Loading...
HomeMy WebLinkAboutR-2020-070 Six-Year TIP 2021-2026 AdoptionA RESOLUTION RESOLUTION NO. R-2020-070 adopting the Six -Year Transportation Improvement Program (TIP) for the period of 2021 through 2026 for transportation improvements to arterial streets in the City of Yakima and amending the Transportation Systems Plan 2040 WHEREAS, the City of Yakima annually prepares, reviews and adopts a six -year program for transportation improvements to arterial streets in the City of Yakima for the ensuing six -year period, all as contemplated and required by the State RCW 35 77 010 and applicable federal law; and WHEREAS, the City of Yakima desires to amend the Transportation Systems Plan 2040 to ensure compliance with the Growth Management Act and the regional transportation plan for the construction of streets and arterial streets in the City Of Yakima, all as contemplated and required by State and Federal Law; and, WHEREAS, after a public hearing on the matter, held at the regular meeting of the Yakima City Council on June 16, 2020, with proper public notice as required by RCW 35 77 010, the City Council finds that the plan attached hereto should be adopted as the Six - Year Transportation Improvement Program for the period of 2021 through 2026 for transportation improvements to arterial streets in the City of Yakima, and, WHEREAS, adopting the Six -year Transportation Improvement Program and amending the Transportation Systems Plan 2040 are in the best interest of the City and its residents, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA: The Six -Year Construction Program for the period of 2021 through 2026, a copy of which is attached hereto and by this reference made a part thereof, is hereby adopted as the official Six -Year Transportation Improvement Program for the City of Yakima, including proposed amendments to the Transportation Systems Plan 2040 along with Street Improvements, which are also approved ADOPTED BY THE CITY COUNCIL this 16th day of June, 2020 ATTEST S-o-nya Clak t'ee, City Clerk NJ africia Byers, IVai yor eak. CWWashington State Department of Transportation Agency' Yakima County. Yakima MPO/RTPO. YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 8 End Termini F Project Description G. Structure ID gf Et.' 5' ,0 Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 03 YAK 106 North 1st Street Revitalization North 1st Street Revitalization, Phase 2 'I' Street to 'N' Street Improve North 1st Street by rehabilitating the pavement and lane markings, removing on -street parking, installing bike lanes, replacing and widening sidewalk, enhancing street lighting, installing pedestrian lighting, constructing median islands and installing various pedestrian and decorative elements. 06/16/20 06/16/20 04 CGPST W 0.500 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2021 0 TIB 1,000,000 2,840,000 3,840,000 Totals 0 1,000,000 2,840,000 3,840,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th CN 3,840,000 0 0 0 0 Totals 3,840,000 0 0 0 0 Report Date June 17, 2020 Page 1 Attu Washington State Department of Transportation Agency. Yakima County. Yakima MPO/RTPO. YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 03 1 / 000S(473) YAK44 34th Avenue & Fruitvale Boulevard, and 34th Avenue and River Road Roundabouts 34th Avenue River Road to Fruitvale Boulevard Improve the intersections of River Road & Fruitvale Boulevard, and N. 34th Avenue and River Road by installing roundabouts. 06/16/20 06/16/20 21 OPSTW 0200. CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S RW 2021 HSIP 76,820 0 8,870 85,690 S CN 2022 HSIP 788,308 0 87,590 875,898 Totals 865,128 0 96,460 961,588 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th RW 85,690 0 0 0 0 CN 0 875,898 0 0 0 Totals 85,690 875,898 0 0 0 Report Date. June 17, 2020 Page 2 LICZb. 77;Washington State 1 Department of Transportation Agency. Yakima County. Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F Project Description G. Structure ID Hearing Adopted > 3 cr, m 1 = Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 04 2 YAK11 Bravo Company Boulevard Bravo Company Blvd 'H' Street to 'D' Street Construct four -lane roadway section with median, bike lanes and roundabouts, install curb, gutter, sidewalk, street lighting and storm drainage system, along with water and sewer systems. 06/16/20 06/16/20 01 OPSTW 0.650 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2021 0 OTHER 15,000,000 0 15,000,000 Totals 0 15,000,000 0 15,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 15,000,000 0 0 0 0 Totals 15,000,000 0 0 0 0 Report Date. June 17, 2020 Page 3 aka VWApr, Washington State ' Department of Transportation Agency. Yakima County. Yakima MPO/RTPO• YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 8 End Termini F Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 3 / 4566(007) 2143 E Nob Hill Blvd & Fair Ave WS Improvements Nob Hill Blvd E Nob Hill Blvd to Fair Ave Widen Nob Hill Boulevard through the intersection, construct left -turn lane, curb, gutter, sidewalk, street lighting and drainage. Upgrade signal, including mast arm structures. 06/16/20 06/16/20 03 COPTW CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2024 STP(U) 1,460,160 0 227,890 1,688,050 Totals 1,460,160 0 227,890 1,688,050 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th CN 0 0 0 1,688,050 0 Totals 0 0 0 1,688,050 0 Report Date: June 17, 2020 Page 4 VW4. Washington State ' Department ot Transportation Agency • Yakima County. Yakima MPOIRTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type c E Z 0 o b. in Total Length Environmental Type RW Required 07 4 / SR17(011) YAK87 McClure Elementary School Safety Improvements Vairous Streets Various locations to various locations This project will make various pedestrian safety improvements in the vicinity of McClure Elementary School, such as, constructing sidewalk, ADA ramps and improving crosswalks. 06/16/20 06/16/20 38 COPT CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2021 0 SRTS 228,000 0 228,000 Totals 0 228,000 0 228,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & fith CN 228,000 0 0 0 0 Totals 228,000 0 0 0 0 Report Date. June 17, 2020 Page 5 /Ott Washington State Varif Department of Transportation AgencyYakima County' Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class -0 n. Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 9, A PIN/Project No. B. STIP ID .rZ z .-. C. Project Title x D. Road Name or Number 2 3 cr E. Begin & End Termini :.,. m 9 F Project Description G. Structure ID . 07 5 YAK106 06/16/20 06/16/20 03 CGOPS 0 100 CE No T W S. 48th Avenue and W Washington Avenue Improvements S. 48th Avenue (Spring Creek Road) W Washington Avenue to Spring Creek Road Construct a traffic signal at the S. 48th Ave. and W Washington Ave. intersection. S. 48th Ave. (Spring Creek Road) will be reconstructed and realigned to correct the substandard corner at Spring Creek Road. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2021 0 OTHER 23,000 0 23,000 S CN 2021 0 OTHER 627,000 0 627,000 Totals 0 650,000 0 650,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 23,000 0 0 0 0 CN 627,000 0 0 0 0 Totals 650,000 0 0 0 0 Report Date. June 17, 2020 Page 6 eats WWashington State ATIT Department of Transportation Agency • Yakima County • Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 6 YAK98 S. 72nd Avenue and W Washington Avenue Improvements S. 72nd Avenue S. 72nd Avenue to W Washington Ave. Improve intersection by constructing a roundabout. 06/16/20 06/16/20 21 OPSTW CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2021 0 OTHER 100,000 0 100,000 S RW 2021 0 OTHER 100,000 0 100,000 S CN 2022 0 OTHER 800,000 0 800,000 Totals 0 1,000,000 0 1,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 100,000 0 0 0 0 RW 100,000 0 0 0 0 CN 0 800,000 0 0 0 Totals 200,000 800,000 0 0 0 Report Date. June 17, 2020 Page 7 eft& TrWWashington State Department of Transportation Agency' Yakima County' Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 8 End Termini F Project Description G. Structure ID i Oi 3 . Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 7 / 1485(024) YAK80 Cowiche Canyon Trail Cowiche Canyon Rd Powerhouse Road to Trailhead Construct a pathway, including pedestrian bridges over Cowiche Creek 06/16/20 06/16/20 28 2.000 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S RW 2021 0 CWA 105,000 0 105,000 S CN 2021 0 CWA 1,695,000 0 1,695,000 Totals 0 1,800,000 0 1,800,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th RW 105,000 0 0 0 0 CN 1,695,000 0 0 0 0 Totals 1,800,000 0 0 0 0 Report Date. June 17, 2020 Page 8 Aga& Washington State Department of Transportation Agency • Yakima CountyYakima MPO/RTPO• YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 8 YAK92 North 1st Street Revitalization, Phase 3 North 1st Street MLK Boulevard to "J" Street Improve North 1st Street by rehabilitating the pavement and lane markings, removing on -street parking, installing bike lanes, replacing and widening sidewalk, enhancing street lighting, installing pedestrian lighting, constructing median islands and installing various pedestrian and decorative elements. 06/16/20 06/16/20 04 CGOPS T W 0.480 GE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2021 BUILD 4,320,000 TIB 1,040,000 0 5,360,000 Totals 4,320,000 1,040,000 0 5,360,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 5,360,000 0 0 0 0 Totals 5,360,000 0 0 0 0 Report Date. June 17, 2020 Page 9 aint, VWWashington State Department of Transportation Agency • Yakima County. Yakima MPO/RTPO. YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F Project Description G. Structure ID Hearing Adopted D 3 7 7 0. a Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 9 YAK10 E. "H" Street Extension, Phase 1 E. "H" Street 1st Street to 7th Street Construct new roadway inlcuding water, sewer, curb, gutter, sidewalk,street lighting and storm drainage system. 06/16/20 06/16/20 01 OPSTW 0 550 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2022 BUILD 515,000 0 0 515,000 P CN 2023 BUILD 4,944,000 TIB 1,200,000 0 6,144,000 Totals 5,459,000 1,200,000 0 6,659,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8, 6th PE 0 515,000 0 0 0 CN 0 0 6,144,000 0 0 Totals 0 515,000 6,144,000 0 0 Report Date June 17, 2020 Page 10 eft. WWashington State A; Department of Transportation AgencyYakima County' Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F Project Description G. Structure ID x : r!.. 2 Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 04 10 YAK74 E. "H" Street Extension, Phase 2 E. 'H' Street Bravo Co. Boulevard to 1-82 Construct new roadway including water, sewer, curb, gutter, sidewalk, street lighting and storm drainage system. 06/16/20 06/16/20 01 CGOPS T W 0.550 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2023 0 OTHER 2,060,000 515,000 2,575,000 Totals 0 2,060,000 515,000 2,575,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 0 0 2,575,000 0 0 Totals 0 0 2,575,000 0 0 Report Date. June 17, 2020 Page 11 Washington State VIAPY Department of Transportation Agency' Yakima CountyYakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F Project Description G. Structure ID Hearing, Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 11 YAK03 1-82 & Lincoln Avenue Interchange Lincoln Avenue E. "G" Street to 1-82 Reconstruct/extend off -ramp from existing 1-82 off -ramp for Lincoln Avenue to E "G" Street 06/16/20 06/16/20 01 GO P CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2026 BUILD 301,400 0 46,400 347,800 P RW 2026 BUILD 194,700 0 30,400 225,100 P CN 2026 BUILD 1,890,400 0 295,000 2,185,400 Totals 2,386,500 0 371,800 2,758,300 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 347,800 RW 0 0 0 0 225,100 CN 0 0 0 0 2,185,400 Totals 0 0 0 0 2,758,300 Report Date. June 17, 2020 Page 12 .....mr•11214:.. Washington State Vat, Department of Transportation Agency' Yakima County" Yakima MPOIRTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 8, End Termini F Project Description G. Structure ID x 2 -g' = Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 12 YAK88 Robertson Elementary School Safety Improvements various streets various locations to various locations This project will make various pedestrian safety improvements in the vicinity of Robertson Elementary School, such as new sidewalk and constructing ADA ramps. 06/16/20 06/16/20 28 COPT CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 SRTS 50,000 0 0 50,000 P CN 2022 SRTS 460,000 0 0 460,000 Totals 510,000 0 0 510,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 50,000 0 0 0 0 CN 460,000 0 0 0 0 Totals 510,000 0 0 0 0 Report Date. June 17, 2020 Page 13 Washington State D e p a r tment of Transportation Agency. Yakima County. Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D Road Name or Number E. Begin & End Termini F Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 07 13 YAK103 Nob Hill Elementary School Safety Improvements various streets various locations to various locations This project will make various pedestrian safety improvements in the vicinity of Nob Hill Elementary School, such as new sidewalk and constructing ADA ramps. 06/16/20 06/16/20 28 COPT CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 SRTS 50,000 0 0 50,000 P CN 2022 SRTS 460,000 0 0 460,000 Totals 510,000 0 0 510,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 50,000 0 0 0 0 CN 0 460,000 0 0 0 Totals 50,000 460,000 0 0 0 Report Date. June 17, 2020 Page 14 VWWashington State / Department of Transportation Agency • Yakima County. Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 14 / 1485(025) YAK72 Northside Alley Paving Various Alleys N. 161h Avenue to N. 61h Avenue Pave the east/west gravel alleys between Summitview Avenue and Fruitvale Boulevard from 161h Avenue to 61h Avenue 06/16/20 06/16/20 05 COPT 3.500 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 CMAQ 50,000 0 7,800 57,800 P CN 2022 CMAQ 450,000 0 70,200 520,200 Totals 500,000 0 78,000 578,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 51h 8 6th PE 57,800 0 0 0 0 CN 0 520,200 0 0 0 Totals 57,800 520,200 0 0 0 Report Date. June 17, 2020 Page 15 Alba IV;Washington State Department of Transportation Agency' Yakima CountyYakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 15 YAK70 Box Culvert Installations S. 801h Avenue and Wide Hollow Road Wide Hollow Road to Plath Avenue Install box culvert (s) adjacent to the 801h Avenue Bridge and Wide Hollow Bridge to reduce flooding issues. Joint project with Yakima County 06/16/20 06/16/20 10 0.050 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P CN 2022 0 OTHER 160,000 0 160,000 Totals 0 160,000 0 160,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 160,000 0 0 0 0 Totals 160,000 0 0 0 0 Report Date: June 17, 2020 Page 16 sfilb. Washington State Department of Transportation Agency. Yakima County. Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 16 YAK102 N 1st St & R St Signal N 1st Street to R Street Install traffic signal at the intersection. 06/16/20 06/16/20 21 PT 0.100 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 STP 58,000 0 9,000 67,000 P CN 2026 STP 347,800 0 54,300 402,100 Totals 405,800 0 63,300 469,100 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 67,000 CN 0 0 0 0 402,100 Totals 0 0 0 0 469,100 Report Date. June 17, 2020 Page 17 aft& IV;Washington State Department of Transportation Agency" Yakima County' Yakima MPO/RTPO" YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 17 YAK06 S. 1st Street and E Washington Avenue Intersection Improvement S. 1st Street S. 1st Street to E. Washington Ave Realign intersection, widen E Washington Avenue to accomodate an additional lane, replace curb, gutter and sidewalk and install a new traffic signalization system. 06/16/20 06/16/20 03 OPSTW CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2026 STP(U) 292,600 0 45,000 337,600 P RW 2026 STP(U) 284,100 0 43,700 327,800 P CN 2026 STP(U) 1,284,800 0 200,500 1,485,300 Totals 1,861,500 0 289,200 2,150,700 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 337,600 RW 0 0 0 0 327,800 CN 0 0 0 0 1,485,300 Totals 0 0 0 0 2,150,700 Report Date. June 17, 2020 Page 18 attkik 17; A. Washington State Department of Transportation Agency' Yakima CountyYakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 8 End Termini F Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 18 YAK14 Washington Avenue & Longfiber Road Intersection Improvements Washington Avenue Washington Avenue to Longfiber Road Improve the Washington Avenue and Longfiber Road intersection by constructing an eastbound left -turn lane on Washington and a northbound left -turn lane on Longfiber, install or replace curb, gutter, sidewalk, street lighting, storm drainage and safety flashing signal 06/16/20 06/16/20 21 COPST W GE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2026 STP(U) 114,300 0 17,800 132,100 P RW 2026 STP(U) 111,000 0 17,300 128,300 P CN 2026 STP(U) 751,400 0 117,300 868,700 Totals 976,700 0 152,400 1,129,100 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 132,100 RW 0 0 0 0 128,300 CN 0 0 0 0 868,700 Totals 0 0 0 0 1,129,100 Report Date. June 17, 2020 Page 19 VW;Washington State Department of Transportation AgencyYakima County' Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside -n c = n 0 r-t c,7 c. (n = al E Priority Number A. PIN/Project No. B. STIP ID C. Project Title D Road Name or Number E. Begin & End Termini F Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 19 YAK93 Powerhouse Road Multi -Use Path Powerhouse Road Mobile Home Park to Cowiche Canyon Rd. Construct 10-foot paved pathway and install a crosswalk across Powerhouse Road at Cowiche Canyon Road. 06/16/20 06/16/20 38 C 0 T 0.600 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2023 0 Ped/Bike Program 69,800 8,700 78,500 P RW 2024 0 Ped/Bike Program 59,700 7,900 67,600 P CN 2025 0 Ped/Bike Program 761,600 98,500 860,100 Totals 0 891,100 115,100 1,006,200 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 78,500 0 0 RW 0 0 0 67,600 0 CN 0 0 0 0 860,100 Totals 0 0 78,500 67,600 860,100 Report Date. June 17, 2020 Page 20 WWashington State V Department of Transportation AgencyYakima County' Yakima MPO/RTPO• YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 03 20 YAK105 Summitview Avenue Resurfacing Summitview Avenue Resurfacing N. 401h Avenue to N. 48th Avenue Grind and overlay, and ADA curb ramp replacement. 06/16/20 06/16/20 05 CGOPS T W 0.500 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2021 0 TIB 24,000 6,000 30,000 P CN 2021 0 TIB 336,000 84,000 420,000 Totals 0 360,000 90,000 450,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 30,000 0 0 0 0 CN 420,000 0 0 0 0 Totals 450,000 0 0 0 0 Report Date June 17, 2020 Page 21 AZ*. VWWashington State ' Department of Transportation Agency. Yakima County. Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F Project Description G. Structure ID x o o i . Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 04 21 YAK104 Teton Drive Resurfacing Tieton Drive S. 48th Ave. to S. 72nd Ave. Grind and overlay, and ADA curb ramp replacement. 06/16/20 06/16/20 05 CGO PS T W 1 530 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2023 0 TIB 84,000 21,000 105,000 P CN 2023 0 TIB 960,000 240,000 1,200,000 Totals 0 1,044,000 261,000 1,305,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 105,000 0 0 CN 0 0 1,200,000 0 0 Totals 0 0 1,305,000 0 0 Report Date: June 17, 2020 Page 22 Alats IV;Washington State Department of Transportation Agency. Yakima County. Yakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 8, End Termini F Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 22 YAK84 16th Avenue and Tieton Drive Intersection Improvements 16th Avenue 16th Avenue to Tieton Drive Reconstruct and widen 16th Avenue and Tieton Drive by adding left -turn lanes for all movements at the intersection. Upgrade the traffic signal. 06/16/20 06/16/20 04 CGOPS T W 0 400 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2026 STP(U) 310,400 0 46,400 356,800 S RW 2026 STP(U) 1,297,500 0 202,500 1,500,000 S CN 2026 STP(U) 1,420,500 0 218,600 1,639,100 Totals 3,028,400 0 467,500 3,495,900 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 0 0 0 0 356,800 RW 0 0 0 0 1,500,000 CN 0 0 0 0 1,639,100 Totals 0 0 0 0 3,495,900 Report Date. June 17, 2020 Page 23 VWWashington State ' Department of Transportation Agency' Yakima CountyYakima MPO/RTPO: YVCOG Y Inside Six Year Transportation Improvement Program From 2021 to 2026 N Outside Functional Class Priority Number A. PIN/Project No. B. STIP ID C. Project Title D Road Name or Number E. Begin 8 End Termini F Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 23 YAK57 18th Street Underpass Yakima Avenue Yakima Avenue to 18th Street Replace the bridge on E. Yakima Avenue that crosses over 18th Street. 06/16/20 06/16/20 11 CPT 0 010 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2025 BR 270,100 0 67,500 337,600 P CN 2026 BR 2,575,200 0 643,800 3,219,000 Totals 2,845,300 0 711,300 3,556,600 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 0 0 0 0 337,600 CN 0 0 0 0 3,219,000 Totals 0 0 0 0 3,556,600 Federal Funds State Funds Local Funds Total Funds Grand Totals for Yakima 25,128,488 26,433,100 6,278,950 57,840,538 Report Date June 17, 2020 Page 24 't..an,gtntj ka d E$A BUSINESS OF THE CITY COUNCIL YAKIMA, WASHINGTON AGENDA STATEMENT Item No. 6. For Meeting of: June 16, 2020 ITEM TITLE: Public Hearing to consider: A) Resolution adopting the Six-Year Transportation Improvement Program for the period of 2021 through 2026, and to amend the Transportation Systems Plan 2040; and B) Resolution amending the Yakima Urban Area Comprehensive Plan Capital Facilities Element SUBMITTED BY: Scott Schafer, Director of Public Works Bob Desgrosellier, Chief Engineer- 575-6228 SUMMARY EXPLANATION: This item contains two elements: A) Each year the City of Yakima (City) is required by RCW 35.77.010 and RCW 36.81.121 to update its Six-Year Transportation Improvement Program (TIP)for submittal to the Washington State Department of Transportation. This Plan must include all transportation projects for which state gas tax revenue and federal revenue will be used. The proposed 2021-2026 TIP includes seven (7) funded projects that have full or partial funding. These projects are: Spring Creek Road Reconstruction; Phase 2 South 36th Avenue Reconstruction Bravo Company Boulevard Extension Cowiche Canyon Trail; Phases 1 and 2 34th Avenue / Fruitvale Blvd. & 34th Avenue / River Road Roundabouts East Nob Hill Boulevard and Fair Avenue Intersection Improvements McClure Elementary School Vicinity Safety I mprovements Two more projects have just recently been funded and will be added to the 2021-2026 STIP: 48th Avenue & Washington Avenue Intersection Improvements (Spring Creek) 72nd Avenue & Washington Avenue Roundabout Attached is the complete 2021 —2026 Six-Year TIP, which describes each project. The City will continue to seek funding for the remainder of the projects included in the 2021-2026 TIP. City Council and the public are welcome to add other arterial system projects to the list. The Six- 2 Year TI P project listing will be finalized at this hearing and sent to the Yakima Valley Conference of Governments (YVCOG) after approval. In order to utilize federal funds, such as those administered by the Federal Highway Administration (FHWA) and the Federal Transit Authority (FTA), projects must be included in the Statewide Transportation Improvement Program (STI P). The STIP is a prioritized program of transportation projects, complied from local and regional plans, along with the Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the inter -modal transportation network in the State of Washington. The ST I P contains federally funded projects plus state and local projects that are regionally significant. These projects have been identified through the planning process as the highest priority for the available funding to the state's Transportation Program. Planning activities of state and local governments are essential parts of integrated regional planning processes. Long range transportation planning is a part of the comprehensive land use planning carried out by local governments. Public participation is an integral part of the planning process at all levels. Local agencies are required to develop and adopt a Six -year Transportation Program; holding at least one public hearing during its development. B) The City is required to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element by incorporating the adopted Six -Year T I P for 2021 to 2026. This will ensure that we are in compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as required. The amendment is limited to incorporating only those projects that are adopted in the Six -Year TIP and is not subject to the "once a year" change required under the laws of the Growth Management Act. The Public Hearing notice has been provided to all Yakima -area media, including tu Decides', KDNA Radio, El Sol de Yakima, Hispanavision, Bustos Media, and El Mundo. ITEM BUDGETED: NA STRATEGIC PRIORITY: Public Trust and Accountability APPROVED FOR SUBMITTAL BY THE CITY MANAGER RECOMMENDATION: Adopt resolutions ATTACHMENTS: Description Upload Date D Resolution A Fil412071 D Resolution B 5/4120al D 6-ktor STIP 2021-2226 5'4/2020 Type Rcsolulupp Recolulloa Backup Mutcnal