Loading...
HomeMy WebLinkAboutR-2003-009 Huibregtse Agreement / Addendum / Kiwanis Phase IRESOLUTION NO. R-2003- 09 A RESOLUTION authorizing and directing the City Manager and the City Clerk of the City of Yakima to execute a contract addendum with Huibregtse, Louman Associates, Inc. for design and final plans and specifications for Phase One development of Kiwanis Park. WHEREAS, the sale of a portion of Larson Park to Yakima Valley Community College (YVCC) necessitates relocation and consolidation of Yakima's recreational ballfields to a more suitable site to help meet active youth and adult recreational needs in Yakima, Washington; and WHEREAS, resources have been identified for development at Kiwanis Park, including grant funding along with proceeds from the sale of a portion of Larson Park to YVCC, therefore enabling ballpark development to move forward; and WHEREAS, there is a June 2003 obligation requirement associated with the grant funding, the ballfields at YVCC will only be available for use through 2003, and there are detailed plans and specifications that need to be prepared to allow bidding and subsequent construction to begin in the Spring of 2003 since Phase 1 Kiwanis Park improvements need to be completed by the 2004 adult softball season; and WHEREAS, the City Council deems it to be in the best interest of the City of Yakima to contract with Huibregtse, Louman Associates, Inc. for design and final plans and specifications for bidding and for the first construction phase of the Kiwanis Park Development Project; and Huibregtse, Louman Associates, Inc. is willing to perform these services required by the City in accordance with the terms and conditions of the attached agreement, now therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The City Manager and the City Clerk of the City of Yakima are hereby authorized and directed to execute the attached and incorporated Agreement for Professional Services Addendum No. 1 with Huibregtse, Louman Associates, Inc., for Development Design and Final Plans and Specifications for. the Kiwanis Park Development Project, Yakima, Washington. ADOPTED BY THE CITY COUNCIL this 21Stdayof January 2003. ATTEST: 44)ts---N"— City Clerk 01/10/2003 Mary Place, Mayor City of Yakima KIWANIS PARK DEVELOPMENT PHASE ONE Preliminary Project Cost Summary December 31, 2002 Professional Design Fee Breakdown for Option 2 recommended by the Parks and Recreation Commission and selected by City Council on December 17, 2002. Option 2 includes the following basic park improvements: (2) Premium Softball Fields (lighted) Title 12 Frontage Improvements (Beech and 13`h Street) 140 Car Gravel Parking Lot (lighted) Asphalt Paved Plaza Area Full Vinyl Fencing New, Bathroom/Concession Building The following features will be designed and included in the bid package as additive alternates: 140 Car Asphalt Paved Parking Lot Parking Lot Perimeter Concrete Curb and Gutter Parking Lot Drainage Facilities Concrete Plaza Area Picnic Shelter Cost Breakdown/Summary Estimated Construction Cost of Basic Improvements Includes Contingency, Tax, Contractor Overhead and Mobilization. Estimated Construction Cost of Bathroom/Concession Bldg.* Estimated Construction Cost of Picnic Shelter* Estimated Construction Cost of Title 12 Improvements* Estimated Construction Cost of Full Vinyl Fencing* Subtotal Construction (*) includes Contingency, Tax, Contractor Overhead and Mobilization Total Design Fee per this Amendment, includes: Design of Basic Park Improvements Design of Title 12 Improvements, Design of Restroom/Concession Building, Design of Additive Alternates $ 1,252,797.74 $ 205, 336.00 $ 70, 500.00 $ 207,086.00 $ 24, 000.00 $ 1,759,719.74 $ 198,369.95 Estimated Construction Administration Fee $ 83,392.00 (For Future Addendum Consideration) Total Estimated Cost per Option 2 Estimate dated 11/22/02 $ 2,041,481.69 AGREEMENT FOR PROFESSIONAL SERVICES ADDENDUM NO.,1 This Addendum, hereinafter identified as Addendum No. 1, is hereby entered into and made a part of the Agreement between City of Yakima, Washington, and Huibregtse, Louman Associates, Inc., for Professional Services first entered into on the 9h day of May 2002, by the CITY OF YAKIMA, hereinafter called the "CITY," and HUIBREGTSE, LOUMAN ASSOCIATES, INC., hereinafter called the "ENGINEER." WHEREAS, the City Council of the CITY at their meeting on December 17, 2002, approved the scope of improvements for the first construction phase of Kiwanis Park. WITNESSETH: That in consideration of the mutual covenants and agreements herein contained, the parties hereto do mutually agree to amend, revise, and/or add the following to the referenced Agreement: SECTION 2 SCOPE OF SERVICES 2.1 Basic Services: ENGINEER agrees to perform additional work tasks described in ' the attached Addendum No. 1 Exhibit A. SECTION 5 COMPENSATION 5.1 COMPENSATION ON A LUMP SUM BASIS: For the services described in the attached Addendum No. 1 Exhibit, compensation shall be on a lump sum basis as shown on the attached Addendum No. 1 Exhibit B. 5.3 Add the following: "For services provided on a lump sum basis, monthly invoices based on the estimated percent of completion of the services shall be prepared by the ENGINEER and transmitted to the CITY for review and payment." SECTION 7 PROJECT SCHEDULE AND BUDGET Add the following: "7.3 The ENGINEER shall complete the design and final plans and specifications ready for bid advertisement within ninety (90) calendar days from the date of execution of this Addendum No. 1 by the CITY." SECTION 11 SUBCONTRACTS 11.3 CITY hereby authorizes the ENGINEER to subcontract with persons and firms listed below: Add the following: "Conley Engineering, Inc." G:UAMYAK I MA -J C4\20. wpd HLA Project No. 02032 Page 1 of 2 IN WITNESS WHEREOF the parties hereto duly enter into and execute this Addendum No. 1, as of this day of , 2003. CITY OF YAKIMA HUIBREGTSE, LOUMAN ASSOCIATES, INC. Signature Signature Printed Name: Printed Name: Richard A. Zais, Jr. William L. Huibregtse Title: Title: City Manager President Date: Date: Attest City Clerk City Contract No. Resolution No. G:\JANWAKIMA-JC4\20.wpd HLA Project No. 02032 1- /s--03 Page 2 of 2 ADDENDUM NO. 1 EXHIBIT A CITY OF YAKIMA - KIWANIS PARK DEVELOPMENT SCOPE OF WORK DESIGN AND FINAL PLANS AND SPECIFICATIONS During the term of this AGREEMENT, the ENGINEER shall perform professional services in connection with the following project: City of Yakima - Kiwanis Park Development This scope of work shall include the furnishing of all services, Tabor, materials, equipment, supplies, and incidentals necessary to conduct and complete the work as indicated hereinafter: ASSUMPTIONS: This scope of work is prepared and offered with the following understanding: ❖ All of the property for this Kiwanis Park Development has been acquired by the CITY, and existing structures will be cleared and disposed of by CITY forces. ❖ There are no toxic materials, asbestos, or other hazardous materials on this site. The existing, old incinerator building will remain in place through the master planning and primary construction phase. ❖ Existing pond to stay where and as is. ❖ Existing Kiwanis municipal well and pumphouse to stay where and as is. ❖ CITY staff will prepare a State Environmental Policy Act (SEPA) checklist and complete the SEPA review process for this Kiwanis Park Development project. ❖ CITY staff will arrange for/perform any demolition work north of Maple Street within the existing park area. ❖ CITY staff will select all playground equipment for inclusion in this Kiwanis Park Development. ❖ CITY staff will arrange for/purchase portable outfield fencing. ❖ The Yakima City Council, at their meeting of December 17, 2002, approved the recommendation of the City Parks Commission, at their meeting of December 9, 2002, to proceed with the first phase of development of Kiwanis Park Improvements G:UAMYAKIMA-JC4119. wpd 1 identified as Option No. 2 including the following project elements (see attached drawing): Construct two (2) New Premium Softball Fields with 300' Outfield Fences: With Title 12 Street Improvements along South 13"' Street and Beech Street With 140 Car Gravel Parking Lot With Full Vinyl Fencing With Bathroom and Concession Building With Asphalt Paved Plaza Area No Parking Lot Drainage Facilities No Concrete Curbs in Parking Lot No Concrete Sidewalk along Parking Lot No Tot Lot No Overhead Netting ❖ The following project elements shall be designed and included in the Final Plans and Specifications and are to be identified as "Additive Alternates." These Additive Alternates may be selected for construction by the Yakima City Council following bid opening: Picnic Shelter Asphalt Paving for Parking Lot with Curbing Parking Lot Drainage Facilities Cement Concrete Plaza Area 1. PROJECT MANAGEMENT A. Project Management. The project manager will coordinate ENGINEER's design team to ensure that the work is completed on schedule, is technically competent, and meets the CITY's needs. The project manager will provide overall project management for ENGINEER's work elements, including coordination with JGM Landscape Architects, Davis -Opfer -Raab Architecture, Conley Engineering, Inc., progress reports, and invoicing. Project Meetings. Attend up to three (3) project meetings in Yakima with CITY Staff to coordinate the design aspects of the project with the CITY. C. Public Meetings. Attend up to two (2) public meetings in support of the CITY to address technical aspects of the work related to design and final plans and specifications for the Project. 2. DESIGN AND FINAL PLANS AND SPECIFICATIONS A. Provide assistance for project updates and related administrative documents to the appropriate agencies which have jurisdiction over funding, design, and construction of this project. B. Perform the additional field investigations and field surveying, if necessary, to design the identified improvements. G:UAN\YAKIMA-JC4\19.wpd 2 C. Perform the preliminary design and present preliminary plans to the CITY prior to detailing final Plans. D. On the basis of approved preliminary plans, perform the final design and prepare complete Plans and Specifications for bid call on the proposed work, as authorized by the CITY. E. Furnish the CITY forty (40) copies of the final Plans and Specifications for bidding and construction. F. Furnish to the CITY engineering data for and assist in the preparation of the required documents so that the CITY may secure approval of such governmental authorities as have jurisdiction over design criteria applicable to the Project. G. Answer and supply such information as is requested by prospective bidders. H. Prepare and issue addenda, if necessary. Prepare the Engineer's Estimate of construction cost. J. Attend bid opening and participate in the bid opening and evaluation process. K. Prepare tabulation of all bids received by the CITY and review bidder's qualifica- tions. L. Make recommendation of construction contract award to the lowest responsible bidder. G'UAMYAKIMA-JC4\19.wpd J ADDENDUM NO. 1 EXHIBIT B KIWANIS PARK DEVELOPMENT Professional Fees Compensation for professional services for Design and Final Plans and Specifications will be on a lump sum basis. The following spreadsheet shows the estimated time and expenses to perform this Design and Final Plans and Specifications. The lump sum amount of compensation to the ENGINEER for this Design and Final Plans and Specifications will be $198,369.95. This maximum amount will not be exceeded without the written agreement of the CITY and the ENGINEER. PROJECT TITLE: KIWANIS PARK DEVELOPMENT CLIENT: CITY OF YAKIMA JOB NUMBER: 02032 Huibregtse, Louman Associates, Inc. DATE: December 31, 2002 ENGINEER'S HOURLY ESTIMATE TASK NO PROJECT TASK Principal Engineer Licensed Prof. Engineer Licensed Land Surveyor CAD Operator 2 -Man Surveys Clerical TOTAL HRS TASK DIRECT COSTS $119 $98 $91 $71 $130 $47 DESIGN AND FINAL PLANS AND SPECIFICATIONS FOR KIWANIS PARK DEVELOPMENT (TWO BALLFIELDS) PROJECT MANAGEMENT 6A Project Management 120 8 0 60 0 8 196 19,700.00 6B Field investigations and field surveying 20 0 4 12 20 0 56 6,196.00 6C Perform the preliminary design 220 30 0 260 0 16 526 48,332.00 6D Final design, Plans, and Specifications 63 0 0 80 0 16 159 13,929.00 6E Fumish copies of Plans and Specifications 2 0 0 4 0 4 10 710.00 6F Fumish engineering data for approvals 6 0 0 0 0 2 8 808.00 6G Answer bidders questions 12 0 0 0 0 0 12 1,428.00 6H Prepare and issue addenda 8 0 0 8 0 4 20 1,708.00 61 . Prepare Estimate of construc- tion cost 10 0 0 0 0 2 •12 1,284.00 6J Attend bid opening 4 0 0 0 0 0 4 476.00 6K Prepare tabulation of bids 4 0 0 0 0 2 6 570.00 G:\JAN\YAKIMA-JC4\18 - KP EST2.wpd 1 TASK NO PROJECT TASK Principal Engineer Licensed Prof. Engineer „ Licensed Land Surveyor CAD Operator . 2 -Man Surveys Clerical TOTAL HRS TASK DIRECT COSTS $119 $98 $91 $71 $130 $47 6L Make recommendation of con- struction contract award 2 0 0 0 0 2 4 332.00 Labor Subtotal 471 38 4 424 20 56 1013 95,473.00 EXPENSES: hours $/hr Computers: 0.00 Travel: Cost/ Unit Air Trips Ground . Trp. Days Trip Miles Air Travel $0.00 0.00 Mileage $0.00 0.00 Meals/Lodging $0.00 0.00 Misc. expenses: FAX 25.00 TELEPHONE 100.00 POSTAGE 100.00 PRINTING 4,800.00 SUB -CONSULTANTS: 1. JGM Landscape Architects 54,074.50 x 1.1 59,481.95 2. Davis-Opfer-Raab Architecture 25,800.00 x 1.1 28,380.00 3. Conley Engineering, Inc. 9,100.00 x 1.1 10,010.00 Subtotal - Labor 95,473.00 Subtotal - Expenses 5,025.00 Subtotal - Subconsultants 97,871.95 Total - DESIGN AND FINAL PLANS AND SPECIFICATIONS $198,369.95 G:\JAN\YAKIMA-JC4\18 - KP EST2.wpd 2 ••• 01 ... I 1 PIT it 1 1 I CITY OF YAKIMA MIN MOW KIMANIS PARK Demob CONCEPTUAL ALT. A PHASE 1 (SITE WORE AND 2 SOUTH BALLFIELDS, + Ildbisetsm, Lammas Assedatee, Mc ..1. 11111 II. “... ••••••• IN NM MI .1...••••• OM INF MO BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. For Meeting of: January 21, 2003 ITEM TITLE: A Resolution Authorizing Execution of an Agreement For Professional Services Addendum No. 1 with Huibregtse Louman Associates, Inc. for Phase One Development of Kiwanis Park SUBMITTED BY: Chris Waarvick, Director of Public Works Denise Nichols, Parks and Recreation Manager CONTACT PERSON/TELEPHONE: Denise Nichols, 575-6020 SUMMARY EXPLANATION: Staff respectfully requests Council consideration of the attached resolution authorizing execution of an agreement with Huibregtse, Louman Associates, Inc. to complete the design and final plans and specifications for Phase 1 development of Kiwanis Park. Professional Fees for services will not exceed $198,370 and are outlined in Exhibit "B." Resolution X Ordinance _Other (Specify) Contract Addendum for Kiwanis Park Development Contract X Mail to (name and address): Phone: Funding Source: APPROVED FOR SUBMITTAL: � City Manager STAFF RECOMMENDATION: Staff respectfully requests Council to adopt the attached resolution authorizing execution of a contract addendum with Huibregtse, Louman Associates, Inc. for Kiwanis Park development. BOARD/COMMISSION RECOMMENDATION: The Parks and Recreation Commission recommends Kiwanis Park Development. COUNCIL ACTION: Resolution adopted. RESOLUTION NO. R-2003-09