HomeMy WebLinkAbout03/24/2009 18 Six-Year TIP Amendment - Public Hearing [Transportation Improvement Program] BUSINESS OF THE CITY COUNCIL 0 YAKIMA, WASHINGTON AGENDA STATEMENT G Item No. `�I For Meeting of: March 24, 2009 ITEM TITLE: Set time and date for 7:00 pm on April 7, 2009 to hold a Public Hearing to Amend the six -year Transportation Improvement Program (TIP). SUBMITTED BY: William R. Cook, Director of Community and Economic Development CONTACT PERSON/TELEPHONE: Doug Mayo, City Engineer 576 -6678 Brett Sheffield, Chief Engineer 576 -6797 SUMMARY EXPLANATION: This action would set April 7, 2009 as the date for a public hearing to amend the six -year TIP. This TIP amendment is required to make selected projects eligible for funds from the American Recovery and Reinvestment Act (ARRA). 0 The selected projects include: 1) Nob Hill Boulevard Improvements (TIP priority number 13); 2) purchasing five new transit buses (TIP priority number 5); and 3) purchasing three new paratransit vehicles (TIP priority number 6). The Nob Hill Boulevard Improvement project consists of constructing curb, gutter, sidewalk, street lights, a storm drainage system and intersection improvements from 64th Avenue and 72 Avenue. Three other projects are being modified to be eligible for ARRA funds if they become available. They include: the Yakima Railroad Grade Separations; Yakima Downtown Future Initiatives, Phase 4; and, Summitview Avenue Grind and Overlay. Since we have secured enough funding to construct one underpass of the Yakima Railroad Grade Separation Project we are splitting the project shown into separate projects or phases. Current Phase 2 will become - Lincoln Avenue Underpass and new Phase 3 will be Martin Luther King, Jr. Boulevard Underpass. (continued on Page 2) Resolution Ordinances Other (Specify) Set Public Hearing Date Contract Mail to (name and address) : Phone: Funding Source: APPROVED FOR SUBMITTAL: - _ City Manager STAFF RECOMMENDATION: Set April 7, 2009 as the date of Public Hearing to amend the 0 six -year TIP. BOARD /COMMISSION RECOMMENDATION: COUNCIL ACTION: Page 2 See STIP priority numbers 1 and 2. As the Lincoln and MLK Underpasses were planned to b constructed one at a time, it is perfectly feasible to break them into two separated phases. Phase 1 of the Yakima Railroad Grade Separations project, which relocated underground utilities, was completed in the summer of 2007. Lincoln Avenue Underpass construction is scheduled to begin in 2009. Lincoln Avenue is being constructed first because when a train blocks Lincoln Avenue during the need for an emergency response to the west side of the tracks the Fire Department response time will be at least two minutes shorter than having to travel to use the Walnut Street Underpass. We have requested $8,000,000 of ARRA funds to complete funding of the MLK Underpass. The Yakima Downtown Future Initiatives, Phase 4 project requests $1,000,000 of ARRA funds to provide new sidewalk and streetscape improvements to the north side of 'A' Street from 3rd Street to Naches Avenue and to the east side of Naches Avenue between Yakima Avenue and 'A' Street. See STIP priority number 69. The Summitview Avenue Grind and Overlay requests $2,000,000 of ARRA funds to replace the aging pavement from 14th Avenue to 56th Avenue. See STIP priority number 82. • I II 0 . . . � . • • . ■ • { Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From . 2009 • to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 . Adoption Date: 7 -15 -2008 . City No.: 1485 MPOIRTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.: • Project Identification Project Costs In Thousands of Dollars Federally Funded Y . Expenditure Schedule Projects Only • A. PIN /Federal Ald No. - B. Bridge No. m c m Fund Source Information o N � C . Project Title a = a o w — (Local Agency) •U m o E j a d ii Federal Fundin R/W v ti Z D. Street/Road Name or Number a i- r o .3 F. u Phase Federal Federal State 4th Required ` E. Beginning MP or Road - Ending MP or Road E I - o Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Type Date F. Describe Work to be Done a. (mm/ddyyyy) Code Phase Code Funds Funds Funds 6th Type • (MM/Y1� 1 2 3 4 5 6 7 8 9 10 11 12 13 . 14 15 16 17 18 19 20 21 PE 1/1/2009 STP(U) 500 OTHER 150 650 650 • 14 1 01 S 0.2 T RW 6/1/2009 STP(U) • 1000 OTHER 1000 1000 • EA • . Yakima Railroad Grade Separations - Phase 2 06 P CN 6/1/2009 STP(U) 8150 FMSIB 2500 1000 11650 6000 5650 Yes Lincoln Ave. 07 G CN 6/1/2009 OTHER 1000 1000 1000 from: N 1st St to: N 1st Ave 08 W CN 6/1/2009 AIP 3000 3000 3000 . • Construct Grade Separations and adjacent roadway reconstructon, • . 4/30/09 inctuding realignment of Front Street. S , Totals • 9,650 6650 1000 17300 7650 9650 PE 1/1/2009 STP(U) 175 25 200 200 • 14 2 01 P 0.2 T CN 6/1/2009 STP(U) 2400 FMSIB 2000 3975 • 8375 8375 EA Yakima Railroad Grade Separations- Phase 3 06 G CN 6/1/2009 ARRA - 8000 OTHER 1500 9500 ' 2000 7500 Yes Martin Luther King, Jr. Blvd • 07 from: N. 1st Sreet to: N. 1st Ave O OS 4/30/09 Construct Grade Separation and adjacent roadway reconstruction including Front Street • - — • ■ Totals • 10,575 3500 4000 18075 200 10375 7500 14 3 01 S 1.0 P CN 4/1/2000 I I 3810 38401 38401 1 Yes • 16TH AVENUE REALIGNMENT O E 16TH AVENUE REALIGNMENT T from: AHTANUM ROAD 1o: WASHINGTON AVENUE • W Realign 16th Avenue out of the runway safety area of the Yakima Air S 11/2007 • Terminal. Includes FAA funds. • Totals • 3840 3840 3840 00 4 03 p N/A G PE 1/1/2009 STP(E) 18 • 32 501 50 C CN 6/1/2009 STP(E) 1900 285 2185 2185 EA YVT Railway Rehabilitation 8 Museum No 3rd Ave S from: 3rd Ave to: Pine St T Car earn, Museum Restoration and Pathway W P . Totals 1,918 317 2235 2235 „___ , v. 5.7 - Supersedes previous editions III . . • . III I . , ,. . _ • . . . . . , , , . . .rte. irtI Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 • Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO/RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.: Project Identification • Project Costs In Thousands of Dollars Federally Funded t Expenditure Schedule Projects Only I A. PIN /Federal Ald No. B. Bridge No. m ^ .c d a, Fund Source Information 4 ° C. Po e ct Title m V rn d o m (Local Agency) — m o` E rj s .E u - Federal Funding R/W D v a Z D. Street/Road Name or Number • a I- r n 9 ; a Phase Federal Federal State 4111 Required E. Beginning MP or Road - Ending MP or Road 1-- o Start Fund Cost by Fund Slate Local Tot 1st 2nd 3rd TI1ru Envir. Date E F. Describe Work to be Done a` (mm /dd/ Code Phase Code Funds Funds Funds 6th Type (MM/YY) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 5 21 S ALL 4/15/2009 ARRA - FTA 2000 1 1 1 1 2000 2000 I I CE Purchase of 5 (five) transit buses - 35 foot low floor versions • No • • from: lo: Acquire 5 (five) G ing 35' low floor Transit buses through the federal stimulus - - program to replace 5 (live) unreliable Thomas buses - - -- - - - - -- - - - - -- Totals 2,000 2000 2000 00 6 21 S ALL 1 4/15/2009 I ARRA FTA 1 150 1 30 1 1801 1801 CE Acquisition of 3 (three) new Paratransif vehicles for Dial - A - Ride I No from: to: Purchase 3 (three) new Paratranslt vehicles to replace 3 (three) older similar unreliable units — Totals 150 30 180 180 00 7 12 $ N/A CN 1 1/1/2009 1 5307 1 1655 1 1655 1 33101 33101 1 I CE Transit Operating Expenditures 22 I No Various Funding Areas 23 from: N/A to: N/A 24 Supplemental Funding for Transit Service Operating Expenses 31' Totals 1,655 1655 3310 3310 PE 1/1/2009 STP(E) 36 36 36 00 8 • 03 S N/A C RW 1/1/2009 STP(E) 205 205 205 CE YVT Trolley Barn/powerhouse Rehabilitation O G CN 1/1/2009 STP(E) 255 255 255 Yes S3rdAve . P from: to: S 06/01/07 Minor car barn and powerhouse restoration Including property purchase T • W Totals 496 496 496 Report Date: January 31, 2008 • Page 2 v. 5.7 - Supersedes previous editions • e • . • ., . . . . . . . • . . • . . • . . A Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: ,Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.: Project Identification • Project Costs in Thousands of Dollars Federally Funded m A. PIN /Federal Ald No. B. Bridge No. c 2 a , Fund Source Information • Expenditure Schedule Projects Only 4 N .o C. Project Title d= w D o m (Local Agency) _ E 1 m J U L Federa Funding R/W c v r D. Street/Road Name or Number ° r `` ° — "" — m D - z a hc w = ; , Phase Federal Federal State 4th Required . tL E. Beginning MP or Road - Ending MP or Roa E r ° St ar t F un d C os t b Fund State Local Total Envir. Date F. Describe Work to be Done g 0_ (mm/ddyyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (M � — 1 2 3 4 5 6 7 8 9 - 10 11 12 13 14 15 16 17 18 19 20 21 00 9 22 S N/A ALL 1/1/2009 1 WSDOT 1 50 50 50 S 1 treet Asset Amenities (Transit) 31 CE No Route Maintenance, Repair and Improvements from: 1o: • Maintenance of Shelters, Benches and Signage throughout our Transit Route System _ _ Totals 50 50 50 • 00 10 — — — — 32 S 1.0 0 CN 1 4/1/2009 1 STP(E) 525 1 1 5251 . 5251 1 William O. Douglas Trail 08 S • CE S 6th Ave Pathway & Bridge Decking 06 from: to: W Build pathway and install pathway decking on Naches River bridge with T . partner William O. Douglas Trail Fundation .-- ..- - -.. -- _ • __ Totals 525 525 525 00 11 32 S N/A G PE 1/1/2009 STP(E) 65 65 65 RW 1/1/2009 STP(E) 150 150 150 CE William O. Douglas Heritage Trails 13 P CN 1/1/2009 STP(E) 285 285 285 • Yes Bridge Restoration & Trailhead 10 from: to: s Trailhead restoration, right of way acquisition partner with the William 0. T • 6/01/09 Douglas Foundation, including restoration of bridge , cleaning, rust removal W _ and painting Totals 500 500 500 ' ALL 1 1/1/2009 1 WSDOTI 51 9 601 601 -- -- — 00 12 22 S N/A Transit Service to Terrace Heights No New University & Retail Links from: to: . Provide Transit service to this growing area of Yakima County to include the new University 8 Retail Shops. • _— —__ __ ____ _____.__._ -_ __ Totals 51 9 60 60 • • . . _ v. 5.7 - Supersedes previous editions o 0 • ' i i2ii Washington State Department of Transportation Six Year Transportation Improvement Program I . • From 2009 to 2014 aggenen cy: Yakima :o. No.: 39 Co. Name: Yakima C Hearing Date: 7 -1 -2008 � Adoption Date: _ 7 -15 -2008 :ity No.: 1485 MPOIRTPO: YVCOG • Amend Date: 3 -24 -2009 Resolution No.: Project Identification Project Costs in Thousands of Dollars • Federally Funded ■ Fund Source Information - Expenditure Schedule Projects Only A. PIN/Federal Aid No. B. Bridge No. m �r v N (Local Agency) - c N � m -6 a ,c , c o F Fundin R/W o v o C. Project Title m — -- R e uired a .g 5 j a a Z D. Street/Road Name or Number E ~ w ° Phase � Start F Fund l Cost by Fund State Local Total 1st 2nd 3rd 6th Type (MM/YY) F. Describe Work to be Done Federal Stae 4th E. Beginning MP or Road - Ending MP or Road Thru S Funds Funds Funds o (mm/ddlyyyy) Code Phase Code ___ • 1 2 3 4 5 6 7 8 9 10 11 12 •13 14 15 16 17 18 19 20 21 • • PE 2/6/2009 150 150 150 CE 14 13 06 S 0.55 P CN 6/1/2009 ARRA- 950 950 950 No Nob Hill Blvd. Improvements T from: 64th Ave lo: 72nd Ave • Construct curb, gutter, sidewalk, street lights, storm drain and intersection �_ improvements Totals 950 150. 1100 1100 PE 1/1/2009 . TPP 200 300 500 500 EA 14 14 04 P .77 ' RW 1/1/2009 200 200 200 Yes G Nob Hill Blvd CN 1/1/2009 STP(U) 1000 TPP 1300 2000 4300 4300 Nob Hill Blvd 0 12/01/09 from: 49th Ave 1o: 641h Ave g Widen. curb, gutter, sidewalk, lighting, drainage T W Totals 1,000 1500 2500 5000 5000 — - PE 1/1/2009 STIP (S) 60 60 120 120 CE 00 15 01 P N/A CN 4/1/2009 STP(S) 180 AIP 240 360 360 No Annual Signal Upgrades CN 4/1/2009 STIP (S) 360 Local Selection from: N/A to: N/A Upgrade signals Totals 600 240 60 900 120 _780 _ ___ — — — • CN 1 6/1/2009 ( STP(U) 2281 1 1 32I 2601 2601 I EA 00 16 07 P N/A . W No Various Overlay Projects/Selected on Local Priority S N/A from: N/A 1o: N/A ' Totals 228 32 260 260 __. v . 5.7 - Supersedes previous e ditions Report Date: January 31, 2008 Page 4 ® • • • Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 . Co. No.: 3g Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.: • Project Identification Project Costs in Thousands of Dollars Federally Funded ._ A. PIN /Federal Aid No. B. Bridge No. c L Expenditure Schedule „_ c v d Fund Source Information P Projects Only ro ' o E C Project Title E " r ' c O m (Local Agency) — - -_ r, _ ; a ' o t Federal Funding R/W • c <5 l ‘ Z D. Street/Road Name or Number ° >. n. a l- co o a u Phase Federal Federal State 4th Required LL E. Beginning MP or Road - Ending MP or Road E I- ° S t a rt Fund Cost by Fund State Local Total Envir. Date F. Describe Work to be Done a (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th T ype (Mw 1 2 3 4 5 6 7 8 .9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2009 100 100 100 00 17 32 P N/A CN 1/1/2009 900 900 soo E A Storm Drains/Vegetation No Local Selection from: City Wide to: . • City Wide . Totals 1000 1000 1000 17 18 — 03 P 76 W PE 1/1/2010 STP(C) 109 27 1361 136 ' , Reconstruction Rudkin Rd 06 T CN 1/1/2011 STP(C) 945 TPP 945 106 1996 1996 CE Rudkin Rd P _ No from: E Viola Ave to: Rainier Place s Reconstruct, excavate ballast, top course, curb. gutter, sidewalk • Partner with City of Union Gap. additional sewer force main ___ _ Totals 1,054 945 133 2132 136 1996 16 19 03 P .76 C PE 9/1/2010 STP(S) 122 IPP 23 7 152 152 CN 4/1/2010 STP 1730 TPP 206 70 20061 2006 • CE E Mead Ave Reconstruction 06 G E Mead Ave O No from: Rudkin Rd to: Fair Ave P Partner with City of Union Gap. reconstruct, excavate ballast, top course, S • curb. gutter, storm, acp T • ____ Totals 1,852 229 77 2158 152 2006 19 20 03 P N/A P PE 1/1/2010 STP(U) 100 14 114 114 -- -- CN 1/1/2011 STP(U) 700 95 795 795 CE Longfiber Rd 8 Washington Ave 05 S Intersection D6 W Yes T from: to: O New intersection construction and reconstruction, 3 -lane and 5 -lane w/turn, 7/1/2009 curb, gutter, sidewalks. Totals 800 109 909 114 795 • v ri 7 - A imarcartac nravinnc sari if its Inc. • ill Washington State Department of Transportation Six Year Transportation Improvement Program • Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG • Amend Date: 3 -24 -2009 Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN/Federal Aid No. B. Bridge No. •c d Fund Source Information Expenditure Schedule Projects Only o ° C. Project Title m " d ° m (Local Agency) -- .__ 0 m o f o v t Federal Funding R/W s 0 a Z D. Street/Road Name or Number aF H 9 - a Phase Federal Federal State 4th Required E. Beginning MP or Road - Ending MP or Road E i ,. Start Fund , Cost by Fund State Local Total Thru Envir. Date F. Describe Work to be Done L (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (Myy) 1 2 3 4 r 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 21 04 P .1 C CN 1 1/1/2009 1 STP(U) 1 240 I 1 42 1 282 1 282 CE E Nob Hill Blvd & S 18th St 01 S Yes E Nob Hill Blvd W from: S 18th St to: E Nob Hill Blvd T f or double LT from west bound Nob Hill; 01 /01/07 Widen south leg (Tie to WSDOT Project) possible curb, gutter and sidewalk _ _ _ _ _ Totals 240 42 282 282 PE 4/1/2009 CMAQ 24 3 27 27 • 16 22 01 P N/A S CN 7/1/2009 CMAQ 480 65 5451 545 CE Roadway City Wide Shoulder Improvements No City Wide from: to: City Wide shoulder Improvements, PM10 abatement. _ _ Totals 504 68 572 572 14 23 31 S N/A O PEI 1!12009 i STP(U) I 72 1 11 83I 831 1 E Nob Hill Blvd & Fair Ave 03 C C E Yes E Nob Hill Blvd 04 P from: E Nob Hill Blvd to: Fair Ave T Intersection widening 8 new signal, curb, gutter and sidewalk. street lighting, W 10/01/ ■ stormwaler . ___ Totals 72 11 83 83 -- 17 24 04 P 1.3 0 PE 1/1/2009 AIP 131 20 151 151 C RW 1/1/2010 AIP 382 59 441 441 EA S 80th Ave - Tieton Dr to Zier Rd C CN 6/1/2010 AIP 1667 260 1927 1927 Yes S 80th Ave T front: Tieton Dr to: Zier Rd W 01/01/09 Major widening, curb, gutter, sidewalk s Totals 2180 339 2519 151 2368 Report Date: January 31, 2008 Page 6 v. 5 . 7 - Supersedes previous editions • ID • 0 • • Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 Co. No.: 39 Co..Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded • c � A. PIN /Federal Atd No. B. Bridge No. a ^ v Fund Source Information Expenditure Schedule Projects Only o m . C. Project Title 4. if r d co Federal Funding (Local Agency) —_ —__ _. - -____ c U 13. Street/Road Name or Number o T .5 J L• o- g R/V11 7 n - Z ;II to o = 6 Phase Federal Federal State 4th Required E. Beginning_MP or Road - Ending MP or Road E o Start Fund Cost by Fund State Local Total Envir. Date F. Describe Work to be Done a (mm/dd/yyyY) Code Phase Code Funds Funds Funds 1st 2nd 3rd Thru Type (MM/1 y) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2009 STP(E) 22 7 29 P9 17 25 05 S .15 C CN 6/1/2009 STP(E) 75 20 95 95 CE Zier Rd - S 751h Ave to S 72nd Ave 06 • S Yes Zier Rd T • from: S 75th Ave to: S 72nd Ave P Minor widening, curb, gutter and sidewalk 03/01/09 • Totals 97 27 124 124 PE 1/1/2012 STP(C) 272 43 315 315 05 P 1.0 yy 17 26 RW 6/1/2012 STP(C) 349 55 404 Englewood Ave - N 40th Ave to N 56th Ave S 404 EA 06 CN 1/1/2013 STP(C) 2352 340 2692 2692 • Yes Englewood Ave T from: N 40th Ave to: N 56th Ave P . Widen roadway, curb, gutter, sidewalk O 04/01/11 • C - -___ Totals 2,973 438 3411 3411 17 27 05 P 2 O PE 1/1/2010 STP(U) 219 34 253 253 RW 1/1/2011 STP(U) 327 51 378 378 EA Englewood Ave - N 24th Ave to N 16th Ave 06 W CN 6/1/2012 STP(U) 2980 244 3224 Englewood Ave S 3224 Yes from: N 16th Ave to: N 24th Ave Widen, curb, gutter and sidewalk, water and sewer lines 01/01/10 i Totals 3,526 329 3855 253 378 3224 00 28 14 P 25 T PE 1/1/2011 STP(E) 252 34 286 — 286 — Pedestrian Bridge 32 P CN 3/1/2012 STP(E) 3150 412 3562 3562 CE Pedestrian Bridge O • - No from: N 101h St to: Yakima Greenway Construct pedestrian bridge from Gateway area to Yakima Greenway, power, handicap accessible, lights _ — _ - —_ _ - :..._.. — _ —__ _- — Totals 3,402 446 3848 286 3562 -- _ . ____ • u g 7 _ C nnnrcn rinc nrn•i.+rro ...4r44....n i • • 410 i • Washington State Department of Transportation • Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded Tx) m A.. PIN /Federal Aid No. B. Bridge No. c rn ID m Fund Source Information Expenditure Schedule Projects Only o n C P Title m `; d a m (Local Agency) u m . o E c- o • Federal Funding R/VN s U D. Street/Road Name or Number I? T a 3 i_' a Required 8.1-- Z r- in B — Phase Federal Federal State 4th Q u_ E. Beginning MP or Road - Ending MP or Road E 1— o 73 .. Start Fund Cost by Fund State Local Total Envir. Date Thru ° mn r/dd/ F un d s F un d s ' F un ds 1st 2nd 3rd Type (MM/Y F. Describe Work to be Done a ( YYYY) Code Phase Co 6th - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 _ 00 29 07 P N/A S PE 4/1/2009 252 252 • 100 70 82 CN 6/1/2009 CMAQ 195 38 233 233 CE No Gravel Road B.S.T. • Various Areas from: City Wide to: • _ Totals 195 290 485 100 70 315 16 30 12 p N/A T CN 1 10/1/2010 I STP(S) I '504 741 578 578 P 1 owerhouse Rd & Englewood Ave P CE Yes Powerhouse Rd 0 from: Powerhouse Rd lo: Englewood Ave S C 09/01/2009 Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal, W possible roundabout _- - --- — Totals 504 74 578 578 PE 1/1/2012 STP(S) 25 4 29 29 14 31 12 P N/A P RW 6/1/2012 STP(S) 25 4 29 29 CE S 48th Ave & Summitview Ave Signalization • T CN 8/1/2013 STP(S) 554 81 635 635 Yes 1 S 48th Ave from: S 48th Ave to: Summitview Ave 06/01/12 Signalization Totals 604 • 89 693 693 1 • 16 32 12 P N/A P PE 4/1/2009 13 CN CN 6/1/2009 214 214 214 13 CE S 3rd Ave & W Washington Ave Signal T No S3rdAve • from: S 3rd Ave to: W Washington Ave • Signal Upgrades Totals 227 227 227 • Report Date: January 31, 2008 Page 8 v 5 . 7 - Supersedes previous editions • • • . • . . . , . . . . . . . . . .atls. • Washington State Department of Transportation Six Year Transportation Improvement Program • . Agency: Yakima From 2009 to 2014. Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO/RTPO: YVCOG Amend Date: 3-24-2009 Resolution No.: Project Identification , Project Costs in Thousands of Dollars Federally Funded m _ ._ A. PIN /Federal Aid No. B. Bridge No. e .c m , Expenditure Schedule • Projects Only m o , a m F und Source Informa v ( g Yj 4 N ' ` _ - C. Project Title a c Local A enC U m ,o E n ' J o L • Federal Funding R/W v 2 Z D. Street /Road Name or Number n i- ce 3 r a Ph Federal Federal State Required E. Beginning MP or Road - Ending MP or Road E .o • Start Fund Cost by Fund State Local Total 4th Envir. Date F. Describe Work to be Done d (mink/4m) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6;n Type (MM/YY) • 1 2 3 4 5 6 7 8 . 9 10 11 12 13 14 15 16 17 18 19 20 . 21 14 33 12 S N/A p PE 1/1/2009 AIP 120 52 172 100 72 RW 6/1/2009 AIP 84 36 120 40 80 • CE S 16th Ave 8 W Washington Ave Signal 8 Intersection. 05 T CN 6/1/2009 AIP 880 383 1263 1263 Yes S 16th Ave 03 . from: S 16th Ave lo: W Washington Ave • Included in Union Gap's Valley Mall Blvd. project 3/1/2009 • L _._ . -- -- -- .___ -- - Totals • 1084 471 1555 1403 152 I 14 34 12 p 2 5 P PE 1/1/2010 STP(S) 55 8 63 63 W Nob Hill Blvd Sidewalks T RW 6/1/2010 STP(S) 107 • 19 126 126 CE W Nob Hill Blvd W CN 3/1/2011 STP(S) • 321 57. 378 378 Yes • from: S 16th Ave to: S. 6th St. S Install missing sidewalks on southside of Nob Hill. - 09/01 /08 • Totals • 483 84 567 189 • 378 00 35 06 • P 1.0 P PE 1/1/2011 STP(S) 57 7 64 64 • BeecbStPedesliianConnection - - T RW 6/1/2011 STP(S) 189 25 214 214 CE Beech St 32 CN - 1/1/2012 STP(S) 504 68 572 572 Yes from: Fair Ave to: Chalmers /Riverside Construct pedestrian pathway under SR82 to Greenway 09/01/10 • ' L Totals 750 100 850 64 .786 ' 16 36 2.0 P PE 1/1/2011 STP(S) 43 7 50 50 — RW 6/1/2011 STP(S) 86 15 101 W Lincoln Ave Sidewalks 12 T CN 1/1/2012 STP(S) 572 88 660 660 CE Yes W Lincoln Ave S • from: N 56th Ave to: N 29th Ave W Sidewalks, meters and tire hydrants replacement or relocation 09/01/11 - -- — — Totals 701 110 811 811 • Report Date: January 31. 2008 ,,, o o v. 5.7 - Supersedes previous editions ® 0 0 1. Washington State Department of Transportation .. Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. . Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.: • Project Identification Project Costs In Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Brld a No. c t v, Expenditure Schedule Pro Only Tn 9 c rn % Fund Source Information p 1 Y o y .0 ° C. Project Title E yr w c o' y (Local Agency) :� ro ,o E > . ' L c1 - Federal Funding R/W G li z D . Street/Road Name or Number 2 N 0... Phase Federal Federal State 41h Required u_ E. Beginning MP or Road - Ending MP or Road E r° - m Start Fund Cost by Fund State Local Total Envir. Dale 1st 2nd 3rd Thru Funds Funds Funds T ' F. Describe Work to be Done a. (mm /dd/yyyy) Code Phase Code 6th Type (MM/YV) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 37 01 P 5 W PE 1/1/2010 STP(E) 424 67 491 491 RW 1/1/2011 STP(E) 1047 163 1210 1210 CE W Lincoln Ave & 'B' St Realignment 12 S CN 1/1/2012 STP(E) 1801 281 2082 2082 Yes W Lincoln Ave from: W 5th Ave lo: Custer St P 0 09/01 /11 Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights G C Totals 3,272 511 3783 491 3292 PE 1/1/2009 PSMP 13 2 15 15 16 38 - -_ -� - - - - -- - - - -- _ 12 P N/A W CN 1/1/2009 PSMP 239 48 287 287 CE School Safety Projects Various Locations - Citywide from: to: • Crossing flashers, sidewalks, signing, other features • Totals 252 . 50 302 302 14 39 03 P 85 C PE 1/1/2010 S'IP(C) 546 • 84 630 • 630 RW 1/1/2011 STP(C) 1090 170 1260 1260 EA E Nob Hill Blvd. Reconstruction 04 GG CN 1/1/2012 STP(C) 6539 1013 7552 - 7552 Yes E Nob Hill Blvd. 06 P • from: S 6th Street to: S 18th Street s 1/1(2010 Major roadway widening and reconstruction to 5 lanes with intersection T - improvements, curb, gutter, sidewalks. replacement or relocation of meters an hydrants W Totals 8,175 1267 9442 9 17 40 01 P N/A W PE 1/1/2010 STP(C) ' 91 . 14 105 105 RW 1/1/2011 STP(C) 91 14 105 105 CE S72ndAvenue& WWashingtonAvenue 12 T CN 1/1/2012 STP(C) • 544 86 630 630 Yes S 72nd Ave 06 p from: S 72nd Ave - • lo: W Washington Ave 0 1/1/2011 4 Intersection improvement, possible roundabout Totals 726 114 840 840 I ,, d eport Date: January 31, 2008 Page 10 v. 5.7 - Supersedes previous editions • • 0 . • • r I V; Washington State Department of Transportation Six Year Transportation Improvement Program • Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. . City No.: 1485 MPO /RTPO: YVCOG Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008 i - Amend Date: 3 -24 -2009 Resolution No.: • Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN / Federal Aid No. B. Bridge No. e in m g o, v a, Fund Source Information Expenditure Schedule Projects Only 4 . C. Protect Title E st a o w ,o E d d a U 2 (Local Agency) .v , a r Federal Funding (..) r i z D. Street/Road Name or Number o n. Federal —_ RIW 1 51- tn _ Phase Federal Federal Sta 4th Required E. Beginning MP or Road - • Ending MP or Road E 1- 5 d Start Fund Cost by Fund State Local Total E nvir. F. Describe Work to be Done o (mm/d y F unds Funds Funds 1st 2nd 3rd Thru 6t yP M a d/YYYY) Code Phase Code h T e ( � 1 J - 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 — • 14 41 4579 PE 6/1/2009 STP 252 38 290 290 12 P N/A P I S 1st St. - E. Washington Ave. Intersection Improvement W I I EA S 1st St. S Yes from: S 1st St. to: E Washington Ave. T • 1 O 01!01/11 • I Realigninlerseclion, upgrade traffic signal 38 290 290 . ' Totals 252 16 .42 4562 ALL 4/4/2010 I STP(U) 1 3781 WSDOT ! 1 3781 I 7561 7561 1 — I Teton Dr - S 5th Ave. Intersection Project 12 P N/A W 1 • C • Tieton Drive T No • ' from: 5th Ave. Intersection 1o: O _ Replace traffic signal with roundabout - s - - -- Totals - 378 378 756 756 1743 4587 _ 03 P 1.00 •P ALL 4/1/2009 1 STP 1 2268 1 ' - 307 I 25751 I 525 1 20501 - - - -_- S 48th Ave. Reconstruction T EA S 48th Avenue W No from: Summitview Ave. to: Nob Hill Blvd. s Widen, curb, gutter, sidewalk, lighting, drainage - - - Totals • 2,268 307 2575 525 2050 14 44 03 P N/A 0 PE 1/1/2009 STP(U) 51 8 59 59 South 72nd Ave 8 Mead Ave Intersection 12 P CN 6/1/2009 STP(U) 383 61 444 I 444 CE South 72nd Ave S No from: South 72nd Ave to: Mead Ave T New intersection, signals, curb, gutter and sidewalk W - -.._.- ......- -- ... .- - -__.- --- - - - - -- — Totals 434 69 - 503 503 • o,,.....+ n...... ,__..__. ... ...... • te g 7 _ C.. rats roi.•l.... r.....••...•... ...J:a:...._ • • • • • • • "�'r Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima . From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008 - —.. City No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 " Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No. c w 6 F und Source Information Expenditure Schedule Projects Only Z ar m rn v y (Local Agency) — -- ____ - --- .o m o E C. Project Title m a ci r Federal Funding _ _ RAN c U D. Street/Road Name or Number 8 r ;; o- Required n Z E. Be innin MP or Ro ad - Endin MP or Road E ~ rn o 9 1 Start Ph I Cost b Fund State Local Total 1st 2nd 3rd Thu Envir. Date Beginning Ending o • Funds Funds Funds Type (MM/yy) F. Describe Work to be Done a (mm /dd/yyyy Code Phase 'Code 6th 1 2 3 4 5 6 7 8 • 9 10 11 12 13 14 15 16 17 18 19 20 21 PE 1/1/2009 STP(E) 10 2 12 12 00 45 14 P N! A CE 0 CN 7/1/2009 STP(E) . 109 17 126 126 William 0. Douglas Pathway 32 No P W from: Pine St to: Cowiche Canyon . Pathway Improvements, connections, and signage to Cowiche Canyon Trail. Totals 119 19 138 138 PE 1/1/2009 STP(E) 23 — -- 5 28 1 28 17 46 04 p .76 W CN 7/1/2009 STP(E) 1096 164 1260 1260 S 66th Avenue 03 Yes S 66th Ave S from: Scenic Drive to: Summitview P 0 1/1/2009 Widen roadway, curb, gutter, sidewalk and utilities - • Totals 1,119 169 1288 1288 PE 1/1/2010 STP(S) 164 25 189 189 CE 16 47 05 p .20 G RW 6/1/2010 STP(S) 382 60 442 442 66th Ave. 8 Summitview Intersection 12 P CN 7/1/2011 STP(S) 1090 170 1260 1260 Yes N. 66th Avenue & Summitview S from: N. 66th Ave. to: Summitview Ave. T 1/1/2010 Widen for left turn lanes. intersection improvements, curb, gutter, handicap w ramps and lighting 0 Totals 1,636 255 1691 189 442 1260 PE 1/1/2010 STP(U) 126 17 143 143 CE 14 48 • 12 p N/A W RW 1/1/2010 STP 63 8 71 71 40th Avenue and Summitview Signal Upgrade S CN 6/6/2010 STP(U) 544 86 630 630 Yes 40th Avenue T from: 40th Avenue to: Summitview • 0 1/1/2010 Signal upgrade, radius improvements, turn lane extension Totals 733 111 844 844 __- __ -__- Report Date: January 31, 2008 • Page 12 v. 5.7 - Supersedes previous editions t i. 1 0 0 0 • • • . 0 Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 • Co. No.: 39 Co. Name: Yakima Co. - - Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG • Amend Date: 3 -24 -2009 ° Resolution No.: • • Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. - B. Bridge No. c " Expenditure Schedule To w ` m 9 „^ rn v C , Fund Source Information P Projects Only s .o E C. Project Title E " ` o (Local Agency) a m v t Federal Funding R/W n o a Z D. Street/Road Name or Number o ~ 0 P. a Phase Federal Federal State • 4th Required E. Beginning MP or Road - Ending MP or Road E f 5 .°' - Start Fund Cost by Fund State Local Tot Thru Envir. Date F. Describe Work to be Done • a te ` (m�ddNYYY) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM/YY) - ---- 1 2 3 4 .1 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 49 12 P N/A W PE 1/1/2010 STP 95 13 108 108 RW 1/1/2010 STP 63 8 71 71 CE 40th Avenue and Englewood T 40th Avenue S CN 1/1/2011 STP 145 • 20 165 165 Yes from: 40th Avenue to: Englewood P Replace traffic signal poles, upgrade controller - 1/1/2010 ___( __ —_ —_ Totals 303 41 344 344 PE 1/1/2010 STP 126 ' 18 144 144 • 00 50 12 P N/A w RW 6/1/2010 STP 63 8 71 71 CE 16th Avenue and Fruitvale,Blvd T CN 1/1/2011 STP 315 43 , 358 358 Yes 16th Avenue s from: 16th Avenue to: Fruitvale Blvd P Replace traffic signaf poles. radius improvements, ADA ramps O 6/1/2010 • Totals 504 69 573 573 14 51 12 p N/A W PE 1/1/2010 STP 32 5 37 ist Street and I Street T CN 1/1/2011 STP 126 17 143 I 143 CE No 1st Street S • from: 1st Street to:IStreet P • O Replace and upgrade traffic signal equipment - • Totals 158 - 22 180 180 14 52 01 P .25 W PE 6/1/2011 STP(U) 820 189 1009 - -- 1009 RW 1/1/2012 STP(U) 3150 630 3780 3780 CE Mead Ave. Railroad Grade Separation T Mead Ave. S CN 1/1/2013 STP(U) 6552 1008 7560 7560 Yes P from: Presson Place to: Maryland Construct railroad overpass Including all utilities _ 1/1/2012 • • _ _ -_- _ _____ Totals 10,522 1827 12349 4789 7560 ° ^ ^^ n ° ' ^^ ^ ^ ^ ^o v. 5.7 - Supersedes previous editions • . • i Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima - From 2009 to 2014 Co. No.: 39. Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded c v A. PIN /Federal Aid No. B. Bridge No . N Fund Source Information Expenditure Schedule Projects Only p o le C. Project Title E m N c o m (Local Agency) m . o E > . 1 u .0 Federal Funding RAN c 0 a Z D. Street/Road Name or Number ° ° T" z. 0- 4th Required E. Beginning MP or Road - Ending MP or Road E ~ N F ° - °' P tart F Fund I Cost b Federal Funtd State Local Total Envir. Date F. Describe Work to be Done a (mm/ddyyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MMiY10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 53 01 P 25 0 PE 6/1/2011 STP(U) 820 189 1009 1009 RW 1/1/2012 STP(U) 3150 630 3780 3780 CE Washington Ave. Railroad Grade Separation P CN 1/1/2013 STP(U) 6552 1008 7560 7560 Yes Washington Ave. S from: Longfibre Road to: T Railroad grade overpass including all utilities W 1/1/2012 TOtais _ 10,522 1827 12349 12349 • 16 54 01 P 4.0 0 PE 6/1/2011 STP(U) 252 — 38 290 290 RW 1/1/2012 STP(U) 756 88 844 844 CE Citywide Pathway Connections P CN 1/1/2013 STP(U) 1890 315 2205 2205 Yes Yakima S from: to; T Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths. W 1/1/2012 WOO Trail, Greenway including Naches Rail Spur, signage and amenities Totals 2,898 441 3339 290 3049 16 55 01 P 1 1 O PE 1/1/2011 S I P(U) 2180 340 2520 2520 RW 1/1/2013 STP(U) 2180 340 2520 2520 CE E. 'H" Sf. Extension 08 P CN 6/1/2014 STP(U) 1199 1871 3070 3070 Yes E. "H" St. S from: 1st St. to: Yakima River T Construct road Including water, sewer, curb. gutter and sidewalk for future W 1/1/2013 development. Totals 5,559 2551 8110 8110 PE 1/1/2012 STP(C). 700 108 808 808 17 56 01 P 1,3 0 N.10thSt.Extension P RW 1/1/2013 STP(U) 5500 850 6350 6350 CE N. 101h St. 06 S CN 6/1/2013 STP(U) 7900 - 972 8872 8872 Yes from: R St. to: 10th Street - Lincoln Ave. T W Construct road including water, sewer, curb. gutter, sidewalk for future 1/1/2013 ' development. - - -- - .. - _.__. _. _ - --- ---- -- ._..--- - -- --- - -- -.._ Totals 14,100 1930 16030 16030 • Page 14 v. 5.7 - Supersedes previous editions Report Date: January 31, 2008 • I. • • f 1111 110 . • • t • • • ,° ;77 Washington State Department of Transportation Six Year Transportation Improvement PCProgram Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing ,Date: 7 -1 -2008 . Adoption Date: 7 -15 -2008 City No.: .1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 . Resolution No.: ' Project Identification. Project Costs in Thousands of Dollars • Federally Funded L. c A: PINIFederal Aid No. B. Bridge No. m rn Fund Source Information Expenditure Schedule Projects Only o .o C. Project Title m a 3 o . Fede Funding (Local Agency) t v l i z D. StreetlRoad Name or Number - a I- N . o a Phase Federal ' Federal State 4th Required E. Beginning MP or Road - . Ending MP or Road E 1- o Start Fund " .Cost by Fund Slate Local Total . Envir. Date Funds Funds Funds 1st 2nd 3rd Th T e F. Describe Work to be Done a (mmidd/Y Code Phase Code 6th YP (MM/Y11 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 . 16 17 18 19 20 21 00 57 03 P N/A 0 PE 1/1/2012 STP(U) 315 38 353 353 CN 6/1/2012 STP(U) 945 126 1071 1071 CE YVT Pathway 32 P YVT Railway Corridor. S No • from: to: T Development pathway in West Valley area including 53rd Ave, Wide Hollow, W ' 641h Ave, Ahtanum including all utilities and signage _ _ Totals 1,260 164 1424 1424: 17 58 01 P N/A O PE 1/1/2011 STP(U) 63 • - 5 68 68 '— 34th Ave 8 River Rd Improvements 12 • P CN 6/1/2011 STP(U) 567 76 643 I 643 CE Fruitvale Blvd. S No • from: 34th Ave. 1o: River Rd. T Intersection improvements including luminalion, sewer, water, curb, water W . and sidewalks • Totals 630 • 81 - 711 711 17 59 01 P 1.o O PE 1/1/2010 STP(U) 218 34 ' 252 252 — — RW 6/1/2011 STP(U) 327 51 378 378 CE Englewood Ave 05 P CN 1/1/2012 STP(U) 2980 - 244 3224 3224 Yes Englewood Ave 12 S . • from: 24th Ave to: 40th Ave T Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water. lines W 6/1/2011 and streetlights. Totals 3,525 329 3854 630 3224 16 60 01 P 1.3 C PE 1/1/2010 STP(U) 272 • 43 315 - -- 315 RW 6/1/2010 STP(U) 349 55 404 404 CE G Frontage Road 8 "H" St. Loop CN 1/1/2011 STP(U) 2352 340 2692 . 2692 Yes N. 81h St. O from: "H" St. to: 1 -82 P Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for S • 6/1/2010 future development and Terrace Heights connection. T _ Totals 2,973 438 3411 719 2692 _ . _ v. 5.7 - SunersedPS nrevinuc Prtitinnc • 0 ® . 0 • g li Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 Co. No.: 3g . Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008 City No:: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded' A. PIN /Federal Aid No. B. Bridge No. c rn v w F un d Source Information Expenditure Schedule Projects Only `m (Local Agency) t ri o E C. Project Title d 6 , gy m , j p , t Federal Funding RAN = 3 r D. Street/Road Name or Number 8 T '� ;; o- - Required `l ti Z E. Beginning MP or Road - Ending MP or Road E ~ rn a - o S Federal F Fund I Cost by Fund State local Total 1 2nd � 3rd Thu Tnvir. Date • F. Describe Work to be Done 0_ (mm/ Code Phase C o d e Funds Funds Funds 6th ype (MM/YY) • 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 00 61 07 P 5 G CN 6/1/2009 1 75 75 251 25 25 CE Citywide Alleys P . No • S from: lo: W T Pave alleys Throughout the city. Totals 75 75 25 25 25 PE 14 62 03 p Nob Hill Corridor 04 2 7 G 1 1/1/2010 1 STP(U) 1 120 1 1 17 1 137 1 1 137 1 ` CE Nob Hill O 1 from: 1 -82 lo: S. 16th Ave. s S Widen roadway. sidewalk. curb, gutter, lighting T __ W Totals 120 17 137 . 137 14 63 04 P 3.2 C PE 1/1/2011 STP(U) 1 120 171 1371 1 1371 CE 40th Ave. Corridor 0- - 40th Ave. G • from: SR -12 ' to: Washington Ave. P - S Widen roadway, curb. gutter, sidewalks, lighting. W T Totals 120 • 17 137 137 14 64 04 P 3.5 C PE 1 1/1/2012 STP(U) 1 120 17 137 r 1 137 CE 16th Ave. Corridor G 16th Ave. O from: SR -12 to: KY Ave.Nalley Mall P T Widen roadway, curb, gutter, sidewalk, lighting. T W Totals 120 17 137 137 V. 5.7 - Supersedes previous editions Report Date: January 31, 2008 Page 16 • ; , . . , ,. • • • i . • • Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima • From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPOIRTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded • g d Expenditure Schedule Projects Only A. PIN/Federal Aid No. B. Bridge No m a , Fund Source Information .c a P g w 'o s) C. Project Title w In m ° m (Local Agency) E 1 a 3 v L Federal Funding RNV c -6 d Z D. Street/Road Name or Number .. y -J a Phase Federal Federal State 4th Required - E. Beginning MP or Road - Ending MP or Road E l m Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru . Envlc Date • F. Describe Work to be Done d ( mm/dd/yyyy) C Phase Code Funds Funds Funds 6th Type (MM/YY) 1 2 3 , 4 5 6 7 8 9 10 . 11 12 13 14 15 16 17 18 19 20 21 14 65 04 P 2.0 C - PE 1/1/2012 STP(U) 1201 " 17 137 137 CE • • S. 1st St/Main St. Corridor G S. 1st St./Main S1. 0 from: Nob Hill Blvd. to: Barker Mill Bridge P Join! project with Union Gap to siden roadway, curb, gutter, sidewalk, T lighting. T _ __ -. ---- W Totals 120 17 137 137 6.0 c PE 1 1/1/2012 1 STP(U) 120 I I 1 17 I 137 I 1 1 I 137 CE • 14 66 01 P I I W Yakima North/South Connector to West Valley 04 GO . • Unknown road 06 from: North - South to: in West Valley P S City & County joint project to build /extend roadways. T , • W Totals 120 17 137 137 00 67 23 $ N/A PE 1/15/2009 1 OTHER . 100 1001 100 West Side Transit Center Placement Study Acquire Property to Expand Operations from: to: Recent Annexations Mandate Transit Expansion to These Areas - Totals 100 too 100 16 68 04 P .73 C CN 6/1/2009 1 432 68 1 500 5001 " - - -- . W. Nob Hill Blvd -S 681h Ave to S. 72nd Ave. . W W Nob Hill Blvd 0 . • from: S. 68th Ave. to: 72th P . Reconstruct to minor arterial standards S Totals 432 68 500 500 v. 5.7 - Sunersedes previous editions • ... • .. . ; • . • • Aa.... igii Washington State Department of Transportation - Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 Co. No.: 3g Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPOJRTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.: Project Identification Project Costs In Thousands of Dollars Federally Funded A. PIN /Federal Ald No. B. Bridge No. c w Fund Source Information Expenditure Schedule Projects Only s y � ° C. Proj Title fo v c v, (Local Agency) - -- - - - -. m o E J d o t Federal Funding RNV c� p` Z D. Street/Road Name or Number a a Phase Federal Federal State 4th Required u _ E. Beginning MP or Road - Ending MP or Road E t o - 5 Start Fund Cost by Fund State Local Total Thru Envir. Date F. Describe Work to be Done 9 a. (mm/dd/yyyy) Code Ph Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM/Yr) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 17 69 03 P PE 4/6/2009 ARRA - 75 75 75 . P CN 6/1/2009 ARRA - 925 925 925 CE Yakima Downtown Future Initiatives, Phase 4 05 • T No 06 • from: 'A" Street • to: 3rd Street to Neches Install Historic lighting, sidewalk modifications and other Improvements _ _ Totals 1,000 _ 1000 1000 _ _ 17 70 OB S PE 511/2009 OTHER 400 4001 400 ' f .60 P CN 4/1/2010 OTHER 2600 2600 2800 CE Yakima Downtown Future Initiatives, Phase 5 S No from: 1st Street to: 9th Street T Install Historic Lighting, Sidewalk Modification & Other Improvements. 0 Exact Improvement area(s) to be determined. - - - - -.— — - - - - - -- • Totals ' 3000 3000 3000 CN 1/1/2009 CMAQ 540 1 214 754 754 00 71 03 S Coolidge Road Widening and Paving. 05 50 W S I 1 1 1 CE No 06 T from: 80th AVE. to: 88TH AVE. T Widen roadway and pave with curb and gutter. Totals 540 214 754 754 5 PEI 1/1/2012 I 1 I 100 1001 I I 100 3 8 16 72 01 P W Occidental Road Construction. • P from: 58th Ave. to: 64th Ave. T Construct roadway Totals 100 100 100 Report Date: January 31, 2008 Page 18 v. 5.7 - Supersedes previous editions • . i • . 0 . • • • • • • • • W Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 Co. No.:. 3g Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008 City No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded • c m A. PIN /Federal Ald No. B. Bridge No. d� v o Fund Source Information Expenditure Schedule Projects Only c K1, - E C. Project Title e 7 H o 0 0 (Local Agency) n w v Federal Funding RAN j v n- D. Street/Road Name or Number o l N ,- z - 0 Phase Federal Federal State 4th Required • tl E. Beginning MP or Road - Ending MP or Road E t- m .v by Start Fund Cost b Fund State Loca Total Thru Envir. Date Funds Funds Funds 1st 2nd 3rd T e F. Describe Work to be Done a (mm/ddyyyy) Code Phase Code 6th yp (MIWYV) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 . 21 00 73 01 P 27 PEI 1/1/2012 I 1 I 1 too too I 1 100 86th Ave. Road Construction from: Occidental to: Coolidge Construct roadway Totals 100 100 100 • 16 74 04 P 1.5 W PEI 1/1/2012 I STP(U) 1 120 1 1 1 17 1 1371 I 1 13 64th Ave. Roadway Widening. 06 G EA P YES • from: Washington Avenue. to: Tieton Drive. T Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage. - 7/4/2012 Totals • 120 17 137 137 ALL 1/1/2009 1 5309(Bus) I 1 I 1 15401 15401 1540 I 1 CE 00 75 21 S N/A Purchase four new transit buses (replacements) No • On -going vehicle replacement program from: to: Seek RFP's to acquire tour new transit buses that will replace units that are 18 years of age. (six years past federal standards) • Totals • 1540 • 1540 1540 ALL 1 6/1/2009 1 30 115 1 115 1 I - 1 -_ — 00 76 21 S NIA CE Acquisition of new Dial -A -Ride parafransif vehicles No Replace several older vehicles from: to: . Upgrade Dial -A -Ride service by replacing several older vehicles with new - models. - -_ -- — -- -- Totals 85 30 115 115 • R annrt oat, Ioniianr 9008 Pont 10 • v. 5.7 - Supersedes previous editions 0 .. ® • i . . i .... Washington State Department of Transportation Six Year Transportation Improvement Program agency: Yakima From 2009 to 2014 3o. No.: 39 Co. Name: Yakima Co. ' Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008 3ity No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded A. PIN /Federal Aid No. B. Bridge No. d .c d Fund Source Information Expenditure Schedule Projects Only M v �, y (Local Agency) o m ' E C. Project Title 'Eli P N • 3 .c Federal Fu R/W c o D. Street/Road Name or Number ° T z' a — Required a Cl Z E. Beginning MP or Road - Ending MP or Road E I - CO o P Start F Fund ederal Cost by Fund State Local Total 1st 2nd 3rd Thru Tnvi Date F. Describe Work to be Done a` (mm/ Code Phase Code Funds Funds Funds 6th YP (MM/Yl) 1 — 2 3 4 5 6 7 8 9 10 11. 12 13 14 15 16 17 18 19 20 21 14 77 11 P CN 4/1/2009 BR 1742 I 1742 1742 0.2 I 1 CE Nob Hill Overpass Repair No from: 1st Street to: Ledwich Ave Make necessary repairs to Railroad Overpass (Bridge) Totals 1,742 1742 1742 14 78 03 P N/A PE 1/1/2009 STP(U) 173 27 200 200 RW 1/1/2010 STP(U) 433 67 500 500 E. Lincoln & 10th Street Roundabout 05 CN 6/1/2010 STP(U) 1125 175 1300 1300 Yes 06 from: E. Lincoln to: E. MLK Jr. Blvd. 4/1/2010 Roundabout construction a1 intersection curb, gutter, sidewalk, 8 street lighting - - - -- - Totals 1,731 • 269 2000 200 1800 12 79 03 P N/A G ALL 1 1/1/2009 STP(U) 1 865 1 1 1 135 1 10001 1 000 CE S.R.12 & 16th Avenue Interchange 06 No • Interchange from: 16th Avenue to: S.R. 12 Upgrade Interchange by constructing a Roundabout Totals 865 135 1000 1000 11 80 01 P N/A o I 1 1 I 1 I I 1 I 1 I EA 1 -82 & Lincoln Avenue Interchange P Yes I -82 Interchange G from: E. "G" Street 1o: 1 -82 6/2011 Reconstruct / extend off -ramp from existing 1 -82 off-ramp for Lincoln Avenue to Street. • Totals — -- — — -- Report Date: January 31, 2008 Page 20 v. 5.7 - Supersedes previous editions • . Washington State Department of Transportation Six Year Transportation Improvement Program Agency: Yakima From 2009 to 2014 Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008 • City No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded To `m A. PIN /Federal Aid No. ' B. Bridge No. c f, b a) Fund Source Information Expenditure Schedule Projects Only s . . E C. Project Title e " i o (Local Agency) .0 _ 8 d ; v r Federal Funding R/W s c5 ti Z D. Street/Road Name or Number ° T w Y a u_ E co o = Phase Federal Federal State • 4th Required E. Beginning MP or Road - Ending MP or Road E I- S o Start Fund Cost by Fund State Local Total Envir. Date F. Describe Work to be Done n. imm/dd/yyYY) Code Phase Code Funds Funds Funds 1st 2nd 3rd T Type (MM/YY) 1 2 3 4 5' 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 14 81 12 p N/A P ALL 1/1/2010 1 STP(U) 1 8651 1 135 1 1000 1000 1 . E . Yakima Avenue & Fair Avenue Signalization W CE No T from: E. Yakima Avenue to: Fair Avenue S Construct Traffic Signal O Totals 865 135 1000 1000 PE 4/6/2009 ARRA - 50 14 82 06 P 2 .64 CN 6/1/2009 ARRA - 1950 1950 50 1950 50 CE Summitview Ave. Grind & Overlay 07 No from: 14th Ave 1o: 561h Ave Grind 0.20' of ACP 8 replace with 0.20' of HMA, and install required ADA ramps . _- _ Totals 2,000 2000 2000 Grand Totals for Yakima • 129,965 20,094 33,605 183,664 40,781 34775 37,505 70,603 • Report Date: January 31, 2008 Pans 9 1 v. 5.7 - Supersedes previous editions