BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 7.C.
For Meeting of: November 7, 2023
ITEM TITLE: Resolution authorizing an agreement with Iron Horse LLC for
Project SW2651 2023 Drainage Improvement District
Rehabilitation
SUBMITTED BY: Scott Schafer, Director of Public Works
*Mike Price, Wastewater/Stormwater Division Manager
SUMMARY EXPLANATION:
City of Yakima (City) Project SW2651 rehabilitates 5,508 linear feet of stormwater conveyance
pipe and 11 manholes that were previously a part of Drainage Improvement District (DID)
infrastructure at various locations as shown on the attached Project Location Map. The project
will utilize cured-in-place lining technology to minimize excavation and other disturbances.
The City previously entered into an agreement with HLA Engineering and Land Surveying, Inc. under
City Contract No. 2020-014 to provide engineering design, bidding, and construction services for the
project. The City utilized the procedure established by the State of Washington for competitively
bidding projects. Four contractors submitted bids, with Iron Horse, LLC. submitting the lowest bid. The
contract is for an amount not to exceed $520,029 and is attached for City council review. The project
is funded by Stormwater Capital Fund 442.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY: Public Safety
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
RECOMMENDATION:
Adopt Resolution.
ATTACHMENTS:
Description Upload Date Type
❑ 10/24/2023 Resolution
❑ 10/25/2023 Corer Memo
❑ 10/17/2023 Backup Material
2
RESOLUTION NO. R-2023-
A RESOLUTION authorizing an agreement with Iron Horse, LLC. for Project SW2651 2023
Drainage Improvement District Rehabilitation
WHEREAS, the City of Yakima owns, operates, and maintains the Stormwater Collection
System in accordance with applicable Federal, State and Local regulations; and
WHEREAS, portions of the stormwater conveyance system comprising sections of former
Drainage Improvement District infrastructure in various locations in the City of Yakima require
improvements; and
WHEREAS, under City Contract No. 2020-124, the City entered into an agreement with
HLA Engineering and Land Surveying, Inc. to prepare the plans and contract documents for the
cured-in-place rehabilitation of 5,508 linear feet of pipe and 11 manholes to improve stormwater
conveyance; and
WHEREAS, the City of Yakima Stormwater Division requires construction services for the
stormwater system improvements; and
WHEREAS, the City of Yakima used the procedure established by the State of
Washington for competitively bidding projects; and
WHEREAS, Iron Horse, LLC. submitted the low bid and has the ability to perform the
contract specified work; and
WHEREAS, the City Council finds that it is in the best interest of the City of Yakima and
its residents to enter into a contract with Iron Horse, LLC. to provide construction services outlined
in the contract.; now, therefore
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute the attached contract with Iron Horse,
LLC., in the amount of Five Hundred Twenty Thousand and Twenty-Nine Dollars ($520,029) to
provide the construction services outlined in the contract.
ADOPTED BY THE CITY COUNCIL this 7th day of November, 2023.
ATTEST: Janice Deccio, Mayor
Rosalinda Ibarra, City Clerk
3
CONTRACT
THIS AGREEMENT, made and entered in triplicate,this day of ��.,�,.,, ,�,202. by and between
the City of Yakima , hereinafter called the Owner, and I((y(\ tktiAC ( - a
Washington Corporation, hereinafter called the Contractor.
WITNESSETH:
That in consideration of the terms and conditions contained herein and attached and made a part of this
agreement, the parties hereto covenant and agree as follows:
I. The Contractor shall do all work and furnish all tools, materials, labor and equipment for THE
BID AMOUNT OF: $ (J7 PI , for 2023 CIPP DID Rehabilitation, City of Yakima Project No.
SW2651, all in accordance with, and as described in the attached plans and specifications and the 2023
Standard Specifications for Road, Bridge, and Municipal Construction which are by this reference
incorporated herein and made a part hereof, and shall perform any alterations in or additions to the work
provided under this contract and every part thereof.
Contract time shall begin on the first working day following the Notice to Proceed Date and shall be
completed in thirty-five (35) working days. If work has not commenced within the ten (10) days after the
notice to proceed, the first chargeable working day shall be the eleventh (11th) working day after the date
on which the City issues the Notice to Proceed.
if said work is not completed within the time specified, the Contractor agrees to pay to the Owner the sum
specified in the Standard Specifications for each day said work remains uncompleted after expiration of the
specified time, as liquidated damages.
The Contractors shall provide and bear the expense of all equipment;work and labor of any sort whatsoever
that may be required for the transfer of materials and for constructing and completing the work provided for
in this contract and every part thereof, except such as are mentioned in the specifications to be furnished
by the City of Yakima .
II. The City of Yakima hereby promises and agrees with the Contractor to employ, and does
employ the Contractor to provide the materials and to do and cause to be done the above described work
and to complete and finish the same according to the attached plans and specifications and the terms and
conditions herein contained and hereby contracts to pay for the same according to the attached
specifications and the schedule of unit or itemized prices hereto attached, at the time and in the manner
and upon the conditions provided for in this contract.
III. INDEMNIFICATION. Contractor agrees to release, indemnify, defend, and hold harmless the
City, its elected and appointed officials, officers, employees, agents, representatives, insurers, attorneys,
and volunteers from all liabilities, losses, damages, and expenses related to all claims, suits, arbitration
actions, investigations, and regulatory or other governmental proceedings arising from or in connection with
this Contract or the acts, failures to act, errors or omissions of the Contractor, or any of Contractor's agents
or subcontractors, in performance of this Contract, except for claims caused by the City's sole negligence.
The City's right to indemnification includes attorney's fees and costs associated with establishing the right
to indemnification hereunder in favor of the City.
IV. The Contractor for himself, and for his heirs, executors, administrators, successors, and
assigns, does hereby agree to the full performance of all the covenants herein contained upon the part of
the Contractor.
V. It is further provided that no liability shall attach to the City of Yakima by reason of entering
into this contract, except as expressly provided herein.
G:\PROJECTS\2 02 212 21 65E\Spec122165 Spec.docx 4-2
4
IN WITNESS, WHEREOF the parties hereto have caused this agreement to be executed the day and year
first herein above written.
Countersigned: CITY OF YAKIMA ` CO,_NTRACTOR
this day of 20_ \vtr ]1. tLLC ,a Corporation
Contra;,or
By: edit ,,
V -. /t M_
City Manager CRO�ie • A t\Ve
Attest: ,�\
(Print Name)
City Clerk Its: ;0 N/
1
residen Owner,etc.)
Address:55c\ N� 222$ P(V 1:31c\c 0
rx Yv w 1 Off t- ol9- 7 1
G:\PROJECTS\2022\22165E\Spec122165 Spec.docx 4-3
5
PROJECT LOCATION MAP
SW2651
`= �■► , '4 a nma,lib 111.11illim &,,L_Pkit:111%,„., it. - 111::-.-111111 i --../ iii Wt.-711kiik imviiiiiiimplill
— ■ ■■■■�ii�fil4lu■�gl
IELL'a.-1141111,111g4N0 11‘11F-4—riii AlitPrw.. r`,10,1Alk.W:t t!"..',N 41i- --,.,,,71111
`t It Az ram v.,-.M-m 4..0,p I, i (..„, ,■ !r4;
r I �'1 .A■. � ��■ Sa s ;L(h�'Siii r . J I . ` II 4 y-, �t L ai 1A'. 1mhi � ♦1
1 ■ ;.� Ihi +�: ' �, 11.:. ■► �J l ..Ilr 1 -it, , y. !Y'rt'"L Y m'i�_
l ■lil` ;. 'nl <t •• ' p i j . :',�'• IL\ s.,t 'kY'Y sib;.� r.-�-1
'.. : i ,►'-, f Iil-i4`t, i --"I: — 11►j`I ,`,'``$' +,;.• � Y 1 al
,oe Iv' •1 r 'il,ty C;y ` + `��li .. ����1•'' , ,1 11 — AvE r , " `di:. J r
,'ir 11 .-0 Sic .-- .. ,141l,1l
{E 1 1', ` oit.
1 i1lL
...ii `■Noma 1
• El.„.-i'amk a =.
rT.NI_' r '_ !',�_
�r' �� �;r. fin:
,mIl pm= ,ilk ■ F Ilrc i 1ji I,
it r,....um 11.1 1. - . v .■III` ■ - m -' ia_ 7;O�+1Lt'Iu i.l■♦I ;
i
. 1111 ,
'• - p :ullul _I'i : 11 U. ■ ww-',-.-- . r,l�.-.
INi II � ,.. 'Ell lulr i .. I' �_ 1 , V11 �4���
■rinm' ■
•
...roll 11 - ■■ r 1 �� `
Tdi
IIJIII11,11.:1�IIL'';1�;'t ,1 Al ■_,� J��� ,'a':IMERV.",,,.1■�_�,,,,,,N!IL�� =
�•1 == III I! 1I11 I'■�I� L■1 InlI F-n.1 Ilt!
ii4L 1111ifi�i1�� I`j ,Ipf, �i111 unk+� . �� Iwinllu_axis ���or
` ��I�1� * -Gi�, �(
:...F-�lllllllllNi ■�������. IIi ar■�,' 1
1• ram.- m �wi�i 1Il■ III■■■ 4L. 1r.t mil
■�. .
is■� ma1111111111111II1i,•�-- ,:1■ �'tr♦ �j � ��.,
1�.�11111111111� �.__ ° .�� I,,, r ...
.III ,, it � ■ ,
ni-3- 11111111111ZE Itillill-211A.Lao a' ' Iti.i...h&A;d• i' N' El* il 1111111
4;.u•2 r I— f
1"� implIIIN•ril milk
fi,s�liMbiW r � I•lainil-•��I: •� �! f
anon
IMMIAIIEM
VICINITY MAP
NOT TO SCALE