 150,000 0
CN 0 0 0 0 384,085
Totals 0 0 50,000 150,000 384,085
Report Date: June 12, 2024 Page 20 110
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c o < c � ' x
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' x
n 0 c D.Road Name or Number C c Q. o' ' n m °' c
�, a E.Begin&End Termini Z ,< Q. co ,<
H E - F.Project Description G.Structure ID 2 Q. o m CD m Q.
07 WA-15118 07/02/24 07/02/24 R-2024-XXX 28 P T 0.300 CE No
Prasch Avenue Sidewalk Improvements
Prasch Avenue
S 20th Avenue to S 16th Avenue
Construct sidewalks against existing curbing on Prasch Avenue from S. 16th Avenue
to S.20th Avenue,and along S 16th Ave from Prasch Avenue to Nob Hill Blvd.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2025 0 OTHER 25,000 0 25,000
P CN 2026 0 OTHER 185,000 0 185,000
Totals 0 210,000 0 210,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 25,000 0 0 0 0
CN 0 185,000 0 0 0
Totals 25,000 185,000 0 0 0
Report Date: June 12, 2024 Page 21 111
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c CD < C -I ' x
A.PIN/Project No. B.STIP ID 3 0 3 c o m
c z C.Project Title D m E co z' °' x
n 0. c D.Road Name or Number a cr. Q. 0' ' c) m °' c
i,g a E.Begin&End Termini m Z a
H F.Project Description G.Structure ID a c P m CD 3 m CD
04 YAK 108 07/02/24 07/02/24 R-2024-XXX 03 C G P S T 0.030 CE No
W
S. 1st Street and E.Washington Avenue Intersection Improvements
1st Street
Washington Avenue to Washington Avenue
Realign intersection,widen E.Washington Ave.for additional lane,replace curb,
gutter,sidewalk,and construct new signal.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P ALL 2029 0 0 2,645,000 2,645,000
Totals 0 0 2,645,000 2,645,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
ALL 0 0 0 0 2,705,725
Totals 0 0 0 0 2,705,725
Report Date: June 12, 2024 Page 22 112
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
5.
c o < c � ' x
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' C
n 0. c D.Road Name or Number a c Q. 0' ' c) m °' c
i,g a E.Begin&End Termini 3 Z a
H F.Project Description G.Structure ID a c P m CD 3 m a
14 /9939(028) YAK98 07/02/24 07/02/24 R-2024-XXX 21 O P S T W 0.050 CE Yes
S.72nd Avenue and W.Washington Avenue Improvements
S.72nd Avenue
S.72nd Avenue to W.Washington Ave.
Improve intersection by constructing a roundabout.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S CN 2025 0 OTHER 800,000 0 800,000
P CN 2025 0 OTHER 1,200,000 0 1,200,000
Totals 0 2,000,000 0 2,000,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 2,000,000 0 0 0 0
Totals 2,000,000 0 0 0 0
Report Date: June 12, 2024 Page 23 113
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c 0) < C -I ' x
A.PIN/Project No. B.STIP ID 3 0 3 c o m
c z C.Project Title D m E co z' °' x
n 0 c D.Road Name or Number a cr. Q. 0' ' c) m °' c
i,g a E.Begin&End Termini m Z a
H F.Project Description G.Structure ID a c P m CD 3 m a
04 YAK104 07/02/24 07/02/24 R-2024-XXX 05 C G O P S 1.530 CE No
TW
Tieton Drive Resurfacing
Tieton Drive
S.48th Ave.to S.72nd Ave.
Grind and overlay,and ADA curb ramp replacement.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2027 0 OTHER 97,000 24,260 121,260
P CN 2028 0 OTHER 1,108,800 277,200 1,386,000
Totals 0 1,205,800 301,460 1,507,260
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 0 0 121,260 0 0
CN 0 0 0 1,386,000 0
Totals 0 0 121,260 1,386,000 0
Report Date: June 12, 2024 Page 24 114
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
5.
c o < c � c x
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' x
n 0. c D.Road Name or Number C c Q. 0' ' n m °' c
�, a E.Begin&End Termini Z ,< Q. co ,<
H E - F.Project Description G.Structure ID 2 o. o m CD m Q.
14 YAK14 07/02/24 07/02/24 R-2024-XXX 21 CO P S T CE Yes
W
Washington Avenue&Longfiber Road Intersection Improvements
Washington Avenue
Washington Avenue to Longfiber Road
Improve the Washington Avenue/Longfiber Road intersection by construction of
channelization,a signal,or a roundabout.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
S PE 2025 0 0 100,000 100,000
P RW 2025 0 0 150,000 150,000
P CN 2026 0 0 1,000,000 1,000,000
Totals 0 0 1,250,000 1,250,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 100,000 0 0 0 0
RW 150,000 0 0 0 0
CN 0 1,000,000 0 0 0
Totals 250,000 1,000,000 0 0 0
Report Date: June 12, 2024 Page 25 115
'`' Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
v
c o < c -1 ' x
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' x
n 0. c D.Road Name or Number a cr. Q. o' ' n m °' 2
i,g a E.Begin&End Termini m Z a
H F.Project Description G.Structure ID a c P m CD 3 m a
00 WA-15913 07/02/24 07/02/24 R-2024-XXX 47 0.060 CE No
Naches River Bridge Repair
Naches River to Naches River
The project will complete repairs to the Yakima Valley Trolley Bridge over the 08593100
Naches River. Repairs include removing and replacing decayed timber elements,
regrading and compacting approach fills, replacements of the timber sill footings and
the timber backwall,and scour protection of a bridge pier.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P CN 2025 STBG(UM) 276,800 0 43,200 320,000
S CN 2025 0 WSDOT 333,000 0 333,000
Totals 276,800 333,000 43,200 653,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
CN 653,000 0 0 0 0
Totals 653,000 0 0 0 0
Report Date: June 12, 2024 Page 26 116
" Washington State Six Year Transportation Improvement Program
I; Department of Transportation
From 2025 to 2030
Agency: Yakima
County: Yakima
MPO/RTPO: YVCOG Y Inside N Outside
_ m
5.
c o < c � ' x
A.PIN/Project No. B.STIP ID 3 o 3 c o m
c z C.Project Title D m E co z' °' C
n 0. c D.Road Name or Number a c Q. 0' ' c) m °' c
i,g a E.Begin&End Termini m Z a
H F.Project Description G.Structure ID a c o m CD 3 m a
05 YAK116 07/02/24 07/02/24 R-2024-XXX 28 1.130 CE Yes
Zier Road Sidewalk Improvements
Zier Road
75th Avenue to West Valley High School
Add sidewalk.
Funding
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds
P PE 2025 0 OTHER 100,000 0 100,000
P RW 2026 0 OTHER 120,000 0 120,000
P CN 2027 0 OTHER 980,000 0 980,000
Totals 0 1,200,000 0 1,200,000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th&6th
PE 100,000 0 0 0 0
RW 0 120,000 0 0 0
CN 0 0 980,000 0 0
Totals 100,000 120,000 980,000 0 0
Federal Funds State Funds Local Funds Total Funds
Grand Totals for Yakima 5,214,327 27,866,352 23,502,158 56,582,837
Report Date: June 12, 2024 Page 27 117
_: `y 1ljlt
l'A-ir ii!
'1.:4‘
I!I
s .
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 8.A.
For Meeting of: July 2, 2024
ITEM TITLE: Public hearing to consider: A) Resolution adopting the Six-Year
Transportation Improvement Program for the period of 2025 through
2030, and to amend the Transportation Systems Plan 2040; and B)
Resolution amending the Yakima Urban Area Comprehensive Plan
Capital Facilities Element
SUBMITTED BY:
Scott Schafer, Public Works Director
*Bill Preston, City Engineer
SUMMARY EXPLANATION:
A) Each year the City of Yakima (City) is required by state statute to update its Six-year Transportation
Improvement Program (TIP)for submittal to the Washington State Department of Transportation. This
plan must include all transportation projects for which state gas tax revenue or federal revenue will be
used.
Attached is the complete 2025 - 2030 Six-Year TIP, which describes all projects currently on the list. The
City will continue to seek funding for projects that do not currently have secured funding. City Council
and the public are welcome to add other arterial system projects to the TIP. The Six-Year TIP project
listing will be finalized at this hearing and sent to the Yakima Valley Conference of Governments
(YVCOG) after approval. In order to utilize federal funds, such as those administered by the Federal
Highway Administration (FHWA) and the Federal Transit Authority (FTA), projects must be included in
the Statewide Transportation Improvement Program (STIP). The STIP is a prioritized program of
transportation projects, compiled from local and regional plans, along with the Washington
Transportation System Plan (WTP), which provides a backbone for developing projects for the inter-
modal transportation network in the State of Washington.
The STIP contains federally funded projects plus state and local projects that are regionally significant.
These projects have been identified through the planning process as the highest priority for the available
funding to the state's Transportation Program. Planning activities of state and local governments are
essential parts of integrated regional planning processes. Long range transportation planning is a part of
the comprehensive land use planning carried out by local governments. Public participation is an integral
part of the planning process at all levels. Local agencies are required to develop and adopt a Six-year
Transportation Program; holding at least one public hearing during its development.
B) The City is required to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element
by incorporating the adopted Six-Year TIP for 2025 to 2030. This will ensure that we are in compliance
with the Growth Management Act and that we are consistent with the Comprehensive Plan as required.
87
The amendment is limited to incorporating only those projects that are adopted in the Six-Year TIP and is
not subject to the once a year change required under the laws of the Growth Management Act.
The Public Hearing notice has been provided to all Yakima-area media, including to Decides', KDNA
Radio, El Sol de Yakima, Hispanavision, Bustos Media, and El Mundo.
ITEM BUDGETED: N/A
STRATEGIC PRIORITY: Public Safety
RECOMMENDATION: Adopt Resolutions.
ATTACHMENTS:
Resolution A for 6 year TIP
Resolution B for 6 year TIP
6-Year TIP 2025-2030
88