HomeMy WebLinkAbout09/19/2023 06.D. Project Completion and Contract Acceptance for the Capitol Theatre HVAC with Bruce Mechanical EPO 2216E Project 2686 1 . BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 6.D. For Meeting of: September 19, 2023 ITEM TITLE: Project Completion and Contract Acceptance for the Capitol Theatre HVAC with Bruce Mechanical EPO 2216E Project 2686 SUBMITTED BY: Charlie Robin, Capitol Theatre CEO *Brian Palandri, Technical Director(509)853-8324 SUMMARY EXPLANATION: Bruce Mechanical completed the Capitol Theatre HVAC Control System Project 2686 EPO 2216E. Final inspection for this project was made and the recommendation is that the project be accepted. A final retainage payment of $4331.50 is due from the City to Bruce Mechanical for the completion of this project. Project Manager: Brian Palandri Contractor: Bruce Mechanical Contract Awarded on: 02/13/23 Contract Cost: $93,820.28 Final Retainage Payment Due: $4,331.50 The total contract cost is for construction only and does not include engineering and other costs. City Council action is required to accept the project and approve the final construction costs. ITEM BUDGETED: Yes STRATEGIC PRIORITY: Public Safety APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Accept project. ATTACHMENTS: Description Upload Date Type ❑ 8/14/2023 2 CAPITOL April 20th, 2023 Bruce Mechanical 5115 W Brinkley Rd Suite C Kennewick, WA 99338 BOARD OF DIRECTORS Michael Moen ATTN: Seth Draper Chair JoAnne Hanses Past-Chair Re: Capitol Theatre HVAC Control Project Kelly Murray City Project no. CT2686, EPO 2216E Secretary Bill Dezellem Treasurer NOTICE OF COMPLETION Reesha Cosby Erika Dore Dana Eliason Dear Seth, Aaron Erickson Elizabeth Hargrave David Mack This letter is your Notice of Completion for the above referenced project(s). Gabriel Munoz The notice of Completion date is April 20th, 2023. Ozzie Park Jocelyn Pedrosa Julie Rottman As of this date, all work is considered complete and the final invoices for the Eric Silvers above referenced project(s) can be sent. Hilary Tanneberg Susie Temple LauraTerrazas If you have any questions regarding the above referenced project(s), please Janice Deccio contact me at (509) 853-8324. City Council Rep Sincerely, Brian Palandri CTC Technical Director 9 19 S 3rd St,Yakima,WA 98901 kos (509)853-8000 V PO Box 102 Yakima,WA 98907 u www.capitoltheatre.org