Loading...
HomeMy WebLinkAbout05/21/2013 05M Terminal Apron Rehabilitation Construction Project, Engineering Agreement with Huibregttse, Louman Associates, Inc.BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. C3 f For Meeting of: 5/21/2013 ITEM TITLE: Resolution authorizing agreement with Huibregtse, Louman Associates for engineering services at the Yakima Airport. SUBMITTED BY: Robert Peterson- Interim Airport Manager 509 - 575 -6149 Ext 7 SUMMARY EXPLANATION: The terminal apron ramp facilitates the flow of commercial flights from the gates at the terminal building to the aircraft and is approximately 2.35 acres of high strength concrete. Passengers arriving and departing at Yakima, board and exit the aircraft by walking across the terminal apron ramp to the terminal building. The ramp was originally constructed in the 1960's, and this project is the first major rehabilitation of the ramp. The most recent pavement condition index (PCI) rates the ramp at 60. The overall condition of the concrete is good given it's age, however the individual panels have moved apart from one another, in some cases several inches separate the individual panels. This horizontal movement has created tripping and operation hazards for aircraft and personnel. Work will include joint and crack stabilization and removal of heaved asphalt at the ramp perimeter. The funding source for this contract comes from the Airport Improvement Program which assists primary commercial service airports with various projects. The program allows the airport to utilize funds for Capital Improvement Projects which are addressed in either the Airport Master Plan or needed project to ensure safe aircraft operations are upheld at the airport. At this point the Draft Airport Master Plan addresses the need to rehabilitate the airport's terminal apron to ensure future preservation of the concrete panels Under the Airport Improvement Program the airport is funded 90% of the projected costs in the form of Federal grants and the remaining 10% originates from local sources such as the Passenger Facility Charge program. These charges are collected each time a passenger purchases an airline ticket originating from the Yakima Air Terminal. Engineering Services Agreement has a Not To Exceed value of $99,484.00. Resolution: Other (Specify): Contract: X Start Date: 5/21/13 Item Budgeted: Yes Funding Source/Fiscal Impact: Strategic Priority: Insurance Required? No Mail to: Phone: APPROVED FOR SUBMITTAL: RECOMMENDATION: Ordinance: Contract Term: End Date: 8/1/13 Amount: 99,484 Federal Aviation Administration - Airport Improvement Program NA City Manager Staff recommends City Manager and City Council review and approve the Engineering Services Agreement in order to enter the construction phase of the Terminal Apron project. Engineering Services Agreement - Terminal Apron Construction Terminal Apron Construction Map Terminal Apron Construction Fees A RESOLUTION authorizing the City Manager to execute an Engineering Services Agreement with Huibregtse� Lournan Associates, Inc. (HLA), in the amount not to exceed $99,48400 to provide Engineering Services for Terminal Apron Rehabilitation Construction project AIP 3-53-0089-35 WHEREAS, City owns and operates Yakima Air Terminal in accordance with applicable Federal, State and Local regulations; and WHEREAS, the City maintains a roster of consultants whose statements of qualifications represent that they have the expertise necessary to perform the services required • the City, and WHEREAS, the state of Washington requires these services to be performed by a Professional Licensed Engineer; and I I III III III III Ulu= OEM Sonya Claar-Tee� City Clerk Micah Cawley, Mayor ENGINEERING SERVICES AGREEMENT FOR CONSTRUCTION PROJECTS UNDER AIRPORT IMPROVEMENT PROGRAM Terminal Apron Rehabilitation Project AIP Project No. 3 -53- 0089 -35 This AGREEMENT, made this day of , 2013, by and between City of Yakima, 129 North Second Street, Yakima, WA 98901, hereinafter called the "OWNER" and Huibregtse, Louman Associates, Inc., 801 North 39th Avenue, Yakima, WA 98902, hereinafter called the "ENGINEER." WITNESSETH, that the OWNER intends to improve the Yakima Air Terminal at Yakima, Washington, consisting of the following items: The Terminal Apron Rehabilitation Project includes rehabilitation of approximately 2.39 acres of 16 foot x 16 foot concrete panels. Rehabilitation will include joint stabilization by cleaning joints of debris and stabilizing with backer rods; and panel stabilization by removing and replacing significantly cracked panels with new reinforced concrete. Project will also include concrete surface rehabilitation, grinding surrounding heaved asphalt, and new markings on the terminal apron. The below scope of work is to provide construction observation and administration, and project close out services for the above referenced work. The extent of improvements will be coordinated with the amount of available funds for construction. I. SCOPE OF WORK The OWNER hereby employs the ENGINEER and the ENGINEER accepts and agrees to perform the following services for the project during the 2013 calendar year. A. CONSTRUCTION ADMINISTRATION The ENGINEER shall provide the following services under this work phase: 1. Assist OWNER in evaluation of available funding. 2. Assist OWNER in AIP Grant Preparation to complete grant authorization. 3. With FAA concurrence and OWNER concurrence, issue notification of award, prepare the construction contract and monitor contract execution. 4. Coordinate and conduct a preconstruction conference and prepare meeting minutes. 5. Assist OWNER in issuing the notice to proceed upon FAA concurrence. 6. Attend up to two (2) City of Yakima Meetings as necessary to provide project updates. 7. Complete Construction Management Plan once all contractor information is known. 8. Review Contractor's Safety and Quality Assurance Plan, provide comments as needed to facilitate the intent of the applicable airport and FAA standards to maintain safety and quality. 9. Conduct weekly construction and safety meetings with the Contractor and Airport staff. 10. Prepare and submit daily and weekly inspection reports in accordance with FAA guidelines. G: \Contracts & Task Orders \Yakima Air Terminal \11050 \2013 -05 -02 Scope of Svcs Construction Terminal Apron.doc Page 1 of 9 G:\Contracts & Task Orders\Yakima Air Terminahl 1050\2013-05-02 Scope of Svcs Construction Terminal Apron.doc Page 2 of I li;l;il ill 'rYT77911111 rendered as herein agreed: A. The OWNER shall pay the ENGINEER for services as set forth in Section IA of this Agreement, on a lump sum basis as follows: 1 5 illi, 111F;11�2�' 0 A . 0 gEijl:jlmkllm B. The OWNER shall pay publishing costs for advertisements of notices, public hearings, and other similar items; shall pay for all permits and licenses that may be required by local, state, or federal authorities; and shall secure the necessary land, easements, and rights of way required for the Project. .................. G:\Contracts & Task Orders\Yakima Air Terminal\1 1050\2013-05-02 Scope of Svcs Construction Terminal Apron,doc Page 3 of 9 4. Nothing contained in this Section • this Agreement shall be construed to create a liability or a right • indemnification in any third party. D In any and all claims by an employee of the ENGINEER, any subcontractor, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, the indemnification obligations under this Agreement shall not be limited in any way by any limitation on the amount or types of damages, compensation, or benefits payable by or for the ENGINEER or a subcontractor under workers • workmen's' compensation acts, disability benefit acts, or other employee benefit acts. G:\Contracts & Task Orders\Yakima Air Terminaftl 1050\2013-05-02 Scope of Svcs Construction Terminal Apron doc Page 4 oiC v. INSURANCE A. At all times during performance of the WORK, ENGINEER shall Secure and maintain in effect insurance to protect the OWNER and ENGINEER from and against all claims, damages, losses, and expenses arising out of or resulting from the performance of this Agreement. ENGINEER shall provide and maintain in force insurance in limits no less than that stated below, as applicable. The OWNER reserves the right to require higher limits should it deem it necessary in the best interest of the public. a. If ENGINEER owns any vehicles, before this Contract is fully executed by the parties, OIC shall provide the OWNER with a certificate • insurance as proof • commercial automobile liability insurance and commercial umbrella liability insurance with a total minimum liability limit of Two Million Dollars ($2,000,000.00) per occurrence combined single limit bodily injury and property damage. Automobile liability will apply to "Any Auto" and be shown on the certificate. lb If ENGINEER does not own any vehicles, only "Non-owned and Hired Automobile Liability" will be required and may be added to the commercial liability coverage at the same limits as required in that section of this Agreement, which is Section 12.2 entitled "Commercial Liability Insurance". * - _r mom Professional Liability Coverage: Before this Agreement is fully executed by the parties, ENGINEER shall provide the OWNER with a certificate of insurance as proof of professional liability coverage with a total minimum liability limit of Two Million Dollars ($2,000,000.00) per claim combined single limit bodily injury and property damage, and Two Million Dollars ($2,000,000.00) aggregate. The certificate shall clearly state who the provider is, the G:\Contracts & Task Orders\Yakima Air Terminahl 1050\2013-05-02 Scope of Svcs Construction Terminal Apron.doc Page 5 of 9 I . 1 • 1 a 0 A� The ENGINEER reserves the right to obtain the services • other Consulting Engineers experienced in Airport work to prepare and execute the work which is related to the Project within the scope of services and fees contained herein. All subconsultants are subject to the review and approval of the OWNER. The OWNER acknowledges that a geotechnical engineer subconsultant will be utilized for this Project to obtain material cores and other pertinent information for the ENGINEER. M M I A L-ZA 019 19 00-1-r-A61 M A A r- 1 A 12 J-# 1r, 11 uk I I Mzxg I a a I I a m 14 Lai a =axeml 110 Loa 4 r-1 , 14" &1 $1 A. In the event that the OWNER authorizes the ENGINEER to proceed to execute the various portions • work called for herein, this Agreement shall be in full force and effect until completion and acceptance by the OWNER of the Project or: C. This Agreement may be terminated by the OWNER for the OWNERS convenience at any time. If terminated for this reason, the ENGINEER shall be paid for services performed to the date of termination, including reimbursements then due. G:\Contracts & Task Orders\Yakima Air Terminal\l 1050\2013-05-02 Scope of Svcs Construction Terminal Apron.doc Page 6 of 9 ENGINEER makes no representations as to long-term compatibility, usability, or readability of electronic files or documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used to create the file. The OWNER and the ENGINEER hereby certify that the ENGINEER has not been required, directly or indirectly, as an express or implied condition in connection with obtaining or carrying out this Agreement to: W itl Pay, or agree to pay, to any firm, person, or organization any fee, contribution, donation, or consideration • any kind. A, The OWNER and ENGINEER each bind themselves, their partners, successors, executors, administrators, and assigns to the other parties to this Agreement, and to the successors, executors, administrators, and assigns of such other party in respect to all covenants of this Agreement. B. Except as above, neither the OWNER nor the EN INEER shall assign, sublet, or trans r their interest or obligation hereunder in this Agreement without the written consent of the other. C It is understood by the OWNER and the ENGINEER that the FAA is not a party to this Agreement and will not be responsible for engineering costs except as should be agreed upon by the OWNER and the FAA under a Grant Agreement for the Project. OWNER approval of this Engineering Services Agreement is conditioned upon and subject to FAA approval. X. TITLE V1 ASSURANCES During the performance of this Agreement, the ENGINEER, for itself, its assignees and successors in interest (hereinafter referred to as the "Contractor") agrees as follows: A. Compliance with Regulations. The Contractor shall comply with the regulations relative to nondiscrimination in federally assisted programs of the Department of Transportation (hereinafter, "DOT") Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time (hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of this Contract G:\Contracts & Task Orders\Yakima Air TerminaI\1 1 050\2013-05-02 Scope of Svcs Construction Terminal Apron,doc Page 7 of 9 1� Nondiscrimination. The Contractor, with regard to the work performed by it during the Contract, shall not discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The Contractor shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the Contract covers a program set forth in Appendix B of the Regulations. Lo . E! M811011111; LM L W-0 is WIM X ppligy. It is the policy of the Department of Transportation (DOT) that minority business enterprises as defined in 49 CFR Part 23 shall have the maximum opportunity to participate in the performance of contracts financed in whole or in part with federal funds under this Agreement. MH=X-QM-W MGMEMM HMMM M.- -1 116111101MMINUMI 650- 11 Mall INWINIVE-112M T"MI, I - -trl rTIEIJ' aujiu 51CF11 5111 or acil" lj(,rl 51m z15 Irle Gu both trial and appellate court. Since the FAA is not a party to this Agreement, it cannot be held liable for actions under this section. G:\Contracts & Task Orders\Yakima Air Terminal\1 1050\2013-05-02 Scope of Svcs Construction Terminal Apron,doc Page 8 of 9 *4111pLen-gont This Agreement shall be governed by the laws of the State of Washington. Venue shall be in Yakima County. IN WITNESS WHEREOF, the OWNER and the ENGINEER hereto have made and executed this Agreement the day and year first above written. CITY OF YAKIMA BY BY Tony O'Rourke Jeffrey T. Louman, President TITLE: _ City Manager ATTEST: Sonya Claar Tee TITLE:, City Clerk G:NContracts & Task Orders\Yakima Air Terminal\1 1050\2013-05-02 Scope of Svcs Construction Terminal Apron.doc Page 9 of 9 N W E S 0 2D 40 8D .y LIMITS OF WORK .. _ CONCRETE APRON SIDA LINE �Cpyq T � XjWq Y o �P t JOB NUMBE : DATE: SHEET 801 North 39th Avenue 091 2013 H L A Yakima, WA 98902 FILE NAMES: YA K I M A AIR TERMINAL 509.966.000 P R Un � & H V DRAWING: 09101.dwg TERMINAL APRON Huibregtse, Louman Associates, Inc. Fax 509.965.3800 SUBJECT 4 O RE V M O N of Civil Engineering ® Land Surveying *Planning www.hlacivil.com REVISION DATE ENTERED BY: BWT AERIAL PHOTOGRAPHY PROJECTTITLE: TERMINAL APRON REHABILITATION CLIENT: YAKIMA AIR TERMINAL AIP NUMBER: 3- 53- 0089 -34 DATE: 4/24/2013 Principal Licensed Project Resident Land Surveyoron TASK TASK Engineer Engineer Engineer Engineer Surveyor 2 -Man Crew Clerical TOTAL DIRECT NO PROJECT TASK $60.00 $30.00 $23.20 $36.70 $50.00 $28.70 $20.50 HRS COSTS CONSTRUCTION PHASE SERVICES 1 Assist Owner with Evaluation of FAA Funding Program 4 4 8 $360.00 2 AIP Grant Preparation and Assistance 2 8 10 $360.00 3 Award and Contract Execution 4 4 16 4 28 $1,029.20 4 Preconstruction Conference and Prepare Minutes 4 8 4 8 2 26 $907.40 5 Assist Owner /FAA with Notice to Proceed 4 4 8 2 18 $694.60 6 Attend up to two (2) City of Yakima meetings as 4 6 4 2 16 $607.80 necessary 7 Final Construction Management Plan 4 12 4 4 2 26 $880.60 8 Review Contractors Safety and Quality Assurance Plan 2 8 8 18 $653.60 9 Conduct Weekly Construction and Safety Meetings 4 16 8 16 44 $1,492.80 10 Prepare Daily and Weekly Inspection Reports 2 4 24 4 34 $1,202.80 11 Full -Time Construction Observation up to 40 Days (10 hrs 10 20 20 400 450 $16,344.00 per Day) 12 Evaluate and Prepare Change Orders, as necessary 2 8 4 16 8 38 $1,204.00 13 Review Contractor Material Submittals 2 4 12 4 22 $762.40 14 Prepare Monthly Pay Estimates 4 8 8 4 24 $855.60 15 Wage Rate Interviews /Labor Documents & Payroll 4 4 20 20 48 $1,504.00 Review 16 Claims and Conformance Recommendations 4 4 20 4 32 $1,176.00 17 Observe and Prepare Required DBE Participation 2 4 4 2 12 $42780 Documentation 18 Final Project Inspection 2 4 8 2 16 $574.60 19 Prepare Record Drawings 2 4 8 2 16 $574.60 20 Prepare Final Project Report 4 24 8 4 2 42 $1,333.40 21 Final Project Closeout 2 16 4 4 4 30 $921.60 Labor Subtotal 72 174 52 592 0 0 68 0 0 0 0 958 $33,866.80 Direct Overhead 147.17% $49,841.77 Fixed Fee 15.0% $12,556.29 Total Labor + Overhead +Fixed Fee $96,264.85 EXPENSES: Cost Air Ground Trip Travel: Per Unit Trips Trips Days Miles Markup Air Travel $0.00 1.0 $0.00 Mileage (from office) $0.500 30 8 1.0 $120.00 Mileage (Surveys) $0.500 1.0 $0.00 Meals /Lodging $0.00 1.0 $0.00 Misc. expenses. FAX $0.00 COPIES $250.00 TELEPHONE $150.00 POSTAGE $200.00 PRINTING $500.00 PLOTTING $2,000.00 SUB - CONSULTANTS: Markup 1. Geotechnical Investigation and Pavement Design 1.07 $0.00 2. Electrical Consultant 1.07 $0.00 1.07 $0.00 Subtotal - Labor + Overhead +Fixed Fee Subtotal- Expenses Subtotal - Subconsultants Total - Terminal Apron Rehabilitation :ONSULTANT COST BREAKDOWN CONSULTANTS: UNITS QTY. RATE TOTAL 1. Geotechnical Investigation and Pavement Design Principal Engineer $0.00 Project Engineer $0.00 Asst. Project Engineer $0.00 Project Assistant $0.00 Staff Engineer $0.00 Local Field Assistant $0.00 Draftsman $0.00 Grain size eval > 0.02mm $0.00 Atterburg limits $0.00 Insitu Unit wt. and Moisture Content $0.00 Lab Manager $0.00 CBR, each $0.00 Wash 200, each $0.00 Drilling, per hr $0.00 Support Truck, per day $0.00 Drill Rig Mob -Demob $0.00 Asphalt Expert $0.00 Asphalt core & unit weight $0.00 Asphalt oil content $0.00 Quick set concrete, per hole $0.00 Bentonite, per bag $0.00 Administrative Markup $0.00 Materials $0.00 Per Diem & Lodging $0.00 $0.00 2. Electrical Engineering Project Manager $0.00 Senior Engineer $0.00 Draftsman $0.00 Clerical $0.00 $0.00