Loading...
HomeMy WebLinkAboutR-2020-099 Task Order 2020-02 with HLA Engineering and Land SurveyingA RESOLUTION RESOLUTION NO, R-2020-099 authorizing the City Manager to execute Task Order 2020-02, incorporated in Professional Services Agreement with HLA Engineering and Land Surveying, Inc. to provide engineering services for the Yakima Water and Irrigation Distribution Systems, City Contract No. 2018-048. WHEREAS, the City of Yakima maintains Waste and Irrigation distribution Systems in accordance with applicable Federal, State and Local regulations; and WHEREAS, the City of Yakima Water/Irrigation Division requires engineering services for improvements identified in the adopted 2017 Water System Plan and the 1999 Irrigation Master Plan; and WHEREAS, the City of Yakima Water/Irrigation Division representatives have complied with the provisions of RCW 39.80, which concerns the procurement of engineering and architectural services by a city; and WHEREAS, In December 2017 the City evaluated qualification submittals from three Engineering firms, selected the two most qualified, and on December 11 and 12 the City held interviews with the Engineering firms; and WHEREAS, as a result of these interviews, the City selected HLA Engineering and Land Surveying, Inc. as the most qualified engineering firm to perform the required work; and WHEREAS, the 2017 Water System Plan has identified a necessary water main — fire flow improvement project on North 41st and North 42nd Avenue; and WHEREAS, the City Council has determined that it is in the best interest of the City of Yakima to enter into Task Order 2020-02 with HLA Engineering and Land Surveying, Inc., attached hereto and incorporated herein by this reference, to perform the required engineering services for the water main -fire flow project; now, therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager is hereby authorized and directed to execute Task Order 2020-02, incorporated in Professional Services Agreement between the City of Yakima and HLA Engineering and Land Surveying, Inc. (City Contract No. 2018-048) to provide engineering services for the water main - fire flow project on North 41st and 42nd Avenues; a copy of Task Order 2020-02 is attached hereto and by this reference made a part hereof. ADOPTED BY THE CITY COUNCIL this 15 day of Septe ber, 2020. TTEST: Sonya Claar Tee, City Clerk a\'4\lyy bxk ik 1 + PPP d g. P A PPPPPP+Pd s' lii it tYlltYlA.\ta. BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 4.E. For Meeting of: September 15, 2020 ITEM TITLE: Resolution authorizing Task Order 2020-02 with HLA Engineering and Land Surveying SUBMITTED BY: Scott Schafer, Director of Public Works David Brown,Assistant Director of Public Works, 509-575-6204 SUMMARY EXPLANATION: This is a Resolution authorizing Task Order 2020-02 with HLA Engineering and Land Surveying. The Task Order contains the design elements for fire flow improvements on North 41st and 42nd Avenues, including construction engineering. This Task Order is attached to Contract 2018-048 and Resolution R-2018-018 in an amount not to exceed $177,680. This project was identified by priority within the 2017 Water System Plan. The Water/Irrigation Division used the Municipal Research and Services Center(MRSC)of Washington Roster, a statewide small works and consultants roster system, followed by a competitive selection process, prior to selecting HLA Engineering and Land Surveying for a 4 year contract to complete design of water system improvements by task order. The Project is funded through a Public Works Trust Fund Loan. ITEM BUDGETED: Yes STRATEGIC PRIORITY: Public Trust and Accountability APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Adopt Resolution ATTACHMENTS: Description Upload Date Type resolution 9/1/2020 Resolution Task order 9/1/ 020 ntract For City of Yakima Use Only: Contract No 2018-048 Project No. AC2504 Resolution No._R-2018-018 TASK ORDER NO. 2020-02 SOO No. REGARDING AGREEMENT BETWEEN CITY OF YAKIMA (CITY CONTRACT NO 2018-048, RESOLUTION NO R-2018-018) AND HLA ENGINEERING AND LAND SURVEYING, INC PROJECT DESCRIPTION: N. 41st Avenue and N. 42"d Avenue Waterline Fire Flow Improvements, D-1, AC2504(PROJECT) HLA Project No. 20148E The City of Yakima (CITY)desires to improve fire flow capacity to the area between W. Lincoln Avenue and Snowmountain Road, and N.41st Avenue and N 42nd Avenue by reconfiguring watermain connections from Zone 3 to Zone 2, including replacement of approximately 1,700 linear feet of existing 6-inch and 8-inch diameter watermains with new 12-inch diameter ductile iron watermain, relocation of an existing PRV station, water services, valves, hydrants, and related surface repairs. SCOPE OF SERVICES: At the direction of the CITY, HLA Engineering and Land Surveying, Inc (HLA), shall provide professional engineering and land surveying services for the PROJECT HLA services shall include 1.0 Project Administration and Environmental Assistance 1.1 Assist City with financial management requirements of funding agency 1.2 Assist CITY with environmental process requirements for the PROJECT. 2.0 Design Engineering 2 1 Provide complete project management to deliver the PROJECT within mutually determined expectations. 2.2 Attend two (2) PROJECT meetings with CITY staff at 60% and 90% plan completion to fully review all elements of the PROJECT 2 3 Perform detailed topographic survey of the project area as required to complete design, plans, and specifications, including call for utility locates and obtaining invert elevations of existing infrastructure (no potholing is anticipated to be performed). 2 4 Perform field investigations necessary to design the identified improvements 2 5 Review and identify public and private utilities within the PROJECT area Notify utilities of pending construction and potential impacts. 2 6 Research and identify existing easements and right of way limits 2 7 Perform the preliminary design Present, review, and discuss preliminary plans with the CITY at both 60% and 90% completion 2.8 On basis of approved preliminary plans, perform the final design, and prepare complete plans and specifications for publicly-bid improvements, as authorized by the CITY G:\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\41st and 42nd Water Improvements\2020-08-31 COY W&I Task Order 2020- 02.docx Page 1 of 7 2 9 Prepare the Engineer's Estimate of construction cost. 2.10 Furnish the CITY electronic copies of the final plans and specifications for bidding and construction Print up to twelve (12) paper copies of the final plans and specifications It is anticipated HLA will prepare one (1) complete set of plans and specifications for one bid call, additional bid packages will be considered additional services 2.11 Submit bid advertisements to Paper of Record and Publications directed by the CITY (All advertisement fees to be paid by the CITY) 2 12 Post contract plans and specifications to the HLA website for bidding purposes 2 13 Prepare and maintain planholders list, including CITY staff, private utility companies, and plan centers. 2 14 Answer and supply such information as requested by prospective bidders 2.15 Prepare and issue addenda, if necessary. 2 16 Attend bid opening and participate in the bid evaluation process. 2.17 Prepare tabulation of all bids received by the CITY and review bidder's qualifications. 2 18 Make recommendation of construction contract award to the lowest responsible bidder 3.0 Construction Engineering 3.1 Coordinate execution of the Contract with the Contractor, including review of Bond and Insurance requirements, and provide Contracts for City Council consideration 3.2 Prepare and transmit Notice of Award to the Contractor 3 3 Coordinate and facilitate preconstruction meeting with the CITY, Contractor, private utilities, and affected agencies 3 4 Prepare and issue Notice to Proceed to the Contractor 3.5 Furnish the field survey crew necessary to set horizontal and vertical control for the improvements authorized for construction 3.6 Furnish a qualified resident engineer(inspector) to observe construction at the PROJECT site during all significant work. The resident engineer shall provide surveillance of construction for substantial compliance with plans and specifications. 3 7 Perform measurement and computation of pay items, prepare and file progress reports on the PROJECT with the CITY, and provide monthly progress pay estimates to the CITY. 3 8 Administer weekly construction meetings (as needed) 3 9 Consult and advise the CITY during construction and make a final report of the completed work. 3 10 The CITY is required to monitor the Contractor's payment of prevailing wage rates As part of construction services, HLA will monitor General Contractor and Subcontractor compliance with State labor standards during the construction phase of the PROJECT This work includes checking weekly certified payrolls, conducting employee interviews in the field, and issuing letters of non-compliance and/or letters of missing documents. 3 11 Review Contractor's submission of samples and shop drawings, where applicable G:\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\41st and 42nd Water Improvements\2020-08-31 COY W&I Task Order 2020- 02.docx Page 2 of 7 3 12 Review materials testing results for compliance with plans and specifications. 3 13 Prepare and submit proposed contract change orders when applicable. 3 14 Perform final walk-through with the CITY and Contractor, and issue final punch list. 3 15 Prepare and furnish reproducible record drawings of all completed work from as-built drawings furnished by the resident engineer and Contractor. If as-built drawings from the Contractor are not received by HLA within thirty (30) calendar days from the date of the letter of recommendation of project acceptance, HLA will submit the reproducible record drawings to the CITY with a note stating that no as-built information was received by HLA. 4.0 Additional Services Provide professional engineering and land surveying services for additional work requested by the CITY that is not included above. 5.0 Items to be Furnished and Responsibility of CITY The CITY will provide or perform the following: 5 1 Provide full information as to CITY requirements of the PROJECT 5.2 Assist HLA by placing at their disposal all available information pertinent to the site of the PROJECT, including previous reports, drawings, plats, surveys, utility records, and any other data relative to design and construction of the PROJECT 5 3 Provide staff and equipment to pothole at specific areas of potential conflict or interest, necessary to confirm the design 5.4 Contact property owners affected by the PROJECT and gain necessary access to property for field investigation, design, and construction of improvements. 5 5 Examine all studies, reports, sketches, estimates, specifications, drawings, proposals, and other documents presented by HLA and provide written decisions within a reasonable time as not to delay the work of HLA. 5.6 Obtain approval of all governmental authorities having jurisdiction over the PROJECT and approvals and consents from other individuals or bodies as necessary for completion of the PROJECT 5.7 Pay for project bid advertisement costs 5.8 Pay for all necessary testing costs and permit fees. TIME OF PERFORMANCE: The services called for in this Agreement shall be completed as follows. 1.0 Project Administration and Environmental Assistance These assistance services shall begin immediately following receipt of the signed Task Order and continue until all funding and labor compliance closeout requirements for the PROEJCT have been satisfied. 2.0 Design Engineering Plans, specifications, and cost estimate for all project elements shall be completed within 120 working days following authorization to proceed. G:\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\41st and 42nd Water Improvements\2020-08-31 COY W&l Task Order 2020- 02.docx Page 3 of 7 3.0 Construction Engineering Engineering services during construction for the PROJECT shall begin upon construction contract award by the CITY to the lowest responsible bidder and shall extend through both the completion of construction and completion of as-constructed drawings and labor documentation closeout, as requested and directed by the CITY A maximum of forty (40) working days has been assumed for the construction of improvements. Should the Contractor be granted time extensions for construction completion due to recognized delays, requested additional work, and/or change orders, engineering services beyond the forty (40)working days shall be considered additional services. 4.0 Additional Services Time of completion for work directed by the CITY under this phase shall be negotiated and mutually agreed upon at the time of service requested by the CITY FEE FOR SERVICE: For the services furnished by HLA as described under this Agreement, the CITY agrees to pay HLA the amounts not to exceed the fees as set forth in 1 0, 2 0 and 3.0, below The amounts listed below may be revised only by written agreement of both parties. A fee breakdown is provided in EXHIBIT 1 attached. 1.0 Project Administration and Environmental Assistance All work directed by the CITY for this PROJECT phase shall be performed on a time-spent basis at the hourly billing rates provided in EXHIBIT B of the Agreement (City Contract No. 2018-048, Resolution No. R-2018-018), plus reimbursement for direct non-salary expenses as described in section 5 1.1 for the estimated maximum amount of$5,680 2.0 Design Engineering All work directed by the CITY for this PROJECT phase shall be performed on a lump sum basis in the amount of$86,000 3.0 Construction Engineering All work directed by the CITY for this PROJECT phase shall be performed on a time-spent basis at the hourly billing rates provided in EXHIBIT B of the Agreement (City Contract No 2018-048, Resolution No R-2018-018), plus reimbursement for direct non-salary expenses as described in section 5.1.1 for the estimated maximum amount of$86,000. 4.0 Additional Services Any additional work requested by the CITY that is not included above shall be authorized by the CITY and agreed to by HLA in writing prior to proceeding with the services. HLA shall perform the additional services as directed/authorized by the CITY on a time-spent basis at the hourly billing rates included in our General Agreement (City Contract No 2018-048, Resolution No R-2018-018), plus reimbursement for direct non-salary expenses such as laboratory testing, printing expenses, out of town travel costs, and outside consultants G.\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\41st and 42nd Water Improvements\2020-08-31 COY W&I Task Order 2020- 02.docx Page 4 of 7 CITY OF YAKIMA HLA Engineering and Land Surveying, Inc .../Zer....,_ if. Ls...C. Signature Signature Printed Name. w�.. '}' �* . 1 sO►') Printed Name Michael T. Battle, PE Title @ Ai v ►/0, QsAJ Title* President Date' OF!) Date e/3//Z4, Zo Attest 20 o, **.\ City Clerk v :s d .,,,�;`' : - A .,\, # CITY rn TRACT NO* �oW IU 2D� L/�L?•Y'h'rr ,., y �„ ION NO' \ 'ci- RLL)LuiIONNO � lC( l G:\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\41st and 42nd Water Improvements\2020-08-31 COY W&I Task Order 2020- 02.docx Page 5 of 7 EXHIBIT 1 — PROFESSIONAL SERVICES N. 41st Ave and N. 42nd Ave Watermain Fire Flow Improvements, D-1, AC2504 (PROJECT) Task Order No. 2020-02 HLA Project No. 20148E { For the services described in Task Order No. 2020-02, compensation shall be paid per Section 5 of the Agreement (City Contract No 2020- , Resolution No R-2020- ). The following spreadsheet shows the estimated time and expenses to perform said services. Project Title: N.41st Avenue and N.42nd Avenue Waterline Firetlow Improvements Client: City of Yakima Task Order No.2020.02 Date: August 26,2020 ENGINEERS HOURLY ESTIMATE Senior licensed Project Licensed Two Man Contract Word Task Principal Principal Engineer Land Survey Admin Proceeeing Total Tasl:Direct Project Taskflours Coal: No. Engineer Engineer Surveyor Crew Technician $215 $193 $145 $160 $226 $132 $84 _ - 1.0 Project Administration and Environmental Assistance 1 Assist City with financial management requirement:of 1 4 6 0 0 12 0 23 13,441 funding agency Avei;t City with environmental ptoetss requirement 2 for the PROJECT 1 2 4 0 0 8 0 15 22,237 Labor Subtotal 2 6 10 0 0 20 0 38 $5.678 1.0 Project Adr•i.i:tratio.amid E.wiro.me.tal A::i:ta.ce $5,680 Senior liceneed Project Licensed Two Man CAD Word Task Principal Principal Engineer Land Survey Technician Processing Total Task Direct Project Task Hour: Costs No. Engineer Engineer Surveyor Crew Technician $215 $193 $145 W160 $226 $127 $84 2.0 Design Engineering 1 Project Iv1anagement 4 8 4 2 0 0 2 20 $3,472 2 Project Meeting:(Kick-off.60:and 90:) 2 6 12 0 0 8 4 32 f4,6$0 3 Detailed topographic survey 0 4 6 12 40 10 0 72 113,872 4 Field investigation: 1 4 8 2 0 6 0 21 $3,229 5 Review public and private utilities 1 4 $ 2 4 $ 0 27 $4.387 6 Review existing eseemehl:and right-of-way 0 0 4 8 0 6 0 18 $2,622 7 Preliminary Engineering Design(60%and 90%) 4 16 48 2 4 88 6 168 $23.812 8 In-house project revi<w,quality control 2 4 2 0 0 2 2 12 11,914 • 9 Review wfand Incorporate Agency comment: 2 4 8 0 0 12 3 29 $4,138 ' 10 Final design•plan:.and specifications 2 12 24 0 0 40 6 84 $11,810 I1 Prepare Engineet•s Estimatt of construction cost 1 4 12 0 0 6 0 23 $3,489 12 Furnish copies of plan;and specifications 0 2 2 0 0 0 4 8 $1,012 13 Submit Bid Advcrtieemcnte to Publication; 0 2 0 0 0 0 4 6 $722 Manage Advertisement,Contract DOCYnienti, 16 Planholderu List,and Addenda 0 2 0 0 0 0 4 6 f722 { 15 Anwrer bidder:queelions 0 2 6 0 0 0 0 8 $1,256 16 Prepare and i sue addenda 1 2 4 0 0 2 2 11 $1,603 17 Attend bid opening 0 2 2 0 0 0 - 0 4 f676 18 Review bide/Prepare tabulation of bide I 2 2 0 0 0 6 11 $1,395 19 Make recommendation of contract award 0 I 2 0 0 0 2 5 $651 Labor Subtotal 21 81 154 28 48 188 45 565 $85,460 EXPENSES: Expenses: Cost/Unit Ground Days Days Miles Units Mileage $0.58 205 - 1120 Printing 12 topic;plane/epee; $35 12 S420 2.0 Oe:ig.E.gi.eeris9 86.000 Total Phase 1.0 and Phase 2.0 91.680 G:\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\41st and 42nd Water Improvements\2020-08-31 COY W81 Task Order 2020- 02.docx Page 6 of 7 EXHIBIT 1 — PROFESSIONAL SERVICES (Continued) Project Title: N.41st Avenue and N.42nd Avenue Waterline Fireflow Improvements Client: City of Yakima Task Order No.2020.02 Date: August 26,2020 ENGINEER'S HOURLY ESTIMATE Senior licensed Project lie.Pr inc. Two Man Rexident Contract Engineering Task. Principal Principal Engineer land Survey Engincerl Administrator Technician Total Task Direct Project Task NO, Engineer Engineer Surveyor Crew Inspector Mourc Colic $222 $200 $150 $164 $226 _ $119 $132 $84 _ 3.0 Construction Engineering I Coordinate Contract Execution including 0 1 2 0 0 0 4 2 9 11,196 review of bond and insurance 2 Prepare and Issue Notice of Award 0 1 2 0 0 0 2 0 5 2764 3 Conduct Pro•Constraction Meeting 1 2 4 0 0 2 1 0 10 11,532 4 Prepare and I,lie Notice to Proceed 0 1 I 0 0 0 2 2 6 1782 5 Field Survey Crow for Mori:!Vert Control 0 1 2 6 24 I 0 0 34 17,027 6 Construction Observation(40d) 2 12 28 0 0 360 4 2 408 1$0,580 7 Field Inspection Report: 0 I 2 0 0 6 4 2 15 11,310 8 Construction Adminixtration 2 2 4 0 0 0 18 12 38 14.828 5 Weekly Construction 7vlcetingc 1 6 12 0 0 0 4 3 26 14,002 10 rvlaterinls Submittal Review 0 2 6 0 0 2 0 6 16 12,042 l 11 State labor Standards Compliance 0 0 1 0 0 2 4 8 15 11,588 12 Progress Pay Estimates I 2 2 0 0 2 12 4 23 13.080 13 Review fvlaterials Testing Results for 0 0 2 0 0 2 1 2 7 1838 Compliance 14 Prepare and Submit Change Order; 0 1 2 0 0 2 2 2 9 11,170 15 Final Walk•Through7Punchli;t 0 2 2 0 0 2 2 0 8 11,202 16 Project Closeout 1 I 2 0 0 2 2 2 10 11,392 17 Record Drawings 0 I 1 0 0 5 2 2 II $1,377 Labor Subtotal 8 36 75 6 24 388 64 43 650 185,310 EXPENSES: Travel: Cost/Unit Ground Days , Days , Miles Mileage f0.580 ION1630 Mc lsllodging Misc.Expenses:(None) Advertisement ,Telephone Postage Sub-Consultants: None Anticipated I S0.00 10.00 Multiplier 1.1 1.1 10.00 Subtotal•labor 185,370 Subtotal•Expenxcc $630 Total•CONSTRUCTION ENGINEERING 186,000 - G:\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\41st and 42nd Water Improvements\2020-08-31 COY W&I Task Order 2020- 02.docx Page 7 of 7 Task Order Supplemental Agreement Supplemental Agreement Organization and Address Number: 1 HLA Engineering and Land Surveying, Inc. 2803 River Road Yakima, WA 98902 Original Task Order Number: Execution Date of Supplement: 2020-02 December 1, 2020 City Water/Irrigation Project Number: Completion Date of Supplement: AC2504 Refer to EXHIBIT A Project Title* Original Amount Payable N. 41st Avenue & N. 42nd Avenue Waterline $177,680 Fire Flow Improvements, D-1, AC2504 Revised Amount Payable this Supplement: $115,680 (Deduction of$62,000) Reason for Supplemental Agreement The City of Yakima (CITY), Washington desires to supplement Task Order No 2020-02 entered into with HLA Engineering and Land Surveying, Inc., and executed on September 16, 2020, by Resolution No. 2020-099 and identified as Contract 2018-048 to 2020-02 All provisions in the original task order remain in effect except as expressly modified by this supplement. Following execution of Task Order 2020-02 the CITY requested review and analysis of the original fire flow improvement project identified in the Water System Plan (Project D-1) This effort led to a reduction in the infrastructure improvements needed to provide increased fire flow to the area between W Lincoln Avenue and Snowmountain Road, from N 41st Avenue to N 42nd Avenue Scope of Services The Task Order 2020-02 PROJECT DESCRIPTION, SCOPE OF SERVICES, and TIME OF PERFORMANCE sections shall be revised as shown in EXHIBIT A of this Supplement. Compensation The Task Order 2020-02 FEE FOR SERVICE section shall be revised as shown in EXHIBIT A of this Supplement, including the revised hourly breakdown provided in EXHIBIT B The fee for task 1 0 Project Administration and Environmental Assistance, in Task Order 2020-02, has not changed and is included in the total revised amount payable under this supplement. If you concur with this supplement and agree to the changes as stated above, please sign the appropriate spaces below and return to this office for final action By. it/ «i�t�e—z i• '77 �E By' Q v be_r- ' 4- Consult t Signa r City Manager Signature ate G\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\41st and 42nd Water Improvements\2020-12-04 Supplement Nooy1 to HLA Task Order No 2020-02.docx CITY CONTRACT NO'T"'.-.tr , RESOLUTION NO:IKn�A' —{Nq r EXHIBIT A PROJECT DESCRIPTION: Revise the PROJECT DESCRIPTION section of Task Order 2020-02 as follows The City of Yakima (CITY) desires to improve fire flow capacity to the area between W. Lincoln Avenue and Snowmountain Road, from N 41st Avenue to N. 42nd Avenue by reconfiguring watermain connections from Level 3 to Level 2. Improvements will include installation of approximately 750 linear feet of new 12-inch ductile iron watermain in Avalanche Avenue,from N.40th Avenue to N 42nd Avenue, including connections to existing 6-inch and 8-inch watermains in N 41st Avenue and N 42nd Avenue and the existing 16-inch watermain in N. 40th Avenue, installation of a new Level 2 to Level 3 PRV station,valves, hydrants, and related surface repairs Existing hydrants along Lincoln Avenue at N 41st Avenue and N 42nd Avenue will be replaced by CITY crews SCOPE OF SERVICES: Add the following to the SCOPE OF SERVICES section of Task Order 2020-02 6.0 Project Formulation 6 1 Review and analyze original improvement recommendations from the Water System Plan 6.2 Coordinate with CITY on field testing necessary to confirm recommendations 6.3 Provide revised improvement recommendations and associated cost estimates to the CITY TIME OF PERFORMANCE: Revise the TIME OF PERFORMANCE section of Task Order 2020-02 as follows 2.0 Design Engineering Plans, specifications, and cost estimate for all PROJECT elements shall be completed within ninety (90) working days following completion of 6.0 Project Formulation 3.0 Construction Engineering Engineering services during construction for the PROJECT shall begin upon construction contract award by the CITY of the lowest responsible bidder and shall extend through both the completion of construction and completion of as-constructed drawings and labor documentation closeout, as requested and directed by the CITY. A maximum of twenty (20) working days has been assumed for the construction of improvements. Should the Contractor be granted time extensions for construction completion due to recognized delays, requested additional work, and/or change orders, engineering services beyond the twenty (20) working days shall be considered additional services. Add the following to the TIME OF PERFORMANCE section of Task Order 2020-02. 6.0 Project Formulation Time of completion for work directed by the CITY under this phase shall be as mutually agreed at the time of service requested by the CITY. G\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\41st and 42nd Water Improvements12020-12-04 Supplement No.1 to HLA Task Order No 2020-02 docx FEE FOR SERVICE: The FEE FOR SERVICE for 1.0 Project Administration and Environmental Assistance, provided in Task Order 2020-02, is not changed by this supplement. The estimated maximum amount is $5,680 Revise the FEE FOR SERVICE section of Task Order 2020-02 as follows 2.0 Design Engineering All work directed by the CITY for this PROJECT phase shall be performed on a lump sum basis in the amount of$50,000. 3.0 Construction Engineering All work directed by the CITY for this PROJECT phase shall be performed on a time-spent basis at the hourly billing rates provided in EXHIBIT B of the General Agreement (City Contract No 2018-048, Resolution No 2018-018), plus reimbursement for direct non-salary expenses as described in Section 5 1 1 of the General Agreement, for the estimated maximum amount of$50,000 Add the following to the FEE FOR SERVICE section of Task Order 2020-02 6.0 Project Formulation All work directed by the CITY for this PROJECT phase shall be performed on a time spent basis at the hourly billing rates provided in EXHIBIT B of the General Agreement (City Contract No. 2018-048, Resolution No. 2018-018) for the estimated maximum amount of$10,000. Replace the EXHIBIT 1 fee breakdown of Task Order 2020-02 with the attached EXHIBIT B. G\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\41st and 42nd Water Improvements\2020-12-04 Supplement No.1 to HLA Task Order No.2020-02 docx EXHIBIT B Professional Services N. 41st Avenue & N. 42nd Avenue Waterline Fire Flow Improvements, D-1, AC2504 Project Title: N.41st Ave.&N.42nd Ave Watermain Improvements Client: City of Yakima Task Order No.2020-02,Supplement No.1 Date: December 1,2020 ENGINEERS HOURLY ESTIMATE Senior Licensed Project Licensed Two Man Contract Word Task Principal Principal Engineer Land Surrey Admin Processing Total Task Direct No Project Task Engineer_ Engineer Surveyor Crew Technician Hours Costs $222 $200 $150 $164 $226 $136 $87 1.0 Project Administration and Environmental Assistance Assist Citywith financial management 1 1 4 4 0 0 12 0 21 $3.254 requirements of funding agency 2 Assist Citywith emnronmental process 1 2 3 0 0 10 0 16 $2,432 requirement for the PROJECT Labor Subtotal 2 6 7 0 0 22 0 37 i $5,686 1.0 Project Administration and Environmental Assistance Total $5,680 Senior Licensed Project Licensed Two Man CAD Word Task Principal Principal Engineer Land Survey Technician Processing Total Task Direct No. Project Task ' Engineer Engineer Surveyor Crew Technician Hours Costs i. -$222 $200 $150 $164 $226 $136 $87 2.0 Design Engineering 1 Project Management 4 6 4 2 0 0 2 18 $3,190 2 Project Meetings(Kick-off,60%and 90%) 2 4 4 0 0 4 4 18 $2.736 3 Detailed topographic survey 0 2 4 6 8 10 0 30 $5.152 4 Field investigations 1 2 4 2 0 6 0 15 $2,366 5 Renew public and private utilities 1 4 2 2 2 4 0 15 $2,646 6 Renew existing easements and right-of-way 0 0 4 4 0 4 0 12 $1,800 7 Preliminary Engineering Design(60%and 90%) 2 4 36 2 2 17 3 66 $9,997 8 In-house project review quality control 2 4 2 0 0 2 2 12 $1,990 9 Renew w/and Incorporate Agency comments 2 4 6 0 0 12 2 26 $3,950 10 Final design.plans and specifications 2 4 12 0 0 16 4 38 $5.568 11 Prepare Engineer's Estimate of construction cost 1 2 6 0 0 2 0 11 $1,794 12 Fumish copies of plans and specifications 0 2 2 0 0 0 4 8 $1,048 13 Submit Sid Advertisements to Publications 0 2 0 0 0 0 4 6 $748 14 Manage Advertisement,Contract Documents 0 2 0 0 0 0 4 6 $748 Planholders List,and Addenda 15 Answer bidders questions 0 2 6 0 0 0 0 8 $1,300 16 Prepare and issue addenda 1 2 4 0 0 2 2 11 $1,668 17 Attend bid opening 0 2 2 0 0 0 0 4 $700 18 Renew bids/Prepare tabulation of bids 1 2 2 0 0 0 6 11 $1 444 19 Make recommendation of contract award 0 1 2 0 0 0 2 5 $674 Labor Subtotal 19 51 102 18 12 79 39 320 $49,520 EXPENSES: Expenses: Cost/Unit Ground Days Days Miles Units _ mileage $0 58 200 $120 Printing 12 copies plans/specs $35 12 $420 Expenses Subtotal $540 2.0 Design Engineering Total $50,000 Senior Licensed Project Licensed Two Man CAD Word Task Project Task Principal Principal Engineer Land Survey Technician Processing Total Task Direct No. Engineer Engineer Surveyor Crew Technician Hours Costs $222 $200 $150 $164 $226 $136 $87 , 6.0 Project Formulation 1 Renew and analyze onginal improvements 2 8 16 0 0 0 0 26 $4 444 recommendation from the Water System Plan 2 Coordinate with CITY on field test necessary to 0 4 10 0 0 0 0 14 $2,300 confirm recommendations. I 3 Fronde revised improvement recommendation 1 6 10 0 0 0 4 21 $3,270 and associated cost estimates to the CITY. _ _ Labor Subtotal 3 18 36 0 0 0 4 61 $10,014 6.0 Project Formulation Total $10,000 Phase 1.0,2.0,and 6.0 Total 665,680 G\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\41st and 42nd Water Improvements\2020-12-04 Supplement No 1 to HLA Task Order No.2020-02 docx EXHIBIT B — PROFESSIONAL SERVICES (Continued) , 1 Project Title: N.41st Ave.8 N.42nd Ave.Waterman Improvements Client: City of Yakima Task Order No 2020-02,Supplement No.1 Date December 1,2020 ENGINEERS HOURLY ESTIMATE Senior Licensed Project Lic Pnnc Two Man Resident Contract Engineenng I Task Principal Pnncipal Engineer Land Survey Engineer/ Administrator Technician Total Task Direct No. Project Task Engineer Engineer _ Surveyor Crew Inspector Hours Costs $222 $200 $150 $164 $226 $119 $132 $84 3.0 Construction Engineering 1 Coordinate Contract Execution including 0 1 2 0 0 0 4 2 9 $1,196 review of bond and insurance 2 Prepare and Issue Nohce of Award 0 1 2 0 0 0 2 0 5 $764 3 Conduct Pre-Construction Meeting 1 2 2 0 0 2 1 0 8 $1,292 4 Prepare and Issue Notice to Proceed 0 1 2 0 0 0 2 2 7 $932 5 Field Survey Crew for HonzNert Control 0 1 2 4 6 1 0 0 14 $2,631 6 Construction Observation(20d) 1 4 18 0 0 180 2 2 205 $25,274 - 7 Field Inspection Reports 0 1 2 0 0 6 4 2 15 $1,910 8 Construction Administration 1 2 2 0 0 0 5 6 16 $2,086 9 Weekly Construction Meetings 1 4 6 0 0 0 2 2 15 $2,354 10 Materials Submittal Renew 0 2 6 0 0 2 0 6 16 $2,042 11 State Labor Standards Compliance 0 0 1 0 0 2 4 4 11 $1,252 12 Progress Pay Estimates 0 2 2 0 0 2 6 4 16 $2,066 13 Revew Materials Testing Results for 0 0 2 0 0 2 2 2 8 $970 Compliance 14 Prepare and Submit Change Orders 0 1 2 0 0 2 2 2 9 $1,170 15 Final Walk-Through/Punchlist 0 2 2 0 0 2 2 0 8 $1,202 16 Project Closeout 1 1 2 0 0 2 2 2 10 $1,392 17 Record Drawings 0 1 1 0 0 5 1 2 10 $1,245 Labor Subtotal 5 26 54 4 8 208 41 38 382 $49,778 EXPENSES: Travel: Cost/Unit Ground Days Days _ Miles Mleage $0 580 400 $232 - Meals/Lodging Misc.Expenses:(None) Advertisem ent Telephone Postage Sub-Consultants: None Anticipated $000 $000 Multiplier 11 11 $0.00 Subtotal-Labor $49,778 Subtotal-Expenses $232 3.0 Construction Engineering Total $50,000 G'\Contracts&Task Orders\Yaklma\2020\Water&Irrigation Capital Improvements\41st and 42nd Water Improvements\2020-12-04 Supplement No.1 to HLA Task Order No.2020-02 docx For City of Yakima Use Only: Contract No 2018-048 7" Project No AC2537 Resolution No _R-2010.04.8 r O X'159C1 TASK ORDER NO. 2020-03 SOQ No REGARDING AGREEMENT BETWEEN CITY OF YAKIMA (CITY CONTRACT NO 2018-048, RESOLUTION NO. R-2018-018) AND HLA ENGINEERING AND LAND SURVEYING, INC PROJECT DESCRIPTION: E. Mead Avenue Waterline Fire Flow Improvements, D-13,AC2537 (PROJECT) HLA Project No. 20194E The City of Yakima (CITY) desires to improve fire flow capacity to the area between S Fair Avenue and approximately 1825 S. 1st Street along E Mead Avenue and S 1st Street by replacement of approximately 1,500 linear feet of existing 6-inch and 8-inch diameter watermains with new 12-inch diameter ductile iron watermain, reconnection of existing water services and fire hydrants, valves, and related surface repairs. SCOPE OF SERVICES: At the direction of the CITY, HLA Engineering and Land Surveying, Inc. (HLA), shall provide professional engineering and land surveying services for the PROJECT HLA services shall include. 1.0 Project Administration and Environmental Assistance 1 1 Assist CITY with financial management requirements of funding agency. 1.2 Assist CITY with environmental process requirements for the PROJECT. 2.0 Design Engineering 2 1 Provide complete PROJECT management to deliver the PROJECT within mutually determined expectations 2.2 Attend two (2) PROJECT meetings with CITY staff at 60% and 90% plan completion to fully review all elements of the PROJECT. 2.3 Perform detailed topographic survey of the PROJECT area as required to complete design, plans, and specifications, including call for utility locates and obtaining invert elevations of existing infrastructure (no potholing is anticipated to be performed). 2.4 Perform field investigations necessary to design the PROJECT. 2.5 Review and identify public and private utilities within the PROJECT area Notify utilities of pending construction and potential impacts 2 6 Research and identify existing easements and right of way limits. 2.7 Perform the preliminary design Present, review, and discuss preliminary plans with the CITY at both 60% and 90% completion 2.8 On basis of approved preliminary plans, perform the final design, and prepare complete plans and specifications for publicly-bid improvements, as authorized by the CITY. G\Contracts&Task Orders\Y&dma\2020\Water&Irrigation Capital Improvements\E.Mead Water Improvements\2020-12-4 COY W&I Task Order No 2020-03 docx Page 1 of 7 2 9 Prepare the final engineer's estimate of construction cost. 210 Furnish the CITY electronic copies of the final plans and specifications for bidding and construction Print up to twelve (12) paper copies of the final plans and specifications It is anticipated HLA will prepare one (1) complete set of plans and specifications for one bid call; additional bid packages will be considered additional services. 2 11 Submit bid advertisements to Paper of Record and Publications directed by the CITY (All advertisement fees to be paid by the CITY). 2.12 Post contract plans and specifications to the HLA website for bidding purposes 2 13 Prepare and maintain plan holders list, including CITY staff, private utility companies, and plan centers 2.14 Answer and supply such information as requested by prospective bidders. 2 15 Prepare and issue addenda, if necessary. 2.16 Attend bid opening and participate in the bid evaluation process 2.17 Prepare tabulation of all bids received by the CITY and review bidder's qualifications 2 18 Make recommendation of construction contract award to the lowest responsible bidder 3.0 Construction Engineering 3.1 Coordinate execution of the Contract with the Contractor, including review of Bond and Insurance requirements, and provide Contracts for City Council consideration 3.2 Prepare and transmit Notice of Award to the Contractor. 3 3 Coordinate and facilitate preconstruction meeting with the CITY, Contractor, private utilities, and affected agencies. 3 4 Prepare and issue Notice to Proceed to the Contractor 3 5 Furnish the field survey crew necessary to set horizontal and vertical control for the PROJECT, including construction staking 3 6 Furnish a qualified resident engineer(inspector) to observe construction at the PROJECT site during all significant work. The resident engineer shall provide surveillance of construction for substantial compliance with plans and specifications 3.7 Perform measurement and computation of pay items, prepare and file progress reports on the PROJECT with the CITY, and provide monthly progress pay estimates to the CITY. 3.8 Administer weekly construction meetings (as needed). 3.9 Consult and advise the CITY during construction and make a final report of the completed work. 3 10 The CITY is required to monitor the Contractor's payment of prevailing wage rates. As part of construction services, HLA will monitor General Contractor and Subcontractor compliance with State labor standards during the construction phase of the PROJECT This work includes checking weekly certified payrolls, conducting employee interviews in the field, and issuing letters of non-compliance and/or letters of missing documents 1 3.11 Review Contractor's submission of samples and shop drawings, where applicable. G\Contracts&Task Orders\Yawma\2020\Water&Irrigation Capital Improvements\E.Mead Water Improvements\2020-12-4 COY W&I Task Order No.2020-03 docx Page 2 of 7 3 12 Review materials testing results for compliance with plans and specifications. 3 13 Prepare and submit proposed contract change orders when applicable 3.14 Perform final walk-through with the CITY and Contractor, and issue final punch list. 3 15 Prepare and furnish reproducible record drawings of all completed work from as-built drawings furnished by the resident engineer, and by Contractor as identified in contract specification, within thirty (30) calendar days from the date of the letter of recommendation of project acceptance 4.0 Additional Services Provide professional engineering and land surveying services for additional work requested by the CITY that is not included above 5.0 Items to be Furnished and Responsibility of CITY The CITY will provide or perform the following• 5.1 Provide full information as to CITY requirements of the PROJECT. 5.2 Assist HLA by placing at their disposal all available information pertinent to the site of the PROJECT, including previous reports, drawings, plats, surveys, utility records, and any other data relative to design and construction of the PROJECT. 5 3 Provide staff and equipment to pothole at specific areas of potential conflict of interest, necessary to confirm the design. 5 4 Contact property owners affected by the PROJECT and gain necessary access to property for field investigation, design, and construction of improvements. 5 5 Examine all studies, reports, sketches, estimates, specifications, drawings, proposals, and other documents presented by HLA and provide written decisions within a reasonable time as not to delay the work of HLA. 5 6 Obtain approval of all governmental authorities having jurisdiction over the PROJECT and approvals and consents from other individuals or bodies as necessary for completion of the PROJECT. 5 7 Pay for PROJECT bid advertisement costs. 5.8 Pay for all necessary testing costs and permit fees TIME OF PERFORMANCE: The services called for in this Task Order shall be completed as follows. 1.0 Project Administration and Environmental Assistance Services shall begin immediately following receipt of signed Task Order and continue until all funding and labor compliance closeout requirements for the PROEJCT have been satisfied 2.0 Design Engineering Plans, specifications, and cost estimate for all PROJECT elements shall be completed within one-hundred twenty (120) working days following receipt of signed Task Order G\Contracts&Task Orders\Yaldma\2020\Water&Irrigation Capital Improvements\E.Mead Water Improvements\2020-12-4 COY W&I Task Order No.2020-03.docx Page3of7 3.0 Construction Engineering Engineering services during construction for the PROJECT shall begin upon construction contract award by the CITY to the lowest responsible bidder and shall extend through both the completion of construction and completion of as-constructed drawings and labor documentation closeout, as requested and directed by the CITY A maximum of twenty-five (25) working days has been assumed for the construction of improvements. Should the Contractor be granted time extensions for construction completion due to recognized delays, requested additional work, and/or change orders, engineering services beyond the twenty-five (25)working days shall be considered additional services 4.0 Additional Services Time of completion for work directed by the CITY under additional services shall be negotiated and mutually agreed upon at the time of service request by the CITY FEE FOR SERVICE: For the services furnished by HLA as described under this Task Order, the CITY agrees to pay HLA the amounts not to exceed the fees as set forth in 1.0, 2.0, and 3.0 below These amounts may be revised only by written agreement of both parties A fee breakdown is provided in EXHIBIT 1 attached. 1.0 Project Administration and Environmental Assistance All work directed by the CITY for this PROJECT phase shall be performed on a time-spent basis at the hourly billing rates provided in EXHIBIT B of the Agreement (City Contract No. 2018-048, Resolution No. R-2018-018), plus reimbursement for direct non-salary expenses as described in section 5 1 1 for the estimated maximum amount of$5,000 2.0 Design Engineering All work directed by the CITY for this PROJECT phase shall be performed on a lump sum basis in the amount of$59,990 3.0 Construction Engineering All work directed by the CITY for this PROJECT phase shall be performed on a time-spent basis at the hourly billing rates provided in EXHIBIT B of the Agreement (City Contract No 2018-048, Resolution No R-2018-018), plus reimbursement for direct non-salary expenses as described in section 5.1.1 for the estimated maximum amount of$60,000. 4.0 Additional Services Any additional work requested by the CITY that is not included above shall be authorized by the CITY and agreed to by HLA in writing prior to proceeding with the services HLA shall perform the additional services as directed/authorized by the CITY on a time-spent basis at the hourly billing rates included in our General Agreement (City Contract No 2018-048, Resolution No. R-2018-018), plus reimbursement for direct non-salary expenses such as laboratory testing, printing expenses, vehicle mileage, out of town travel costs, and outside consultants. G'\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\E Mead Water Improvements\2020-12-4 COY W&I Task Order No.2020-03 docx Page 4 of 7 CITY OF YAKIMA HLA ENGINEERING AND LAND SURVEYING, INC Signature Signature Printed Name 1' ix-r-I r) Printed Name• Michael T. Battle, PE Title !I'ffry)cuelAy3 Title. President Date. L-t, • /�/o,/z-0 -o Attest: 'T) .1-s4 1 s\> City Cle k ti-;.„• = * CITY CONTRACT NOO: ,'D,.,_`-U5'G7 RESOLUTION NO:'+--� dJ V I G\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\E.Mead Water Improvements\2020-12-4 COY W&I Task Order No.2020-03.docx Page 5 of 7 i EXHIBIT 1 — PROFESSIONAL SERVICES E. Mead Avenue Waterline Fire Flow Improvements, D-13, AC2537 (PROJECT1 Task Order No. 2020-03 HLA Project No. 20194E For the services described in Task Order No. 2020-03, compensation shall be paid per Section 5 of the Agreement (City Contract No 2018-048, Resolution No. R-2018-018) The following spreadsheet shows the estimated time and expenses to perform said services. Project Title: E. Mead Avenue Waterline Fire Flow Improvements Client' City of Yakima , Task Order No.2020-03 Date: December 1,2020 ENGINEERS HOURLY ESTIMATE Senior Licensed Project Licensed Two Man Contract Word Task Principal Principal Engineer Land Survey Adm in Processing Total Task Direct No. Project Task Engineer Engineer Surveyor - Crew Technician Hours Costs $222 $200 $150 $164 $226 $136 $87 - 1.0 Project Administration and Environmental Assistance 1 Assist Citywith financial management 1 2 4 0 0 10 0 17 $2,582 requirements of funding agency 2 Assist Citywith environmental process 1 2 4 0 0 9 0 16 $2,446 requirement for the PROJECT Labor Subtotal 2 4 8 0 0 19 0 33 $5,028 1.0 Protect Administration and Environmental Assistance Total $5,000 Senior Licensed Project Licensed Two Man CAD Word Task Principal Principal Engineer Land Survey Technician Processing Total Task Direct No Project Task Engineer- Engineer_ Surveyor Crew Technician Hours Costs $222 $200 $150 $164 $226 $136 $87 2.0 Design Engineering 1 Project Management 4 9 4 2 0 0 2 21 $3,790 2 Project Meetings(Kick-off,60%and 90%) 1 3 6 0 0 4 4 18 $2,614 3 Detailed topographic survey 0 4 6 4 8 12 0 34 $5,796 4 Field investigations 1 4 8 2 0 6 0 21 $3,366 5 Review public and private utilities 1 2 8 2 2 8 0 23 $3,690 6 Revew existing easements and right-of-way 0 0 4 6 0 8 0 18 $2,672 7 Preliminary Engineering Design(60%and 90%) 1 12 42 4 2 22 6 89 $13,544 8 In-house project review,quality control 2 4 4 0 0 2 4 16 $2,464 9 Review w/and incorporate Agency comments 2 4 12 0 0 12 3 33 $4,937 10 Final design,plans,and specifications 2 6 12 0 0 10 4 34 $5,152 11 Prepare Engineer's Estimate of construction cost 1 4 12 0 0 2 0 19 $3,094 12 Furnish copies of plans and specifications 0 2 2 0 0 0 4 8 $1,048 13 Submit Bid Advertisements to Publications 0 2 0 0 0 0 4 6 $748 Manage Advertisement,Contract Documents, 14 Planholders List,and Addenda 0 2 0 0 0 0 4 6 $748 15 Answer bidders questions 0 2 6 0 0 0 0 8 $1,300 16 Prepare and issue addenda 1 2 4 0 0 2 2 11 $1,668 17 Attend bid opening 0 2 2 0 0 0 0 4 $700 18 Review bids/Prepare tabulation of bids 1 2 2 0 0 0 6 11 $1,444 19 Make recommendation of contract award 0 1 2 0 0 0 2 5 $674 Labor Subtotal 17 67 136 20 12 88 45 385 $59,450 , EXPENSES: Expenses: Cost/Unit Ground Days Days _ Miles Units i Mileage $0.58 200 $120 Printing 12 copies plans/specs $35 12 $420 2.0 Design Engineering Total $59,990 Total Phase 1.0 and Phase 2.0 $64,990 1 G\Contracts&Task Orders\Yakima\2020\water&Irrigation Capital Improvements\E Mead Water Improvements\2020-12-4 COY W&I Task Order No.2020-03.docx Page 6of7 EXHIBIT 1 — PROFESSIONAL SERVICES (Continued) Project Title: E Mead Avenue Waterline Fire Flow Improvements Client: City of Yakima Task Order No.2020-03 Date. December 1,2020 ENGINEER'S HOURLY ESTIMATE Senior Licensed Project Lic Princ. Two Man Resident Contract Engineering Task Pnncipal Principal Engineer Land Survey Engineer/ Administrator Technician Total Task Direct No. Project Task Engineer Engineer Surveyor Crew Inspector Hours Costs $222 $200 $150 $164 $226 $122 $136 $87 3.0 Construction Engineering 1 Coordinate Contract Execution including 0 1 2 0 0 0 4 2 9 $1,218 renew of bond and insurance 2 Prepare and Issue Notice of Award 0 1 2 0 0 0 2 0 5 $772 3 Conduct Pre-Construction Meeting 0 4 6 0 0 2 2 0 14 $2,216 4 Prepare and Issue Notice to Proceed 0 1 1 0 0 0 2 2 6 $796 5 Field Survey Crew for HorizNert Control 0 1 2 6 12 1 0 0 22 $4,318 6 Construction Observation(25d) 2 6 18 0 0 225 2 2 255 $32,240 I 7 Field Inspection Reports 0 1 2 0 0 8 4 2 17 $2,194 8 Construction Administration 2 2 4 0 0 0 4 4 16 $2,336 9 WeeklyConstruction Meetings 1 6 10 0 0 0 2 2 21 $3,368 10 Materials Submittal Review 0 2 5 0 0 2 0 4 13 $1 742 11 State Labor Standards Compliance 0 0 1 0 0 2 2 4 9 $1,014 12 Progress Pay Estimates 0 2 2 0 0 2 4 4 14 $1.836 13 Review Materials Testing Results for 0 0 2 0 0 2 1 2 7 $854 Compliance 14 Prepare and Subm it Change Orders 0 1 2 0 0 2 2 2 9 $1 190 ' 15 Final Walk-ThroughiPunchlist 0 2 2 0 0 2 2 0 8 $1,216 16 Project Closeout 1 1 2 0 0 2 2 2 10 $1.412 17 Record Drawings 0 1 1 0 0 2 2 2 8 $1,040 Labor Subtotal 6 32 64 6 12 252 37 34 443 $59,762 EXPENSES: , Travel. Cost/Unit Ground Days Days Miles Mleage $0580 500 $290 ' Meals/Lodging Misc Expenses:(None) Advertisement , Telephone Postage , Sub-Consultants: None Anticipated $000 $0.00 Multiplier 1.1 11 $0.00 Subtotal-Labor $59,762 Subtotal-Expenses $290 3.0 Construction Engineering Total $60,000 G'\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\E.Mead Water Improvements\2020-12-4 COY W&I Task Order No.2020-03 docx Page 7 of 7 Task Order Supplemental Agreement Supplemental Agreement Organization and Address: Number: 1 HLA Engineering and Land Surveying, Inc. 2803 River Road Yakima, WA 98902 Original Task Order Number: Execution Date of Supplement: 2020-03 October , 2021 City Water/Irrigation Project Number: Completion Date of Supplement: AC2537, D-13 June 30, 2022 Project Title: Original Amount Payable: E. Mead Avenue Waterline Fire Flow $124,990 Improvements, D-13, AC2537 HLA Project No. 20194 Revised Amount Payable this Supplement: $134,990 (Increase of$10,000) Supplemental Agreement No. 1 The City of Yakima (CITY), Washington desires to supplement Task Order No. 2020-03 entered into with HLA Engineering and Land Surveying, Inc. on September 16, 2020, by Resolution No. 2020-099 and identified as Contract 2018-048 TO 2020-03; as executed December 14, 2020. All provisions in the original task order remain in effect except as expressly modified by this supplement. The Contractor has been granted three (3) additional working days to complete this project and the N. 41st Avenue & N. 42nd Avenue Waterline Fire Flow Improvements, D-1, beyond the original contract completion date to address unknown utility conflicts encountered during installation of the new waterline. The Contractor has also submitted a request for consideration to add contract time due to unavailability of additional union workers because of the pandemic and employees being unable to work because of testing positive for COVID-19. Including this request and previously granted three additional working days, the Contractor will have exceeded their original contract time for both projects by 12.5 working days to substantial completion, based on working a 4-10 schedule. The requested additional 9.5 working days beyond the three previously granted days have not been approved by the CITY. The CITY may seek damages for the additional overage or reimbursement of direct additional engineering expenses. Construction Engineering services are needed to continue observation and administration of the Contractor's additional contract days. Substantial completion has been granted, but additional Construction Engineering services are also needed to complete construction contract closeout and related tasks, including participation in punch list walkthrough, preparation of additional progress payment requests, verification of punch list item completion, final contract voucher, notice of completion, and preparation of record drawings. Scope of Services The additional tasks to be performed as part of this Supplemental Agreement include Construction Engineering services associated with 12.5 additional contract days required by the Contractor to achieve substantial completion and Construction Engineering services needed to complete contract closeout and related tasks. G:\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\E Mead Water Improvements\2021-10-08 Supplement No 1-Task Order No. 2020-03 docx Compensation Payment for this supplemental work, as shown on Exhibit B is not to exceed $10,000, bringing the total amount of the Agreement to $134,990 (Original Task Order Amount of$124,990, plus Supplement No. 1 Amount of$10,000). If you concur with this supplement and agree to the changes as stated above, please sign below and return to this office for final action. By: ,'i cg e.- G> BY: kpbC--r-f- _- \,, Consultant(Signatur City Manager Signature D -a-cat Date CITY CONTRACT f RESOLUTION NO: Ijad(—o(GJ G:\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\E Mead Water Improvements\2021-10-08 Supplement No 1-Task Order No 2020-03 docx EXHIBIT A Scope of Services Additional work required to complete the E. Mead Avenue Waterline Fire Flow Improvements, D-13,AC2537, project includes: • Construction Engineering services associated with 12.5 additional contract days required by the Contractor to achieve substantial completion and Construction Engineering services needed to complete contract closeout and related tasks. G:\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\E Mead Water Improvements\2021-10-08 Supplement No.1-Task Order No 2020-03 docx EXHIBIT B Project Title E Mead Avenue Waterline Fire Flow Improvements Client' City of Yakima Task Order No 2020-03,Supplement No 1 Date: October 6,2021 ENGINEER'S HOURLY ESTIMATE Senior Licensed Project Lic Princ Two Man Resident Contract Engineering Task Principal Principal Engineer Land Survey Engineer/ Administrator Technician Total Task Direct No Project Task Engineer Engineer Surveyor Crew Inspector Hours Costs $222 $200 $150 $164 $226 $119 $132 $84 3.0 Construction Engineering 1 Construction Observation(6 25d/50hr) 0 0 0 0 0 50 0 0 50 $5,950 2 Field Inspection Reports 0 1 1 0 0 2 1 0 5 $720 3 Construction Adm inistration 1 1 1 0 0 0 4 1 8 $1,184 4 Weekly Construction Meetings 0 2 2 0 0 0 0 5 $832 1 5 State Labor Standards Compliance 0 1 0 0 0 0 2 2 5 $632 6 Progress Pay Estimates 0 1 0 0 0 0 2 1 4 $548 7 Prepare and SubmitChange Orders 0 0 0 0 0 0 1 0 1 $132 Labor Subtotal 1 6 4 0 0 52 11 4 78 $9,998 EXPENSES: Travel Cost/Unit Ground Days Days Miles Mileage $0 580 70 $41 Subtotal-Labor $9,998 Subtotal-Expenses $41 3.0 Construction Engineering Total $10,040 G.\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\E Mead Water Improvements\2021-10-08 Supplement No 1-Task Order No 2020-03 docx Task Order Supplemental Agreement Supplemental Agreement Organization and Address: Number: 2 HLA Engineering and Land Surveying, Inc. 2803 River Road Yakima, WA 98902 Original Task Order Number: Execution Date of Supplement: 2020-02 October , 2021 City Water/Irrigation Project Number: Completion Date of Supplement: AC2504, D-1 June 30, 2022 Project Title: Original Amount Payable: N. 41st Avenue & N. 42nd Avenue Waterline $177,680 Fire Flow Improvements, D-1, AC2504 HLA Project No. 20148 Revised Amount Payable Supplement No. 1: $115,680 (Deduction of$62,000) Revised Amount Payable this Supplement: $125,680 (Increase of$10,000) Supplemental Agreement No. 2 The City of Yakima (CITY), Washington desires to supplement Task Order No. 2020-02 entered into with HLA Engineering and Land Surveying, Inc. on September 16, 2020, by Resolution No. 2020-099 and identified as Contract 2018-048 TO 2020-02; and Supplemental Agreement No. 1 executed December 1, 2020. All provisions in the original task order remain in effect except as expressly modified by this supplement. The Contractor has been granted three (3) additional working days to complete this project and the E. Mead Avenue Waterline Fire Flow Improvements, D-13, beyond the original contract completion date to address unknown utility conflicts encountered during installation of the new waterline. The Contractor has also submitted a request for consideration to add contract time due to unavailability of additional union workers because of the pandemic and employees being unable to work because of testing positive for COVID-19. Including this request and previously granted three additional working days, the Contractor will have exceeded their original contract time for both projects by 12.5 working days to substantial completion, based on working a 4-10 schedule. The requested additional 9.5 working days beyond the three previously granted days have not been approved by the CITY. The CITY may seek damages for the additional overage or reimbursement of direct additional engineering expenses. Construction Engineering services are needed to continue observation and administration of the Contractor's additional contract days. Substantial completion has been granted, but additional Construction Engineering services are also needed to complete construction contract closeout and related tasks, including participation in punch list walkthrough, preparation of additional progress payment requests, verification of punch list item completion, final contract voucher, notice of completion, and preparation of record drawings. Scope of Services The additional tasks to be performed as part of this Supplemental Agreement include Construction Engineering services associated with 12.5 additional contract days required by the Contractor to achieve substantial completion and Construction Engineering services needed to complete contract closeout and related tasks. G:\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\41 st and 42nd Water Improvements\2021-10-08 Supplement No.2-Task Order No 2020-02 docx Compensation Payment for this supplemental work, as shown on Exhibit B is not to exceed $10,000, bringing the total amount of the Agreement to $125,680 (Original Task Order Amount of $177,680, deducted Supplement No. 1 Amount of$62,000, plus Supplement No. 2 Amount of$10,000). If you concur with this supplement and agree to the changes as stated above, please sign below and return to this office for final action. By: Mt Gu ELT 5A-rrLz: P: By: Rob -rf F-1 rri r- Consultant ignature City Manager Signature Date CITY CONTRACT NO' .1)I v 0L1 -'0 Ij"'-da—F.VPP4t.3- RESOLUTION NO: _20.,17)1760 G.\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\41 st and 42nd Water Improvements\2021-10-08 Supplement No 2-Task Order No.2020-02 docx EXHIBIT A Scope of Services Additional work required to complete the N.415t Avenue&N.42nd Avenue Waterline Fire Flow Improvements project includes: • Construction Engineering services associated with 12.5 additional contract days required by the Contractor to achieve substantial completion and Construction Engineering services needed to complete contract closeout and related tasks. G.\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\41 st and 42nd Water Improvements\2021-10-08 Supplement No 2-Task Order No 2020-02 docx EXHIBIT B Project Title. N.41st Ave.&N 42nd Ave Watermain Improvements Client. City of Yakima Task Order No.2020-02,Supplement No.2 Date October 6,2021 ENGINEERS HOURLY ESTIMATE Senior Licensed Project Lic Princ Two Man Resident Contract Engineering Task project Task Principal Principal Engineer Land Survey Engineer/ Administrator Technician Total Task Direct No Engineer Engineer Surveyor Crew Inspector Hours Costs $222 $200 $150 $164 $226 $119 $132 $84 3.0 Construction Engineering 1 Construction Observation(6 25d/50hr) 0 0 0 0 0 50 0 0 50 $5,950 2 Field Inspection Reports 0 1 1 0 0 2 1 0 5 $720 3 Construction Administration 1 1 1 0 0 0 4 1 8 $1,184 4 WeeklyConstruction Meetings 0 2 2 0 0 0 1 0 5 $832 5 State Labor Standards Compliance 0 1 0 0 0 0 2 2 5 $632 6 Progress Pay Estimates 0 1 0 0 0 0 2 1 4 $548 7 Prepare and Submit Change Orders 0 0 0 0 0 0 1 0 1 $132 Labor Subtotal 1 6 4 0 0 52 11 4 78 $9,998 EXPENSES: Travel Cost/Unit Ground Days Days Miles Mileage $0 580 70 $41 Subtotal-Labor $9,998 Subtotal-Expenses $41 3.0 Construction Engineering Total $10,040 G\Contracts&Task Orders\Yakima\2020\Water&Irrigation Capital Improvements\41 st and 42nd Water Improvements\2021-10-08 Supplement No 2-Task Order No.2020-02.docx