HomeMy WebLinkAboutR-2021-081 Resolution authorizing an agreement with Ken Leingang Excavating, Inc. for 41st Avenue Fire Flow Improvements and Waterline Replacement on S. 1st Street and Mead AvenueRESOLUTION NO. R-2021-081
A RESOLUTION authorizing an agreement with Ken Leingang Excavating, Inc. for Project
Nos. AC2504 and AC2537 41st Ave fire flow Improvements and waterline
replacement on S. 1st St and Mead.
WHEREAS, the City of Yakima owns, operates, and maintains the Domestic Water Supply
and Distribution System in accordance with applicable Federal, State and Local regulations; and
WHEREAS, fire flow should be improved in the 41st Ave, and Avalanche and undersized
waterlines on S. 1st Street and Mead Avenue sometimes results in lower flow recommended; and
WHEREAS, under City Contract No. 2018-048 and Task Order 2020-02 and 03, the City
entered into an agreement with HLA Engineering and Land Surveying, Inc. to prepare the plans
and contract documents for 41st Ave fire flow Improvements and waterline replacement on S. 1st
St and Mead; and
WHEREAS, the City of Yakima Water/Irrigation Division requires construction services for
the waterline replacement; and
WHEREAS, the City of Yakima used the procedure established by the State of
Washington for competitively bidding projects; and
WHEREAS, Ken Leingang Excavating, Inc. submitted the low bid and has the ability to
perform the contract specified work; and
WHEREAS, the project is funded by a low interest loan from Washington State Public
Works Trust Fund; and
WHEREAS, the City Council finds that it is in the best interest of the City of Yakima and
its residents to enter into a contract with Ken Leingang Excavating, Inc. to perform the work
detailed in the contract documents for 41st Ave fire flow Improvements and waterline replacement
on S. 1st St and Mead; now, therefore
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute the attached contract with Ken
Leingang Excavating, Inc., in the amount of Eight Hundred Fifteen Thousand Seven Hundred
Sixty Four Dollars ($815,764) for 41st Ave fire flow Improvements and waterline replacement on
S. 1st St and Mead.
ADOPTED BY THE CITY COUNCIL this 15111 day of June, 2021.
)
ATTEST:
,a9
Sonya Claar Tee City Clerk
Y0/71
PatriciO Byers, Mayor
m
CONTRACT
THIS AGREEMENT, made and entered in triplicate, this 91 - '5f-day of -JUA-0— , 20ak , by and between
the City of Yakima , hereinafter called the Owner, and j,�F-W I _IM C
Washington Corporation, hereinafter called the Contractor.
VVITNESSETH:
That in consideration of the tonno and conditions contained heroin and attached and made o part of this
agreement, the parties hereto covenant and agree aefollows:
i The Contraclpr shall do all work and furnish all tno|n. materials, labor and equipment for THE
BID AMOUNT OF: $ rAvalanche Avenue and East Mead Avenue Waterline
Improvements, CITY OF YAK|K0AVVATER PROJECT NO. AC3804& NO. A^C2537. all in accordance
vvith, and as described inthe attached plans and specifications and the 2021 Standard Specifications for
Road, Bridge, and Municipal Construction which are by this reference incorporated herein and made a part
hereof, and shall perform any alterations in or additions to the work provided under this contract and every
part thereof.
Work shall start within ten (10) days after the Notice to Proceed and shall be completed in forty-five (45)
working days. If work has not commenced within the ten (110) days after the notice to proceed, the first
chargeable working day shall be the eleventh (11 th) working day after the date on which the City issues the
Notice tnProceed.
Ifsaid work isnot completed within the time specified, the Contractor agrees hopay bzthe Owner the sum
specified in the Standard Specifications for each day said work remains uncompleted after expiration of the
specified time, moliquidated damages.
The Contractors shall provide and bear the expense of all equipment; work and labor of any sort whatsoever
that may be required for the transfer of materials and for constructing and completing the work provided for
inthis contract and every part thereof, except such aoare mentioned inthe specifications tubafurnished
bythe City ofYakima .
||. The City of Yakima hereby promises and agrees with the Contractor to omp|oy, and does
employ the Contractor to provide the materials and to do and cause to be done the above described work
and to complete and finish the same according to the attached plans and specifications and the terms and
conditions herein contained and hereby contracts to pay for the same according to the attached
specifications and the schedule ofunit oritemized prices hereto attoohod, otthe time and in the manner
and upon the conditions provided for inthis contract.
|||. INDEMNIFICATION. The Contractor shall dehand, indemnify, and hold harmless the City, its
offioexo, elected uffioio|o, employees and agents from and against all o|oimu` cuuona of action, damages,
|ose*e, and oxponono of any kind ornature whatsoever, including but not limited to, attorney'afoeo and
court costs, arising out of, relating to, or resulting from The Contractor's performance or non-performance
nfthe services, duties and obligations required ofitunder this Agreement.
|V. The Contractor for himself, and for his hoiro, exooutoru, odminiatratom, wunoe000m, and
assigns, does hereby agree to the full performance of all the covenants herein contained upon the part of
the Contractor.
V. It is further provided that no liability shall attach to the City of Yakima by reason of entering into
this contract, except ooexpressly provided herein.
|NWITNESS, WHEREOF the parties hereto have caused this agreement tobeexecuted the day and year
first herein above written.
City Manager
'
—CITYCONTRACTN'���z
4-2
CONTRACTOR
)
�5 Corporation
ITEM TITLE:
SUBMITTED BY:
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEM ENT
Item No. 4.D.
For Meeting of: June 15, 2021
Resolution authorizing an agreement with Ken Leingang
Excavating, Inc. for 41 st Avenue Fire Flow Improvements and
Waterline Replacement on S. 1st Street and Mead Avenue
Scott Schafer, Director of Public Works
David Brown, Assistant Director of Public Works
Mike Shane, Water/Irrigation Engineer, 509-576-6480
SUMMARY EXPLANATION:
This project replaces the undersized waterline near the S. 1st Street and Mead Ave. intersection with
a new 12 inch ductile iron waterline and installs a new 12 inch water line on Avalanche to improve fire
flow near 41 st Avenue. The project will improve water quality and increases flow which improves
delivery and enhances fire flow.
City staff used the State bidding process to advertise for competitive bids; selecting Ken
Leingang Excavating, Inc. as the low bidder with the bid of $815,764. The Agreement has been
attached for City Council review in an amount not to exceed $814,764. The projects are funded
by a low interest Public Works Trust Fund Loan.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY: Neighborhood and Community Building
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
RECOMMENDATION:
Adopt Resolution