Loading...
HomeMy WebLinkAbout06/06/2023 06.B. Project Completion and Contract Acceptance for Insituform Technologies LLC for the W. Yakima Irrigation Main CIPP Rehabilitation Project IC2657 BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 6.B. For Meeting of: June 6, 2023 ITEM TITLE: Project Completion and Contract Acceptance for I nsituform Technologies LLC for the W. Yakima Irrigation Main CI PP Rehabilitation Project I C2657 SUBMITTED BY: Scott Schafer, Director of Public Works * Mike Shane, Water/Irrigation Manager(509) 576-6480 SUMMARY EXPLANATION: I nsituform Technologies LLC completed the W Yakima Irrigation Main CI PP Rehabilitation Project I C2657. Final inspection for this project was made and the recommendation is that the project be accepted. A final payment of$0 is due from the City to (nsituform Technologies LLC for the completion of this project. Project Manager: Mike Shane Contractor: I nsituform Technologies LLC Contract Awarded on: 1/17/23 Contract Cost: $100,102.77 Total Due: $0 The total contract cost is for construction only and does not include engineering and other costs. City Council action is required to accept the project and approve the final construction costs. ITEM BUDGETED: Yes STRATEGIC PRIORITY: Neighborhood and Community Building APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Accept Project ATTACHMENTS: Description Upload Date Type D Completion Letter Backup Material z ♦ H LA ErOmer*and Land Surveymg,Inc March 10, 2023 Insituform Technologies, LLC 580 Goddard Avenue Chesterfield, MO 63005 Attn: Mike Morris, Project Manager Re: City of Yakima W. Yakima Irrigation Main CIPP Rehabilitation City of Yakima Project No.: IC2657 HLA Project No.: 22172C Substantial Completion Dear Mr. Morris: The work on this project was substantially completed on March 9, 2023. The City of Yakima has full use of the project from operational and safety standpoints. However, not all contract work is complete. Please expedite completion of all remaining items and contract documentation including, but not limited to, approved Affidavits, as-built drawings, and punch list completion, to allow us to close the project as soon as possible. Please call me at (509) 966-7000, should you have any questions. Very truly yours, Digitally signed by Benjamin A.Annen Date: 2023.03.13 07:28:38-07'00' Benjamin A. Annen, PE BAA/JLD Enclosure Copy: Mike Shane —City of Yakima Water and Irrigation Division Jack Best, Dennis Perala, Eric Stein, Tim Fries — HLA Engineering and Land Surveying G:WROJECTS12022122172C114.PROJECT CLOSEOUT12023-03-10-22172C-Substantial Completion.docm 2803 River Road ❖ Yakima,WA 98902 ❖ (509)966-7000 :• www.hlacivil.com