BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 8.
For Meeting of:April 18, 2023
ITEM TITLE: Public hearing to consider: A) Resolution adopting the amended
Six-Year Transportation Improvement Program for the period of
2023 through 2028, and to amend the Transportation Systems Plan
2040; and B) Resolution amending the Yakima Urban Area
Comprehensive Plan Capital Facilities Element
SUBMITTED BY: Scott Schafer, Public Works Director
*Bill Preston, City Engineer(509) 575-6754
SUMMARY EXPLANATION:
A) Each year the City of Yakima (City) is required by state statute to update its Six-year
Transportation Improvement Program (TIP)for submittal to the Washington State Department of
Transportation. This plan must include all transportation projects for which state gas tax revenue
or federal revenue will be used.
The City is amending the Six-year TIP to include the following funded additional project:
• 2024 Northside Alley Paving
Project information for this project being considered is attached in the DRAFT Six-Year
Transportation Improvement Program.
City Council and the public are welcome to add other arterial system projects to the TIP. The
amended Six-Year TIP project listing will be finalized at this hearing and sent to the Yakima Valley
Conference of Governments (YVCOG) after approval.
In order to utilize federal funds, such as those administered by the Federal Highway
Administration (FHWA) and the Federal Transit Authority(FTA), projects must be included in the
Statewide Transportation Improvement Program (STIP). The STIP is a prioritized program of
transportation projects, compiled from local and regional plans, along with the Washington
Transportation System Plan (WTP), which provides a backbone for developing projects for the
inter-modal transportation network in the State of Washington.
The STI P contains federally funded projects plus state and local projects that are regionally
significant. These projects have been identified through the planning process as the highest
2
priority for the available funding to the state's Transportation Program. Planning activities of state
and local governments are essential parts of integrated regional planning processes. Long range
transportation planning is a part of the comprehensive land use planning carried out by local
governments. Public participation is an integral part of the planning process at all levels. Local
agencies are required to develop and adopt a Six-year Transportation Program; holding at least
one public hearing during its development.
B) The City is required to amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element by incorporating the adopted Six-Year TI P for 2023 to 2028. This will ensure that we
are in compliance with the Growth Management Act and that we are consistent with the
Comprehensive Plan as required. The amendment is limited to incorporating only those projects
that are adopted in the Six-Year T I P and is not subject to the "once a year" change required under
the laws of the Growth Management Act.
The Public Hearing notice has been provided to all Yakima-area media, including to Decides',
KDNA Radio, El Sol de Yakima, Hispanavision, Bustos Media, and El Mundo.
ITEM BUDGETED: NA
STRATEGIC PRIORITY: Public Trust and Accountability
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
RECOMMENDATION:
Adopt Resolutions
ATTACHMENTS:
Description Upload Date Type
D Adopt llP amendment a 3/27/2023 Resolution
❑ Adopt TIP amendment b 3/27/2023 Resolution
❑ liP Amendment 3r27/2023 Backup Material
3
RESOLUTION NO. R-2023-
A RESOLUTION amending the adopted Six-Year Transportation Improvement Program
(TIP) for the period of 2023 through 2028 and amending the
Transportation Systems Plan 2040.
WHEREAS, on December 6, 2022 the City of Yakima (City) adopted R-2022-166 as
required by state statute to update its Six-year Transportation Improvement Program (TIP) and
the Transportation Systems Plan 2040; and
WHEREAS, the City of Yakima desires to amend the adopted Six-Year Transportation
Improvement Program and the Transportation Systems Plan 2040 with the following additional
project
• 2024 Northside Alley Paving
WHEREAS, after a public hearing on the matter, held at the regular meeting of the
Yakima City Council on April 18, 2023, with proper public notice as required by RCW 35.77.010,
the City Council amends the Six-Year Transportation Improvement Program for the period of
2023 through 2028 and the Transportation Systems Plan 2040; and,
WHEREAS, amending the Six-year Transportation Improvement Program and amending
the Transportation Systems Plan 2040 are in the best interest of the City and its residents; now,
therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The amended Six-Year Construction Program for the period of 2023 through 2028, and
Transportation Systems Plan 2040, a copy of which is attached hereto and by this reference
made a part thereof, is hereby adopted and approved.
ADOPTED BY THE CITY COUNCIL this 18'h day of April, 2023.
ATTEST: Janice Deccio, Mayor
Sonya Clear Tee, City Clerk
4
RESOLUTION NO. R-2023-
A RESOLUTION to amend the Yakima Urban Area Comprehensive Plan Capital
Facilities Element to incorporate the amended Six-year Transportation
Improvement Program (TIP) for the period of 2023 through 2028.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a six-year
Transportation Improvement Program for transportation improvements to arterial streets in the
City of Yakima for the ensuing six-year period, all as contemplated and required by the State
RCW 35.77.010 and applicable Federal law; and
WHEREAS, the City of Yakima desires to amend the Yakima Urban Area
Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six-year TIP, as
contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and,
WHEREAS, this amendment is limited to incorporation of the projects listed in the Six-
Year Transportation Improvement Plan for the period of 2023 to 2028 to the Capital Facilities
Element of the Yakima Urban Area Comprehensive Plan, which is required under RCW
36.70A.130(2B) and RCW 35.77.010; and,
WHEREAS, a public hearing was held by the Yakima City Council on the Six-year TIP
on April 18, 2023 with the proper public notice as required by RCW 35.77.010; and
WHEREAS, the City Council of the City of Yakima, after reviewing the information and
holding the public hearing, finds that amending the Yakima Area Comprehensive Plan Capital
Facilities Element is in the best interest of the City and its residents; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted Six-year Transportation Improvement Program for the period of 2023
through 2028 for the City of Yakima shall be incorporated as an amendment to the Capital
Facilities Element of the Yakima Urban Area Comprehensive Plan.
ADOPTED BY THE CITY COUNCIL this 18'h day of April, 2023.
ATTEST: Janice Deccio, Mayor
Sonya Clear Tee, City Clerk
alk
-/a WashiDeparngto
to Tre ansportation Six Year Transportation Improvement Program
From 2023 to 2028
Agency: Yakima
Courty: Yakima
MPO/RTPO: YVCDG Y hside N Outside
m
3 c
0 0 c J
' A. PIN/Project No. B.STIP ID 3 0 3 a
ii 'C C. Project Tille x m S. m ,k d a z
a D. Road Name cc Number m s- i 3 y u y c.
—0 o- E.Begin &End Termiri M $
H w M F. Project Descripticn G.Structure ID n a 7 & ri n
00 WA15080 04.04/23 04/18/23 R-2023.N1N 05 co P T 0.850 CE No
2024 Nonhside Aley Paling
Various Aleys
N nth Po.enue to Wilco Street
The city of Yakima will paw approximately4500 LF of noMhouth alleys between N
nth Avenue and N 3rd Avenue,tom W D'Streetto IMllow Street.
Fundng
Status Phase Phase Start Year(YYYY) Federal Fund Code Federal Funds State Find Code State Finds Local Funds Total Funds
S PE 2023 CMAQ 50.000 0 0 50.000
S CN 2024 CMAQ 450.000 0 0 450.000
Totals 500.000 0 0 500.000
Expenditure Schedule
Phase 1st 2nd 3rd 4th 5th &Sth
PE 50 A00 0 0 0 0
CN 0 450 A00 0 0 0
Totals 50A00 450A00 0 0 0
Federal Funds State Finds Local Funds Total Funds
Grand Totals fcr Yakima 500.000 0 0 500.000
Report Date: March 15, 2023 Page 1