Loading...
HomeMy WebLinkAbout04/18/2023 06.E. Project Completion and Contract Acceptance for Hancock Sandblast & Paint LLC for the Naches River Water Treatment Plant Effluent Flume Concrete Repair Project AC2601 BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 6.E. For Meeting of:April 18, 2023 ITEM TITLE: Project Completion and Contract Acceptance for Hancock Sandblast& Paint LLC for the Naches River Water Treatment Plant Effluent Flume Concrete Repair Project AC2601 SUBMITTED BY: Scott Schafer, Director of Public Works * Mike Shane, Interim Water/Irrigation Manager(509) 576-6480 SUMMARY EXPLANATION: Hancock Sandblast& Paint LLC completed the Naches River Water Treatment Plant Effluent Flume Concrete Repair Project AC2601 . Final inspection for this project was made and the recommendation is that the project be accepted. A final payment of$0 is due from the City to Hancock Sandblast & Paint LLC for the completion of this project. Project Manager: Mike Shane Contractor: Hancock Sandblast& Paint LLC Contract Awarded on: 10/06/22 Contract Cost: $81,972.00 Total Due: $0 The total contract cost is for construction only and does not include engineering and other costs. City Council action is required to accept the project and approve the final construction costs. ITEM BUDGETED: Yes STRATEGIC PRIORITY: Neighborhood and Community Building APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Accept Project ATTACHMENTS: Description Upload Date Type D Completion Letter 3/20/2023 Backup Material 2 0'...Y' Water/Irrigation Division ;,� °••' 1'`�. "\ Working Together Toward Excellence in Service and Quality '/' 2301 Fruitvale Blvd. °;V' I'>' Yakima, WA 98902 µgm March 20, 2023 Martin Salinas Hancock Sandblast & Paint, LLC PO Box 3399 Pasco, WA 99302 Re: Naches River Water Treatment Plant Effluent Flume Concrete Repair City Project No. AC2601 Physical Completion Martin, Please be advised that work on the above referenced project was considered physically complete on February 3, 2023. Thank you for the service your company provided for the City of Yakima. We look forward to working with you again. Should you have any questions, please call me at (509) 576-6480. Sincerely, ..._. - "7- 2-'-(1 Mike Shane Mike Shane, Interim Water/Irrigation Manager (509) 576-6480, Fax(509) 575-6187 mike.shane@yakimawa.gov