HomeMy WebLinkAboutR-2020-139 UV Slide Gate Replacement; TML Construction, Inc.RESOLUTION NO. R-2020-139
A RESOLUTION authorizing a contract with TML Construction, Inc. for Project No. 2525 UV
Slide Gate Replacement at the City of Yakima Wastewater Treatment Plant
WHEREAS, the City of Yakima owns, operates, and maintains the Yakima Wastewater
Treatment Plant in accordance with applicable Federal, State and Local regulations; and
WHEREAS, the City of Yakima Wastewater NPDES permit requires that the facility
provide effective and reliable disinfection of plant effluent prior to discharge to the Yakima River;
and
WHEREAS, the treatment plant staff have identified that corrosion is interfering with
reliable operation of the existing ultraviolet disinfection system gates and motor operators that
control flow through the disinfection system; and
WHEREAS, under City Contract No. 2020-091, the City entered into an agreement with
Gray and Osborne, Inc. to prepare the plans and contract documents for the replacement of the
existing aluminum gates with stainless steel gates and accompanying motor operators; and
WHEREAS, the City of Yakima Wastewater Division requires construction services for the
gate and motor operator replacement; and
WHEREAS, The City of Yakima used the procedure established by the State of
Washington for competitively bidding projects; and
WHEREAS, TML Construction, Inc. submitted the low bid and has the ability to perform
the contract specified work; and
WHEREAS, the City Council finds that it is in the best interest of the City of Yakima and
its residents to enter into a contract with TML Construction, Inc. to perform the work detailed in
the contract documents for the replacement of the ultraviolet disinfection system gates and motor
operators; now, therefore
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The City Manager is hereby authorized to execute the attached contract with TML
Construction, Inc., in the amount of One Hundred Fifty -Three Thousand Eight Hundred and
Ninety -Four Dollars ($153,894) for the replacement of the ultraviolet disinfection system slide
gates and motor operators at the Yakima Wastewater Treatment Plant
ADOPTED BY THE CITY COUNCIL this 1st day of December 020.
ATTEST:
Sonya Claar T
IT
Pa icia Byers, Ma
CITY CONTRACT N()
RESOLUTION NO:_J
CONTRACT
THIS AGREEMENT, made and entered into in triplicate, this 4th day of November. 2020. by and between the City of
Yakima, hereinafter called the Owner, and TML Construction,,inc.�noWashington Corporation,
hereinafter called the Contractor.
VNTNESSETH:
That in consideration of the terms and conditions contained herein and attached and made a part of this agreement, the parties
hereto covenant and agree oafollows:
|. The Contractor shall do all work and furnish all tools, materials, labor and equipment for THE BID AMOUNT OF:
$ 153,894.30 , for UV Slide Gate Replacement Project, City Project No. WP2525, all in accordance with, and as
described in the attached plans and specifications and the 2020 Standard Specifications for Road, Bridge, and Municipal
Construction which are by this reference incorporated herein and made a part hereof, and shall perform any alterations in or
additions to the work provided under this contract and every part thereof.
Work ohu|| start within ten (10) days after the Notice to Pm000d and shall be substantially completed in One Hundred and
Twenty (120) working days and physically completed in One Hundred and Thirty (130) working days. If work has not
commenced within the ten (10) days after the notice to proceed, the first chargeable working day shall be the eleventh (11th)
working day after the date onwhich the City issues the Notice toProceed.
If said work is not completed within the time specified, the Contractor agrees topay tothe Owner the sum specified in
Section 1-08.9 of the WSDOT Standard Specifications for each and every day said work remains uncompleted after
expiration ufthe specified time, oaliquidated damages.
The Contractors shall provide and bear the expense of all equipment; work and labor of any sort whatsoever that may be
required for the transfer of materials and for constructing and completing the work provided for in this contract and every part
thereof, except such as are mentioned in the specifications to be furnished by the City of Yakima.
||. The City of Yakima hereby promises and agrees with the Contractor to employ, and does employ the Contractor to
provide the materials and todo and cause to be done the above described work and to complete and finish the same according
to the attached plans and specifications and the terms and conditions herein contained and hereby contracts to pay for the same
according to the attached specifications and the schedule of unit or itemized prices hereto attached, at the time and inthe
manner and upon the conditions provided for inthis contract.
|||. INDEMNIFICATION. The Contractorshall defend, indemnify, and hold harmlessthe City, its officers, elected
officials, employees and agents from and against any and all claims, causes of action, damages, losses, and expenses of any
kind or nature whatsoever, including but not limited to, attorney's fees and court costs, arising out of, relating to, or resulting from
The Contractor's performance or non-performance of the services, duties and obligations required of it under this Agreement.
|V. The Contractor for himself, and for his heirs, executors, administrators, successors, and assigns, does hereby
agree to the full performance of all the covenants herein contained upon the part of the Contractor,
V. |tiofurther provided that noliability shall attach to the City ofYakima byreason ofentering into this contract,
except aoexpressly provided herein.
IN WITNESS WHEREOF the parties honatn have caused this agreement to be executed the day and year first herein above
written.
CITY OFYAK|MA CONTRACTOR
this �
n�
��
C����~�._e '& -v , �
����
Brian
By:,PetcrIsen
Brian Petersen
Corporation
(Print Name)
Its: President
(President, Owner, etc.)
Address: P0Box 2Q7O.Hayden, Idaho 83835
City of Yakima 153
1
ITEM TITLE:
SUBMITTED BY:
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEM ENT
Item No. 4.G.
For Meeting of: December 1, 2020
Resolution authorizing a contract with TML Construction, Inc. for
Project No. 2525 UV Slide Gate Replacement
Scott Schafer, Director of Public Works
David Brown, Assistant Director of Public Works
Mike Price, Wastewater/Stormwater Division Manager, 249-6815
SUMMARY EXPLANATION:
City of Yakima (City) Project No. 2525 UV Slide Gate Replacement replaces the six aluminum
gates and six automatic gate motor operators that control wastewater treatment plant flow through
the plant's ultraviolet (UV) effluent disinfection system. Corrosion of the existing aluminum gates,
installed in 2009, is interfering with automatic UV system operation and has caused excessive
wear on the motor operators that function to raise and lower the gates. The replacement of the
existing aluminum gates with corrosion -resistant stainless steel gates and the replacement of the
worn motor operators will restore reliable automatic UV disinfection system operation.
The City previously entered into an agreement with Gray & Osborne, Inc. under City Contract
No. 2020-091 to provide engineering design, bidding, and construction services for the UV Slide
Gate Replacement. The City utilized the procedure established by the State of Washington for
competitively bidding projects. Nine contractors submitted bids, with TML Construction, Inc.
submitting the lowest bid of $153,894. The contract is attached for City Council review. The
project is funded by Wastewater Capital Fund 472.
ITEM BUDGETED:
STRATEGIC PRIORITY:
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
RECOM M ENDATION:
Adopt Resolution
Yes
Public Safety
ATTACHMENTS:
Description Upload Date Type
D R+74,=olurnn
D Cootract
1111712(120
11:1242n20
2
Resolution
Contrdcl
RESOLUTION NO:R .s't)^Inr l Act
CHANGE ORDER
Project Title UV Slide Gate Replacement
Owner City of Yakima Contractor Name TML Construction, Inc.
Change Order No. 1 Contractor Address PO Box 2970
Hayden, ID 83835
Change Order Date March 2, 2021
G&O No. 17042.05 City of Yalania.Pi•oject No. WP2525
The following changes are hereby made to the Contract Documents:
ITEM 1: Supply and Install New Walkway and Handrail (COP No. 001)
Supply and install a new walkway and handrail east of the UV effluent gates to allow treatment
facility staff to access new actuators. Per TML PCO 1 dated February 15, 2021.
The lump sum cost for this work is: $38,698.00
Justification: The additional work is at the request of the Owner. Construction of a walkway for
treatment facility staff on the east side of the UV effluent gates was initially planned as a future
project; however, the Owner requested it be added into the current project.
CHANGE TO CONTRACT PRICE
Original Contract Amount (without tax)• $142,100.00
Current Contract Amount, as adjusted by previous change orders: $142,100.00
The Contract Amount due to this Change Order will be increased by• $38,698.00
The new Contract Amount (without tax) due to this Change Order will be: $180,798.00
CHANGE TO CONTRACT TIi VEE
The Substantial Completion Contract Time will be increased by 4 working days, for a total of
124 working days.
This document will become a supplement to the Contract and all provisions in the Contract will apply
hereto. The Contractor acknowledges and agrees that by executing this change order he foregoes all
rights and privileges of acquiring any additional compensation for any known or unknown claims of any
type or nature, to include but not be limited to, any additional work, delays, extended office overhead,
design omissions, changed site conditions, or any oral directions as of the date of the execution of this
change order.
GRAY & OSBORNE, INC. '7/
�� Date
TML
CONSTRUCTION, INC.
(ACCEPTED)
CITY Or YAKIMA
(ACCEPTED)
Ora
CITY CONTRACT NO:n 02C5-dOS--Chop Q`' e
rage 1 of 1
Date 3 / 2 (z
Date
p Dpal
�
cmmamo
| TMLCoDSt[UCti0|lx �Uc�
Skeet Address — - —
| p.{). B0X �g7O
dw-—- —
Hayden
'
pmjer/Number (Ovmer)
|VVp252S
/ Job (Title)
w»
[]\/ Slide Gate Re | t
Dale `wmkPhysically ,ample/uu
� 6/10/2021
slato
ID
�� � �~ �.�. �
wKn���"��� v^���~UnUK��~c)
� up
|83835
Final �iio" ��tdiiwaaes ram
$103.280.84
Contractor's Certification
Date
G/18/2021
|. The undersigned, having first been duly sworn, certify that |om authorized Nsign for the claimant; that in
connection with the work performed and ho(fie best n{myknowledge noloan, gratuity orgift inany form whatsoever
has been extended to any employee of the City of Yakima nor have I rented or purchased any equipment or materials
from any employee of the City of Yakima; I further certify that the attached final estimate is a true arid correct
statement showing all the ninnies clue mnfrom the City o[Yakima for wohperformed and material furnished Under
this Contract; (ho( | have carefully examined said final estimate arid understand the same; have paid all |abor,
material, an(] other costs for this project; and that I hereby release the City of Yakima from any and all claims of
whatsoever nature which I may have, arising out of the performance of said contract, which are not set forth in said
WHITNEY WARREN
COMMISSION NO, 20
NOTARY PUBLIC
STATE OF IDANO
Subscribed and sworn tobefore mothis _ �=
^ ��,
X
r=-�'
day of
Notary Public in and for the State of
Residing at
City of Yakima Certification
|. certify the attached final estimate bbmbased upon actual
measurements, and to be true and correct.
Approved Date 103��
� �J
��'/�� vw
~1
�
CITY CONTRACT IN
RESOLUTION NO'
This Final Contract Voucher CurtifiovUnniuk,heprepared bythe Engineer arid the original forwarded wthe City of
Yakima for acceptance and payment.
Contractors Claims, if any, must be included and the Contractors Certification must be labeled indicating a claim
attached.
(May /.zo/n