BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 7.D.
For Meeting of:April 16, 2024
ITEM TITLE: Project Completion and Contract Acceptance for the Flip Flow
Terminal Security Exit Lane Project
SUBMITTED BY: Jaime Vera,Airport Operations and Maintenance Manager
SUMMARY EXPLANATION:
Record FlipFlow Exit Lane Breach Control System was installed in the airport's terminal facility
to improve pedestrian security, handle peak pedestrian flow, and comply with new Transportation
Security Administration requirements. The project was completed in March 2022. The Department of
Labor and Industries has been working with Record, USA to complete the required paperwork.
Contractor: Record, USA
Contract Awarded: 9/22/2021
Total Contract Cost: $92,000.00
Retainage Due: $0.00
The total contract cost is for construction and installation of the unit and does not include design and
other related costs.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY: Public Safety
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
RECOMMENDATION:
Accept Project.
ATTACHMENTS:
Description Upload Date Type
❑ 4/9/2024 Backup Material
2
F � Yima lkirTerminal-�� � ' �6 W.9 hirgton Ave.Suite B_Yakima,Vit&98903
www.hyYKM.co m
4/9/2024
Record USA
P.O Box 772542
Chicago, IL 60677
Re: Yakima Air Terminal-McAllister Field Security Exit Gate
City of Yakima Project No. A02616
Dear Mr. David Pickers,
Be advised that work on the above referenced project was considered physically complete on
March 25th, 2022.
Labor and& Industries has given the approval to close the project out as of April 3rd, 2024. All
Prevailing Wages documentations has been provided to Labor and Industries.
Thank you for your service your company provided for the City of Yakima.
Should you have any questions, please contact me at 509.575.6010
Sincerely,
Jaime Vera
Airport Operations and Maintenance Manger
(509) 575-6010