Loading...
HomeMy WebLinkAboutR-2024-122 Resolution adopting the Six-Year Transportation Improvement Program (TIP) for the period of 2025 through 2030 for transportation improvements to arterial streets in the City of Yakima and amending the Transportation Systems Plan 2040. RESOLUTION NO. R-2024-122 A RESOLUTION adopting the Six-Year Transportation Improvement Program (TIP) for the period of 2025 through 2030 for transportation improvements to arterial streets in the City of Yakima and amending the Transportation Systems Plan 2040. WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year program for transportation improvements to arterial streets in the City of Yakima for the ensuing six-year period, all as contemplated and required by the State RCW 35.77.010 and applicable federal law; and WHEREAS, the City of Yakima desires to amend the Transportation Systems Plan 2040 to ensure compliance with the Growth Management Act and the regional transportation plan for the construction of arterial streets in the City of Yakima, all as contemplated and required by State and Federal Law; and, WHEREAS, after a public hearing on the matter, held at the regular meeting of the Yakima City Council on July 2, 2024, with proper public notice as required by RCW 35.77.010, the City Council finds that the plan attached hereto should be adopted as the Six-Year Transportation Improvement Program for the period of 2025 through 2030 for transportation improvements to arterial streets in the City of Yakima; and, WHEREAS, adopting the Six-year Transportation Improvement Program and amending the Transportation Systems Plan 2040 are in the best interest of the City and its residents; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six-Year Construction Program for the period of 2025 through 2030, a copy of which is attached hereto and by this reference made a part thereof, is hereby adopted as the official Six-Year Transportation Improvement Program for the City of Yakima, including proposed amendments to the Transportation Systems Plan 2040 along with Street Improvements, which are also approved. ADOPTED BY THE CITY COUNCIL this 2nd day of July, 2024. 4 l E ATTEST: 0,K1,14,4 Patricia By s, Mayor SEAL• P t• �\-\ Rosalinda Ibarra, City Clerk tiiN� '`' Washington State Six Year Transportation Improvement Program Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m 5. c o < c � c x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' x n 0. c D.Road Name or Number C c Q. 0' ' n m °' c �, a E.Begin&End Termini Z ,< Q. co ,< H E - F.Project Description G.Structure ID 2 Q. o m CD m Q. 14 YAK84 07/02/24 07/02/24 R-2024-XXX 04 C G O P S 0.400 CE Yes TW 16th Avenue and Tieton Drive Intersection Improvements 16th Avenue 16th Avenue to Tieton Drive Reconstruct and widen 16th Avenue and Tieton Drive by adding left-turn lanes for all movements at the intersection. Upgrade the traffic signal. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2029 0 OTHER 358,512 53,592 412,104 P RW 2029 0 OTHER 1,498,607 233,893 1,732,500 P CN 2030 0 OTHER 1,640,683 252,483 1,893,166 Totals 0 3,497,802 539,968 4,037,770 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 0 412,104 RW 0 0 0 0 1,732,500 CN 0 0 0 0 1,893,166 Totals 0 0 0 0 4,037,770 Report Date: June 12, 2024 Page 1 91 " Washington State Six Year Transportation Improvement Program I; Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c o < c � ' x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' C n 0 c D.Road Name or Number a cr. Q. 0' ' c) m °' c i,g a E.Begin&End Termini m Z a H F.Project Description G.Structure ID a c P m CD 3 m a 14 YAK57 07/02/24 07/02/24 R-2024-XXX 11 CPT 0.010 CE No 18th Street Underpass Yakima Avenue Yakima Avenue to 18th Street Replace the bridge on E.Yakima Avenue that crosses over 18th Street. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 BR 311,970 0 77,970 389,940 P CN 2026 BR 2,974,360 0 743,590 3,717,950 Totals 3,286,330 0 821,560 4,107,890 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 354,490 0 0 0 0 CN 0 337,995 0 0 0 Totals 354,490 337,995 0 0 0 Report Date: June 12, 2024 Page 2 92 '`' Washington State Six Year Transportation Improvement Program Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c 0) < C -I ' x A.PIN/Project No. B.STIP ID 3 0 3 c o m c z C.Project Title D m E co z' °' x n 0 c D.Road Name or Number a cr. Q. 0' ' c) m °' c i,g a E.Begin&End Termini 3 Z a H F.Project Description G.Structure ID a c o m CD 3 m a 04 YAK 111 07/02/24 07/02/24 R-2024-XXX 04 C G P S T 1.500 CE No W 6th Avenue Roadway Improvements 6th Avenue Walnut Street to River Road Reconstruct roadway including trolley provisions. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2026 0 0 7,935,000 7,935,000 Totals 0 0 7,935,000 7,935,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 0 7,935,000 0 0 0 Totals 0 7,935,000 0 0 0 Report Date: June 12, 2024 Page 3 93 '`' Washington State Six Year Transportation Improvement Program Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c o < c -1 ' x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' C n 0 c D.Road Name or Number a cr. Q. 0' ' c) m °' c i,g a E.Begin&End Termini m Z a H F.Project Description G.Structure ID a c P m CD 3 m a 07 YAK 107 07/02/24 07/02/24 R-2024-XXX 28 C G P S T 0.450 CE No W 88th Avenue Sidewalk 88th Avenue Tieton Drive to Summitview Avenue Construct sidewalk on east side of roadway. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2025 0 SRTS 591,000 0 591,000 Totals 0 591,000 0 591,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 591,000 0 0 0 0 Totals 591,000 0 0 0 0 Report Date: June 12, 2024 Page 4 94 '`' Washington State Six Year Transportation Improvement Program Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c Of < C -I ' x A.PIN/Project No. B.STIP ID 3 0 3 c o m c z C.Project Title D m E co z' °' x n 0. c D.Road Name or Number C c Q. 0' ' c) m °' c �, a E.Begin&End Termini Z ,< Q. co ,< H E F.Project Description G.Structure ID 2 Q. o m CD m Q. 04 YAK11 07/02/24 07/02/24 R-2024-XXX 01 O P S T W 0.280 EA No Bravo Company Boulevard, Phase 1 Bravo Company Blvd Railroad Tracks to'D'Street Construct four-lane roadway section with median,bike lanes and roundabouts,install curb,gutter,sidewalk,street lighting and storm drainage system,along with water and sewer systems. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2025 0 0 6,000,000 6,000,000 Totals 0 0 6,000,000 6,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 2,000,000 4,000,000 0 0 0 Totals 2,000,000 4,000,000 0 0 0 Report Date: June 12, 2024 Page 5 95 '`' Washington State Six Year Transportation Improvement Program Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c o < c � ' x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' C n 0. c D.Road Name or Number C c Q. 0' ' c) m °' c �, a E.Begin&End Termini Z ,< Q. co ,< H E F.Project Description G.Structure ID 2 Q. o m CD m Q. 04 WA-13520 07/02/24 07/02/24 R-2024-XXX 01 S W 0.280 EA No Bravo Company Boulevard, Phase 2 Bravo Company Boulevard "H"Street to Railroad Tracks Construct four-lane roadway section with median,bike lanes and roundabouts,install curb,gutter,sidewalk,street lighting and storm drainage system,along with water and sewer systems. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2025 0 OTHER 6,500,000 0 6,500,000 Totals 0 6,500,000 0 6,500,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 6,500,000 0 0 0 0 Totals 6,500,000 0 0 0 0 Report Date: June 12, 2024 Page 6 96 " Washington State Six Year Transportation Improvement Program I; Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c CD < C -I ' x A.PIN/Project No. B.STIP ID 3 0 3 c o m c z C.Project Title D m E co z' °' x n 0 c D.Road Name or Number a cr. Q. 0' ' c) m °' c i,g a E.Begin&End Termini m Z a H F.Project Description G.Structure ID a c P m CD 3 m a 07 WA-13522 07/02/24 07/02/24 R-2024-XXX 28 C G P S T 0.530 CE No W Browne Avenue Sidewalk Browne Avenue 7th Avenue to 16th Avenue Replace damaged sidewalk panels. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2029 0 0 443,900 443,900 Totals 0 0 443,900 443,900 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th ALL 0 0 0 0 443,900 Totals 0 0 0 0 443,900 Report Date: June 12, 2024 Page 7 97 " Washington State Six Year Transportation Improvement Program I; Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m 5. c o < c � ' x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' C n 0. c D.Road Name or Number a c Q. 0' ' c) m °' c i,g a E.Begin&End Termini m Z a H F.Project Description G.Structure ID a c P m CD 3 m a 05 WA-14955 07/02/24 07/02/24 R-2024-XXX 04 0.750 CE Yes Coolidge Road from 72nd Ave to 84th Ave-Roadway Improvements Coolidge Road 72nd Avenue to 84th Avenue Rehabilitate existing pavement and update roadway to current city standards. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2026 0 0 200,000 200,000 P RW 2027 0 0 200,000 200,000 P CN 2028 0 0 1,100,000 1,100,000 Totals 0 0 1,500,000 1,500,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 200,000 0 0 0 RW 0 0 200,000 0 0 CN 0 0 0 1,100,000 0 Totals 0 200,000 200,000 1,100,000 0 Report Date: June 12, 2024 Page 8 98 '`' Washington State Six Year Transportation Improvement Program Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m 5. c o < c � ' x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' x n 0. c D.Road Name or Number C c Q. o' ' n m °' c �, a E.Begin&End Termini Z ,< Q. co ,< H E - F.Project Description G.Structure ID 2 Q. o m CD m Q. 16 YAK10 07/02/24 07/02/24 R-2024-XXX 01 O P S T W 0.550 EA Yes E."H"Street Extension, Phase 1 E."H"Street 1st Street to 7th Street Construct new roadway inlcuding water,sewer,curb,gutter,sidewalk,street lighting and storm drainage system. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 0 OTHER 566,500 0 566,500 P RW 2025 0 OTHER 150,000 0 150,000 P CN 2026 0 OTHER 6,758,400 0 6,758,400 Totals 0 7,474,900 0 7,474,900 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 566,500 0 0 0 0 RW 150,000 0 0 0 0 CN 0 6,758,400 0 0 0 Totals 716,500 6,758,400 0 0 0 Report Date: June 12, 2024 Page 9 99 " Washington State Six Year Transportation Improvement Program I; Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m 5. c 0) < C -I ' x A.PIN/Project No. B.STIP ID 3 0 3 c o m c z C.Project Title D m E co z' °' x n 0 c D.Road Name or Number a c Q. 0' ' c) m °' c i,g a E.Begin&End Termini m Z a H F.Project Description G.Structure ID a c P m CD 3 m a 04 YAK 109 07/02/24 07/02/24 R-2024-XXX 28 C G P S T 0.500 CE Yes W Fair Avenue Sidewalk Fair Avenue Pacific Avenue to Nob Hill Boulevard Construct sidewalk on west side of roadway. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2029 0 0 488,750 488,750 Totals 0 0 488,750 488,750 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th ALL 0 0 0 0 488,750 Totals 0 0 0 0 488,750 Report Date: June 12, 2024 Page 10 100 " Washington State Six Year Transportation Improvement Program I; Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c o < c � ' x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' x n 0. c D.Road Name or Number C c Q. o' ' n m °' c �, a E.Begin&End Termini Z ,< Q. co ,< H E - F.Project Description G.Structure ID 2 Q. o m CD m Q. 03 WA-15117 07/02/24 07/02/24 R-2024-XXX 15 C O P S T 0.200 CE Yes W Fred Meyer Active Transportation Pathway-40th Ave& Fruitvale Blvd Roundabout Various to Various Roundabout, Rectangular Rapid Flashing Beacons(RRFB), New Marked Crosswalk, Green Pavement/Bicycle Intersection Crossing Markings,ADA Curb Ramps,Audible Pedestrian Signal, Bicycle Wayfinding Signs/Markings,Shared-use Path/Trail Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S RW 2025 0 Ped/Bike Program 100,000 0 100,000 S CN 2026 0 Ped/Bike Program 1,230,904 0 1,230,904 Totals 0 1,330,904 0 1,330,904 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th RW 100,000 0 0 0 0 CN 0 1,230,904 0 0 0 Totals 100,000 1,230,904 0 0 0 Report Date: June 12, 2024 Page 11 101 " Washington State Six Year Transportation Improvement Program I; Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c o < c � ' x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' C n 0. c D.Road Name or Number a cr. Q. 0' ' c) m °' c i,g a E.Begin&End Termini m Z a H F.Project Description G.Structure ID a c o m CD 3 m a 04 YAK 113 07/02/24 07/02/24 R-2024-XXX 28 C G P S T 0.010 CE No W Mead Avenue Pedestrian Signal Mead Avenue 10th Avenue to 12th Avenue Install school zone flashers and pedestrian signal RRFBs. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2028 0 OTHER 50,000 0 50,000 P CN 2029 0 OTHER 346,750 0 346,750 Totals 0 396,750 0 396,750 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 0 50,000 0 ALL 0 0 0 0 346,750 Totals 0 0 0 50,000 346,750 Report Date: June 12, 2024 Page 12 102 " Washington State Six Year Transportation Improvement Program I; Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c o < c � ' x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' C n 0 c D.Road Name or Number a cr. Q. 0' ' c) m °' c i,g a E.Begin&End Termini 3 Z a H F.Project Description G.Structure ID a c P m CD 3 m a 16 YAK102 07/02/24 07/02/24 R-2024-XXX 21 P T 0.030 CE No N 1st St& R St Signal N. 1st St. R Street to R Street Install traffic signal at the intersection. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 0 OTHER 66,990 10,395 77,385 P CN 2028 0 OTHER 401,709 62,722 464,431 Totals 0 468,699 73,117 541,816 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 77,385 0 0 CN 0 0 0 464,431 0 Totals 0 0 77,385 464,431 0 Report Date: June 12, 2024 Page 13 103 " Washington State Six Year Transportation Improvement Program I; Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m 5. c 0) < C -I ' x A.PIN/Project No. B.STIP ID 3 0 3 c o m c z C.Project Title D m E co z' °' x n 0 c D.Road Name or Number a c Q. 0' ' c) m °' c i,g a E.Begin&End Termini m Z a H F.Project Description G.Structure ID a c o m CD 3 m a 04 YAK 114 07/02/24 07/02/24 R-2024-XXX 28 C G P S T 0.310 CE Yes W N. 16th Avenue Sidewalk N. 16th Avenue River Road to US 12 Off-Ramp Construct sidewalk on west side of roadway. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2029 CRP(UM) 237,197 0 209,022 446,219 Totals 237,197 0 209,022 446,219 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th ALL 0 0 0 0 446,219 Totals 0 0 0 0 446,219 Report Date: June 12, 2024 Page 14 104 " Washington State Six Year Transportation Improvement Program I; Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c o < c —1 ' x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' x n 0. c D.Road Name or Number a cr. Q. o' ' n m °' 2 i,g a E.Begin&End Termini m Z a H F.Project Description G.Structure ID a c P m CD 3 m CD 03 WA-15735 07/02/24 07/02/24 R-2024-0XX 05 C G O P S 0.670 CE No TW Nob Hill Blvd 28th Ave to 40th Ave Paving Nob Hill Boulevard 28th Avenue to 40th Avenue This project will rehabilitate the pavement on Nob Hill Blvd by milling and paving, ADA curb ramp replacement,adjust utilities, restripe the road,and other work as needed to rehabilitate the pavement. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2025 N H P P 1,414,000 0 0 1,414,000 Totals 1,414,000 0 0 1,414,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 1,414,000 0 0 0 0 Totals 1,414,000 0 0 0 0 Report Date: June 12, 2024 Page 15 105 " Washington State Six Year Transportation Improvement Program I; Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m 5. c 0) < C -I ' x A.PIN/Project No. B.STIP ID 3 0 3 c o m c z C.Project Title D m E co z' °' x n 0 c D.Road Name or Number a c Q. 0' ' c) m °' c i,g a E.Begin&End Termini m Z a H F.Project Description G.Structure ID a c o m CD 3 m a 04 YAK 110 07/02/24 07/02/24 R-2024-XXX 28 C G P S T 1.500 CE Yes W Nob Hill Boulevard Sidewalk Nob Hill Boulevard 12th Street to 14th Street Construct sidewalk on south side of roadway. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2029 0 0 172,500 172,500 Totals 0 0 172,500 172,500 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th ALL 0 0 0 0 172,500 Totals 0 0 0 0 172,500 Report Date: June 12, 2024 Page 16 106 " Washington State Six Year Transportation Improvement Program I; Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c o < c � ' x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' x n 0. c D.Road Name or Number a cr. Q. o' ' n m °' 2 i,g a E.Begin&End Termini m Z a H F.Project Description G.Structure ID a c P m CD 3 m CD 07 YAK103 07/02/24 07/02/24 R-2024-XXX 28 C O P T 0.500 CE No Nob Hill Elementary School Safety Improvements various streets various locations to various locations This project will make various pedestrian safety improvements in the vicinity of Nob Hill Elementary School,such as new sidewalk and constructing ADA ramps. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2026 0 SRTS 101,200 0 101,200 P CN 2027 0 SRTS 674,520 0 674,520 Totals 0 775,720 0 775,720 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 101,200 0 0 0 CN 0 0 674,520 0 0 Totals 0 101,200 674,520 0 0 Report Date: June 12, 2024 Page 17 107 " Washington State Six Year Transportation Improvement Program I; Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c o < c � ' x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' x n 0. c D.Road Name or Number a cr. Q. o' ' n m °' 2 i,g a E.Begin&End Termini m Z a H F.Project Description G.Structure ID a c P m CD 3 m CD 03 WA-15881 07/02/24 07/02/24 47 0.160 CE No Nob Hill RR#2 and 72nd Ave S#87 Bridges-Joint Replacement Nob Hill Boulevard,72nd Avenue Nob Hill Blvd to 72nd Avenue Replace expansion joints on the Nob Hill RR#2 bridge and expansion joints and 8548900,839000 girder grout channels on the 72nd Ave S#87 bridge. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2026 0 OTHER 189,390 0 189,390 P CN 2027 0 OTHER 1,172,552 0 1,172,552 Totals 0 1,361,942 0 1,361,942 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 189,390 0 0 0 CN 0 0 1,172,552 0 0 Totals 0 189,390 1,172,552 0 0 Report Date: June 12, 2024 Page 18 108 " Washington State Six Year Transportation Improvement Program I; Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c CD < C -I ' x A.PIN/Project No. B.STIP ID 3 0 3 c o m c z C.Project Title D m E co z' °' x n 0 c D.Road Name or Number a cr. Q. 0' ' c) m °' c i,g a E.Begin&End Termini m Z a H F.Project Description G.Structure ID a c o m CD 3 m a 05 YAK 112 07/02/24 07/02/24 R-2024-XXX 04 C G P S T 0.030 CE No W Powerhouse Road and Englewood Avenue Intersection Improvements Powerhouse Road Englewood Avenue to Englewood Avenue Intersection improvements. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2029 0 0 1,014,431 1,014,431 Totals 0 0 1,014,431 1,014,431 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th ALL 0 0 0 0 1,014,431 Totals 0 0 0 0 1,014,431 Report Date: June 12, 2024 Page 19 109 " Washington State Six Year Transportation Improvement Program I; Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m 5. c o < c � ' x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' C n 0. c D.Road Name or Number a c Q. 0' ' c) m °' c i,g a E.Begin&End Termini m Z a H F.Project Description G.Structure ID a c P m CD 3 m a 17 YAK93 07/02/24 07/02/24 R-2024-XXX 38 COT 0.600 CE Yes Powerhouse Road Multi-Use Path Powerhouse Road Mobile Home Park 800'W of Pecks Canyon Rd to Cowiche Canyon Rd. Construct multi-use path. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 0 Ped/Bike Program 44,500 5,500 50,000 P RW 2028 0 Ped/Bike Program 133,500 16,500 150,000 P CN 2029 0 Ped/Bike Program 341,835 42,250 384,085 Totals 0 519,835 64,250 584,085 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 50,000 0 0 RW 0 0 0 150,000 0 CN 0 0 0 0 384,085 Totals 0 0 50,000 150,000 384,085 Report Date: June 12, 2024 Page 20 110 '`' Washington State Six Year Transportation Improvement Program Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c o < c � ' x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' x n 0 c D.Road Name or Number C c Q. o' ' n m °' c �, a E.Begin&End Termini Z ,< Q. co ,< H E - F.Project Description G.Structure ID 2 Q. o m CD m Q. 07 WA-15118 07/02/24 07/02/24 R-2024-XXX 28 P T 0.300 CE No Prasch Avenue Sidewalk Improvements Prasch Avenue S 20th Avenue to S 16th Avenue Construct sidewalks against existing curbing on Prasch Avenue from S. 16th Avenue to S.20th Avenue,and along S 16th Ave from Prasch Avenue to Nob Hill Blvd. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 0 OTHER 25,000 0 25,000 P CN 2026 0 OTHER 185,000 0 185,000 Totals 0 210,000 0 210,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 25,000 0 0 0 0 CN 0 185,000 0 0 0 Totals 25,000 185,000 0 0 0 Report Date: June 12, 2024 Page 21 111 " Washington State Six Year Transportation Improvement Program I; Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c CD < C -I ' x A.PIN/Project No. B.STIP ID 3 0 3 c o m c z C.Project Title D m E co z' °' x n 0. c D.Road Name or Number a cr. Q. 0' ' c) m °' c i,g a E.Begin&End Termini m Z a H F.Project Description G.Structure ID a c P m CD 3 m CD 04 YAK 108 07/02/24 07/02/24 R-2024-XXX 03 C G P S T 0.030 CE No W S. 1st Street and E.Washington Avenue Intersection Improvements 1st Street Washington Avenue to Washington Avenue Realign intersection,widen E.Washington Ave.for additional lane,replace curb, gutter,sidewalk,and construct new signal. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2029 0 0 2,645,000 2,645,000 Totals 0 0 2,645,000 2,645,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th ALL 0 0 0 0 2,705,725 Totals 0 0 0 0 2,705,725 Report Date: June 12, 2024 Page 22 112 '`' Washington State Six Year Transportation Improvement Program Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m 5. c o < c � ' x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' C n 0. c D.Road Name or Number a c Q. 0' ' c) m °' c i,g a E.Begin&End Termini 3 Z a H F.Project Description G.Structure ID a c P m CD 3 m a 14 /9939(028) YAK98 07/02/24 07/02/24 R-2024-XXX 21 O P S T W 0.050 CE Yes S.72nd Avenue and W.Washington Avenue Improvements S.72nd Avenue S.72nd Avenue to W.Washington Ave. Improve intersection by constructing a roundabout. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2025 0 OTHER 800,000 0 800,000 P CN 2025 0 OTHER 1,200,000 0 1,200,000 Totals 0 2,000,000 0 2,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 2,000,000 0 0 0 0 Totals 2,000,000 0 0 0 0 Report Date: June 12, 2024 Page 23 113 '`' Washington State Six Year Transportation Improvement Program Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c 0) < C -I ' x A.PIN/Project No. B.STIP ID 3 0 3 c o m c z C.Project Title D m E co z' °' x n 0 c D.Road Name or Number a cr. Q. 0' ' c) m °' c i,g a E.Begin&End Termini m Z a H F.Project Description G.Structure ID a c P m CD 3 m a 04 YAK104 07/02/24 07/02/24 R-2024-XXX 05 C G O P S 1.530 CE No TW Tieton Drive Resurfacing Tieton Drive S.48th Ave.to S.72nd Ave. Grind and overlay,and ADA curb ramp replacement. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2027 0 OTHER 97,000 24,260 121,260 P CN 2028 0 OTHER 1,108,800 277,200 1,386,000 Totals 0 1,205,800 301,460 1,507,260 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 0 0 121,260 0 0 CN 0 0 0 1,386,000 0 Totals 0 0 121,260 1,386,000 0 Report Date: June 12, 2024 Page 24 114 '`' Washington State Six Year Transportation Improvement Program Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m 5. c o < c � c x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' x n 0. c D.Road Name or Number C c Q. 0' ' n m °' c �, a E.Begin&End Termini Z ,< Q. co ,< H E - F.Project Description G.Structure ID 2 o. o m CD m Q. 14 YAK14 07/02/24 07/02/24 R-2024-XXX 21 CO P S T CE Yes W Washington Avenue&Longfiber Road Intersection Improvements Washington Avenue Washington Avenue to Longfiber Road Improve the Washington Avenue/Longfiber Road intersection by construction of channelization,a signal,or a roundabout. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2025 0 0 100,000 100,000 P RW 2025 0 0 150,000 150,000 P CN 2026 0 0 1,000,000 1,000,000 Totals 0 0 1,250,000 1,250,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 100,000 0 0 0 0 RW 150,000 0 0 0 0 CN 0 1,000,000 0 0 0 Totals 250,000 1,000,000 0 0 0 Report Date: June 12, 2024 Page 25 115 '`' Washington State Six Year Transportation Improvement Program Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m v c o < c -1 ' x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' x n 0. c D.Road Name or Number a cr. Q. o' ' n m °' 2 i,g a E.Begin&End Termini m Z a H F.Project Description G.Structure ID a c P m CD 3 m a 00 WA-15913 07/02/24 07/02/24 R-2024-XXX 47 0.060 CE No Naches River Bridge Repair Naches River to Naches River The project will complete repairs to the Yakima Valley Trolley Bridge over the 08593100 Naches River. Repairs include removing and replacing decayed timber elements, regrading and compacting approach fills, replacements of the timber sill footings and the timber backwall,and scour protection of a bridge pier. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2025 STBG(UM) 276,800 0 43,200 320,000 S CN 2025 0 WSDOT 333,000 0 333,000 Totals 276,800 333,000 43,200 653,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th CN 653,000 0 0 0 0 Totals 653,000 0 0 0 0 Report Date: June 12, 2024 Page 26 116 " Washington State Six Year Transportation Improvement Program I; Department of Transportation From 2025 to 2030 Agency: Yakima County: Yakima MPO/RTPO: YVCOG Y Inside N Outside _ m 5. c o < c � ' x A.PIN/Project No. B.STIP ID 3 o 3 c o m c z C.Project Title D m E co z' °' C n 0. c D.Road Name or Number a c Q. 0' ' c) m °' c i,g a E.Begin&End Termini m Z a H F.Project Description G.Structure ID a c o m CD 3 m a 05 YAK116 07/02/24 07/02/24 R-2024-XXX 28 1.130 CE Yes Zier Road Sidewalk Improvements Zier Road 75th Avenue to West Valley High School Add sidewalk. Funding Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 0 OTHER 100,000 0 100,000 P RW 2026 0 OTHER 120,000 0 120,000 P CN 2027 0 OTHER 980,000 0 980,000 Totals 0 1,200,000 0 1,200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th&6th PE 100,000 0 0 0 0 RW 0 120,000 0 0 0 CN 0 0 980,000 0 0 Totals 100,000 120,000 980,000 0 0 Federal Funds State Funds Local Funds Total Funds Grand Totals for Yakima 5,214,327 27,866,352 23,502,158 56,582,837 Report Date: June 12, 2024 Page 27 117 _: `y 1ljlt l'A-ir ii! '1.:4‘ I!I s . BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 8.A. For Meeting of: July 2, 2024 ITEM TITLE: Public hearing to consider: A) Resolution adopting the Six-Year Transportation Improvement Program for the period of 2025 through 2030, and to amend the Transportation Systems Plan 2040; and B) Resolution amending the Yakima Urban Area Comprehensive Plan Capital Facilities Element SUBMITTED BY: Scott Schafer, Public Works Director *Bill Preston, City Engineer SUMMARY EXPLANATION: A) Each year the City of Yakima (City) is required by state statute to update its Six-year Transportation Improvement Program (TIP)for submittal to the Washington State Department of Transportation. This plan must include all transportation projects for which state gas tax revenue or federal revenue will be used. Attached is the complete 2025 - 2030 Six-Year TIP, which describes all projects currently on the list. The City will continue to seek funding for projects that do not currently have secured funding. City Council and the public are welcome to add other arterial system projects to the TIP. The Six-Year TIP project listing will be finalized at this hearing and sent to the Yakima Valley Conference of Governments (YVCOG) after approval. In order to utilize federal funds, such as those administered by the Federal Highway Administration (FHWA) and the Federal Transit Authority (FTA), projects must be included in the Statewide Transportation Improvement Program (STIP). The STIP is a prioritized program of transportation projects, compiled from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the inter- modal transportation network in the State of Washington. The STIP contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's Transportation Program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Public participation is an integral part of the planning process at all levels. Local agencies are required to develop and adopt a Six-year Transportation Program; holding at least one public hearing during its development. B) The City is required to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element by incorporating the adopted Six-Year TIP for 2025 to 2030. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. 87 The amendment is limited to incorporating only those projects that are adopted in the Six-Year TIP and is not subject to the once a year change required under the laws of the Growth Management Act. The Public Hearing notice has been provided to all Yakima-area media, including to Decides', KDNA Radio, El Sol de Yakima, Hispanavision, Bustos Media, and El Mundo. ITEM BUDGETED: N/A STRATEGIC PRIORITY: Public Safety RECOMMENDATION: Adopt Resolutions. ATTACHMENTS: Resolution A for 6 year TIP Resolution B for 6 year TIP 6-Year TIP 2025-2030 88