ITEM TITLE: Resolution authorizing a contract with Knobel's Electric Inc for the
Russell Lane Improvements Project 2650
SUBMITTED BY: Scott Schafer, Director of Public Works
* Bill Preston, PE, City Engineer
SUMMARY EXPLANATION:
The Russell Lane Improvements Project 2650 will provide for improvements of reconstructing
the lane, sidewalks, curb and gutter, storm drainage, and the traffic signal.
The City of Yakima (City) used the procedure established by Washington State law for the
bidding and awarding of public capital improvement projects with Knobel's Electric Inc being
selected to provide construction on the projects in the amount not to exceed $584,112.00. The
Contract has been enclosed for City Council review.
The project is funded with a SIED grant& loan.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY: Public Safety
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
RECOMMENDATION:
Adopt Resolution.
ATTACHMENTS:
Description Upload Date Type
D Resolution Knobel°s Russell Lane 3/5/2024 Resolution
D Contract 2/28/2024 Contract
2
RESOLUTION NO. R-2024-
A RESOLUTION authorizing a Contract with Knobel's Electric, Inc. for the Russell Lane
Improvements Project 2650.
WHEREAS, the City of Yakima (City) needs to relocate Russell Lane to align with the
existing traffic signal at S 1st Street; and
WHEREAS, the improvements consist of reconstructing the lane, sidewalks, curb and
gutter, storm drainage, and traffic signal improvements; and
WHEREAS, the City received funding from the Yakima County Supporting Investments
in Economic Diversification (SIED) Board in the amount of$416,000 in grant funding and a
$416,000 as a loan for improvements to the intersection of South 1st Street and Russell Lane
(R-2023-030); and
WHEREAS, the City Council previously approved a Project Developer Agreement with
All American Investment Group to repay the SIED loan (R-2023-075); and
WHEREAS, the City used the procedure established by Washington State law for the
bidding and awarding of public capital improvement projects; and
WHEREAS, Knobel's Electric, Inc. was determined to be qualified to perform the needed
construction work; and
WHEREAS, the Contract will be null and void if bond, certificate, and required insurance
certificate and endorsement are not received within specified timeframe; and
WHEREAS, the Scope of Work and Budget included in this Contract meets the needs
and requirements of the City for this project; and
WHEREAS, the City Council of the City of Yakima finds that entering into the Contract
with Knobel's Electric Inc for construction of the Russell Lane Improvements Project 2650 is in
the best interests of the City and its residents; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute a Contract with Knobel's Electric, Inc.,
attached hereto and incorporated herein by this reference, not to exceed Five Hundred Eighty-
Four Thousand One Hundred and Twelve Dollars ($584,112) to provide construction services
for work outlined in the Contract at the intersection of South 1st Street and Russell Lane.
ADOPTED BY THE CITY COUNCIL this 19th day of March, 2024.
Patricia Byers, Mayor
ATTEST:
Rosalinda Ibarra, City Clerk
3
CONTRACT
THIS AGREEMENT, made and entered into in triplicate,this 19th day of March , 2024, by and
between the City of Yakima, hereinafter called the Owner,
and Knobel's Electric, Inc. a Washington Corporation, hereinafter called the
Contractor.
WITNESSETH:
That in consideration of the terms and conditions contained herein and attached and made a part of this
agreement, the parties hereto covenant and agree as follows:
I. The Contractor shall do all work and furnish all tools, materials, labor and equipment for THE BID
AMOUNT OF:$ 584,112.00 , for Russell Lane Improvements, City of Yakima Project No. 2650,
all in accordance with, and as described in the attached specifications and the 2024 Standard
Specifications for Road, Bridge, and Municipal Construction which are by this reference incorporated
herein and made a part hereof, and shall perform any alterations in or additions to the work provided
under this contract and every part thereof.
Work shall start within ten (10) days after the Notice to Proceed and shall be completed in forty (40)
working days. The first chargeable working day shall be the 11th working day after the date on which the
City issues the Notice to Proceed.
If said work is not completed within the time specified, the Contractor agrees to pay to the Owner the sum
specified in the Standard Specifications for each and every day said work remains uncompleted after
expiration of the specified time, as liquidated damages.
The Contractors shall provide and bear the expense of all equipment; work and labor of any sort
whatsoever that may be required for the transfer of materials and for constructing and completing the
work provided for in this contract and every part thereof, except such as are mentioned in the
specifications to be furnished by the City of Yakima.
II. The City of Yakima hereby promises and agrees with the Contractor to employ, and does employ the
Contractor to provide the materials and to do and cause to be done the above described work and to
complete and finish the same according to the attached plans and specifications and the terms and
conditions herein contained and hereby contracts to pay for the same according to the attached
specifications and the schedule of unit or itemized prices hereto attached, at the time and in the manner
and upon the conditions provided for in this contract.
III. INDEMNIFICATION. The Contractor shall release, indemnify, defend, and hold harmless the City, its
elected and appointed officials, officers, employees, agents, representatives, insurers, attorneys, and
volunteers from all liabilities, losses, damages, and expenses related to all claims, suits, arbitration
actions, investigations, and regulatory or other governmental proceedings arising from or in connection
with this Agreement or the acts, failures to act, errors or omissions of the Contractor, or any Contractor's
agent or subcontractor, in performance of this Agreement, except for claims caused by the City's sole
negligence.
a. Industrial Insurance Act Waiver. It is specifically and expressly understood that the Contractor
waives any immunity that may be granted to it under the Washington State industrial insurance act,
Title 51 RCW, solely for the purposes of this indemnification. Contractor's indemnification shall not be
limited in any way by any limitation on the amount of damages, compensation or benefits payable to or
by any third party under workers' compensation acts, disability benefit acts or any other benefits acts or
programs. Contractor shall require that its subcontractors, and anyone directly or indirectly employed or
hired by Contractor, and anyone for whose acts Contractor may be liable in connection with its
performance of this Agreement, comply with the terms of this paragraph, waive any immunity granted
under Title 51 RCW, and assume all potential liability for actions brought by their respective employees.
The Parties acknowledge that they have mutually negotiated this waiver.
b. Should a court of competent jurisdiction determine that this Agreement is subject to RCW
G:\PROJECTS\2023\23035E\Spec\23035 Spec.docx 4-2
4
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to
property caused by or resulting from the concurrent negligence of the Contractor and the City, the
Contractor's liability, including the duty and cost to defend, shall be only to the extent of the Contractor's
negligence.
c. Nothing contained in this Section or this Contract shall be construed to create a liability or a right
of indemnification in any third party.
d. The terms of this Section shall survive any expiration or termination of this Contract.
IV. The Contractor for himself, and for his heirs, executors, administrators, successors, and assigns,
does hereby agree to the full performance of all the covenants herein contained upon the part of the
Contractor.
V. It is further provided that no liability shall attach to the City of Yakima by reason of entering into this
contract, except as expressly provided herein.
IN WITNESS WHEREOF the parties hereto have caused this agreement to be executed the day and year
first herein above written.
Countersigned: CITY OF YAKIMA CONTRACTOR
this day of 2024.
Knobel's Electric, Inc. , a Corporation
Construction Company
By:
City Manager Signature Contractor Signature
(Printed Name) (Printed Name)
Attest:
Its:
City Clerk (President, Owner, etc.)
Address: 801 Tennant Ln
Yakima, WA 98901
G:\PROJECTS\2023\23035E\Spec\23035 Spec.docx 4-3