HomeMy WebLinkAbout02/07/2023 - 06.D. Project Completion and Contract Acceptance for Interwest Construction Inc for the Water Transmission Main Repair EPO #2212E Project AC2655BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 6.D. For Meeting of: February 7, 2023 ITEM TITLE:Project Completion and Contract Acceptance for Interwest Construction Inc for the Water Transmission Main Repair EPO #2212E Project AC2655 SUBMITTED BY:Scott Schafer, Director of Public Works * David Brown, Assistant Director of Public Works - (509) 575- 6204 Mike Shane, Water/Irrigation Engineer SUMMARY EXPLANATION: Interwest Construction Inc completed the Water Transmission Main Repair EPO #2212E Project AC2655. The contractor implemented protective measures on the Naches River for the 48- inch water transmission main. Final inspection for this project was made and the recommendation is that the project be accepted. A final payment of $8,638.63 (5% retainage) is due from the City to Interwest Construction Inc for the completion of this project. Project Manager: Mike Shane Contractor: Interwest Construction Inc EPO Awarded on: 08/08/22 Contract Cost: $181,411.13 Total Due: $8,638.63 The total contract cost is for construction only and does not include engineering and other costs. City Council action is required to accept the project and approve the final construction costs. ITEM BUDGETED:Yes STRATEGIC PRIORITY:Neighborhood and Community Building APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: 1 A ccept P roject AT TAC HM E NT S : Description Upload Date Type Final 1/11/2023 Backup Material 2 Invoice Date:09/22/22 Invoice Number:1380-01 Period Beginning:August Period Ending:September Name:City of Yakima ICI Job Number:1380 Address:2301 Fruitvale Blvd City:Yakima, WA 98902 Attn: David Brown Assistant Director of Public Works INVOICE TOTAL:172,772.50$ Project:Naches River - Emergency Repairs PO No.:2022-142 001 Direct Labor Cost 19,952.00$ 002 Labor Markup (29%)5,786.15$ 003 Direct Material Cost 75,630.99$ 004 Material Markup (21%)15,882.51$ 005 Direct Equipment Cost 45,885.00$ 006 Equipment Markup (21%)9,635.85$ Amount Due this Billing 172,772.50$ PROJECT TOTALS THROUGH THIS INVOICE Gross Total Billed JTD 172,772.50$ Retainage JTD -$ Sales Tax JTD -$ Total Billings Job-To-Date Less Retainage (Line 011 - 012 +013)172,772.50$ Please direct questions regarding this invoice to ar@interwest.biz or the Project Manager. PROJECT INVOICE THROUGH PERIOD ENDING September PER ATTACHED DETAIL Printed: 9/22/2022 REMIT PAYMENT TO: 609 North Hill Blvd. Burlington, WA 98233 360-757-7574 12/15/22 Okay to pay 3