HomeMy WebLinkAbout01/17/2023 06.G. Resolution authorizing supplemental agreement 1 with HLA Engineering and Land Surveying, Inc to provide Professional Construction Management, Observation and Administration Services for the Summitview Ave Project 2566 1
sirF`
4''+
A
I,C: r',,
\III'or :
k#,C"), :..... ..1?"1/
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 6.G.
For Meeting of: January 17, 2023
ITEM TITLE: Resolution authorizing supplemental agreement 1 with HLA
Engineering and Land Surveying, Inc to provide Professional
Construction Management, Observation and Administration
Services for the Summitview Ave Project 2566
SUBMITTED BY: Scott Schafer, Director of Public Works
* Bill Preston, City Engineer- (509) 576-6754
SUMMARY EXPLANATION:
The City of Yakima's Summitview Avenue project included resurfacing from just west of 40th
Avenue to 48th Avenue, and 56th Avenue to 72nd Avenue (including through intersections of 56th
Avenue and 72nd Avenue). The City selected HLA to provide professional services for
construction engineering and administration services on the Summitview project on Resolution
2022-112 and Contract 2022-153. The City desires to supplement the existing contract to
account for a necessary addition of 8 working days and the costs associated. The Supplemental
Agreement 1 is for$24,531.00. The Agreement has been attached for City Council review. The
project is being federally funded with a Washington State Department of Transportation 2021
National Highway System (NHS)Asset Management Award, with no local match required.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY: Public Safety
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
RECOMMENDATION:
Adopt Resolution
ATTACHMENTS:
Description Upload Date Type
❑ Resolution 12/28/2022 Resolution
0 Supplemental Agreement 1 12/5/2022 Backup Material
2
RESOLUTION NO. R-2023-
A RESOLUTION authorizing a supplemental agreement with HLA Engineering and Land
Surveying Inc providing professional construction management,
observation and administration services for the Summitview Avenue
Project 2566 (PROJECT)
WHEREAS, the City had the need to perform construction management on the
Summitview Avenue Resurfacing project; and
WHEREAS, HLA Engineering and Land Surveying, Inc. (HLA) was selected to provide
professional construction management, observation and administration services; and
WHEREAS, the project required additional working days during construction; and
WHEREAS, the City desires to supplement the existing agreement (Contract 2022-153)
with HLA Engineering and Land Surveying, Inc, to account for the necessary additional 8 work
days, and the costs associated with those additional 8 work days; and
WHEREAS, the City Council of the City of Yakima finds that supplementing the
Professional Services Agreement is in the best interests of the City and its residents; now,
therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute a Professional Services Agreement
Supplement 1 with HLA Engineering and Land Surveying, Inc., attached hereto and
incorporated herein by this reference, not to exceed Twenty-Four Thousand, Five Hundred and
Thirty-One Dollars ($24,531) to provide the Professional Services as described in the
Supplemental Agreement.
ADOPTED BY THE CITY COUNCIL this 17'h day of January, 2023.
Janice Deccio, Mayor
ATTEST:
Sonya Clear Tee, City Clerk
3
a
V41Washington State
Department of Transportation
Supplemental Agreement Organization and Address
Number 1 HLA Engineering and Land Surveying,Inc.
Original Agreement Number 2803 River Road
Yakima,WA 98902
22039C
Phone: 509-966-7000
Project Number Execution Date Completion Date
NHPP-4596(007) 9/7/2022 12/31/2024
Project Title New Maximum Amount Payable
Summitview Avenue Resurfacing 186,231.00
Description of Work
Construction engineering and administration services to resurface Summitview Avenue from just west of
40th Avenue to 48th Avenue, and 56th Avenue to 72nd Avenue (including through intersections of 56th
Avenue and 72nd Avenue).
The Local Agency of City of Yakima
desires to supplement the agreement entered in to with HLA Engineering and Land Surveying, Inc.
and executed on 9/7/2022 and identified as Agreement No. 22039C
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
Section 1, SCOPE OF WORK, is hereby changed to read:
SCOPE OF WORK shall remain unchanged with the exception that eight additional working days occurred.
II
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days
for completion of the work to read: TIME FOR BEGINNING AND COMPLETION shall remain unchanged
III
Section V, PAYMENT, shall be amended as follows:
PAYMENT shall be increased $24,531,for a new maximum amount payable of$186,231.00.
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate
spaces below and return to this office for final action.
By: HLA Engineering and Land Surveying, Inc. By: City of Yakima
Consultant Signature Approving Authority Signature
Date
DOT Form 140-063
Revised 09/2005
4
CN Engineering Services (Consultant)
Supplement 1 Fee Estimate (2022)
City of Yakima
Summitview Avenue Resurfacing
CN Phase
Negotiated Hourly Cost:
Classification Hours Rate Cost ($)
Licensed Principal Engineer 24 x $210.00 = $5,040.00
Project Engineer 24 x $155.00 = $3,720.00
Resident Engineer 96 x $128.00 = $12,288.00
Contract Administrator III 24 x $142.00 = $3,408.00
Total = $24,456.00
Reimbursables:
Mileage $75.00
Grand Total $24,531.00
6:AContracts&Task OrdersV Yakima A2022\Sum mitview Avenue Resurfacing ACN Agreement A2022-11-30 Supplement 1 Consultant Services Estimate.xlsx