HomeMy WebLinkAbout02/04/1997 Adjourned Meeting / Study Session R
285.
CITY OF., YAKIMA, WASHINGTON
FEBRUARY 4, 1997
ADJOURNED MEETING /STUDY SESSION
The City Council met in session on this date at 8:00 a.m., in the
First Floor Training Room at the Police Station /Legal Center, 200
South Third Street, Yakima, Washington. Mayor Lynn Buchanan,
presiding. Council Members Clarence Barnett, Ernie Berger, John
Klingele, John Puccinelli, and Bernard Sims present. Council
Member Henry Beauchamp absent and excused. Assistant City Manager
Rice, Director of Finance and Budget Hanson, Chris Waarvick,
Wastewater Superintendent, . Doug Mayo, Project Engineer, Bruce
Bates, Assistant Wastewater Superintendent, Pete Hobbs,
Environmental Analyst, and Deputy City Clerk Skovald also present.
Wastewater Cost Of Service Study
Mayor Buchanan welcomed the group and called the meeting to order.
Glenn Rice directed attention to the 1996 Wastewater. Cost of
Service Study and noted this study session was scheduled after
Council deferred action at the Budget Wrap -Up discussions last
December. He then introduced Wastewater staff members and invited
questions from the Council.
Council Member Barnett questioned the accuracy of the preliminary
results of wastewater strength samples taken from residential
areas that are not known to contain commercial strong waste
sources. He feels the samples are inadequate to consider
increasing the strong waste rates for residential users. Chris
Waarvick described the limited series of tests taken for
Biochemical .Oxygen Demand (BOD) and Total.. Suspended Solids (TSS),
also known as Suspended Solids or (SS). He further explained
domestic strong waste sampling will continue and additional data
will be forthcoming since the test results may be highly variable
from area to area and may be seasonal. Mr. Waarvick didn't feel
the sample is really valid enough to consider making changes in
the residential rates and pointed out that the limited amount of
information prevents a definitive answer to the domestic strength
of wastewater in Yakima. There was a considerable amount of
discussion among the Council members concerning whether or not the
restaurant industry was carrying the entire burden of charges for
BOD and Suspended Solids. A suggestion was made to educate the
public to not pour grease or other inappropriate wastes down the
drain. There was also discussion about the method of sampling,
when the samples were taken, and how strong waste is determined.
I/ Council Member Puccinelli adamantly expressed concern and
reiterated that concern several times during the meeting about
raising the surcharge for only one industry for wastewater strong
waste discharge. The Council also briefly talked about water
saving devices. r
Council Member Barnett directed attention to another area of the
1996 Cost of Service Study where emphasis is placed on charges to
City retail customers with a 3/4 pipe water meter size. He
pointed out that there is a different ready -to -serve charge for
286.
ADJOURNED MEETING -- FEBRUARY 4, 1997
the various sized pipes and a different formula for multi -unit
residential charges. Furthermore,. the 1996 Cost of Service Study
is silent on this issue, and he questioned whether those rates
will increase. Council Member Barnett assumed that the rates
would not be increased for the other water meter sizes or the
multi -unit residential customers. This information is needed to
compare rates. Doug Mayo explained the rates will be included in
the proposed ordinance with all factors multiplied out. He
directed Council's attention to Page 5 of Section 5 of the 1996
Cost of Service Study, specifically to Table 5 -9 which indicates
the Number of Meter Equivalents and provided a detailed
explanation of how rates vary among the meter sizes. He also
indicated both figures and ratios are the same as the last draft
of the report. After Doug Mayo explained how the overall
percentage of increase was figured, the Council discussed the
ready -to -serve charges, unit of consumption, how the rates are
computed, as well as the proposed three percent increase in the
ready -to -serve charge. There was also °ari extensive discussion
about the accelerating costs and inflationary increases in all
rates for utilities, not just sewer bills, as well as higher costs
for property taxes and other living expenses. The Council also
elaborated on the substantial increase and shift in population
within Yakima and the increased wastewater costs that come with
that increased density, particularly more people in households.
Also affecting sewer rates are compliance with environmental
safety mandates as well as higher costs associated with
maintenance and operation of the Wastewater Treatment Facility.
Major factors identified during the discussion include major price
increases for commercial supplies and commodities along with other
necessary expenses to treat wastewater, of which only a small part
consists of increased labor costs for the overall operation of the
Wastewater Division.
Chris Waarvick asked for Council direction on the policy issues
deferred last December, along with the rate increases requested in
the 1996 Cost of Service Study. Those include the East Mead Sewer
Planning Study and initiating a low -level construction
rehabilitation on storm drain systems.
Glenn Rice commended the Wastewater Division for their overall
good job in keeping up with these costs and keeping in mind the
concerns expressed by the Council and appreciating the support
expressed by the }Council. It is critical in any community to keep
in mind the costs associated with a rising population as it
relates to wastewater treatment.
Council Member Klingele directed attention to the Alternative
Disinfection (UV light) capital cost expected in 2006 which will
be replacing the current chlorination and dechlorination
equipment. Council Member Puccinelli feels Wastewater Treatment
Plant maintenance should not be allowed to fall behind and rate
increases need to be implemented instead of issuing bonds to catch
up later because that would hurt the rate payer down the road.
John Hanson explained that when bonds are issued interest and debt
service have to be paid, and it would be cost effective to
implement a rate increase now.
2
287
ADJOURNED MEETING -- FEBRUARY 4, 1997
f End:
Council Member Klingele also brought up the clean air mandate and
asked what is anticipated Cliris Waarvick spoke about the
volatile organic compounds threshold which the City must register
with the Clean Air Authority. Because of the nature of the pre-
treatment program and the nature of the industry in the area, and
the City's continuing education efforts, he doesn't foresee the
type of compounds which would exceed the threshold with the Clean
Air Authority in the near future.
In response to a question from Council Member Puccinelli,
Mr. Waarvick also pointed out that industries in the area are
paying less subsidies in the user classes by the City Retail
Ratepayer paying more with less subsidies for industries than
before. Doug Mayo explained the necessity of planning for future
services, which is triggered by reaching 85% of treatment facility
capacity for three months. That process is in progress.
Chris Waarvick reminded the Council that the City is working under
an extended Wastewater Discharge Permit and there are some areas
concerning" nutrient control, ammonia, phosphorous, and other
things that are uncertain. Water quality and allocation are also
factors when determining discharging into the river. There was
discussion about regulatory orders, water quality and controls,
and outflow purity comparisons. There was a suggestion to perhaps
schedule individual Council member tours of the Wastewater
Treatment Facility. There was a brief discussion about the costs
for piping outside the city limits as well as depreciation costs
for the projects. There was discussion of pretreatment program
costs as it relates to the billing disagreement with City of Union
Gap and the Terrace Heights Sewer District as far as their
' unfulfilled Pretreatment Program obligations.
It appeared to be the general consensus of the Council that staff
bring back the recommended alternatives in the Cost of Service
Study, the East Mead Sewer Study, and the Stormwater minor repair
issue as well as the appropriate legislation and policy issue for
formal action request at the next regular business meeting. Glenn
Rice explained increased rates are needed to provide adequate
funding to do the work so bonds won't have to be issued to raise
the money.
It was MOVED BY SIMS, SECONDED BY BERGER, TO ADJOURN THE MEETING
AT 9:00 A.M.
READ AND CERTIFIED ACCURATE BY: , '_. 7 ,,,r
CIL MEMBER D'. TE
1*(Af "AritO
COUNCIL :ER DATE
ATTEST:
CITY CLERK ' BUC `4 AN, MAYOR �
Minutes prepared by Deputy City Clerk Skovald. An audio tape of this meeting is available in
the City Clerk's Office
3