Loading...
HomeMy WebLinkAbout03/05/2024 07.D. Project Completion and Contract Acceptance for the Capitol Theatre Curtain Replacement with Pacific Northwest Theatre Associates Project 2569 1 s, !% a, 2 BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 7.D. For Meeting of: March 5, 2024 ITEM TITLE: Project Completion and Contract Acceptance for the Capitol Theatre Curtain Replacement with Pacific Northwest Theatre Associates Project 2569 SUBMITTED BY: *Charlie Robin, Capitol Theatre CEO Brian Palandri, Technical Director SUMMARY EXPLANATION: Pacific Northwest Theatre Associates (PNTA) completed the Capitol Theatre Curtain Replacement Project 2569. The project included replacement of the Fire Curtain and Main Drape &Traveler. Final inspection for this project was made and the recommendation is that the project be accepted. A final retainage payment of $9,976.58 is due to the contractor for the completion of the project. Project Manager: Brian Palandri Contractor: Pacific Northwest Theatre Associates Contract Awarded on: 09/07/2022 Contract Cost: $216,092.74 Final Retainage Payment Due: $9,976.58 The total contract cost is for construction only and does not include design and other project related costs. City Council action is required to accept the project and approve the final construction costs. ITEM BUDGETED: Yes STRATEGIC PRIORITY: Public Safety APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Accept project. ATTACHMENTS: 2 Description Upload Date Type D Completion Letter-Fire Curtain 2/13/2024 Backup Material D Completion Letter-Main&TraNeler 2/13/2024 Backup Material 3 CAP' L THEW , ,. h I A•1 A July 7th, 2023 Pacific Northwest Theatre Associates (PNTA) ATTN: Max Pagel BOARD OF DIRECTORS Michael Moen Re: Capitol Theatre Fire Curtain Replacement Project Chair City Project no. 2569 JoAnne Hanses Past-Chair Kelly Murray NOTICE OF COMPLETION Secretary Bill Dezellem Treasurer ReeshaCosby Dear Max, Erika Dore Dana Eliason This letter is your Notice of Completion for the above referenced project(s). Aaron Erickson Elizabeth Hargrave The notice of Completion date is July 7th, 2023. David Mack Gabriel Munoz As of this date, all work is considered complete and the final invoices for the Ozzie Park Jocelyn Pedrosa above referenced project(s) can be sent. Julie Rottman Eric Silvers If you have any questions regarding the above referenced project(s), please Hilary Tanneberg Susie Temple contact me at (509) 853-8324. Laura Terrazas Janice Deccio City Council Rep Sincerely, Brian Palandri CTC Technical Director 9 19 S 3rd St,Yakima,WA 98901 I. (509)853-8000 lM1 PO Box 102 Yakima,WA 98907 !�' www.capitoltheatre.org 4 CAP'T0L July 31st, 2023 Pacific Northwest Theatre Associates (PNTA) ATTN: Max Pagel BOARD OF DIRECTORS Michael Moen Re: Capitol Theatre Main Drape &Traveler Replacement Project Chair City Project no. 2569 JoAnne Hanses Past-Chair Kelly Murray NOTICE OF COMPLETION Secretary Bill Dezellem Treasurer ReeshaCosby Dear Max, Erika Dore Dana Eliason This letter is your Notice of Completion for the above referenced project(s). Aaron Erickson Elizabeth Hargrave The notice of Completion date is July 31st, 2023. David Mack Gabriel Munoz As of this date, all work is considered complete for the above referenced Ozzie Park Jocelyn Pedrosa project(s). Julie Rottman Eric Silvers If you have any questions regarding the above referenced project(s), please Hilary Tanneberg Susie Temple contact me at (509) 853-8324. Laura Terrazas Janice Deccio City Council Rep Sincerely, Brian Palandri CTC Technical Director „r 9 19 S 3rd St,Yakima,WA 98901 (509)853.80O0 1�PO Box 102 Yakima,WA 98907 www.capitoltheatre.org