Loading...
HomeMy WebLinkAboutR-2024-078 Resolution authorizing Supplemental Agreement No. 1 with HLA Engineering and Land Surveying, Inc. for construction engineering services associated with the South 2nd Avenue Water Main Replacement Project AC2792 RESOLUTION NO. R-2024-078 A RESOLUTION authorizing Supplemental Agreement No. 1 with HLA Engineering and Land Surveying, Inc. for Construction Engineering services associated with the South 2nd Avenue Water Main Replacement Project AC2792. WHEREAS, the City of Yakima owns, operates and maintains the domestic water supply and storage systems in accordance with applicable Federal, State and Local regulations; and WHEREAS, the City of Yakima Water/Irrigation Division has experienced a number of breaks along a portion of 100-year old water main on South 2"d Avenue between Division Avenue and East Pine Street, causing damage to both public and private infrastructure; and WHEREAS, the City of Yakima Water/Irrigation Division determined that this portion of water main on South 2nd Avenue between Division Avenue and East Pine Street requires replacement; and WHEREAS, on January 4, 2024, the City entered into a Professional Services Agreement with HLA Engineering and Land Surveying, Inc. for design services associated with the South 2nd Avenue Water Main Replacement Project AC2792 (Contract 2024-012); and WHEREAS, HLA Engineering and Land Surveying, Inc. has completed the design services associated with the South 2nd Avenue Water Main Replacement Project AC2792 (Contract 2024-012); and WHEREAS, HLA Engineering and Land Surveying, Inc. has provided Supplement No. 1 for Construction Engineering Services associated with the construction of the South 2nd Avenue Water Main Replacement Project AC2792, in an amount not to exceed $90,000; and WHEREAS, the City Council has determined that it is in the best interest of the City of Yakima to enter in Supplemental Agreement No. 1 with HLA Engineering and Land Surveying, Inc. to perform Construction Engineering Services associated with the construction of the South 2nd Avenue Watermain Replacement Project AC2792; now, therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Interim City Manager is hereby authorized to execute Supplemental Agreement No. 1 with HLA Engineering and Land Surveying, Inc. in an amount not to exceed Ninety Thousand Dollars ($90,000) to provide Construction Engineering Services associated with the construction of the South 2nd Avenue Watermain Replacement Project AC2792, which is attached hereto and by this reference made a part hereof. ADOPTED BY THE CITY COUNCIL this 7th day of May, 2024. VAKIi14q 14 a a ATTEST: ; SAL , atricia Byers, ayod ii ' I 1 Fkosalinda Ibarra, City Clerk Contract Supplemental Agreement Organization and Address: Supplemental Agreement HLA Engineering and Land Surveying, Inc. Number: 1 2803 River Road Yakima, WA 98902 Original Contract Number: Execution Date of Supplement: 2024-012 City Project Number: Completion Date of Supplement: AC 2792/6534 December 31, 2025 Project Title: South 2nd Avenue Water Main Original Amount Payable: $60,000 Replacement HLA Project No. 24032C Revised Amount Payable: Supplement No. 1. $90,000 (Increase) $150,000 Supplemental Agreement No. 1 The City of Yakima (CITY), Washington desires to supplement the Original Contract No. 2024-012 entered into with HLA Engineering and Land Surveying, Inc. on January 4, 2024 All provisions in the basic contract remain in effect except as expressly modified by this supplement The changes to the Agreement are described as follows: Exhibit A: Scope of Services The attached Exhibit A-Scope of Services for additional tasks to be performed as part of this Supplemental Agreement include Construction Engineering services associated with construction of the South 2nd Avenue Water Main Replacement project. Exhibit B: Construction Fees Payment for this supplemental work, as shown on Exhibit B, is not to exceed $90,000, bringing the total amount of the Agreement to$150,000 (Original Task Order for$60,000, Supplement No. 1 for$90,000 increase). Exhibit C: Schedule of Rates Exhibit C shall be supplemented with the attached 2024 calendar year schedule of rates for the completion of the Agreement for Professional Services. Signature page follows. G:\Contracts&Task Orders\Yakima\2023\Second Avenue Watermain Replacement\CN Agreement\2024-04-22 Contract No 2024- 012 Supplement 1.docx Page 1 of 6 If you concur with this supplement and agree to the changes as stated above, please sign the appropriate spaces below and return to this office for final action. By: A - By: D -Ve 2, ��(✓ h.L 4:2 Consultant Signature it Signature Mr Df)';A+ Date CITY CONTRACT NO: 2 o2y 01 Lp RESOLUTION NO. _2o2' O7 p G.\Contracts&Task Orders\Yakima\2023\Second Avenue Watermain Replacement\CN Agreement\2024-04-22 Contract No 2024- 012 Supplement 1 docx Page 2 of 6 EXHIBIT A Scope of Services South 2nd Avenue Water Main Replacement Project 2.0 Construction Engineering The construction contract duration is thirty (30)working days. The fee estimate assumes each working day consists of twelve (12) hours per day 2.1 Review Contractor's submission of certificate of insurance and contract bond. 2 2 Provide monthly status reports and invoices for work performed 2.3 Maintain PROJECT files for CITY review 2.4 Following Council award authorization, prepare notice of award to the Contractor, assemble construction contract documents, and coordinate contract execution with the CITY and Contractor 2 5 Coordinate and facilitate preconstruction meeting with the CITY, Contractor, private utilities, and affected agencies, including preconstruction agenda and meeting record 2.6 Prepare and issue notice to proceed to Contractor. 2.7 Furnish the field survey crew to set horizontal and vertical control for the PROJECT 2.8 Provide staking for construction, including but not limited to structures and trench limits 2.9 Furnish a qualified resident engineer(inspector) to observe construction for substantial compliance with plans and specifications and CITY Construction Standards. 2.10 Provide submittal review for PROJECT materials as provided by the Contractor per the specifications. Maintain submittals list for duration of PROJECT. 2.11 Maintain record of materials (ROM) for duration of PROJECT. 2.12 Respond to Contractor request for information (RFI) 2.13 Interpret plans and specifications when necessary. 2.14 Administer construction meetings anticipated once per week during the duration of improvements. 2 15 Prepare daily progress reports. 2.16 Prepare weekly statements of working days. 2.17 Create and maintain accurate construction documentation for the life of the PROJECT. 2.18 Consult and advise the CITY during construction and report of the completed work with CITY representatives. 2.19 Review acceptance sampling and testing for construction materials. 2.20 Perform measurement and computation of pay items. G.\Contracts&Task Orders\Yakima\2023\Second Avenue Watermain Replacement\CN Agreement\2024-04-22 Contract No.2024- 012 Supplement 1.docx Page 3 of 6 2 21 Recommend progress payments for the Contractor to the CITY 2.22 Prepare proposed contract change orders and/or force account computations as required 2.23 Conduct final inspection with the Contractor, CITY, and ENGINEER, and prepare punchlist of items to be addressed by the Contractor and provide to the CITY. 2.24 Prepare and furnish reproducible record drawings and field notes of completed work in accordance with PROJECT field records. 2.25 Prepare administrative documents to the appropriate agencies which have jurisdiction over funding, design, and construction of this PROJECT. 2.26 Monitor the Contractor and Subcontractor's compliance with state labor standards during the construction phase of this PROJECT, including requests to sublet, intents to pay prevailing wages, affidavits of wages paid, employee wage interviews, and issuing letters of non- compliance and/or missing documentation. 2.27 All PROJECT communications including owner, Contractor, utilities, and others shall be directed through ENGINEER. 2 28 Prepare and submit recommendation of PROJECT acceptance and Notice of Completion of Public Works Contract(NOC) for CITY review and processing 2.29 Notify the CITY when retainage may be released. 2.30 Ensure the PROJECT is completed as designed and contract specifications are adhered to during construction. G:\Contracts&Task Orders\Yakima\2023\Second Avenue Watermain Replacement\CN Agreement\2024-04-22 Contract No 2024- 012 Supplement 1.docx Page 4 of 6 EXHIBIT B Construction Fees The following spreadsheet shows the estimated time and expenses to perform said services. The maximum amount of compensation to the ENGINEER shall not exceed the amount indicated, but the ENGINEER reserves the right to move fee and hours between tasks as necessary to complete the PROJECT. Pro1ec1 Title South 288 Avenue Wabw Main Replacement Client City of Yakima Date Apnl 15,2024 ENGINEER'S HOURLY ESTIMATE San. Opens.' Project Licensed Two Man Rasalent Contract 869awing TiMa Task DescrIption Prempal 9161 Enclaves(I Land Survey &wean Aarnmeseator Tachreban Total Taw Drocl I NO, Caw Inspector 111 Hews Costs 6263 E$235 6174 u$''2.77 $2 70 $143 $159 $102 1 ,Prepare and Mum Nebca 0 Award 0 1 0 0 0 0 0 4 6 5871 2 Conduct Pro•Coratraclaan Mesang 1 1 1 0 0 1 2 1 7 Si 235 3 Prepare and bum/4obui 10 Proceed 1 1 0 0 0 0 0 2 4 5810 4 Field Sway Craw for HoneNen Control 0 0 CI 8 8 0 0 0 10 $3.83e 5 Malerals&Amalie Review 0 2 1 0 0 8 $ 0 19 53.000 6 We.kty Construcbon Mamma(WNW) 1 2 8 0 0 8 6 0 21 $3,58e 7 Gaulascrion ObsoftoOon(304) 0 2 6 0 0 360 0 8 378 $54,158 6 FiMO b, , ion Rapons 0 0 0 0 0 12 12 0 24 63.824 9 Wsekly StiMinsan1 of 1.701%irs3 Days 0 1 0 0 0 8 5 0 17 szes, 10 blmenals on Hand 0 1 0 0 0 4 4 0 9 51,443 11 brows Mona*Progress Pay Estsnales 0 2 1 0 0 2 ., 8 0 I 3 52-202 12 Rummy Mateo Tasling Stasults tor Corrplenos 680 Coner.45 0 2 2 0 0 2 4 0 19 51,740 13 Prepare..11 Subrrei Chafte•Orria 1 1 1 s 0 0 2 4 0 9 51.504 14 Revais Sista labor Stanclaels Complance 0 1 0 0 o 0 8 0 10 51,742 15 concluci Snot Walk-ThroupArapwa Ouncnku 0 1 1 4 4 1 0 0 11 51,719 16 Russet Closecat 1 1 2 0 0 8 6 0 ZO 03,283 , 17 Recoil Onw.:w 1 as 0 2 0 0 6 2 0 13 $2,045 LOW 50919451 3 ' 21 25 ' 8 8 425 84 10 586 5119,607 SUBCONSULTANTS Subccenutorde Fee Mark-up SO , .Subtotal Subconsoltaras SO EXPENSES Expenses: COM/Una Mates . . Maine 50.67 600 MOO $ubbslal Espana. 6400 TOTAL 590,010 G.\Contracts&Task Orders\Yakima\2023\Second Avenue Watermain Replacement\CN Agreement\2024-04-22 Contract No 2024- 012 Supplement 1 docx Page 5 of 6 EXHIBIT C SCHEDULE OF RATES FOR HLA Engineering and Land Surveying, Inc. Effective January 1, 2024, through December 31, 2024 Senior Principal Engineer $263.00 per hour Licensed Principal Engineer $235.00 per hour Licensed Principal Land Surveyor $235 00 per hour Licensed Professional Engineer $212 00 per hour Other Licensed Professional $212 00 per hour Project Engineer II $194.00 per hour Construction Supervisor $194.00 per hour Planning Supervisor $194 00 per hour Licensed Professional Land Surveyor $191.00 per hour Project Engineer I $174.00 per hour Contract Administrator III $159.00 per hour Senior Resident Engineer $159.00 per hour Senior Planner $157.00 per hour CAD Technician $153 00 per hour Engineering Technician III $143.00 per hour Planner $143.00 per hour Resident Engineer $143.00 per hour Surveyor $141.00 per hour Surveyor on Two Man Crew $135.00 per hour Contract Administrator II $133.00 per hour Engineering Technician II $123.00 per hour Surveyor on Three Man Crew $118.00 per hour Contract Administrator I $102.00 per hour Engineering Technician I $102 00 per hour Administrative/Clerical $102 00 per hour Vehicle Mileage Federal Rate Schedule of Rates may be adjusted during the term of this Agreement to the HLA Standard Hourly Rates in effect at the time G\Contracts&Task Orders\Yakima\2023\Second Avenue Watermain Replacement\CN Agreement\2024-04-22 Contract No 2024- 012 Supplement 1 docx Page 6 of 6 1 (...,,,.,'71,.......,..., BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 7.1. For Meeting of: May 7, 2024 ITEM TITLE: Resolution authorizing Supplemental Agreement No. 1 with HLA Engineering and Land Surveying, Inc. for construction engineering services associated with the South 2nd Avenue Water Main Replacement Project AC2792 SUBMITTED BY: Scott Schafer, Director of Public Works *Mike Shane, Water/Irrigation Manager SUMMARY EXPLANATION: On January 4, 2024, the City of Yakima (City)entered info a Professional Services Agreement with HLA Engineering and Land Surveying, Inc. for design services associated with the South 2nd Avenue Water Main Replacement Project AC2792 (Contract 2024-012). Subsequently, on February 6, 2024, City Council ratified the November 29, 2023 emergency declaration for the replacement of the South 2nd Avenue water main, which included the above referenced agreement (R-2024-025). Supplement No. 1 provides for Construction Engineering Services by HLA Engineering and Land Surveying, Inc. during the construction of the South 2nd Avenue Water Main Replacement Project AC2792, in an amount not to exceed $90,000. Funding for the project is from the Water Capital Fund 477. ITEM BUDGETED: Yes STRATEGIC PRIORITY: Public Trust and Accountability APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Adopt Resolution. ATTACHMENTS: Description Upload Date Type ID Resolution 4/30/2024 2 D Supplemental Agreement No. 1 4/22/2024 Contract D Original Agreement 4/22/2024 Backup Material