Loading...
HomeMy WebLinkAbout01/03/2023 06.B. Project Completion and Acceptance for Hurst Construction, LLC. Project SC2548 2021 Citywide Wastewater Improvements 1 \III'or : BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 6.B. For Meeting of: January 3, 2023 ITEM TITLE: Project Completion and Acceptance for Hurst Construction, LLC. Project SC2548 2021 Citywide Wastewater Improvements SUBMITTED BY: Scott Schafer, Director of Public Works David Brown,Assistant Director of Public Works *Mike Price, Wastewater/Stormwater Division Manager(509)249- 6815 SUMMARY EXPLANATION: City of Yakima (City) Project 2548 replaced 2,011 feet of deficient clay and concrete sewer pipe and 9 failing manholes at 8 locations in the City to reduce groundwater infiltration and improve collection system reliability and maintainability. Final inspection for this project was made and the recommendation is that the project be accepted. Project completion is subject to issuance of Certificate of Payment by the Department of Revenue. A final payment of$28,582.83 (5% retainage) is due from the City to Hurst Construction, LLC. for the completion of the work. Project Manager: Dana Kallevig Contractor: Hurst Construction, LLC. Contract Award: $699,961.50 Final Contract Cost: $571,656.51 Retainage Due: $28,582.83 The total contract is for the construction only and does not include engineering and other costs. City Council action is required to accept the project and approve the final construction costs. ITEM BUDGETED: Yes STRATEGIC PRIORITY: Public Safety APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: 2 Accept project ATTACHMENTS: Description Upload Date Type ❑ Notice of Completion 11/10/2022 Backup Material 3 Engineering and Land Surveying,Inc October 24, 2022 City of Yakima Wastewater Division 2220 East Viola Avenue Yakima, WA 98901 Attn: Dana Kallevig, Utility Project Manger Re: City of Yakima 2021 Citywide Wastewater Improvements City of Yakima Project No.: SC2548 HLA Project No.: 21058 Project Acceptance Dear Dana: Enclosed is Progress Estimate No. 05 designated as the Final for work performed by Hurst Construction, LLC through June 10, 2022 in connection with their contract on the above referenced project. The amount due the contractor of$125,916.84 is net, less retainage, per the contract documents. We recommend this Final Progress Estimate be considered and accepted by the City of Yakima Council. This letter also serves as our recommendation for acceptance for the above referenced project by the City of Yakima. We have reviewed the work performed by Hurst Construction, LLC on this project and believe it has been completed satisfactorily. If everything is acceptable, please provide us with a copy of the City of Yakima Council resolution authorizing project acceptance. Once the project has been accepted as complete by the City, the required "Notice of Completion of Public Works Contract" will be completed by HLA and sent to the Department of Revenue, Department of Labor and Industries, and Employment Security Department in Olympia, on the City's behalf through our access to the City of Yakima Labor and Industries Portal. The retainage on this project in the amount of $28,582.83, should be released to Hurst Construction, LLC after acceptance of the project and when the City of Yakima has received a lien release from the Department of Labor and Industries, the Department of Revenue, and the Employment Security Department, and when the City has confirmed there are no additional liens on this project. Please use the following link to access this project's Closeout Documentation: 21058 - Closeout and Labor Documents. Closeout Documentation for this project includes: ❖ A Contractor signed punch list confirming all items identified during the final walkthrough were completed. HLA has verified and confirmed that all items were completed. ❖ A PDF set of Record Drawings. ❖ The Final Contract Voucher Certification signed by the contractor which states that all labor and materials furnished on this project have been paid for. 2803 River Road •:• Yakima,WA 98902 •:• (509)966-7000 •:• www.hlacivil.com 4 City of Yakima October 24, 2022 Page 2 ❖ The required project labor documentation including: o Requests to Sublet and Contractor Verifications for the Prime Contractor and all Subcontractors. o A Statement of Intent to Pay Prevailing Wages and Affidavits of Wages Paid approved by the Department of Labor and Industries for the Prime Contractor and all Subcontractors. Our office will retain an electronic copy of all these files on the City's behalf, should you need them again. Please provide us with a copy of your notice releasing retainage (after all the required steps are met) for our records and to complete the project file. Please contact this office if you have questions or if we may furnish additional information. Very truly yours, ' Digitally signed by Benjamin A.Annen Dete:2022.10.24 13:42`:18-07'00' Benjamin A. Annen, PE BAA/egs Enclosures Copy: Jesse Hurst, Hurst Construction, LLC Angela Ringer, HLA G:\PROJECTS\2021\21058C\10 PROGRESS ESTIMATES\Progress Estimate No 05 and Final\2022-10-24-21058-PE 05 and Final&Project Acceptance docx