HomeMy WebLinkAboutR-2009-094 Lincoln Avenue Railroad Grade Separation Project Contract with Berger/ABAM Engineers, Inc.RESOLUTION NO. R-2009-94
A RESOLUTION authorizing the City Manager to execute an additional (sixth)
supplemental agreement with BERGER/ABAM Engineers, Inc., for project
administration, inspection and engineering support for the Lincoln Avenue
Grade Separation Project.
WHEREAS, in July 2000 the City of Yakima issued and advertised _a request for
qualifications from firrns interested in providing consulting services for the design and
development of a grade separation railroad project; and
WHEREAS, the request for qualifications advertisement described the matter as a multi-
phase project that would later include preparation of plans, specifications and estimates and
construction project management for the Railroad Grade Separation Project ("Project"); and
WHEREAS, as a result of that request for qualifications process, the City selected and
contracted with BERGER/ABAM Engineers, Inc., to provide the said services for the Project;
and
WHEREAS, additional engineering and consulting services are required for project
administration and inspection to construct the Project, as described in the Scope of Work
Description included in the Supplemental Agreement; and
WHEREAS, it is requested that the City Manager have the authority to execute an
additional (sixth) supplemental agreement for additional engineering and consulting services -to
administer and inspect the Project and to extend the completion date and term of the second
contract with BERGER/ABAM Engineers, Inc., through July 31, 2011; and
WHEREAS, the City Council deems it to be in the best interest of the City of Yakima to
authorize the City Manager to execute an additional (sixth) supplemental agreement with
BERGER/ABAM Engineers, Inc., for additional engineering and consulting services to
administer and inspect the Lincoln Avenue Railroad Grade Separation Project and to extend the
completion date and term of the contract with BERGER/ABAM Engineers, Inc., through July 31,
2011, now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute an additional (sixth) supplemental
agreement with BERGER/ABAM Engineers, Inc., for additional engineering and consulting
services to administer and inspect the Lincoln Avenue Railroad Grade Separation Project and to
extend the completion date and term of the contract with BERGER/ABAM Engineers, Inc., (City
Contract No. 2003-53) through July 31, 2011. The total additional compensation authorized by
said supplemental agreement shall not exceed $1,513,059. The form of said supplemental
agreement shall be reviewed and approved by the City Attome or his designee.
ADOPTED BY THE CITY COUNCIL this 7'h day o uly,,2009.
1
David E , Mayor
IV"Washington State
Department of Transportation
Su lemental A reement
pp g
Number 6
Organization and Address
BERGER/ABAM Engineers, Inc. ,
33301 Ninth Avenue South, Suite 300
Federal Way, WA 98003
Phone 206-431-2300
Original Agreement Number
LA - 4453
Project Number
STPX-NCPD-000S (062)
Execution Date
6/30/2009
Completion Date
7/31/2011
Project Title
MLK Blvd. and Lincoln Ave. Grade Separation
New Maximum Amount Payable
$ 3,989,244.00
Description of Work
The Consultant shall provide project administration, inspection and engineering support for the Lincoln Avenue ,
Grade Separation project.
1
The Local Agency of City of Yakima
desires to supplement the agreement entered into with BERGER/ABAM Engineers, Inc.
and executed on 6/20/2003 and identified as Agreement No LA -4453
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows
Section 1, SCOPE OF WORK, is hereby changed to read
'See attached
11
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for
completion of the work to read Work will he completed by lily 11, 7011
III
Section V, PAYMENT, shall be amended as follows
See attached
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action
By ByRGFR/ARAM Fngineers Inr By
/ //el
DOT Form 140-063 EF
Revised 9/2005
Consultant Signature
CITY CONTRAC f NO:
City of Yakima
Approviuthority Signature
R. A. Zais, J , City Manager
05.
-1,1473
RESOLUTION N0 _ ae2t_9S/
Date
SECTION II, SCOPE OF WORK
This Scope of Work Modification adds construction project management, construction
inspection and engineering support during construction to the Exhibit B, Scope of Work
description of the Local Agency Standard Consultant Agreement numbered LA — 4453 for the
Yakima Railroad Grade Separations Project The various tasks are listed below.
SCOPE OF WORK DESCRIPTION
The Consultant shall provide project administration, inspection, and engineering support for
the Lincoln Avenue Grade Separation project. Should construction funding become available,
project administration, inspection, and engineering support will be provided as supplemental
services for the MLK, Jr. Blvd. Grade Separation. The project will be constructed by the
successful low bidder for the project, hereafter referred to as the Contractor.
Services to be provided by the Consultant during construction include shop drawing review,
submittal review, responses to Contractor requests for information (RFIs) during construction,
inspection, and construction administration of the construction contract on behalf of the City of
Yakima, hereafter referred to as the City.
Prior to the start of construction, the Consultant will meet with City staff to clarify and agree on
roles, responsibilities, and communication procedures to be followed by both the Consultant
and City during the administration of the construction contract.
The following tasks are to be performed by the Consultant on a time -and -materials basis. These
tasks have been developed to estimate the level of effort required and shall be performed only
as required to complete construction of the project, in consultation with City staff.
ASSUMPTIONS
1. It is assumed that the Contractor will achieve substantial completion within 12 months
after award of the Construction Contract.
2. The Consultant shall provide a resident project engineer, a lead inspector, a part-time
inspector as needed, and a part-time administrative assistant for record keeping, filing
and other document management tasks as required.
3 The Consultant shall provide review of RFIs and submittals for project elements
designed by the Consultant. Responses to RFIs and submittal review will be prepared
within a mutually agreed time frame.
4 Revisions to environmental documents and/or project permits will not be required.
5 Contract administration and inspection duties, as described above and in Task 1 below,
will be provided for an additional two months beyond the substantial completion
milestone, if required, to facilitate close out of the project. During this two-month
period, the project will be closed out and inspection services will be reduced or be
discontinued as the project is completed.
City of Yakima
Lincoln Avenue Grade Separation Project
Yakima, Washington
Section 11
BERGER/ABAM1, FAPWT-04-016
June, 2009
Page 1 of 14
6. The Construction Contract shall include the provision of an office facility for the
construction administration team with power, heat, air conditioning, suitable furniture
(file cabinets, desks, and chairs) for four staff, an alarm, security, and communications,
including high-speed internet.
7. The Consultant shall provide computers, copiers, fax, and other miscellaneous office
equipment as required.
TASK 1 - PROJECT ADMINISTRATION AND MEETINGS
The Consultant will organize and facilitate a preconstruction conference that will include
representatives from the City, the Contractor, and all utility agencies affected by the project.
The Consultant's field staff will attend weekly site meetings and other meetings with City staff
as required for monitoring the Contractor's workplans, methods, and schedule. The Consultant
shall also prepare monthly estimates of payments to be made to the Contractor in accordance
with the terms of the Construction Contract. This task includes the setting up of project
documentation files for correspondence, pay estimate, and other constriction inspection
records, and the subsequent submittal of these records to the City at the conclusion of the
project.
The Consultant shall review the Contractor's baseline schedule for construction of the project
and shall monitor the Contractor's progress relative to that schedule and request updates as
necessary.
All documentation and project administration activities shall be sufficient to comply with
current state and federal aid requirements as established by the Federal Highway
Administration (FHWA) and the Washington State Department of Transportation (WSDOT).
The Consultant shall be available to meet with local and state auditors when required.
The Consultant shall also prepare monthly invoices for the Consultant's services that include a
brief description of services provided during the month. Invoices will be based on the task
descriptions contained in this scope of work.
The Consultant shall set up and maintain a file transfer protocol (FTP) site to allow City,
Contractor, and other consultants to upload and download electronic documents during
construction. The Consultant shall add and delete files on the FTP site as necessary to enable
expedient sharing of information.
Deliverables
■ Monthly pay estimates
■ Meeting minutes for preconstruction meeting
■ Meeting minutes for weekly site meetings
City of Yakima
Lincoln Avenue Grade Separation Project
Yakima, Washington
Section II
BERGER/ABAM, FAPWT-04-016
June, 2009
Page 2 of 14
■ Meeting minutes for coordination meetings with City staff if requested by the City (assume
two per month)
■ Meeting minutes for meetings with auditors if required (assume three during the life of the
project)
■ Monthly Consultant invoices and progress reports
■ Substantial completion notice and list of deficiencies (punchlist)
■ One set of all project -related inspection and correspondence at the end of the project (project
close out)
TASK 2 - REQUESTS FOR INFORMATION (RFIs) AND SUBMITTAL REVIEW
The Consultant shall respond to questions and RFIs by the Contractor, and shall review all
submittals. The Consultant shall create and maintain a log of RFIs and submittals. It is
assumed that up to 100 RFIs will be submitted.
Deliverables
■ Responses to RFIs in format to be agreed to with the Contractor
■ Submittals will be returned with comments written directly on the submittal material and/or
accompanied by a memo if required
■ A record of telephone conversation will be prepared where required to coordinate the
submittal review with the Contractor.
TASK 3 - CHANGE ORDERS
The Consultant shall evaluate change order requests and provide revised plans and
specifications, as required, to execute agreed changes. The Consultant shall provide legal
review of the change orders when requested by the City. An allowance for assistance with
change orders has been provided with the fee estimate. It is assumed that all change order
requests will be successfully negotiated.
Deliverables
■ Independent estimate of proposed change orders
■ Revised plans and specifications will be provided if required
■ Change orders will be issued in a format as approved by the City
TASK 4 - INSPECTIONS
The Consultant shall provide a full-time inspector and other specialized inspection services on
an as -needed basis. The Consultant shall also provide a field engineer to maintain project
documentation and assist with inspection. Inspectors shall observe the construction work in
progress, the placement of materials, and monitor the overall adherence to the Contract
Documents The Consultant shall provide coordination for all material testing in accordance
with WSDOT and FHWA requirements. The Consultant shall provide construction survey
Cit of Yakima
Lincoln Avenue Grade Separation Project
Yakima, Washington
Section II
BERGER/ABAM, FAPWT-04-016
June, 2009
Page 3 of 14
services, if required by the construction administration team, to validate the Contractor's survey
or to resolve project issues related to surveying.
Deliverables
■ Inspector's Daily Report including Inspector's Summary of Quantities
■ Preconstruction photographs and/or videos, periodic photo records during construction,
and postconstruction project photos (digital photos, minimum resolution of 2 mega pixels)
■ Inspection records
■ Survey notes
TASK 5 - RECORD DRAWINGS
The Consultant shall prepare a set of record drawings for the City that reflects field changes
(additions, modifications, or deletions) made from the bid drawing set during construction.
The record drawing set shall include any drawings revised or reissued during construction as a
result of change orders and shall include changes resulting from RFI responses. These
drawings shall be noted as "Record Drawings" in the drawing revision block, but shall not
require seals or signatures of registered professionals. The intent of the record drawing set is to
provide the best information available to capture significant field changes, but not necessarily
every minor change that may occur.
It is assumed that the Contractor shall keep independent records of field changes and shall
provide any requested information from their records to validate and/or clarify changes during
construction in order to provide the most complete information available for preparation of the
record drawings.
Deliverables
■ One full-size Mylar plan set of final record drawings
TASK 6 - PUBLIC INVOLVEMENT PROGRAM
The following is a list of public involvement services that are to be provided by the Consultant
on this project The outline/list of recommended activities and corresponding deliverables
provides the basis for establishing a public involvement budget. It is anticipated that public
involvement services may be revised in consultation with the City during the course of the
project in response to task and activity additions or unforeseen necessities, and that reasonable
changes to the budget for public involvement services may be required.
A key assumption of the Public Involvement Plan (PIP) and associated fee estimate surrounds
the formation of a Project Advisory Group (PAG). By virtue of this group's vested interest in
the successful outcome of this project, they will be charged with carrying out specific outreach
and communications activities, which are discussed below
The proposed public involvement services are intended to address the following key issues.
City of Yakima
Lincoln Avenue Grade Separation Project
Yakima, Washington
Section 11
BERGER/ABANI, FAPWT-04-016
June, 2009
Page 4 of 14
1 Anticipated public dissatisfaction with work zone congestion, delays, and safety issues
associated with a road closure anticipated to last about one year. Detours will create
additional travel time for emergency vehicles, school, and public transit buses, and may
inconvenience residents, both those traveling within the area and those whose streets
become part of construction detours.
2. Business owners are concerned about loss of business due to yearlong construction,
most of them adjacent to the closure and the detour. Businesses in the limited access
area will need safe access alternatives.
3. Eastbound traffic on MLK Blvd. will be affected as it is reduced from three lanes to two
and has opposing traffic where it normally doesn't.
Stakeholder Outreach/Public Involvement Plan Development
The blueprint for these activities is the PIP. The PIP will identify the project goals, public
involvement schedule, stakeholder groups, communication tools and what they will
communicate, and address the concerns of the community while adequately evaluating and
mitigating potential levels of controversy. The PIP will be developed with input obtained from
stakeholder interviews. Stakeholder interviews or "knowledge mapping" involve one-on-one
discussions with select individuals representing communities of interest and are designed to
identify knowledge needs, gain a deeper understanding of the issues and concerns, and
uncover potential risks to project success.
BERGER/ABAM recommends the following to gather stakeholder intelligence and prepare the
PIP.
1. Prepare for and participate in a 60 -minute teleconference with the City to develop a list
of potential stakeholders or stakeholder groups for interviews, including identification
of potential proponents (champions) and opponents of the project. This first meeting
will also be used to establish/confirm communication protocols, both internal and
external, to ensure consistent messaging and point(s) of contact.
2. Conduct background research via review of available information and City -provided
historical documentation, reports, surveys, and the City's existing downtown merchant
and property owner stakeholder database(s), along with other relevant materials to
inform development of stakeholder questions and PIP.
3. Develop questions and process schedule (two review cycles), and conduct by phone up
to six, 30 -minute stakeholder interviews.
4. Prepare an aggregate stakeholder interview summary report.
5. Prepare for and participate in one, 60 -minute teleconference with the City to review key
findings and outline messaging and next steps.
Cit- of Yakima
Lincoln Avenue Grade Separation Project
Yakima, Washington
Section 11
BERGER/ABAM, FAPWT-04-016
June, 2009
Page 5 of 14
6. Draft and provide one electronic copy of the preliminary PIP for review.
7. Prepare for and participate in teleconference (review cycle) to review the draft PIP.
8. Revise the preliminary plan for final approval.
BERGER/ABAM Deliverables
■ Questions and process for stakeholder interviews
■ Up to six, 30 -minute stakeholder interviews (by phone)
■ Aggregate summary report of stakeholder interviews
■ Preliminary draft of the PIP
■ Final PIP
To Be Provided by City
■ City will provide contact information for identified stakeholders to facilitate
BERGER/ABAM scheduling of stakeholder interviews.
■ City will provide relevant background information and data for research task item.
Messaging
Creating consistent key messages and messaging format, responsibilities, and protocols early in
the process will help "brand" the project and ensure that everyone working on the project is on
the same page. BERGER/ABAM recommends the following.
1. Draft main and audience -specific messages (e.g., residents, businesses, commuters, etc.)
outlined through PIP process (one review cycle). Identify benefits and opportunities of
project.
2. Create a FAQ for distribution. Up to two review cycles. Up to three update revisions as
needed throughout the course of the project (based on new or changed information).
3. Maintain and update messaging on project website (up to six updates), including
progress and closures.
4. Prepare and participate in a 60 -minute teleconference with the City once a month for one
year, to coordinate messaging, updates, and identify needed strategies, tactics, or course
corrections.
BERGER/ABAM Deliverables
■ Main and audience -specific messaging for internal and external use
■ FAQ updated up to three times over the course of the project
City of Yakima
Lincoln Avenue Grade Separation Project
Yakima, Washington
Section 11
BERGER/ABAM, FAPWT-04-016
June, 2009
Page 6 of 14
ra Maintain and provide up to six updates on the project website
• Twelve, 60 -minute teleconference update and coordination meetings with the City
To Be Provided by City
• City will provide updated information as needed for FAQ and website updates.
Project Advisory Group
The creation of a PAG of impacted stakeholders to provide oversight and advice on, as well as
carry out some important project outreach and communications activities, is an integral
component of the public involvement strategy. The PAG, selected based on their constituent
networks and stakeholder representation, would provide advice through the duration of the
project, preconstruction through completion, in addition to providing a key component of the
outreach effort itself. The main focus of this group will be to help develop strategies (business
retention, marketing) for keeping local businesses viable during construction, and provide
ongoing liaison or information dissemination to constituencies and organizational affiliations
about project status. BERGER/ABAM recommends the following for development of a PAG.
1. BERGER/ABAM will prepare for and conference call with the City to identify potential
membership and a recruitment approach for the PAG (target 10 to 15 members).
Constituency pools for consideration include
- City technical/project management staff
— Representatives or business owners in the immediately affected area
- Representatives of the greater area business association
- Larger property owners
- Local business district property management representatives
- Emergency services (fire and police)
— School district
- Neighborhood association representation
2. Develop a PAG charter (two review cycles) to establish parameters and manage
expectations. The PAG charter could include protocols related to
- Roles/responsibilities/decision-making limits
- Operating protocols and structure
- Facilitator expectations
— Constituency relations/volunteer recruitment
— Duration of committee
- Media protocols
3. Schedule and send notifications for ten, 1- to 2 -hour monthly meetings
4. Prepare for, facilitate, and prepare meeting notes for ten, 1- to 2 -hour monthly meetings
City of Yakima
Lincoln Avenue Grade Separation Project
Yakima, Washington
Section 11
BERGER/ABAM, FAPWT-04-016
June, 2009
Page 7 of 14
5. Develop with (as part of the working charge of) the PAG, a business/neighborhood
outreach plan, and schedule, including construction mitigation,business retention, and
marketing strategies. Prepare final plan document.
BERGER/ABAM Deliverables
• Assist with PAG development and recruitment strategy (conference call)
• PAG charter
• Meeting notification for 10 PAG meetings
• Facilitation and meeting notes for ten, 1- to 2 -hour PAG meetings
• PAG -driven business/neighborhood outreach plan
To Be Provided by City
• City will assist identifying potential members and recruit PAG members.
• City will provide staff person (or persons) to be seated on the PAG.
Informational Meetings/Events
Existing events and organizational meetings are excellent opportunities for disseminating and
reinforcing messages and project updates. Initial outreach could include recruiting and
developing a list of neighborhood volunteers and/or PAG members to assist with the various
events.
1. Identify opportunities, locations (shopping malls, library, community centers, etc.), and
well -attended business, community, school, safety, sports, City, and other events to
piggyback communications efforts.
Deliverables
• A list and calendar of potential activities with which to piggyback and disseminate
communications about the project.
To Be Provided by City
• City will determine which recommended activities to engage in.
• Some events/activities may require City staffing/attendance or displays.
Create/Disseminate Collateral information
The use of carefully chosen communication tools and collateral pieces will educate and
reinforce messaging throughout the duration of the project. BERGER/ABAM recommends the
following.
1. Up to three project updates to be submitted to local neighborhood newsletters; school
district newsletters (via backpack marketing), and/or business association publications.
One review cycle per submission.
2. Develop and orchestrate PAG distribution of door hangers and/or door -hanging
packages that may include items like earplugs, detour map, magnet with website or
hotline number, etc , for businesses and residents in the immediately impacted area
City of Yakima
Lincoln Avenue Grade Separation Project
Yakima, Washington
Section 11
BERGER/ABAA4, FAPWT-04-016
June, 2009
Page 8of 14
3 Create stand-alone/point-of-purchase information display(s) to be rotated among
businesses in the area (e.g., grocery stores, banks, restaurant lobbies). (Assumption is
one display, two review cycles.)
4. Develop one-page PAG -informed, locally -driven business retention/marketing tip sheet
for impacted businesses (two review cycles).
Deliverables
■ Up to three project updates submitted through locally identified communications channels
■ PAG door hanger or door -hanger package and orchestration of PAG dissemination
■ One stand-alone display for use at rotating locations
To Be Provided by City
■ City will provide contact information for identified communications channels.
■ City will determine locations and be responsible for placement of rotating display.
Preconstruction Press Conference
A press conference held on site will give the media an early opportunity to learn the facts about
the project, critical safety issues, detour and road alternatives, business impacts, website
information, construction schedule, meet the project spokespersons and citizen champions. and
reinforce that impacted businesses are open during construction. BERGER/ABAM tasks include
1. Develop event agenda and timeline
2. Identify and draft press release and media background materials and graphics (two
review cycles); disseminate media release and assemble media kit
3. Draft talking points for speakers (City, PAG, fire, police) (two review cycles)
4. Secure logistics (with City assistance), including seating, refreshments, chairs, sound,
and shelter, if needed
5. On-site orchestration, media management, and tear down
Deliverables
■ Press conference agenda and timeline
■ Press release, background materials and graphics, media kit
■ Talking points for speakers
■ On-site orchestration and media management
To Be Provided by City
■ City will determine best location for press conference.
■ City will assist with printing media kit pieces, securing seating, refreshments, chairs, sound,
and shelter.
City of Yakima
Lincoln Avenue Grade Separation Project
Yakima, Washington
Section II
BERGER/ABAM, FAPWT-04-016
June, 2009
Page 9 of 14
Media Coordination
The media is a powerful conduit to the general public and will play a key role in educating and
informing stakeholder audiences and commuters about every aspect of the project
BERGER/ABAM recommends the following media strategy.
1. Prepare for and meet with the Yakima Herald Editorial Board to inform and generate
support for the project.
2. Meet with and conduct follow up with the business editor of the Yakima Herald to broker
business promotion/marketing opportunities that could include (more ideas may be
forthcoming from the PAG)
- Writing business profiles for local impacted businesses ("advertorials")
- Creating a project "column" with frequently asked questions or project updates
- Providing weekly construction schedule updates for a construction column
- Develop "open for business" ads
- Develop inserts for local distribution, if affordable
3. Up to four press release updates when key milestones are reached (e.g., 50 percent
complete, etc.) (one review cycle per release)
4. Draft and provide up to eight traffic/detour updates and alerts (one review cycle each).
(Assumes communications/coordination with construction field team.)
Deliverables
• Prepare for and attend Yakima Herald Editorial Board, including preparation of media
kit/background materials
• Prepare for and attend meeting with Yakima Herald business editor to broker business and
marketing opportunities
• Up to four project update press releases
• Up to eight traffic/detour updates/alerts
To Be Provided by City
• City representative will attend Editorial Board meeting
Grand Reopening Event
A grand reopening event can serve to engage the community in the revitalization of the area,
provide businesses the opportunity to remind customers their services are again fully
accessible, and allow the City to celebrate a project well done and on time and budget. The
PAG will also be integrally involved planning this event, which can also involve area
businesses. BERGER/ABAM tasks include
1. Develop event agenda and timeline, one review
City of Yakima
Lincoln Avenue Grade Separation Project
Yakima, Washington
Section 11
BERGER/ABAM, FAPWT-04-016
June, 2009
Page 10 of 14
2. Identify and draft press release, media background materials, and graphics (two review
cycles); disseminate media release and assemble media kit
3. Draft talking points for speakers (two review cycles)
4 Secure logistics,(with City assistance), including seating, refreshments, chairs, sound,
and shelter if needed
5. Coordinate with PAG on event participation, business involvement, and miscellaneous
outreach needs
6. On-site orchestration, media management, and tear down
Deliverables
• Press conference agenda and timeline
• Press release, background materials and graphics, media kit
• Talking points for speakers
• PAG coordination
• On-site orchestration and media management
To Be Provided by City
• City will determine best location for press conference and will assist with securing seating,
refreshments, chairs, sound, and shelter.
Business Coordination
Prior to construction, if possible, but certainly after construction commences, BERGER/ABAM
recommends that businesses and business groups develop contingency plans and marketing
strategies to prepare for the closure and, thereby, minimize the amount of potential economic
loss. The PAG will be helpful in this effort. Once construction begins, ongoing marketing and
public relations efforts will be necessary to further mitigate impacts to those most directly
affected due to access issues, utility relocation, and the like. BERGER/ABAM recommends the
following strategies, but additional ideas could emerge from meetings with businesses and the
PAG, and these possibilities will be assessed for efficacy and cost-effectiveness. Budget
assumes a collaborative effort (one-third each) between BERGER/ABAM, the City, and PAG
1. Assistance with initial (prior to project kick-off) door-to-door business contacts to key
impacted entities with general information, including schedule and contact information,
ways to stay informed, and perhaps tips to prepare for construction impacts, as well as
gathering specific or preferable business contact information.
2. Create an e-mail blast list for businesses and interested others, and prepare
informational updates up to twice a month, or as needed before and during
construction. In addition to construction updates, business tips and information about
upcoming meetings, etc., can be included via e-mail.
City 01 Yakima
Lincoln Avenue Grade Separation Project
Yakima, Washington
Section 11
BERGER/ABAN1, FAPWT-04-016
June, 2009
Page 11 of 14
3. Conduct PAG -driven (City sponsored) workshops on "managing your business to
minimize disruption" based on the premise that problems faced by business owners
during construction projects can be anticipated, tapping low -to -no cost expertise such as
S.C.O.R.E., and educational business expertise Planning for such disruptions can
significantly reduce potential economic loss and overall impact on the business.
(Details of workshop to be determined which may impact budget estimate.)
4. Conduct a planning workshop for businesses to discuss and share creative marketing
techniques. (Details of workshop to be determined which may impact budget estimate.)
5. Design a locally focused one-page support piece for business -to -customer marketing
Deliverables -
• Assistance with initial (prior to project kick-off) door-to-door business contacts
• Up to two e-mail update blasts per month
• Orchestrate and conduct "managing your business to minimize disruption" workshop
(details TBD)
• Orchestrate and conduct a planning workshop for businesses to discuss and share creative
marketing techniques (details TBD)
• Business -to -customer marketing support piece
To Be Provided by City
• City staff contact person will participate in initial door-to-door business contacts
Commuter Coordination
Thousands of commuters, local residents, shoppers, and emergency and municipal services use
this thoroughfare every day. BERGER/ABAM recommends partnering with public transit for
information dissemination.
1. Coordination with public transit for their development of a flier with construction and
detour/schedule change information for distribution on the transit system and posting
on the website. Determine origin/designation information for affected lines Post rider
alerts at bus stops and at transit centers
Deliverables
• Coordination assistance with public transit on informational flier
To Be Provided by City
• City will provide contact information for public transit liaison
Public Information Summary Report
At the conclusion of the project, BERGER/ABAM will produce a public involvement summary
report that identifies all actions, activities, methods, and outcomes conducting throughout the
City of Yakima
Lincoln Avenue Grade Separation Project
Yakima, Washington
Section II
BERGER/ABAM FAPWT-04-016
June, 2009
Page 12 of 14
course of the project. One conference call to review the draft report and identify needed
revisions.
Deliverables
s Draft public involvement summary report (two review cycles)
• Final summary report
SERVICES PROVIDED BY THE CITY
It is assumed that the City will identify one contact person/City representative to coordinate
public involvement (PI) activities throughout the duration of the project and will provide
support for all PI activities as identified for the various activities in Task 6.
The City shall provide final approval for all contract changes and payments. Unless specifically
identified in Task 6, the City shall provide all public notice/involvement services required,
including notices regarding the closure of streets and other facilities affected by the project.
The City shall contract with WSDOT to provide at a minimum the following.
1. A record of materials (ROM)
2. Provide plant inspection of the prestressed concrete girders
3. Others as deemed necessary and agreed upon by the City and WSDOT
EXPENSES
Direct nonsalary costs (expenses) listed in Exhibits E and G are considered billable expenses.
The following is a summary of the how the expenses will be treated for invoicing purposes.
Field Office Equipment
Field office equipment includes computers, printer, faxes, copiers, and phones, including cell
phones. Allowances have been established for the purpose of acquiring these items and/or
covering monthly expenses associated with their use.
The actual monthly expenses will be invoiced The actual cost to purchase the equipment shall
also be invoiced. All equipment purchased with project funds will become the property of the
City at the conclusion of the project
Some field office equipment, such as a copier, may be provided by the Contractor. Contractor -
provided equipment will become the property of Contractor or the City, depending on the
terms of the Construction Contract.
Vehicles and Mileage
Travel expenses for part-time inspection services by BERGER/ABAM and its subconsultants
shall be invoiced on the basis of mileage.
Living Expenses
The full-time resident engineer, full-time inspector, and part-time office administrator will be
locally based and will not require subsidies for living expenses. It is assumed that the part-time
City of Yakima
Lincoln Avenue Grade Separation Project
Yakima, Washington
Section 11
BERGER/ABAM, FAPWT-04-016
June, 2009
Page 13 of 14
inspector, if needed, will be living in Yakima during the workweek and returning home to the
Seattle area on the weekend. This individual, as well as any other part-time staff required to
travel and stay overnight at the project site, would be compensated for living expenses in
accordance with the latest WSDOT per diem allowances for lodging and meals.
Public Involvement Expenses
No allowance has been made for renting space for PAG group workshops, providing
refreshments, and other expenses associated with public involvement activities. It is assumed
that the City will pay for all public involvement expenses directly.
City of Yakima
Lincoln Avenue Grade Separation Project
Yakima, Washington
Section 11
BERGER/ABANt, FAPWT-04-016
June, 2009
Page 14 of 14
EXHIBIT D
CONSULTANT FEE DETERMINATION SUMMARY
(All Tasks)
DIRECT SALARY COSTS (DSC) for BERGER/ABAM Engineers, Inc.
Personnel
1 Project Manager
2 Resident Engineer
3 Field Engineer
4 Office Engineer
5 Inspector
6 Public Involvement
7 CADD Operator/Graphics
8 Proj Coord./Clerical
Hours Rate
474
0
0
1,136
2,813
720
212
222
$56 62
$50 96
$45 91
$50 07
$41 52
$32.39
$30 82
$27 57
Cost
26,839
56,876
116,794
23,317
6,534
6,120
BERGER/ABAM Hours, TOTAL 5,577 Subtotal Direct Salary Costs (DSC) = $
Escalation of DSC @ 5% per year (assume 2/3 of work done in FY 2009) = 3.33% $
Subtotal (DSC + SE) _ $
Overhead (OH) 158.23% of (DSC + SE) _ $
Fixed Fee (FF) 32.00% of (DSC + SE) = $
236,480
7,883
244,363
386,656
78,196
TOTAL SALARY COSTS (DSC + SE + OH + FF) = $
DIRECT NONSALARY COSTS (DNSC)
Courier
Field Office Computer
Portable Laptop
Printer
Copier (by contractor)
Fax
Office Phones
Cell Phones
Vehicle Lease
Fuel and Maintenance
Mileage (Engineering Support)
Mileage (Public Involvement)
Daily Per Diem (field visits)
Daily Per Diem (temporary inspector)
Daily Per Diem (public involvement)
Info meeting / event booth reservation
Press conference
Paid media, advertorials, etc
Grand Reopening Event
Workshop (room, refreshments, etc)
Refreshments for PAG Meetings
Misc Printing & Expendables (film, etc)
40 packages @
2
0
1
1
16 months @
0 months @
0 months @
0 months @
6,888 miles @
4,305 miles @
30 days @
90 days @
15 days @
1 estimate @
1 estimate @
5 each @
1 estimate @
2 each @
15 days @
1 estimate @
$ 25 00
$ 1,200 00
$ 1,500 00
$ 4,000 00
$ 900 00
$ 150
$ 100
$ 1,000
$ 500
$ 0 550
$ 0 550
$ 109
$ 109
$ 109
$ 2,500
$ 1,500
$ 150
$ 1,500
$ 750
$ 100
$ 1,000
TOTAL REIMBURSABLE EXPENSES (DNSC) =
709,215
1,000
2,400
4,000
900
2,400
3,788
2,368
3,270
9,810
1,635
2,500
1,500
750
1,500
1,500
1,500
1,000
41,821
TOTAL BERGER/ABAM FEE (DSC + SE + OH + FF + DNSC) = $ 751,036
City of Yakima Construction Admin Fee_3 March 09 xlsx
Page 1 of 2
EXHIBIT D
CONSULTANT FEE DETERMINATION SUMMARY
(All Tasks)
SUBCONSULTANTS
HLA
Transpo
Shannon & Wilson
Widener Associates
Kennedy -Jenks
Hanson Professional Services
Baer Testing
$ 347,650
$ 58,154
$ 110,354
$ 13,783
$ 49,068
$ 15,384
$ 67,631
1 TOTAL SUBCONSULTANT FEES = $ 662,023 1
I TOTAL AUTHORIZED AMOUNT = $ 1,413,059
1
MANAGEMENT RESERVE = $ 100,000
TOTAL CONTRACT AMOUNT = $ 1,513,059
City of Yakima Construction Admin Fee_3 March 09 xlsx Page 2 of 2
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. -*it)
For Meeting of July 7, 2009
ITEM TITLE: Consideration of Resolution authorizing the City Manager to execute Supplement
No. 6 of the Professional Services Contract with Berger/ABAM Engineers, Inc. for
project management and inspection services and engineering support during the
construction of the Lincoln Avenue Railroad Grade Separation Project
SUBMITTED BY: William Cook, Director CED
CONTACT PERSON/TELEPHONE: Doug Mayo, City Engineer — 576-6678
SUMMARY EXPLANATION:
The City and our consultant Berger/ABAM Engineers, Inc. have been working closely with
BNSF over the past several months on the completion of the Construction and Maintenance
Agreement for the project and the Purchase and Sale Agreement for the needed right of way
and easements to be purchased from BNSF. After many months of negotiations, the City and
BNSF have reached agreement on the content of these two agreements. The City Manager
has signed these agreements and we are waiting for BNSF to sign and retum them. The City
has secured enough funding to construction the Lincoln Avenue Underpass and it is anticipated
that the Lincoln Avenue Underpass project will be advertised by mid to late August, with
construction beginning in late October.
The city has a consultant agreement with Berger/ABAM under which they provide the City with
design, right of way and administrative services for the development of the Lincoln Avenue/MLK
Boulevard Grade Separations Project. At this time, staff requests authorization to execute
Supplement No. 6 of this agreement, which would increase the scope of services to include
project management, construction inspection services and engineering support during the
construction of the Lincoln Avenue Underpass. This supplement would extend the agreement
to July 31, 2011, and would be at an additional cost not to exceed $1,513,059. It was always
anticipated that administration and inspection services for this project would be performed by
consultants.
(Continued on Page Two)
Resolution X Ordinance Contract X Other (Specify)
Funding Source: Cumulative Reserve for Capital movements: Fund 392
APPROVED FOR SUBMITTAL:
City Manager '
STAFF RECOMMENDATION: Approve resolution authorizing Supplement No 6 with
Berger/ABAM Engineers, Inc.
BOARD/COMMISSION/COMMITTEE RECOMMENDATION:
COUNCIL ACTION:
1
Page Two
The need to hire a consultant to perform the project management, construction inspection and
engineering support for this project is due to the fact that the work required to build this
underpass is highly specialized. The City does not often construct highly complex projects and
does not have the experience required to perform all of the required duties.
, Berger/ABAM has done a very good job to date with the -design of this project, and has been
very receptive and responded quickly to requests made by the City. We are very comfortable
extending their contract to handle the many objectives that will be required with this complex
construction project, including all of the federal regulations.
2
Agreements with Berger/ABAM for the Yakima Railroad Grade Separations Project
Item Description
Begin
Date
End
Date
, Dollar
Amount
Accumulated
Amount
Scope of work Description
Design Consultant Agreement
06/20/03.
03/31/07
$1,250,000
$1,250,000
Develop the design, acquire the necessary right of way and
prepare the environmental documentation for the Lincoln Ave.
and MLK Blvd. grade separations.
Supplemental Agreement #2
08/30/05
03/31/07
$620,000
$1,870,000
Compensation for additional efforts required to complete the
original scope of work, salary escalation for the project taking
longer than originally anticipated, and work outside of the
original scope of work.
Supplemental Agreement #3
01/16/07
06/30/08
$177,284
$2,047,284
Compensation for additional efforts required to complete the
original scope of work, salary escalation for the project taking
longer than originally anticipated, and work outside of the
original scope of work.
Supplemental Agreement #4
06/30/08
12/31/08
$210,989
$2,258,273
Compensation for additional efforts required to complete the
original scope of work, salary escalation for the project taking
longer than originally anticipated, and work outside of the
original scope of work. Removal of certain items of work that
was originally scoped.
Supplemental Agreement #5
12/31/08
06/30/10
$217,912
$2,476,185
Out of scope work required to reach agreement with BNSF.
Proposed Supplemental
Agreement #6
07/31/09
07/31/11
$1,513,059
$3,989,244
Provide project management, inspection services and
engineering support during construction of the Lincoln Avenue
Grade Separation Project.