11/01/2011 11 2011 3rd Quarter Capital Improvement Projects Report
BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. For Meeting of November 1, 2011 ITEM TITLE: 2011 3 Quarter Capital Improvement Projects Report SUBMITTED BY: Michael Morales, Assistant City Manager CONTACT PERSON /TELEPHONE: Douglas Mayo, PE, City Engineer, 576 -6678 SUMMARY EXPLANATION: Attached is the Engineering Division's 3 Quarter Capital Improvement Projects Memorandum and Report which includes Water /Irrigation and Wastewater Capital Improvement Projects. Also attached is the current project spreadsheet developed by the Sewer, Water, Irrigation, Streets, Traffic and Engineering Divisions. The current project listing assists in the planning of current and upcoming projects. It helps the divisions coordinate their work so that, for example, a street is not rebuilt or seal coated just prior to planned underground work on the same street. • New, proposed and continued construction plus construction administration for 2011 is as follows: Engineering: $ 15,000,000 Water: $ 3,000,000 Irrigation: $ 1,600,000 WasteWater Collections: $ 4,280,000 WasteWater Plant: $ 6,120,000 (additional $7,140,000 in 2012) Total: $ 30,000,000 SEE ATTACHED MEMORANDUM AND REPORT Resolution Ordinance Contract Other (Specify) Memorandum and Report Funding Source APPROVED FOR SUBMITTAL: GO C Manager STAFF RECOMMENDATION: Accept Report • BOARD /COMMISSION /COMMITTEE RECOMMENDATION: COUNCIL ACTION: 1 -- October 25, 2011 MEMORANDUM October 25, 2011 TO: Mayor Micah Cawley Members of City Council FROM: Joan Davenport, Acting Director of CED Doug Mayo, PE, City Engineer SUBJECT: 2011 Capital Improvement Projects: 3 Quarter INTRODUCTION This Quarterly Report information is intended to provide a status overview of the City's capital improvement projects for the 3rd Quarter of 2011, including current project status, milestones, and any new developments that may significantly alter the schedules or costs of the projects. This narrative report includes projects of the Water /Irrigation Division, Wastewater Division and Engineering Division. CAPITAL IMPROVEMENT PROJECTS 4110 Railroad Grade Separations; Lincoln Avenue (& Martin Luther King jr. Blvd.) 1St Street to 1St Avenue; Phase 2 (MLK: Phase 3) This project consists of re- constructing Lincoln Avenue so the roadway will pass beneath the existing BNSF railroad tracks. It also includes constructing a bridge for Front Street that will bridge over Lincoln Avenue. Phase 1 of this project, which relocated utilities for both underpasses; was completed in the fall of 2007. All of the right -of -way required for both underpasses has been acquired. Phase 2 of this project, which constructs the Lincoln Avenue underpass, was awarded to Apollo, Inc. of Kennewick, on February 3, 2010. Construction began in March of 2010. Due to the existing ground conditions differing from those described in the plans and specifications, the bottom seal construction method required modification, which has increase the cost of and extended the length of the project. Construction of the bottom seal was completed in late September. The underpass west of the railroad tracks has been paved with its' first lift of asphalt. The contractor continues to work on the east half of the underpass, by installing the stormwater system and plugging anticipated leaks in the bottom seal. It doesn't appear that this work will be completed prior to the asphalt plants closing down (around Thanksgiving), so the project most likely won't be completed until April, 2012. Design of Phase 3, the MLK underpass, is 95% complete and on hold until additional funding is secured. We estimate that the project is about 4110 $4.5 million short of being fully funded. We continue to search for additional funds and hope to go out to bid on the MLK underpass mid 2012. 1 ♦ Projected completion date for Lincoln Avenue Underpass: 2nd Quarter FY2012. O Washington Avenue — BNSF Crossing Upgrade This project consists of upgrading the signals and improving the track crossing by installing new concrete crossing pads. The project has been completed. ♦ Project completion date: 3 Quarter FY2011 East Nob Hill Blvd. & Fair Avenue Intersection Reconstruction Design for the complete intersection project has been funded by federal STP funds. The full project will consist of widening the intersection and installing a new mast -arm signal. The southeast corner frontage improvements were constructed as part of the Fiesta Foods development, using SIED and REET 2 monies for a portion of the cost. Due to design demands on the Engineering Division for funded construction projects this project design will be used as a filler project for engineering designers. ♦ Project design completion date: This filler work' will extend into 2012. Yakima Valley Trolley Barn & Museum Preservation Using State Enhancement funds, the City purchased the historic Yakima Valley Transportation Company Trolley Repair Barn and Substation on January '31, 2008. Environmental documentation approval was received to make repairs to the west and south walls and crane system. Repairs to the crane inside the barn, and to the south and west walls of the Trolley Barn have been completed. Some funding still remains. These funds will be used to restore portions of the 6 -mile track, poles and the overhead system. The material purchase and work will be completed in 2012. ♦ Project completion date: 3 Quarter FY2012. William 0. Douglas Trail, 6th Avenue & Bridge Deck Crossing This State Enhancement Grant project constructed a 10 -foot wide asphalt pathway along the west side of 6 Avenue from Hathaway, approximately 0.8 miles in length, which ties into the Greenway pathway. This project has been completed. ♦ Project completion date: 3 Quarter FY2011. 0 2 William O. Douglas Trail Bridge Restoration & Trailheads The purpose of this State Enhancement Grant project was to restore the YVT Naches River Bridge including cleaning, rust removal and painting, along with filling in William O. Douglas Trail gaps by acquiring right -of -way adjacent to nineteen private parcels and to add interpretive signing. The right -of -way plans detailing the needed property acquisition for the pedestrian /bike pathway have been approved by WSDOT, but some of the property owners were not willing sellers. We are looking to purchase property in other areas to fill different gaps. The Yakima County Right of Way Division is under contract to assist us with the Right of Way process. Long Painting Co. completed cleaning and painting the YVT Trolley Bridge in October of 2009. ♦ Project completion date: 2nd Quarter FY2012. Public Works Parking Lot Reconstruction This project was the end of a three -year program to replace and restore the subgrade and pavement at the Public Works Complex using six identified funding sources. Construction has been completed. ♦ Project completion date: 2nd Quarter FY2011. West Nob Hill Blvd., 50th Avenue to 64th Avenue At the end of August, 2011 we again applied for a TIB grant to construct this project. We will find out if we are awarded a grant from the TIB Board on November 18th. Huibregtse Louman & Associates (HLA) has completed the design of the project in anticipation of Federal or TIB funding. The Environmental Documentation has been completed and the right of way needed for the project has been acquired. We continue to pursue sources of revenue. ♦ Project completion date: To Be Determined. Coolidge Avenue, 80th Avenue to 88th Avenue This project that paved Coolidge Avenue and installed curb, gutter and a storm drainage system from 80th Avenue to 88th Avenue has been completed. It is in the process of being closed out. ♦ Project completion date: 3 Quarter 2011. 3 South 16th Avenue & Washington Avenue Intersection This project consists of widening and realigning the intersection to meet the new alignment and recent construction of Valley Mall Boulevard. Funding of $1.1 Million is through a Transportation Improvement Board (TIB) grant with local match of $300,000 from REET 2 funds. Right -of -Way has been acquired from all but one parcel (Ding Ho Restaurant). Possession and Use was received from the Ding Ho property so the project could be constructed. Attorneys have yet to reach a settlement on the Ding Ho property. Delivery of the signal poles was delayed by 6 weeks so the project took longer than anticipated. Paving of the project was completed on October 22, 2011, and construction of the project will be complete this month. o Projected completion date: 4th Quarter FY2011. Capitol Theatre Production Center, Pavilion & Plaza PHASE I — Capitol Theatre - Production Center The Production Center (attached to the back of the Capitol Theatre facility) facilitates the unloading and loading of semi- trucks delivering show equipment. Upgraded electronics required for computerized lighting, staging and sound; address the need for prop and equipment storage; and parking facilities for production trucks. The project completed a base layout including all lighting and electrical equipment for a 499 seat, II/ flexible, "Black Box" theatre affectionately dubbed the "4th Street Theatre ", on the second floor. The Capitol Theatre Company has paid for and completed additional work, purchased seating, draperies, etcetera bringing the 4th Street Theatre into operation this past October. Reconstruction of the adjacent alley with permeable brick pavers for drainage has been awarded to Leingang Construction. That work starts in November and should be completed this year. Air handling rebalance and noise dampening will finalize the project which is 99.5% complete. PHASE II — Capitol Theatre - Pavilion Development of the SE Corner 3rd St. & Yakima Ave. This project is pending funding. PHASE III — Pedestrian Plaza Development of a pedestrian plaza and lobby extension by closing 3rd Street to vehicular traffic between Yakima to Chestnut Avenues. This project is pending funding. TRAHO Architects is the architect for the Project. Leone, Keeble & Moen, a Joint Venture, is the competitively selected contractor for the project and oversees 29 types of subcontracted construction. The updated construction budget, including all design, inspections, fees and construction is set at $6,725,232. o Projected completion date of Phase I: 3rd Quarter FY2011 4 Kiwanis Park, Upper Park This project consists of building three multi-use ball fields including field lighting, restroom facilities, a volleyball court, a basketball court, a skate park, a playground, a concession /restroom, new sidewalk and pathways, and parking. Funding includes • $500,000 from a Recreation and Conservation Office (RCO) grant, $500,000 from YSD for field lighting, plus funding from various local service clubs. Sun Yakima LLC purchased the property adjacent to the existing Kiwanis Park, cleared the property and donated the property to the City of Yakima. The skate park has been constructed with funds donated by the Apple Valley Kiwanis Club. The playground was purchased and installed by Downtown Yakirna Rotary. The basketball court has been constructed with funds donated by Yakima Southwest Rotary. A 30'x30' covered picnic shelter was constructed with funds donated by Sunrise Rotary. A project that constructed parking spaces and sidewalk connecting the walkway from Fair Avenue to Gateway Park along Maple Street was recently completed at a cost of $123,000. A $45,000 project that prepared the site for future work was completed in April of 2011. Bids were received for the project to construct the ball fields, field lighting, the pedestrian pathway and west parking lot. The low bidder was Stephens and Sons Construction, Inc., with a bid of $1,274,122.70, and they began construction on October 3, 2011. The concession /restroom building will be constructed with the help of local service clubs in 2012. ♦ Projected completion date: 4th quarter 2012 Underground Storage Tanks at Yakirna Airport The City received a 75% site cleanup grant from the Department of Ecology to locate, assess and develop a plan to remediate, if necessary, contamination remaining from previously removed underground storage tanks. The project has been completed; wells were placed for monitoring; and final monitoring occurred in 1St quarter 2011. Final reports are complete and the project is pending finalization by the DOE. ♦ Projected assessment and project completion date: 2nd Quarter 2011 South 2 Avenue: Street Improvements, Yakima Avenue to Walnut Street This project removed the abandoned and unused trolley tracks on 2nd Avenue, and renovated the centerline of the roadway with concrete roadway and five (5) irrigated planters. Bids were opened on this project on July 15, 2011. The low bidder was M. Sevigny Construction, Inc., with a bid of $149,280.40. The project is undergoing final construction and project cleanup. Work should be completed this month. 4111 ♦ Projected completion date: 3rd Quarter FY2011 5 South 64th Avenue Roadway Widening: Nob Hill Blvd. to Tieton Drive This project will widen this section of 64th Avenue to a 39 -foot roadway (14'- 11' -14') 40 with curb and gutter on both sides of the road, and a 7 -foot sidewalk on one side of the road. Street lighting and a stormwater runoff treatment system will also be constructed. The project is funded by a $900,000 Surface Transportation Program (STP) federal grant and $200,000 mitigation from the Wal -Mart Development Project. Design and environmental documentation for this project has begun; with right of way acquisition and construction occurring in 2012. e Project completion date: 4th Quarter FY2012 Powerhouse / William O. Douglas Trail Connector, vicinity Willow Street This project will construct a paved pathway that will connect the Powerhouse Canal Trail at 14th and Swan Avenues to the William O. Douglas Trail on 6th Avenue at "I" Street. Once this project is completed, the Powerhouse Trail, William O. Douglas Trail and Yakima Greenway will be connected and complete a 6.5 -mile loop. The project is funded by a Transportation Enhancement Grant of $283,278. The project should be designed this year with construction beginning in the spring of 2012. ♦ Projected completion date: 3 Quarter FY 2012. Energy Recovery Grant & Energy Efficiency and Conservation Block Grant Program These projects are funded by a combination of American Recovery & Reinvestment Act (ARRA) funds and Energy Efficiency and Conservation Block Grant (EECBG) funds totaling $285,000 as well as incentives. The City Facilities Lighting Upgrade Project includes retrofitting with efficient lighting at City Hall, Yakima Public Affairs Channel (Y -PAC), Fire Station 94, Fire Station 95, Public Works Complex, & SE Community Center. The City Facilities HVAC Project includes Fire Station 95, Yakima Public Affairs Channel (Y -PAC), & City Hall (Council Chambers). This project was awarded on May 16, 2011 to Knobel's Electric at the bid of $153,004.54, and replacement of the lighting fixtures began in August. The project work should be completed in November. The HVAC design consultant, Hultz /Bhu Engineers Inc., from Tacoma, WA designed the HVAC. upgrades. It has been decided to bid the HVAC Systems Upgrade project in late winter 2012, so that City facilities will not be without heat during the upcoming winter. • Projected completion date: 2nd Quarter FY 2012 6 Yakima Sawmill Redevelopment 411 Staff review has begun on the multi - phased redevelopment of the former sawmill and plywood plant. Public funding sources include a commitment from the State of Washington in 2009 for up to $25 million of tax increment financing and a SIED loan in the amount of $500,000 from Yakima County to provide for the engineering design of new roads and utilities. The City and sawmill property owners are developing a master plan for over 200 acres of interstate frontage property to include retail - commercial, office - medical, light industrial, residential and open recreation space. The City has contracted with a consultant team led by H.W. Lochner Engineers to develop and design the Fair Avenue Extension, which will extend from Lincoln Avenue to 'R' Street. Yakima County has also contracted with the consultant team led by H.W. Lochner Engineers for the development of an East -West Corridor that will extend from 1St Street in Yakima easterly to Butterfield Road in Terrace Heights, and the development of an Interchange Justification Report to modify the Yakima Avenue and Fair Avenue interchanges. The consultant team began the design and surveying for these projects in October, 2011. ♦ Project completion date: To Be Determined. North 1St Street Corridor Revitalization In 2010 the City received a $25,000 planning grant through Yakima County SIED funding for the first segment of this project; a comprehensive approach to planning for future improvements to North First Street from "A" Street to the US- 12/I -82 Interchange. The North First Street Improvement Study will begin early this year to develop a design and action plan to address potential arterial street design alternates including an analysis of resulting traffic flow, streetscape and landscape improvements, and required utility upgrades. A final study document is expected to be completed by late summer 2011. Project design will begin as funding allows. ♦ Project completion date: To Be Determined. South 64th Avenue & Washington Avenue: Signal Construction This project will construct a traffic signal at this intersection. Street lighting and electrical conduits were installed with intersection construction in 2006. The project is funded by $265,000 from the Wal -Mart Development Project. Construction bids were opened on this project on October 25th. • Project completion date: 2nd Quarter FY2012 OTHER TASKS SERVICE TO OTHER DIVISIONS O Service to other divisions continues to be provided. Miscellaneous work has included: Sewer extension and restoration projects, legal descriptions . for annexations and vacations; updating irrigation, water and sewer maintenance reference maps; surveying and mapping; miscellaneous assistance to Police, Planning, Streets, Airport, Public Works Divisions and Public Works facilities, Yakima Convention Center, Fire Department, including remodels and miscellaneous projects, and the Capitol Theatre for capital improvement projects; Purchasing Division, etcetera. We currently have one (1) area considering pursuit of a Sanitary Sewer Local Improvement District (LID) and one (1) area considering pursuit of a Roadway Improvement District (RID). We recently provided or are providing engineering assistance for: • Convention Center: reroofing, partition recovering and stucco repairs. • Capitol Theatre Remodel; provided design and construction oversight. • Several small drainage improvement projects. 0 8 Water /Irrigation Division Capital Improvements Projects • General 308 Irrigation System Phase 4 /Stage 2 Improvements This project consists of replacing irrigation main and services in the General 308 Irrigation District. The limits of the project are from North 1St Street Avenue to North 10th Street and from East Yakima Avenue to East "F" Street. The project also replaces the irrigation main in Pierce Avenue from Summitview Avenue to Lincoln Avenue. Huibregtse, Louman Associates is completed the design. The project was bid on September 27, 2011 and the low bidder was KRCI, LLC of Wenatchee, WA. Construction is anticipated to begin in November, 2011 and be completed by April, 2012. City Irrigation crews are also replacing various portions of the irrigation main and services in the General 308 System. This is the last scheduled replacement project within the General 308 Irrigation System. • Project completion date: 2nd Quarter FY2012. Fruitvale Canal Improvements Part of this project will replace an open ditch irrigation wasteway /canal with a piped irrigation line along East H Street from North 6th Avenue to North 9th Street. Huibregtse, Louman Associates, Inc. completed a design report, providing a preliminary design and project costs. Final project design has been completed, which includes the design for two new industrial waste lines between North 1St Avenue and North 9th Street. Project design is also being coordinated with potential street improvements on East H Street. Bid opening is scheduled for October 18, 2011. The project will constructed in the fall of 2011 /winter 2012 and is scheduled to be completed by April, 2012. The rest of the project is to consolidate the river diversions for Fruitvale Canal with the diversions at the Nelson Dam. Project is being designed in cooperation with the Bureau of Reclamation, Washington Depart of Fish and Wildlife, Yakima County and North Yakima Conservation District. to Project completion date: Pipeline Improvements 2nd Quarter 2012. Diversion Consolidation On- going. Gardner Park Domestic Well The project installs a new 3,000 gpm domestic well in Gardner Park, located at Cornell Avenue and West Pierce Street. Construction on the project began January 2009. The e well was drilled to a depth of 1,328 feet. Well screen and casing has been installed and pump testing of the well has been completed. Golder Associates has completed the design and William Charles West of Kennewick, WA began construction April 11, 2011. 9 • The project report, construction approval and source approval documents have been approved by the Department of Health. The pump station is expected to be competed and the well on line late -2011. o Project completion date: 4th Quarter FY2011. East Viola Avenue (1 Crossing) Waterline Replacement The project will replace an undersized, deteriorating waterline crossing under I -82 at East Viola Avenue, between Rudkin Road and the Wastewater Treatment Plant. Replacement of the waterline will improve flows and reliability in this part of the water system, as well as replace a sub - standard, direct bury waterline across I -82 with a new ductile iron waterline in a steel casing within the limits of the interstate highway. Huibregtse, Louman Associates has completed the design. The project will be constructed as funding becomes available. ♦ Project completion date: On- going. Water Treatment Plant Backwash Recycle Upgrade The project will replace the unlined backwash recycle pond with new lined recycle ponds. Huibregtse, Louman Associates developed a preliminary design recommendation and report to submit to the Department of Health for approval. The project was submitted and selected for a 2011 Drinking Water State Revolving Fund (DWSRF) loan. Project design and construction is expected in 2012, pending final approval of the loan. o Project completion date: 4th Quarter 2012. 48" Domestic Transmission Main Repairs and Modifications The project will install 2 — 48" x 24" tee and valve assemblies to allow for temporary bypass in the event of future damage occurring to the transmission main at the Naches River crossing. The project also installs protective measures on the existing transmission main at the river crossing. Temporary repairs were completed after damage occurred during high river flows in spring 2011. Huibregtse, Louman Associates has completed final plans and specs for the permanent protection of 48" transmission main, as well as the bypass modifications. The project will be bid as a separate schedule to the Fruitvale Canal and Industrial Waste Improvement Project on October 18, 2011. o Project completion date: 4th Quarter 2011. 10 Wastewater Division Capital Improvements Projects 40 Digester Cover Replacement Project This project was contracted in the 1St Quarter of 2009 and construction began in the 2nd Quarter of 2009. The project included the replacement of the three secondary digester covers with new membrane gas holder covers; replacement of secondary cover blowers, air piping, Motor Control Centers (MCCs), local control panel and associated digester system accessories; improvements to the Secondary Digester Control Room, and Primary Digester electrical Room; replacement of the existing Dissolved Air Flotation Thickener (DAFT) mechanical system, improvements to plant SCADA system, sludge piping improvements; modifications to the plant electrical distribution system and; dredging of an existing storage lagoon. The project is 100% complete. Air and gas leaks have been resolved and the digester covers have been in operation since the end of November 2010. • Project is in process of being closed out. Received O &M manuals second week of October 2011 and record drawings are being delivered October 25, 2011 Second Phase of the Speedway Race Street Interceptor ® The Engineering Division is finishing up the design of the remainder of the Speedway Interceptor that will eliminate Race and Beech Street Lift Stations and extend a 36 inch sewer main to the sewer main at 8th Street and Beech at the Washington Middle School. The exact route is being planned and will be determined by the ability to get a Franchise from the Washington State Dept. of Transportation (WSDOT) along 1 -82. The franchise has been approved by WSDOT. The design is expected to be completed in December 2011 and bid in December with construction being complete in July 2012. ♦ Projected project completion date: .3rd Quarter FY2012. Wastewater Facility TMDL (Struvite) Project The project has been bid and awarded to Shannon Industrial Constructors out of Coeur D'Alene, ID. The construction of the system is expected to be complete by July 2012. When constructed this project will begin reducing our nutrient concentrations in the wastewater effluent discharged to the Yakima River as required by the Department of Ecology. The construction will include the fabrication and installation of a reactor to harvest phosphorous and the installation of eight (8) mixers in the aeration basins to augment nutrient removal through the reactors. Received Ecology approval on 7/11/2011. ® ♦ Contract bid and award: September /October 2011 ♦ Projected project completion: 3 Quarter FY2011. 11 Wastewater Facility, Collection System Plan Update & initial Stormwater Comp Plan The last Water System Plan was completed in February 2004. This project will update the current facility plan by providing current information on the existing wastewater facility and collection system infrastructure, regulatory requirements, future loadings, operation and maintenance, future capital improvements, rate structure and revenue forecasting. With the adoption of the new Stormwater Regulations a comprehensive Stormwater system plan is needed and will be implemented along with the Wastewater Facility and Collection system plan update. Akel Engineering Group, Inc. was selected and has developed preliminary maps. Survey data collection was completed in October 2011 by HLA and City Staff. Tom Coleman is updating the treatment plant facility plant with input from several on- going projects and studies along with the comprehensive sewer plan from Akel Engineering. e Project completion date: 2nd Quarter FY2012. Levee set back Project and new Wastewater Outfall Staff continues to be involved in the Gap to Gap project for flood plan restoration which will include the Wastewater Treatment Plant to relocate or develop a new wastewater outfall. Alternatives will be evaluated to select a new outfall location. Currently the old Wastewater spray field is being evaluated as a riparian outfall. An engineering report for alternatives like this will be developed and submitted to Ecology for approval.. Ridolphi was selected to develop this floodplain restoration plan in September 2011. • Phase I Project completion date: 4t11 Quarter FY2013. Boiler Replacement Project A boiler procurement specification was developed and bids will be received October 20, 2011. Design of the other system modifications are ongoing and expect to be bid in December 2011. Project will replace existing boiler and add additional capacity for the Industrial Waste Reactor which is currently in design. Project will also improve gas and hot water piping systems to improve reliability and reduce maintenance of the system. o Project completion date: 2nd Quarter FY2012. Industrial UASB Reactor and North End Power Distribution System Upgrade Project A UASB (Upflow Anaerobic Sludge Blanket) reactor pre - purchase agreement is expected to be complete in November 2011. After selection of the process vendor the design will be finalized. This project will allow the City to treat high BOD industrial 12 waste streams like we get from Del Monte directly in the new UASB reactor opening up additional capacity for other domestic waste streams. The UASB reactor will also 41) generate additional methane gas for use in a future sludge dryer project which is anticipated to begin the preliminary engineering phase mid 2012. The project also included upgrading the power distribution system for the North end of the treatment plant to improve reliability and future expandability. Much of this electrical gear in this area was installed in the 1960's and has reached the end of its useful life. A similar project for the South end of the plant was completed in 2009. A new Industrial Waste Pump Station is included as part of this project which will bid in November 2011 to complete this part of the project to make room for the new North End Power Distribution Building. • Design Completion date: January 2012 ♦ Project Bid date: March 2012 ♦ Project completion date: 3rd Quarter FY2013. Stormwater Capital Improvements Projects • Yakima Underground Injection Control (UIC) / Water Quality Retrofits This project will design and construct prototype Underground Injection Control (UIC) retrofits to the City's' existing 436 UIC facilities. The Department of Ecology is providing a grant of $280,000 for the development of different methods to retrofit existing facilities & structures. ♦ Project completion date: 4th Quarter FY2014. 13 PRIVATE PROJECTS (Current Listing) • 0 Listing private developer projects shows the amount of private projects that " g p ro p p) p p� is at are "on the books" and pending or under construction with . some (not all shown) that go back several more years. These projects have all been approved since February 2008 and are either pending construction, under construction, started but not completed or recently completed. The projects, most recent at top, include: Project Name Location Improvements Anderson Park Occidental & 64th Ave. Site Improvements Yakima Bears Executive Viewing Deck Pacific & 12th Ave. Water line alignment YVMH Spinal / Phase II 1450 N. 16th Ave. Storm Drainage J.M. Perry Parking Lot / Perry St. 1800 Perry St. Parking Lot South 81st Place Short Plat - Sewer 81st Ave & Tieton Water, sewer & new street Columbia Reach Storm Water 3107 River Rd. Storm Drainage 20th Ave. & 22nd Ave. Street Imp's 20th / 22nd Ave's & River Rd. Site Improvements Cameo Court at Apple Tree / Streets Coolidge Rd. / 86th Ave. ,Site Improvements Grace Brethren Spanish Church 202 W. Mead Ave. Parking Lot Malibu Subdivision Chestnut & 67th Ave Site Improvements Panda Express at Wal -Mart Center 6560 W. Nob Hill Blvd. Site Improvements Supercold CA Storage 2002 River Rd. Storm Drainage Scenic Estates N. 80th Ave. Site Improvements Future Fun LLC Drainage 715 S. 2nd St. Storm Drainage ID 27th Avenue Sewer Extension 27th Ave. & Loren Court Sewer Extension Summit Crest Commercial 48th Ave. & Summitview Site Improvements Development p Bob Lynch Parking Lot 1102 S. 40th Ave. Storm Drainage J.M. Perry West Parking Lot Repaving 2011 W. Washington Ave. Parking Lot Francis McSharry Short Plat 8905 Tieton Dr. Street Wellington Estates Phase 4 60th Ave. S. of Washington Site Improvements Fiesta Food Expansion 1112 E. Nob Hill Blvd. Site Improvements Living Care Parking Lot 3801 Summitview Storm water Steve Skeel Sewer Extension 83rd Ave. & Tieton Dr. Sewer Extension Hospice Care Center S. 48th Ave. Site Improvements Toscana LLC Castlevale & Kern Rd. Site Improvements Powerhouse Villa Phase 1 5321 W. Powerhouse Rd. Site Improvements Hidden Lakes Washington Ave, & 72nd Ave. Site Improvements. Wilson Properties 16th Ave. N. of McKinley Sewer extension Golden Corral 1901 -1915 S. 1st St. Street improvements Hollow Creek Place Short Plat S. 27th Ave, Hollow Creek Pl. Street Improvements WestTowne Center - Riverside Mall 16th Ave., River Rd & 6th Ave Mall Site Development Rite Aid - Nob Hill Blvd Nob Hill & 24th Avenue Site, Water, Sewer & SD Washington Mid School Portable Unit 510 S. 9th St. Site Improvements Franklin Middle School Portable Unit 410 S. 19th Ave. Site Improvements Hoover Elementary Sewer Extension 400 W. Viola Ave. Site Improvements 10 Advanced Secure Storage Drainage 1913 McKinley Ave. Storm drainage All Services Parking Lot 715 E. Viola Ave. Parking Lot 14 AFFIRMATIVE ACTION GOALS & W/M /DBE PARTICIPATION W/M /DBE utilization has been included in the past but is not included with this report. The Engineering Division continues to request apparent low bidders of public works contracts to document their efforts to achieve the City of Yakima's goal of 10% MBE, WBE or DBE participation goal prior to contract award. However, changes in state law due to the passage of Initiative 200 prohibit certain practices by contracting agencies (i.e. the City) for the award of public works projects such as requiring W/M /DBE subcontracting. While some contractors have voluntarily reported such information in the past, we have not received any such reporting this year. Although we do not receive such information voluntarily, the City must still meet certain of these federal requirements and each contractor must comply with the Standard Specifications that are included on each City Public Works Contract. The City is responsible to; • Conduct pre- construction conferences during which EEO and City policies are discussed with the contractor. • Monitor on -site compliance with the EEO and City policies. • Ensure our contractors locate, qualify, and increase the skills of minority groups, women employees, and applicants for employment as required by City policies. • Ensure the preparation of required EEO and related reports. • 15 Prof Proj. Lead Division Project Name /Location Description of Work Project Lead Impacted Constrctn. Status /Schedule Notes Type No. Divisions Start Date 10/24/11 Underpass on Lincoln; (MLK Jr. Engineering, Apollo Inc, Kennewick, is contractor, Storm Project is scheduled for paving 1a11 -2011; project 1818 R/R Grade Separation, Phase 11; Bob Desgrosellier / Wa ter /irrigation, Phase II, Main Drainage started; Bottom Seal on east started; closeout next spnng; Underpass walls will start after 7 CIP Phase II Engineering Lincoln Ave.; 1st St. to 1st Ave. Blvd. late in '10 Front St, over Brett Sheffield Wastewater, PW, Project, 3/10 Mainline BNSF Railroad Bridge complete. initial bottom seal starts; Lincoln (& MLK ) Jr. Blvd.) Streets. IS BNSF access bridge nears complete Work includes fuel station reconstruction; . 1818 R/R Grade Separation, Phase III;' Underpass on MLK Jr. Blvd. Engineenng, Construction proposed starting June 2011; • p Bob Desgrosellier / Water /Irrigation, Phase III, Main Design is at 95 %; R/W is in hand; We will be ready to advertise for 2 CIP Phase Engineering Martin Luther King Jr. Blvd., under railroad, Front Street construction of the MLK Underpass III 'B" . st St. to 1st Ave over MLK Jr. Blvd. Brett Sheffield Wastewater, PW, Project, Nov. '11 Potential Federal Senate earmark not likely; ( Si) ) Streets, IS $1.5M State TIB grant and / or STP award when the remainder of funding is secured Fueling Station Addition © 1st St. & Build a remote fueling station Engineering, Public Engineering / Bob Desgrosellier / Proposed at ARCO lot, 1st St. & Lincoln Avenue Demo of the ARCO building is complete; 3 CIP 2792 Public Works Lincoln for City -owned vehicles 7? Richard Wanner Works 9 /2011 7 after Grade Separation construction. pump station being prepared for reconstruction; $100K was available ?? BNSF will be placing new Washington Avenue - BNSF crossing Brett Sheffield / Bob Engineering, Traffic, BNSF work, BNSF has the new signal in place and finalized the RxR signal and crossing complete, 4 CIP 2063 Engineenng upgrade concrete crossing pads with Desgrosellier Water /Irrig early 2010 crossing replacement some sidewalk still needs replacing signal upgrades _ Purchase of YVT property and Strengthened shoring of west wall; Brett Sheffield / Project awarded to GM McClure of Yakima; 5 CIP 2153 Engineering YVT Barn & Museum Preservation preserve carbam and museum Bob Desgrosellier Engineenng 12/2009 100 complete; finalizing closeout straightened south wall; buildings and site More work on YVT items with remaining funds W.O. Douglas Trail Bridge Strip YVT Bridge and repaint; Brett Sheffield / Right -of -way purchases are under way for property in 6 CIP 2167 Engineenng Restoration and Trailheads purchase some trailhead Bob Desgrosellier - Engineering 8/17/2009 Bndge Restoration and repainting is complete the Cowiche Canyon area; property & interpretive signs some purchases made, & will continue Remove & rebuild P.Works Phase 3 included the interior parking garage Engineering 1 Public Works Parking Lot Brett Sheffield / Bob At Divisions at Project award to :Tri- Valley, low bidder, 7 CIP 2184 Public Works Reconstruction Op Fruitvale Blvd Complex asphalted areas; $1M Desgroseilier Public Works 10/2010 Work is 100% complete. Door repair as well as storm drainage improvements budgeted over 3 years move to completed section next 1/4 Engineering. Traffic Project tied to the Wal -Mart project. There may be Design is 90% complete; We submitted for 8 CIP 2272 Engineering Nob Hill Blvd, 49th to 64th Avenues Widen roadway, add sewer & Brett Sheffield / Eng., Wastewater TIB grant a private / public partnership on construction; some 9 g water utilities Bob Desgrosellier pending results RAN was purchased with Wal-mart mitigation Transportation Improvement Board (TIB); in 8/2011; funding - TIB results November 18, 2011; UNFUNDED 2217 Coolidge Ave. Kith to 88th 82217; Project to pave 28' asphalt Engineering. Traffic Construction delayed, started in late April; Brett Sheffield / Bids opened 9/23/10, Project award to TTC 9 CIP 2271 Engineering Coolidge Sewer 82271; ribbon, w/ curb & gutter, Eng., Wastewater April 2011 bids delayed due to extended RJW acquisition. 2269 Coolidge Drainage #2269 includes sanitary , Yakima; Work started in May; C g rY sewer Bob Desgrosellier Construction, Construction now complete, closing out Engineenng, Traffic. E. Nob Hill Blvd & Fair Avenue, Widen intersection all 4 legs; Brett Sheffield / Design only at this time beginning 6/2008; Design only; (Drainage system 10 CIP 2143 Engineering Wastewater, Design only Intersection Improvements purchase Uway, new signal Randy Tabert Search for funding on -going for this intersection is included.) Water/Irrigation - 16th Ave. & Washington Avenue Widen 16th to match V. Mall Brett Sheffield / Engineering, Traffic, Bids were opened 4172; TIB Grant' $1.1.Million; match is 0300K REET 2; • 11 CIP 2232 Engineering intersection reconstruction Blvd.; replace signal Dan Ford Wastewater, Summer 2011 Granite Construction Co. is low bidder, Construciion 78% complete; Water /lmgation work has begun and will be completed this year New signal is in and operational • Engineering, Traffic This project ties to terminus of ' 16th Ave; Nob Hill to Washington Brett Sheffield / Project awarded to Columbia Asphalt & Gravel, 12 CIP 2270 Engineering Grind & Overtay Gnnd & overlay existing asphalt Randy Tabert Eng., Wastewater, 4/2011 Funded by REET2; Project 100% complete 16th & Washington Avenue project; Water Work is complete; move down list next 1/4 13 CIP 2191 Engineenng 66th Avenue & New traffic signal with current Brett Sheffield / Engineering, Traffic 9/20/10 Construction started 9 /20 /10; Project paved, sidewalks are in place; Work is 100% Summitview Avenue Signal street alignment Dan Ford Low bidder. Belsaas & Smith, Ellensburg complete; going through final closeout - Capitol Theatre - Utilities 6/08; TRAHO is Architect; GC /CM Contractor Leone, Production Center Const. only at this time; Funded by Facility Addition & Remodel Bob Desgrosellier / Engineering, municipal bonds, PFDistrict & private donations from 14 CIP 2231 Engineenng New Production Center on 4th St. Phase 2 start Keeble & Moen (Joint Venture); Project is 99 %; , (& Black Box Theatre) (Production Center current ) Michael Morales Capital Theatre 8/17!09 Placement of alley pavers to occur this fall Theatre benefactors; Doing final - touchups and air - balancing. noise reduction Multi -use ball fields: RCO grant $500K + local$; Little League / Softball Fields; bids opened 7/19/11; 15 CIP 2212 Engineering Upper Kiwanis Park; (Little League / Softball); Doug Mayo / Engineering, Parks 7/2010 Maple Street parking project complete; Work started & continue while weather is good, Fair Ave & Maple Street lighting; volleyball; basketball; Brett Sheffield Restroom, Playground Jungle -Gym & 30'030' picnic restarting in spring; Lighting; volleyball; more parking_ parking shelter built by volumeers & walking path is planned . Remove Underground Storage Underground Storage Tank Removal Doug Mayo / Work is complete; - DOE grant included locating, assessing and 16 CIP 2274 Engineenng at the airport Tanks &remove /replace Brett Sheffield Engineering, Airport 2009 Waiting for DOE review and approval of report; developing a plan to remove unused USTs contaminated soil . Richardson Field Cleanup Remove & Replace 4,000 CY Doug Mayo / DOE grant included removal and replacement Project is complete and closed out; • 17 CIP 2145 Engineenng at the airport of contaminated soil Brett Sheffield Engineering, Airport 2009 of 4,000 CY of contaminated soil move to completed next quarter • Move north curb, widening Engineering, Streets West Coast Construction is low bidder, work started Downtown Futures Initiative (DFI), street, remove & replace Brett Sheffield / & Traffic Eng., 9/20/10; 100% complete; Rem/Repl. sidewalks; DYFI -4 and HUD funding; 18' CIP 2299 Engineering Phase 5; "A" St., 3rd to 6th Street, sidewalk, place new pedestrian Bob Desgrosellier Water /Irn anon, 9/2010 north side lighting, trees, twinkle lights, 9 9 place trees, twinkle lights and pad lights on "A" St., going through closeout landscaping Wastewater 3rd to 6th, north side only 64th Avenue; Roadway, Sidewalk (Pathway), Doug Mayo / Funding by $900K of STP & 32000 of This road section to be 3 lanes (14' travel lanes); ' 19 CIP ? ? ?? Engineering Nob Hill Blvd, to Tieton Drive Storm Drainage, Street Brett Sheffield Engineering, Streets 2012 Wal -Mart mitigation;' Surveying completed; T sidewalk(s); storm drainage & street lighting; Lighting R/W and design has started Reconstruct intersection, widen Partial funding by part of $200K of Wal -Mart This intersection reconstruction and Ireton Drive and 64th Avenue Doug Mayo / 20 CIP 2282 Engineenng for additional lane on Tieton Engineering, Streets 2012 mitigation; Design to start in 2011 while funding is signal addition project is lacking Intersection Drive; add signal Brett Sheffield sought; r/way needs will be identified RNVay & construction funding Remove trolley tracks from Funded wdh $150,000 REET Funds;. Remove trolley tracks & rebuild center of roadway; 0 2nd Avenue, roadway, add planters to part Doug Mayo / 21 CIP 2286 Engineering Yakima Avenue to Walnut Street of center of roadway Brett Sheffield Engineering, Streets 2011 Bids open on 7/15/11; M. Sevigny Construction is add planters to portions of roadway center, low bidder, work is 95% complete midblock x -walk for pedestrians City Hall Demolition of Remove jail cells, interior walls Doug Mayo / Demolition 100% complete; 22 CIP 1783 Engineenng interior 3rd and 4th Floors & asbestos abatement, Bob Desgrosellier Engineenng, CED 2010 Window replacement complete; 100% complete. Rem/Replace windows 8" sanitary sewer Funded through Wastewater, work being done Engineering Willow, 20th to 24th Doug Mayo / Engineering, Survey and design started in- house; 23 CIP 2297 NEW (Swan dropped, but is now back in) Brett Sheffield Wastewater 2011 ? ? (Additional easements for Swan needed) to determine easement and needs; PROJECT IS ON STANDBY Y • Energy efficiency upgrades at Design for this multiyear / multiphase project is Doug Mayo! Engineering, Traffic, Energy Recovery Grant. PAL Center, SE Comm. Center nearly complete; Lighting project has been Work also includes upgrade to 75+ street lights; 24 CIP None Engineenng ARRA - funded & Public Works Dan Ford / Water /Irrigation. Summer/Fall 2010 awarded to Knobel's; HVAC design is being Construction has started & is 39% complete Joe Rosenlund Wastewater reviewed and refined • . 411111 s le • Proj •ead Division Project Name /Location Description of Work Project Lead Impac• Constrctn. Status /Schedule Notes • Type Divisions Start Date 10/24/11 __ Engineering Sanitary Sewer LID - Letters 25 LID N/A 777 ers sent out upon Doug Mayo / Engineering, LID is just M the investigative stage A petition is being circulated by neighbors • NEW Alpine Way, 68th to 71st Avenues neighborhood request Scott Schafer Wastewater En rneerin Powerhouse / William O. Douglas Connector of Powerhouse Path - Work completes a 6.5 mile pathway loop; 9 9 Doug Mayo / Engineering, Water, 26 CIP 2301 Trail Connector, to WODouglas Path & 2012 Survey & Design in 2011, build in 2012 Funded by a Transportation Enhancement Grant of NEW vicinity Willow Street Greenway Dana Kallevig Parks 0283,278 New rights of way, public - Engineering, Streets 208 Acre privately owned she for development as a Designs anticipated to be pedestrian friendly, office utilities, roads, lighting, 'flex" business park uses, public and residential Engineering: „ Yakima Resources ffic Eng., Revenue Development Area (RDA); 27 CIP 2295 - - signal(s), sidewalks, ? cilit 20137 1 development, faies, recreational; H.W.Lochner �'' -NEW . Old Boise Cascade Sawmill Property , p Doug Mayo Water /Inigation, allows state designation of this project area infrastructure selected for project planning, design, etc.; design ' Wastewater as a "LIFT" District; SIED 0 in project as well; started in September • - -, - r -- -- East -West Connector, "H" Street New rights of way, public Engineering, Streets TransAction Committee has had this on their project riot Engineering alignment from Frudvale Blvd to utilities, roads, lighting, Michael Morales 1 8 Traffic Eng., Yakima County is project lead; they are moving 28 CIP 2295 signal(s), s g " 2013? ? ? ahead with preliminary tlesi nand listing for many years; Consultant (H.W. Lochner) ..,NEW I ':,, Terrace Hts.; through Yakima 9 O, sidewalks, pathway, Doug Mayo Water /Irrigation, p ry 9 has been hired to create design alternatives and pre- , Resources property infrastructure Wastewater initial environmental clearances environmental documents Design planning for future Engineering, Streets 29 CIP ? ? ?? ' Engineering 1. North 1st Street Corridor street renovation, designs and Michael Morales / & Traffic Eng., TBD 2010 SIED grant provides $25K for planning Study documents to be NEW' Revitalization; "A" Street to 1 -82 utlhty upgrades Doug Mayo Water /Irrigation, the comprehensive project completed late summer 2011 _ Wastewater Signal is warranted; Project Design complete, bid The intersection only needs signal poles, mast arms & 30 CIP o ? ?? Engineering • .- 64th Ave & Washington Avenue New traffic signal with current Doug Maya / opening was on 10/25/11; Construction a controller base, cabinet & controller added. Signal construction street alignment Randy Tabert Engineering, Traffic Fall 2011 "may" begin over winter, depends on weather, Electrical conduits are in place. Contractor will order funding from Wal -Mart mitigation equipment this year Engineering, Streets En ineeriri ONDS development; new Roadway, lighting and utilities to be Residential units to be built through ONDS program(s) g g Hines Development; N. 3rd St & Archie Matthews / & Traffic Eng., 31 CIP 2312 street, water & lighting for new Late 2011 7 ? constructed as a public project; and Habitat for Humanity; ' ;:NEW N 4th St., vicinity of "S" Street Doug Mayo Water /Irrigation, • residential units Wastewater Low Bidder is Artisan Inc. City Water to install water lines Engineering, Streets Build new roadway section due Design, R/Way and funding discussions are under r Eng inee�bio River Road vicinity Wash. Fruit & Doug Mayo / & Traffic Eng., Roadway, lighting and utilities to be 32 CIP 2313 , to requirements of private 2012? ? ? way; will be applying for funding using adjacent 'NEW - _.: proposed Stanton School developments Dan Ford Water /Irrigation, constructed as needed for development; y development funds as match. -. Wastewater ,Eri Ineerin Remove and replace sidewalk, Remove & replace sidewalks around perimeter of g g, . ; County Courthouse Sidewalk; Zais 1 Engineering / S pring /Summer Design by County staff; 33 CIP 2314 trees, add ped. lighting & . block; place trees, twinkle lights, irrigation and petl NEW MLK & N. 1st Street Leita County Pub. Works 2012 it is expected to be bid in spring 2012 landscaping Tights similar to east side of courthouse Arlington Ave., (RID) - Complete & extend roadway Aside from neighbors wants /needs, . • Engineering Doug Mayo / Engineering, Streets, • Roadway Impmvement District 34 CIP ? ?1? Roadway Improvement District and storm drainage ? ?? Congdon's has shown an interest to complete the ? NEW ` Joe Rosenlund Wastewater ( financing is similar to an LID ) ... ,. 53rd to 64th Avenues roadway to 64th CIP 2221 Wastewater Final Scada Tip Out Wastewater /Facility - Continued Max Linden Wastewater/B &V 5/1/09 Protect 2221, 2222, 2223 bid as one; -Bids Continue tipping out existing communications 35 2222 DAFT Retrofit SCADA and wastewater opened 4114109; Apollo awarded contract - Final systems; replace existing covers; fix pressure and . 2223 • Dyster Retrofit _ improvements - upgrades Closeout in process flow monitoring issue; electrical distribution system upgrades 36 CIP 2228 Wastewater Congdon Sewer Main Wastewater /Collection Sys Shelley Willson / Engineering/ 7? Unknown Ryan Anderson Wastewater 37 CIP 2234 Wastewater Neighborhood Wastewater Wastewater /Collection Sys Shelley Willson / Engineering/ 7? Unknown improvements Ryan Anderson Wastewater 38 CIP 2264 Wastewater Speedway /Race street Interceptor Wastewater /Collection Sys Shelley Willson / W W /Eng./PLSA 7 Late 2011 ?? Design for the completion of the 36" sewer line to waiting on franchise from WSDOT Ryan Anderson Race street LS and demo LS NEPA & SEPA to be completed soon Wastewater Sewer Collection and storm water Wastewater /Collection Sys Shelley Willson / Wastewater/ 39 comprehensive plan update and Strom Water System Ryan Anderson Akel Eng • CIP 1911 development 10/1/2010 Completion in 2012 40 Wastewater WW Facility plan update Wastewater /Facility Ryan Anderson Wastewater/ Coleman Staff are updating portions where an engineer Is not CIP 2268 Eng 6/1/2010 Completion in 2012 needed CIP 7??? Wastewater Gas Evaluation and Install New Wastewater /Facility Dean Smith Wastewater/ Pharmer 12/1/2011 project in design. Boiler purchase is out for bid. Older Boilers are worn out and will be replaced. Agas 41 Boilers Engineering Expect completion in 1st qtr 2012. evaluation is being done to properly size new boilers for future demand 42 CIP 2306 Wastewater Power Distribution Wastewater /Facility Dean Smith Wastewater/ Pharmer Early 2012 Deisgn is about 30% complete Engineering underway. Scheduled to bid in Jan or 2305 Industrial Waste System Engineering Feb 2012 CIP 3/3/06 Wastewater Security Lights and Gate for W WTP Wastewater/Facility Dean Smith Wastewater/ Connelly Early 2013 Design is underway. Lights have been purchased. Project includes new gates and additional Plant 43 Engineering Working on bids for installation. Working with lighting suppliers and engineers for new gate and actuator. 44 CIP 2256 Wastewater Struvite Reactor Wastewater /Facility Dean Smith Wastewater/ Pharmer 10/1/11 Awarding to Shannon Industrial. Construction to This will remove Phosphorus from the WW effluent to Engineering start by November 2011. help meet future nutrient standards. CIP 2267 Wastewater A -Basin Mixers Magnesium Tank Wastewater /Facility Dean Smith Tom Coleman Early 2012 Prepurchace of mixers has been completed. In Will reduce Phosphorus from effluent. . 45 Relocate submittal review phase currently. Working on diffuser modification requirements. • CIP 2267 - Wastewater NEW Riparian Outfall Project Wastewater /Facility Ryan Anderson Wastewater late 2012 Developing contract with Ridolfi, Inc. to begin will be altemative discharge plan d Gap to Gap Levy 46 design of Phase 1 to be completed w/ SRFB Grant Setback goes through. Also will support compliance • with future TMDL requirements . PWTF Loan. Water right transfer complete 8/22/06. Golder and Assoc. completed design. Bid Opened Worked with Parks Division on siting of new well at Nov. 6, 2008. Awarded to Layne Christensen Gardner Park. Archeological survey complete - no Water /Irrigation, WW, 1/26/2009 For drill Company. Drilling completed as of 3/9/09 (1,328'). findings. Drilling operations completed. Golder • 47 CIP 2132 Water/Irrigation Design and Install a new 3,000 gpm New well at Gardner Park Mike Shane / Dave Streets, Eng, Parks, 4/11!2011 for Wellhouse design at 100 %. Project construction working on design of pump station. Plans at 100 %. well at Gardner Park Brown beginning April 11, 2011. Project underway. UG Apparent Low Bidder was William Charles West at Rldgeview School wellhouse piping, drains, footings, foundation floor slab, $1,122,290.75. Engineer Estimate was 01,597,140. electrical conduhs,CMU block walls, pump and PreCon. scheduled for 4/1/11. Final completion date motor installation completed. Project currently 65% 12/23/11. complete • • • Proj Proj. Lead Division Project Name /Location Description of Work Pro Lead Impacted Constrctn. Notes ea Type No. p Project Divisions Start Date StatuslSchedule 10/24/11 In Progress, lined canal under Hwy 12, completed study. work needed on diversion and areas of the HLA has completed report and recommendations for canal. Enlarged pipe from General System to Fruitvale multi -year piping project from 6th Ave. to 9th St Refurbish the Fruitvale Canal, Water /Irrigation, Canal. City crews completed connection between 100% design complete. Working with other Divisions 48 CIP 2010 Water /Irrigation Fruitvale Canal Diversion and Wasteway on H Dave Brown / Streets. Stormwater, 2011/2012 General and . Fruitvale systems near 16th and Jerome, and agencies on joint project (Wastewater Industrial St Mike Shane Parks, DOT Yakima Repaired wood gates at Cowiche Creek. Point of Waste Line) Bid opening scheduled for Oct. 18, 2011. County, WDFW diversion change to Nelson Bridge applications Low bidder was Hurst Contraction LLC at complete, submit to DOE in Jan 2011. Piping of canal 91,359,354.47. Engineers Estimate was from N. 6th Ave. to N. 9th SL to he completed 91,698,791,94. 2011/12. . Water facilities impacted by On -going coordination with Engineering projects, rli other improvements - DFI, Mike Shane / Water /Irrigation, sidewalk projects and misc. Transportation projects. 49 CIP 2288 Water/Imgation Misc. waterline improvements. Mist. sidewalk &transportation James Dean Streets, Eng. 2011 Hines Addition waterline to be installed by City Majority of work to be completed by in -house staff. projects. crews in coordination with site contractor - Oct. 2011. Design of new recycle lagoons; Dave Brown Recycle lagoons and new electrical 2011 DWSRF Loan applied for and project chosen for 50 CIP 2259 Water /Irrigation service at the WTP new 800 amp electrical service; Mike Shane Water /Irrigation Possibly 2012 HLA completed report for City and DOH on funding. Providing additional info. to DOH for final new generator Jeff Bond recommendations for design. approval. - - Internal discussion to began in January 201010 Inter- agency agreement approved by Council, Selah determine next course of action. G & 0 and Nob Hill. Funding identified in 2011 budget to Begin process of determining Dave Brown Water /Irrigation (consultant) provided study and recommendation begin project. Mueller pilot project underway 3/1/11 51 CIP 2261 Water /Irrigation Automated Meter Reading method, materials. process for Mike Shane Wastewater 2009 for Yakima, Selah and Nob Hill. Report provided for in prox. 4 weeks. Badger and Mueller meter pilot automated water meter reading James Dean Utility Billing recommendations specific to each agency. project completed. G u O to complete a summary Installing two 20 unit pilot tests near YVCC. Pilot report. • program completed by two vendors. 52 CIP 2262 Water /Ini anon Re lace Main at I -82 and Viola Design Inc water main Mike Shane �� F Water /Inigation HLA is consultant. Project design is 95% Project will be constructed as funding becomes • 9 p replacement at 1 -82 and Viola Wastewater Waiting funding complete. available. Irrigation System Replacement in the neighborhoods north of General Irri alion E. Yakima Ave.., south of E. F HLA is consultant. Project design 100 %complete. Last phase /stage of the General 308 Irrigation System 53 CIP 2287 Water /Irrigation 9 St., east of S. 1 st St and west Mike Shane Water/Irrigation 2011/2012 Bid opening scheduled for Sept. 27, 2011. replacement. KRCI Inc low bidder at 0467,339.60. Phase 4 - Stage 2 of S. 10th St. Also, Pierce Ave. Wastewater, Streets Construction to be completed by April, 2012. Engineers Estimate $512,213.39 between Lincoln Ave. to Summitview Ave. HLA is consultant. Temporary repairs have been Repair damaged air release completed. Plans and specs being completed for Project being added as a separate schedule to the 48" Domestic Transmission Main valve connection on 48" Dave Brown / Mike permanent repair p p y 53 CIP Water /Irrigation Water /Irrigation 2011/2012 p pair and protection of 48" transmission Fruitvale Canal and IW Improvements. City has Repairs and Modifications transmission main at Naches Shane main, as well as modifications to main to prepare purchased all valves and Ameron fittings for River crossing . for possibility of future damage at Neches River contractor installation. • _ _ crossing .. 2011 Sealcoating Program; -- Streets- 'J., Chip -Seal roadways that had Streets, 54 CIP 24th, Nob Hill to Washington; Status of Sealcoating all depends upon available wheel -paths ground Joe Rosenlund Waterllmgation mid -year 2011 ''" Summitview, 7th to 18th; in funds the sealcoating program - 1: ",NEW -; Lincoln, 16th to 40th and patched in 2010 Wastewater, Traffic COMPLETED PROJECTS Realign 8th Street, remove & Engineering, Streets Realign and reconstruct 8th Street from "A" to CIP 2284 Engineering Downtown Futures Initiative (DFI), . replace sidewalk, place new Brett Sheffield / & Traffic Eng., , 7/2010 Yakima Avenue; Rem/Repl. sidewalks north of Belsaas & Smith: low bidder, work is complete; Phase 4; 815 St., "A" to Chestnut pedestrian lighting. trees, Bob Desgrosellier Water /Irrigation, Yakima Ave.; place trees, went to Council on 3/15 for closeout twinkle lights, landscaping Wastewater twinkle lights and ped lights "A" to Chestnut New pathway on 6th Avenue, W.O. Douglas Trail. 6th Avenue & "1" Street to YVT Bridge over Brett Sheffield / Project has been awarded CIP 2166 Engineering Bridge Deck Crossing the Naches River, pathway ties Bob Desgrosellier Engineering Spring 2010 to Belsaas & Smith of Ellensburg; Construction has been completed. to the Greenway work is complete & being closed out Construct sewer manhole and 64th Ave Sewer Crossing Doug Mayo / Engineering, Winter Small Works Project awarded to: Project is complete; going through CIP N/A Engineering at Occidental 8" sewer crossing for future Dana Kallevig Wastewater 2010/2011 West Coast Construction cleanup and project closeout continuation to east CIP N/A En ineerin Pierce Avenue at 3rd Avenue Reconstruct sewer manholes Doug Mayo / Engineering, g g and connections Dana Kallevig Wastewater .Summer 2010 Work is Complete; project is complete CIP 2255 Wastewater Pretreatment offices Wastewater /Facility MaxLinden Wastewater 6/1/09 Add office space in storage building '09 Project is complete • CIP 2055 Wastewater - WWTP Phase /Facility Wastewater/Facility Max Linden B &V/Water- Irr/Com. 6/1/06 WWTP Improvements /upgrades - construction Project is complete Improvements Electronic sec completed . CIP 2229 Engineering Nob Hill Overpass Repairs Repair deteriorated portions Brett Sheffield / Contract awarded to Mowat Construction Co.; Work 9 9 rP ass p of the overpass Bob Desgrosellier Engineering 8/2009 started 8/20/09 - through April 2010. Project is complete and closed out; • - Place several types of Surface . CIP 2291 En ineerin J Street LID Demonstration, Water Drainage Materials in Randy Meloy / RP &E of Ellensburg has contract; g 9 for drainage study Brett Sheffield Engineering, Streets 4/2010 Project is being closed out "J' Street, 18th to 20th Avenues roadway g y n project is complete and is being closed out Remove & replace sidewalk. • County 8 City Joint "DFI Engineenng, Streets Granite Northwest is Low Bidder, new lights, frees, twinkle lights, Brett Sheffield / Improvements. West - side of 2nd Street, & Traffic En Construction is complete; CIP 2285 Engineering landscaping; (New community Mark Brzoska - 10/2009 Project Is being closed out MK to "A" Street; north side "A" Street Water /Inigation, (Adjacent Performance Park I g 2nd Street westerly to alley, performance park is adjacent) Yakima County Wastewater Construction is complete) 0 0 • • • • • Proj P Impac Constrctn. Status /Schedule Notes • T yp e No, earl Division Project Name /Location Description of Work P Lead _ 4 Divisions Start Date 10/24/11 -- ----- Public Works/ Study Transit, Streets, Fire, Initial Meetings have begun. CIP WW T, West side service sub station study - (No Action Taken) Chris Waarvick Police, W T, ?/09? $50k approved through 2007 Council Budget Information Systems 28th Avenue, south of Washington Add curbing on east side, Brett Sheffield / Engineering . Cancelled 6/2010 CIP 2241 Engineering south to Airport widen and rebuild roadway Bruce Floyd Interest from private partners fell through; Project to be deleted from list Project will be cancelled _ Ped signals at 16th & Bonnie Doon; GIP 2236 Engineering 4th Street 8 MLK; New crossing signals and Brett Sheffield / Low bidder. Knobel's Electric of Yakima • - painted crosswalks Dan Ford Engineering, Traffic 10/2008 0/2008 Construction 100% Complete. N. 1st St & N. 16th near Hathaway 4/2010 Jeld -Wen roadway imp's Roadway reconstruction, CIP 2120 En lneerin y I P Brett She / Low bidder. Granit NW of Yakima 9 9 6th Avenue, River Rd. north 650' pathway addition on west side Engineering 7/2009 of roadway Dan Ford ' _ 4/2010 Construction 100% Complete. CIP 2182 Wastewater UV Disinfection Wastewater /Facility - Max Linden B &V/Water- Irr/Com. 3/1/08 WWTP improvements /upgrades - _ Project Complete Electronic sec . - 100% complete CIP 2188 Wastewater 40th & Fruitvale sewer sleeve • Wastewater /Collection Sys MaxLinden B &V /Eng/Water March /Apnl 2007 WSDOT Project- Completed complete, waiting for WSDOT project closure CIP 2278 Engineering Nob Hill Blvd, 64th to 72nd Avenues Widen roadway, add sewer & Brett Sheffield / Engineering, Traffic 9 9 Project cleanup & closeout is underway; _ water utilities Bob Desqrosellier Eng., Wastewater 8/2009 Project is 100 %complete 4/2010 851h Avenue, Karl & Juanita Sewer Neighborhood sewer LID - Al Rose / Brett Engineering, 895oK ARRA funding received for City portion CIP 2208 Engineering 9 9• Premier Excavating was low hldder, Project is closed out; Local Improvement District (LID) Approx. 29 parcels Sheffield ' Wastewater 2/2009 100% complete final assessment hearing went to Council 4/6/10 CIP 2215 Engineering 2/2009 Simpson Lane Sewer LID; So. 13th, Neighborhood sewer LID - Bob Desgrosellier / Engineering, Scott's Excavating was low bidder. Council assessment hearing m complete; 4/2010 _ 14th, 15th Streets Approx. 82 parcels Al Rose Wastewater 100% complete Realign 1616 Ave. south side of Engineering, Streets & Brett Sheffield / project is 100 %complete; CIP 2213 Engineering 16th Avenue Realignment Purport airport tying to future V. Mall Bob Des rosellier Traffic, Wastewater, 7/2009 100% complete. Blvd. & 16/Wash g WaterAmgadon Low bidder was: Granite Northwest; Downtown Futures Initiative (DPI), Phase Remove & replace sidewalk, Engineering, Streets Reconstruct: east side 1st Street; 2nd St. both CIP 2216 Engineenng 3; 1st St , No Yakima 2nd St. "A" to new lights, trees, twinkle lights, Brett Sheffield / & Traffic Eng., sides, 3rd St. both sides, west side Neches all Chestnut (or Walnut); 3rd St, "A" to landscaping Bob Desgrosellier Water /Irrigation, 7/2008 Yakima Ave to "A" Street; plus both sides 100% complete. Yakima, (Neches "A" to Yak ") Wastewater So.'2nd St. Yakima to Chestnut Tieton Dr. Pedestrian Project, Update north side sidewalk, Brett Sheffield / Engineering, Traffic, CIP 2233 Engineering 16th Ave to 24th Avenues including wheelchair ramps Dan Ford / Wastewater, 10/2008 Construction is 100% complete 100% complete. Joan Davenport Water /irrigation CIP 1977 Engineering Nob Hill Blvd, Construct sanitary sewer, north Doug Mayo / Engineering, 8/2009 Premier Excavating: Project completed 100% complete. 53rd to 62nd Avenues ( + / -) side of roadway Brett Sheffield Wastewater Kiwanis Skateboard Park; New concrete Skateboard Park CIP 2023 Engineering Bob Desgrosellier Engineering, Parks 6/2008 Bids opened on 5/15/08 Construction is complete; Fair Ave & Maple Street L Kiwanis Park Parks has project funds for a few more amenities 3rd Ave. - Grind & Overlay; Grind and Overlay (G&O) Engineering, Traffic, CIP 2230 En ineedn y; • Brett Sheffield / We extended rind and overla to'ust north of g g Mead Avenue to Chestnut roadway & restnpe; update Randy Tabert Wastewater, B /2008 9 y ) Project is complete wheelchair ramps y Water/Irrigation Avenue W. Nob Hill - Grind & Overlay; Grind and Overlay G &O of Bob D Engineering Streets y y ( ) es CIP 2214 Engineedng Desgrosellier / Water, Wastewater, 8/2008 Received good bids; grind inside lanes and Project is complete; 24th Avenue to 4th Avenue two inside 'through' lanes Wayne Deacon seaicoat entire width in 2008 ($500,000 REET ?) Streets to sealcoat in future as funding is available Traffic Eng 9 $1150 Streets Poplarview Way Check face of plat Chris Waarvick / Nob Hill Water 2008 - Graded and dust abatement material applied spring project is complete Randy Meloy Wastewater • 2007; new easement in place Rdwy New 3 lane roadway, C /Gutter River Rd. Improvements, 15th to y Engineering, Sheets, • CIP 144' Engineering Fruitvale; 27" Sewer trunk 6th Ave to & S/Walk, ADA ramping, street Brett Sheffield / Traffic, Water / Sew lighting. Replace 8" sewer with Bob Desgrosellier Irngation, Old Union 9/19/06 This project is closed out Complete 2128 Fruitvale 27" trunkline Ditch, Wastewater CIP Engineenng Harman's Senior Center Parking Lot Reconstruct & repave parkin - - q g Reconfiguration • N. 65th Ave. lot to maximize parking Brett Sheffield / Engineering, Parks 4/21/08 contractor done; complete 5/2/08 Project is complete Streets 00th Ave ter to neve, Sar 72nd Ave to Arterial Chip Seal Wayne Deacon - Mid-June 2008 80th Ave., 72nd Avenue - Nob Ha to Coolidge, - REET & Street Division Budget C.a.-ale-24th Ave to Powerhouse. M &O Powerhouse - 40th Ave to the West City limas, Powerhouse 40th Ave In U Coln, ONDS development, was Brett Sheffield / Engineering, ONDS, CIP 2107 Engineenng Marvin Gardens Development private, switched to public Al Rose Wastewater, 10/15/07 This project is complete and being closed out Project is complete Waterdnigation Remove & replace sidewalk, Street &Traffic, West Yakima Avenue Improvements; Brett Sheffield / Project is complete; Banners are in place; working on CIP 2165 Engineenng new lights, trees, twinkle lights, Water /Irrigation, 7/2007 This project is complete Front Street to 7th Avenue landscaping Bob Desgrosellier Wastewater getting spring - loaded banner arms outside of contract Engineering, Westcoast Construction is Prime; Work included 1818 R/R Grade Separation, Phase I; Utilities Relocations Phase I - Utility Bob Desgrosellier / Water /Irrigation, Front Street and "A" Street bricking/paving in Project is complete; CI P phase 1 Lincoln Ave. Martin Luther Engineenng Liln A & Ma Luth King Jr. surrounding the Grade Brett Sheffield Wastewater, PW, Relocation work existing right -of -way, includes utility relocation in we soda - blasted utility markings as final step Blvd. vicinity Separation Project Streets, IS began July 23rd area of future underpasses CIP 2087 Wastewater Speedway Interceptor SR24 phase I- Wastewater /Collection Sys Max Linden B&V /Engineering 3/19/07 Need to connect at diversion box • completed - work complete waiting for WSDOT project closure and _ _82 Viola to Speedway on punch list WWiP waiting for rebate of funds from DOT CIP 2087 Wastewater Speedway Interceptor Speedway to Wastewater /Collection Sys Max Linden 88V/Engineering Design/Bid/Construction inspection- Not funded yet Washington School Memorial Hospital to "rebuild" Engineering, Streets, Eng has estimate for Streets & Waarvick; awaiting No. 30th Avenue - Reconstruction; Bob Desgrosellier / CIP Engineenng Tieton Drive to Walnut 30th Avenue due to damage Bruce Floyd Water /Irrigation, 7 / 2007 Hospital funding; may have been sealcoated Inc Seal Coating completed during their campus upgrad Wastewater temporary measure? Fruitvale Blvd & 40th Avenue 200' +/- of 42" carrier pipe for Brett Sheffield / Street & Traffic. Superior Paving is prime; Project tied with WSDOT Sewer zing complete; . • CIP 2188 Engineering Water /Irrigation, Feb /March 2007 construction project of new on -ramps and • interchange reconstruction @ 98 %; Sewer X -ing of WSDOT on -ramp future 27" sewer trunk Bob Desgrosellier Wastewater interchange upgrade. signal in & running; trail connection complete CIP 2116 Engineering Basalt An Project, 2nd & E. Yakima Basalt column placement with Brett Sheffield / Bob Engineering. Parks 9 g f lit Comucopia & brass Sun Desgrosellier 6/7/07 Art work complete, on time and on budget 6-20-07 Project is 100°A complete: • Proj Proj. Lead Division Project Name /Location Description of Work Project Lead Impacted Constrctn. Notes Project Status /Schedule Type No. • Divisions Start Date 10/24/11 2 western medians to be 2124 Engineering Washington Avenue Metlian removed for left-firm storage. Bob Desgmsellier / Engineering, Traffic, Big 2- 14 -07, Columbia is Prime; • Removal btwn 16th 8 2 th An Eastern median.gets several Rand Tabert Water/Im construct spring 6 -20-07 Project is t00 % complete; new lights & bock pavers y g 2007 100% complete 2169 Engineering 6th Street S/Walk Replacement, one Remove & Replace one block Bob Desgrosellier / Engineering. Traffic, Spring 2007 Tied to Lincoln Avenue Sidewalk Construction 6th Street project is 100% complete; block n/o Race Street of concrete sidewalk Larry Johnston Water /brig Project; Block Grant funds 100% complete Lincoln Ave_ Sitlewaik, 25th to 29th New sidewalk on Lincoln, Engineering, 2046 Engineenng adding 24th to 23rd on Linc. Bob Desgrosellier/ Water /Imgation, Spnng 2007 Columbia is Prime; Ave. & r /way purch near 18th Ave. Larry Johnston p g Lincoln Sidewalk 100% complete 8 -11 -07 Project is 100 % complete; and 40th Ave. near Lincoln Streets and Traffic 2095 Water /Irngation PRV in 40th Ave. Pump Station Install PRV in 40th Ave. Pump Dave Brown Water /Imgation, Summer 2007 Old pump removed by City crews. PRV installed by Final Cost - $7,100 Rehab, work in -house Station Streets, En.ineerin. Cd Crews Work completed " CIP / Water /Irrigation MaClaren Reservoir Rehabilitation Repaired cracks in MaClaren Mike Shane Water /Irrigation 3/1/07 100% Complete . Final Cost - $31,216 M80 Reservoir. Replaced ladder & slide gate: Repaired weir box. Water /Imgation Front St. Water Main Replacement water main replacement for Mike Shane Water / trngation, and August of 2007 Water main in Front St., Lincoln and MLK installed. CIP _ railroad grade separation Engineenng All water services transferred to new main in Front project. Streets include Front ' from Yakima to MLK. SI , MLK and Lincoln ' Water /Imgation Brackett Park Imgation System Replace the wood imgation Mike Shane Water /Imgation, 11/19/07 Bid opening occurred 00. 3, 2007 Jansen Inc. of Final Cost - $215,705.19 CIP Replacement pipes in the Brackett Park Streets Ferndale, WA is contractor. HLA is consultant. system Project is 100% complete Final clean -up and restoration in sons. 2008. III 2181 Water /Imgation Repair /Replace Glenn Dnve Replace the pump station and Mike Shane tvater /Irngation 11/01/07 Design complete. Bid opening Oct 10, 2007. Final Cost - $326,570.45 Reservoir Pump Station and Platform platform in the Glenn Drive POW of Pasco, WA is contractor. Work is Reservoir underway. HLA is consultant. Project is 100 complete, ission complete. Replace Radios and Antennas for Replace Radios & Antennas for 2185 Water /Irrn ahon Telemes System Telemetry S stem Dave Brown Water A.r -07 Complete Cost $27,755 34 11111:1111 Decommission the Ranney Water - DOT - Yakima Decommp, WSDOT hauled e fill. u Water /Irrigation Ranney Well Decommission Dave Brown Spring . 0 2008 Ol complete Well Count to adv. for haulin. rest of spoil material CIP 2097 Water /Irrigation 5R 24 water main under crossing 5R24 Under crossing Mike Shane Engineering, 6/1/05 100% complete Final Cost - $290,484 Wastewater 2054 & Water /Imgation WTP Chemical Feed Improvements Chemical Feed System, New Dave Brown Water /Imgation 6/1105 100% complete Final Cost - 84,660,003 CIP 2002 & Filter Rehabilitation Building, Pumped Flash Mix, Rehabilitate Filters CIP 2099 Water /Irrigation West Yakima Irrigation System Replace the W Yakima Mike Shane Water /Irrigation, 10/1/05 100% complete, close out project. Final Cost - $798,580 (south of Summitview) Irrigation System Streets CIP 2059 Water /Imgation General lmgation Phase 2 - Stage 1 Replacement of the General Mike Shane Water /Irrigation, 10/1/04 100% complete. Final Cost - $2,912,300 to 3 Imgalion System 2004 - 2007 Streets 2096 Water /Imgation 2nd Level Reservoir Pipe New waterline in Pecks Canyon Mike Shane Engineering and 9/1/06 100% complete. Final Cost - $894,930 Improvements - Ph. 1 Rd. from Powerhouse to 1200' Wastewater, south. Replaced/Relocated Water/II-ligation. CIP waterlines at 2nd Level Resv. Yakima County, . and at intersect. of 40th and Streets Powerhouse. ' 2096 Water /Irrigation 2nd Level Reservoir Pipe Rehab. /Install new waterlines, Mike Shane Engineering, 1/14/08 Survey and design completed. Bid opening was Final Cost - $147,336.05 CIP Improvements - Ph. 2 drainlines and control valves at Water /Irrigation Dec. 5, 2007. Contractor is TTC of Yakima. HLA is 2nd Level Resv. Site consultant. Project is 100% complete, Irrigation System Replacement in the neighborhoods south of General Irrigation Pacific Ave., north of E Nob Water /Imgalion, Bid opening occurred Sept. 26, 2007. KRCI of CIP 2180 Water /Irrigation phase 3 -Stage 1- Hill Blvd„ east of S Naches Mike Shane Streets Stage 1 - 11/2007 Wenatchee, WA is contractor HLA is consultant. Final Cost • $1,329,593.67 Ave., west of Fair Ave Also, Project is 100% complete. Custer Ave. between Lincoln and W. A Street Irrigation System Replacement HLA is consultant. Project design complete. in the neighborhoods north of j 9 n corn p CIP 2180 Water /Irrigation General Irrigation Pacific Ave ,south of E. Pine Mike Shane Water /Irrigation, 11/01/08 Advertise Sept. 17, 2008. Bid Opening Oct. 2, 10 bid received. Low bid - $739,132.11, EE - Phase 3 - Stage 2- St., east of S. 1st St., west of Streets 2008. Project awarded to Jansen, Inc. of Femdale, 51,117,451.73. Final contract - $638,956.56 • Fair Ave. WA. Construction is 100% complete. Irrigation System Replacement in venous neighborhoods Project areas include areas • bounded by A) Lincoln, HLA is consultant. Project design complete. - CIP 2220 Water /Irrigation Hillcrest, N_ Hillcrest and Buena Vista Summitview, N. 35th Ave. and Mike Shane Water /Imgalion, 11/01/08 Advertise Sept. 24, 2008. Bid Opening Oct. 8. 6 bids received. Low bid • $633,122.02. EE - Inigation System Replacements N. 37th Ave., 8) Tieton Dr, Streets 2008. Project awarded to Rotuchy, Inc. of Yacolt, $777,877 67 Final Contact Price - $607,855.47 Bonnie Doon, S. 16th Ave. and WA. Construction is 100% complete. S. 1915 Ave. and C) Chestnut, Tieton, S. 18th Ave. and S. 19th Ave. 0 41 ill . III • . .