Loading...
HomeMy WebLinkAbout07/01/2008 10 2009-2014 Six-year TIP; Metropolitan Transportation Plan Amendment; Yakima UACP Amendment; Public Hearing BUSINESS OF THE CITY COUNCIL 0 YAKIMA, WASHINGTON AGENDA STATEMENT Item No. / For Meeting of July 1, 2008 ITEM TITLE: Public Hearing to consider: A) Adoption of the Six -year Transportation Improvement Program (TIP) for years 2009 to 2014, and to amend the Metropolitan Transportation Plan; and B) Amending the Yakima Urban Area Comprehensive Plan Capital Facilities Element SUBMITTED BY: Department of Community and Economic Development - William Cook, Director CONTACT PERSON/TELEPHONE: Brett Sheffield, PE, Chief Engineer, 576 -6797 SUMMARY EXPLANATION: Attached is the 2009 -2014 Six -Year TIP. We have added two projects. They are Priority Nos. 74 & 75, Yakima Downtown Futures Initiative - Phase 4 and 10 Street Roundabout, respectively. Transit updates have been received and added. They include: purchasing four new replacement buses; acquisition of new Dial -A -Ride paratransit vehicles; and, 0 providing transit service to Terrace Heights. Several projects have been removed as they are either complete or under construction and their removal is appropriate. Council and the public are welcome to add other arterial system projects to this list. The Six -Year TIP listing will be finalized at the second hearing on July 15 and sent to Yakima Valley Conference of Governments, (YVCOG) after approval. Continued on page Two Resolution Ordinance_ Contract Other (Specify) Excerpts from the STIP Manual & STIP Funding Source APPROVED FOR SUBMITTAL: 10- 2-g-f-fie �� City Manager STAFF RECOMMENDATION: 1) Hold the Public Hearing to consider adoption of Resolution approving the STIP and amend the regional Metropolitan Transportation Plan and the Comprehensive Plan Capital Facilities • Element. 2) Continue Public Hearing to July 15th, 2008 Council meeting for second Public Hearing and possible adoption of plan. 0 BOARD /COMMISSION RECOMMENDATION: COUNCIL ACTION: 411, 9. Appendices A. Six Year Form Instructions • Heading Agency Enter name of the sponsoring agency. County Number Enter the OFM assigned number (see LAG Appendix 21.44). City Number Enter the OFM assigned number (see LAG Appendix 21.45). MPO /RTPO Enter the name of the associated MPO (if located within urbanized area) or RTPO (if located in a rural area). Hearing Date Enter the date of the public hearing. Adoption Date Enter the date this program was adopted by council or commission. Resolution Number Enter Legislative Authority resolution number (if applicable.) Amendment Date Enter the date this program was amended by council or commission. Column Number 1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal Functional Classification. (Note: The Federal Functional Classification must be approved by FHWA.) Description 00- No Classification Rural (Under 5000 0 0 .) Urban (Over 5000 .) PP PP 01 - Interstate 11- Interstate 02 - Principal Arterials 12- Freeways & Expressways 06 - Minor Arterials 14- Other Principal Arterials 07 - Major Collector 16- Minor Arterial 08 - Minor Collector 17- Collector 09 - Local Access 19- Local Access 1. Priority Numbers. Enter local agency number identifying agency project priority (optional). 2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b) Bridge Number; (c) Project Title; (d) Street/Road Name or Number /Federal Route Number; (e) Beginning and Ending Termini (mile post or street names); and (f) Describe the Work to be Completed. 3. Improvement Type Codes. Enter the appropriate federal code number. Description 01- New construction on 07 - Resurfacing 14 - Bridge Program - Special new alignment 08 - New Bridge Construction 21 - Transit Capital Project 02- Relocation 09- Bridge Replacement 22- Transit Operational Project 03- Reconstruction 10 - Bridge Rehabilitation 23 - Transit Planning 04- Major Widening 11 - Minor Bridge Rehabilitation 24 - Transit Training /Admin. 05- Minor Widening 12 - Safety/Traffic Operation /TSM. 31- Non Capital Improvement 06- Other Enhancements 13 - Environmentally Related 32 - Non Motor Vehicle Project • 25 • 5. Funding Status. Enter the funding, status for the entire project which describes the current status. S - Project is selected by the appropriate selection body and funding has been secured by the lead agency. P - Project is subject to selection by an agency other than the lead and is listed for planning purposes. (Funding has not been determined.) 6. Total Length. Enter project length to the nearest hundredth (or code "00" if not applicable). 7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that would need to be relocated or are impacted by the construction project. C - Cable TV G - Gas 0 - Other P - Power S - Sewer (other than agency- owned) T - Telephone • W - Water • 8. Project Phase. Select the appropriate phase code of the project. • PE - Preliminary Engineering only (or Planning) • RW - Right of Way or land acquisition only (or equipment purchase) CN - Construction only (or transit operating) ALL - All Phases: from Preliminary Engineering through Construction 9. Phase Start Date. Enter the month /day /year in MM /DD/YY format that the selected phase of the project is actually expected to start. 10. Federal Fund Code. Enter the Federal Fund code from the table. FTA Discretionary for Capital Expenditures BIA - Bureau of Indian Affairs 5307 - FTA Urban Areas BR - Bridge Replacement or Rehab. 5309(Bus)- Bus CDBG - Community Development 5309(FG) - Fixed Guideways • Block Grant (HUD) 5309(NS) - New Starts CMAQ - Congestion Mitigation Air Quality 5310 - FTA Elderly /Disabled DEMO - ISTEA Demo Project (Selected) 5311 - FTA Rural Areas Discretionary - Ferry Boat Discretionary, Public REV - Rural Economic Vitality Program Lands Highways, or Scenic Byways STP(C) - STP Statewide Competitive Program DOD - Dept. of Defense STP(E) - STP Transportation Enhancements IC - Interstate Construction STP(S) - STP Safety Including Hazard and RR IM - Interstate Maintenance STP(R) - STP Rural Regionally Selected • NHS - National Highway System STP(U) - STP Urban Regionally Selected STP - WSDOT use only 11. Federal Funds. Enter the total federal cost (in thousands) of the phase . regardless of when the funds will be spent. • 12. State Fund Code. Enter the appropriate code for any of the listed state funds to be used on this project. • 26 0 CAPP - County Arterial Preservation Program PWTF - Public Works Trust CHAP - City Hardship Assistance Program RAP - Rural Arterial Program TPP - Transportation Partnershis Program SCP - Small City Program AIP - Arterial Improvement Program WSDOT - WSDOT funding PSMP - Pedestrian Safety & Mobility Program OTHER - All other unidentified state funding PTST - Public Transportation Systems Progra 13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase regardless of when the funds will be spent. 14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase regardless of when the funds will be spent. 15. Total Funds. Enter the sum of columns 10, 12, and 14. (Auto - calculation in the "STIP . Too" program.) 16 -19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated expenditures (in thousands) of dollars by year. (This data is for Local Agency use.) 20. Environmental Data Type. Enter the type of environmental assessment that will be required for this project. (This is "required" for Federally funded projects, but may be filled in for state or locally funded projects.) EIS - Environmental Impact Statement EA - Environmental Assessment CE - Categorical Exclusion 21. R/W Certification. Click Y if Right of Way acquisition is required. If yes, Enter R/W Certification Date, if known. (This is "required" for Federally funded projects only.) • • 0 27 Washington State Department of Transportation Six Year. Transportation Improvement Program Agency: Yakima From 2009 to 2014 • Co. No.: 3g Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded N Expenditure Schedule Projects Only a A. PIN /Federal Aid No. B. Bridge No. m _ „ Fund Source Information ` s N ' C. Project Title E " . c 6 rn (Local Agency) U o D. Street/Road Name or Number o r -? ;, a Federal Funding R/VV n- Z a l- ca .3 _ Phase Federal Federal State 4th Required t ` E. Beginning MP or Road - Ending MP or Road E o Start Fund Cost by. Fund State Local Tot 1st 2nd 3rd Thru Envir. Date F. Describe Work to be Done a (mm /dd /yyyy) Code Phase Code Funds Funds Funds 6th Type tntAM 1) 1 2 3 4 5 I 6 7 8 9 I 10 11 12 13 14 15 16 17 18 19 20 . 21 • CN 1/1/2009 FMSIB 4500 1000 5500 0 .2 T 14 1 01 S CN 1/1/2009 OTHER 2250 2250 EA Yakima Railroad Grade Separations - Phase 2 06 G CN 4/1/2009 STP(U) 20600 AIP 4650 25250 15000 18000 Yes Lincoln Ave. & Martin Luther King J. Blvd. 07 O • from: N 1st St to: N 1st Ave 08 W 3/01/07 Construct Grade Separations and adjacent roadway reconstructon, s including realignment of Front Street Totals 20,600 11400 1000 33000 15000 18000 CN 4/1/2009 . 3840 3840 3840 14 2 01 S 1.0 p EA 16TH AVENUE REALIGNMENT 08 0 Yes. 16TH AVENUE REALIGNMENT T from: AHTANUM ROAD lo: WASHINGTON AVENUE W Realign 16th Avenue out of the runway safety area of the Yakima Air S 11/2007 • Terminal. Includes FAA funds. Totals 3840 3840 3840 1 00 3 03 P N/A G PE 1/1/2009 STP(E) 18 32 50 . 50 CN 6/1/2009 STP(E) 1900 285 2185 2185 E • YVT Railway Rehabilitation & Museum C No 3rd Ave S . • from: 3rd Ave to: Pine St T Car Barn, Museum Restoration and Pathway W I Totals 1.918 317 2235 2235 00 4 12 S N/A CN 1/1/2009 5307 1655 1655 3310 1 3310 _ CE Transit Operating Expenditures 22 No Various Funding Areas - 23 from: N/A to: N/A 24 • Supplemental Funding for Transit Service Operating Expenses , 31 _ - Totals 1,655 1655 3310 3310 • 00 5 03 S N/A C PE 1/1/2009 STP(E) 36 36 36 RW 1/1/2009 STP(E) 205 205 205 CE YVT Trolley Barn /Powerhouse Rehabilitation G CN 1/1/2009 STP(E) 255 255 255 Yes S 3rd Ave . 0 • from: to: P Minor car barn and powerhouse restoration including property purchase S 06/01/07 T W Totals 496 496 496 ALL 1/1/2009 WSDOT1 50 "1 50 CE 00 6 22 S N/A Street Asset Amenities (Transit) 31 No Route Maintenance, Repair and Improvements • from: to: Maintenance of Shelters. Benches and Signage throughout our Transit Route System Totals 50 50 50 00 7 32 S 1.0 O CN 4/1/2009 STP(E) 525 1 5251 525 CE William 0. Douglas Trail 08 P • No 6th Ave Pathway & Bridge Decking 06 S from: 10: W Build pathway a II pathway decking on Neches River bridge with T partner Willie Trail Fundation ' _____ Totals •s 525 525 — .... v. 5.7 - Supersedes previous editions ' . ID . . ... Washington State Department of Transportation Six Year Transportation Improvement Program • Agency: Yakima . From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: • City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of.Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No. a m m Fund Source Information Expenditure Schedule • Projects Only m a — .(Local Agency) 5 g3 o C. Project Title a n A J o t Federal Funding RAN V D. Street/Road Name or Number ° r m ?-^ d i a l- y Phase Federal Federal State Required = u 4th Envir. u _ E o State Local Total Date . E. Beginning MP or Road • Ending MP or Road r 5 . Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type 7A42/7 • F. Describe Work to be Done a (mm /dd/yyyy) Code Phase Code 6t 1 2 3 4 5 r 6 7 8 i 9 10 11 12 • 13 14 I 15 16 17 18 1 20 PE 1/1/2009 STP(E) 65 65. 65 00 8 32 S N/A G RW 1/1/2009 STP(E) 150 150 150 CE William O. Douglas Heritage Trails 13 - 0 CN 1/1/2009 STP(E) 285 285 285 Yes Bridge Restoration & Trailhead 10 • s T ' • • • from: lo: 01/01/07 Trailhead restoration, right of way acquisition partner with the William O. w Douglas Foundation, including restoration of bridge , cleaning, rust removal - and painting Totals - 500 500 500 00 9 22 S ALL 1/1/2009 WSDOT 51 9 60I 60 N/A Transit Service to Terrace Heights --. No New Uniyersity & Retail Links from: to: Provide Transit service to this growing area of Yakima County to include the new University & Retail Shops. Totals • 51 9 60 60 .PE 1/1/2009 TPP • 200- i 300 500 ' 500 14 10 04 P .77 P RW 1/1/2009 200 200 200 EA Nob Hill Blvd C CN 1/1/2009 STP(U) 1000 . TPP 1300 2000 4300 4300 Yes Nob Hill Blvd • G • fro ' m: S 52nd Ave to: S 68th Ave O S 01/01/07 Widen. curb, gutter, sidewalk. lighting, drainage T W Totals 1,000 1500 2500 5000 5000 ' 120 00 11 - 01 P N/A CN • 4/1/2009 STP(S) 180 AIP 240 60 420 120 420 CE Annual Signal Upgrades CN 4/1/2009 STIP (S) 360 _ 360 360 No Loral Selection from: N/A to: N/A • Upgrade signals • . Totals 600 240 60 900 120 780 00 12 07 P N/A W CN 6/1/2009 STP(U) 228 32 260 260 EA Various Overlay Projects/Selected on Local Priority S - No N/A from: N/A to: N/A • Totals 228 32 260 260 PE . 1/1/2009 100 100 100 00 13 • I 32 P N/A CN 1/1/2009 900 900. 900 EA Storm Drains/Vegetation . No Local Selection • from: City Wide to: . City Wide Totals 1000 1000 1000 . • PE 1/1/2010 STP(C) 109 27 136 136 17 14 • 03 P .76 W CN 1/1/2011 STP(C) 945 TPP 945 106 1996 1996 CE Reconstruction Rudkin Rd 06 T NO Rudkin Rd P from: E Viola Ave to: Rainier Place S • Reconstruct, excavate ballast. top course, curb, gutter, sidewalk • Partner with City of Union Gap. additional sewer force main I Totals • 1,054 945 133 2132 136 1996 v. 5.7 - Supersedes previous editions • Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 • Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: City No.: 1485 MPO /RTPO: YVCOG • Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded • A. PIN /Federal Aid No. B. Bridge No. a E d v Fund Source Informatio Expenditure Schedule Projects Only 0 y - 1 = C. Project Title d= . 0 0 m • Federal Fundin (LocalAgency) Rl1N 'g ? �° . J a 9 Re wired n U t1 Z D . Street/Road Name or Numbe a i- ( n .' _ Ph ase Federal Federal State 4th q u_ E o •.. State Local Total Envir. Date E. Beginning MP or Road - Ending MP or Road i S . o Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM YID F. Describe Work to be Done a (mm/dd /yyyy) ' Code Phase Code 6th 1 I 2 3 4 5 6 17- 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 9/1/2010 STP(S) 122 TPP 23 7 152 152 16 15 03 P .76 C CN 4/1/2010 STP 1730 TPP 206 70 2006 2006 CE No E Mead Ave Reconstruction 06 E Mead Ave 0 from: Rudkin Rd to: Fair Ave - P S Partner with City of Union Gap, reconstruct, excavate ballast, top course. T • curb, gutter, storm, acp Totals 1,852 • 229 77 - 2158 152 2006 PE 1/1/2010 STP(U) 100 14 114 114 19 16 03 P N/A P CN 1/1/2011 STP(U) 700 95 795 795 CE Longfiber Rd & Washington Ave 05 S Yes Intersection 06 W T from: to: 0 7/1/2009 New intersection construction and reconstruction, 3 -lane and 5 -lane w /turn, curb. gutter, sidewalks. Totals 800 . 109 • 909 114 795 14 17 04 P 1 c CN 1/1/2009 STP(U) 1 240 42 2821 282 CE E Nob Hill Blvd & S 18th St 01 s 1 Yes E Nob Hill Blvd W . from: S 18th St lo: E Nob Hill Blvd T • 01/01/07 • Widen south leg for double LT from west bound Nob Hill: (Tie to WSDOT Project) possible curb. gutter and sidewalk • ' . Totals 240 42 282 282 16 18 01 p PE 4/1/2009 CMAQ 24 • 3 27 27 1 N/A S CN 7/1/2009 CMAQ 480 65 545 545 CE • Roadway City Wide Shoulder Improvements No City Wide . from: to: City Wide shoulder improvements, PM 0 abatement. Totals 504 68 572 572 14 19 — ---_— - — 31 S N/A 0 PE 1/1/2009 STP(U) 72 11 831 83 CE • E Nob Hill Blvd & Fair Ave 03 - C Yes E Nob Hill Blvd 04 P from: E Nob Hill Blvd to: Fair Ave T W 10/01/2009 Intersection widening & new signal, curb, gutter and sidewalk, street lighting, stormwater Totals . • 72 11 83 83 PE 1/1/2009 AIP 131 20 151 151 17 20 04 P 1.3 0 RW 1/1/2010 AIP 382 59 441 441 . EA S 80th Ave - Tieton Dr to Zier Rd C . CN 6/1/2010 AIP 1667 260 1927 1927 Yes S 80th Ave P from: Tieton Dr to: Zier Rd T W 01/01/09 Major widening, curb. gutter, sidewalk S - Totals 2180 339 2519 151 2368 17 21 05 S .15 C CN 6/1/2009 STP(E) 75 20 95 95 CE Zier Rd - S 75th Ave to S 72nd Ave 06 T Yes • Zier Rd P from: S 75th Ave to: S 72nd Ave • 03/01/09 Minor widern utter and sidewalk • __ Totals 1117 27 _ 124 124 v. 5.7 - Supersedes previous editions . - - • e . • • 0 . 0 Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima • From 2009 to 2014 Co. No.: 39 Co- Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification • Project Costs in Thousands of Dollars Federally Funded • A. PIN /Federal Aid No. B. Bridge No. E 5 2 m Fund Source Information Expenditure Schedule Projects Only u rn v V (Local Agency) 4 2 o f C. Project Title d a 3 r I Federal Funding . RAN 0 U d Z D. Street/Road Name or Number o.- an 2 i a Phase Federal Federal State 4th Envir. Required o State Local Total Date E. Beginning MP or Road - Ending MP or Road E t- . 5 o Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (M>) F. Describe Work to be Done a (mm/dd/yyyy) Code Phase Code 6th 1 2 I 3. 4 5 6 7 8 9 10 11 12 I 13 14 15 16 17 18 19 20 21 PE 1/1/2012 STP(C) 272 43 315 315 • - 17 22 05 P 1.0 W RW 6/1/2012 STP(C) 349 • 55 404 404 EA Englewood Ave - N 40th Ave to N 56th Ave 06 S CN 1/1/2013 STP(C) 2352 340 2692 2692 Yes Englewood Ave from: N 40th Ave to: N 56th Ave P • Widen roadway, curb, gutter. sidewalk 0 04/01/11 C . • Totals 2.973 438 3411 3411 • PE 1/1/2010 STP(U) 219 34 253 253 17 23 05 P 2 0 RW 1/1/2011 STP(U) 327 51 378 378 EA Englewood Ave - N 24th Ave to N 16th Ave 06 8 CN 6/1/2012 STP(U) 2980 244 3224 3224 Yes • Englewood Ave from: N 16th Ave lo: N 24th Ave 01/01/10 • Widen, curb, gutter and sidewalk, water and sewer lines Totals 3,526 329 3855 253 378 3224 PE 1/1/2011 STP(E) 252 34 286 • . 286 00 24 • 14 P .25 I T CN 3/1/2012 STP(E) 3150 412 3562 I 3562 CE Pedestrian Bridge 32 P I I No Pedestrian Bridge 0 from: N 10th St to: Yakima Greenway • Construct pedestrian bridge from Gateway area to Yakima Greenway, . power, handicap accessible, lights . Totals 3,402 446 3848 286 3562 00 25 07 ID N/A S PE 4/1/2009 252 252 100 70 82 CE CN 6/1/2009 CMAQ 195 38 233 233 Gravel Road B. S. T. • No . Various Areas ' • from: City Wide to: Totals 195 290 485 100 70 -315 16 26 1 ID N/ A T CN 10/1/2010 STP(S) 504 74 5781 578 .CE ' Powerhouse Rd & Englewood Ave P Yes Powerhouse Rd 0 . from: Powerhouse Rd to: Englewood Ave - s 9 C . 09/0112009 Intersection, realignment. curb. gutter. sidewalk, Safety Flashing Signal. w possible roundabout _ Totals 504 74 578 578 PE 1/1/2012 STP(S) 25 4 ' 29 29 14 27 1 f 12 P N/A P RW 6/1/2012 STP(S) 25 4 29 29 CE • S 48th Ave & Summitview Ave Signalization . T CN 8/1/2013 STP(S) 554 81 635 635 Yes S 48th Ave from: S 48th Ave lo: Summitview Ave 06/01/12 ' Signalization Totals 604 89 693 693 I PE 4/1/2009 13 13 13 16 28 I 12 P N/A P CN 6/1/2009 1 2141 214 214 CE S 3rd Ave & W Washington Ave Signal T I No S 3rd Ave • from: S 3rd Ave to: W Washington Ave _ Signal Upgrades • Totals 227 227 227 v. 5.7 - Supersedes previous editions • • Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: • Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No B. Bridge No. 5 $ ' at Fund Source Information Expenditure Schedule • Projects Only 2 d _ . , co (Local Agency) o t, a 2 . o C Project Title a m J r t /W Federal Funding R 0 0 d D. Street/Road Name or Number °. r = a Required LL o rn = T, Phase Federa Federal State 4th o State Local Total Envir. Date E. Beginning MP or Road • Ending MP or Road E 1 5 .o Start Fund Cost by Fund 3rd Thru Funds Funds Funds 1st 2nd 3r Type (M Y/ F. Describe Work to be Done a (mm/dd/yyy Code Pha Code 6th 1 2 3 . I 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2009 AIP 14 29 12 S N/A P RW 6/1/2009 1 AIP 52 1 84 36 120 72 1 40 80 CE S 16th Ave & W Washington Ave Signal & Intersection. 05 T CN 6/1/2009 AIP 880 383 1263 1263 Yes S 16th Ave 03 from: S 16th Ave to: W Washington Ave . 3/1/2009 Included in Union Gap's Valley Mall Blvd. project . Totals 1084 471 1555 1403 152 PE 1/1/2010 •STP(S) 55 8 63 63 14 30 12 P 2 . 5 P RW 6/1/2010 STP(S) 107 19 126 126 CE W Nob Hi /1 Blvd Sidewalks T . CN 3/1/2011 STP(S) 321 ' 57 378 378 Yes W Nob Hill Blvd W from: S 16th Ave to: S. 6th St. s • 09/01/08 Install missing sidewalks on southside of Nob Hill. Totals - 483 84 567 189 378 06 P PE 1/1/2011 STP(S) 57 7 64 64 00 31 • 1.0" P RW 6/1/2011 STP(S) 189 25 214 214 CE Beech St Pedestrian Connection 32 T CN 1/1/2012 STP(S) 504 68 572 572 Yes Beech St from: Fair Ave to: Chalmers /Riverside 09/01/10 Construct pedestrian pathway under SR82 to Greenway Totals - 750 100 850 64 786 PE 1/1/2011 STP(S) 43 7 50 50 16 32 12 P 2 . 0 P RW 6/1/2011 STP(S) 86 15 101 101 CE W Lincoln Ave . Sidewalks T ' CN 1/1/2012 STP(S) 572 88 660 550 Yes W Lincoln Ave S from: N 56th Ave to: N 29th Ave W 09/01/11 Sidewalks, meters and lire hydrants replacement or relocation Totals 701 110 811 811 14 33 01 P .5 W PE 1/1/2010 STP(E) 424 67 491 491 RW 1/1/2011 STP(E)• 1047 163 1210 1210 CE W Lincoln Ave & 'B' St Realignment 12 T CN 1/1/2012 STP(E) 1801 281 2082 - 2082 Yes W Lincoln Ave S from: W 5th Ave • to: Custer St P Realignment of W Lincoln Ave. sidewalks, curb, gutter, lights 0 09/01!11 G C Totals 3,272 511 3783 491 3292 • PE 1/1/2009 PSMP 13 2 '15 15 16 34 12 p N/A W CN 1/1/2009 PSMP 239 48 287 287 CE School Safety Projects No Various Locations - Citywide from: lo: Crossing flashers. sidewalks, signing. other features Totals 252 50 302 302 PE 1/1/2010 STP(C) 546 84I 630 630 14 35 03 P •85 C RW 1/1/2011 STP(C) 1090 170 1260 • 1260 EA E Nob Hill Blvd. Reconstruction 04 G CN 1/1/2012 STP(C) 6539 1013 7552 7552 Yes E Nob Hill Blvd. 06 p from: S 6th Street to: S 18th Street S 1/1/2010 Major roadwa Mg and reconstruction to 5 lanes with intersection • l improveme her, sidewalks, replacement or relocation of meters T Tot 1075 1267 9442 9442 L an hydrant —__ W — v. 5.7 - Supersedes previous editions 10 . 0 . 0 Washington State Department of Transportation Six Year Transportation Improvement Program • Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded A PIN /Federal Aid No B. Bridge No. 2 = m c , • Fund Source Informa Expenditure Schedule Projects Only w a N rn a — (Local Agency) 3 o f C Project Title • d 7 o t Federal Funding I R/W • c ro 3 D. Street/Road Name or Number o r n - D Cl- Required m — Z nr = Phase Federal Federal State 4th Envir. LL o State Local Total Date E. Beginning MP or Road - Ending MP or Road E o Start Fund Cost by Fund 1st 2nd 3rd Thru F. Describe Work to be Done a (mmidd /yyyy) Code Phase Code Fu Funds Funds 6th Type (MM Yl� 1 2 3 4 1 5 6 7 8 I 9 10 11 12 13 I 14 15 16 17 18 19 20 21 • PE . 1/1/2010 STP(C) 91 14 105 - 105 17 36 01 P N/A W . RW 1/1/2011 STP(C) 91 14 105 105 CE S 72nd Avenue & W Washington Avenue 12 T CN 1/1/2012 STP(C) 544 86 630 630 Yes S 72nd Ave 06 from: S 72nd Ave to: W Washington Ave P O 1/1/2011 Intersection improvement, possible roundabout Totals 726 114 840 840 14 37 4579 12 P N/A P PE 6/1/2009 STP 252 38 2901 290 EA S 7st St. - E. Washington Ave. Intersection Improvement W Yes S 1st St. S from: S 1st St. to: E Washington Ave. T • O 01/01/11 Realign intersection, upgrade traffic signal . Totals 252 38 290 290 16 38 4582 12 P NIA P ALL 4/4/2010 STP(U) 378 WSDOT 378 7561 756 CE Tieton Dr- S 5th Ave. Intersection Project W No Tieton Drive T . from: 5th Ave. Intersection to: 0 • S • Replace traffic signal with roundabout ' ' Totals 378 378 756 756 • 4587 ALL 4/1/2009 STP 2268 307 2575 1 . 525 2050 • 17 39 03 P 1.00 P EA S 48th Ave. Reconstruction T - No S 48th Avenue W . • from: Summitview Ave. to: Nob Hill Blvd. S 0 Widen, curb, gutter, sidewalk, lighting, drainage • Totals 2268 307 2575 525 2050 14 40 03 - p N/A O CN 6/1/2009 STP(U) 383 6 444 444 . CE South 72nd Ave 8 Mead Ave Intersection • 12 P No South 72nd Ave S from: South 72nd Ave to: Mead Ave T W . New intersection. signals, curb, gutter and sidewalk • • . Totals 434 69 503 503 00 41 14 P N/A O CN 7/1/2009 STP(E) 109 17 126 126 CE William O. Douglas Pathway 32 S No P • from: Pine St to: Cowiche Canyon W ' Pathway improvements, connections. and signage to Cowiche Canyon Trail. . Totals 119 • 19 138 138 PE 1/1/2009 STP(E) 23 5 28 281 . 17 42 04 P .76 W • S 66th Avenue T CN 7/1/2009 STP(E) 1096 164 1260 1 1260 1 03 Yes S 66th Ave S from: Scenic Drive to: Summitview P O I 1/1/2009 Widen roatlway, curb, gutter, sidewalk and utilities • Totals 1,119 169 1288 1288 - - v. 5.7 - Supersedes previous editions Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima • From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. . Hearing Date: 7/1/2008 Adoption Date: . City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded • , >,._ r A. PIN /Federal Aid No. B. Bridge No. 0,.... a m und Source Information Expenditure Schedule Projects Only 4 u :=13) o C. Project Title a a J L m . Federal Funding (Local Agency) R/VV U ti Z D. Street/Road Name or Number Phase Federal Federal State 4th Required E o LL E. Beginning MP or Road - Ending MP or Road _ t o • Start Fund State Local Total Envir. Date Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru T ype at y • F. Describe Work to be Done a (mm/dd /yyyy) Code Phase Code 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 43 05 p 20 G PE 1/1/2010 STP(S) 164 25 ,189 189 CE RW 6/1/2010 STP(S) 382 60 442 • 442 66th Ave. & Summitview Intersection 12 P CN 7/1/2011 STP(S) 1090 170 1260 1260 Yes N. 66th Avenue & Summitview • from: N. 66th Ave. to: Summitview Ave. S • Widen for left turn lanes, intersection improvements. curb, gutter. handicap T 1/1/2010 W ramps and lighting C Totals 1,636 255 1891 189 442 1260 PE 1/1/2010 STP(U) 126 17 143 143 14 44 12 P N/A W RW 1/1/2010 STP 63 8 71 71 CE • 40th Avenue and Summitview Signal Upgrade T CN 6/6/2010 STP(U) 544 . 86 630 630 Yes • 40th Avenue ' from: 40th Avenue to: Summitview P o 1/1/2010 Signal upgrade, radius improvements, turn lane extension Totals 733 111 844 844 PE 1/1/2010 STP 95 13 108 , 108 14 45 12 P N/A W RW 1/1/2010 STP I 63 8 71 71 CE 40th Avenue and Englewood T CN 1/1/2011 STP 145 20 165 165 Yes 40th Avenue S . � from: 40th Avenue lo: Englewood P O 1/1/2010 Replace Traffic signal poles, upgrade controller • Totals 303 41 344 344 PE 1/1/2010 STP 126 18 144 144 00 46 12 P N/A W RW 6/1/2010 STP 63 8 71 • 71 CE 16th Avenue and Fruitvale Blvd T CN 1/1/2011 STP • 315 43 358 358 Yes 16th Avenue S from: 16th Avenue to: Fruitvale Blvd P o 6/1/2010 Replace traffic signal poles, radius improvements. ADA ramps Totals 504 69 573 573 PE 1/1/2010 STP 32 5 37 • 37 14 47 12 P N/A W CN 1/1/2011 STP 126 17 143 143 CE 1st Street and I Street _ T No 1 st Street S . from: 1st Street to: I Street • P • Replace and upgrade traffic signal equipment O Totals 158 22 180 180 PE 6/1/2011 STP(U) 820 1 189 1009 1009 14 48 01 P .25 W RW 1/1/2012 STP(U) 3150 630 3780 3780 CE Mead Ave. Railroad Grade Separation T CN 1/1/2013 STP(U) 6552 1008 7560 7560 Yes Mead Ave. S from: Presson Place to: Maryland P Construct railroad overpass including all utilities 1/1/2012 Totals 10,522 1827 12349 4789 7560 • PE 6/1/2011 STP(U) 820 189 1009 1009 16 49 01 P .25 C RW 1/1/2012 STP(U) 3150 1 630 3780 1 3780 CE Washington Ave. Railroad Grade Separation S CN 1/1/2013 STP(U) 6552 1008 7560 7560 Yes Washington Ave. • T from: Longfibre Road to: W 2 Railroad gra 's including all utilitie - .- Totals 1827 12349 1/1/201• 12349 / . _ _ v. 5.7 - Supersedes previous editions J - e .. . . . • 0 Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima • From 2009 to 2014 Co. No.: 39 • Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 • Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded . A. PIN /Federal Aid No. B. Bridge No. m_ a1 Fund Source Information Expenditure Schedule Projects Only (Local Agency) m w y - 4 o - C. Project Title • o a m o g," Federal Funding RN`I c U a D . St Name or Number • a r in 3 _ Phas Fed eral Federal State 4th Required o - State Local Total Envir Date t E. Beginning MP or Road - Ending MP or Ro ad E 1- 5 o Sta rt Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM YY) F. Describe Work to be Done a (mm /ddiyyyy) Code Phase Code 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 • PE 6/1/2011 STP(U) 252 1 38 290 290 CE 16 50 01 P 4.0 0 RW 1/1/2012 STP(U) 756 88 844 844 Citywide Pathway Connections - , S CN 1/1/2013 STP(U) 1890 315 2205 2205 Yes • Yakima T from: to: W 1/1/2012 Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths, WOD Trail, Greenway including Neches Rail Spur, signage and amenities ' Totals 2,898 441 3339 290 3049 PE 1/1/2011 STP(U) 2180 340 2520 2520 CE 16 51 01 P 1.1. 0 RW 1/1/2013 STP(U) 2180 340 2520 2520 E. 'H" St. Extension 08 - P CN 6/1/2014 STP(U) 1199 1871 3070 3070 Yes E. "H" St. S from: 1st St. to: Yakima River T 1/1/2013 Construct road including water. sewer. curb, gutter and sidewalk for future • development. Totals 5,559 2551 8110 8110 PE 1/1/2012 STP(C) 700 108 808 808 CE 17 52 01 P 1.3 0 RW 1/1/2013 STP(U) .5500 850 6350 6350 N. 10th St. Extension 06 9 CN 6/1/2013 STP(U) 7900 .972 8872 8872 Yes N. 10th St. • T from: R St. to: 10th Street - Lincoln Ave. W 1/1/2013 Construct road including water. sewer, curb, gutter, sidewalk for future development. Totals 14,100 1930 16030 16030 PE 1/1/2012 STP(U) 315 38 353 353 00 53 03 P N/A O CN 6/1/2012 STP(U) 945 . 126 1071 1071 CE VW - Pathway ' 32 P No YVT Railway Corridor. S • T from: to: w - Development pathway in West Valley area including 53rd Ave. Wide Hollow, • 64th Ave, Ahtanum including all utilities and signage Totals 1,260 164 1424 1424 17 54 01 P N/A 0 CN 6/1/2011 STP(U) 567 76 643 643 CE 34th Ave B River Rd Improvements 12 P • No Fruitvale Blvd. S from: 34th Ave. to: River Rd. T W Intersection improvements including lumination, sewer, water, curb, water and sidewalks • Totals 630 81 711 711 P 1/1/2010 STP(U) 218 34 252 252 • 17 55 01 P 1.0 O RW 6/1/2011 STP(U) 327 51 378 378 CE Englewood Ave 05 8 CN 1/1/2012 STP(U) 2980 244 3224 • . 3224 Yes • Englewood Ave 12 T from: 24th Ave to: 40th Ave . W 6/1!2011 Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines and street lights. Totals 3,525 329 3854 630 3224 PE 1/1/2010 STP(U) 272 43 315 315 16 56 01 P 1.3 C RW 6/1/2010 STP(U) 349 55 404 404 CE Frontage Road & "H' St. Loop G 1/1/2011 STP(U) 2352 340 2692 2692 Yes N. 8th St. P I • from: "H" St. to: 1 -82 S 6/1/2010 . Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for future development and Terrace Heights connection. T . Vi✓ —. Tot als 2,973 438 3411 719 2692 _ - v. 5.7 - Supersedes previous editions Washington State Department of Transportation Six Year Transportation Improvement Program -en Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs In Thousands of Dollars Federally Funded m w A. PIN /Federal Aid No. B. Bridge No. 8 v y Fund Source Information Expenditure Schedule Projects Only 3 m . E C. Project Title - ? u L Federal Funding (Local Agency) R/W LO 1 tl D. Street/Road Name or Number a in d - Phase Federal Federal State 4th Envir. Required o t ` E. Beginning MP or Road • Ending MP or Road i - o State Local Total Date Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM/YY) F. Describe Work to be Done (mm /dd /yyyy) Code Phase Code 6th 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 57 07 P .5 G CN 6/1/2009 75 75 25 25 25 CE Citywide Alleys P No S W from: - to: T Pave alleys Throughout the city. Totals 75 75 25 25 ' 25 2.7 C PE 1/1/2010 STP(U) 120 17 1371 137 14 58 03 P CE Nob Hill Corridor 04 G • Nob Hill • 0 P from: 1 -82 to: S. 16th Ave. 5 Widen roadway, sidewalk, curb, gutter, lighting T W Totals 120 17 137 137 3.2 C PE 1/1/2011 STP(U) 120 17 137 137 14 59 04 P CE 40th Ave. Corridor O 40th Ave. G from: SR -12 to: Washington Ave. P • S Widen roadway, curb, gutter, sidewalks, lighting. W • T Totals 120 17 137 137 • 14 60 04 P 3.5 C PE 1/1/2012 STP(U) 120 17 137 137 CE • 16th Avc. Corridor G 1 Ave. O • from: SR -12 to: a hington Ave.Nailey Mall P Widen roadway, curb, gutter, sidewalk, lighting. T W Totals 120 17 137 137 14 61 04 P 2.0 C PE 1/1/2012 STP(U) 120 17 1371 137 CE S. 1st St/Main SI. Corridor G S. 1st St. /Main St. O from: Nob Hill Blvd. to: Barker Mill Bridge P S Joint project with Union Gap to sidan roadway, curb, gutter, sidewalk, T lighting. W Totals 120 17 137 137 PE 1/1/2012 STP(U) 120 17 137 137 14 62 01 P 6.0 C CE W. Yakima North /South Connector to West Valley 04 G - - Unknown road 08 O P from: North - South to: in West Valley S City 8 County joint project to build /extend roadways. T W Totals 120 17. 137 137 • 00 63 23 S PE 1/15/2009 1 OTHER 100 100 100 N/A West Side Transit Center Placement Study • Acquire Property to Expand Operations from: to: Recent Anne ndate Transit Expansion to These Areas e T 411 otals 100 100 100 v. 5.7 - Supersedes previous editions 0 . . • 0 . • Washington State Department of Transportation Six Year Transportation Improvement Program -„ From. 2009 to 2014 Agency: Yakima - Co. No.: 39 Co: Name: Yakima Co. Hearing Date: 7 -1 -2008. Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: - Project Identification 1 - Project Costs in Thousands of Dollars Federally Funded T3 « t A. PIN /Federal Aid No. - B. Bridge -No: v E I c Fund Source Information Expenditure Schedule Projects Only rn (Local Agency) 4 v" '— C. Project Title d a 0 12' .71 0 U t Federal Funding R./W U y_ Z D. Street/Road Name or Number n rn d Phase Federal Federal State 4th Envir. Required o E. Beginning MP or Road - Ending MP or Road o State Local Total Date Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM/YY) F. Describe Work to be Done • a (mm /dd /yyyy) Code Phase Code 6th 1 I 2 I 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 . 21 • CN 6/1/2009 432 r 68 500 500 • • . 16 64 04 P .73 C W. Nob Hill Blvd -S 68th Ave to S. 72nd Ave. 03 W W Nob Hill Blvd O from: S. 68th Ave: to: 72th P T Reconstruct to minor arterial standards S Totals 432 68 500 500 16 65 12 S - 0.50 P 1 1 , 1 1 1 1 1 1 1 1 I Tieton Dr. Pedestrian Safety Improvements W T • • from: 16th Avenue to: 24th Avenue G O • Pedestrian Safety, Sidewalks and ADA Ramps. • Totals - PE 5/1/2009 • OTHER 400 400 400 17 66 06 S .60 P CN 4/1/2010 OTHER 2600 2600 2600 CE • Yakima Downtown Future Initiatives, Phase 4 12 W No - . S from: 1st Street to: 3rd Street T - Install Historic Lighting, Sidewalk Modification 8 Other Improvements. Totals • 3000 3000 3000 00 67 03 S .50 S CN 1/1/2009 CMAQ 440 .214 6541 - 654 . CE • • Coolidge Road Widening and Paving. 05 W No ' 06 P . • from: 80th AVE. lo: 88TH AVE. ' T . ' Widen roadway and pave with curb and gutter. Totals 440 214 654 654 • • 06 68 01 P PE 1/1/2012 1001 1001 l 100 38 S Occidental Road Construction. W . P from: 58th Ave. to: 64th Ave. � T - - Construct roadway • Totals 100 100 100 PE 1/1/2012 100 100 100 00 ' 69 01 P .27. 86th Ave. Road Construction • - - . from: Occidental to: Coolidge Construct roadway Totals 100 100 - 100 06 70 04 P PE 1/1/2012 STP(U) 1201 . 17 1 1371 i 137 1.5 W • EA 640 Ave. Roadway Widening. 06 G YES • P • • from: Washington Avenue. to: Tieton Drive. T 7/4/2012 Wide Roodway,Curb, Gutter, Sidewalks. Lighting, Drainage. C O Totals 120 - 17 137 137 . _ . _ v. 5.7 - Supersedes previous editions Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 - - 2008 Adoption Date: City No.: 1485 MPO /RTPO: YVCOG Amend Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded • A. PIN /Federal Aid No. B. Bridge No. c = . o Fund Source Information Expenditure Schedule Projects Only T6 a o a (Local Agency) 4 o£ C. Project Title E o J u r Federal Funding R/W o p Z D. Street/Road Name or Number e rn m Phase Federal Federal State 4th Required E o State Local Total Envir. Date E. Beginning MP or Road - Ending MP or Road F- 5 o, . Start Fund Cost by Fund Funds Funds Funds 1st 2nd 3rd Thru Type (MM YY) F. Describe Work to be Done a (mm / dd /yyyy) C ode Phase Code 6th 1 2 3 4 15 6 .7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 71 21 S N/A ALL 1/1/2009 5309(Bus) 1540 1540 1540 CE Purchase four new transit buses (replacements) No On -going vehicle replacement program . from: to: Seek RFP's to acquire four new transit buses that will replace units that are 18 years of age. (six years past federal standards) Totals 1540 1540 1540 00 72 21 S N/A ALL 6/1/2009 - 85 30 115 115 CE Acquisition of new Dial -A -Ride paratransit vehicles No Replace several older vehicles from: to: Upgrade Dial -A -Ride service by replacing several older vehicles with new models. - - Totals 85 30 115 115 02 73 11 P 0 2 CN 4/1/2009 BR 700 360 1060 1060 CE Nob Hill Overpass Repair No from: 1st Street to: Ledwich Ave Make necessary repairs to Railroad Overpass (Bridge) Totals 700 360 1060 1060 _ PE 1/1/2009 STP(U) 173 27 200 200 02 74 03 P N/A RW 1/1/2010 STP(U) 433 67 500 500 E. Lincoln & 10th Street Roundabout 05 CN 6/1/2010 STP(U) 1125 - 175 . 1300 1300 Yes 06 . from: E. Lincoln to: E. MLK Jr. Blvd. - .. ' 4/1/2010 Roundabout construction at intersection curb, gutter, sidewalk, 8 street lighting Totals 1,731 269 2000 200 1800 . - Grand Totals for Yakima '121,368 21,344 29,515 172,227 40,215 31404 30,005 70,603 • 0 II , II . • v. 5.7 - Supersedes previous editions •