HomeMy WebLinkAbout03/24/2009 18 Six-Year TIP Amendment - Public Hearing [Transportation Improvement Program] BUSINESS OF THE CITY COUNCIL
0 YAKIMA, WASHINGTON
AGENDA STATEMENT G
Item No. `�I
For Meeting of: March 24, 2009
ITEM TITLE: Set time and date for 7:00 pm on April 7, 2009 to hold a Public Hearing to
Amend the six -year Transportation Improvement Program (TIP).
SUBMITTED BY: William R. Cook, Director of Community and Economic Development
CONTACT PERSON/TELEPHONE: Doug Mayo, City Engineer 576 -6678
Brett Sheffield, Chief Engineer 576 -6797
SUMMARY EXPLANATION:
This action would set April 7, 2009 as the date for a public hearing to amend the six -year TIP.
This TIP amendment is required to make selected projects eligible for funds from the
American Recovery and Reinvestment Act (ARRA).
0 The selected projects include: 1) Nob Hill Boulevard Improvements (TIP priority number 13);
2) purchasing five new transit buses (TIP priority number 5); and 3) purchasing three new
paratransit vehicles (TIP priority number 6). The Nob Hill Boulevard Improvement project
consists of constructing curb, gutter, sidewalk, street lights, a storm drainage system and
intersection improvements from 64th Avenue and 72 Avenue. Three other projects are being
modified to be eligible for ARRA funds if they become available. They include: the Yakima
Railroad Grade Separations; Yakima Downtown Future Initiatives, Phase 4; and, Summitview
Avenue Grind and Overlay.
Since we have secured enough funding to construct one underpass of the Yakima Railroad
Grade Separation Project we are splitting the project shown into separate projects or phases.
Current Phase 2 will become - Lincoln Avenue Underpass and new Phase 3 will be Martin
Luther King, Jr. Boulevard Underpass.
(continued on Page 2)
Resolution Ordinances Other (Specify) Set Public Hearing Date
Contract Mail to (name and address) : Phone:
Funding Source:
APPROVED FOR SUBMITTAL: - _ City Manager
STAFF RECOMMENDATION: Set April 7, 2009 as the date of Public Hearing to amend the
0 six -year TIP.
BOARD /COMMISSION RECOMMENDATION:
COUNCIL ACTION:
Page 2
See STIP priority numbers 1 and 2. As the Lincoln and MLK Underpasses were planned to b
constructed one at a time, it is perfectly feasible to break them into two separated phases.
Phase 1 of the Yakima Railroad Grade Separations project, which relocated underground
utilities, was completed in the summer of 2007. Lincoln Avenue Underpass construction is
scheduled to begin in 2009. Lincoln Avenue is being constructed first because when a train
blocks Lincoln Avenue during the need for an emergency response to the west side of the
tracks the Fire Department response time will be at least two minutes shorter than having to
travel to use the Walnut Street Underpass. We have requested $8,000,000 of ARRA funds to
complete funding of the MLK Underpass.
The Yakima Downtown Future Initiatives, Phase 4 project requests $1,000,000 of ARRA funds
to provide new sidewalk and streetscape improvements to the north side of 'A' Street from 3rd
Street to Naches Avenue and to the east side of Naches Avenue between Yakima Avenue and
'A' Street. See STIP priority number 69.
The Summitview Avenue Grind and Overlay requests $2,000,000 of ARRA funds to replace the
aging pavement from 14th Avenue to 56th Avenue. See STIP priority number 82.
•
I II
0 . . .
� .
• •
.
■ •
{
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From . 2009 • to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 . Adoption Date: 7 -15 -2008 .
City No.: 1485 MPOIRTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.:
•
Project Identification Project Costs In Thousands of Dollars Federally Funded
Y . Expenditure Schedule Projects Only • A. PIN /Federal Ald No. - B. Bridge No. m c m Fund Source Information
o N � C . Project Title a = a o w — (Local Agency)
•U m o E j a d ii Federal Fundin R/W
v ti Z D. Street/Road Name or Number a i- r o .3 F. u Phase Federal Federal State 4th Required
` E. Beginning MP or Road - Ending MP or Road E I - o Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru Type Date
F. Describe Work to be Done a. (mm/ddyyyy) Code Phase Code Funds Funds Funds 6th Type • (MM/Y1�
1 2 3 4 5 6 7 8 9 10 11 12 13 . 14 15 16 17 18 19 20 21
PE 1/1/2009 STP(U) 500 OTHER 150 650 650 •
14 1 01 S 0.2 T RW 6/1/2009 STP(U) • 1000 OTHER 1000 1000 • EA • .
Yakima Railroad Grade Separations - Phase 2 06 P CN 6/1/2009 STP(U) 8150 FMSIB 2500 1000 11650 6000 5650 Yes
Lincoln Ave. 07 G CN 6/1/2009 OTHER 1000 1000 1000
from: N 1st St to: N 1st Ave 08 W CN 6/1/2009 AIP 3000 3000 3000 . •
Construct Grade Separations and adjacent roadway reconstructon, • . 4/30/09
inctuding realignment of Front Street. S ,
Totals • 9,650 6650 1000 17300 7650 9650
PE 1/1/2009 STP(U) 175 25 200 200 •
14 2 01 P 0.2 T CN 6/1/2009 STP(U) 2400 FMSIB 2000 3975 • 8375 8375 EA
Yakima Railroad Grade Separations- Phase 3 06 G CN 6/1/2009 ARRA - 8000 OTHER 1500 9500 ' 2000 7500 Yes
Martin Luther King, Jr. Blvd • 07
from: N. 1st Sreet to: N. 1st Ave O
OS 4/30/09
Construct Grade Separation and adjacent roadway reconstruction including
Front Street • - — • ■
Totals • 10,575 3500 4000 18075 200 10375 7500
14 3 01 S 1.0 P CN 4/1/2000 I I 3810 38401 38401
1 Yes •
16TH AVENUE REALIGNMENT O E
16TH AVENUE REALIGNMENT T
from: AHTANUM ROAD 1o: WASHINGTON AVENUE • W
Realign 16th Avenue out of the runway safety area of the Yakima Air S 11/2007 •
Terminal. Includes FAA funds.
• Totals • 3840 3840 3840
00 4 03 p N/A G PE 1/1/2009 STP(E) 18 • 32 501 50
C CN 6/1/2009 STP(E) 1900 285 2185 2185 EA
YVT Railway Rehabilitation 8 Museum No
3rd Ave S
from: 3rd Ave to: Pine St T
Car earn, Museum Restoration and Pathway W
P .
Totals 1,918 317 2235 2235
„___ , v. 5.7 - Supersedes previous editions
III . .
• .
III
I
. , ,.
. _ •
. .
. .
. ,
, ,
. .
.rte.
irtI Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014 •
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO/RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.:
Project Identification • Project Costs In Thousands of Dollars Federally Funded
t Expenditure Schedule Projects Only I
A. PIN /Federal Ald No. B. Bridge No. m ^ .c d a, Fund Source Information
4 ° C. Po e ct Title m V rn d o m (Local Agency) —
m o` E rj s .E u - Federal Funding R/W
D v a Z D. Street/Road Name or Number • a I- r n 9 ; a Phase Federal Federal State 4111 Required
E. Beginning MP or Road - Ending MP or Road 1-- o Start Fund Cost by Fund Slate Local Tot 1st 2nd 3rd TI1ru Envir. Date
E
F. Describe Work to be Done a` (mm /dd/ Code Phase Code Funds Funds Funds 6th Type (MM/YY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
00 5 21 S ALL 4/15/2009 ARRA - FTA 2000 1 1 1 1 2000 2000 I I CE
Purchase of 5 (five) transit buses - 35 foot low floor versions • No
•
• from: lo:
Acquire 5 (five) G ing 35' low floor Transit buses through the federal stimulus - -
program to replace 5 (live) unreliable Thomas buses - - -- - - - - -- - - - - --
Totals 2,000 2000 2000
00 6 21 S ALL 1 4/15/2009 I ARRA FTA 1 150 1 30 1 1801 1801
CE
Acquisition of 3 (three) new Paratransif vehicles for Dial - A - Ride I No
from: to:
Purchase 3 (three) new Paratranslt vehicles to replace 3 (three) older similar
unreliable units
—
Totals 150 30 180 180
00 7 12 $ N/A CN 1 1/1/2009 1 5307 1 1655 1 1655 1 33101 33101
1 I CE
Transit Operating Expenditures 22 I No
Various Funding Areas 23
from: N/A to: N/A 24
Supplemental Funding for Transit Service Operating Expenses
31'
Totals 1,655 1655 3310 3310
PE 1/1/2009 STP(E) 36 36 36
00 8 • 03 S N/A C RW 1/1/2009 STP(E) 205 205 205 CE
YVT Trolley Barn/powerhouse Rehabilitation O G CN 1/1/2009 STP(E) 255 255 255 Yes
S3rdAve .
P
from: to: S 06/01/07
Minor car barn and powerhouse restoration Including property purchase T •
W Totals 496 496 496
Report Date: January 31, 2008 • Page 2 v. 5.7 - Supersedes previous editions
•
e • .
•
.,
. .
. .
. .
. •
. .
• . .
• . .
A
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: ,Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG
Amend Date: 3 -24 -2009 Resolution No.:
Project Identification • Project Costs in Thousands of Dollars Federally Funded
m A. PIN /Federal Ald No. B. Bridge No. c 2 a , Fund Source Information • Expenditure Schedule Projects Only
4 N .o C. Project Title d= w D o m (Local Agency)
_ E 1 m J U L Federa Funding R/W
c v r D. Street/Road Name or Number ° r `` ° — "" —
m D - z a hc w = ; , Phase Federal Federal State 4th Required
. tL E. Beginning MP or Road - Ending MP or Roa E r ° St ar t F un d C os t b Fund State Local Total Envir. Date
F. Describe Work to be Done g 0_ (mm/ddyyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (M �
— 1 2 3 4 5 6 7 8 9 - 10 11 12 13 14 15 16 17 18 19 20 21
00 9 22 S N/A ALL 1/1/2009 1 WSDOT 1 50 50 50
S
1 treet Asset Amenities (Transit) 31 CE No
Route Maintenance, Repair and Improvements
from: 1o: •
Maintenance of Shelters, Benches and Signage throughout our Transit
Route System
_ _ Totals 50 50 50 •
00 10 — — — — 32 S 1.0 0 CN 1 4/1/2009 1 STP(E) 525 1 1 5251 . 5251 1
William O. Douglas Trail 08 S • CE S
6th Ave Pathway & Bridge Decking 06
from: to: W
Build pathway and install pathway decking on Naches River bridge with T .
partner William O. Douglas Trail Fundation .-- ..- - -.. -- _ •
__ Totals 525 525 525
00 11 32 S N/A G PE 1/1/2009 STP(E) 65 65 65
RW 1/1/2009 STP(E) 150 150 150 CE
William O. Douglas Heritage Trails 13 P CN 1/1/2009 STP(E) 285 285 285 • Yes
Bridge Restoration & Trailhead 10
from: to: s
Trailhead restoration, right of way acquisition partner with the William 0. T • 6/01/09
Douglas Foundation, including restoration of bridge , cleaning, rust removal W _
and painting Totals 500 500 500 '
ALL 1 1/1/2009 1 WSDOTI 51 9 601 601 -- -- —
00 12 22 S N/A
Transit Service to Terrace Heights No
New University & Retail Links
from: to: .
Provide Transit service to this growing area of Yakima County to include the
new University 8 Retail Shops. • _— —__ __ ____ _____.__._ -_ __
Totals 51 9 60 60
•
•
. . _ v. 5.7 - Supersedes previous editions
o
0 •
'
i
i2ii Washington State Department of Transportation
Six Year Transportation Improvement Program
I .
•
From 2009 to 2014
aggenen cy: Yakima
:o. No.: 39 Co. Name: Yakima C Hearing Date: 7 -1 -2008 � Adoption Date: _ 7 -15 -2008
:ity No.: 1485 MPOIRTPO: YVCOG • Amend Date: 3 -24 -2009 Resolution No.:
Project Identification Project Costs in Thousands of Dollars • Federally Funded ■
Fund Source Information - Expenditure Schedule Projects Only
A. PIN/Federal Aid No. B. Bridge No. m �r v N (Local Agency) -
c N � m -6 a ,c , c o F Fundin R/W
o v o C. Project Title m — -- R e uired
a .g 5 j a a Z D. Street/Road Name or Number E ~ w ° Phase � Start F Fund l Cost by Fund State Local Total 1st 2nd 3rd 6th Type (MM/YY)
F. Describe Work to be Done Federal Stae 4th
E. Beginning MP or Road - Ending MP or Road Thru
S Funds Funds Funds
o (mm/ddlyyyy) Code Phase Code ___ •
1 2 3 4 5 6 7 8 9 10 11 12 •13 14 15 16 17 18 19 20 21 •
• PE 2/6/2009 150 150 150 CE
14 13 06 S 0.55 P CN 6/1/2009 ARRA- 950 950 950 No
Nob Hill Blvd. Improvements T
from: 64th Ave lo: 72nd Ave •
Construct curb, gutter, sidewalk, street lights, storm drain and intersection �_
improvements Totals 950 150. 1100 1100
PE 1/1/2009 . TPP 200 300 500 500 EA
14 14 04 P .77 ' RW 1/1/2009 200 200 200 Yes
G
Nob Hill Blvd CN 1/1/2009 STP(U) 1000 TPP 1300 2000 4300 4300
Nob Hill Blvd 0 12/01/09
from: 49th Ave 1o: 641h Ave g
Widen. curb, gutter, sidewalk, lighting, drainage T
W Totals 1,000 1500 2500 5000 5000
— -
PE 1/1/2009 STIP (S) 60 60 120 120 CE
00 15 01 P N/A CN 4/1/2009 STP(S) 180 AIP 240 360 360 No
Annual Signal Upgrades CN 4/1/2009 STIP (S) 360
Local Selection
from: N/A to: N/A
Upgrade signals
Totals 600 240 60 900 120 _780 _ ___
— — — • CN 1 6/1/2009 ( STP(U) 2281
1 1 32I 2601 2601 I EA
00 16 07 P N/A . W No
Various Overlay Projects/Selected on Local Priority S
N/A
from: N/A 1o: N/A
' Totals 228 32 260 260 __.
v . 5.7 - Supersedes previous e ditions
Report Date: January 31, 2008 Page 4
® • •
•
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014 .
Co. No.: 3g Co. Name: Yakima Co.
Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.:
•
Project Identification Project Costs in Thousands of Dollars Federally Funded
._ A. PIN /Federal Aid No. B. Bridge No. c L Expenditure Schedule
„_ c v d Fund Source Information P Projects Only
ro ' o E C Project Title E " r ' c O m (Local Agency) — - -_
r, _ ; a ' o t Federal Funding R/W •
c <5 l ‘ Z D. Street/Road Name or Number ° >. n.
a l- co o a u Phase Federal Federal State 4th Required
LL E. Beginning MP or Road - Ending MP or Road E I- ° S t a rt Fund Cost by Fund State Local Total Envir. Date
F. Describe Work to be Done a (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th T ype (Mw
1 2 3 4 5 6 7 8 .9 10 11 12 13 14 15 16 17 18 19 20 21
PE 1/1/2009 100 100 100
00 17 32 P N/A CN 1/1/2009 900 900 soo E A
Storm Drains/Vegetation No
Local Selection
from: City Wide to: .
•
City Wide
. Totals 1000 1000 1000
17 18 — 03 P 76 W PE 1/1/2010 STP(C) 109 27 1361 136 ' ,
Reconstruction Rudkin Rd 06 T CN 1/1/2011 STP(C) 945 TPP 945 106 1996 1996 CE
Rudkin Rd P _ No
from: E Viola Ave to: Rainier Place s
Reconstruct, excavate ballast, top course, curb. gutter, sidewalk •
Partner with City of Union Gap. additional sewer force main
___ _ Totals 1,054 945 133 2132 136 1996
16 19 03 P
.76 C PE 9/1/2010 STP(S) 122 IPP 23 7 152 152
CN 4/1/2010 STP 1730 TPP 206 70 20061 2006 • CE
E Mead Ave Reconstruction 06 G
E Mead Ave O No
from: Rudkin Rd to: Fair Ave P
Partner with City of Union Gap. reconstruct, excavate ballast, top course, S
•
curb. gutter, storm, acp T
• ____ Totals 1,852 229 77 2158 152 2006
19 20 03 P N/A P PE 1/1/2010 STP(U) 100 14 114 114 -- --
CN 1/1/2011 STP(U) 700 95 795 795 CE
Longfiber Rd 8 Washington Ave 05 S
Intersection D6 W Yes
T
from: to: O
New intersection construction and reconstruction, 3 -lane and 5 -lane w/turn, 7/1/2009
curb, gutter, sidewalks.
Totals 800 109 909 114 795
•
v ri 7 - A imarcartac nravinnc sari if its Inc.
• ill
Washington State Department of Transportation Six Year Transportation Improvement Program
•
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG • Amend Date: 3 -24 -2009 Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. PIN/Federal Aid No. B. Bridge No. •c d Fund Source Information Expenditure Schedule Projects Only
o ° C. Project Title m " d ° m (Local Agency) -- .__
0 m o f o v t Federal Funding R/W
s 0 a Z D. Street/Road Name or Number aF H 9 - a Phase Federal Federal State 4th Required
E. Beginning MP or Road - Ending MP or Road E i ,. Start Fund , Cost by Fund State Local Total Thru Envir. Date
F. Describe Work to be Done
L (mm/dd/yyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (Myy)
1 2 3 4 r 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 21 04 P .1 C CN 1 1/1/2009 1 STP(U) 1 240 I 1 42 1 282 1 282
CE
E Nob Hill Blvd & S 18th St 01 S Yes
E Nob Hill Blvd W
from: S 18th St to: E Nob Hill Blvd T
f or double LT from west bound Nob Hill; 01 /01/07
Widen south leg (Tie to WSDOT
Project) possible curb, gutter and sidewalk
_ _ _ _ _ Totals 240 42 282 282
PE 4/1/2009 CMAQ 24 3 27 27
• 16 22 01 P N/A S CN 7/1/2009 CMAQ 480 65 5451 545 CE
Roadway City Wide Shoulder Improvements No
City Wide
from: to:
City Wide shoulder Improvements, PM10 abatement.
_ _ Totals 504 68 572 572
14 23 31 S N/A O PEI 1!12009 i STP(U) I 72 1 11 83I 831
1
E Nob Hill Blvd & Fair Ave 03 C C E Yes
E Nob Hill Blvd 04 P
from: E Nob Hill Blvd to: Fair Ave T
Intersection widening 8 new signal, curb, gutter and sidewalk. street lighting, W 10/01/ ■
stormwaler . ___
Totals 72 11 83 83
--
17 24 04 P 1.3 0 PE 1/1/2009 AIP 131 20 151 151
C RW 1/1/2010 AIP 382 59 441 441 EA
S 80th Ave - Tieton Dr to Zier Rd C CN 6/1/2010 AIP 1667 260 1927 1927 Yes
S 80th Ave T
front: Tieton Dr to: Zier Rd W 01/01/09
Major widening, curb, gutter, sidewalk s
Totals 2180 339 2519 151 2368
Report Date: January 31, 2008 Page 6 v. 5 . 7 - Supersedes previous editions
•
ID • 0
•
•
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co..Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded • c � A. PIN /Federal Atd No. B. Bridge No. a ^ v Fund Source Information Expenditure Schedule Projects Only
o m . C. Project Title 4. if r d co Federal Funding (Local Agency) —_ —__ _. - -____
c U 13. Street/Road Name or Number o T .5 J L• o- g R/V11
7 n - Z ;II to o = 6 Phase Federal Federal State 4th Required
E. Beginning_MP or Road - Ending MP or Road E o Start Fund Cost by Fund State Local Total Envir. Date
F. Describe Work to be Done a (mm/dd/yyyY) Code Phase Code Funds Funds Funds 1st 2nd 3rd Thru Type (MM/1 y)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
PE 1/1/2009 STP(E) 22 7 29 P9
17 25 05 S .15 C CN 6/1/2009 STP(E) 75 20 95 95 CE
Zier Rd - S 751h Ave to S 72nd Ave 06 • S Yes
Zier Rd T
•
from: S 75th Ave to: S 72nd Ave P
Minor widening, curb, gutter and sidewalk 03/01/09 •
Totals 97 27 124 124
PE 1/1/2012 STP(C) 272 43 315 315
05 P 1.0 yy
17 26 RW 6/1/2012 STP(C) 349 55 404
Englewood Ave - N 40th Ave to N 56th Ave S 404 EA
06 CN 1/1/2013 STP(C) 2352 340 2692 2692 • Yes
Englewood Ave T
from: N 40th Ave to: N 56th Ave P
. Widen roadway, curb, gutter, sidewalk O 04/01/11 •
C
- -___ Totals 2,973 438 3411 3411
17 27 05 P 2 O PE 1/1/2010 STP(U) 219 34 253 253
RW 1/1/2011 STP(U) 327 51 378 378 EA
Englewood Ave - N 24th Ave to N 16th Ave 06 W CN 6/1/2012 STP(U) 2980 244 3224
Englewood Ave S 3224 Yes
from: N 16th Ave to: N 24th Ave
Widen, curb, gutter and sidewalk, water and sewer lines 01/01/10
i Totals 3,526 329 3855 253 378 3224
00 28 14 P 25 T PE 1/1/2011 STP(E) 252 34 286 —
286
—
Pedestrian Bridge 32 P
CN 3/1/2012 STP(E) 3150 412 3562 3562 CE
Pedestrian Bridge O • - No
from: N 101h St to: Yakima Greenway
Construct pedestrian bridge from Gateway area to Yakima Greenway,
power, handicap accessible, lights _ — _ - —_ _ -
:..._.. — _ —__ _- — Totals 3,402 446 3848 286 3562
-- _ . ____ • u g 7 _ C nnnrcn rinc nrn•i.+rro ...4r44....n
i
•
•
410 i
•
Washington State Department of Transportation • Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
Tx) m A.. PIN /Federal Aid No. B. Bridge No. c rn ID m Fund Source Information Expenditure Schedule Projects Only
o n C P Title m `; d a m (Local Agency)
u m . o E c- o • Federal Funding R/VN
s U D. Street/Road Name or Number I? T
a 3 i_' a
Required
8.1-- Z r- in B — Phase Federal Federal State 4th Q
u_ E. Beginning MP or Road - Ending MP or Road E 1— o 73 .. Start Fund Cost by Fund State Local Total Envir. Date
Thru
° mn r/dd/ F un d s F un d s ' F un ds 1st 2nd 3rd Type (MM/Y
F. Describe Work to be Done a ( YYYY) Code Phase Co 6th
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 _
00 29 07 P N/A S PE 4/1/2009 252 252 • 100 70 82
CN 6/1/2009 CMAQ 195 38 233 233 CE No
Gravel Road B.S.T. •
Various Areas
from: City Wide to:
• _ Totals 195 290 485 100 70 315
16 30 12 p N/A T CN 1 10/1/2010 I STP(S) I '504 741 578 578
P
1 owerhouse Rd & Englewood Ave P CE Yes
Powerhouse Rd 0
from: Powerhouse Rd lo: Englewood Ave S
C 09/01/2009
Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal,
W
possible roundabout _- - --- — Totals 504 74 578 578
PE 1/1/2012 STP(S) 25 4 29 29
14 31 12 P N/A P RW 6/1/2012 STP(S) 25 4 29 29 CE
S 48th Ave & Summitview Ave Signalization • T CN 8/1/2013 STP(S) 554 81 635 635 Yes 1
S 48th Ave
from: S 48th Ave to: Summitview Ave 06/01/12
Signalization
Totals 604 • 89 693 693 1
•
16 32 12 P N/A P PE 4/1/2009 13
CN CN 6/1/2009 214 214 214 13 CE
S 3rd Ave & W Washington Ave Signal T No
S3rdAve •
from: S 3rd Ave to: W Washington Ave •
Signal Upgrades
Totals 227 227 227
•
Report Date: January 31, 2008 Page 8 v 5 . 7 - Supersedes previous editions
•
• • . • .
. .
, . .
. . .
. .
. .
.atls. •
Washington State Department of Transportation Six Year Transportation Improvement Program • .
Agency: Yakima From 2009 to 2014.
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO/RTPO: YVCOG Amend Date: 3-24-2009 Resolution No.:
Project Identification , Project Costs in Thousands of Dollars Federally Funded
m _ ._ A. PIN /Federal Aid No. B. Bridge No. e .c m , Expenditure Schedule • Projects Only
m o , a m F und Source Informa
v ( g Yj
4 N ' ` _ - C. Project Title a c Local A enC
U m ,o E n ' J o L • Federal Funding R/W
v 2 Z D. Street /Road Name or Number n i- ce 3 r a Ph Federal Federal State Required
E. Beginning MP or Road - Ending MP or Road E .o • Start Fund Cost by Fund State Local Total 4th Envir. Date
F. Describe Work to be Done d (mink/4m) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6;n Type (MM/YY)
• 1 2 3 4 5 6 7 8 . 9 10 11 12 13 14 15 16 17 18 19 20 . 21
14 33 12 S N/A p PE 1/1/2009 AIP 120 52 172 100 72
RW 6/1/2009 AIP 84 36 120 40 80 • CE
S 16th Ave 8 W Washington Ave Signal 8 Intersection. 05 T CN 6/1/2009 AIP 880 383 1263 1263 Yes
S 16th Ave 03 .
from: S 16th Ave lo: W Washington Ave
• Included in Union Gap's Valley Mall Blvd. project 3/1/2009 •
L _._ . -- -- -- .___ -- - Totals • 1084 471 1555 1403 152
I 14 34 12 p 2 5 P PE 1/1/2010 STP(S) 55 8 63 63
W Nob Hill Blvd Sidewalks T RW 6/1/2010 STP(S) 107 • 19 126 126 CE
W Nob Hill Blvd W
CN 3/1/2011 STP(S) • 321 57. 378 378 Yes •
from: S 16th Ave to: S. 6th St. S
Install missing sidewalks on southside of Nob Hill. - 09/01 /08
• Totals • 483 84 567 189 • 378
00 35 06 • P 1.0 P PE 1/1/2011 STP(S) 57 7 64 64 •
BeecbStPedesliianConnection - - T RW 6/1/2011 STP(S) 189 25 214 214 CE
Beech St 32 CN - 1/1/2012 STP(S) 504 68 572
572 Yes
from: Fair Ave to: Chalmers /Riverside
Construct pedestrian pathway under SR82 to Greenway 09/01/10 • ' L Totals 750 100 850 64 .786 '
16 36 2.0 P PE 1/1/2011 STP(S) 43 7 50 50 —
RW 6/1/2011 STP(S) 86 15 101
W Lincoln Ave Sidewalks 12 T CN 1/1/2012 STP(S) 572 88 660 660 CE Yes
W Lincoln Ave S •
from: N 56th Ave to: N 29th Ave W
Sidewalks, meters and tire hydrants replacement or relocation 09/01/11
- -- — — Totals 701 110 811 811 •
Report Date: January 31. 2008 ,,, o o v. 5.7 - Supersedes previous editions
® 0 0
1.
Washington State Department of Transportation .. Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. . Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.:
•
Project Identification Project Costs In Thousands of Dollars Federally Funded
A. PIN /Federal Aid No. B. Brld a No. c t v, Expenditure Schedule Pro Only
Tn 9 c rn % Fund Source Information p 1 Y
o y .0 ° C. Project Title E yr w c o' y (Local Agency)
:� ro ,o E > . ' L c1 - Federal Funding R/W
G li z D . Street/Road Name or Number 2 N 0... Phase Federal Federal State 41h Required
u_ E. Beginning MP or Road - Ending MP or Road E r° - m Start Fund Cost by Fund State Local Total Envir. Dale
1st 2nd 3rd Thru
Funds Funds Funds T
' F. Describe Work to be Done a. (mm /dd/yyyy) Code Phase Code 6th Type (MM/YV)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 37 01 P 5 W PE 1/1/2010 STP(E) 424 67 491 491
RW 1/1/2011 STP(E) 1047 163 1210 1210 CE
W Lincoln Ave & 'B' St Realignment 12 S CN 1/1/2012 STP(E) 1801 281 2082 2082 Yes
W Lincoln Ave
from: W 5th Ave lo: Custer St P
0 09/01 /11
Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights G
C Totals 3,272 511 3783 491 3292
PE 1/1/2009 PSMP 13 2 15 15
16 38 - -_ -� - - - - -- - - - -- _ 12 P N/A W CN 1/1/2009 PSMP 239 48 287 287 CE
School Safety Projects
Various Locations - Citywide
from: to:
•
Crossing flashers, sidewalks, signing, other features
• Totals 252 . 50 302 302
14 39 03 P 85 C PE 1/1/2010 S'IP(C) 546 • 84 630 • 630
RW 1/1/2011 STP(C) 1090 170 1260 1260 EA
E Nob Hill Blvd. Reconstruction 04 GG CN 1/1/2012 STP(C) 6539 1013 7552 - 7552 Yes
E Nob Hill Blvd. 06 P
• from: S 6th Street to: S 18th Street s 1/1(2010
Major roadway widening and reconstruction to 5 lanes with intersection T -
improvements, curb, gutter, sidewalks. replacement or relocation of meters
an hydrants W Totals 8,175 1267 9442 9
17 40 01 P N/A W PE 1/1/2010 STP(C) ' 91 . 14 105 105
RW 1/1/2011 STP(C) 91 14 105 105 CE
S72ndAvenue& WWashingtonAvenue 12 T CN 1/1/2012 STP(C) • 544 86 630 630 Yes
S 72nd Ave 06 p
from: S 72nd Ave - • lo: W Washington Ave 0 1/1/2011 4
Intersection improvement, possible roundabout
Totals 726 114 840 840 I
,,
d eport Date: January 31, 2008 Page 10 v. 5.7 - Supersedes previous editions
•
• 0 .
•
•
r
I V; Washington State Department of Transportation Six Year Transportation Improvement Program •
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co.
. City No.: 1485 MPO /RTPO: YVCOG
Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008
i - Amend Date: 3 -24 -2009 Resolution No.: •
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. PIN / Federal Aid No. B. Bridge No. e in
m g o, v a, Fund Source Information Expenditure Schedule Projects Only
4 . C. Protect Title E st a o w
,o E d d a U 2 (Local Agency)
.v , a r Federal Funding
(..) r i z D. Street/Road Name or Number o n. Federal —_ RIW
1 51- tn _ Phase Federal Federal Sta 4th Required
E. Beginning MP or Road - • Ending MP or Road E 1- 5 d Start Fund Cost by Fund State Local Total E nvir.
F. Describe Work to be Done o (mm/d y F unds Funds Funds 1st 2nd 3rd Thru 6t yP M
a d/YYYY) Code Phase Code h T e ( �
1 J - 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 —
•
14 41 4579 PE 6/1/2009 STP 252 38 290 290
12 P N/A P
I S 1st St. - E. Washington Ave. Intersection Improvement W I I EA
S 1st St. S Yes
from: S 1st St. to: E Washington Ave. T • 1 O 01!01/11
•
I Realigninlerseclion, upgrade traffic signal 38 290 290
. ' Totals 252
16 .42 4562 ALL 4/4/2010 I STP(U) 1 3781 WSDOT ! 1 3781 I 7561 7561 1 —
I Teton Dr - S 5th Ave. Intersection Project 12 P N/A W 1
•
C
•
Tieton Drive T No
•
' from: 5th Ave. Intersection 1o: O _
Replace traffic signal with roundabout - s
- - -- Totals - 378 378 756 756
1743 4587 _ 03 P 1.00 •P ALL 4/1/2009 1 STP 1 2268 1 ' - 307 I 25751 I 525 1 20501 - - - -_-
S 48th Ave. Reconstruction T EA
S 48th Avenue W No
from: Summitview Ave. to: Nob Hill Blvd. s
Widen, curb, gutter, sidewalk, lighting, drainage -
- - Totals • 2,268 307 2575 525 2050
14 44 03 P N/A 0 PE 1/1/2009 STP(U) 51 8 59 59
South 72nd Ave 8 Mead Ave Intersection 12 P CN 6/1/2009 STP(U) 383 61 444 I 444 CE
South 72nd Ave S No
from: South 72nd Ave to: Mead Ave T
New intersection, signals, curb, gutter and sidewalk W
- -.._.- ......- -- ... .- - -__.- --- - - - - -- — Totals 434 69 - 503 503
•
o,,.....+ n...... ,__..__. ... ...... • te g 7 _ C.. rats roi.•l.... r.....••...•... ...J:a:...._
• • •
•
•
•
•
"�'r Washington State Department of Transportation
Six Year Transportation Improvement Program
Agency: Yakima . From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008
- —..
City No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 " Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. PIN /Federal Aid No. B. Bridge No. c w 6 F und Source Information Expenditure Schedule Projects Only
Z ar m rn v y (Local Agency) — -- ____ - ---
.o m o E C. Project Title m a ci r Federal Funding _ _ RAN
c U D. Street/Road Name or Number 8 r ;; o- Required
n Z E. Be innin MP or Ro ad - Endin MP or Road E ~ rn o 9 1 Start Ph I Cost b Fund State Local Total 1st 2nd 3rd Thu Envir. Date
Beginning Ending o • Funds Funds Funds Type (MM/yy)
F. Describe Work to be Done a (mm /dd/yyyy Code Phase 'Code 6th
1 2 3 4 5 6 7 8 • 9 10 11 12 13 14 15 16 17 18 19 20 21
PE 1/1/2009 STP(E) 10 2 12 12
00 45 14 P N! A CE
0 CN 7/1/2009 STP(E) . 109 17 126 126
William 0. Douglas Pathway 32 No
P
W
from: Pine St to: Cowiche Canyon .
Pathway Improvements, connections, and signage to Cowiche Canyon Trail.
Totals 119 19 138 138
PE 1/1/2009 STP(E) 23 — -- 5 28 1 28
17 46 04 p .76 W CN 7/1/2009 STP(E) 1096 164 1260 1260
S 66th Avenue 03 Yes
S 66th Ave S
from: Scenic Drive to: Summitview P
0 1/1/2009
Widen roadway, curb, gutter, sidewalk and utilities - •
Totals 1,119 169 1288 1288
PE 1/1/2010 STP(S) 164 25 189 189 CE
16 47 05 p .20 G RW 6/1/2010 STP(S) 382 60 442 442
66th Ave. 8 Summitview Intersection 12 P CN 7/1/2011 STP(S) 1090 170 1260 1260 Yes
N. 66th Avenue & Summitview S
from: N. 66th Ave. to: Summitview Ave. T 1/1/2010
Widen for left turn lanes. intersection improvements, curb, gutter, handicap w
ramps and lighting 0
Totals 1,636 255 1691 189 442 1260
PE 1/1/2010 STP(U) 126 17 143 143 CE
14 48 • 12 p N/A W RW 1/1/2010 STP 63 8 71 71
40th Avenue and Summitview Signal Upgrade S CN 6/6/2010 STP(U) 544 86 630 630 Yes
40th Avenue T
from: 40th Avenue to: Summitview • 0 1/1/2010
Signal upgrade, radius improvements, turn lane extension
Totals 733 111 844 844 __- __ -__-
Report Date: January 31, 2008 • Page 12 v. 5.7 - Supersedes previous editions t i. 1
0 0
0
•
•
•
.
0
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014 •
Co. No.: 39 Co. Name: Yakima Co.
- - Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG
•
Amend Date: 3 -24 -2009 ° Resolution No.:
•
•
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. PIN /Federal Aid No. - B. Bridge No. c " Expenditure Schedule
To w ` m 9 „^ rn v C , Fund Source Information P Projects Only
s .o E C. Project Title E " ` o (Local Agency)
a m v t Federal Funding R/W
n o a Z D. Street/Road Name or Number o ~ 0 P. a Phase Federal Federal State • 4th Required
E. Beginning MP or Road - Ending MP or Road E f 5 .°' - Start Fund Cost by Fund State Local Tot Thru Envir. Date
F. Describe Work to be Done • a te ` (m�ddNYYY) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM/YY)
- ---- 1 2 3 4 .1 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 49 12 P N/A W PE 1/1/2010 STP 95 13 108 108
RW 1/1/2010 STP 63 8 71 71 CE
40th Avenue and Englewood T
40th Avenue S CN 1/1/2011 STP 145 • 20 165 165 Yes
from: 40th Avenue to: Englewood P
Replace traffic signal poles, upgrade controller - 1/1/2010
___( __ —_ —_ Totals 303 41 344 344
PE 1/1/2010 STP 126 ' 18 144 144
• 00 50 12 P N/A w
RW 6/1/2010 STP 63 8 71 71 CE
16th Avenue and Fruitvale,Blvd T CN 1/1/2011 STP 315 43 , 358 358 Yes
16th Avenue s
from: 16th Avenue to: Fruitvale Blvd P
Replace traffic signaf poles. radius improvements, ADA ramps O 6/1/2010
•
Totals 504 69 573 573
14 51 12 p N/A W PE 1/1/2010 STP 32 5 37
ist Street and I Street T CN 1/1/2011 STP 126 17 143 I 143 CE
No
1st Street S
•
from: 1st Street to:IStreet P
• O
Replace and upgrade traffic signal equipment -
•
Totals 158 - 22 180 180
14 52 01 P .25 W PE 6/1/2011 STP(U) 820 189 1009 - -- 1009
RW 1/1/2012 STP(U) 3150 630 3780 3780 CE
Mead Ave. Railroad Grade Separation T
Mead Ave. S CN 1/1/2013 STP(U) 6552 1008 7560 7560 Yes
P
from: Presson Place to: Maryland
Construct railroad overpass Including all utilities _ 1/1/2012
• •
_ _ -_- _ _____ Totals 10,522 1827 12349 4789 7560
° ^ ^^ n ° ' ^^ ^ ^ ^ ^o v. 5.7 - Supersedes previous editions
• .
• i
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima - From 2009 to 2014
Co. No.: 39. Co. Name: Yakima Co.
Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
c v A. PIN /Federal Aid No. B. Bridge No . N Fund Source Information Expenditure Schedule Projects Only
p o le C. Project Title E m N c o m (Local Agency)
m . o E > . 1 u .0 Federal Funding
RAN c 0 a Z D. Street/Road Name or Number ° ° T" z. 0- 4th Required
E. Beginning MP or Road - Ending MP or Road E ~ N F ° - °' P tart F Fund I Cost b Federal Funtd State Local Total Envir.
Date
F. Describe Work to be Done a (mm/ddyyyy) Code Phase Code Funds Funds Funds 1st 2nd 3rd 6th Type (MMiY10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
16 53 01 P 25 0 PE 6/1/2011 STP(U) 820 189 1009 1009
RW 1/1/2012 STP(U) 3150 630 3780 3780 CE
Washington Ave. Railroad Grade Separation P CN 1/1/2013 STP(U) 6552 1008 7560 7560 Yes
Washington Ave. S
from: Longfibre Road to: T
Railroad grade overpass including all utilities W 1/1/2012
TOtais _ 10,522 1827 12349 12349
•
16 54 01 P 4.0 0 PE 6/1/2011 STP(U) 252 — 38 290 290
RW 1/1/2012 STP(U) 756 88 844 844 CE
Citywide Pathway Connections P CN 1/1/2013 STP(U) 1890 315 2205 2205 Yes
Yakima S
from: to;
T
Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths. W 1/1/2012
WOO Trail, Greenway including Naches Rail Spur, signage and amenities
Totals 2,898 441 3339 290 3049
16 55 01 P 1 1 O PE 1/1/2011 S I P(U) 2180 340 2520 2520
RW 1/1/2013 STP(U) 2180 340 2520 2520 CE
E. 'H" Sf. Extension 08 P CN 6/1/2014 STP(U) 1199 1871 3070 3070 Yes
E. "H" St. S
from: 1st St. to: Yakima River T
Construct road Including water, sewer, curb. gutter and sidewalk for future W 1/1/2013
development.
Totals 5,559 2551 8110 8110
PE 1/1/2012 STP(C). 700 108 808 808
17 56 01 P 1,3 0
N.10thSt.Extension P RW 1/1/2013 STP(U) 5500 850 6350 6350 CE
N. 101h St. 06 S CN 6/1/2013 STP(U) 7900 - 972 8872 8872 Yes
from: R St. to: 10th Street - Lincoln Ave. T
W
Construct road including water, sewer, curb. gutter, sidewalk for future
1/1/2013
' development. - - -- - .. - _.__. _. _ - --- ---- -- ._..--- - -- --- - --
-.._ Totals 14,100 1930 16030 16030
•
Page 14 v. 5.7 - Supersedes previous editions
Report Date: January 31, 2008
•
I.
•
• f
1111
110 .
•
•
t
•
•
•
,° ;77 Washington State Department of Transportation Six Year Transportation Improvement PCProgram Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing ,Date: 7 -1 -2008 . Adoption Date: 7 -15 -2008
City No.: .1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 . Resolution No.: '
Project Identification. Project Costs in Thousands of Dollars • Federally Funded
L.
c A: PINIFederal Aid No. B. Bridge No. m rn Fund Source Information Expenditure Schedule Projects Only
o .o C. Project Title m a 3 o . Fede Funding (Local Agency)
t v l i z D. StreetlRoad Name or Number - a I- N . o a Phase Federal ' Federal State 4th Required
E. Beginning MP or Road - . Ending MP or Road E 1- o Start Fund " .Cost by Fund Slate Local Total . Envir. Date
Funds Funds Funds 1st 2nd 3rd Th T e
F. Describe Work to be Done a (mmidd/Y Code Phase Code 6th YP (MM/Y11
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 . 16 17 18 19 20 21
00 57 03 P N/A 0 PE 1/1/2012 STP(U) 315 38 353
353
CN 6/1/2012 STP(U) 945 126 1071 1071 CE
YVT Pathway 32 P
YVT Railway Corridor. S No •
from: to: T
Development pathway in West Valley area including 53rd Ave, Wide Hollow, W '
641h Ave, Ahtanum including all utilities and signage _
_ Totals 1,260 164 1424 1424:
17 58 01 P N/A O PE 1/1/2011 STP(U) 63 • - 5 68 68 '—
34th Ave 8 River Rd Improvements 12 • P CN 6/1/2011 STP(U) 567 76 643 I 643 CE
Fruitvale Blvd. S No •
from: 34th Ave. 1o: River Rd. T
Intersection improvements including luminalion, sewer, water, curb, water W .
and sidewalks •
Totals 630 • 81 - 711 711
17 59 01 P 1.o O PE 1/1/2010 STP(U) 218 34 ' 252 252 — —
RW 6/1/2011 STP(U) 327 51 378 378 CE
Englewood Ave 05 P CN 1/1/2012 STP(U) 2980 - 244 3224 3224 Yes
Englewood Ave 12 S . • from: 24th Ave to: 40th Ave T
Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water. lines W 6/1/2011
and streetlights.
Totals 3,525 329 3854 630 3224
16 60 01 P 1.3 C PE 1/1/2010 STP(U) 272 • 43 315 - -- 315
RW 6/1/2010 STP(U) 349 55 404 404 CE
G Frontage Road 8 "H" St. Loop CN 1/1/2011 STP(U) 2352 340 2692 . 2692 Yes
N. 81h St. O
from: "H" St. to: 1 -82 P
Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for S • 6/1/2010
future development and Terrace Heights connection. T
_ Totals 2,973 438 3411 719 2692
_ . _ v. 5.7 - SunersedPS nrevinuc Prtitinnc
•
0 ® . 0
•
g li Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 3g . Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008
City No:: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded'
A. PIN /Federal Aid No. B. Bridge No. c rn v w F un d Source Information Expenditure Schedule Projects Only
`m (Local Agency)
t ri o E C. Project Title d 6 , gy m , j p , t Federal Funding RAN
= 3 r D. Street/Road Name or Number 8 T '� ;; o- - Required
`l ti Z E. Beginning MP or Road - Ending MP or Road E ~ rn a - o S Federal F Fund I Cost by Fund State local Total 1 2nd � 3rd Thu Tnvir. Date •
F. Describe Work to be Done 0_ (mm/ Code Phase C o d e Funds Funds Funds 6th ype (MM/YY)
•
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
00 61 07 P 5 G CN 6/1/2009 1 75 75 251 25 25 CE
Citywide Alleys P . No
•
S
from: lo: W
T
Pave alleys Throughout the city.
Totals 75 75 25 25 25
PE
14 62 03 p
Nob Hill Corridor 04 2 7 G 1 1/1/2010 1 STP(U) 1 120 1 1 17 1 137 1 1 137 1 ` CE
Nob Hill O 1
from: 1 -82 lo: S. 16th Ave. s
S
Widen roadway. sidewalk. curb, gutter, lighting T __
W Totals 120 17 137 . 137
14 63 04 P
3.2 C PE 1/1/2011 STP(U) 1 120 171 1371 1 1371 CE
40th Ave. Corridor 0- -
40th Ave. G •
from: SR -12 ' to: Washington Ave. P -
S
Widen roadway, curb. gutter, sidewalks, lighting. W
T Totals 120 • 17 137 137
14 64 04 P 3.5 C PE 1 1/1/2012 STP(U) 1 120 17 137 r 1 137 CE
16th Ave. Corridor G
16th Ave. O
from: SR -12 to: KY Ave.Nalley Mall P
T
Widen roadway, curb, gutter, sidewalk, lighting. T
W Totals 120 17 137 137
V. 5.7 - Supersedes previous editions
Report Date: January 31, 2008 Page 16
•
; , . .
, ,.
• • •
i . •
•
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima • From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPOIRTPO: YVCOG
Amend Date: 3 -24 -2009 Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded •
g d Expenditure Schedule Projects Only
A. PIN/Federal Aid No. B. Bridge No m a , Fund Source Information
.c a P
g w 'o s) C. Project Title w In m ° m (Local Agency)
E 1 a 3 v L Federal Funding RNV
c -6 d Z D. Street/Road Name or Number .. y -J a Phase Federal Federal State 4th Required -
E. Beginning MP or Road - Ending MP or Road E l m Start Fund Cost by Fund State Local Total 1st 2nd 3rd Thru . Envlc Date •
F. Describe Work to be Done d ( mm/dd/yyyy) C Phase Code Funds Funds Funds 6th Type (MM/YY)
1 2 3 , 4 5 6 7 8 9 10 . 11 12 13 14 15 16 17 18 19 20 21
14 65 04 P 2.0 C - PE 1/1/2012 STP(U) 1201 " 17 137 137
CE
• •
S. 1st St/Main St. Corridor G
S. 1st St./Main S1. 0
from: Nob Hill Blvd. to: Barker Mill Bridge P
Join! project with Union Gap to siden roadway, curb, gutter, sidewalk, T
lighting. T _ __ -. ---- W Totals 120 17 137 137
6.0 c PE 1 1/1/2012 1 STP(U) 120 I I 1 17 I 137 I 1 1 I 137 CE
• 14 66 01 P I I
W Yakima North/South Connector to West Valley 04 GO . •
Unknown road 06
from: North - South to: in West Valley P
S
City & County joint project to build /extend roadways.
T ,
• W Totals 120 17 137 137
00 67 23 $ N/A PE 1/15/2009 1 OTHER . 100 1001 100
West Side Transit Center Placement Study
Acquire Property to Expand Operations
from: to: Recent Annexations Mandate Transit Expansion to These Areas -
Totals 100 too 100
16 68 04 P .73 C CN 6/1/2009 1 432 68 1 500 5001 " - - -- .
W. Nob Hill Blvd -S 681h Ave to S. 72nd Ave. . W
W Nob Hill Blvd 0 . • from: S. 68th Ave. to: 72th P .
Reconstruct to minor arterial standards S
Totals 432 68 500 500
v. 5.7 - Sunersedes previous editions
• ... • ..
. ;
• .
•
•
Aa....
igii Washington State Department of Transportation - Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 3g Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPOJRTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.:
Project Identification Project Costs In Thousands of Dollars Federally Funded
A. PIN /Federal Ald No. B. Bridge No. c w Fund Source Information Expenditure Schedule Projects Only
s y � ° C. Proj Title fo v c v, (Local Agency) - -- - - - -.
m o E J d o t Federal Funding RNV
c� p` Z D. Street/Road Name or Number a a Phase Federal Federal State 4th Required
u _ E. Beginning MP or Road - Ending MP or Road E t o - 5 Start Fund Cost by Fund State Local Total Thru Envir. Date
F. Describe Work to be Done 9 a. (mm/dd/yyyy) Code Ph Code Funds Funds Funds 1st 2nd 3rd 6th Type (MM/Yr)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
17 69 03 P PE 4/6/2009 ARRA - 75 75 75
. P
CN 6/1/2009 ARRA - 925 925 925 CE
Yakima Downtown Future Initiatives, Phase 4 05 • T No
06
•
from: 'A" Street • to: 3rd Street to Neches
Install Historic lighting, sidewalk modifications and other Improvements
_ _ Totals 1,000 _ 1000 1000 _ _
17 70 OB S PE 511/2009 OTHER 400 4001 400 ' f
.60 P CN 4/1/2010 OTHER 2600 2600 2800 CE
Yakima Downtown Future Initiatives, Phase 5
S No
from: 1st Street to: 9th Street T
Install Historic Lighting, Sidewalk Modification & Other Improvements. 0
Exact Improvement area(s) to be determined. - - - - -.— — - - - - - --
• Totals ' 3000 3000 3000
CN 1/1/2009 CMAQ 540 1 214 754 754
00 71 03 S
Coolidge Road Widening and Paving. 05 50 W S I 1 1 1 CE No
06 T
from: 80th AVE. to: 88TH AVE. T
Widen roadway and pave with curb and gutter.
Totals 540 214 754 754
5
PEI 1/1/2012 I 1 I 100 1001 I I 100
3 8
16 72 01 P W
Occidental Road Construction.
•
P
from: 58th Ave. to: 64th Ave.
T
Construct roadway
Totals 100 100 100
Report Date: January 31, 2008 Page 18 v. 5.7 - Supersedes previous editions
•
. i
• .
0 .
•
•
•
•
•
•
•
•
W Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.:. 3g Co. Name: Yakima Co. Hearing Date: 7/1/2008 Adoption Date: 7 -15 -2008
City No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded •
c m A. PIN /Federal Ald No. B. Bridge No. d� v o Fund Source Information Expenditure Schedule Projects Only
c K1, - E C. Project Title e 7 H o 0 0 (Local Agency)
n w v Federal Funding RAN
j v n- D. Street/Road Name or Number o l N ,-
z - 0 Phase Federal Federal State 4th Required •
tl E. Beginning MP or Road - Ending MP or Road E t- m .v by Start Fund Cost b Fund State Loca Total Thru Envir. Date
Funds Funds Funds 1st 2nd 3rd T e
F. Describe Work to be Done a (mm/ddyyyy) Code Phase Code 6th yp (MIWYV)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 . 21
00 73 01 P 27 PEI 1/1/2012 I 1 I 1 too too I 1 100
86th Ave. Road Construction
from: Occidental to: Coolidge
Construct roadway
Totals 100 100 100 • 16 74 04 P 1.5 W PEI 1/1/2012 I STP(U) 1 120 1 1 1 17 1 1371 I 1 13
64th Ave. Roadway Widening. 06 G EA
P YES
•
from: Washington Avenue. to: Tieton Drive. T
Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage. - 7/4/2012
Totals • 120 17 137 137
ALL 1/1/2009 1 5309(Bus) I
1 I 1 15401 15401 1540 I 1 CE
00 75 21 S N/A
Purchase four new transit buses (replacements) No
•
On -going vehicle replacement program
from: to:
Seek RFP's to acquire tour new transit buses that will replace units that are
18 years of age. (six years past federal standards)
• Totals • 1540 • 1540 1540
ALL 1 6/1/2009 1 30 115 1 115 1 I - 1
-_ —
00 76 21 S NIA CE
Acquisition of new Dial -A -Ride parafransif vehicles No
Replace several older vehicles
from: to: .
Upgrade Dial -A -Ride service by replacing several older vehicles with new -
models.
- -_ -- — -- -- Totals 85 30 115 115
•
R annrt oat, Ioniianr 9008 Pont 10 • v. 5.7 - Supersedes previous editions
0 ..
® • i
. .
i
....
Washington State Department of Transportation Six Year Transportation Improvement Program
agency: Yakima From 2009 to 2014
3o. No.: 39 Co. Name: Yakima Co. ' Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008
3ity No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
A. PIN /Federal Aid No. B. Bridge No. d .c d Fund Source Information Expenditure Schedule Projects Only
M v �, y (Local Agency)
o m ' E C. Project Title 'Eli P N • 3 .c Federal Fu R/W
c o D. Street/Road Name or Number ° T z' a — Required
a Cl Z E. Beginning MP or Road - Ending MP or Road E I - CO o P Start F Fund ederal Cost by Fund State Local Total 1st 2nd 3rd Thru Tnvi Date
F. Describe Work to be Done
a` (mm/ Code Phase Code Funds Funds Funds 6th YP (MM/Yl)
1 — 2 3 4 5 6 7 8 9 10 11. 12 13 14 15 16 17 18 19 20 21
14 77 11 P CN 4/1/2009 BR 1742 I 1742 1742
0.2 I 1
CE
Nob Hill Overpass Repair No
from: 1st Street to: Ledwich Ave
Make necessary repairs to Railroad Overpass (Bridge)
Totals 1,742 1742 1742
14 78 03 P N/A PE 1/1/2009 STP(U) 173 27 200 200
RW 1/1/2010 STP(U) 433 67 500 500
E. Lincoln & 10th Street Roundabout 05 CN 6/1/2010 STP(U) 1125 175 1300 1300 Yes
06
from: E. Lincoln to: E. MLK Jr. Blvd. 4/1/2010
Roundabout construction a1 intersection curb, gutter, sidewalk, 8 street
lighting - - - -- -
Totals 1,731 • 269 2000 200 1800
12 79 03 P N/A G ALL 1 1/1/2009 STP(U) 1 865 1 1 1 135 1 10001 1 000 CE
S.R.12 & 16th Avenue Interchange 06 No
•
Interchange
from: 16th Avenue to: S.R. 12
Upgrade Interchange by constructing a Roundabout
Totals 865 135 1000 1000
11 80 01 P N/A o I 1 1 I 1 I I 1 I 1 I EA
1 -82 & Lincoln Avenue Interchange P Yes
I -82 Interchange
G
from: E. "G" Street 1o: 1 -82 6/2011
Reconstruct / extend off -ramp from existing 1 -82 off-ramp for Lincoln Avenue
to Street.
• Totals — -- — — --
Report Date: January 31, 2008 Page 20 v. 5.7 - Supersedes previous editions
• .
Washington State Department of Transportation Six Year Transportation Improvement Program
Agency: Yakima From 2009 to 2014
Co. No.: 39 Co. Name: Yakima Co. Hearing Date: 7 -1 -2008 Adoption Date: 7 -15 -2008
• City No.: 1485 MPO /RTPO: YVCOG Amend Date: 3 -24 -2009 Resolution No.:
Project Identification Project Costs in Thousands of Dollars Federally Funded
To `m A. PIN /Federal Aid No. ' B. Bridge No. c f, b a) Fund Source Information Expenditure Schedule Projects Only
s . . E C. Project Title e " i o (Local Agency)
.0 _ 8 d ; v r Federal Funding R/W
s c5 ti Z D. Street/Road Name or Number ° T w Y a
u_ E co o = Phase Federal Federal State • 4th Required
E. Beginning MP or Road - Ending MP or Road E I- S o Start Fund Cost by Fund State Local Total Envir. Date
F. Describe Work to be Done n. imm/dd/yyYY) Code Phase Code Funds Funds Funds 1st 2nd 3rd T Type (MM/YY)
1 2 3 4 5' 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
14 81 12 p N/A P ALL 1/1/2010 1 STP(U) 1 8651 1 135 1 1000 1000 1 .
E . Yakima Avenue & Fair Avenue Signalization W CE No
T
from: E. Yakima Avenue to: Fair Avenue S
Construct Traffic Signal O
Totals 865 135 1000 1000
PE 4/6/2009 ARRA - 50
14 82 06 P 2 .64 CN 6/1/2009 ARRA - 1950 1950 50 1950 50 CE
Summitview Ave. Grind & Overlay 07 No
from: 14th Ave 1o: 561h Ave
Grind 0.20' of ACP 8 replace with 0.20' of HMA, and install required ADA
ramps .
_- _ Totals 2,000 2000 2000
Grand Totals for Yakima • 129,965 20,094 33,605 183,664 40,781 34775 37,505 70,603
•