HomeMy WebLinkAboutR-1999-097 Golder Associates, Inc. contract amendment #1RESOLUTION NO. R-99- 97 A RESOLUTION authorizing amendments to an existing contract with Golder Associates, Inc. Amended contract will further provide for documentation in support of an application to transfer existing water rights to a replacement well for the Wright Avenue Well; and for the development of an Aquifer Storage and Recovery (ASR) Pilot Test Program. WHEREAS, the City of Yakima has need to replace The Wright Avenue well and concurrently conduct an ASR pilot test program; and WHEREAS, the City does not possess adequate in-house staff, nor the time to perform the necessary work involved in the further development and completion of the financial modeling software; and WHEREAS, the City of Yakima has complied with the provisions of RCW 39.80 which concerns the procurement of engineering and architectural services by a city; and WHEREAS, the City Council deems it to be in the best interest of the City to amend the existing contract with Golder Associates for the engineering services require to provide for documentation in support of an application to transfer existing water rights to a replacement well for the Wright Avenue Well; and for the development of an Aquifer Storage and Recovery (ASR) Pilot Test Program, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager, City Clerk, and the Assistant City Manager are hereby authorized and directed to execute the attached and incorporated "Scope of Work" amending the existing contract with Golder Associates together with its attachments. ADOPTED BY THE CITY COUNCIL this 3rd day of August , 1999. John Puccinelli, Mayor ATTEST: Karen Roberts, City Clerk June 21, 1999 1 983-1085 City of Yakima New Well Amended Scope of Work — June 21, 1999 City of Yakima 1 SCOPE OF WORK Tasks 100 through 400 of the existing contract related to installation of a replacement well for the Wright Avenue Well, remain unchanged, and are addressed in detail in a previous scope of work dated April, 1998. Task 500 is modified to address the expanded scope. Tasks 600 through 1300 are new tasks to the existing scope of work. The revised list of all tasks are: Existing Tasks: 100: Prepare Recommendations for Well Location and Design 200: Preparation of Well Construction Specifications 300: Observation of Well Drilling and Testing 400: Analysis and reporting Modified Task: 500: Project Management New Tasks: 600: Water Level Monitoring Program 700: Hydrogeological Characterization 800: Water Quality Analysis 900: Engineering Modifications for ASR Pilot Test 1000: ASR Pilot Test Plan 1100: ASR Pilot Test Permitting 1200: ASR.Pilot Testing 1300: Analysis and. Reporting Descriptions of each task are given below, including a) purpose for conducting the task, b) a description of the work to be conducted, c) an anticipated schedule for completion of the task, d) deliverables, and e) estimated costs. A . summary of project schedule and budget are provided at the end of this scope of work, following a description of the tasks. Schedule dates are developed assuming authorization to proceed in July, 1999. A budget summary and detailed task costs are attached. Golder Associates June 21, 1999 2 983-1085 Task 100-400: Wright Well Replacement Tasks 100 through 400 are described in detail in a scope of work dated April, 1998. Task 100 consists of review of existing information and preparations of recommendations for well location and design. This task has been completed. Remaining tasks are: Task 200: Preparation of Well Construction Specifications Task 300: Observation of Well Drilling and Pumping Tests Task 400: Analysis and Reporting Task 500: Management Purpose: Regular meetings will be held with City staff, counsel, and other representatives, as necessary and as directed by the City. Description of Work: Meetings may be held in Yakima or Seattle. Materials may be prepared to support these meetings. It is assumed that Chris Pitre will attend all of the meetings, David Banton will attend two meetings, and that a project level Golder staff will attend half of the meetings, as appropriate. Deliverable: Monthly billings will be provided to the City accompanied by a brief status report which documents progress, costs, schedule, and unanticipated project developments and future costs. Attendance at 12 meetings including supporting materials will be provided. Schedule: This task will be on-going for the duration of the project. Cost: Total estimated cost for this task is $18,048. Task 600: Water Level Monitoring Program Purpose: A reliable record of water levels in the aquifer system is necessary to predict and evaluate the impacts, including benefits, of any water resource management approach. Some of this information is, in turn, required for permitting. New monitoring points will complement current monitoring points that the City maintains in the production wells. Description of Work: Between ten and 15 existing wells will be selected for installation of transducers and dataloggers to monitor groundwater levels. Existing wells (e.g., the Wright Avenue well) will be selected to avoid well installation costs. Both City wells and private wells will be considered. Shallow, deep, and intermediate depth wells will be selected with the purpose of developing a three-dimensional monitoring network. Golder Associates June 21, 1999 983-1085 Field visits to the selected points will be made to ascertain the physical condition of the wellheads, to determine whether any retrofitting is necessary, and to arrange for adequate protection measures for installed equipment. Specifications for subcontractor services for retrofitting of wellheads and installation structures to protect installed equipment will be prepared, and cost bids solicited. Golder will retain the services of a subcontractor based on experience, capabilities, and bid price. Golder personnel will provide oversight of subcontractor field services. It is assumed that approximately half of the monitoring points will have to be retrofitted by a subcontractor to provide equipment access and protection. Specifications for transducers and dataloggers will be prepared, and the equipment will ordered and installed. Additional points may be identified for instrumentation in the future as additional data needs and opportunities are identified. Installation of these additional monitoring points is outside the scope of this phase of the project. Two monthly data downloads, and one quarterly analysis of data are included in this scope of work, however, the monitoring network could remain active for many years. Historical groundwater level information will also be compiled from City of Yakima, United States Geological, and other sources. It is assumed that information will be provided to Golder by the City, and that information available over the internet will be used. Schedule: It is assumed that it will take one month to select the monitoring points, and two months to retrofit the wellheads with a subcontractor and install the monitoring equipment. Assuming authorization to proceed in July, 1999, the water level monitoring equipment should be installed by October, 1999. Data downloads will be conducted at the end of November, 1999, and at the end of December, 1999 or the beginning of January, 2000. A quarterly report will be prepared by the end of January, 2000. Deliverable: A three-ring binder will be compiled containing documentation of each monitoring point including as -built sketches, equipment specifications, set-up parameters, photographs of the installation, and a location map. A quarterly report will be prepared containing a hardcopy description of trends, significant anomalies, and plots of water levels at teach of the monitoring points. An electronic copy of the water level database will also be included. Cost: Total estimated costs for this task is $66,743. Engineering fees of $32,695 are based on: ➢ Two days selecting monitoring points; ➢ Two days doing a reconnaissance field visit of selected sites; ➢ One day developing bid specifications for water level monitoring equipment and obtaining bid prices; ➢ Two days developing bid- specifications for subcontractor services, and making contracting arrangements; Golder Associates June 21, 1999 4 983-1085 > Ten days in the field providing oversight of subcontractor work and installing equipment; > Four days for two data downloadings; ➢ One week compiling historical information from City and other sources; and, ➢ One week for quarterly data analysis and reporting. Budgeting assumes eight-hour office days, and 12 -hour -field days.- Expenses of approximately $34,000 cover equipment purchase and estimated subcontractor fees. These costs are subject to the actual number of monitoring points instrumented, and equipment and subcontractor bid prices. Obtaining access and permission to use private wells is not included in this task. Task 700: Hydrogeological Characterization Purpose: An understanding of the effects that conducting an ASR program will have on the natural system is necessary for both logistical considerations of providing a secure municipal water supply, and regulatory reasons. A reliable quantification of the amount of water that can be stored in the aquifer system and recovered for later use is needed. Also needed is information on the delineation of aquifer zones. A hydrogeological characterization of the Ellensberg Formation will be conducted to identify aquifer zones to the extent possible based on existing information such as Ecology well logs. The information will be used to develop and permit an ASR pilot test, and support any necessary change applications related to relocation of the Wright Avenue Well. Description of Work: Well logs from the area where the Ellensberg Formation exists within the Ahtanum-Moxee Valley will be obtained from Ecology files. East -west geologic cross-sections spanning the Yakima River and encompassing the entire Ellensberg Formation within the Ahtanum-Moxee Valley will be compiled. Well logs will also be used to identify aquifer zones within the Ellensberg Formation. The overlying Alluvial Deposits and underlying basalt aquifers will also be included in stratigraphic interpretations. Three City wells will be considered for use in ASR pilot testing: Airport Well, Kissel Well, and the Kiwanis Well. One of these wells will selected by the City and Golder for ASR pilot testing. Once a well is selected, aquifer buildup of water pressure and aquifer response to recharge scenarios will be predicted using analytical techniques. Recharge rates for ASR testing will be identified. Monitoring requirements of water levels and flow rates for ASR pilot scale testing will be defined. If a shallow monitoring well is not available in the vicinity of the selected well, it may be recommended that one be installed to monitor the performance of the pilot testing. Beneficial and other impacts, if any, on surface water flows and other water rights will be qualitatively assessed. Golder Associates June 21, 1999 5 983-1085 Wellhead protection issues will be addressed by commissioning a search of agency databases (e.g., Environmental Protection Agency [EPA] and Ecology registered contaminated sites, Resource Conservation and Recovery Act [RCRA] registered sites, etc.). Relevant agency personnel -(EPA, Ecology, Yakima County) will be contacted to identify any sites that they are aware of that may be of concern. Work commissioned by Yakima County will be reviewed and incorporated as appropriate. Schedule: This task will completed in September, 1999. Deliverable:. The findings of this task will be incorporated as an appendix in the ASR Pilot Test Plan prepared under Task 1000. A separate report will be compiled for necessary changes to existing City water rights for use at the replacement Wright Well. Cost: Total estimated cost for this task is $23,547. Task 800: Water Quality Analysis Purpose: Water quality analysis is necessary to establish a baseline against which to assess water quality changes resulting from reaction of recharged water with native aquifer water, and the aquifer matrix. Description of Work: Water chemistry of surface water and groundwater, and aquifer material composition data will be collected. Available information from existing sources will be collected. Water quality data as part of the City's water quality monitoring program will be used. Information will be collected from the United States Geological Survey and other sources on water quality and aquifer material composition. For parameters that are not now available, water samples will be collected from the City's Rowe Hill water treatment plant and the selected recharge well, and analyzed. Once this information is collected, a computer model developed by the USGS (PHREEQECi) will be used to predict reactions that may occur. These modeling runs will provide a basis upon which to design water quality monitoring during the pilot test and to determine whether special conditioning of the recharged water is necessary. Schedule: This task will completed in September, 1999. Deliverable: The findings of this task will be incorporated as an appendix in the ASR Pilot Test Plan prepared under Task 1000. Cost: Total estimated costs for this task is $14,359. This budget includes two days in the field to collect water samples. 'It is assumed that $2,000 will be used for laboratory analysis. . Golder Associates June 21, 1999 6 983-1085 Task 900: Engineering Modifications for ASR Pilot Test Purpose: Retrofitting of the selected pilot recharge well may be necessary. Golder will review the existing infrastructure and estimated flow requirements based on the hydrogeology and well hydraulics and provide specifications for retrofitting the well for ASR pilot testing. Description of Work: As-builts of the existing distribution system, and the well (i.e., pump and valve specifications, or manufacturer's data sheets) of the selected recharge well, will be provided by the City to Golder. Golder will identify any changes to the existing wellhead configuration that may be needed to allow recharge of water at a specified rate, and monitoring of water levels in the well. Changes may include: modifications to the pump if its impellers are not designed to rotate in reverse as may occur during recharge; disabling of check valves; installation of a water level monitoring port; installation of meters; and other considerations. This task consists only of engineering support to identify the well modifications needed. No actual modifications are included in this task. Schedule: This task will completed in September, 1999. Deliverable: The findings of this task will be incorporated as an appendix in the ASR Pilot Test Plan prepared under Task 1000. Cost: Total estimated costs for this task is $8,905. This cost considers engineering considerations only, and does not include implementation of the retrofit. The actual cost of retrofitting the well is unknown at this time. Task 1000: ASR Pilot Test Plan Purpose: The ASR Pilot Test Plan will consist of a guide for implementing the pilot test, as well as supporting document for regulatory purposes. Description of work: The test plan will include summarizing the findings of Tasks 700, 800 and 900 regulatory considerations. Detailed findings of Tasks as appendices. document appropriate to use as a for submission to Ecology as a an executive summary, sections above, and a section dealing with 700, 800 and 900 will be included Schedule: This task will completed in October, 1999. Deliverable: The findings of this task will be presented as a report including maps, figures, cross-sections, tables, water quality data and other information. Cost: Total estimated costs for this task is $18,799. Golder Associates June 21, 1999 7 983-1085 Task 1100: ASR Pilot Test Permitting Reasoning: Compliance of conducting the ASR pilot test with a number of regulations including the State Environmental Protection Act (SEPA), water quality standards, and possibly other regulations may be required. Golder will provide technical support in complying with these regulations. Description of Work: A SEPA checklist or other necessary SEPA documentation will be prepared on behalf of the City. Assistance will be provided to the City in drafting correspondence with Ecology. The budget assumes that three meetings will be attended by Golder personnel with the City, Ecology, and/or other parties. Materials supporting these meetings will be prepared and distributed in advance of these meetings. Schedule: This task will executed on an as needed basis, but is intended to be complete by the end of January, 2000. Deliverable: Golder will complete the SEPA checklist or other necessary SEPA documentation on behalf of the City of Yakima, and assist in drafting related letters and providing supporting documentation to applicable agencies. Materials in support of meetings will be prepared. Cost: The budget assumes a level of effort of 24 hours in assisting the City with regulatory documentation (e.g., SEPA and other). The budget also supports three meetings at 24 hours per meeting including time for preparation, travel, and meeting. Support staff may be involved in preparation for the meetings. David Banton and Chris Pitre will attend meetings with the City and Ecology. Total estimatedcosts for this task is $10,740. The projected budget covers preparation of a SEPA checklist only. Additional SEPA efforts, if any, are outside the scope of this budget. Task 1200: ASR Pilot Testing Purpose: An Aquifer Storage and Recovery pilot test consists of injecting water into the ground at a constant rate for a discrete period of time (e.g., 30 days), allowing a period of storage time (e.g., 30-90 days), and then extracting the water for a similar period of time at a constant rate (e.g., 30 days). Water levels are monitored throughout, and water quality samples are collected for analysis. This information is then analyzed to assess the capacity of the aquifer for use in an ASR program, changes in water quality during the storage period, if any, and the ability of the aquifer' to hold the water after recharge, for recovery at a later time. Details presented belowmay change based on 'the ASR Pilot Test Plan developed in task 1000. Golder Associates June 21, 1999 8 983-1085 Description of Work: The pilot test plan developed in Task 1000, as approved and modified under Task 1100, will be used to implement the pilot test. It is assumed that the City will implement all changes to the wellhead identified under Task 900: Engineering Modifications for ASR Pilot Test. After completion of wellhead modifications, Golder personnel will be present during a step -rate recharge test to determine the recharge rate for the constant -rate recharge test. Water levels will be monitored throughout the step - rate recharge test with pressure transducers and dataloggers. A constant -rate recharge test will be conducted for 30 days. A maintenance schedule will be prepared for City personnel to check flow rates twice a day to ensure the constancy of the rate of recharge. Water level data will be collected at initiation and completion of the constant -rate recharge test, and for final data retrieval at the end of the recovery period. After recharge, a storage period of 30-90 days will be implemented during which water levels will be monitored. During this period, weekly water quality samples will be collected and analyzed to monitor the evolution of water quality during storage, and to assess the movement of recharged water within the aquifer. After 30-90 days of storage, a 30 -day constant -rate pumping (extraction) test will be conducted and water levels monitored. Time -series water quality samples will be collected during the pumping test on a pseudo log -frequency (e.g., after 1, 4, 12, and 24 hours of pumping, and after 4, 12, 24 and 30 days of pumping). This information will be used to evaluate changes in water quality, if any, that may affect the potability of the water, and reactions that may have occurred in the aquifer during storage.. This information will also be useful in assessing whether the extracted water is representative of the recharged water. Water level recovery data will be collected after completion of the constant -rate pumping (extraction) test. Schedule: This task will completed in the first half of 2000 pending regulatory approval from Ecology. Deliverable: The findings of this task will be incorporated into the Report prepared under Task 1300. Cost: Total estimated costs for this task are tentatively estimated at $31,431, and are subject to change pending preparation of the ASR Pilot Test Plan in Task 1000, as approved and possibly modified under Task 1100. Costs are estimated based on the level of effort shown in the detailed cost estimate provided in the attached budget tables and include approximately $6,000 in water quality analyses. It is assumed that water level monitoring equipment will already be installed for the selected well. If not, an additional cost of approximately $2,000 will be needed to purchase a transducer and datalogger. Golder Associates June 21, 1999 9 983-1085 Task 1300: Analysis and Reporting Description of Work: Data collected during the pilot testing will be compiled and analyzed for the purposes of evaluating the long-term potential of using ASR. The effects of operation of an ASR program with respect to beneficial and other potential impacts, if any, to surface waters, and senior water rights holders will also be evaluated. The interpretation of data will address the following: • Aquifer properties; • Aquifer storage capacity; • Leakage rates from the recharge zone; • Residence time of recharged water; • Water quality considerations; and, • Recommendations for future evaluation/implementation; This report will be formatted to address the information needs of the City of Yakima, as well as the information needs of the Washington Department of Ecology, in order to allow evaluation of the data collected. Maps and figures will be included to allow the quick understanding of significant and relevant information. Recommendations will be provided on future direction of an Aquifer Storage and Recovery program. Schedule & deliverables: A draft report will be submitted to the City within one month of collection of all pilot. test data. A. final report will be issued within one month of receipt of edits from the City. Cost: Total estimated cost for this task is $20,474. Golder Associates Task June 21, 1999 10 983-1085 2 SCHEDULE A schedule for ASR pilot testing is presented below. A major constraint on schedule is that municipal surface water supply for the ASR pilot test is only anticipated .to be available from fall through spring. The variable that may most affects this schedule is the permitting process. However, we believe that the schedule presented is reasonable. Schedule dates are developed assuming authorization to proceed in July, 1999. Schedule 100 — Well Design Aug 1 Sept Month Oct Nov Dec Jan Feb Mar 200 — Well Bid Specs 300 — Drilling Oversight 400 — Well Report 500 — Management 600 — Monitoring 700 — Hydrogeology 800 — Water Quality 900 — Engineering 1000 — ASR Test Plan 1100 — ASR Permitting 1200 — ASR Testing 1300 — ASR Reporting 3 BUDGET Com . leted Not Scheduled Apr May The authorized budget for the original scope of work relating a replacement well for the Wright Avenue Well is for the amount of $29,680. We have expended $6,270 on Task 110. The additional scope of work described in this document is for an additional amount of approximately $210,584 for a total of $240,264. A summary budget is attached. Budget for Tasks 100 through 400 were previously presented to the City and remain unchanged. Detailed budgets for each modified task (Task 500) and new tasks (Tasks 600 through 1300) are included here. vt%envi ros1projec5198312881asr1asrscope. doc Golder Associates June Summary of Costs Wright Avenue Replacement Well and Water Resources Management / Aquifer Storage and Recovery Technical Work Plan City of Yakima Summary of Costs Task 100 Task 200 Task 300 Task 400 Task 500 Task 600 Task 700 Task 800 Task 900 Task 1000 Task 1100 Task 1200 Task 1300 Wright Well Replacement Location and Design Replacement Well Specifications Drilling and Well Installation Oversight Replacement Well Analysis and Report Management Water Level Monitoring Program Hydrogeological Characterization Water Quality Analysis Engineering Modifications for ASR Pilot Test ASR Pilot Test Plan ASR Pilot Test Permitting ASR Pilot Testing Analysis and Reporting Engineering Fees Total: $4,370 $2,450 $9,770 $5,040 $16,400 $32,695 $21,550 $11,420 $7,310 $17,960 $10,060 $21,750 $19,640 $180;415 Expenses $1,900 $180 $3,210 $300 $1,648 $34,048 $1,997 $2,939 $1,595 $839 $680 $9,681 $834 $59,849 Task Total $6,270 $2,630 $12,980 $5,340 $18,048 $66,743 $23,547 $14,359 $8,905 $18,799 $10,740 $31,431 1, $20,474 $240,264 6/15/99 Golder Associates 983-1085 Asr-bdgt.xls, Summary 983-1085 Task 500: Analysis & Reportng Principal $125 Associate 8115 Senior $90 Project $70 Staff $60 Support $50 Total Fees Expenses Total 5001Management and Meetings Totals: Expenses: 16 I Communication 3% of fees 0 96 1 48 1 96 48 0 48 1 816,4001 $1,6481 $18,048 48 $ 16,400 $1,648 $ 18,048 600 'Management and Meetings W15/99 Totals: 1 Equipment I LaboratoryMileage ® Equipment Accomodation Purchase 1 $0.32 Rental 1 (@$60/night) Per diem ReproductionTotal (@$30/day) I Expenses 8492.001 $492 $0 1 $0 1 Golder Associates $7561 8756 1 80 $0 1 1 $4001 $1,648 $0 $400 $1,648 Asr-bdgtxls: 500 983-1085 Task 600: Water Level Monitoring Expenses: $32,695 $34,048 $66,743 Principal $125 Associate $115 Senior $90 Project $70 Staff $60 Support $50 Total Fees Expenses Total Total Expenses 610 Design Monitoring System 2 610 16 $65.10 8 $2,170 $65 $2,236 620 Field Visit 620 24 $115.20 28 $3,840 $531 $4,371 630 Retrofitting Design & Specs 1 630 24 $100.35 16 2 $3,345 $100 $3,445 640 Installation $100 640 8 60 60 $7,500 $8,520 $31,775 $40,295 650 Downloading (2) $31,775 650 8 • $108.00 48 $3,600 $700 $4,300 660 Historical Data Compilation $700 660 8 $105.60 40 8 $3,520 $446 $3,966 670 Quarterly Report (1) 4 670 40 $231.00 40 24 $7,700 $431 $8,131 Totals: 7 n 1 9a ell ...,, _ . $200 $431 Totals: 5981 s'n nnn $7 500 ecce �« . Expenses: $32,695 $34,048 $66,743 6/15/99 $34,048 Golder Associates Asr-bdgt.xls, 600 Communication 3% of fees EquipmentMileage Purchase I Subcontractor @ $0.32 Equipment Rental IAccomodation (@$60/night) Per diem (@$30/day) Reproduction Total Expenses _ 610 Design Monitoring System $65.10 620 Field Visit $115.20 $126.00 $50 $120 $120 $65 $531 630 Retrofitting Design & Specs $100.35 $100 640 Installation $255.60 $20,000 $7,500 $189.00 $300 $480 $300 $31,775 650 Downloading (2) $108.00 $252.00 $100 $120 $120 $700 660 Historical Data Compilation $105.60 $100 $120 $120 $446' 670 Quarterly Report (1) $231.00 $200 $431 Totals: 5981 s'n nnn $7 500 ecce �« . __ ._ - - - _ - 6/15/99 $34,048 Golder Associates Asr-bdgt.xls, 600 Task 700: Hydrogeologic Characterization Principal 8126 983-1085 Associate $116 Senior 890 Project $70 Staff $60 710 720 730 740 Hydrogeological Compilation Well Hydraulics 2 Support $50 Total Fees Expenses Total 16 16 64 Wellhead Protection 2 16 24 8 Wright Well Documentation 760 Reporting Expenses: Totals: 2 4 4 4 8 16 24 2 4 12 24 16 40 4 2 76 56 136 18 $7,050 $3,350 $1,190 $3,580 $6,380 821,550 CommunicationEquipment 3% of fees I Purchase Subcontractor Mileage $0.32 Equipment Rental 710 720 730 740 Hydrogeologlcal Compilation Hydraulic Analysis $211.50 AccomodationPer diem (860/night) I (@$30/day) $812 $101 *586 $107 $391 $1,997 *7,862 $3,461 *1,776 $3,687 86,771 23,647 Reproduction I Total Expenses Wellhead Protection $100.50 *600 Wright Well Documentation 760 Reporting 6/15/99 Totals: $35.70 $107.40 $191.40 $647 $500 $0 $500 Golder Associates $0 $0 $0 $200 $812 $101 $586 $107 $39f $0 $800 $1,997 Asr-bdgt.xls,700 983-1085 Task 800: Water Quality Analysis Expenses: 112 $11,420 2,939 14,359 - Principal $125 Associate 8115 Senior $90 Project $70 Staff $60 Support $50 Total Fees Expenses Total 810 Compilation of Existing Data 8 2 32 2 $3,200 $196 $3,396 820 Collection & Analysis of Field Samples 4 4 $126 24 $60 $2,300 $2,565 $4,865 830 Computer Modeling 8 2 40 2 $3,680 8110 $3,790 840 Reporting 8 2 16 2 82,240 $67 $2,307 Expenses: 112 $11,420 2,939 14,359 - 6/15/99 $60 8100 $2,939 Golder Associates Asr_bdgtxls 800 Communication 3% of fees Equipment Purchase Laboratory Mileage @ $0.32 Equipment IAccomodation Rental (@$60/night) Per diem (@$30/day) Reproduction Total Expenses 810 Compilation of Existing Data $96.00 $100 $196 820 Collection & Analysis of Field Samples $69.00 $2,000 $126 $50 $60 860 82,565 830 Computer Modeling $110.40 $110 840 Reporting 867.20 $67 6/15/99 $60 8100 $2,939 Golder Associates Asr_bdgtxls 800 983-1085 Task900: Engineering Modifications for ASR Pilot Test 8,905 Expenses: Principal $125 Associate $115 Senior $90 Project $70 Staff . $60 Support $50 Total Fees Expenses Total 910 910 Hydraulic System Analysis 4 2 24 $2,320 $240 $2,550 920 Wellhead Modifications 8 2 20 $60 4 $2,700 $1,187 $3,887 930 Reporting 2 4 2 12 6 4 $2,290 $169 $2,459 Totals: 2 1 a a56 - _ _ _ . _ 8,905 Expenses: 6/15/99 Golder Associates $60 100 $1,696 Asr-bdgtxls,900 Communication 3% of fees I Equipment Purchase I Laboratory I Mileage @ $0.32 I Equipment Rental Ac comodation I (@$60/night) Per diem I (@$30/day) Reproduction I Total l Expenses 910 Hydraulic System Analysis $69,60 $70 $100 920 Wellhead Modifications $81.00 $600 $126 $200 $60 $60 $240 930 Reporting $68.70 $100 $1,187 $169 Totals: 3719 to tam a.n. ___ 6/15/99 Golder Associates $60 100 $1,696 Asr-bdgtxls,900 983-1085 Task 1000: Pilot Test Plan 18,799 Expenses: Principal $125 Associate $115 Senior *90 Project *70 Staff $60 Support $50 Total Fees Expenses Total Total 1 Expenses 1010 Plan Preparation 4 8 40 40 16 4 $8,980 *369 $9,349 1020 Review and Final Production 4 8 40 40 16 4 $8,980 $469 $9,449 Totals. R l n on e.. .,. - _ _ _ _ _ _ 18,799 Expenses: 6/15/99 $0 ' 00 839 Golder Associates Asr-bdgtids, 1000 Communication l 3% of fees 1 Equipment Purchase Laboratory 1 Mileage @ $0.32 Equipment Rental Accomodation (@$60/night) 'Per diem (@$30/dayL Reproduction Total 1 Expenses 1010 Plan Preparation $269.40 $100 $369 1020 Review and Final Production $269.40 *200 $469 Totals. 151Q en en.."•.. 6/15/99 $0 ' 00 839 Golder Associates Asr-bdgtids, 1000 Task 1100: ASR Pilot Test Permitting Principal $125 983-1085 Associate $115 Senior $90 Project $70 Staff $60 Support $60 Total Fees Expenses Total 1110 Permitting Documentation 1120 Meetings 8 16 Expenses: 24 Totals: 32 48 0 64 0 0 2 4 $2,540 $7,520 6 $10,060 $680 $76 $604 $2,616 $8,124 10,740 CommunicationEquipment 3% of fees I Purchase 1110 Permitting Documentation 1120 Meetings Laboratory I Mileage Equipment Accomodation Per diem [Reproduction I Total $0.32 I Rental I (@$60/night) IPer I Expenses $76.20 6115/99 $225.60 $378 Totals: $302 $0 $0 $378 $0 $0 $0 $0 Golder Associates $76 $604 $680 Asr-bdgtids,1100 983-1085 Task 1200: ASR Pilot Testing (All costs are contingent upon the final Pilot Test Pian prepared in Task 600 and approved by Ecology under Task 700.) (More detailed costs will be available upon further definition of tasks.) Expenses: 20 0 9,681 31,431 Principal $125 Associate $116 Senior $90 Project $70 Staff $60 Support $50 Total Fees Expenses Total 1210 Step -rate Injection Test $95 2 8 4 32 $60 $3,150 $391 $3,641 1220 30 -Day Constant Rate Injection Test $167 2 8 4 72 $120 $5,550 $1,879 $7,429 1230 30 -Day Storage $167 2 8 4 72 $120 $5,550 $2,979 $8,529 1240 30 -Day Constant Rate Extraction Test $167 2 8 4 72 $120 $5,550 $4,079 $9,629 1250 Data Retreival Tn►.le • n 2 4n 8 ...___ 4 12 $60 _.__ $1,950 $355 $2,306 Expenses: 20 0 9,681 31,431 6/15/99 0 $9,681 Golder Associates Asr-bdgtxls 1200 Communication 3% of fees Equipment Purchase Laboratory I Mileage @ $0.32 Equipment Rental Accomodation (@$60/night) Per diem ((x$30/day) Reproduction I Total I Expenses 1210 Step -rate Injection Test $95 $126 $50 $60 $60 $391 1220 30 -Day Constant Rate Injection Test $167 $1,000 $252 $150 $120 $90 $1,879 1230 30 -Day Storage $167 $2,000 $252 $150 $120 $90 $2,979 1240 30 -Day Constant Rate Extraction Test $167 $3,000 $252 $150 $120 $90 $4,079 1250 Data Retreivat ' Tnf�l.• $59 taS4 en ee nnn $126 . .... $50 -•___ $60 _.__ $60 _. $355 6/15/99 0 $9,681 Golder Associates Asr-bdgtxls 1200 983-1085 Task 1300: Analysis & Reportng Principal $125 Associate $115 Senior $90 Project $70 Staff $60 Support $50 Total Fees Expenses Total 1310 1320 Analysis Reporting 1330 Review and Final Production Expenses: 4 4 4 4 16 40 16 4 4 40 40 16 4 16 20 16 4 86,160 $8,520 84,960 Totals: 12 12 72 100 48 8 $19,640 8834 $285 $0 $549 $6,445 88,520 85,509 20,474 1310 1320 Analysis Communication I Equipment I Laboratory Mileage @ Equipment comodadon 3% of fees Purchase I Ac $0.32 I Rental I (060/night) Reporting 8184.80 1330 Review and Final Production $255.60 8/15/99 $148.80 Totals: $589 $0 $0 Golder Associates $0 $0 $0 Per diemReproduction I Total (x$30/day) I Expenses 8100 8285 8200 8400 $548 ti 834 Asr-bdgt.xls, 1300 Task Order: Authorization to Proceed to complete the remainder for the contract including all amendments to the scope of work dated c�c/t7e. c:.7/ J999• City of Yakima By: e Rice, Assistant City Manager Golder Associates Inc. L By: Michael l . Bro n, Managing Principal Date 643/y' CITY CONTRACT NO! RESOLUTION k0: Date 2 / -7% BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. /1 For Meeting of 8/3/99 ITEM TITLE: Resolution authorizing amendments to an existing contract with Golder Associates, Inc. Amended contract will further provide for documentation in support of an application to transfer existing water rights to a replacement well for the Wright Avenue Well; and for the development of an Aquifer Storage and Recovery (ASR) Pilot Test Program. _ SUBMITTED BY: Dueane Calvin, Water/Irrigation Division Manager Dave Brown, Water/Irrigation Division Engineer Glenn Rice, Assistant City Manager CONTACT PERSON/TELEPHONE: Dueane Calvin / 576-6480 SUMMARY EXPLANATION: Staff respectfully requests City Council to approve the attached resolution authorizing the City to amend an existing contract with Golder Associates, Inc. of Redmond, Washington. This amends the existing Wright Avenue Well replacement contract to provide documentation for an application for transfer of existing water rights to a replacement well for the Wright Avenue Well; and for the development of an Aquifer Storage and Recovery (ASR) Pilot Test Program, which will confirm the technical feasibility of that strategy. The Council Committee on Water/Irrigation met with staff and Golder representatives on the morning of July 20th for a briefing on this matter. After the presentation several questions were raised surrounding the water to be utilized in this program. It was explained that the water would come from the existing domestic water rights, and that State statutes generally require the water to be treated to drinking water standards prior to injection. The committee indicated that this was probably a prudent approach for the City to pursue with respect to meeting needs during water short times. Original Contract amount Added cost from Contract Amendment Total Engineering Costs not to exceed continued $ 29,680.00 210,584.00 $240,264.00 Resolution X Ordinance _Contract Other (Specify) Contract Amendment Funding Source: 477 Fund — Capital Improvements APPROVED FOR SUBMITTAL: 3 City Manager STAFF RECOMMENDATION: Approve the resolution authorizing the accompanying contract amendment to provide documentation for an application for transfer of existing water rights to a replacement well for the Wright Avenue Well; and for the development of an Aquifer Storage and Recovery (ASR) Pilot Test Program with Golder Associates, Inc. of Redmond, WA., and authorize the execution of Task Order No. 2, by the Assistant City Manager. COUNCIL ACTION: During the course of the last year, City staff, Legal Counsel, and Golder Associates Inc have been involved in conducting an analysis of groundwater rights held by the City of Yakima and developing strategies for securing the future municipal water supply of the City. As a result of this work, the City is currently considering various management options for securing future needed municipal water supply sources. Among these options is an Aquifer Storage and Recovery (ASR) program. It is anticipated that, if technically feasible, an ASR program may be an economically, politically and environmentally viable option that can play an integral part in securing needed future municipal water supply for the City of Yakima. The primary objectives of this scope of work are: D To provide documentation to support an application to change existing water rights for use at a replacement well for the Wright Avenue Well; and, ➢ To conduct the necessary technical analysis and permitting support to implement an ASR pilot test in the first quarter of 2000. This work will be completed in two phases. The first phase is to compile existing information, put in place a groundwater resource monitoring system, and analyze available data. The first phase will generate information needed to permit the ASR pilot study, and the information needed to support any water right change applications for the replacement well for the Wright Well. It is proposed that this first phase be completed within the calendar year of 1999. The second phase will consist of an ASR pilot test early in the year 2000. This will consist of: • Retrofitting the wellhead of the selected recharge well; • A step -rate recharge test over one day to determine the ideal rate for the constant -rate recharge test; • A 30 -day constant -rate recharge test; • A storage period ' • Withdrawal of the recharged water; and, • A recovery period. The purpose of this Technical Work Plan is to develop the sequence of steps needed to assess the technical feasibility of an ASR program. The major costs associated with the technical implementation of an ASR program that are included in this scope of work are: • Monitoring of aquifer water levels; • Hydrogeological characterization; • Evaluating water quality considerations; • Reconfiguration of valving and associated distribution plumbing; and, • Conducting the pilot test. Additional major costs that are not included in this scope of work include: • Installation of additional wells (production or monitoring); and • Computer modeling of groundwater flow Balancing the costs of an ASR program are the benefits of added security of water supply and flexibility of operation. Alternative water supplies are not considered to be available, and existing supplies may be reduced. ASR is considered a technological application that could assist the City of Yakima in meeting the obligation of providing for municipal water supply, and be accepted by stakeholders in water resources of the Yakima Basin. This scope of work is intended to be an extension of the existing authorized work under a contract signed between the City of Yakima and Golder on March 2, 1998 for a replacement well for the Wright Avenue Well. This work is provided on a time and materials basis. Any changes that would exceed the budgeted amount for the proposed scope of work, must be authorized by the City.