HomeMy WebLinkAbout11/17/2009 12A Jeld-Wen Frontage Improvements Final Payment, Project AS2120, River Rd and 6th Ave / 6th Ave and "I" St BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 2 - A
For Meeting Of November 17, 2009
ITEM TITLE: Final Contract Payment for Jeld-Wen Frontage Improvements 7 City Project No.:
AS2120
SUBMITTED BY: Doug Mayo — City Engineer
Brett Sheffield - Chief Engineer
CONTACT PERSON/TELEPHONE: Doug Mayo — City Engineer, 509-576-6678
SUMMARY EXPLANATION:
This project included removing and replacing the existing roadbed and surfacing to limits shown
as well as the addition Of new cement concrete curb, gutter and sidewalk along with storm
drainage improvements at the intersection of River Road & 6 Avenue. This project also
included improvements at the northeast corner of the intersection of 6 Avenue and "I" Street.
Final inspection for this project was made and the recommendation is that the project be
accepted.
This Council action is to accept the project and approve the final construction costs.
Contractor: Granite Northwest, Inc.
Contract Award: 7/1/09
Contract Cost $179,879.00
Final Contract Cost: $174,075.96
Amt. This Payment: -0-
The above total contract cost is for construction only and does not include engineering and
other costs.
Resolution Ordinance Other (Specify) Final Contract Payment
Contract Mail to (name and address):
Funding Source Arterial Street
APPROVED FOR SUBMITTAL: City Manager
STAFF RECOMMENDATION: Accept the project and approve final estimate.
BOARD RECOMMENDATION:
COUNCIL ACTION:
•
. ,
. . ' OF YAKIMA
• .
. •
PROJECT #2120 . • : PROJECT NAME: JELD-WEN FRONTAGE IMPROVEMENTS 10/29/2009
CONTRACTOR: GRANITE NORTHWEST, INC.
PROGRESS ESTIMATE NO. FINAL . . . • .
•
. . .
. . • BID TOTAL TO
O. ITEM BID, UNIT UNIT PRICE CONTRACT DATE % OF
QUANTITY AMOUNT QUANTITY CONT AMOUNT
. . .
. ,
1 SPCC PLAN .
1 LS $172.00 $172.00 100% 100% $172.00
2 MOBILIZATION ' ' 1 LS $8,400.00 - $8,400:00 100% 100% $8,400.00
3 PROJECT TEMPORARY TRAFFIC. CONTROL 1 LS $15,000.00 $15,000.00 100% . 100% $15,000.00
4 CLEARING AND GRUBBING 1 LS $2,500.00 $2,500,00 ' 100% 100% $2,500.00
5 ROADWAY EXCAVATION, INCL RAUL 1140 CY $15.00 $17,100-.00, 1286 - ' 113% - $19,290.00
_
6 CONTROLLED DENSITY FILL 12 CY - $150.00 $1,800.00 16 133% $2,400.00
7 CONSTRUCTION GEOTEXTILE FOR UNDERGROUND DE 105 SY $8.00, $840.00 105 100% $840.00
. 8 CRUSHED SURFACING BASE COURSE • 799 TON $25.0.0 $19,975.00 798 100% $19,950.00
9 ASPHALT TREATED BASE 772 TON $59.00, . 559 72% $32,981.00
10 HOT MIX ASPHALT, CLASS 1/2, PG 64-28 ' 398 TON $83.00- $33,034.00 , 480 , 121% $39,640.00
11 STORM WATER TREATMENT SYSTEM 1 EA $9,100.00 $9,100,00 .-, 1 100% $9,100.00
12 3/4" - 2" CRUSHED WASHED STONE . . 17 . CY. . $60.00 $1 :. - 17 100% $1,020.00
13 CORRUGATED POLYETHYLENE STORM SEWER PIPE E 50 • LF $38.00 $1,900.00 65 130% $2,470.00
14 CORRUGATED POLYETHYLENE STORM SEWER PIPE 1 10 LF $20.00 $200.00 10 ' 100% $200.00
-
15 CORRUGATED POLYETHYLENE PERF. STORM SEWER 65 LF $22.00 $1,430.00 63 : 97% $1,386.00
16 ADJUST MANHOLE . 3 EA $400.00 ' $1,200.00 ' 7 233% $2,800.00
17 ADJUST VALVE BOX, 3 EA $35000 . $1,050.00 ' 6 • 200% $2,100.00
18 CATCH BASIN TYPE 1 . 1 EA .- $400,.00 $400.00 - 100% ' $400.00
19 RECTANGULAR FRAME & HERRINGBONE GRATE _ 1 EA $250.00 $250.00 1 100% $250.00
20 CRUSHED SURFACING TOP COURSE (FOR TRENCH E 2 TON :' $25.00 $50.00 ' 0 0% • $0.00
21 CEMENT CONCRETE BARRIER CURB AND GUTTER 120 LF $18.00 . $2,160.00 . 136 • 113% $2,448.00
' 22 MONUMENT CASE AND COVER 1 EA .$350.00 . $350.00 1 100% , $350.00
23 CEMENT CONCRETE SIDEWALK RAMP TYPE 1 ' 2 EA $1,200.00 $2,400.00 2 ' 100% $,2,400.00
24 REMOVE AND RELOCATE UTILITY POLE ' 1 EA $4,000.00 ' $4,000.00 - 1 100% $4,000.00
25 REPAIR OR REPLACEMENT . 1 FA $10,000.00 $10,000.00 . 3778.96 38% . $3,778.96
. .
. .
. . . .
, .
. . .
• :
. .
. . .
. .
- .
, .
. . .
. .
TOTAL $179,879.00 97% $174,075.96
, . . . . .
. .
. . .
• .
, • , , ,
. . .
. . .
. , . .
. ,•
, .
. . . .
, . .
. . .
. . , .
. .
. . , . • . •
. .
. . .