HomeMy WebLinkAboutR-2011-095 Six-Year TIP for 2012 to 2017; Amendment to Capital Facilities Element of YUACP FUNDING RESOLUTIONRESOLUTION NO. R-2011-95
A RESOLUTION to amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to incorporate the Six-year Transportation Improvement Program
(TIP) for the period of 2012 through 2017.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six — Year
Transportation Improvement Program for the construction of streets and arterial streets in the
City of Yakima for the ensuing six year period, all as contemplated and required by State RCW
35.77.010 and applicable Federal law; and
WHEREAS, the City of Yakima desires to amend the Yakima Urban Area
Comprehensive Plan Capital Facilities Element to reflect the adoption of the Six-year TIP, as
contemplated and required by RCW 36.70A.070(6) to ensure compliance with the Growth
Management Act and consistency of the Comprehensive Plan and the Six-year TIP; and,
WHEREAS, this amendment is limited to incorporation of' the projects listed in the Six-
year Transportation Improvement Plan for the period of 2012 to 2017 to the Capital Facilities
Element of the Yakima Urban Area Comprehensive Plan, which is contemplated and provided
under RCW 36.70A.130(2B) and RCW 35.77.010; and,
WHEREAS, public hearings were held by the Yakima City Council on the Six-year TIP
on June 7, 2011 and June 21, 2011, with proper public notice as required by RCW 35.77.010;
now, therefore
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The adopted Six -Year Transportation Improvement Program for the period of 2012
through 2017 for the City of Yakima shall be incorporated as an amendment to the Capital
facilities Element of the Yakima Urban Area Comprehensive Plan.
ADOPTED BY THE CITY COUNCIL this 21st day of June, 2011.
'42Cde Micah Cawle Mayor
ATTEST:
4
Washington State Department of Transportation
-Aggeenncy: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPOIRTPO: YVCOG
Six Year Transportation Improvement Program
From 2012 to 2017
Adoption Date:
Resolution No.:
Hearing Date:
Amend Date:
Ts
U
t''
Priority I
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road.,,.°'Start
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
m
a
Phase
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(mwyr
Federal
Fund
Code
Federal
Cost byFund
Phas
1st
2nd
3rd
4th
sin
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17 .
18
19
20
21
• 14
1CN
Yakima Railroad Grade Separations- Phase 3
Martin Luther King, Jr. Blvd
from: N. 1st Sreet to: N. 1st Ave
Construct Grade Separation and adjacent roadway reconstruction including
Front Street
01
06
07
08
-
P.2
T
P
O
CN
4/1/2012
4/1/2012
STP(U)
DEMO
798
2582
FMSIB
AIP
• 3500
6000
2200
6498
8582
3000
3000
3498
5582
EA
Yes
9/1/2009
Totals 3,380 9500 2200 15080 6000 ' 9080
00
2
•,
Transit Operating Expenditures
Various fixed fates and locations
from: N/A to: N/A
Annual operating assistance from the FTA in support of our transit system;
fixed conte, paratransit Dial -A -Ride and vanpool program • •
12
22
23 '
24
31
S
-
N/A
ALL
1/1/2012
5307
19001 .
1900
38001 3800
-
CE
No
-
Totals 1,900 1900 3800 3800
16
3
64thAve. Roadway Widening.
•
from: Nob Hill Blvd to: Tieton Drive.
Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage.
04
06
03
S
.
0.5
W
G
T
T
RW
CN
1/1/2012.
3/1/2013 '
STP(U)
STP(U)
86
749
14
176
' 100
925
100
925
EA -
YES
4/1/2011
Totals ' 835 190 1025 100 925
00
4'
Powerhouse/William 0 Douglas Trail Connector
from: Powerhouse/Williow St. to: 6th Ave/I Street
Paved pathway -
32
S
1.5
G
P
T
C
O
CN
1/1/2012
250
1
2501
250
CE
No
Totals. • 250 250 . . 250
Report Date: May 26, 2011
Page 1
v. 5.7 - Supersedes previous editions
A
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2012 to 2017
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.e,
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
ImprovementI.
• Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
m
t
a
u
a2
a`
Phase
Start
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
RlV11
Required
Date '
(Mnyyy)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
6th Thru
Envir.
Type
1
2
3
4
5
6
7
8
9
10
11
12
13 '
14
15
16
17
18
19
20
21
00
5
Street Asset Amenities (Transit)
Route Maintenance, Repair and Improvements
from: N/A ' to: N/A
On going improvements to bus benches, shelters and signage infrastructure
22
31
S
N/A
ALL
1/1/2012
5309(Bus)
309
77
386
386
CE
-
No
Totals • 309 77 386 386
14
6
E Nob Hill Blvd &Fair Ave
E Nob Hill Blvd
from: E Nob Hill Blvd to: Fair Ave
Intersection widening & new signal, curb, gutter and sidewalk, street lighting,
stormwater
•
31
03
04
P
N/A
0
C
P
T
W
RW
CN
1/1/2013
4/1/2014
STP(U)
STP(U)
-
173
865
27
135
200
1000
200
1000
-
CE
Yes
4/1/2001
Totals 1,038 162 1200 1200
00
7
Terrace Heights Service -
New University & Retail Links
from: N/A to: N/A
Extension of fixed route bus service only into the Terrace Heights area of
Yakima County
22
S
N/A
ALL
1/1/2012
5316
190
1901 380
380
1
No
Totals 190 190 380 380
8
Nob Hill Blvd •
from: 49th Avenue to: 64th Avenue
Widen, curb, gutter, sidewalk, lighting, drainage, gnnd and overlay hill width
05
06
07
12
13 •
P
0.97
C
P
T
G
O
CN
4/1/20121 1
AIP
2700
4211 31211 3121
1
CE
No
Totals 2700 421 3121 3121
Report Date: MIII011
Page 2
v. 5.7 - Supersedes pre editions
enWashington State Department of Transportation
-Aggency: Yakima
Co. No.: 39 Co, Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2012 to 2017
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.e,
C. Project Title '
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
N
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local'Agency) .
Federally Funded
Projects Only
m
ii
e'
a
Phase
Start
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Emir. •
Type
RNV
Required
Date
(M�
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
9
Acquisition of new Dial -A -Ride paratransit vehicles
from: N/A to: N/A
Purchase new vehicles to replace older, less reliable units
21
S
N/A
-
ALL
1/15/2013
OTHER
144
36
180
180
' CE
.
No
Totals 144 36 180 180
14
10
E. Lincoln & 10th Street Roundabout
from: E. Lincoln • to: E. MLK Jr. Blvd. •
Roundabout construction at intersection curb, gutter, sidewalk, 8 street
lighting
03
05
06
P
• N/A
PE
RW
CN
1/1/2012
1/1/2012
6/1/2012
STP(U)
STP(U)
STP(U)
173
433
1125
27
67
175
200
500
1300
-
200
500
1300
CE
Yes
6/1/2011
Totals 1,731 27 242 2000 200 1800
12
11
S.R.12 & 16th'Avenue Interchange
Interchange from: 16th Avenue to: S.R. 12
Upgrade Interchange by constructing a Roundabout
03
06
P
N/A
O
ALL
1/1/2012
STP(U)
865.
135
1000
1000
•
CE
'No
Totals 865 135 1000 1000
11
12
1-82 & Lincoln Avenue Interchange
1-82 Interchange
from: E. "G" Street - to: 1-82 .
Reconstruct / extend off -ramp from existing 1-82 off -ramp for Lincoln Avenue
to E. 'G' Street -
01
P
N/A
O
P
G
ALL
1/1/2012
STP(U)
865
135
10001 1
1000 I
EA .
1 Yes
6/2011
Totals • 865 135 1000 1000
Report Date: May 26, 2011
Page 3
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2012. to 2017
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
f Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Afd No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Typels)
y
Total Length I
o
c
U
3"
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
d
m
L
a
°
it'
a.
Phase
Start
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
.Total
Funds
_
Envir.
-i-e
yp
RIVV
Required
Date
(MM/Yl�
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
13
E. Yakima Avenue"& Fair Avenue Signalization "
from: E. Yakima Avenue - to: Fair Avenue
Construct Traffic Signal
12
P
N/A
P
W
T
S
ALL
1/1/2013
STP(U)
865
135
1000
1000
CE
No
Totals 865 135 1000 1000
00
14
Fixed route Bus Services to Moxee along SR 24 Corridor
SR 24 Hwy Corridor/Park & Ride Lots
from: to:
JARC funded demonstration project to determine ridership potential to and
from the Moxee area including stops at two Park & Rlde lots along SR 24.
22
$
ALL
-
1/2/2012
5316
130
-
1301 2601 260
"
1-
CE
No
Totals 130 130 260 260
16
15
S 3rd Ave & W Washington Ave Signal
S 3rd Ave '
from: S 3rd Ave to: W Washington Ave
Signal Upgrades
12
P
N/A
P
T
PE
CN
4/1/2012
6/1/2012
13
214
13
214
13
214
CE
No
Totals 227 227 227
14
16
4579
S 1st St. - E. Washington Ave. Intersection Improvement
S1st St.
from: S 1st St. to: E Washington Ave. "
Realign intersection, upgrade traffic signal
12
P
N/A
P
W
S
T
PE
6/1/20121 STP(U)
252
38
2901 290
EA
Yes
01/01/11
Totals 252 38 290 290
Report Date: M
11
•Pae4
v. 5.7 - Supersedes preeditions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: .1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2012 to 2017
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B.. Bridge No.
C. Project Title
1
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done '
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
0 Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNV
Required
Date
(MM/yy)
Federal
Fund
Code
Federal
Cost b y
Phase
1st
2nd
3rd
4th
-Th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17 .
18
19
20
21
17
17
. _ 4587
S 48th Ave. Reconstruction
S 48th Avenue
from: Surnmitview Ave. to: Nob Hill Blvd.
Widen, curb, gutter, sidewalk, lighting, drainage
03
P
too
P
TYes
W
S
O
ALL
4/1/2013
STP
2268
307
' 2575
525
2050
EA
4/1/2014
Totals 2,268 307 2575 525 2050
14
18
South 72nd Ave & Mead Ave Intersection
South 72nd Ave
from: South 72nd Ave to: Mead Ave
New intersection, signals, curb, gutter and sidewalk
03
12
P
N/A
O
P
' S
T
W
PE
CN
' 1/1/2013
6/1/2013
STP(U)
STP(U)
• 51
383
8
61
59
444
59
444
CE
• Yes
6/10/2010
Totals 434 69 • 503 503
16
19
- 4562ALL
Tieton Dr- S 5th Ave. Intersection Project
Tieton Drive
from: 5th Ave. Intersection to:
Replace traffic signal with roundabout
12
P
N/A
w
T
O
S
4/4/2013
STP(U)
378
WSDOT
378
756
I
756
'CE
Yes .
4/1/2014
Totals 378, 378 756 756
•
16
20
E. 'H" St. Extension .,
E. "H" St.. ,
from: 1st St. to: Yakima River .
Construct road including water, sewer, curb, gutter and sidewalk for future
development.
01
08
P
1.1
0
8
T.
W
PE
RW
CN
1/1/2012
1/1/2014
6/1/2014
STP(U)
STP(U)
STP(U)
303
303
1730
47
47
270
350
350
' 2000
350
350
2000
CE
Yes
1/1/2014
Totals 2,336 • 364 2700 350 350 2000
Report Dater May 26, 2011
Page 5
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
.City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2012 to 2017
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
Report Date: M 01
°Pa e
g 6
v. 5.7 -Supersedes pre editions
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No. '
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
m
> a
2 ,,
al-
E
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Federally Funded
Projects Only
Project Phase
o)
S m
Fund Source Information
Expenditure Schedule
Federal Funding
(Local Agency)
Envir.
Type(MMM)
RNV
Required
Date
Federal -
Fund
Code
Federal
Cost byFund
Phase
State
. Code
.
State
Funds
Local
Funds
Total
Funds
1st
2nd
3rd."
4th
Thru
6th '
2
3 _
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
' 21
17
21
N. 10th St. Extension
N. 10th St.
from: R St. to: 10th Street - Lincoln Ave.
Construct road including water, sewer, curb, gutter, sidewalk for future
development.
01
06
P
1.3
O
P
S
T
W
PE
RW
CN
1/1/2013
1/1/2014
6/1/2014
STP(U)
STP(U)
STP(U)
700
5500
7900
108
850
972
808
6350
8872
808
6350
8872
CE
Yes
1/1/2013
Totals
14,100
1930
16030
808
15222
•
00
22
West Valley Transit Center
Acquire Property to Expand Operations
from: N/A to: N/A
Locate and acquire property for the placement of a West Side Transit
Center Operation - -
23
P
N/A
PE
1/1/2012
5309(NS)
1 1600
400
-
20001
1 2000
1
CE
No
Totals
1,600
400
2000
2000
17
23
Yakima Downtown Future Initiatives, Phase 5
from: 1st Street to: 9th Street
Install Historic Lighting, Sidewalk Modification & Other Improvements.
Exact improvement area(s) to be determined.
06
12
P
.60
P
W
S
T
PE
CN
1/1/2013
4/1/2014
OTHER
OTHER
500
5500
500
5500
500
5500
CE
No
Totals 6000 6000 500 5500
00
•
" 24
Annual Signal Upgrades
Local Selection
from: N/A to: N/A
Upgrade signals
01
P
N/A
PE
CN
CN
1/1/2012
4/1/2013
4/1/2013
STIP (S)
STP(S)
STIP (S)
60
180
360
AIP
240
60
_
120
420
360
120
420
360
CE
No
Totals 600 240 60 900 120 780
Report Date: M 01
°Pa e
g 6
v. 5.7 -Supersedes pre editions
Washington State Department of Transportation
Aggeenncy: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2012 to 2017
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
72
s
m
c.)
Priority
Number I
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
3
en
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule .
(Local Agency)
Federally Funded
Projects Only
m
-c
i.
.o
0-
Phase
Start
Fund Source Information
Federal Funding
State
Fund
Code
State'
Funds
Local.
Funds
Total
Funds
Envir.
Type
RNV
Required
Date
(nq>yyy)
Federal
-- Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
19
25
Longfiber Rd & Washington Ave
Intersection
from: to:
New intersection construction and reconstruction, 3 -lane and 5 -lane w/tum,
curb, gutter, sidewalks.
03
05
06
P
N/A
P
5
W
T
0
PE
CN
1/1/2012
3!1/2013
STP(U)
STP(U)
100
700
14
95
114
795
114
'
795 r
CE
Yes
311/2012
Totals 800 109 909 114 795
14.
26
E Nob Hill Blvd & S 18th St
E Nob Hill Blvd
from: -S 18th St - - to: E Nob Hill Blvd
Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT
Project) possible curb, gutter and sidewalk-
• '
04
01
P
.1
C
S
W
T
CN
4/1/2013
STP(U) 2401
J
42
2821
282
II
I
I
CE
Yes
01/01/07
Totals 240 42 282 282
17
27
Zier Rd - S 75th Ave to S 72nd Ave
Zier Rd
from: S 75th Ave to: S 72nd Ave
Minor widening, curb, gutter and sidewalk
05
06
P
.15 '
C
S
T
P
PE
CN
1/1/2012
6/1/2012
STP(E)
STP(E)
22
75
7
20
29 29
951 95
CE
Yes
6/1/2011
Totals 97 27 124 124
16
28
Powerhouse Rd & Englewood Ave
Powerhouse Rd
from: Powerhouse Rd to: Englewood Ave
Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal,
possible roundabout •
12
P
N/A
T
P
0
S
W
CN
10/1/2013
STP(S)
504
74
5781
578
.•
CE
Yes
10/1/2013
Totals 504 74 578 578
Report Date: May 26, 2011
Page 7
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2012 to 2017
Hearing Date:
Amend. Date:
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Schedule
(Local Agency)
Federally Funded
' Projects Only
Project Phase
Phase
Start
Fund Source Information
Expenditure
Federal Funding
State
Code'
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RAN
Required
Date
(MM'YY)
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd.
4th
Thru
6th
2
3
4
5
6
7
8
9
10
11
12
13
14
15
.16
17
18
19
20
21
14
29
S 48th Ave & SummitviewAve Signalization
S 48th Ave
irom: S 48th Ave . to: Summitview Ave
(Signalization
12
P
N/A
P
T
PE
RW
CN
1/1/2013
6/1/2013
8/1/2014
STP(S)
STP(S)
STP(S)
25
25
554
4
.4
81
29
29
635
29
29
635
CE
Yes
8/1/2013
Totals 604 89 693 58 635 .
14
30
W Lincoln Ave & 'B' St Realignment
W Lincoln Ave
from: W 5th Ave to: Custer St
Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights
01
12
P
.5
W
T
P
G
C
PE
RW
CN
1/1/2013
1/1/2014
1/1/2015
STP(E)
STP(E)
STP(E)
424
1047
1801
67
163
281
491
1210
2082
491
1210
2082
CE
Yes
1/1/2014
Totals' 3,272 511' 3783 491 1210 2082
16
31
School Safety Projects
Various Locations - Citywide
from: to:
Crossing flashers, sidewalks, signing, other features
12
P
N/A
W
1 1 1
-
CE
No
Totals
14
32
E Nob Hill Blvd. Reconstruction
E Nob Hit Blvd.
from:,S 6th Street to: S 18th Street •
Major roadway widening and reconstruction to 5 lanes with intersection
improvements, curb, gutter, sidewalks, replacement or relocation of meters
an hydrants
03
04
06
P
.85
C
G
P•
S
T
PE
RW
CN
111/2013.
1/1/2014
1/1/2015
STP(C)
STP(C)
STP(C)
546
1090
6539
• 84
170
1013
630
1260
7552.
630
1260
7552
EA
Yes
1 /1/2014
W
Totals 8,175 1267 9442 630 1260 7552
Report Date: Ma , 011
•
Page 8
v. 5.7 - Supersedes pr11111
e editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2012 to 2017
Adoption Date:
Resolution No.:
Hearing Date:
Amend Date:
FuncltiorClassial I
Priority
Number
Project Identification
A: PIN/Federal Ald No. B. Bridge No. -
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
• Type(s)
yq
...9U1
rn
Total Length
Utility Codes
Project Costs In Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/�>7
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
6th
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
PE
1/1/2013
STP(C)
91
14
105
' 105
17
33
01
P
N/A
W
RW
1/1/2014
STP(C)
91
14
105
105
CE
S 72nd Avenue & W Washington Avenue
12 '
S
CN
1/1/2015
STP(C)
544
86
630
630
Yes
S 72nd Ave . •
from: S 72nd Ave to: W Washington Ave
06
P
Intersection Improvement, possible roundabout
1/1/2015
Totals 726 114 840 105 105 630
PE
1/1/2013
STP(E)
23
5
28
28
17
34
04
P
.76
W
CN
7/1/2014
STP(E)
1096
164
1260
1260
S 66th Avenue
03
T
Yes
S 66th Ave
S
from: Scenic Drive to: Summitview :-
P
Widen roadway, curb, gutter, sidewalk and utilities
7/1/2013
Totals 1,119 169 1288 28 1260
PE
1/1/2014
STP(U)
126
17
143
143
14
35
12
P
N/A
W
RW
1/1/2014
' STP
63
8
71
71
CE
40th Avenue and Summitview Signal Upgrade
S
CN
6/6/2014
STP(U)
544
.
86
630
630
Yes'
40th Avenue
from: 40th Avenue to: Summitview
T
P
Signal upgrade, radius improvements, tum lane extension
6/1/2014
Totals 733 111 844 844
PE
1/1/2014
STP
95
13
' 108
108
14
36
12
P
N/A
W
RW
1/1/2015
STP
63
8
71
71
CE
40th Avenue and Englewood .
T
CN
1/1/2015
STP .
145
20
165
165
Yes
40th Avenue
from: 40th Avenue' to: Englewood
P
Replace traffic signal poles, upgrade controller
1/1 /2015
Totals ' 303 41 344 179 165
Report Date: May 26, 2011
Page.9
v. 5.7 - Supersedes previous editions
Ott.
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2012 to 2017
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
I
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road '
.F. Describe Work to be Done
Improvement
Type(s)
`"
n
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Federally Funded
Project Phase
73m
m
Fund Source Information
Expenditure Schedule
Projects Only
Federal Funding
(Local Agency)
RNV
Federal
Fund
Code
Federal
Cost by
Phase
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
1st
2nd
3rd
4th
6th
Envir.
Type
Required
Date
(M y)
2
3 •
4
5
6
7
8
9
10
11
12
13
14
15 '
16
17
18
19
20
21
00
37
16th Avenue and Fruitvale Blvd
16th Avenue
from: 16th Avenue to: Fruitvale Blvd
flteplace traffic signal poles, radius improvements, ADA ramps
12
P
N/A
W
S
P
PE
RW
CN
1/1/2013
6/1/2013
1/1/2014
STP -
STP
STP
126
63
315
18
8
43
144
= 71
358
144
71
358
CE
Yes
1/1/2013
Totals
504
69
573
215
358
14
38
1st Street and ! Street
1st Street
from: 1st Street to: I Street
Replace and upgrade traffic signal equipment
12
P
N/A
W
T
S
P
PE
CN
1/1/2012
1/1/2013
STP
STP
32
126
5
17
37
143
37
143
CE
No
Totals
158
22
180
37
143
-
16
39
Washington Ave. Railroad Grade Separation
Washington Ave.
from: Longfibre Road to: .
Railroad grade overpass including all utilities
01
P
.25
O
P
S
T
W
PE
RW
CN
6/1/2015
1/1/2016
1/1/2017
STP(U)
STP(U)
STP(U)
820
3150
6552
189
630
1008
1009
3780
7560
1009
3780
7560
CE
Yes
1/1/2017
Totals 10,522 1827 12349 12349
16
40
Frontage Road & "H" St. Loop
N. 8th St.
from: "Fr St. • to: I-82
Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for
future development and Terrace Heights connection. -
01
P
1.3
C
G
O
P
T
W
PE
RW
CN
1/1/2012
6/1/2013
1/1/2015
STP(U)
STP(U)
STP(U)
• 272
349
2352
43
55
340
:315
404
2692
315
404
2692
CE
Yes
1/1/2015
Totals 2,973 438 3411 315 404 2692
Report Date: M
11
*age 10
v. 5.7 - Supersedes pre editions
41111
71 Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2012 to 2017
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification .
A. PIN/Federal Aid No. • B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending_MP or Road
F. Describe Work to be Done
Improvement
Type(s)
E
N
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule ,
(Local Agency)
Federally Funded
Projects Only .
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M>7
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
41
.16th Ave. Corridor
16th Ave.
from: SR -12 to: gyapington Ave.Natley Mall
Widen roadway, curb, gutter, sidewalk, lighting.
04
p
3 5
-
C
G
O
P
S'
T
W
PE
1/1/2014
STP(U)
120
17
137
137
CE
Totals
120
17
137
137
14
42
40th Ave. Corridor
40th Ave.
from: SR -12 to: Washington Ave.
Widen roadway, curb, gutter, sidewalks, lighting.
04
P
3.2
C PE
- 0
G
P
S
W
T
1/1/2014
STP(U)
120
17
. 1371
137
1
CE
Totals
• 120
17
137 _
137
14
43
Nob Hill Corridor
Nob Hill
from: 1-82 to: S. 16th Ave.
Widen roadway, sidewalk, curb, gutter, lighting
03
04
P
2.7
C
G
O
P
S
T
W
PE
1/1/2013
STP(U)
120
17
1371
137
CE
Totals`.
120
17
137 ' 137
14
44
S. 1st St/Main St. Comdor
S. 1st St./Main St. •
from: Nob Hill Blvd. to: Barker Mill Bridge
Joint project with Union Gap to widen roadway, curb, gutter, sidewalk,
lighting.
04
P
2.0
C
G
0
P
S
T
W
PE
1/1/2014
STP(U)
120
1
17
1371
137
CE
Totals
120
17
137
137
Report Date: May 26, 2011
Page 11
v. 5.7 - Supersedes previous editions
ncWashington State Department of Transportation
-Ageen
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPOIRTPO: YVCOG
Six Year Transportation Improvement Program
From 2012 to 2017
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
Report Date: Mai 011
41111
Page 12
v. 5.7 - Supersedes prey s editions
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Federally Funded
Project Phase
,13
m d
Fund Source Information .
Expenditure Schedule
Projects Only
Federal Funding
(Local Agency)•
R/W
Federal
Fund •
Code
Federal
Cost by
Phase
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
1st
2nd
3rd
4th
6th Thru
Envir.
Type
Required
Date
(MM/1 Y)
2
3 -
4 '
5
6
7
8
9
10
11
12
13 •.
14:
15
16
17
18
19
20
21
17
45
•
Reconstruction Rudkin Rd
Rudkin Rd
from: E Viola Ave to: Rainier Place
Reconstruct, excavate ballast, top course, curb, gutter, sidewalk .
Partner with City of Union Gap, additional sewer force main
03
06
P
.76
W
T
P
S
PE
CN
1/1/2013
1/1/2014
STP(C)
STP(C)
109
945
TPP
945
27
106
136
1996.
136
1996
CE
No
Totals
1,054
945
133
2132
136
1996
16
46
E Mead Ave Reconstruction
E Mead Ave
from: Rudkin Rd to: Fair Ave
Partner with City of Union Gap, reconstruct, excavate ballast, top course,
curb, gutter, storm, acp
' 03
06
P
.76
C
G
O
P
S
T
PE
CN
9/1/2013
4/1/2014
STP
122
1730
TPP
206
70
2006
152
2006
CE
.
No
Totals
1,852
229
. 77
2158
.152
2006
17
• 47
S 80th Ave - Tieton Dr to Zier Rd
S 80th Ave .
from: Tieton Dr to: Zier Rd
Major widening, curb, gutter, sidewalk
04
P
1.3
O
C
P
T
S
PE
RW
CN
1/1/2013
1/1/2014
4/1/2015
AIP
AIP
AIP
131
382
1667
20
59
•260
151
441
1927
151
441
1927
EA
Yes
4/1/2015
Totals 2180 339 2519 151 441 1927
17
48
Englewood Ave - N 40th Ave to N 56th Ave
Englewood Ave
from: N 40th Ave to: N 56th Ave
Widen roadway, curb. gutter, sidewalk
05
06
P
-
1.0
W
S
T
P
O
C
PE
RW
CN
1/1/2015
6/1/2015
1/1/2016
STP(C)
STP(C)
STP(C)
272
349
2352
43
55
340
315
404
2692
315
404
2692
EA
Yes
1/1/2013
Totals 2,973 438 3411 3411
Report Date: Mai 011
41111
Page 12
v. 5.7 - Supersedes prey s editions
Washington State Department of Transportation
-en
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPOIRTPO: YVCOG
Six Year Transportation Improvement Program
From 2012 to 2017
Adoption Date:
Resolution No.:
Hearing Date:
Amend Date:
Functional
Class
Priority
Number •
Project Identification
A. PIN/Federal Aid No. B. Bridge No:
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s) ,
? Federal
.5RIW
w
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Funding
State4th
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir,
Type
Required
Date
(Miyyy)
• Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
Thru
1
2
3
4
5
6
7
8
9
10
11
12
' 13
14
15
16
17
18
19
20
21
PE
1/1/2014
STP(U)
. 219
34
253
253
17
49
05
P
2
O
RW
6/1/2014
STP(U)
327
51
378
378
EA
Englewood Ave.- N 24th Ave to N 16th Ave . .
06
S
CN
6/1/2015
STP(U)
2980
244
3224
3224
Yes
Englewood Ave
from: N 16th Ave to: N 24th Ave
Widen, curb, gutter and sidewalk, water and sewer lines
6/1/2015
Totals 3,526 329 3855 631 3224
PE
.1/1/2014
STP(S)
55
8
63
63
14
.50
12
P
2.5
P
6/1/2014
RW
STP(S)
107
19
126
126
CE
W Nob Hill Blvd Sidewalks
T
CN
3/1/2015
STP(S)
321
57
378
378
Yes
W Nob Hill BlvdW
from: S 16th Ave to: S. 6th St.
S
Install missing sidewalks on southside of Nob Hill.
3/1/2015
Totals 483 84 567 189 378
00
51
06
P
1.0
P
PE
RW
1/1/2014
6/1/2014
STP(S)
STP(S)
57
189
' 7
25
64
214
64
. 214
CE
Beech St Pedestrian Connection
32
T
CN
1/1/2015
STP(S)
504
68
572
572
Yes
Beech St
from: Fair Ave to: Chalmers/Riverside
't,
Construct pedestrian pathway under S1282 to Greenway
1/1/2015
Totals 750 100 . 850 278 572
•
•
PE
1/1/2014
STP(S)
43
7
50
50
16
52
12
P
2.0
T
RW
6/1/2014
STP(S)
' 86
15
', 101
101
CE
WLincolnAve Sidewalks
CN
1/1/2015
. STP(S)
572
88
660
.
660
Yes
W Lincoln Ave
from: N 56th Ave to: N 29th Ave
S
W
Sidewalks, meters and fire hydrants replacement or relocation
1/1/2015
Totals 701 . 110 811 151 660
Report Date: May 26, 2011
Page 13
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
®en
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2012. to 2017
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.a,
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Schedule
(Local Agency)
Federally Funded
Projects Only
ii
o
a
Phase
Start
Fund Source Information
Expenditure
Federal Funding
State
Funds
Local
Funds
Total
Funds
RNV
Required
Date
(MM/VY)
Federal
Fund
Code
Federal
Cost by
Phase
State
Fund
Code
1st
2nd
•
3rd
4th
Thru
6th
Envir.
Type
1
2.
3
4
5
6
7
8
9
10
11
12
13
14 •
15
16
17
18
19
20'
21
14
53
Mead Ave. Railroad Grade Separation
Mead Ave.
from: Presson Place to: Maryland
Construct railroad overpass including all utilities
01
P
25
W
S
P
°
PE
RW
CN
6/1/2014
1/1/2015
1/1/2016
STP(U)
STP(U)
STP(U)
820
3150
6552
189
630
1008
1009
3780
7560
1009
3780
7560'
CE
Yes
1/1/2016
Totals 10,522 1827 12349: 1009 11340
16
54
City wide Pathway Connections
Yakima •
from: to:
Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths,
WOD Trail, Greenway including Naches Rail Spur, signage and amenities
01
P
4.0
°
P
S
T
W
PE
RW
CN
6/1/2013
1/1/2014
1/1/2015
STP(U),
STP(U) .
STP(U)
252
756
1890
38
88
315
290
844
2205
290
844
2205
CE
Yes
1/1/2015
Totals 2,898 441 3339 290 844 2205
17
55•.'01
34th Ave & River Rd Improvements
Fruitvale Blvd.
from: 34th Ave. to: River Rd.
Intersection improvements including lumination, sewer,.water, curb, water
and sidewalks
12
P
N/A
°
P
S
T
W
PE
CN
1/1/2014
6/1/2014
STP(U)
STP(U)
63
567
5
76
68
643
-
68
643
CE
No
Totals 630 81 711 711
17
56
Englewood Ave
Englewood Ave
from: 24th Ave to: 40th Ave
Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water lines
and street lights.
01
05
12
P
. 1.0
°
P
S
T
W
PE
RW
CN
1/1/2014
6/1/2015
1/1/2016
STP(U)
• STP(U)
' STP(U)
218
327
2980
' -
34
51
244
252
378
3224
252
378
3224
CE
Yes
1/1/2016
Totals . 3,525 329 3854 252 3602
Report Date: M41 011
e
age 14
v. 5.7 - p1111
Supersedes re editions
P
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement .Program
From 2012 to 2017
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.'cu
C. Project Title •
D. Street/Road Name or Number
Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s) •
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
a
u
o
a
Phase
Start
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNV
Required
Date
(MM/Yl�
Federal
•E. Fund
Code •
Federal
Cost by
Phase
1st
2nd
3rd
4th
6th Thru
2 :;
3
4
5
6
7
8
9
10'
11
12
13
14 '
15
16
17
18
19
20
21
14
t
57"
•
W. Yakima North/South-Connector to West Valley
Unknown road
from: North - South to: in West Valley
City & County joint project to build/extend roadways.
01
04
06
P
6.0
C
G
O
P
S T
W
PE
1/1/2015
.STP(U)
120
17
• 137
137
CE
Totals
120 17 137
137
16
58
Occidental Road Construction.
from: 58th Ave. to: 64th Ave.
Construct roadway
01
P
.38
S
W
P
T
PE 1'1/1/2014
1
I
1
I
1001 tool
.
.I 1 1001
Totals
100 100
100
00
59
-1
86th Ave. Road Construction
from: Occidental to: Coolidge
Construct roadway
01
P
27
PE 1
1/1/2015 1
1 1
1
1
1001 1001
1 1 1
. 100
Totals
100 100
100
00
60
•
YVT Railway Rehabilitation & Museum
3rd Ave
from: 3rd Ave to: Pine St
Car Barn, Museum Restoration and Pathway
03
P
N/A
G
C
S
T
W
P
PE
CN
1/1/2015
6/1/2015
STP(E).
STP(E)
18
1900
•
32
285
50
' 2185
50
2185
EA
No
'
Totals
1,918 317 2235
2235
' Report Date: May 26,2011
Page 15
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.:
1485 MPO/RTPO: . YVCOG
Six Year Transportation Improvement Program
From 2012 to. 2017
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
- D. Street/Road Name or Number
. E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Schedule
Local Agency)
Federally Funded
Projects Only
a
.c
a
m
a
Phase
Start
• Fund Source Informatiori .
Expenditure
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Re uir
q ed
Date
(Mh
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
6th
2
3
4
5
6
7
8
.9
10
11
12
13
14
'15
16
17
18
19
20
21
16
61
Roadway City Wide Shoulder Improvements
City Wide
from: to:
City Wide shoulder improvements, PM10 abatement.
01
P
N/A
S
PE
CN
4/1/2013
7/1/2013
CMAQ
CMAQ
24
480
3
65
27
545
27
545
CE
No
Totals 504 68 572 572
00
62
Pedestrian Bridge
Pedestrian Bridge . -
from: N 10th St to:' Yakima Greenway
Construct pedestrian bridge from Gateway area to Yakima Greenway,
power, handicap accessible, lights
• 14
32
-
P
.25
T
P
0
PE
CN
1/1/2014
3/1/2015
STP(E)
STP(E)
_
252
3150
34
412
286
3562
286
.,
3562
CE
No
Totals ' 3,402 446 3848 286 3562
00
63
William 0, Douglas Pathway
from: Pine St to: Cowiche Canyon
Pathway improvements, connections, and signage to Cowiche Canyon Trail.
14
32
P
N/A
0
S
P
W
PE
CN
1/1/2013
7/1/2013
STP(E)
STP(E)
10
109
-
2
17
12
126
12
126
CE
No
Totals 119 19 138 138
00
64
'
YVT Pathway
YVT Railway Corridor.
from: to:
Development pathway in West Valley area including 53rd Ave, Wide Hollow,
64th Ave, Ahtanum including all utilities and signage
03
32
P
N/A
0
P
S
T
W
PE
CN
1/1/2015
6/1/2015
STP(U)
STP(U)
315
945
38
126
353
1071
353
1071
CE
No
Totals 1,260 164 1424 1424
Report Date: M
11
Page 16
v. 5.7 - Supersedes pre editions
wi Washington State Department of Transportation
-Aggeenncy: Yakima
Co..No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From . 2012 to 2017
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. . B. Bridge No.0)
C. Project Title
Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
• Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
,
il
e1
oma`
Phase
Start
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
_ Funds
Total
Funds
Envir.
Type
RNVD.
Required
Date
(MM/t Y)
Federal
Fund
Code .
Federal
Cost byFund
Phase
1st
•
2nd
3rd
4th
Bih
2-
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
65 'r
SummitviewAve. Grind & Overlay .
from: 14th Ave to: 56th Ave
Grind 0.20' of ACP & replace with 0.20' of HMA, and install required ADA
ramps -
06
07
P
2.64
PE
CN
1/1/2013
6/1/2013
ARRA-FHWA
ARRA-FHWA .
50
1950
50
19501950
50
CE
No
Totals 2,000 2000 2000
17
'
66
River Road Improvements
•
from: 6th Ave to: 16th Ave •
Reconstruct roadway, widen, curb, gutter, sidewalk, lighting and drainage
.03
05
06
07
P
0.50
W
G
O
T
PE
RW
CN
1/1/2012
6/1/2012
1/1/2013
STP(U)
STP(U)
STP(U)
86
1168
50
14
182
• 50
100
1350
50
50
50
1350
CE
Yes
6/1/2015
Totals 1,254 246 1500 100 1400
14
'
67
Nob Hill Blvd and 64th Ave Improvements
Nob Hill Blvd
from: Nob Hill Blvd to: 64th Ave
Widen and re -construct 64th Ave. to 33 -foot width with curb, gutter and
sidewalk from Nob Hill Blvd. to 400 feet north. Construct curb, gutter
sidewalk and stormwater runoff treatment on the north side of Nob Hill.
03
05
' 07
12 •
13
P
.71
C
P
T
CN
1/1/2012 I
-
JOBS
925+
I
I
I
I 1
925+
I
925
-
CE
.
No
Totals ' 925 925 925
68
18th Street Underpass
•
from: Yakima Ave to: 18th Street
Repair or replace 18th Street Underpass
10
11-
P
.01
P
T
C
PE
4/1/2012
1
BRAC.
1
50
I
1
I.
50
50
N/A
No .
Totals 50 •50 50
Report Date: May 26, 2011
Page 17
v. 5.7 - Supersedes previous editions
Washington StateDepartment of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2012 to 2017
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
To
m
c U
LL
Priority I
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding •
State
Fund
Code
State
Funds
'Local
Funds
Total
Funds
R/W
Required
Date
(MM/Y))
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
Envir.
Type
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
69
88th Avenue
from: Tieton Drive to: Summitview Ave
Construct curb, gutter, sidewalk and stormwater runoff treatment on the east
side of 88th.
06
12
13
P
0.4S
C
T
G
PE
RW
CN
1/1/2013
2/1/2013
6/1/2013
WSDOT
WSDOT
WSDOT
50
25
320
10
50
25
330
50
25
330
CE
Yes
Totals 395 10 405 405
70
Sunday Bus Service
from: to:
Demonstration project to provide limited fixed -route transit services on
Sundays.
23
S
-
NIA
ALL
3/10/20121
CMAQ
196
25.
2211 221
-
CE
No
Totals 196 25 221 221
16
71
64th Ave. Roadway Widening
from: Washington Ave to: Nob Hill Blvd
Widen roadway, curb, gutter, sidewalks, lighting and drainage
03
04
06
P
1.0
W
G
P
T
O
C
PE
CN
1/1/2012
1/1/2013
STP(U) '
STP(U)
200
1600
32
249
232
1849
232
1849
-
CE
Yes
1/1/2013
Totals 1,800 281 2081 232 1849 •
00
72
Various Overlay Projects/Selected on Local Priority
N/A
from: N/A to: N/A
07
P
N/A
W
S
CN
6/1/2012
STP(U)
228
32
2601 2601 1
EA
No
Totals 228 32 260 260
Report Date: M011
Page 18
v. 5.7 - Supersedes prem editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.:. 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2012 to 2017
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
c U
u.
Priority I
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number '
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
2
5
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M y)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
6th
1
2
3 .
4
5
6
7
8
9.
10
11
12
13
14
15
16
17
18
19
20
21
00
73
Gravel Road B.S.T.
Various Areas
from: City Wide to:
07
P
N/A
S
PE
CN
1/1/2013
6/1/2013
240
240
240
CE
No
Totals
290 290
290
00
74.
Storm Drains/Vegetation
Local Selection
from: City Wide to:
City Wide
32
P
N/A
PE
1/1/2012
I
-
100
loot 1001
I
EA
No
Totals
100 100 100
00
75
City wide Alleys
from: to:
Pave alleys throughout the city.
07
P
.5
.G
P
S
W
T
CN
6/1/2012
1
75
751 25
25
• 25
CE
No
Totals
75 75 25
. 25 25
76
Westside Transit Center (property acquisition)
from: N/A to: N/A
Construct a West Side Transit Center (Park & Ride Faality) '
23
P
N/A
S
PE
4/1/2013
5309(Bus)
800
200
. 1000
1000
Yes
Totals
800
200 1000 1000
Repoli Date May 26, 2011
Page 19
v.. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No:: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2012 to 2017
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
Report Date: Ma 011
•Pae 20
v. 5.7 -Supersedes preeditions
Functional
•
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Protect Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
R/W
Req
Date
(MM/YY)
d
Federal
Fund
Code
•
Federal
Cost by
Phase
1st
2nd
3rd
4th
6th
Envir.
Type
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
77
Transit Operating Hours Expansion
from: to:
Expand Transit Operating Hours an hour later into the evening except for
one route that will be expanded an hour earlier
23
-
P
ALL
1/1/2012
•
5316
200
48
248
248
CE
Totals
200
48
.248..
248
78
.
„
'Terrace Heights Moxee Route Expansion
from: to:
Expand route service to Terrace Heights and Moxee
23
P
ALL
1/1/2012
5307
2881
-
2881
288
1
CE
Totals
. 288
288
288
79
Ellensburg -Yakima Commuter Bus
from: to:
Expand Route Service to the city of Ellensburg
23
P
ALL
1/1/2012
5316
264
1
264
528)
528
1
1
GE.
Totals
264
264
528
528
80
Selah - Military Training Center Commuter Bus
from: to:
Expand route service to the military training center near Selah
23
P
ALL
1/1/2012
-
5316
49
12
611
61
Totals
49
12
61
61
Report Date: Ma 011
•Pae 20
v. 5.7 -Supersedes preeditions
AM.
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.:
'1,1485
MPO/RTPO: YVCG
Six Year Transportation Improvement Program
From 2012 to 2017
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
ti m
c U
Priority I
Number
Project IdentificationProject
A. PIN/Federal AId No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
co
o -
u
,.
a
Phase
Start
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RIVV
Required
Date
(Mwyy)
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
-20
21
14
81
North 1st Street Revitalization
from: MLK BLVD to: SR 12
06
12
P
14
C
G
P
T
ALL
1/1/2012
STP(U)
8650
1350
10000
100
100
4900
4900
CE
No
Totals . 8,650 • 1350 10000 100 1004900 4900
16
82
•
Tieton Drive & 64th Ave. //S
from: Tieton Drive to: 64th Avenue
03
05
12
P
0.2
C.
G
S
W
O
P
T
ALL
1/1/2012
STP(U)
1040
160
12001 1001 4001 700
CE
Yes
01/12
Totals 1,040 160 1200 100 400 700
Report Date:' May 26, 2011
Page 21
v. 5.7 - Supersedes previous editions
•
•
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No.
/0
For Meeting of June 21, 2011
ITEM TITLE: Public Hearing to consider:
A) Adoption of the Six-year Transportation Improvement Program for the
years 2012 to 2017, and to amend the Metropolitan Transportation Plan;
and,
B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to Incorporate the Adopted Six -Year Transportation
Improvement Program .
SUBMITTED BY: Joan Davenport, Acting Director of Community and Economic Development
CONTACT PERSON/TELEPHONE: Doug Mayo, City Engineer, 576-6678.
SUMMARY EXPLANATION:
Attached is the 2012 — 2017 Six-year TIP, along with an explanation sheet that describes the
information contained. on the various columns of the Six-year TIP. One transit and two
transportation projects have been added to the six-year TIP. The projects are:
• #80 Selah-Military Training Center Commuter Bus
• #81 North First Street Revitalization
• #82 Tieton Dr. and 64th Ave. Intersection Improvements
Continued on Page Two
Resolution X Ordinance Contract Other (Specify) Six -Year TIP
Funding Source
APPROVED FOR SUBMITTAL:
City Manager ..
STAFF RECOMMENDATION:
1. Hold the Public Hearing to consider adoption of Resolution approving the Six-year TIP and
amending .the regional Metropolitan Transportation Plan and the Comprehensive Plan
Capital Facilities Element.
2. Adopt the Six -Year TIP and amend the Metropolitan Transportation Plan and Yakima Urban
Area Comprehensive Plan Capital Facilities Element.
BOARD/COMMISSION/COMMITTEE RECOMMENDATION:
COUNCIL ACTION:
Page Two
Projects that that have been removed from the 2011 — 2016 TIP as they were completed or the
funds were obligated include:
• #3 William O. Douglas Heritage Trails
• #7 S. 16th Avenue and W. Washington Avenue Signal and Intersection
• #8 66th Avenue and Summitview Avenue Intersection
• #9 Coolidge Road Widening and Paving
Council and the public are welcome to add other arterial system projects to the list. The six-year
TIP project listing will be finalized at the June 21st hearing and sent to the Yakima Valley
Conference of Governments (YVCOG) after approval.
City and County staff, together with the Council Intergovernmental Committee, are working toward
common standards and coordinated planning for public projects that impact both the city and
surrounding county areas.. Agreement on these issues will be the first step toward the goal of a
seamless transportation planning process between the City and County.
A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six-year
Transportation Improvement Program (TIP) for submittal to the Washington State Department of
Transportation. This plan must include all transportation projects for which state gas tax revenue
of federal revenue will be used.
The current plan for 2012 — 2017 includes nine projects that are funded. Funding for the remainder
of the projects will continue to be sought.
Six-year Transportation Improvement Program (TIP) Background
On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient
Transportation Equity Act: A Legacy for Users (SAFETEA-LU). This act is the next authorization
after the prior Transportation Equity Act of 1998 for the 21St Century (TEA -21) and previous
Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies
the systems on which certain funds can be used and activities for which funds can be used and
promotes the role of the Metropolitan Planning Organizations (MPO) in the planning and
programming of projects. SAFETEA-LU requires each designated MPO to develop a Transportation
Improvement Program (TIP), and the state to develop a Statewide Transportation Improvement
Program (STIP) as a condition to securing federal funds for the transportation projects.
Projects listed in the STIP are the only projects that can be approved by the Federal Highway
Administration (FHWA) and the Federal Transit Administration (FTA) to utilize federal fund of by
the State of Washington for approved State funding agencies. The STIP is a prioritized program of
transportation projects, complied from local and regional plans, along with the Washington
Transportation System Plan (WTP), which provides a backbone for developing projects for the
intermodal transportation network in the State of Washington.
The STIP contains federally funded projects plus state and local projects that are regionally
significant. These projects have been identified through the planning process as the highest
priority for the available funding to the state's transportation program.
Planning activities of state and local governments are essential parts of integrated regional
planning processes. Long range transportation planning is a part of the comprehensive land use
planning carried out by local governments. Citizen participation is an integral part of the planning
process at all levels. Local Agencies are required to develop and adopt a six-year transportation
program. All local agencies are required to hold at least one public hearing during the
development of the six-year transportation program.
Project ranking has been performed utilizing data supplied by the Street and Traffic Division. The
ranking will be integrated with other project needs and the total list will be reviewed and adjusted to
the particular need of the City of Yakima.
B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to incorporate the adopted six-year TIP for 2012 to 2017. This will ensure that we are in
compliance with the Growth Management Act and that we are consistent with the Comprehensive
Plan as. required. The amendment is limited to incorporate only those projects that adopted in the
STIP and is not subject to the "once a year" change required under the laws of the Growth
Management Act.
•
9. Appendices
A. Six Year Form Instructions
Heading
Agency
County Number
City Number
MPO/RTPO
Hearing Date
Adoption Date
Resolution Number
Amendment Date
Column Number
Enter name of the sponsoring agency.
Enter the OFM assigned number (see LAG Appendix 21.44).
Enter the OFM assigned number (see LAG Appendix 21.45).
Enter the name of the associated MPO (if located within urbanized area) or
RTPO (if located in a rural area).
Enter the date of the public hearing.
Enter the date this program was adopted by council or commission.
Enter Legislative Authority -resolution number (if applicable.)
Enter the date this program was amendedby council or commission.
1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal
Functional Classification. (Note: The Federal Functional Classification must be
approved by FHWA.)
Description
00- No Classification
Rural (Under 5000 pop.)
01 - Interstate
02 - Principal Arterials
06 - Minor Arterials
07 - Major Collector
08 - Minor Collector
09 - Local Access
Urban (Over 5000 pop.)
11- Interstate
12- Freeways & Expressways
14- Other Principal Arterials
16- Minor Arterial
17- Collector
19- Local Access
1. Priority Numbers. Enter local agency number identifying agency project priority
(optional).
2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b)
Bridge Number; (c) Project Title; (d) Street/Road Name or Number/Federal Route
Number; (e) Beginning and Ending Termini (mile post or streetnames); and (f)
Describe the Work to be Completed.
3. Improvement Type Codes. Enter the appropriate federal code number.
Description
01- New construction on 07 - Resurfacing
new alignment 08 - New Bridge Construction
02- Relocation 09- Bridge Replacement
Project
03- Reconstruction
04- Major Widening
05- Minor Widening
06- Other Enhancements
10 - Bridge Rehabilitation
11 - Minor Bridge Rehabilitation
12 = Safety/Traffic Operation/TSM
13 Environmentally Related
25
14 - Bridge Program -Special
21 - Transit Capital Project
22- Transit Operational
23 - Transit Planning
24 - Transit Training/Admin.
31= Non Capital Improvement
32 - Non Motor Vehicle Project
5. Funding Status. Enter the funding status for the entire project which describes the
current status.
S - Project is selected by the appropriate selection body and funding has
been secured by the lead agency.
P - Project is subject to selection by an agency other than the lead and is
listed for planning purposes. (Funding has not been determined.)
6. Total Length. Enter project length to the nearest hundredth (or code "00" if not
applicable).
7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that would
need to be relocated or are impacted by the construction project.
C -Cable TV
O - Other
S - Sewer (other than agency -owned)
W _ Water
G - Gas
P - Power
T - Telephone
8. Project Phase. Select the appropriate phase code of the project.
PE = Preliminary Engineering only (or Planning)
RW - Right of Way or land acquisition only (or equipment purchase)
CN - Construction only (or transit operating)
ALL - All Phases: from Preliminary Engineering through Construction
9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the
selected phase of the project is actually expected to start.
10. Federal Fund Code. Enter the Federal Fund code from the table.
BIA
BR
CDBG
CMAQ
DEMO
Discretionary
DOD
IC
IM
NHS
- Bureau of Indian Affairs
- Bridge Replacement or Rehab.
- Community Development
Block Grant (HUD)
- Congestion Mitigation Air Quality
- ISTEA Demo Project (Selected)
- Ferry Boat Discretionary, Public
Lands Highways, or Scenic Byways
- Dept. of Defense
- Interstate Construction
- Interstate Maintenance
- National Highway System
FTA Discretionary for Capital Expenditures
5307 - FTA Urban Areas
5309(Bus)- Bus
5309(FG) - Fixed Guideways
5309(NS) - New Starts
5310 - FTA Elderly/Disabled
5311 - FTA Rural Areas
REV - Rural Economic Vitality Program
STP(C) - STP Statewide Competitive Program
STP(E) - STP Transportation Enhancements
STP(S) - STP Safety Including Hazard and RR
STP(R) - STP Rural Regionally Selected
STP(U) - STP Urban Regionally Selected
STP - WSDOT use only
11. Federal Funds. Enter the total federal cost (in thousands) of the phase
regardless of when the funds will be spent.
12. State Fund Code. Enter the appropriate code for any of the listed state funds
to be used on this project.
26
IP
•
CAPP - County Arterial Preservation Program PWTF - Public Works Trust
CHAP - City Hardship Assistance Program RAP - Rural Arterial Program
TPP - Transportation Partnershis Program SCP - Small City Program
AIP - Arterial Improvement Program WSDOT - WSDOT funding
PSMP - Pedestrian Safety & Mobility Program OTHER - All other unidentified state funding
PTST - Public Transportation Systems Progra
13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase
regardless of when the funds will be spent.
14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase
regardless of when the funds will be spent.
15. Total Funds.. Enter the sum of columns 10, 12, and 14. (Auto -calculation in the "STIP
Too" program.)
16-19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated
expenditures (in thousands) of dollars by year. (This data is for Local Agency use.)
20. Environmental Data Type. Enter the type of environmental assessment that will be
required for this project. (This is "required" for Federally funded projects, but may be
filled in for state or locally funded projects.)
EIS Environmental Impact Statement
EA - Environmental Assessment
CE - Categorical Exclusion
21. RIW Certification. Click Yif Right of Way acquisition is required. If yes, Enter R/W
Certification Date, if known. (This is "required"for Federally funded projects only.)
27