HomeMy WebLinkAboutR-2020-070 Six-Year TIP 2021-2026 AdoptionA RESOLUTION
RESOLUTION NO. R-2020-070
adopting the Six -Year Transportation Improvement Program (TIP) for the
period of 2021 through 2026 for transportation improvements to arterial
streets in the City of Yakima and amending the Transportation Systems
Plan 2040
WHEREAS, the City of Yakima annually prepares, reviews and adopts a six -year
program for transportation improvements to arterial streets in the City of Yakima for the ensuing
six -year period, all as contemplated and required by the State RCW 35 77 010 and applicable
federal law; and
WHEREAS, the City of Yakima desires to amend the Transportation Systems Plan 2040
to ensure compliance with the Growth Management Act and the regional transportation plan for
the construction of streets and arterial streets in the City Of Yakima, all as contemplated and
required by State and Federal Law; and,
WHEREAS, after a public hearing on the matter, held at the regular meeting of the
Yakima City Council on June 16, 2020, with proper public notice as required by RCW
35 77 010, the City Council finds that the plan attached hereto should be adopted as the Six -
Year Transportation Improvement Program for the period of 2021 through 2026 for
transportation improvements to arterial streets in the City of Yakima, and,
WHEREAS, adopting the Six -year Transportation Improvement Program and amending
the Transportation Systems Plan 2040 are in the best interest of the City and its residents, now,
therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The Six -Year Construction Program for the period of 2021 through 2026, a copy of which
is attached hereto and by this reference made a part thereof, is hereby adopted as the official
Six -Year Transportation Improvement Program for the City of Yakima, including proposed
amendments to the Transportation Systems Plan 2040 along with Street Improvements, which
are also approved
ADOPTED BY THE CITY COUNCIL this 16th day of June, 2020
ATTEST
S-o-nya Clak t'ee, City Clerk
NJ
africia Byers, IVai yor
eak.
CWWashington State
Department of Transportation
Agency' Yakima
County. Yakima
MPO/RTPO. YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin 8 End Termini
F Project Description G. Structure ID
gf
Et.'
5'
,0
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
YAK 106
North 1st Street Revitalization
North 1st Street Revitalization, Phase 2
'I' Street to 'N' Street
Improve North 1st Street by rehabilitating the pavement and lane markings,
removing on -street parking, installing bike lanes, replacing and widening sidewalk,
enhancing street lighting, installing pedestrian lighting, constructing median islands
and installing various pedestrian and decorative elements.
06/16/20
06/16/20
04
CGPST
W
0.500
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
CN
2021
0
TIB
1,000,000
2,840,000
3,840,000
Totals
0
1,000,000
2,840,000
3,840,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th 8 6th
CN
3,840,000
0
0
0
0
Totals
3,840,000
0
0
0
0
Report Date June 17, 2020
Page 1
Attu
Washington State
Department of Transportation
Agency. Yakima
County. Yakima
MPO/RTPO. YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
1
/ 000S(473) YAK44
34th Avenue & Fruitvale Boulevard, and 34th Avenue and River Road Roundabouts
34th Avenue
River Road to Fruitvale Boulevard
Improve the intersections of River Road & Fruitvale Boulevard, and N. 34th Avenue
and River Road by installing roundabouts.
06/16/20
06/16/20
21
OPSTW
0200.
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
RW
2021
HSIP
76,820
0
8,870
85,690
S
CN
2022
HSIP
788,308
0
87,590
875,898
Totals
865,128
0
96,460
961,588
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
RW
85,690
0
0
0
0
CN
0
875,898
0
0
0
Totals
85,690
875,898
0
0
0
Report Date. June 17, 2020
Page 2
LICZb.
77;Washington State
1 Department of Transportation
Agency. Yakima
County. Yakima
MPO/RTPO: YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F Project Description G. Structure ID
Hearing
Adopted
>
3
cr,
m
1
=
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
2
YAK11
Bravo Company Boulevard
Bravo Company Blvd
'H' Street to 'D' Street
Construct four -lane roadway section with median, bike lanes and roundabouts, install
curb, gutter, sidewalk, street lighting and storm drainage system, along with water
and sewer systems.
06/16/20
06/16/20
01
OPSTW
0.650
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2021
0
OTHER
15,000,000
0
15,000,000
Totals
0
15,000,000
0
15,000,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
15,000,000
0
0
0
0
Totals
15,000,000
0
0
0
0
Report Date. June 17, 2020
Page 3
aka
VWApr, Washington State
' Department of Transportation
Agency. Yakima
County. Yakima
MPO/RTPO• YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin 8 End Termini
F Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
3
/ 4566(007) 2143
E Nob Hill Blvd & Fair Ave WS Improvements
Nob Hill Blvd
E Nob Hill Blvd to Fair Ave
Widen Nob Hill Boulevard through the intersection, construct left -turn lane, curb,
gutter, sidewalk, street lighting and drainage. Upgrade signal, including mast arm
structures.
06/16/20
06/16/20
03
COPTW
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2024
STP(U)
1,460,160
0
227,890
1,688,050
Totals
1,460,160
0
227,890
1,688,050
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th 8 6th
CN
0
0
0
1,688,050
0
Totals
0
0
0
1,688,050
0
Report Date: June 17, 2020
Page 4
VW4. Washington State
' Department ot Transportation
Agency • Yakima
County. Yakima
MPOIRTPO: YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
c
E
Z
0
o
b.
in
Total Length
Environmental Type
RW Required
07
4
/ SR17(011) YAK87
McClure Elementary School Safety Improvements
Vairous Streets
Various locations to various locations
This project will make various pedestrian safety improvements in the vicinity of
McClure Elementary School, such as, constructing sidewalk, ADA ramps and
improving crosswalks.
06/16/20
06/16/20
38
COPT
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2021
0
SRTS
228,000
0
228,000
Totals
0
228,000
0
228,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & fith
CN
228,000
0
0
0
0
Totals
228,000
0
0
0
0
Report Date. June 17, 2020
Page 5
/Ott
Washington State
Varif Department of Transportation
AgencyYakima
County' Yakima
MPO/RTPO: YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
-0
n.
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
9,
A PIN/Project No.
B. STIP ID
.rZ
z
.-.
C. Project Title
x
D. Road Name or Number
2
3
cr
E. Begin & End Termini
:.,.
m
9
F Project Description
G. Structure ID
.
07
5
YAK106
06/16/20
06/16/20
03
CGOPS
0
100
CE
No
T W
S. 48th Avenue and W Washington Avenue Improvements
S. 48th Avenue (Spring Creek Road)
W Washington Avenue to Spring Creek Road
Construct a traffic signal at the S. 48th Ave. and W Washington Ave. intersection.
S. 48th Ave. (Spring Creek Road) will be reconstructed and realigned to correct the
substandard corner at Spring Creek Road.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2021
0
OTHER
23,000
0
23,000
S
CN
2021
0
OTHER
627,000
0
627,000
Totals
0
650,000
0
650,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
23,000
0
0
0
0
CN
627,000
0
0
0
0
Totals
650,000
0
0
0
0
Report Date. June 17, 2020
Page 6
eats
WWashington State
ATIT Department of Transportation
Agency • Yakima
County • Yakima
MPO/RTPO: YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
6
YAK98
S. 72nd Avenue and W Washington Avenue Improvements
S. 72nd Avenue
S. 72nd Avenue to W Washington Ave.
Improve intersection by constructing a roundabout.
06/16/20
06/16/20
21
OPSTW
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2021
0
OTHER
100,000
0
100,000
S
RW
2021
0
OTHER
100,000
0
100,000
S
CN
2022
0
OTHER
800,000
0
800,000
Totals
0
1,000,000
0
1,000,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
100,000
0
0
0
0
RW
100,000
0
0
0
0
CN
0
800,000
0
0
0
Totals
200,000
800,000
0
0
0
Report Date. June 17, 2020
Page 7
eft&
TrWWashington State
Department of Transportation
Agency' Yakima
County' Yakima
MPO/RTPO: YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin 8 End Termini
F Project Description G. Structure ID
i
Oi
3
.
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
7
/ 1485(024) YAK80
Cowiche Canyon Trail
Cowiche Canyon Rd
Powerhouse Road to Trailhead
Construct a pathway, including pedestrian bridges over Cowiche Creek
06/16/20
06/16/20
28
2.000
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
RW
2021
0
CWA
105,000
0
105,000
S
CN
2021
0
CWA
1,695,000
0
1,695,000
Totals
0
1,800,000
0
1,800,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
RW
105,000
0
0
0
0
CN
1,695,000
0
0
0
0
Totals
1,800,000
0
0
0
0
Report Date. June 17, 2020
Page 8
Aga&
Washington State
Department of Transportation
Agency • Yakima
CountyYakima
MPO/RTPO• YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
8
YAK92
North 1st Street Revitalization, Phase 3
North 1st Street
MLK Boulevard to "J" Street
Improve North 1st Street by rehabilitating the pavement and lane markings,
removing on -street parking, installing bike lanes, replacing and widening sidewalk,
enhancing street lighting, installing pedestrian lighting, constructing median islands
and installing various pedestrian and decorative elements.
06/16/20
06/16/20
04
CGOPS
T W
0.480
GE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
CN
2021
BUILD
4,320,000
TIB
1,040,000
0
5,360,000
Totals
4,320,000
1,040,000
0
5,360,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
5,360,000
0
0
0
0
Totals
5,360,000
0
0
0
0
Report Date. June 17, 2020
Page 9
aint,
VWWashington State
Department of Transportation
Agency • Yakima
County. Yakima
MPO/RTPO. YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F Project Description G. Structure ID
Hearing
Adopted
D
3
7
7
0.
a
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
9
YAK10
E. "H" Street Extension, Phase 1
E. "H" Street
1st Street to 7th Street
Construct new roadway inlcuding water, sewer, curb, gutter, sidewalk,street lighting
and storm drainage system.
06/16/20
06/16/20
01
OPSTW
0 550
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
BUILD
515,000
0
0
515,000
P
CN
2023
BUILD
4,944,000
TIB
1,200,000
0
6,144,000
Totals
5,459,000
1,200,000
0
6,659,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th 8, 6th
PE
0
515,000
0
0
0
CN
0
0
6,144,000
0
0
Totals
0
515,000
6,144,000
0
0
Report Date June 17, 2020
Page 10
eft.
WWashington State
A; Department of Transportation
AgencyYakima
County' Yakima
MPO/RTPO: YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F Project Description G. Structure ID
x
:
r!..
2
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
10
YAK74
E. "H" Street Extension, Phase 2
E. 'H' Street
Bravo Co. Boulevard to 1-82
Construct new roadway including water, sewer, curb, gutter, sidewalk, street lighting
and storm drainage system.
06/16/20
06/16/20
01
CGOPS
T W
0.550
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
CN
2023
0
OTHER
2,060,000
515,000
2,575,000
Totals
0
2,060,000
515,000
2,575,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
0
0
2,575,000
0
0
Totals
0
0
2,575,000
0
0
Report Date. June 17, 2020
Page 11
Washington State
VIAPY Department of Transportation
Agency' Yakima
CountyYakima
MPO/RTPO: YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F Project Description G. Structure ID
Hearing,
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
11
YAK03
1-82 & Lincoln Avenue Interchange
Lincoln Avenue
E. "G" Street to 1-82
Reconstruct/extend off -ramp from existing 1-82 off -ramp for Lincoln Avenue to E "G"
Street
06/16/20
06/16/20
01
GO P
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2026
BUILD
301,400
0
46,400
347,800
P
RW
2026
BUILD
194,700
0
30,400
225,100
P
CN
2026
BUILD
1,890,400
0
295,000
2,185,400
Totals
2,386,500
0
371,800
2,758,300
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
347,800
RW
0
0
0
0
225,100
CN
0
0
0
0
2,185,400
Totals
0
0
0
0
2,758,300
Report Date. June 17, 2020
Page 12
.....mr•11214:.. Washington State
Vat, Department of Transportation
Agency' Yakima
County" Yakima
MPOIRTPO: YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin 8, End Termini
F Project Description G. Structure ID
x
2
-g'
=
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
12
YAK88
Robertson Elementary School Safety Improvements
various streets
various locations to various locations
This project will make various pedestrian safety improvements in the vicinity of
Robertson Elementary School, such as new sidewalk and constructing ADA ramps.
06/16/20
06/16/20
28
COPT
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
SRTS
50,000
0
0
50,000
P
CN
2022
SRTS
460,000
0
0
460,000
Totals
510,000
0
0
510,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th 8 6th
PE
50,000
0
0
0
0
CN
460,000
0
0
0
0
Totals
510,000
0
0
0
0
Report Date. June 17, 2020
Page 13
Washington State
D e p a r tment of Transportation
Agency. Yakima
County. Yakima
MPO/RTPO: YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D Road Name or Number
E. Begin & End Termini
F Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
07
13
YAK103
Nob Hill Elementary School Safety Improvements
various streets
various locations to various locations
This project will make various pedestrian safety improvements in the vicinity of Nob
Hill Elementary School, such as new sidewalk and constructing ADA ramps.
06/16/20
06/16/20
28
COPT
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
SRTS
50,000
0
0
50,000
P
CN
2022
SRTS
460,000
0
0
460,000
Totals
510,000
0
0
510,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
50,000
0
0
0
0
CN
0
460,000
0
0
0
Totals
50,000
460,000
0
0
0
Report Date. June 17, 2020
Page 14
VWWashington State
/ Department of Transportation
Agency • Yakima
County. Yakima
MPO/RTPO: YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
14
/ 1485(025) YAK72
Northside Alley Paving
Various Alleys
N. 161h Avenue to N. 61h Avenue
Pave the east/west gravel alleys between Summitview Avenue and Fruitvale
Boulevard from 161h Avenue to 61h Avenue
06/16/20
06/16/20
05
COPT
3.500
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
CMAQ
50,000
0
7,800
57,800
P
CN
2022
CMAQ
450,000
0
70,200
520,200
Totals
500,000
0
78,000
578,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
51h 8 6th
PE
57,800
0
0
0
0
CN
0
520,200
0
0
0
Totals
57,800
520,200
0
0
0
Report Date. June 17, 2020
Page 15
Alba
IV;Washington State
Department of Transportation
Agency' Yakima
CountyYakima
MPO/RTPO: YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
15
YAK70
Box Culvert Installations
S. 801h Avenue and Wide Hollow Road
Wide Hollow Road to Plath Avenue
Install box culvert (s) adjacent to the 801h Avenue Bridge and Wide Hollow Bridge to
reduce flooding issues. Joint project with Yakima County
06/16/20
06/16/20
10
0.050
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
CN
2022
0
OTHER
160,000
0
160,000
Totals
0
160,000
0
160,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
160,000
0
0
0
0
Totals
160,000
0
0
0
0
Report Date: June 17, 2020
Page 16
sfilb.
Washington State
Department of Transportation
Agency. Yakima
County. Yakima
MPO/RTPO: YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
16
YAK102
N 1st St & R St Signal
N 1st Street to R Street
Install traffic signal at the intersection.
06/16/20
06/16/20
21
PT
0.100
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2025
STP
58,000
0
9,000
67,000
P
CN
2026
STP
347,800
0
54,300
402,100
Totals
405,800
0
63,300
469,100
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
67,000
CN
0
0
0
0
402,100
Totals
0
0
0
0
469,100
Report Date. June 17, 2020
Page 17
aft&
IV;Washington State
Department of Transportation
Agency" Yakima
County' Yakima
MPO/RTPO" YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
17
YAK06
S. 1st Street and E Washington Avenue Intersection Improvement
S. 1st Street
S. 1st Street to E. Washington Ave
Realign intersection, widen E Washington Avenue to accomodate an additional
lane, replace curb, gutter and sidewalk and install a new traffic signalization system.
06/16/20
06/16/20
03
OPSTW
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2026
STP(U)
292,600
0
45,000
337,600
P
RW
2026
STP(U)
284,100
0
43,700
327,800
P
CN
2026
STP(U)
1,284,800
0
200,500
1,485,300
Totals
1,861,500
0
289,200
2,150,700
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
337,600
RW
0
0
0
0
327,800
CN
0
0
0
0
1,485,300
Totals
0
0
0
0
2,150,700
Report Date. June 17, 2020
Page 18
attkik
17; A. Washington State
Department of Transportation
Agency' Yakima
CountyYakima
MPO/RTPO: YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin 8 End Termini
F Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
18
YAK14
Washington Avenue & Longfiber Road Intersection Improvements
Washington Avenue
Washington Avenue to Longfiber Road
Improve the Washington Avenue and Longfiber Road intersection by constructing an
eastbound left -turn lane on Washington and a northbound left -turn lane on Longfiber,
install or replace curb, gutter, sidewalk, street lighting, storm drainage and safety
flashing signal
06/16/20
06/16/20
21
COPST
W
GE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2026
STP(U)
114,300
0
17,800
132,100
P
RW
2026
STP(U)
111,000
0
17,300
128,300
P
CN
2026
STP(U)
751,400
0
117,300
868,700
Totals
976,700
0
152,400
1,129,100
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
132,100
RW
0
0
0
0
128,300
CN
0
0
0
0
868,700
Totals
0
0
0
0
1,129,100
Report Date. June 17, 2020
Page 19
VW;Washington State
Department of Transportation
AgencyYakima
County' Yakima
MPO/RTPO: YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
-n
c
=
n
0 r-t
c,7 c.
(n =
al E
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D Road Name or Number
E. Begin & End Termini
F Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
19
YAK93
Powerhouse Road Multi -Use Path
Powerhouse Road
Mobile Home Park to Cowiche Canyon Rd.
Construct 10-foot paved pathway and install a crosswalk across Powerhouse Road
at Cowiche Canyon Road.
06/16/20
06/16/20
38
C 0 T
0.600
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2023
0
Ped/Bike Program
69,800
8,700
78,500
P
RW
2024
0
Ped/Bike Program
59,700
7,900
67,600
P
CN
2025
0
Ped/Bike Program
761,600
98,500
860,100
Totals
0
891,100
115,100
1,006,200
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
78,500
0
0
RW
0
0
0
67,600
0
CN
0
0
0
0
860,100
Totals
0
0
78,500
67,600
860,100
Report Date. June 17, 2020
Page 20
WWashington State
V Department of Transportation
AgencyYakima
County' Yakima
MPO/RTPO• YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
03
20
YAK105
Summitview Avenue Resurfacing
Summitview Avenue Resurfacing
N. 401h Avenue to N. 48th Avenue
Grind and overlay, and ADA curb ramp replacement.
06/16/20
06/16/20
05
CGOPS
T W
0.500
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2021
0
TIB
24,000
6,000
30,000
P
CN
2021
0
TIB
336,000
84,000
420,000
Totals
0
360,000
90,000
450,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
30,000
0
0
0
0
CN
420,000
0
0
0
0
Totals
450,000
0
0
0
0
Report Date June 17, 2020
Page 21
AZ*.
VWWashington State
' Department of Transportation
Agency. Yakima
County. Yakima
MPO/RTPO: YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F Project Description G. Structure ID
x
o
o
i
.
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
04
21
YAK104
Teton Drive Resurfacing
Tieton Drive
S. 48th Ave. to S. 72nd Ave.
Grind and overlay, and ADA curb ramp replacement.
06/16/20
06/16/20
05
CGO PS
T W
1 530
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2023
0
TIB
84,000
21,000
105,000
P
CN
2023
0
TIB
960,000
240,000
1,200,000
Totals
0
1,044,000
261,000
1,305,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
105,000
0
0
CN
0
0
1,200,000
0
0
Totals
0
0
1,305,000
0
0
Report Date: June 17, 2020
Page 22
Alats
IV;Washington State
Department of Transportation
Agency. Yakima
County. Yakima
MPO/RTPO: YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin 8, End Termini
F Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
22
YAK84
16th Avenue and Tieton Drive Intersection Improvements
16th Avenue
16th Avenue to Tieton Drive
Reconstruct and widen 16th Avenue and Tieton Drive by adding left -turn lanes for all
movements at the intersection. Upgrade the traffic signal.
06/16/20
06/16/20
04
CGOPS
T W
0 400
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2026
STP(U)
310,400
0
46,400
356,800
S
RW
2026
STP(U)
1,297,500
0
202,500
1,500,000
S
CN
2026
STP(U)
1,420,500
0
218,600
1,639,100
Totals
3,028,400
0
467,500
3,495,900
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th 8 6th
PE
0
0
0
0
356,800
RW
0
0
0
0
1,500,000
CN
0
0
0
0
1,639,100
Totals
0
0
0
0
3,495,900
Report Date. June 17, 2020
Page 23
VWWashington State
' Department of Transportation
Agency' Yakima
CountyYakima
MPO/RTPO: YVCOG
Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
Functional
Class
Priority Number
A. PIN/Project No. B. STIP ID
C. Project Title
D Road Name or Number
E. Begin 8 End Termini
F Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
23
YAK57
18th Street Underpass
Yakima Avenue
Yakima Avenue to 18th Street
Replace the bridge on E. Yakima Avenue that crosses over 18th Street.
06/16/20
06/16/20
11
CPT
0 010
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2025
BR
270,100
0
67,500
337,600
P
CN
2026
BR
2,575,200
0
643,800
3,219,000
Totals
2,845,300
0
711,300
3,556,600
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th 8 6th
PE
0
0
0
0
337,600
CN
0
0
0
0
3,219,000
Totals
0
0
0
0
3,556,600
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Yakima
25,128,488
26,433,100
6,278,950
57,840,538
Report Date June 17, 2020
Page 24
't..an,gtntj ka
d E$A
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. 6.
For Meeting of: June 16, 2020
ITEM TITLE: Public Hearing to consider: A) Resolution adopting the Six-Year
Transportation Improvement Program for the period of 2021
through 2026, and to amend the Transportation Systems Plan
2040; and B) Resolution amending the Yakima Urban Area
Comprehensive Plan Capital Facilities Element
SUBMITTED BY: Scott Schafer, Director of Public Works
Bob Desgrosellier, Chief Engineer- 575-6228
SUMMARY EXPLANATION:
This item contains two elements:
A) Each year the City of Yakima (City) is required by RCW 35.77.010 and RCW 36.81.121 to
update its Six-Year Transportation Improvement Program (TIP)for submittal to the Washington
State Department of Transportation. This Plan must include all transportation projects for which
state gas tax revenue and federal revenue will be used.
The proposed 2021-2026 TIP includes seven (7) funded projects that have full or partial
funding. These projects are:
Spring Creek Road Reconstruction; Phase 2
South 36th Avenue Reconstruction
Bravo Company Boulevard Extension
Cowiche Canyon Trail; Phases 1 and 2
34th Avenue / Fruitvale Blvd. & 34th Avenue / River Road Roundabouts
East Nob Hill Boulevard and Fair Avenue Intersection Improvements
McClure Elementary School Vicinity Safety I mprovements
Two more projects have just recently been funded and will be added to the 2021-2026 STIP:
48th Avenue & Washington Avenue Intersection Improvements (Spring Creek)
72nd Avenue & Washington Avenue Roundabout
Attached is the complete 2021 —2026 Six-Year TIP, which describes each project. The City will
continue to seek funding for the remainder of the projects included in the 2021-2026 TIP.
City Council and the public are welcome to add other arterial system projects to the list. The Six-
2
Year TI P project listing will be finalized at this hearing and sent to the Yakima Valley Conference
of Governments (YVCOG) after approval.
In order to utilize federal funds, such as those administered by the Federal Highway
Administration (FHWA) and the Federal Transit Authority (FTA), projects must be included in the
Statewide Transportation Improvement Program (STI P). The STIP is a prioritized program of
transportation projects, complied from local and regional plans, along with the Washington
Transportation System Plan (WTP), which provides a backbone for developing projects for the
inter -modal transportation network in the State of Washington.
The ST I P contains federally funded projects plus state and local projects that are regionally
significant. These projects have been identified through the planning process as the highest
priority for the available funding to the state's Transportation Program. Planning activities of state
and local governments are essential parts of integrated regional planning processes. Long range
transportation planning is a part of the comprehensive land use planning carried out by local
governments. Public participation is an integral part of the planning process at all levels. Local
agencies are required to develop and adopt a Six -year Transportation Program; holding at least
one public hearing during its development.
B) The City is required to amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element by incorporating the adopted Six -Year T I P for 2021 to 2026. This will ensure that we
are in compliance with the Growth Management Act and that we are consistent with the
Comprehensive Plan as required. The amendment is limited to incorporating only those projects
that are adopted in the Six -Year TIP and is not subject to the "once a year" change required
under the laws of the Growth Management Act.
The Public Hearing notice has been provided to all Yakima -area media, including tu Decides',
KDNA Radio, El Sol de Yakima, Hispanavision, Bustos Media, and El Mundo.
ITEM BUDGETED: NA
STRATEGIC PRIORITY: Public Trust and Accountability
APPROVED FOR SUBMITTAL BY THE CITY MANAGER
RECOMMENDATION:
Adopt resolutions