Item No. 4.D.
For Meeting of: June 15, 2021
ITEM TITLE: Resolution authorizing an agreement with Ken Leingang
Excavating, Inc. for 41st Avenue Fire Flow Improvements and
Waterline Replacement on S. 1st Street and Mead Avenue
SUBMITTED BY: Scott Schafer, Director of Public Works
David Brown,Assistant Director of Public Works
Mike Shane, Water/Irrigation Engineer, 509-576-6480
SUMMARY EXPLANATION:
This project replaces the undersized waterline near the S. 1st Street and Mead Ave. intersection with
a new 12 inch ductile iron waterline and installs a new 12 inch water line on Avalanche to improve fire
flow near 41st Avenue. The project will improve water quality and increases flow which improves
delivery and enhances fire flow.
City staff used the State bidding process to advertise for competitive bids; selecting Ken
Leingang Excavating, Inc. as the low bidder with the bid of$815,764. The Agreement has been
attached for City Council review in an amount not to exceed $814,764. The projects are funded
by a low interest Public Works Trust Fund Loan.
ITEM BUDGETED: Yes
STRATEGIC PRIORITY: Neighborhood and Community Building
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
RECOMMENDATION:
Adopt Resolution
ATTACHMENTS:
Description Upload Date Type
D esolution 0/3/ 0 1 des lotion
retract 0/3/ 01 retract
2
RESOLUTION NO. R-2021-
A RESOLUTION authorizing an agreement with Ken Leingang Excavating, Inc. for Project
Nos. AC2504 and AC2537 41st Ave fire flow Improvements and waterline
replacement on S. 1st St and Mead.
WHEREAS,the City of Yakima owns, operates, and maintains the Domestic Water Supply
and Distribution System in accordance with applicable Federal, State and Local regulations; and
WHEREAS, fire flow should be improved in the 41st Ave, and Avalanche and undersized
waterlines on S. 1st Street and Mead Avenue sometimes results in lower flow recommended; and
WHEREAS, under City Contract No. 2018-048 and Task Order 2020-02 and 03, the City
entered into an agreement with HLA Engineering and Land Surveying, Inc. to prepare the plans
and contract documents for 41st Ave fire flow Improvements and waterline replacement on S. 1st
St and Mead; and
WHEREAS, the City of Yakima Water/Irrigation Division requires construction services for
the waterline replacement; and
WHEREAS, the City of Yakima used the procedure established by the State of
Washington for competitively bidding projects; and
WHEREAS, Ken Leingang Excavating, Inc. submitted the low bid and has the ability to
perform the contract specified work; and
WHEREAS, the project is funded by a low interest loan from Washington State Public
Works Trust Fund; and
WHEREAS, the City Council finds that it is in the best interest of the City of Yakima and
its residents to enter into a contract with Ken Leingang Excavating, Inc. to perform the work
detailed in the contract documents for 41st Ave fire flow Improvements and waterline replacement
on S. 1st St and Mead; now, therefore
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute the attached contract with Ken
Leingang Excavating, Inc., in the amount of Eight Hundred Fifteen Thousand Seven Hundred
Sixty Four Dollars ($815,764) for 41st Ave fire flow Improvements and waterline replacement on
S. 1st St and Mead.
ADOPTED BY THE CITY COUNCIL this 15th day of June, 2021.
ATTEST: Patricia Byers, Mayor
Sonya Clear Tee, City Clerk
3
CONTRACT
THIS AGREEMENT, made and entered in triplicate, this day of . 20 . Uy and between
the City of Yakima , hereinafter called the ()viner. and Ken L8iOg@OgExcavating, Inc a
Washington Corporation, hereinafter called the Contractor.
VNTNESSETH:
That in consideration of the terms and conditions contained herein and attached and made a part of this
agreement, the parties hereto covenant and agree aofollows:
| TheContra(tor »ha| UoaUworkanUfurni»haUtoo|». noateria|n. |aboranUequipnoenthorTHE
B0 AMOUNT OF: S 81 4 . for Avalanche Avenue and East Mead Avenue Waterline
Improvements, CITY OFYAK|K8A WATER PROJECT NO. AC2504 & NO. AC3537. all inaccordance
w|th. anda» UenoriUedintheattacheUp|ansandnpecifinationsandthe2O21GtandarUSpeoihcationoh>r
Road, Bridge, and Municipal Construction which are by this reference incorporated herein and made a part
hereof, and shall perform any alterations in or additions to the work provided under this contract and every
part thereof.
Work shall start within ten (10) days after the Notice \o Proceed and shall bz completed in forty-five (45)
working days. If work has not commenced within the ten (10) days after the notice to proceed, the first
chargeable working day shall be the eleventh (1 1th)working day after the date on which the City issues the
Notice <nProceed.
If said work is not completed within the time specified, the Contractor agrees to pay to the Owner the sum
specified inthe Standard Specifications for each day said work remains uncompleted after expiration of the
specified time, on liquidated damages.
The Contractors shall provide and bear the expense of all equipmenL work and labor of any sort whatsoever
that may be required for the transfer of materials and for constructing and completing the work provided for
in this contract and every part thereof, except such as are mentioned in the specifications to be furnished
by the City o[Yakima
|| The City o[ Yakima hc/chy promises and agrees with the Contractor <nemploy, and does
employ the Contractor to provide the materials and to do and cause to be done the above described work
and to complete and finish the same according to the attached plans and specifications and the terms and
conditions herein contained and hereby contracts to pay for the same according to the attached
specifications and the schedule of unit or itemized prices hereto attached, at the time and in the manner
and upon the conditions provided fn/ in this contract.
||| INDEMNIFICATION. The Contractor shall defend, indemnify, and hold harmless the City, its
officers. elected officials. employees and agents from and against all claims, causes of action, damages,
losses, and expenses of any kind or nature whatsoever, including but not limited to, attorney's fees and
court costs, arising out of, relating to, or resulting from The Contractor's performance or non-performance
of the services, duties and obligations required of it under this Agreement.
|V, The Contractor for himself, and for his heirs, executors, administrators. successors. and
assigns, does hereby agree to the full performance of all the covenants herein contained upon the part of
the Contractor.
V, |tio further provided that no |iabil% shall attach to the City of Yakima by reason o[entering into
this contract, except ao expressly provided herein.
IN WITNESS. WHEREOF the parties hereto have caused this agreement to be executed the day and year
first herein above written.
CounteroigneU� CITY CJFYAK|KUA CONTRACTOR
this day of 20 .a Corporation
ovotm*vr
By:
City Manager
Attest
(Print Name)
_
City Clerk
Its
(President, Owner, etc.)
Address
vm000mvm��no�c:/000�oom^oaov�vnm^oovvv�vp «'z