HomeMy WebLinkAboutR-2013-107 Industrial Waste Collection System; Huibregtse, Louman Associates Agreement 2012-42 Addendum 4A RESOLUTION
RESOLUTION NO. R-2013-107
authorizing the City Manager to execute Addendum No. 4 to
existing Professional Services Agreement 2012-42 with Huibregtse,
Louman Associates, Inc. (HLA) for Phase 6 additional services
rendered during Construction under the original contract.
WHEREAS, the City of Yakima (City) owns and operates wastewater collection
and treatment facilities in accordance with applicable Federal, State and Local
regulations; and
WHEREAS, the City maintains a roster of consultants whose statements of
qualifications represent that they have the expertise necessary to perform the services
required by the City; and
WHEREAS, the state of Washington requires these services to be performed by a
Professional Licensed Engineer; and
WHEREAS, on May 2, 2012 the City entered Contract 2012-42 with HLA Inc. for
Engineering Services related to the design and construction of Industrial Waste (IW) Line
improvements for the City's wastewater system identified to meet regulatory requirements,
community growth, replacement needs, and operational efficiencies; and
WHEREAS, the City desires to retain HLA Inc. through Addendum No.4 to the
existing Contract 2012-42 to provide additional necessary engineering services to
accomplish the construction identified under the original Agreement; and
WHEREAS, the City ran into unforeseen construction interruptions during the
construction of the IW line to Seneca that created delays and ultimate project extension
due to private utilities' failure to properly mark their respective infrastructure; and
WHEREAS, the City desires to provide payment to HLA for their services during
construction as provided for in the original contract; and
WHEREAS, the City Council has determined that it is in the best interest of the
City to enter into Addendum No 4 with HLA to accomplish the additional work required by
the unforeseen construction problems; now , therefore;
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute Addendum No. 4 to
Professional Services Contract 2012-42, thereby increasing the total contract value to an
amount not to exceed Four Hundred Sixty Four Thousand Two Hundred Twenty Four
Dollars ($464,224.00) with Huibregtse, Louman Associates, Inc., said not to exceed value
representing an increase of Two Hundred Eleven Thousand Seven Hundred Twenty Four
Dollars ($211,724.00) for the work described in Addendum No. 4, attached hereto and
incorporated herein by this reference, to provide the additional Professional Engineering
Services required for the City extension of the IW Collection System to the vicinity of 23rd
Avenue and River Road.
ADOPTED BY THE CITY COUNCIL this 20th day of August, 2013.
ATTEST: Micah Caw ey, 11ayor
Sony- •laar Tee,
ADDENDUM NO.4
AGREEMENT FOR PROFESSIONAL SERVICES
City of Yakima Contract No. 2012-42
City Project No. WW2327, Resolution R-2012-60
HLA Project No. 12064
This Addendum, hereinafter identified as Addendum No 4, is hereby entered into and made a part of the
Agreement between City of Yakima, Washington, and Huibregtse, Louman Associates, Inc (HLA), for
Professional Services first entered into on the 2nd day of May, 2012, Addendum No 1 entered into on the
2nd day of July 2012, Addendum No. 2 entered into on the 22nd day of March 2013, and Addendum No 3
entered into on the 17th day of April 2013, by the City of Yakima, hereinafter called the "CITY," and
Huibregtse, Louman Associates, Inc., hereinafter called the "ENGINEER."
WITNESSETH That in consideration of the mutual covenants and agreements herein contained, the
parties hereto do mutually agree to amend, revise, and/or add the following to the referenced Agreement:
SECTION 5 - COMPENSATION
5 1 COMPENSATION for the services in Phases 4, 6, and 7 described in EXHIBIT A — SCOPE OF
SERVICES, shall be in accordance with EXHIBIT B — SCHEDULE OF RATES, attached hereto
and incorporated herein by this reference, on a time spent basis plus reimbursement for direct
non -salary expenses These hourly rates shall be subject to periodic modifications based on
annual adjustments in individual employee salaries and State -approved overhead rates.
COMPENSATION for the services in Phases 1, 2, 3, and 5 described in EXHIBIT A — SCOPE OF
SERVICES, shall be per lump sum fee The maximum amount of compensation to the
ENGINEER for Phases 1 through 6, as described in the FEE FOR SERVICE section of EXHIBIT
A, shall not exceed $464,224.00 without the written agreement of the CITY and the ENGINEER.
Other than the specific amendments identified herein, all other terms, conditions, and requirements of the
underlying contract, Addendum No 1, Addendum No 2, and Addendum No 3 shall remain in full force
and effect throughout the term of the Contract's performance
IN WIT SS W EREOF the parties hereto duly enter into and execute this Addendum No 4, as of this
day of , 2013
CITY •I' YAKIMA
Sign
Printed Name. Tony O'Rourke
Title
Date
City Manager
HUIBREGTSE, LOUMAN ASSOCIATES, INC.
Printed Name Jeffrey T Louman, PE
Title:
President
Printed Name: Sonya Claar Tee
Title. City Clerk
City Contract No 2012-42
Resolution No R-2013- /(P. -
G. \Contracts
O 7
G.\Contracts & Task Orders\Yakima \YRWWTP -1W Lines\2013-07-08 APS Addendum No4 - 12064 Addtnl Cons Services docx
-1-
ADDENDUM NO.4
EXHIBIT A — SCOPE OF SERVICES
City of Yakima Contract No. 2012-42
City Project No. WW2327, Resolution R-2012-60
HLA Project No. 12064
During the term of this AGREEMENT, the ENGINEER shall perform professional services in connection
with the following project:
City of Yakima — Industrial Waste Line Improvements
This scope of work shall include the furnishing of all services, labor, materials, equipment, supplies, and
incidentals necessary to conduct and complete the work as indicated hereinafter The work to be
performed involves services during construction
PROJECT: The City of Yakima Wastewater Department desires to install a new 12 -inch diameter
industrial waste sewer line from the approximate intersection of Quince Street/N 3rd Avenue
to 23rd Avenue near Seneca Foods Corporation (est. 8,000 linear feet) The line is
anticipated to be extended at a future date to the proximity of 32nd Avenue/Fruitvale
Boulevard The attached Exhibit illustrates potential alignment routes for improvements
SCOPE OF SERVICES:
PHASE 6 - SERVICES DURING CONSTRUCTION
Additional Services Performed
A. HLA provided additional construction services beyond the original scope of services for
an alignment revision through Elks Memorial Park and for coordination efforts with
Cascade Natural Gas, AT&T, Centurylink, Level 3 Communications, and other utilities
B HLA furnished a resident engineer (inspector) during construction activities when the
Contractor exceeded normal straight time working hours, resulting in additional inspection
outside of the original project scope.
C The City of Yakima authorized twelve (12) additional construction contract days
necessary to compensate the Contractor for unforeseen circumstances during
construction Additional engineering and administration services are required while the
Contractor is performing work.
FEE FOR SERVICE:
PHASE 6 — SERVICES DURING CONSTRUCTION
All work was and shall be performed on a time -spent basis at the hourly billing rates provided in EXHIBIT
B plus reimbursement for direct non -salary expenses as described in section 5 1 1 of the AGREEMENT
The estimated maximum amount of this phase of work is $211,724.00
G:\Contracts & Task Orders\Yakima\YRWWTP -1W Lines12013-07-08 APS Addendum No4 - 12064 Addtnl Cons Services.docx
-2-
EXHIBIT B
SCHEDULE OF RATES
FOR
HUIBREGTSE, LOUMAN ASSOCIATES, INC.
Effective January 1, 2013, Through December 31, 2013
Licensed Principal Engineer $170.00 per hour
Licensed Principal Land Surveyor $156.00 per hour
Licensed Professional Engineer $140.00 per hour
Licensed Professional Land Surveyor $128.00 per hour
Project Engineer $115.00 per hour
CAD Technician $101.00 per hour
Resident Engineer/Inspector $96.00 per hour
Surveyor $96.00 per hour
Senior Engineering Technician $96.00 per hour
Engineering Technician $67.00 per hour
Word Processing Technician $67.00 per hour
Surveyor on Two Man Crew $92.00 per hour
Surveyor on Three Man Crew $80.00 per hour
Vehicle Mileage $0.52 per mile
Global Positioning Survey System Fee $88.00 per hour
G.\Contracts & Task OrdersWakimaWRW WTP - 1W Lines12013-01-23 APS Addendum Not - Noel Extension docx
•8-
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. S-(?
For Meeting of: 8/20/2013
ITEM TITLE:
SUBMITTED BY:
SUMMARY EXPLANATION:
Resolution authorizing Addendum No. 4 to existing
Professional Services Agreement 2012-42 with Huibregtse,
Louman Associates, Inc. (HLA) for Phase 6 additional
services rendered during Construction under the original
contract.
Debbie Cook, Utilities & Engineering Director
Scott Schafer, Wastewater Division Manager
Shelley Willson, Utility Engineer
The City of Yakima (City) completed extension of the industrial waste (IW) collection system to
Seneca near 23rd Avenue and River Road. During the construction of the line, underground
utilities were either marked incorrectly or not marked creating construction interruptions for TTC
Construction. The cumulative impact was the extension in construction days for the project by
twelve days and requiring the contractor to work an extended period at night to mitigate impact
to businesses along the construction route. In addition, the original alignment of the IW line
through Elk's Park was adjusted to reduce the impact on playing fields used by Eisenhower
High School for practice. These additional items required HLA to provide inspection and design
work outside of their original project scope. HLA has requested consideration for additional
compensation to their original contract to cover their cost for providing service through these
revisions. The addendum authorizes payment for the additional services performed as
provided by the original City of Yakima Contract No 2012-42.
The City of Yakima has filed a complaint with the Washington Utilities Coordinating Council and
has requested reimbursement from Century Link and Pacific Power for costs accrued due to
delay of construction caused by the utilities failure to properly mark their infrastructure.
The terms of Addendum No.4 would be in an amount not to exceed $211,724 for services
during construction. This is an increase of $40,324 for phase 6 from the original contract but still
remains within the budget amount for the approved project. (See attached Agreement with
Exhibit A):
Exhibit "A" of the Agreement describes the Scope of Work in more detail.
Resolution: X Ordinance:
Other (Specify):
Contract: X
Start Date:
Item Budgeted:
Funding Source/Fiscal
Impact:
Strategic Priority: Economic Development
Insurance Required? Yes
Mail to: Jeffery T. Louman, P.E. President, Huibregtse, Louman
Associates, Inc. 801 North 39th Ave. Yakima, WA. 98902
Phone: 966-7000
Contract Term:
End Date:
Amount: $211,724.00
Wastewater Construction Fund 476 - Budgeted
APPROVED FOR
SUBMITTAL:
City Manager
RECOMMENDATION:
Staff respectfully requests City Council approve the Resolution authorizing the City Manager to
execute the accompanying contract.
ATTACHMENTS:
Name: Description:
E1 HLA -Wastewater Line Extension- Addendum 4-7-2013.docx Resolution HLA No. 4 Addendum
El 2013-07-08 APS Addendum No4 - 12064 Addtnl Cons Servicesdocx HLA Agreement No, 4 Addendum