BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 6.G.
For Meeting of: September 5, 2023
ITEM TITLE: Resolution authorizing an agreement with Ascent Foundations &
More, LLC. for Project SW2646 DID #24 Improvements
SUBMITTED BY: Scott Schafer, Director of Public Works
* Mike Price, Wastewater/Stormwater Manager(509)249-6815
SUMMARY EXPLANATION:
City of Yakima (City) Project SW2646 installs stormwater infiltration structures in the vicinity of W.
Washington Avenue between S. 10th and Cornell Avenues as shown on the attached Project
Location Map. Stormwater in the Project area is currently conveyed by a former Drainage
Improvement District (DID)#24 pipe, constructed in 1915, that is failing to provide adequate
stormwater conveyance. The Project will allow the City to abandon the failing section of DID #24
pipe by installing a subsurface stormwater infiltration system which includes 19 catch basins, 160
feet of storm drain pipe, and 360 feet of infiltration trench.
The City previously entered into an Agreement with HLA Engineering and Land Surveying, Inc.
under City Contract No. 2020-124 to provide engineering design, bidding, and construction
services for the DID #24 Improvements. The City utilized the procedure established by the
State of Washington for competitively bidding projects. Six contractors submitted bids, with
Ascent Foundations & More, LLC. submitting the lowest bid.
The contract with Ascent Foundations & More, LLC. is for an amount not to exceed $348,313
and is attached for City Council review. The project is funded by the Stormwater Capital Fund
442.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY: Public Safety
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
RECOMMENDATION:
Adopt Resolution.
2
ATTACHMENTS:
Description Upload Date Type
❑ Resolution 8/11/2023 Resolution
❑ Contract 8/14/2023 Contract
❑ Project Location Map 8/11/2023 Backup Material
3
RESOLUTION NO. R-2023-
A RESOLUTION authorizing an agreement with Ascent Foundations & More, LLC. for Project
SW2646 DID #24 Improvements
WHEREAS, the City of Yakima owns, operates, and maintains the Stormwater Collection
System in accordance with applicable Federal, State and Local regulations; and
WHEREAS, a portion of the stormwater conveyance infrastructure comprising a section
of DID #24 pipe along Cornell Avenue needs improvements; and
WHEREAS, under City Contract No. 2020-124, the City entered into an agreement with
HLA Engineering and Land Surveying, Inc. to prepare the plans and contract documents for
stormwater infiltration improvements between S. 10th Avenue and Cornell Avenue that will allow
the City to abandon a portion of DID#24 pipe and construct a more effective method of stormwater
conveyance; and
WHEREAS, the City of Yakima Stormwater Division requires construction services for the
stormwater system improvements; and
WHEREAS, the City of Yakima used the procedure established by the State of
Washington for competitively bidding projects; and
WHEREAS, Ascent Foundations & More, LLC. submitted the low bid and has the ability
to perform the contract specified work; and
WHEREAS, the City Council finds that it is in the best interest of the City of Yakima and
its residents to enter into a contract with Ascent Foundations & More, LLC. to perform the work
detailed in the contract documents for the installation of stormwater catch basins, conveyance
pipe, and infiltration trenches in the vicinity of W. Washington Avenue between S. 10th and Cornell
Avenues; now, therefore
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute the attached contract with Ascent
Foundations&More, LLC., in the amount of Three Hundred Forty-Eight Thousand Three Hundred
and Thirteen Dollars ($348,313) for the installation of stormwater catch basins, drain pipe, and
infiltration trenches in the vicinity of W. Washington Avenue between S. 10th and Cornell Avenues.
ADOPTED BY THE CITY COUNCIL this 5th day of September, 2023.
ATTEST: Janice Deccio, Mayor
Rosalinda Ibarra, City Clerk
4
CONTRACT
THIS AGREEMENT, made and entered in triplicate, this 5th day of September , 2023 , by and
between the City of Yakima , hereinafter called the Owner, and
Ascent Foundations and More LLC a Washington Corporation, hereinafter called the
Contractor.
WITNESSETH:
That in consideration of the terms and conditions contained herein and attached and made a part of this
agreement, the parties hereto covenant and agree as follows:
I. The Contractor shall do all work and furnish all tools, materials, labor and equipment for THE
BID AMOUNT OF: $ 348,312.71 , for DID #24 Stormwater Improvements, City of Yakima
Project No. SW2646, all in accordance with, and as described in the attached plans and specifications
and the 2023 Standard Specifications for Road, Bridge, and Municipal Construction which are by this
reference incorporated herein and made a part hereof, and shall perform any alterations in or additions to
the work provided under this contract and every part thereof.
Contract time shall begin on the first working day following the Notice to Proceed Date and shall be
completed in thirty-five (35) working days. If work has not commenced within the ten (10) days after the
notice to proceed, the first chargeable working day shall be the eleventh (11th) working day after the date
on which the City issues the Notice to Proceed.
If said work is not completed within the time specified, the Contractor agrees to pay to the Owner the sum
specified in the Standard Specifications for each day said work remains uncompleted after expiration of
the specified time, as liquidated damages.
The Contractors shall provide and bear the expense of all equipment; work and labor of any sort
whatsoever that may be required for the transfer of materials and for constructing and completing the
work provided for in this contract and every part thereof, except such as are mentioned in the
specifications to be furnished by the City of Yakima .
II. The City of Yakima hereby promises and agrees with the Contractor to employ, and does
employ the Contractor to provide the materials and to do and cause to be done the above described work
and to complete and finish the same according to the attached plans and specifications and the terms
and conditions herein contained and hereby contracts to pay for the same according to the attached
specifications and the schedule of unit or itemized prices hereto attached, at the time and in the manner
and upon the conditions provided for in this contract.
III. INDEMNIFICATION. Contractor agrees to release, indemnify, defend, and hold harmless the
City, its elected and appointed officials, officers, employees, agents, representatives, insurers, attorneys,
and volunteers from all liabilities, losses, damages, and expenses related to all claims, suits, arbitration
actions, investigations, and regulatory or other governmental proceedings arising from or in connection
with this Contract or the acts, failures to act, errors or omissions of the Contractor, or any of Contractor's
agents or subcontractors, in performance of this Contract, except for claims caused by the City's sole
negligence. The City's right to indemnification includes attorney's fees and costs associated with
establishing the right to indemnification hereunder in favor of the City.
IV. The Contractor for himself, and for his heirs, executors, administrators, successors, and
assigns, does hereby agree to the full performance of all the covenants herein contained upon the part of
the Contractor.
V. It is further provided that no liability shall attach to the City of Yakima by reason of entering
into this contract, except as expressly provided herein.
G:\PROJECTS\2022\22111E\Spec\22111 Spec.docx 4-2
5
IN WITNESS, WHEREOF the parties hereto have caused this agreement to be executed the day and
year first herein above written.
Countersigned: CITY OF YAKIMA CONTRACTOR
this day of 20 Ascent Foundations and More, LLC,a
Corporation
Contractor
By:
City Manager
Attest:
(Print Name)
City Clerk
Its:
(President, Owner,etc.)
Address:
G:\PROJECTS\2022\22111E\Spec\22111 Spec.docx 4-3
6
Project Location Map
SW2646 DID #24 Improvements
w
__L__ L1J Q
ti ®_> i- . -J >
. %C/) 1.1 P. 0 .
ri
,Th
o�
, ..
W KINNGG ST
L - C
IM
_ li 00 00 _ T
- -I®' 1
I C ) W PIERCE '_ -
it
1—
I - SPOKANE ST
F I J
_ 1 r i J --
1 FREMONT ST
1 j I 1 I J
11 i mot' I � I 11 1 I I- --[ ,,��0 SHINGTC