Loading...
HomeMy WebLinkAboutR-1990-D5704 Gary Hall Engineering• RESOLUTION NO. - 57 0 4 A RESOLUTION authorizing the City Manager and the City Clerk of Yakima to execute an amendment to the agree- ment with Gary Hall Engineering for professional services. WHEREAS, in connection with the Public Works Yakima Central Business District Transfer Site Selection and Develop- ment Project, it is necessary to amend the professional ser- vices contract with Gary Hall Engineering to conduct additional transit system research, analysis, design, and reporting which contract was authorized by Resolution D-5646, and WHEREAS, Gary Hall Engineering has offered to perform additional professional services in accordance with the provi- sions of the attached document, and WHEREAS, the City Council deems it to be in the best interest of the City that an amendment to the aforementioned contract be executed by the City, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager and the City Clerk are hereby authorized and directed to execute "Amendment No. 1 to the Contract" with Gary Hall Engineering, for the purpose mentioned above, a copy of which agreement is attached hereto and by reference made part hereof. ADOPTED BY THE CITY COUNCIL this -). -7 day of fk 1990. ATTEST: City Clerk (res/g.hall) >416Lp/1-- Mayor • • AMENDMENT NO 1 TO THE CONTRACT For the provision of professional services between City of Yakima, hereinafter called "City", and Gary Hall Engineering, hereinafter called "Engineer" dated October 18, 1989, WHEREAS City wishes to prepare an inventory of its transit bus stops and their needed improvements, and investigate alternative concepts to timed transfer, fixed route operation, and WHEREAS, the City and Engineer have executed and Agreement as mentioned above with an item. number 12, Additional Services, then the parties agree as follows: TASK ORDER NO. 1 of AMENDMENT NO.1 BUS STOP INVENTORY Scope of Services Engineer shall provide services to inventory Yakima Transit's existing bus stops (approximately 600). The inventory shall be prepared in an IBM compatible data base format which includes the bus stops' location, existing condition in terms of City -owned facilities at each site, ground slope, ground condition, and degree of use by the ridership. The inventory will also present suggested improvements and a cost estimate for those improvements for each site. The work product will be: (1) A report including the inventory of existing bus stops, cost estimates for improvements, and a proposed grouping of these improvements into projects with approximately $50,000 construction costs; (2) A map of each route showing the bus stop locations; and (3) "Generic" engineering design drawings and specifications for bus stop improvements including cut and fill sections, concrete pads, benches, and shelters suitable for inclusion with contract documents for bidding purposes. The maps and drawings in items (2) and (3) will be prepared on a city compatible Auto-CADD format, and the City will receive a reproducible mylar and magnetic disk of each map and drawing. City will furnish a tabulation of the existing bus stops on a 5.25 inch, 1.2 mega byte magnetic disk in an IBM compatible format. Engineer's Fee: Engineer's fee shall be calculated according to the fee schedule method with an estimated maximum as follows: III 1. Survey Existing Bus Stops (600+) On board 40 hr. @ $45 $1800 Review Easements 80 hr @ $45 3600 Summarize 40 hr. @ $45 1800 10 hr. @ $60 600 Project managem't. 15 hr. @ $60 900 Expenses 500 Subtotal $9,200 or/ comma NO q f 13-570y 2. Build Database Conversion of City Database $ 600 Input Survey 40 hr. @ $30 1200 20 hr. @ $45 900 Project Management 5 hr. @ $60 300 Expenses 500 Subtotal $3,500 3. Prepare Report Identify improvements 40 hr. @ $45 $ 1800 Prepare Cost Estimates 40 hr. @ $45 1800 10 hr. @ $55 550 Separate Projects 10 hr. @ $45 450 10 hr. @ $60 600 Maps (10 sheets) 10 sheets @ $600 6000 Typing 40 hr. @ $30 1200 Writing 30 hr. @ $45 1350 Review 10 hr. @ $60 600 Project Mgm't. 20 hr. @ $45 900 5 hr. @ $60 300 Expenses 2000 Subtotal $17,550 4. Meetings 40 @ $45 $ 1800 20 @ $60 1,200 Subtotal $ 3,000 5. Generic Designs Design 60 hr. @ $45 $ 2700 20 hr. @ $60 1200 Drafting 4 sheets @ $600 2400 Specifications 20 hr. @ $30 600 Project Management 10 hr. @ $60 600 Expenses 300 Subtotal $7.800 $41,050 Project Subtotal Contingencies (10%) Estimated Fee Task Order 1 4.100 $45,150 Time for Performance Engineer shall commence work upon execution of the Task Order and provide services in a diligent manner. The initial inventory of existing conditions and proposed improvements is estimated for completion at 8 weeks from authorization. A draft repor} presenting cost estimates and separated projects and the final report are estimat• for completion at 12 and 16 weeks from authorization, respectively. ACCEPTED CITY OF YAKIMA er 3--I— 9 By: "" Date Attest • TASK ORDER NO. 2 Of AMENDMENT NO. SERVICE ALTERNATIVES STUDY Scope of Services Engineer shall: 1. Review Yakima Transit's current timed transfer fixed route service. 2. Prepare a narrative of the present service, summarizing its accomplishments as well as areas that may need to be addressed. 3. Prepare a summary of alternative service delivery methods existing in the industry. The potential options involve two basic groups - fixed route and demand response. Within each of these major groups, there are several variations e.g. radial, grid, and timed transfer for fixed route; door-to- door, check -point, and subscription for demand responsive. This task will present a brief summary description of ma.ior categories regarding service options. The description will include key characteristics, rationale for their implementation (e.g. why grid vs. timed transfer?), and examples of their application in various systems. 4. Prepare a written report summarizing findings from items 1,2, and 3; and assessing service alternatives that may be appropriate to Yakima Transit. Several factors will be considered in this assessment. These factors include impacts on the current transit market, effects on achieving a higher transit share of total travel, impact on potential service expansion, and relationship between service development and available resources. (i.e. a particular approach may appear attractive from a customer standpoint but not affordable). Engineer's report in item 4 above will be prepared on a reconnaissance (conceptual) basis. No intensive investigation, nor travel, nor in-person presentations are included in this scope of work. Engineer's Fee Engineer's fee for TASK ORDER 2 will be a fixed fee of $1,800.00. Time For Services Engineer will furnish a final report within 6 weeksof execution of this Task Order. ACCEPTED CITY OF YAKIMA Attest Kora A fee -64}14.,, 3- I-90