HomeMy WebLinkAboutR-2008-111 2009-2014 Six-Year Transportation Improvement Program [FUNDING RESOLUTION]RESOLUTION NO. R-2008-111
A RESOLUTION adopting a Six -Year Transportation Improvement Program for the
period of 2009 through 2014 for the construction of streets and
arterials streets in the City of Yakima and amending the Metropolitan
Transportation Plan.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year
Program for the construction of streets and arterial streets in the City of Yakima for the
ensuing six year period, all as contemplated and required by State RCW 35.77.010 and
applicable Federal law; and
WHEREAS, the City of Yakima desires to amend the Metropolitan Transportation
Plan to ensure compliance with the Growth Management Act and the regional transportation
plan for the construction of streets and arterial streets in the City of Yakima, all as
contemplated and required by State and Federal law, and
WHEREAS, after public hearings on the matter, held at regular meetings of the
Yakima City Council on July 1, 2008, and on July 15, 2008, with proper public notice as
required by RCW 35.77.010, the City Council finds that the plan attached hereto should be
adopted as the Six -Year Transportation Improvement Program for the period of 2009
through 2014 for the construction of streets and arterial streets in the City of Yakima, now,
therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The Six -Year Construction Program for the period of 2009 through 2014, a copy of
which is attached hereto and by this reference made a part hereof, is hereby adopted as the
official Six -Year Transportation Improvement Program for the City of Yakima, including
proposed amendments to the Metropolitan Transportation Plan along with Street
Improvements, which are also approved.
ADOPTED BY THE CITY COUNCIL this 15(h day of July, 2008.
ATTEST:
City Cle
Davi • ''dler, Mayo
•
•
9. Appendices
A. Six Year Form Instructions
Heading
Agency Enter name of the sponsoring agency.
County Number Enter the OFM assigned number (see LAG Appendix 21.44).
City Number Enter the OFM assigned number (see LAG Appendix 21.45).
MPO/RTPO Enter the name of the associated MPO (if located within urbanized area) or
RTPO (if located in a rural area).
Hearing Date Enter the date of the public hearing.
Adoption Date Enter the date this program was adopted by council or commission.
Resolution Number Enter Legislative Authority resolution number (if applicable.)
Amendment Date Enter the date this program was amended by council or commission.
Column Number
1. Functional Classification. Enter the appropriate 2 -digit code denoting the Federal
Functional Classification. (Note: The Federal Functional Classification' must be
approved by FHWA.)
Description
00- No Classification
Rural (Under 5000 pop.)
01 - Interstate
02 - Principal Arterials
06 - Minor Arterials
07 - Major Collector
08 - Minor Collector
09 - Local Access
Urban (Over 5000 pop.)
11- Interstate
12- Freeways & Expressways
14- Other Principal Arterials
16- Minor Arterial •
17- Collector
19- Local Access
1. Priority Numbers. Enter local agency number identifying agency project priority
(optional).
2. Project Identification. Enter (a) Federal Aid Number if previously assigned; (b)
Bridge Number; (c).Project Title; (d) Street/Road Name or Number/Federal Route
Number; (e) Beginning and Ending Termini (mile post or street names); and (f)
Describe the Work to be Completed.
3. Improvement Type Codes. Enter the appropriate federal code number.
Description
07 - Resurfacing
08 - New Bridge Construction
09- Bridge Replacement
10 - Bridge Rehabilitation
11 - Minor Bridge Rehabilitation
12 - Safety/Traffic Operation/TSM
13 - Environmentally Related
01- New construction on
new alignment
02- Relocation
Project
03- Reconstruction
04- Major Widening
05- Minor Widening
06- Other Enhancements
25
14 - Bridge Program -Special .
21 - Transit Capital Project
22- Transit Operational
23 -.Transit Planning
24 - Transit Training/Admin.
31- Non Capital Improvement
32 - Non Motor Vehicle Project
5. Funding Status. Enter the funding status for the entire project which describes the
current status.
S - Project is selected by the appropriate selection body and funding has
been secured by the lead agency.
P - Project is subject to selection by an agency other than the lead and is
listed for planning purposes. (Funding has not been determined.)
6. Total Length. Enter project length to the nearest hundredth (or code "00" if not
applicable).
7. Utility Code(s). Enter the appropriate code letter(s) for the utilities that would
need to be relocated or are impacted by the construction project.
C - Cable TV
O - Other
S - Sewer (other than agency -owned)
W - Water
G - Gas
P Power
T - Telephone
8. Project Phase. Select the appropriate phase code of the project.
PE - Preliminary Engineering only (or Planning)
RW - Right of Way or land acquisition only (or equipment purchase)
CN - Construction only (or transit operating)
ALL - All Phases: from Preliminary Engineering through Construction
9. Phase Start Date. Enter the month/day/year in MM/DD/YY format that the
selected phase of the project is actually expected to start.
10. Federal Fund Code. Enter the Federal Fund code from the table.
FTA Discretionary for Capital Expenditures
BIA - Bureau of Indian Affairs 5307 - FTA Urban Areas
BR - Bridge Replacement or Rehab. 5309(Bus)- Bus
CDBG - Community Development 5309(FG) - Fixed Guideways
Block Grant (HUD) 5309(NS) - New Starts
CMAQ - Congestion Mitigation Air Quality 5310 - FTA Elderly/Disabled
DEMO - ISTEA Demo Project (Selected) 5311 - FTA Rural Areas
Discretionary - Ferry Boat Discretionary, Public REV - Rural Economic Vitality Program
Lands Highways, or Scenic Byways STP(C) - STP Statewide Competitive Program
DOD - Dept. of Defense STP(E) - STP Transportation Enhancements
IC - Interstate Construction STP(S) - STP Safety Including Hazard and RR
IM - Interstate Maintenance STP(R) - STP Rural Regionally Selected
NHS - National Highway System STP(U) - STP Urban Regionally Selected
STP - WSDOT use only
11. Federal Funds. Enter the total federal cost (in thousands) of the phase
regardless of when the funds will be spent.
12. State Fund Code. Enter the appropriate code for any of the listed state funds
to be used on this project.
26
CAPP - County Arterial Preservation Program PWTF - Public Works Trust
CHAP - City Hardship Assistance Program RAP - Rural Arterial Program
TPP - Transportation Partnershis'Program SCP - Small City Program
AIP - Arterial Improvement Program WSDOT - WSDOT funding
PSMP - Pedestrian Safety & Mobility Program OTHER - All other unidentified state funding
PTST - Public Transportation Systems Progra
13. State Funds. Enter all funds from the State Agencies (in thousands) of the phase
regardless of when the funds will be spent.
14. Local Funds. Enter all the funds from Local Agencies (in thousands) of the phase
regardless of when the funds will be spent.
15: Total Funds. • Enter the sum of columns 10, 12, and 14. (Auto -calculation in the "STIP
Too" program.)
16-19. Expenditure Schedule - (1st, 2nd, 3rd, 4th thru 6th years). Enter the estimated
expenditures (in thousands) of dollars by year. (This data is for Local Agency use.)
20. Environmental Data Type. Enter the type of environmental assessment that will be
required for this project. (This is "required" for Federally funded projects, but may be
filled in for state or locally funded projects.)
EIS . - Environmental Impact Statement
EA - Environmental Assessment
CE - Categorical Exclusion
21. RJW Certification. Click Y if Right of Way acquisition is required. If yes, Enter R/W
Certification Date, if known. (This is "required" for Federally funded projects only.)
27
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date:
Amend Date:
7-1-2008
Adoption Date:
Resolution No.:
To
4 m
c U
LL
w a,
:o E
i Z
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
(MMDate/VY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
_
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
1
-
Yakima Railroad Grade Separations - Phase 2
Lincoln Ave. 8 Martin Luther King J. Blvd.
from: N 1st St to: N 1st Ave
Construct Grade Separations and adjacent roadway reconstructon,
including realignment of Front Street.
01
06
07
08
S
0.2
T
G
O
W
S
CN
CN
CN
1/1/2009
1/1/2009
4/1/2009
STP(U)
20600
FMSIB
OTHER
AIP
4500
2250
4650
1000
5500
2250
25250
15000'
18000
EA
Yes
3/01/07
Totals 20,600 11400 1000 33000 15000 18000
14
2
16TH AVENUE REALIGNMENT
16TH AVENUE REALIGNMENT
from AHTANUM ROAD to WASHINGTON AVENUE
Realign 16th Avenue out of the runway safety area of the Yakima Air
Terminal Includes FAA funds.
01
08
S
1.0
P
O
T
W
$
CN
4/1/2009
3840
38401 3840
EA
Yes
11/2007
Totals 3840 3840 3840
00
3
YVT Railway Rehabilitation & Museum
3rd Ave
from: 3rd Ave to: Pine St
Car Barn, Museum Restoration and Pathway
03
P
N/A
G
C
S
T
W
P
PE
CN
1/1/2009
6/1/2009
STP(E)
STP(E)
18
1900
_
32
285
50
21851
50
2185
EA
No
Totals 1,918 317 2235 2235
00
4
'
Transit Operating Expenditures
Various Funding Areas
from: N/A to' N/A
Supplemental Funding for Transit Service Operating Expenses
12
22
23
24
31
S
N/A
CN
1/1/2009
5307
1655
1655
33101 3310
CE
No
Totals 1,655 1655 3310 3310
Report Date: July 10, 2008
•
Page 1
v. 5.7 - Supersedes previous editions
•
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
7-1-2008
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
Functional
Class
Priority I
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. ' Project Title
D. Street/Road Name or Number•
E. Beginning MP or Road - EndingMP or Road
g g
F. Describe Work to be Done
Improvement I
Type(s)
�—
vi
in
ITotal Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase 1
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
5
YVTTrolley Barn/Powerhouse Rehabilitation
S 3rd Ave0
from: to:
Minor car barn and powerhouse restoration including property purchase
03
S
N/A
C
G
P
S
T
W
PE
RW
CN
1/1/2009
1/1/2009
1/1/2009
STP(E)
STP(E)
STP(E)
36
205
255
36
205
255
36
205
255
-
CE
Yes
06/01/07
Totals 496 496 496
00
6
Street Asset Amenities (Transit)
Route Maintenance, Repair and Improvements
from: to:
Maintenance of Shelters, Benches and Signage throughout our Transit
Route System
22
31
-
S
N/A
ALL
1/1/2009
WSDOT
.
-
50
50
-
50
-
CE
No
Totals 50 50 50
00
7
William 0 Douglas Trail
6th Ave Pathway & Bridge Decking
from: to:
Build pathway and install pathway decking on Naches River bridge with
partner William 0 Douglas Trail Fundation
32
08
06
S
1.0
'
0
P
w
T
CN
4/1/2009
STP(E)
525
5251 525
CE
No
Totals 525 525 525
00
8
William 0. Douglas Hentage Trails
Bridge Restoration & Trailhead
from: - to:
Trailhead restoration, right of way acquisition partner with the Wiliam 0.
Douglas Foundation, including restoration of bndge , cleaning, rust removal
and painting
32
13
10
S
N/A
G
P
S
T
W
PE
RW
CN
1/1/2009
1/1/2009
1/1/2009
STP(E)
STP(E)
STP(E)
65
150
285
65
150
285
65
150
285
CE
Yes
01/01/07
Totals 500 500 500
Report Date: July 10, 2008
Page 2
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7-1-2008 Adoption Date:
Amend Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or NumberRequired
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase 1
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Date
(MMyy)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
9
Transit Service to Terrace Heights
New University & Retail Links
from: to:
Provide Transit service to this growing area of Yakima County to include the
new University & Retail Shops
22
S
N/A
ALL
1/1/2009
WSDOT
51
9
60
60
No
Totals 51 9 60 60
14
10
Nob Hill Blvd
Nob Hill Blvd
from: S 52nd Ave to: S 68th Ave
Widen, curb, gutter, sidewalk, lighting, drainage
04
P
-77
P
G
O
T
T
W
PE
RW
CN
1/1/2009
1/1/2009
1/1/2009
STP(U)
1000
TPP
TPP
200
1300
300
200
2000
500
200
4300
500
200
4300
EA
Yes
01/01/07
Totals 1,000 1500 2500 5000 5000
00
11
Annual Signal Upgrades
Local Selection
from: N/A to: N/A
Upgrade signals
01
P
N/A
PE
CN
CN
1/1/2009
4/1/2009
4/1/2009
STIP (S)
STP(S)
STIP (S)
60
180
360
AIP
240
60
120
420
360
120
420
360
CE
No
Totals 600 240 60 900 120 780
00
12
Various Overlay Projects/Selected on Local Priority
N/A
from: N/A to: N/A
07
PEA
N/A
W
S
CN
6/1/2009
I STP(U)
228
32
2601 260
No
Totals 228 32 260 260
Report Date' July 10, 2008
Page 3
•
v. 5.7 - Supersedes previous editions
Am Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
S
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7/1/2008 Adoption Date:
Amend Date: Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
-
Expenditure Schedule
Local Agency
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNV
Required
Date
(MM/y1�
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11 :
12
13
14
15
16
17
18
19
20
21
00
13
Storm Drains Vegetation
Local Selection
from: City Wde to:
City Wde
32
P
N/A
PE
CN
1/1/2009
1/1/2009
100
900
100
900
100
900
EA
No
Totals 1000 1000 1000
17
14
Reconstruction Rudkin Rd
Rudkin Rd
from: E Viola Ave to: Rainier Place
Reconstruct, excavate ballast, top course, curb, gutter, sidewalk
Partner with City of Union Gap, additional sewer force main
03
06
P
.76
W
T
S
PE
CN
1/1/2010
1/1/2011
STP(C)
STP(C)
109
945
TPP
945
27
106
136
1996
136
1996
CE
No
Totals 1,054 945 133 2132 136 1996
16
15
E Mead Ave Reconstruction
E Mead Ave '
from: Rudkin Rd to: Fair Ave
Partner with City of Union Gap, reconstruct, excavate ballast, top course,
curb, gutter, storm, acp
03
06
P
.76
C
G
0
P
T
PE
CN
9/1/2010
4/1/2010
STP(S)
STP
122
1730
TPP
TPP
23
206
7
70
152
2006
152
2006
CE
No
_
Totals 1,852 229 77 2158 , 152 ' 2006
19
16
LongfiberRd &WashingtonAve
Intersection -
from: - - to:
New intersection construction and reconstruction, 3 -lane and 5 -lane Mum,7/1/2009
curb, gutter, sidewalks.
03
05
06
P
N/A
p
S
W
T
PE
CN
1/1/2010
1/1/2011
STP(U)
STP(U)
100
- 700
14
95
114
795
114
795
CE
Yes
Totals 800 ' 109 909 114 795
Report Date: July 10, 2008
Page 4
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7/1/2008 Adoption Date:
Amend Date: Resolution No.:
m g;Local
B a
U
LLE.
Priority I
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
a
u)
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
Agency)
Federally Funded
Projects Only
Project Phase 1
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
DateV)
(MM/y
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
17
E Nob Hill Blvd & S 18th St
E Nob Hill Blvd
from: S 18th St to: E Nob Hill Blvd
Widen south leg for double LT from west bound Nob Hill, (Tie to WSDOT
Project) possible curb, gutter and sidewalk
04
01
P
1
C
S
W
T
CN
1/1/2009
STP(U)
240
42
282
282
CE
Yes
01/01/07
Totals 240 42 282 282
16
18
Roadway City Wide Shoulder Improvements
City Wide
from. ' to:
City Wde shoulder improvements, PM10 abatement.
01
P
N/A
S
PE
CN
4/1/2009
7/1/2009
CMAQ
CMAQ
24
480
3
65
27
545
27
545
CE
No
Totals 504 68 572 572
14
19
E Nob Hill Blvd & Fair Ave
E Nob Hill Blvd
from' E Nob Hill Blvd to: Fair Ave
Intersection widening 8 new signal, curb, gutter and sidewalk, street
lighting, stormwaler
31
03
04
S
N/A
O
C
P
T
W
PE
1/1/2009
STP(U)
72
11
831 83
CE
Yes
10/01/2009
Totals 72 11 83 83
17
20
S 80th Ave - Tieton Dr to Zier Rd
S 80th Ave
from: Tielon Dr to: Zier Rd
Major widening, curb, gutter, sidewalk
04
P
1.3
O
P
T
W
S
PE
RW
CN
1/1/2009
1/1/2010
6/1/2010
AIP
AIP
AIP
131
382
1667
20
59
260
151
441
1927
151
441
1927
EA
Yes
01/01/09
Totals 2180 339 2519 151 2368
Report Date: July 10, 2008
410
Page 5
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
WAF
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG '
•
•
Six Year Transportation Improvement Program
From 2009 to 2014
7/1/2008 Adoption Date:
Resolution No.: -
Hearing Date:
Amend Date:
c
:F., m
c
LL
Priority I
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E.' Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Expenditure
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M >7
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
PE
1/1/2009
STP(E)
22
7
29
29
17
21
05
S
.15
C
CN
6/1/2009
STP(E)
75
20
95
95
CE
Zier Rd - S 75111 Ave to S 72nd Ave
06
S
Zier Rd
from: S 75th Ave - to: S 72nd Ave
T
P
Yes
Minor vndening, curb, gutter and sidewalk
03/01/09
Totals 97 27 124 124
17
22
05
P
1.0
W
PE
RW
1/1/2012
6/1/2012
STP(C)
STP(C)
272
349
43
55
315
404
315
404
EA
Englewood Ave - N 40th Ave to N 56th Ave
Englewood Ave
from: N 40th Ave to- N 56th Ave
06
S
T
P
CN
1/1/2013
STP(C)
2352-
-
340
- 2692
-
2692
Yes
Widen roadway, curb, gutter, sidewalk
0
04/01/11
•
Totals 2,973 438 3411 3411
17
23
05
P
2
PE
RW
1/1/2010
1/1/2011
STP(U)
STP(U)
219
327
34
51
253
378
253
378
EA
Englewood Ave - N 24th Ave to N 16th Ave
Englewood Ave
06
W
S
CN
6/1/2012
STP(U)
2980
244
3224
3224
Yes
from: N 16th Ave to: N 24th Ave
Widen, curb, gutter and sidewalk, water and sewer lines
01/01/10
Totals 3,526 '329' 3855 - 253 378 3224
00
24
14
P
.25
T
T
PE
1/1/2011 .
3/1/2012
STP(E)
STP(E)
252
34
286
286
Pedestrian Bridge
34
CN
3150
412
. 3562
3562
CE
Pedestrian Bridge
0
No
from: N 10th St to: Yakima Greenway
Construct pedestrian bndge from Gateway area to Yakima Greenway,
power, handicap accessible, lights
Totals 3,402 446 3848 286 3562
Report Date' July 10, 2008
Page 6
v. 5.7 - Supersedes previous editions
V//
Agency: Yakima
Washington State Department of Transportation
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7/1/2008 Adoption Date:
Amend Date: Resolution No.:
o m
c U.
Li_
' E
Cl-nZ
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
Street/Road-Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
d
E a
E
E
m
rn
rn
J
;o
i2
m
v
rT
-
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(Mpl/yy)
Federal
Fund
Code
Federal
Cost b y
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00.
25
Gravel Road 8 S.T.
Vanous Areas
from: City Wide to:
07
P
N/A
S
PE
CN
4/1/2009
6/1/2009
CMAQ
195
252
38
252
233
100
70
82
233
CE
No
Totals 195 290 485 100 70 315
16
26
Powerhouse Rd & Englewood Ave
Powerhouse Rd
from: Powerhouse Rd to: Englewood Ave
Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal,
possible roundabout
12
P
N/A
T
P
0
S
S
W
CN
10/1/2010
STP(S)
504
74
5781 578
CE
Yes
09/01/2009
Totals 504 74 578 578
14
27
S 48th Ave & Summdwew Ave Signalization
S 48th Ave
from: S 48th Ave to: Summitview Ave
Signalization
12
P
N/A
P
T
PE
RW
CN
1/1/2012
6/1/2012
8/1/2013
STP(S)
STP(S)
STP(S)
25
25
554
4
4
81
29
29
635
-
29CE
29
635
Yes
06/01/12
Totals 604 89 693 693
16
28
S 3rd Ave & W Washington Ave Signal
S 3rd Ave
from: S 3rd Ave to. W Washington Ave
Signal Upgrades
12
p
- N/A
T
PE
CN
4/1/2009
6/1/2009
13
214
13
214
13
1 214
CE
No
Totals 227 227 227
Report Date: July 10, 2008
•
Page 7
•
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
•
Six Year Transportation Improvement Program
From 2009 to 2014.
Hearing Date: 7/1/2008 Adoption Date:
Amend Date: Resolution No.:
To
UC.
S o
LL
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Types)
in
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyY)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNV
Required
Date
(M yl
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
29
12
S
N/A
P
PE
RW
1/1/2009
6/1/2009
AIP
AIP
120
84
52
36
172
120
100
40
72
80
CE
S 16th Ave & W Washington Ave Signal & Intersection.
05
T
CN
6/1/2009
AIP
880
383
1263
1263
Yes
S 16th Ave
from: S 16th Ave to: W Washington Ave
03
Included in Union Gaps Valley Mall Blvd. protea
3/1/2009
Totals 1084 471 1555 1403 152
14
30
12
P
2 5
P
PE
RW
1/1/2010
6/1/2010
STP(S)
STP(S)
55
107
8
19
63
126
63
126
CE
W Nob Hill Blvd Sidewalks
- .
T
CN
3/1/2011
STP(S)
321
57
378
-
378
Yes
W Nob Hill Blvd
from: S 16th Ave to: S. 6th St.
W
S
Install missing sidewalks on southside of Nob Hill.
09/01/08
Totals 483 84 567 189 378
00
31
• 06
P
1.0
P
PE
RW
1/1/2011
6/1/2011
STP(S)
STP(S)
57
189
7
25
64
214
64
214
CE
Beech St Pedestnan Connection
32
T
CN
1/1/2012
STP(S)
504
68
572
572
Yes
Beech St
from: Fair Ave to: Chalmers/Riverside
Construct pedeslnan pathway under SR82 to Greenway
09/01/10
Totals 750 100 850 .64 786
16
32
12
P
2.0
P
PE
RW
1/1/2011
6/1/2011
STP(S)
STP(S)
43.
86
7
15
50
101
50
101
CE
WLnncolnAve Sidewalks
T
CN
1/1/2012
STP(S)
572
_
88
.660
660
Yes
W Lincoln Ave
S
from: N 56th Ave to: N 29th Ave
W
Sidewalks, meters and fire hydrants replacement or relocation
09/01/11
Totals 701 110 811 -811
Report Date: July 10, 2008
Page 8
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7/1/2008 Adoption Date:
Amend Date: Resolution No.:
m
,,
U,2
c 5n.
u.E.
w
':o E
Z
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
2
u)
Total Length I
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(min/cid/MA
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
PE
1/1/2010
STP(E)
424
67
491
491
14
33
01
P
.5
W
RW
1/1/2011
STP(E)
1047
163
1210
1210
CE
WLincoln Ave & 'B' St Realignment
12
S
CN
1/1/2012
STP(E)
1801
281
2082
2082
Yes
W Lincoln Ave
from: W 5th Ave to: Custer St
P
0
09/01/11
Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights
G
C
Totals 3,272 511 3783 491 3292
PE
1/1/2009
PSMP
13
2
15
15
16
34
12
p
N/A
W
CN
1/1/2009
PSMP
239
48
287 1
287
CE
School Safety Projects
No
Various Locations - Citywide
from: to
Crossing flashers, sidewalks, signing, other features
Totals 252 50 302 302
PE
1/1/2010
STP(C)
. 546
84
630
630
14
35
03
p
.85
C
RW
1/1/2011
STP(C)
1090
170
1260
1260
EA
E Nob Hill Blvd Reconstruction
04
G
CN
1/1/2012
STP(C)
6539
1013
7552
7552
Yes
E Nob Hill Blvd.
from: S 6th Street to: S 18th Street
06
P
S
1/1/2010
Major roadway widening and reconstruction to 5 lanes with intersection
improvements, curb, gutter, sidewalks, replacement or relocation of meters
T
Totals 8,175 ' 1267 9442 9442
an hydrants
W
PE
1/1/2010
STP(C)
91
14
105
105
17
36
01
PRW
N/A
W
1/1/2011
STP(C)
91
14
105
105
CE
S 72nd Avenue & WWashington Avenue
12
T
CN
1/1/2012
STP(C)
544
86
630
630
Yes
S 72nd Ave
from: S 72nd Ave to: W Washington Ave
06
P
O
1/1/2011
Intersection improvement, possible roundabout
_
Totals 726 114 840 840
Report Date July 10, 2008
•
Page 9
•
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
11,71
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
•
•
Six Year Transportation Improvement Program
From 2009 to 2014
7/1/2008 Adoption Date:
Resolution No.:
Hearing Date:
Amend Date:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/YYYY)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/Y11
Federal
Fund
Code '
Federal
Cost by.
Phase,
1st
2nd
3rd
4th
Thru
6th
2
3 ,
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
37
4579
S 1st St. - E Washington Ave. Intersection Improvement
S 1st St.
from: S 1st St. ' to: E Washington Ave.
Realign intersection, upgrade traffic signal
12
P
N/A
_
P
W
S
T
O
PE
6/1/2009
STP
252
38
290
290
EA
Yes
01/01/11
Totals 252 38 290 290
16
38
4562
Tieton Dr - S 5th Ave. Intersection Protect
Tieton Drive
from' 5th Ave. Intersection to:
Replace traffic signal with roundabout
12
P
N/A
P
W
T
0
S
ALL
4/4/2010
STP(U)
378
WSDOT
378
7561 756
CE
No
'Totals 378 378 756 756
17
39
4587
S 48th Ave. Reconstruction
S 48th Avenue
from: Sumrnitview Ave. to: Nob Hill Blvd.
Wden, curb, gutter, sidewalk, lighting, drainage
03
P
1.00
_
P
T
W
S
.O
ALL
4/1/2009
STP
2268
307
25751
525
2050
EA
No
Totals 2,268 307 2575 525 2050
14
40
South 72nd Ave & Mead Ave Intersection
South 72nd Ave •
from: South 72nd Ave to: Mead Ave
New intersection, signals, curb, gutter and sidewalk
03
12
p
N/A
O
P
S
T
W
PE
CN
1/1/2009
6/1/2009
STP(U)
STP(U)
51
383
_
8
61
59
444
59
444
CE
'
No
Totals 434 69 503 503
Report Date: July 10, 2008
Page 10
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date: 7/1/2008 Adoption Date:
Amend Date: Resolution No.:
T.)
o
U
LL
w
.o
a D
Z
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - MP or Road
g 9 Ending
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNVc
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6 .
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
41
.
William 0 Douglas Pathway
from: Pine St to: Cowiche Canyon
Pathway improvements, connections, and signage to Cowiche Canyon
Trail.
14
32
P
N/A
0
S
P
W
PE
CN
1/1/2009
7/1/2009
STP(E)
STP(E)
10
109
2
17
12
126
12
126
CE
No
Totals 119 19 136 138
17
42
S 66th Avenue
S 66th Ave
from: Scenic Drive to: Summitview
Widen roadway, curb, gutter, sidewalk and utilities
04
03
P
.76
W
T S
P
-0 0
PE
CN
1/1/2009
7/1/2009
STP(E)
STP(E)
23
1096
5
164
28
1260
28
1260
Yes
1/1 /2009
Totals 1,119 169 1288 1288
16
43
.
66th Ave. & Summitview Intersection
N. 66th Avenue & Summitview
from: N. 66th Ave. to: Summitview Ave.
Widen for left turn lanes, intersection improvements, curb, gutter, handicap
ramps and lighting
05
12
p
.20
G
0
S
T
W
C
PE
RW
CN
1/1/2010
6/1/2010
7/1/2011
STP(S)
STP(S)
STP(S)
164
382
1090
25
60
170
189
442
1260
189
442
1260
CE
Yes
1/1/2010
Totals 1,636 255 1891 189 442 1260
14
44
40th Avenue and Summitview Signal Upgrade
40th Avenue
from: 40th Avenue to: Summitview
Signal upgrade, radius improvements, turn lane extension
12
P
N/A
W
S
P
0
PE
RW
CN
1/1/2010
1/1/2010
6/6/2010
STP(U)
STP
STP(U)
126
63
544
17
8
86
143
71
630
143
71
630
CE
Yes
1/1/2010
Totals 733 111 844 844
Report Date July 10, 2008
•
Page 11
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation _
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
1
Six Year Transportation Improvement Program
From 2009 to 2014
7-1-2008
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
To
N
A
c o
m
Priority I
Number
Project Identification '
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Types)
Status
Total Length
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Utility Codes
Project Phase
Phase
Start
(mm/dd/YYYY)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
•
Envir.
Type
R/V1!
Required
Date
(M y)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
6[h
1
2
3
4
5
6
7 8
9
10
11
12
13
14
15
16 '
17
18
19
20
21
14
45
40th Avenue and Englewood
40th Avenue
from: 40th Avenue to: Englewood
Replace traffic signal poles, upgrade controller
12
P
N/A
W PE
RW
T CN
S
P
1/1/2010
1/1/2010
1/1/2011
STP. •
STP
STP
95
63
145
13
8
20
108
71
165
108,
71
165
CE
Yes
1/1/2010
Totals 303 41 344 344
00
46
16th Avenue and Fruilvale Blvd
16th Avenue
from 16th Avenue to: Fruitvale Blvd
Replace traffic signal poles, radius improvements, ADA ramps'
12
P
N/A
WPE
RW
T CN
S
P
1/1/2010
6/1/2010
1/1/2011
STP
STP
STP
126
63
315
_ _
18
8
43
144
71
358
144
71
358
CE
Yes
6/1/2010
Totals 504 69 573 573
14
47
1st Street and / Street
1st Street
from: 1st Street to: I Street
Replace and upgrade traffic signal equipment
12
P
N/A
WPE
T CN
S
P
0
1/1/2010
1/1/2011
STP
STP
32
126
5
17
37
143
37
143
CE
No
Totals 158 22 180 180
14
48
Mead Ave Railroad Grade Separation
Mead Ave.
from: Presson Place to: Maryland
Construct railroad overpass including all utilities
01
P
•25
W PE
RW
T CN
S
P
6/1/2011
.1/1/2012
1/1/2013
STP(U)
STP(U)
STP(U)
820
3150
6552
189
630
1008
1009
3780
7560
1009
3780
7560
CE
•
Yes
1!1/2012
Totals 10,522 1827 12349 4789 7560
Report Date: July 10, 2008
Page 12
v. 5.7 - Supersedes previous editions '
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date:
Amend Date:
7-1-2008
Adoption Date:
Resolution No.:
Report Date: July 10, 2008
•
Page 13
•
v. 5.7 - Supersedes previous editions
Project Identification
Project Costs in Thousands of Dollars
Expenditure Schedule
Federally Funded
Projects Only
Project Phase
Fund Source Information
To
v
A. PIN/Federal Aid No. B. Bridge No.
d _
rn
2
(Local Agency)
Federal Funding
R/W
o N
'— n
C. Project Title
d s
B
m
U.
u m
g U
° E
n
D. Street/Road Name or Number
> n.
rn
_
Phase
Federal
Federal
State
Total
4th
nvir.
Required
Date
E. Beginning MP or Road - MP or Road
9 9 Ending
Start
Fund
Cost by
Fund
State
Funds
Local
Funds
Funds
1st
2nd
3rd
Thru
6th
Type(MM/YY)
F. Describe Work to be Done
(mm/dd/yyyy)
Code
Phase
Code
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
PE
6/1/2011
STP(U)
820
189
1009
1009
16
49
01
P
.25
0
RW
1/1/2012
STP(U)
3150
630
3780
3780
CE
Yes
Washington Ave. Railroad Grade Separation
S
CN
1/1/2013
STP(U)
6552
1008
7560
7560
Washington Ave.
T
from: Longfibre Road to
W
1/1/2012
Railroad grade overpass including all utilities
Totals 10,522 1827 12349 12349
PE
6/1/2011
STP(U)
252
38
290
290
CE
16
50
01
P
4.0
0
RW
1/1/2012
STP(U)
756
88
844
844
Yes
Citywide Pathway Connections
S
CN
1/1/2013
STP(U)
1890
315
2205
2205
Yakima
from: to
T
W
1/1/2012
Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths,
WOD Trail, Greenway including Naches Rail Spur, signage and amenities
Totals 2,898 441 3339 290 3049
PE
1/1/2011
STP(U)
2180
340
2520
2520.
16
51
01
P
1.1
O
RW
1/1/2013
STP(U)
2180
340
2520
2520
CE
E 'H"St Extension
08
P
CN
6/1/2014
STP(U)
1199
1871
3070
3070
Yes
E."H"St.
from: 1st St. to. Yakima River
T
W
1/1/2013
Construct road including water, sewer, curb, gutter and sidewalk for future
development.
Totals 5,559 2551 8110 8110
PE
1/1/2012
STP(C)
700
108
808
808
17
52
01
P
1.3
0
RW
1/1/2013
STP(U)
5500
850
6350
6350
CE
Yes
N 10th St Extension
06
P
CN
6/1/2013
STP(U)
7900
972
8872
8872
N. 10th St.
from. R St. to. 10th Street - Lincoln Ave.
T
W
1/1/2013
Construct road including water, sewer, curb, gutter, sidewalk for future
development.
Totals 14,100 1930 16030 16030
Report Date: July 10, 2008
•
Page 13
•
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
•
Six Year Transportation Improvement Program
From 2009 to 2014
7-1-2008
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
mA.
t.,9' m
S U
Priority I
. Number
Project Identification
PIN/Federal Aid No. B. Bridge g No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNV
Required
Date
(Miwyy)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
53
YVT Pathway
YVT Railway Corridor. _
frorn: to:
Development pathway in West Valley area including 53rd Ave, Wde
Hollow, 64th Ave, Ahlanum including all utilities and signage
03
32
P
N/A
0
P
S
T
w
PE
CN
1/1/2012
6/1/2012
STP(U)
STP(U)
315
945
38
126
353
1071
353
1071
CE
No
Totals 1,260 164 1424 1424
17
54
34th Ave &River Rd Improvements
Fruitvale Blvd.
from: 34th Ave. to: River Rd.
Intersection improvements including lumination, sewer, water, curb, water
and sidewalks
01
12
P
N/A
0
P
S
T
W
PE
CN
1/1/2011
6/1/2011
STP(U)
STP(U)
63
567
5
76
68
643
1
68
643
_
CE
No
Totals 630 81 711 711
17
55
Englewood Ave
Englewood Ave
from: 24th Ave to: 40th Ave
Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water
lines and street lights.
01
05
12
P
1.0
-
O
P
S
T
W
PE
RW
CN
1/1/2010
6/1/2011
1/1/2012
STP(U)
STP(U)
STP(U)
218
327
2980
34
51
244
252
378
3224
252
378
3224
CE
Yes
6!1/2011
Totals 3,525 329 3854 630 3224
16
56
Frontage Road & "H" St Loop
N. 8th St.
from: "H" St. to: 1-82
Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for
future development and Terrace Heights connection.
01
P
1.3
C
G
0
P
S
T
' W
PE
RW
CN
1/1/2010
6/1/2010
1/1/2011
STP(U)
STP(U)
STP(U)
272
349
2352
-
43
55
340
315
404
2692
315
404
2692
CE
Yes
6/1/2010
Totals 2,973 438 3411 719 2692
Report Date: July 10, 2008
Page 14
v. 5.7 - Supersedes previous editions
T
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
7-1-2008
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
4
s 5
-
o c'
8:
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - MP or Road
9 9 Ending
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RAN
Required
Date
(MM/YV)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18.
19
20
21
00
57
Citywide Alleys
from: to'
Pave alleys throughout the city
07
P
.5
G
P
S
W
T
CN
6/1/2009
75
75
25
25
25
CE
No
Totals
75
75 25
25
25
14
58
Nob Hill Corridor
Nob Hill
from: 1-82 to' S. 16th Ave.
Widen roadway, sidewalk, curb, gutter, fighting
03
04
P
2.7
C
G
0
P
S
T
W
PE
1/1/2010
STP(U)
120
17
1371
137
CE
Totals
120
17
137
137
14
59
40th Ave. Corridor
40th Ave.
from: SR -12 to: Washington Ave.
Widen roadway, curb, gutter, sidewalks, lighting.
04
P
3.2
C
0
G
P
S
W
T
PE
1/1/2011
STP(U)
120
17
1371
137
CE
Totals .
120
17
137
137
14
60
16th Ave Corridor
16th Ave.
from: SR -12 to: a Kington Ave.Nalley Mall
6Y..
Widen roadway, curb, gutter, sidewalk, lighting
04
P
3.5
C
G
0
P
S
T
W
PE
1/1/2012
STP(U)
120
17
1371
137
CE
Totals
120
17
137
137
Report Date: July 10, 2008
Page 15
•
v. 5.7 - Supersedes previous editions
•
Washington State Department of Transportation
Aggeenncy: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
•
Six Year Transportation Improvement Program
From 2009 to 2014
7-1-2008
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
a
4 m
.0 _
c o
LL
Priority I
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
d
m
.
a
•o
a
Phase
Start
(mm/dd/YYYY)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M yl
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd.
3rd
4th
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
61
S. 1st St/Main St Comdor
S. 1st St./Main St.
from: Nob Hill Blvd. to: Barker Mill Bridge
Joint project with Union Gap to olden roadway, curb, gutter, sidewalk,
lighting.
04
P
2.0
C
G
0
P
S
T
W
PE
1/1/2012
STP(U)
120
17
137
137
CE
Totals 120 17 137 137
14
62
W. Yakima North/South Connector to West Valley
Unknown road
from: North - South to: in West Valley
City 8 County joint project to build/extend roadways.
01
04
06
P
6.0
C
G
0
P
S
T
W
PEI 1/1/2012
STP(U)
120
17
1371
137
CE
Totals 120 17 137 137
00
63
West Side Transit Center Placement Study
Acquire Property to Expand Operations
from: to:
Recent Annexations Mandate Transit Expansion to These Areas
23
S
N/A
PE
1/15/2009
OTHER
100
1001 100
Totals 100 100 1o0
16
64
W Nob Hill Blvd -S 68th Ave to S 72nd Ave.
W Nob Hill Blvd
from: S. 68th Ave. . to: 72th
Reconstruct to minor artenal standards.
• -
04
03
P
73
C
W
0
P
T
S
CN
' 6/1/2009
432
68
5001
500
Totals - 432 68 500 500
Report Date: July 10, 2008
Page 16
v. 5.7 - Supersedes previous editions
v Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date:
Amend Date:
7/1/2008 Adoption Date:
Resolution No.:
m
o m
o•
LL
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. 'Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase 1
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
T e
yP
R/W
Required
Date
(MM/YV)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
65
Yakima Downtown Future Initiatives, Phase 4
from: 1st Street to: 9th Street
Install Historic Lighting, Sidewalk Modification & Other Improvements.
Exact improvement area(s) to be determined.
06
12
S
.60
P
W
S
T
O
PE
CN
5/1/2009
4/1/2010
OTHER
OTHER
400
2600
400
2600
400
2600
CE
No
Totals 3000 3000 3000
00
66
Coolidge Road Widening and Paving.
from. 80th AVE to: 88TH AVE.
Widen roadway and pave with curb and gutter.
03
05
06
S
.50
S
W
T
T
CN
1/1/2009
CMAQ
440
214
• 6541
654
CE
No
Totals 440 214 654 654
16
67
Occidental Road Construction
from:' 58th Ave. to: 64th Ave.
Construct roadway
01
p
.38
S
W
P
T
PE
1/1/2012
100
1001
100
Totals 1o0 100 100
00
68
86th Ave Road Construction
from Occidental to: Coolidge
Construct roadway
01
P
27
PE
1/1/2012
100
1001
100
Totals too 100 100
Report Date' July 10, 2008
•
Page 17
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
•
Six Year Transportation Improvement Program
From 2009 to 2014
Hearing Date:
Amend Date:
7-1-2008
Adoption Date:
Resolution No.:
o_` 6„
c U
LLState
Priority I
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement I
Type(s)
S'
co
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
1
Project Phase
Phase
Start'
(mm/dd/YYYY)
Fund Source Information
Federal Funding
State
Fund
Code
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Re uired
4
Date
(MftNY
Federal
Fund
Code
Federal
Cost by
Phase
-
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
69
64th Ave. Roadway kt4denmq.
from: Washington Avenue. to. Tieton Drive.
Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage.
04
06
P
1.5
wPE
G
P
T
C
O
1/1/2012
STP(U)
120
17
137
•
137
EA
YES
7/4/2012
Totals 120 17 137 137
00
70
Purchase four newtransitbuses(replacements)
On-going vehicle replacement program
from: to: -
Seek RFP's to acquire four new transit buses that will replace units that are
15 years of age (six years past federal standards)
21
S
_
N/A
ALL
1/1/2009
5309(Bus)
1540
15401 1540
-
CE
No
Totals 1540 1540 1540
00
71
Acquisition of new Dial -A -Ride paratransit vehicles
Replace several older vehicles
from: to:
Upgrade Dial -A -Ride service by replacing several older vehicles wnh new
models.
21
S
N/A
ALL
6/1/2009
85
30
1151 115
CE
No
Totals 85 30 115 115
14
72
Nob Hill Overpass Repair
from: 1st Street to: Ledwich Ave
Make necessary repairs to Railroad Overpass (Bndge)
11
P
0.2
CN
4/1/2009
BR
•
• 700
360
i 1060 I
1060
-
CE
No
Totals 700 360 1060 - 1060
Report Date: July 10, 2008
Page 18
v. 5.7 - Supersedes previous editions
Ink
Washington State Department of Transportation
-ii
Aggeenncy: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2009 to 2014
7-1-2008
Hearing Date:
Amend Date:
Adoption Date:
Resolution No.:
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - EndingMP or Road
g
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir,
Type
R/Nt
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
73
E Lincoln 810th Street Roundabout
from: E. Lincoln to E. MLK Jr. Blvd.
Roundabout construction at intersection curb, gutter, sidewalk. & street
lighting
03
05
06
P
N/A
PE
RW
CN
1/1/2009
1/1/2010
6/1/2010
STP(U)
STP(U)
STP(U)
173
433
1125
27
67
175
200
500
1300
200
500
1300
Yes
4/1/2010
Totals 1,731 269 2000 200 1800
12
74
S R.12 & 16th Avenue interchange
Interchange
from- 16th Avenue to: S.R. 12
Upgrade Interchange by constructing a Roundabout
03
06
P
N/A
O
ALL
1/1/2009
STP(U)
865
135
10001
1000
CE
No
Totals 865 135 1000 1000
11
75
1-82 & Lincoln Avenue Interchange
I-82 Interchange
from: E. "G" Street to: I-82
Reconstruct / extend off -ramp from existing 1-82 off -ramp for Lincoln
Avenue to E. "G" Street.
01
P
N/A
O
P
C
i 1 I 1 1 1 1 I 1 1 1
EA
Yes
6/2011
Totals
14
76
E. Yakima Avenue & Fair Avenue Signalizabon
from E. Yakima Avenue to: Fair Avenue
Construct Traffic Signal
12
P
N/A
P
W
T
S
O
ALL
1/1/2010
STP(U)
865
135
1000
i
1000
CE
No
Totals 865 135 1000 1000
Report Date: July 10, 2008
•
Grand Totals for Yakima
123,098 21,344 29,785 174,227 40,215 33404 30,005 70,603
Page 19
•
v. 5.7 - Supersedes previous editions
O
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
CORRECTED
AGENDA STATEMENT
Item No. 7
For Meeting of July 15, 2008
ITEM TITLE: Public Hearing to consider:
A) Adoption of the Six-year Transportation Improvement Program (TIP) for
years 2009 to 2014, and to amend the Metropolitan Transportation Plan;
and
B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to incorporate the adopted Six-year Transportation Improvement
Program (STIP).
SUBMITTED BY: Department of Community and Economic Development -
William Cook, Director
CONTACT PERSON/TELEPHONE: Brett Sheffield, P.E., Chief Engineer, 576-6797
SUMMARY EXPLANATION:
See Attached.
Resolutions X Ordinance_ Contract Other (Specify) STIP and STIP Form Instructions
STAFF RECOMMENDATION:
1) Hold the Public Hearing to consider adoption of Resolution approving the Six-year TIP
and amending the regional Metropolitan Transportation Plan and the Comprehensive Plan
Capital Facilities Element.
2) Adopt the plan.
BOARD/COMMISSION RECOMMENDATION:
® COUNCIL ACTION:
O
Six-year Transportation Improvement Program (continued)
SUMMARY EXPLANATION: Attached is the 2009-2014 Six -Year TIP. Three projects have been added to
the six-year TIP following the July 1, 2008 meeting. These projects are:
• #74. SR12 and 16th Avenue Interchange Improvements
• #75. I-82 and 'G' Street Interchange
• #76. Fair Avenue and Yakima Avenue Intersection Signal
Project rankings are determined by reviewing data supplied by the City's Street and Traffic Division and
integrating particular needs of the City.
Projects that were deleted from the 2008-2013 TIP as they were completed or funds were obligated include:
• Downtown Yakima Futures Initiative, Phase 3
• Tieton Pedestrian Safety Improvements
Council and the public are welcome to add other arterial system projects to this list. The Six -Year TIP listing
will be finalized at today's hearing and sent to Yakima Valley Conference of Governments, (YVCOG) after
approval.
City and County staff, together with the Council Intergovernmental Committee, are working toward common
standards and coordinated planning for public projects that impact both the city and surrounding county areas.
Agreement on these issues will be the first step toward the goal of a seamless transportation planning process
between the City and County.
A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six Year
Transportation Improvement Program (TIP) for submittal to the Washington State Department of
Transportation. This plan must include all transportation projects for which state gas tax revenue or
federal revenue will be used.
The plan for 2009 — 2014 includes sixteen (16) funded projects and locally identified activities. Funding for
the remainder of the projects will continue to be sought.
On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient Transportation
Equity Act: A Legacy for Users (SAFETEA-LU). This act is the next authorization after the prior
Transportation Equity Act of 1998 for. the 21g Century (TEA -21) and previous Intermodal Surface
Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies the systems on which certain
funds can be used, and activities for which funds can be used and promotes the role of the Metropolitan Planning
Organizations (MPO) in the planning and programming of projects. SAFETEA-LU requires each designated
MPO to develop a Transportation Improvement Program (TIP), and the state to develop a Statewide
Transportation Improvement Program (STIP) as a condition to securing federal funds for the transportation
projects.
Projects listed in the STIP that are on an identified federal route are the only projects that will be eligible for
approval by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to
utili7P federal funds or by the State of Washington for approved State -funding agencies. The STIP is a
prioritized program of transportation projects, compiled from local and regional plans, along with the
2 - July 14, 2008
Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the
intermodal transportation network in the State of Washington.
The STIP contains federally funded projects plus state and local projects that are regionally significant. These
projects have been identified through the planning process as the highest priority for the available funding to
the state's transportation program.
Planning activities of state and local governments are essential parts of integrated regional planning processes.
Long range transportation planning is a part of the comprehensive land use planning carried out by local
governments. Citizen participation is an integral part of the planning process at all levels. Local Agencies are
required to develop and adopt a six-year transportation program. All local agencies are required to hold at
least one public hearing during the development of the six-year transportation program. All Transaction
Committee projexts within the city limits are listed in the TIP with at least preliminary engineering needs
identified.
B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to
incorporate the adopted Six-year Transportation Plan for 2009 to 2014. This will ensure that we are in
compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as
required. This amendment is limited to incorporate only those projects that are adopted in the STIP and is
not subject to the "once a year" change required under the laws of the Growth Management Act.
•