Loading...
HomeMy WebLinkAboutR-1990-D5803 Gray & Osborne, Inc.• RESOLUTION NOD r.4 58 03 A RESOLUTION authorizing execution of a contract for engineer- ing services with Gray & Osborne, Inc., Con- sulting Engineers. WHEREAS, the City of Yakima has need for consulting engineering services for the design of a "Supervisory Control and Data Acquisition System" for the City's water treatment plant; and WHEREAS, the City does not possess adequate in-house engineering staff to perform necessary design of the aforemen- tioned system, and WHEREAS, the City of Yakima has complied with the provi- sions of RC W 39.80 which concerns a procurement of engineering and architectural services by a city; and WHEREAS, the City Council deems it to be in the best interest of the City to contract with Gray & Osborne, Inc., Consulting Engineers for design services on the City's "Super- visory Control and Data Acquisition System," now, therefore, HE IT RESOLVED BY TBE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager, City Clerk, and Director of the Depart- ment of Engineering and Utilities are hereby authorized and directed to execute the attached and incorporated "Agreement" together with its attachments, including Task Orders 1 and 2. ADOPTED BY THE CITY COUNCIL this day of pue,u_ci-- 1990. ATTEST: City Clerk (res/gray) Mayor AGREEMENT City of Yakima & Gray & Osborne, "lc. WTP S C.A.DA. System AGREEMENT THIS AGREEMENT, made and entered into this 12th day of September , 1990, by and between the City of Yakima, Washington, hereinafter called "City" and Gray & Osborne, Inc., Consulting Engineers, hereinafter called "Engineer", is for the provision by the Engineer to the City of professional services in support of City's Water Treatment Plant Supervisory Control and Data Acquisition (S.C.A.D.A.) System. In consideration of the covenants and agreements herein contained and the teims and conditions hereof, the parties agree as follows: 1. Services. Engineer shall provide the City professional consulting engineering services through a series of task orders as provided in paragraph 2 below. The professional services to which the parties may agree by task orders may include, but are not limited to those listed in Exhibit A, attached hereto and by this reference incorporated herein. 2. Task Orders. Prior to commencement of any services, the City and Engineer shall mutually agree upon and execute a task order for the specified services. The task order shall describe the services to be provided, the time for performance of the services, the provisions for fees for the services, and any provisions additional to this agreement. Execution of this agreement and Task Order No. 1 by the City and the Engineer authorizes the Engineer to proceed with the services described in Task Order No. 1. Execution of each subsequent task order shall incorporate each subsequent task order into this agreement. The execution of this agreement does not obligate either of the parties hereto to provide or accept any services unless and until the parties have mutually agreed upon and executed a specific task order for such services. WATIRG SCADA 1 AGREEMENT City of Yakima & Gray & Osborne, .nc. WTP S C.A.DA. System 3. Time period for Performance of Services. The Engineer shall commence such services as are described on executed task orders in accordance with the time schedules set forth therein and shall proceed with the provision of such services in a diligent manner. The Engineer shall not be responsible for delays caused by factors beyond the Engineer's control or which could not reasonably have been foreseen by the parties at the time the task order was executed. The anticipated schedule for the project is shown as Exhibit B. 4. Payments to Engineer. WATIRG SCADA A. Fees for Services. In each specified task order executed by the parties, the parties shall specify payment to the Engineer for services performed by either (1) agreeing to a fixed fee amount, or (2) agreeing to pay the Engineer utilizing the hourly rate and expense schedule, "Fee Schedule", attached hereto as Exhibit C and by this reference incorporated herein. Said Fee Schedule is subject to revision by the Engineer not sooner than one year after the execution of this agreement, and no more often than once each year thereafter. Under the fee schedule method, the parties shall agree on an amount which represents the maximum fee to which the Engineer shall be entitled under that task order. That amount shall represent the best estimate of the parties of the maximum cost of the Engineer's services specified in that task order. In the event the cost of services will exceed that estimate, the Engineer shall advise the City in advance of such excess costs and shall provide no services in excess of such estimated costs without the approval of the City. B. Estimated Fees. The estimated fees for anticipated task orders are shown on Exhibit A. G Renegotiation of Fee. The Engineer reserves the right to renegotiate the fee or estimate of fee specified in any task order 2 AGREEMENT City of Yakima & Gray & Osbome, WTP S.C.A. D.A. System if the scope of services as specified in the task order is modified by the City or by others or by conditions beyond the control of the parties hereto whereupon additional expenses shall be incurred by the Engineer. The City and Engineer shall agree to such a change in fee and services in writing prior to the Engineer's provision of such modified or changed services. D. Time of Payments. Engineer shall periodically submit invoices for the unbilled portion of the services completed to that date. City agrees to pay the invoiced amounts within 30 days from the date of receipt of the invoice. E. Payments in the Event of Termination. In the event of termination of this agreement, Engineer shall be compensated for services performed under this agreement to the date of teimination in accordance with the terms above. F. Permits and Advertising. City shall pay all regulatory permitting and advertising fees and all other project fees normally paid by the City for a public works project. 5. Standard for Perfoimance. Engineer shall perform his services in accordance with generally accepted engineering and consulting standards and shall be responsible for the technical soundness and accuracy of all work and services furnished pursuant to this agreement. 6. Termination. Either party may teiminate this agreement at any time upon 30 days written notice to the other party. 7. Opinions of Cost. Engineer has no control over the cost of labor, materials, equipment, or services provided by parties other than Engineer and its subcontractors. Engineer has no control over contractor's methods of determining prices, or other competitive WATIRG SCADA 3 .AGREEMENT City of Yakima & Gray & Osbome, ,..c. WTP S.C.A.DA. System Engineer and its subcontractors. Engineer has no control over contractor's methods of determining prices, or other competitive bidding or market conditions, and its opinions of probable project or construction costs are to be made on the basis of its experience with the construction industry. However, Engineer cannot and does not guarantee that proposals, bids, or actual project or construction costs will not vary from the opinions of probable costs prepared by the Engineer. 8. Construction and Safety. Engineer shall not be responsible for the means, methods, techniques, sequences, or procedures of construction selected by contractors or the safety precautions and programs and programs incident to the work of contractors. 9. Ownership of Documents. The originals of all documents, including drawings and specifications, prepared by Engineer shall remain the property of the Engineer. The Engineer shall provide the City with reproducible and/or non -reproducible copies, at the City's option, of the documents, drawings, and specifications, and other work products as specified in each task order. Such documents, drawings, and specifications are not intended or represented by the Engineer to be suitable for reuse by the City or others on extensions of the services provided for the intended project or on any other project. Any reuse without written verification or adaptation by the Engineer will be at the City's sole risk and without liability or exposure to the Engineer, and the City shall indemnify and hold harmless the Engineer from all losses, claims, damages, and expenses, including attorney's fees arising out of or resulting therefrom. Any such verification or adaptation by Engineer will entitle the Engineer to further compensation at rates agreed upon by the parties. Engineer shall provide a reproducible copy of the final record drawings showing the construction project measurements when authorized to do so by task order. WATIRG SCADA 4 AGREEMENT City of Yakima & Gray & Osborne, ,,ic. WTP S C.A.DA. System 10. Design Intent. Engineer shall prepare design documents, drawings, and specifications with the understanding that he will be observing the quality and progress of construction for compliance with the intent of the design, and furthermore that such observation of construction will be compensated by the City at the rates agreed upon by the parties hereto. 11. Indemnity. The Engineer shall defend, indemnify, and hold harmless City from any and all claims or liabilities, including attorneys fees, arising out of Engineer's negligent perfoiniance of this Contract. WATIRG SCADA Engineer shall comply with all federal government, state, and local laws and ordinances applicable to the work to be done under this Contract. Prior to beginning work under this Contract, Engineer shall provide Certificates of Insurance as evidence that policies providing the following coverage and limits of insurance are in full force and effect. A GENERAL COMPREHENSIVE LIABILITY With respect to liability for injuries to or death of persons and with respect to liability for destruction of or damage to property, the insurance coverage shall be $500,000 combined single limit and such coverage shall include the special provisions listed below: City shall defend, indemnify and hold Engineer harmless from all claims or liabilities, including attorney's fees, arising out of City's negligent acts. 1. The City, its officers, employees, and agents shall be named as an additional insured and the coverage shall be 5 AGREEMENT City of Yakima & Gray & Osbome, inc. WTP S C.A.DA. System applicable to and protect the City, its officers, employees, and agents from liability arising from or relating to Engineer's activities relating to this Contract. Such insurance shall be primary and other insurance maintained or carried by the City shall be separate and distinct and shall not be contributing with the insurance listed hereunder. 2. Such insurance shall not include explosion, collapse, or underground exclusions commonly referred to as the "XCU" hazards. B. AUTOMOBILE COMPREHENSIVE LIABILITY With respect to liability for injury to or death of persons and with respect to liability for destruction of or damage to property, the City, its officers, employees, and agents shall be named insured and the insurance coverage shall be $500,000 combined single limit. Such insurance shall be primary and other insurance maintained or carried by the City shall be separate and distinct and shall not be contributing with the insurance listed hereunder. Failure of either or all of the named insured to report a claim under such insurance shall not prejudice the rights of the City, its officers, employees, and agents thereunder. The City, its officers, employees, and agents will have no obligation for the payment of premiums because of its being named as an insured under such insurance. Prior to the beginning work for property acquisition, development of contract plans and specifications, and construction management, the Engineer or its subcontractors shall provide evidence of errors and omissions coverage for a minimum of $250,000. WATIRG SCADA 6 AGREEMENT City of Yakima & Gray & Osborne, ..,c. WTP S.C.A.DA. System 12. Additional Services. At the City's option and direction, Engineer shall provide additional engineering, observation, and/or planning services as authorized by mutually agreed task orders. 13. Entire Agreement. This Agreement constitutes the entire agreement between the City and Engineer and supersedes all prior or contemporaneous oral or written representations or agreements. This agreement shall not be modified, except with an agreement signed by both parties. 14. Attorney's Fees. In the event suit or legal action is instituted to enforce any of the terms or conditions of this agreement, venue shall be in the Superior Court for Yakima County. The losing party shall pay to the prevailing party, in addition to the costs and disbursements allowed by statute, such sum as court may judge reasonable as attorney's fees in such suit or action, in both trial and appellate courts. 15. Assignment. Neither party to this agreement shall assign the agreement, nor any interest arising herein, without the written consent of the other. The Engineer, with the City's consent, shall be authorized to employ or subcontract with any other party or entity it deems necessary for the performance of any of the services to be provided by the Engineer pursuant to the tei ms of this agreement. 16. Separate Agreement. In the even any of the terms or clauses of this agreement is held to be illegal or unenforceable by any court or arbitrator, the remaining clauses and terms shall continue in full force and effect and shall be enforceable. 17. GoverningLaw. This agreement is governed by the laws of the State of Washington. WATIRG SCADA 7 AGREEMENT City of Yakima & Gray & Osborne, WTP S.C.A.DA. System IN WITNESS WHEREOF, the parties hereto have executed this agreement the day and year first written above. CITY OF YAKIMA, WASHINGTON GRAY & OSBORNE, INC. Consulting Engineers BY: Richard A. Zais, Jr. : John C. Poston, City Manager Principal Engineer ATT:u ST: City Clerk City Contract No. 90-62 Resolution No. D-5803 WATIRG SCADA 8 AGREEMENT City of Yakima & Gray & Osborne, Inc. WTP S C.A.D.A. System EXHIBIT A ANTICIPATED SCOPE OF SERVICES & FEES Task Est. Fee Estimated: S.CAD.A. System Conceptual Design Development Balance of Work $15,200.00 $50,000 Note: The fees listed above as "Estimated" are the best estimates of the parties at the time of the agreement execution. The fees to be paid Engineer are dependent upon actual time required to accomplish each task. For this reason, the estimates listed above are subject to change and should only be used for general planning purposes. However, the total cost will not be exceeded without prior written approval by the City. WATIRG SCADA 9 AGREEMB'ff City of Yakima & Gray & Osbome, inc. WTP S.C.A.DA. System TASK ORDER NO. 1 Sub Tasks Yakima WTP S.C.A.D.A. System Proposal Preliminary Cost Estimate - 8/6/90 Estimated Hours Engr. Tech/ Engineering Drafting Meet to discuss and check out all input and outputs a. Review all input and control devices 8 8 b. Determine which existing input and devices can be used . 16 c. Deteiuiine what new devices will be required 8 d. Make cost/performance evaluations in cases where there may be a choice between using existing devices or replacing with a new device. 16 Determine cost and feasibility of installing wiring from the new control panel to the input and control devices. 16 Review the findings of the above tasks with the City to make tentative decisions on the number and type of the input and control devices as required to achieve the :oals of the S.CADA. system Prepare a summary o all o the I/O points based on the above evaluations and discussions 8 8 # of discrete I/O points # of analogy I/O points 5. Develop preliminary conceptual design of the S.CA.DA system hardware and software for WTP, includin: P & ID dia:ram 24 16 Work with necessary City st. i to develop a summary of the data acquisition system requirements a. Process variables for which data is to be 8 logged. b. Data acquisition time interval for each 4 process variable c. Amount of data to be stored for review before archiving (i.e period of time, 1 month, 6 4 months, 1 year?) d. Graphics requirements for historical 8 trending displays e. Evaluate hardware and software requirements for data storage and archiving (i.e. size of mass storage and type of archive 8 media) 4 4 WATIRG SCADA 10 AGREEMENT City of Yakima & Gray & Osborne, =..c. WTP S-C.A.DA. System 7. Evaluate telemetry system requirements a. # and location of telemetry points b. For each location determine whether -monitoring only, or -monitoring and control c. Evaluate telemetry and control hardware requirements at each telemetry point d. Evaluate telemetry communication methods and hardware (radio vs. leased telephone lines 8. Develop mal conceptual design for the telemetry _ system 9. Develop final conceptual design for the WTP S.C.A.DA. system including incorporation of the telemetry system into the TWP Control S stem 10. Develop budgetary cost estimate or the S.C.A.D.A. system based on the conceptual desi; n 4 8 16 16 12 Total Estimated Hours: Total Costs: Task No. 1 Total Estimated Cost: 208 56 $13,520 $1,680 $15,200 Anticipated Time of Completion: 8 weeks from authorization to proceed TASK ORDER NO. 1 AUTHORIZATION TO PROCEED 1 CITYn C F YAKIMA El(i By: Dennis E. Co ell, P.E. e'?9 Date %/86/9 y: John C. Poston, P.E.. ate WATIRG SCADA 11 AGREEMENT City of Yakima & Gray dt Osborne, Inc. WPTP S.C.A.D.A. System Task Order No, 2 Task Order No. 2. BALANCE OF WORK After completion of Task Order No. 1 and upon authorization by the City the Engineer shall proceed with the preparation of detailed contract drawings and specifications for the City of Yakima Water Treatment Plant S.C.A.D.A. system. The technical content of the drawings and the specifications will be provided by the Engineer with input from the City staff. The General Requirements of the Specifications will be based on the 1988 APWA Amendments to Division One of the WSDOT/APWA Standard Specifications. Any special requirements to be included in the General Requirements shall be provided by the City. The Bidding and Bid Analysis Phase shall take place when the contract documents have been reviewed and approved by the appropriate City of Yakima personnel. At this time the City would advertise for bids and issue drawings and contract documents to plan centers, prospective bidders, and interested parties. During bidding stage, Engineer would be available to answer questions, clarify the documents if necessary, prepare addenda if required, and advise the City should any questions regarding the scope or content of the project arise. When bids have been received, Engineer will prepare a bid tabulation sheet listing the bidders and the bid information provided. At the conclusion of the bid tabulation process Engineer will make a recommendation for award of contract. The Construction Observation Phase shall begin after the City has awarded and executed a contract and issued a notice to proceed to the contractor, Construction observation would consist of review of shop drawings and submittal information, progress review meetings with the contractor and City personnel, periodic visits to the job site that would coincide with milestones in the project schedule of the construction contractor. A final observation visit performed in conjunction with the City and the contractor would identify any items of work to be completed at the conclusion of the project. The work to be completed would be identified and a substantial completion check list issued. When work is complete and all documents have been received by the City from the contractor, the project will be terminated. Page 10 AGREEMENT City of Yakima & Gray & Osborne, Inc. WPTP S.C.A.D.A. System Task Order No. 2 Engineer's Fee for Task Order No. 2: Engineer's fee shall be calculated according to the fee schedule method with an estimated fee calculated as follows: Labor: Project Manager Senior Design Engineer Engineer - EIT CAD Drafting Engineering Tech Design Draftsman Estimated Labor Expenses: 180 hrs @ $62.50 160 hrs @ $56.50 120 hrs @ $42.50 180 hrs @ $25.00 70 hrs @ $30.00 180 hrs @ $44.50 $11,250.00 9,040.00 5,100.00 4,500.00 2,100.00 8,010,0Q $40,000.00 Estimated Expenses $10,000.00 (including sub -consultant) Estimated Task No. 2 Fee $50,000.00 Anticipated Time of Completion: 180 days from authorization to proceed after completion of Task No. 1. TASK ORDER NO. 2 AUTHORIZATION TO PROCEED CITY OF YAKIMA By: Date By: John C. Poston, P.E. Date Page 11 EXHIBIT B YAKIMA WTP S.C.A.D.A. SYSTEM PHASE I SCHEDULE TASK SCHEDULED DAYS 1. MEET TO DISCUSS AND CHECK OUT ALL INPUT AND OUTPUTS 2. DETERMINE COST AND FEASIBILITY OF INSTALLING WRING FROM THE NEW CONTROL PANEL TO THE INPUT AND CONTROL DEVICES 3. REVIEW THE FINDINGS OF THE ABOVE TASKS WITH THE CITY 4. PREPARE A SUMMARY OF ALL OF THE I/O POINTS BASED ON THE ABOVE EVALUATIONS 5. DEVELOP PRELIMINARY CONCEPTUAL DESIGN OF THE S.C.A.D.A. SYSTEM 6. WORK WITH NECESSARY CITY STAFF TO DEVELOP A SUMMARY OF THE DATA ACQUISITION SYSTEM REQUIREMENTS 7. EVALUATE TELEMETRY SYSTEM REQUIREMENTS 8. DEVELOP FINAL CONCEPTUAL DESIGN FOR THE TELEMETRY SYSTEM 9. DEVELOP FINAL CONCEPTUAL DESIGN FOR THE WTP S.C.A.D.A. SYSTEM 10. DEVELOP BUDGETARY COST ESTIMATE FOR THE S.C.A.D.A. SYSTEM BASED ON THE CONCEPTUAL DESIGN AUGUST SEPTEMBER OCTOBER 20 21 22 23 24 27 28 29 30 31 3 4 5 6 7 10 11 12 13 14 17 18 19 20 21 24 25 26 27 28 1 2 3 4 5 8 AGREEMENT City of Yakima at Gray at Osborne, Inc. WPTP S.C.A.D.A. System EXI-IIBIT C FEE SCHEDULE Fees for services shall be based on the rates set forth below. Rates shown include Engineer's direct costs, overhead costs, and profit. Labor rates shown are charged on a per hour basis. Labor Project Manager Senior Design Engineer Engineer - EIT * CAD Drafting * Engineering Tech * Design Draftsman * $62.50 $56.50 $42.50 $25.00 $30.00 $44.50 Expenses Mileage $0.30/mi. Reimbursable Expenses ** 110% Cost * Estimated average hourly rate for this employee category. Actual rate charged will be the employee's direct labor cost times 2.5645 which includes direct cost, overhead cost and profit. Any employee category not listed will also be charged at direct labor cost times 2.5645. ** Reimbursable expenses include reproduction costs, postage and freight, computer-aided drafting equipment costs, expense of additional insurance, including professional liability insurance, required by Client in excess of that normally carried by Engineer and Engineer's sub -contractors, and other costs necessary to complete the project but not listed herein. Page 12