HomeMy WebLinkAboutR-2007-095 2008 to 2013 Six-Year Transportation Improvement Plan Adoption (TIP)RESOLUTION NO. R — 2007 - 95
A RESOLUTION adopting a Six -Year Transportation Improvement Program for the period of
2008 through 2013 for the construction of streets and arterials streets in the
City of Yakima and amending the Metropolitan Transportation Plan.
WHEREAS, the City of Yakima annually prepares, reviews and adopts a Six Year Program
for the construction of streets and arterial streets in the City of Yakima for the ensuing six year
period, all as contemplated and required by State RCW 35.77.010 and applicable Federal law; and
WHEREAS, the City of Yakima desires to amend the Metropolitan Transportation Plan to
ensure compliance with the Growth Management Act and the regional transportation plan for the
construction of streets and arterial streets in the City of Yakima, all as contemplated and required by
State and Federal law, and
WHEREAS, after public hearings on the matter, held at regular meetings of the Yakima City
Council on June 19, 2007, and on July 3, 2007, with proper public notice as required by RCW
35.77.010, the City Council finds that the plan attached hereto should be adopted as the Six -Year
Transportation Improvement Program for the period of 2008 through 2013 for the construction of
streets and arterial streets in the City of Yakima, now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF YAKIMA:
The Six -Year Construction Program for the period of 2008 through 2013, a copy of which is
attached hereto and by this reference made a part hereof, is hereby adopted as the official Six -Year
Transportation Improvement Program for the City of Yakima, including proposed amendments to the
Metropolitan Transportation Plan along with Street Improvements, which are also approved.
ADOPTED BY THE CITY COUNCIL this 3rd day of July, 2007.
ATTEST:
Deborah Moore, City Clerk
40/
Davi. • ler, Mayor
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 7-3-2007 Adoption Date: 7/3/2007
Amend Date:
Resolution No.: 2007-
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mmfdd/yyYY)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(M y)
21
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
14
1
Yakima Railroad Grade Separations - Phase 2
Lincoln Ave. & Martin Luther King J. Blvd.
from: N 1st St to: N 1st Ave
Construct Grade Separations and adjacent roadway reconstructon,
including realignment of Front Street.
01
06
07
08
S
0 2
T
p
G
W
S
PE
RW
CN
6/1/2008
8/1/2008
4/1/2009
STP(U)
STP(U)
STP(U)
5500
3000
7000
AIP
OTHER
AIP
1285
7500
1000
7785
3000
14500
3000
3000
3000
4785
11500
EA
Yes
3/01/07
Totals 15,500 8785 1000 25285 9000 16285
14
2
16TH AVENUE REALIGNMENT
16TH AVENUE REALIGNMENT
from: AHTANUM ROAD to: WASHINGTON AVENUE
Realign 16th Avenue out of the runway safety area of the Yakima Air
Terminal. Includes FAA funds.
01
08
S
1.0
P
0
T
W
S
CN
1 4/1/2009
I
1
3840
38401 3840
1
CE
Yes
11/2007
Totals 3840 3840 3840
00
3
YVT Railway Rehabilitation & Museum
3rd Ave
from: 3rd Ave to: Pine St
Car Bam, Museum Restoration and Pathway
03
P
N/A
G
C
S
T
F
PE
CN
1/1/2008
6/1/2008
STP(E)
STP(E)
18
1816
32
272
50
2088 I
50
2088
EA
Na
Totals 1,834 304 2138 2138
00
4
Transit Operating Expenditures
Various Funding Areas
from: N/A to: N/A
Supplemental Funding for Transit Service Operating Expenses
12
22
23
24
31
S
N/A1
CN
1/1/2008
5307
1650
1650
3300
I
3300
I
CE
No
Totals 1,650 1650 3300 3300
Report Date: June 27, 2007
Page 1
v. 5.7 - Supersedes previous editions
� Washington State Department of Transportation
W
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 7-3-2007 Adoption Date: 7/3/2007
Amend Date:
Resolution No.: 2007-95
Functional
Class
Priority
Number
Project Identification
A. PINIFederal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/VV
Required
Date
M
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
5
YVT Trolley Barn/Powerhouse Rehabilitation
S 3rd Ave
from: to:
Minor car barn andpowerhouserestorationS
including property purchase
03
S
C
G
0
P
T
W
PE
RW
CN
6/1/2008
6/1/2008
6/1/2008
STP(E)
STP(E)
STP(E)
36
205
255
36
205
255
36
205
255
CE
Yes
06/01/07
Totals 496 496 496
00
6
Street Asset Amenities (Transit)
Route Maintenance, Repair and Improvements
from: to:
Maintenance of Shelters, Benches and Signage throughout our Transit
Route System
22
31
S
N/A
ALL
1/1/2008
50
501 50
CE
No
Totals 50 50 50
00
7
Wiliam 0. Douglas Trail
6th Ave Pathway & Bridge Decking
from: to:
Build pathway and install pathway decking on Naches River bridge with
partner Wiliam 0. Douglas Trail Fundation
32
08
06
S
1.0
0
S
W
T
PE
CN
1/1/2008
4/1/2009
STP(E)
STP(E)
57
271
57
271
57
1 271
CE
No
Totals 328 328 328
00
8
Wiliam 0. Douglas Heritage Trails
Bridge Restoration & Trailhead
from: to:
Trailhead restoration, right of way acquisition partner with the William 0.
Douglas Foundation, including restoration of bridge , cleaning, rust removal
and painting
32
13
10
S
G
P
S
T
W
PE
RW
CN
1/1/2008
1/1/2008
1/1/2008
STP(E)
STP(E)
STP(E)
65
150
285
65
150
285
65
150
285
CE
Yes
01/01/07
Totals 500 500 500
Report Date: June 27, 2007
Page 2
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
-en
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 7-3-2007 Adoption Date: 7/3/2007
Amend Date:
Resolution No.: 2007-95
Functional
Class
Priority
Number
Project Identification
A. PINIFederalAid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
m
11
rn
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RAN
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
9
Transit Service to Union Gap.
Demonstration Transit Project Expansion
from: to:
Demonstration project that provide service to, and around Union Gap.
22
31
S
ALL
1/1/2008
CMAQ
63
63
7
70
70
No
Totals 63 7 70 70
00
10
West Side Transit Center Placement
Acquire Property to Expand Operations
from: to:
Recent Annexations Mandate Transit Expansion to These Areas
12
28
21
P
NNPE
1/15/2008
OTHER
50
50I 50
Totals 50 50 50
16
11
W. Nob Hill Blvd -S 68th Ave to S. 72nd Ave.
W Nob Hill Blvd
from: S. 68th Ave. to: 74th
Reconstruct to minor arterial standards
04
03
P
73
C
W
0
P
T
s
CN
6/1/2009
4321
68
5001
500
Totals 432 68 500 500
14
12
Nob Hill Blvd
Nob Hill Blvd
from: S 52nd Ave to: S 68th Ave
Widen, curb, gutter, sidewalk, lighting, drainage
04
P
.77
p
C
G
0
S
T
W
PE
CN
CN
1/1/2008
6/1/2008
10/1/2008
STP(U)
STP(U)
248
360
TPP
2011
20
48
232
268
408
2243
268
408
500
1743
EA
Yes
01/01/07
Totals 608 2011 300 2919 1176 1743
Report Date: June 27, 2007
Page 3
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
-Aggeenncy: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 7-3-2007 Adoption Date: 7/3/2007
Amend Date:
Resolution No.: 2007-95
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/YYYY)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/yy)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
' 9
10
11
12
13
14
15
16
17
18
19
20
21
00
13
Annual Signal Upgrades
Local Selection
from: N/A to: N/A
Upgrade signals
01
P
N/A
PE
CN
CN
8/1/2008
8/1/2008
8/1/2008
STIP (S)
STP(S)
STIP (S)
60
180
360
AIP
240
60
120
420
360
120
420
360
CE
No
Totals 600 240 60 900 120 780
00
14
Various Overlay Projects/Selected on Local Pnority
N/A
from: N/A to: N/A
07
P
N/A
WCN
S
7/1/2008
STP(U)
228
1
32
2601 260
EA
No
Totals 228 32 260 260
00
15
Storm Drains/Vegetation
Local Selection
from: City Wide to:
City Wide
32
P
N/A
PE
CN
1/1/2008
1/1/2008
96
864
96
864
96
1 864
EA
No
Totals 960 960 960
17
16
Reconstruction Rudkin Rd
Rudkin Rd
from: E Vola Ave to: Rainier Place
Reconstruct, excavate ballast, top course, curb, gutter, sidewalk
Partner with City of Union Gap, additional sewer force main
03
06
P
76
WPE
T
P
S
CN
1/1/2010
1/1/2011
STP(C)
STP(C)
104
900
TPP
900
26
101
130
1901
130
1901
CE
No
Totals 1,004 900 127 2031 130 1901
Report Date: June 27, 2007
Page 4
v. 5.7 - Supersedes previous editions
4111
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 7-3-2007 Adoption Date: 7/3/2007
Amend Date:
Resolution No.: 2007-95
Functional
Class
Priority
Number
Project Identification
A. PINIFederal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - EndingMP or Road
g g
F. Describe Work to be Done
II, Improvement I
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Code
State
Funds
Local
Funds
Total
Funds
Envir.
'
Type(MM��
R/W
Required
Date
Federal
Fund
Code
Federal
Cost byFund
Phase
1st
2nd
3rd
4th
Thru
6th
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
17
E Mead Ave Reconstruction
E Mead Ave
from: Rudkin Rd to: Fair Ave
Partner with City of Union Gap, reconstruct, excavate ballast, top course,
curb, gutter, storm, acp
03
06
P
.76
C
G
P
T
PE
CN
9/1/2009
4/1/2009
STP(S)
STP
116
1648
TPP
TPP
22
196
7
66
145
1910
145
1910
CE
No
Totals 1,764 218 73 2055 145 1910
19
18
Long(berRd- Phase 2(3 -Phases)
Longfiber Rd
from: Valley Mat Blvd to: W Washington Ave
New roadway construction and reconstruction, 3 -lane w/tum, curb, gutter,
sidewalks - Partner with City of Union Gap, waterloop with development
01
03
P
.50
P
S
T
PE
CN
1/1/2009
1/1/2010
127
1411
127
1411
127
1411
CE
No
Totals 1538 1538 127 1411
14
19
E Nob Hill Blvd & S 18th St
E Nob Hill Blvd
from: S 18th St to: E Nob Hill Blvd
Widen south leg for double LT from west bound Nob Hill; (Tie to WSDOT
Project) possible curb, gutter and sidewalk
04
01
P
.1
C
S
T
PE
RW
CN
1/1/2008
3/1/2008
1/1/2009
STP(U)
STP(U)
STP(U)
16
22
240
2
2
42
18
24
282
18
24
282
CE
Yes
01/01/07
Totals 278 46 324 42 282
16
20
Roadway City Wide Shoulder Improvements
City Wide
from: to:
City Wide shoulder improvements, PM10 abatement.
01
P
N/A
S
PE
7/1/2008
CMAQ
480
65
5451 545_
CE
No
Totals 480 65 545 545
Report Date: June 27, 2007
Page 5
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 7-3-2007 Adoption Date: 7/3/2007
Amend Date:
Resolution No.: 2007-95
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Enver.
Type
R/W
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
21
E Nob Hill Blvd 8 Fair Ave
E Nob Hill Blvd
from: E Nob Hill Blvd to: Fair Ave
Intersection widening & new signal, curb, gutter and sidewalk, street
lighting, stormwater
31
03
04
S
N/A
O
C
P
T
W
PE
8/1/2008
STP(U)
72
11
83
83
CE
Yes
10/01/07
Totals 72 11 83 83
17
22
S 80th Ave - Tieton Dr to Zier Rd
S 80th Ave
from: Tieton Dr to: Zier Rd
Major widening, curb, gutter, sidewalk
04
P
1.3
0
C
P
T
W
S
PE
RW
CN
1/1/2008
1/1/2009
6/1/2009
AIP
AIP
AIP
125
364
1588
19
56
248
144
420
1836
144
420
1836
EA
Yes
01/01/08
Totals 2077 323 2400 144 2256
17
23
Zier Rd - S 75th Ave to S 72nd Ave
Zier Rd
from: S 75th Ave to: S 72nd Ave
Minor widening, curb, gutter and sidewalk
05
06
S
.15
C
S
T
P
PE
CN
1/1/2008
6/1/2008
STP(E)
STP(E)
22
75
7
20
29
95
1 29
95
CE
Yes
03/01/07
Totals 97 27 124 124
17
24
Englewood Ave - N 40th Ave to N 56th Ave
Englewood Ave
from: N 40th Ave to: N 56th Ave
Widen roadway, curb, gutter, sidewalk
05
06
P
1.0
W
T
P
0
C
PE
RW
CN
1/1/2011
6/1/2011
1/1/2012
STP(C)
STP(C)
STP(C)
259
332
2240
41
52
324
300
384
2564
300
384
2564
EA
Yes
04/01/10
Totals 2,831 417 3248 3248
Report Date: June 27, 2007
Page 6
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 7-3-2007 Adoption Date: 7/3/2007
Amend Date:
Resolution No.: 2007-95
Functional
Class
Priority
Number
Project Identification
A. PIN/federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
a ^
8 m
t r
a1—
E
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/YYYY)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/VV
Required
9
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
17
25
Englewood Ave - N 24th Ave to N 16th Ave
Englewood Ave
from: N 16th Ave to: N 24th Ave
Widen, curb, gutter and sidewalk, water and sewer lines
05
06
P
2
0
S
PE
RW
CN
1/1/2009
1/1/2010
6/1/2011
STP(U)
STP(U)
STP(U)
208
311
2838
32
49
232
240
360
3070
240
360
3070
EA
Yes
01/01/09
Totals 3,357 313 3670 240 360 3070
00
26
Pedestrian Bridge
Pedestrian Bridge
from: N 10th St to: Yakima Greenway
Construct pedestrian bridge from Gateway area to Yakima Greenway,
power, handicap accessible, lights
14
32
P
.25
T
0
PE
CN
1/1/2010
3/1/2011
STP(E)
STP(E)
240
3000
32
392
272
3392
272
3392
CE
No
Totals 3,240 424 3664 272 3392
00
27
Gravel Road B.S.T.
Various Areas
from: City Wide to:
07
P
N/A
S
PE
CN
4/1/2008
6/1/2008
CMAQ
186
240
36
240
222
1 100
70
70
222
CE
No
Totals 186 276 462 100 70 292
16
28
Powerhouse Rd & Englewood Ave
Powerhouse Rd
from: Powerhouse Rd to: Englewood Ave
Intersection, realignment, curb, gutter, sidewalk, Safety Flashing Signal,
possible roundabout
12
P
N/A
T
P
Q
S
C
W
CN
10/1/2009
STP(S)
480
70
5501 550
CE
Yes
09/01/2007
Totals 480 70 550 550
Report Date: June 27, 2007
Page 7
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 7-3-2007 Adoption Date: 7/3/2007
Amend Date:
Resolution No.: 2007-95
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length I
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
mm/dd/
( yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
MM/Y11
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
29
12
P
N/A
p
PE
RW
1/1/2011
6/1/2011
STP(S)
STP(S)
24
24
4
4
28
28
28
28
CE
S 48th Ave & Summitview Ave Signa/ization
T
CN
8/1/2012
STP(S)
528
77
605
605
Yes
S 48th Ave
from: S 48th Ave to: Summitview Ave
Signalization
06/01/11
Totals 576 85 661 661
16
30
12
P
N/A
P
PE
CN
4/1/2008
6/1/2008
12
204
12
204
12
204
CE
S 3rd Ave & W Washington Ave Signal
T
No
S 3rd Ave
from: S 3rd Ave to: W Washington Ave
Signal Upgrades
Totals 216 216 216
14
31
12
ID
N/A
p
PE
CN
1/1/2008
6/1/2008
STP(S)
STP(S)
12
72
12
72
24
144
24
144
CE
S 16th Ave & WWashington Ave Signal & Intersection.
05
T
CN
6/1/2008
650
650
650
No
S 16th Ave
from: S 16th Ave to: W Washington Ave
03
Included in Union Gaps Valley Mall Blvd. project
Totals 84 650 84 818 818
14
32
12
P
2 5
P
PE
RW
1/1/2009
6/1/2009
STP(S)
STP(S)
52
102
8
18
60
120
60
120
CE
W Nob Hill Blvd Sidewalks
T
CN
3/1/2010
STP(S)
306
54
360
360
Yes
W Nob Hill Blvd
from: S 16th Ave to: S. 6th St.
W
S
Install missing sidewalks on southside of Nob Hill.
09/01/08
Totals 460 80 540 180 360
Report Date: June 27, 2007
Page 8
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 7-3-2007 Adoption Date: 7/3/2007
Amend Date:
Resolution No.: 2007-95
Functional
Class
Priority
Number
Project Identification
A. PINIFederal Aid No. B. Bridge No.
C. Project Title
1
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Date
(MM/rY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4thRequired
bin
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
33
Beech St Pedestrian Connection
Beech St
from: Fair Ave to: Chalmers/Riverside
Construct pedestrian pathway under SR82 to Greenway
06
32
P
1.0
p
T
PE
RW
CN
1/1/2010
6/1/2010
1/1/2011
STP(S)
STP(S)
STP(S)
54
180
480
7
24
65
61
204
545
61
204
545
CE
Yes
09/01/09
Totals 714 96 810 61 749
16
34
W Lincoln Ave Sidewalks
W Lincoln Ave
from: N 56th Ave to: N 29th Ave
Sidewalks, meters and fire hydrants replacement or relocation
12
P
2.0
P
T
S
W
PE
RW
CN
1/1/2010
6/1/2010
1/1/2011
STP(S)
STP(S)
STP(S)
41
82
545
7
14
84
48
96
629
48
96
629
CE
Yes
09/01/10
Totals 668 105 773 773
14
35
WLmcoln Ave 8 'B' St Realignment
W Lincoln Ave
from: W 5th Ave to: Custer St
Realignment of W Lincoln Ave, sidewalks, curb, gutter, lights
01
12
P
.5
W
T
S
P
0
G
G
C
PE
RW
CN
1/1/2009
1/1/2010
1/1/2011
STP(E)
STP(E)
STP(E)
404
997
1715
64
155
268
468
1152
1983
468
1152
1983
CE
Yes
09/01/10
Totals 3,116 487 3603 468 3135
16
36
School Safety Projects
Various Locations- Citywide
from: to:
Crossing flashers, sidewalks, signing, other features
12
P
N/A
WPE
CN
1/1/2008
1/1/2008
PSMP
PSMP
12
228
2
46
14
274
14
1 274
CE
No
Totals 240 48 288 288
Report Date: June 27, 2007
Page 9
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.:
Co. Name: Yakima Co.
1485 MPO/RTPO:
YVCOG
Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 7-3-2007 Adoption Date: 7/3/2007
Amend Date:
Resolution No.: 2007-95
TO
o y
c v
t`
Priority I
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - EndingMP or Road
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditureal Schedule
cy)
Federally Funded
Projects Only
,
co
o
Q7
oo.
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
MM/Y
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
37
E Nob Hill Blvd. Reconstruction
E Nob Hill Blvd.
from: S 6th Street to: S 18th Street
Major roadwayvnden in and reconstruction to 5 lanes with intersection
improvements, curb, gutter, sidewalks, replacement or relocation of meters
an hydrants
03
04
06
p
.85
C
G
P
S
T
W
PE
RW
CN
1/1/2009
1/1/2010
1/1/2011
STP(C)
STP(C)
STP(C)
520
1038
6228
80
162
965
600
1200
7193
600
1200
7193
EA
Yes
1/1/09
Totals 7,786 1207 8993 8993
17
38
S 72nd Avenue & W Washington Avenue
S 72nd Ave
from: S 72nd Ave to: W Washington Ave
Intersection improvement, possible roundabout
01
12
06
PRW
N/A
W
T
P
0
PE
CN
1/1/2009
1/1/2010
1/1/2011
STP(C)
STP(C)
STP(C)
87
87
518
13
13
82
100
100
600
100
100
600
CE
Yes
1/1/2008
Totals 692 108 800 800
14
39
4579
S 1st Sf. - E. Washington Ave. Intersection Improvement
S 1st St.
from: S 1st St. to: E Washington Ave.
Realign intersection, upgrade traffic signal
12
P
N/A
P
W
S
T
0
PE
6/1/2008
STP
240
36
2761 276
EA
Yes
06/01/07
Totals 240 36 276 276
16
40
4562
Tieton Dr - S 5th Ave. Intersection Project
Tieton Drive
from: 5th Ave. Intersection to:
Replace traffic signal with roundabout
12
p
N/A
p
W
T
0
S
ALL
4/4/2009
STP(U)
360
WSDOT
360
1 7201 720
CE
No
Totals 360 360 720 720
Report Date: June 27, 2007
Page 10
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 7-3-2007 Adoption Date: 7/3/2007
Amend Date:
Resolution No.: 2007-95
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - EndingMP or Road
g g
F. Describe Work to be Done
Improvement I
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Start
(mm/dd/yyyY)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
41
Tieton Dr. Pedestrian Safety Improvements
from: 16th Avenue to: 24th Avenue
Pedestrian Safety, Sidewalks and ADA Ramps.
12
S
0.50
W
T
O
0
PE
CN
1/1/2008
1/1/2008
WSDOT
WSDOT
20
172
10
20
182
20
182
Totals 192 10 202 202
17
42
4587
S 48th Ave. Reconstruction
S 48th Avenue
from: Summitview Ave. to: Nob Hill Blvd.
Widen, curb, gutter, sidewalk, lighting, drainage
03
P
1.00
P
T
W
S
0
ALL
4/1/2008
STP
2160
292
24521
500
1952
EA
No
Totals 2,160 292 2452 500 1952
14
43
South 72nd Ave & Mead Ave Intersection
South 72nd Ave
from: South 72nd Ave to: Mead Ave
New intersection, signals, curb, gutter and sidewalk
03
12
P
N/A
O
P
S
T
W
PE
CN
1/1/2008
6/1/2008
STP(U)
STP(U)
49
365
8
58
57
423
57
423
CE
No
Totals 414 66 480 480
00
44
William 0. Douglas Pathway
from: Pine St to: Cowiche Canyon
Pathway improvements, connections, and signage to Cowiche Canyon
Trail.
14
32
P
N/A
O
S
P
w
PE
CN
1/1/2008
7/1/2008
STP(E)
STP(E)
10
104
2
16
12
120
1
12
120
CE
No
Totals 114 18 132 132
Report Date: June 27, 2007
Page 11
v. 5.7 - Supersedes previous editions
Ink
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 7-3-2007 Adoption Date: 7/3/2007
Amend Date:
Resolution No.: 2007-95
Functional
Class
Priority
Number
Project Identification
A. PINIFederal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - EndingMP or Road
9 9
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R!W
Required
Date
(My)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
45
Arterial Street Crosswalk Safety Upgrade.
Bonnie Doone & 16th Avenue.
from: Bonnie Doone to: 16th Avenue.
Install crosswalk safety facilities.
12
S
N/A
W
T
G
`'
PE
CN
1/1/2009
6/1/2009
STP(S)
STP(S)
121
140
261
10
261
Totals 129 142 271 271
17
46
S 66th Avenue
S 66th Ave
from: Scenic Drive to: Summitview
Widen roadway, curb, gutter, sidewalk and utilities
04
03
P
.76
T
S
P
PE
CN
1/1/2008
7/1/2008
STP(E)
STP(E)
22
1044
5
156
27
1200
1
27
1200
Yes
1/1/2008
Totals 1,066 161 1227 1227
16
47
66th Ave. &SumrnitviewIntersection
N. 66th Avenue & Summitview
from: N. 66th Ave. to: SummitoiewAve.
Widen for left tum lanes, intersection improvements, curb, gutter, handicap
ramps and lighting
05
12
P
.20
G
P
S
T
W
C
PE
RW
CN
1/1/2009
6/1/2009
7/1/2010
STP(S)
STP(S)
STP(S)
156
364
1038
24
57
162
180
421
1200
180
421
1200
•
CE
Yes
1/1/2009
Totals 1,558 243 1801 180 421 1200
14
48
40th Avenue and Summitview Signal Upgrade
40th Avenue
from: 40th Avenue to: SummitviewP
Signal upgrade, radius improvements, tum lane extension
12
PRW
N/A
W
T
0
PE
CN
1/1/2009
1/1/2009
6/6/2009
STP(U)
STP
STP(U)
120
60
518
16
8
82
136
68
600
136
68
600
CE
Yes
1/1/2006
Totals 698 106 804 804
Report Date: June 27, 2007
Page 12
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 7-3-2007 Adoption Date: 7/3/2007
Amend Date:
Resolution No.: 2007-95
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or NumberPhase
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
Local Agency)
Federally Funded
Projects Only
Project Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM��
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
49
40th Avenue and Englewood
40th Avenue
from: 40th Avenue to: Englewood
Replace traffic signal poles, upgrade controller
12
PRW
N/A
WPE
T
S
P
0
CN
1/1/2009
1/1/2009
1/1/2010
STP
STP
STP
90
60
138
12
8
19
102
68
157
102
68
157
CE
Yes
1/1/2008
Totals 288 39 327 327
00
50
16th Avenue and Fruitvale Blvd
16th Avenue
from: 16th Avenue to: Fruitvale Blvd
Replace traffic signal poles, radius improvements, ADA ramps
12
PRW
N/A
W
T
S
P
O
PE
CN
1/1/2010
6/1/2009
1/1/2009
STP
STP
STP
120
60
300
17
8
41
137
68
341
137
68
341
CE
Yes
1/1/2008
Totals 480 66 546 546
14
51
1st Street and / Street
1st Street
from: 1st Street to: I Street
Replace and upgrade traffic signal equipment
12
P
N/A
W
T
S
P
0
PE
CN
1/1/2009
1/1/2010
STP
STP
30
120
5
16
35
136
35
136
CE
No
Totals 150 21 171 171
14
52
Mead Ave. Railroad Grade Separation
Mead Ave.
from: Presson Place to: Maryland
Construct railroad overpass including all utilities
01
P
.25
W
T
S
P
0
PE
RW
CN
6/1/2010
1/1/2010
1/1/2011
STP(U)
STP(U)
STP(U)
780
3000
6240
180
600
960
960
3600
7200
960
3600
7200
CE
Yes
1/1/2010
Totals 10,020 1740 11760 4560 7200
Report Date: June 27, 2007
Page 13
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 7-3-2007 Adoption Date: 7/3/2007
Amend Date:
Resolution No.: 2007-95
c
4 N
c U
Priority
Number
Project Identification
A. PINIFederal Aid No. B. Bridge No.
C. Project Title
D. StreetiRoad Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RNV
Required
Date
(MM/VY)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
16
53
01
p
.25
0
PE
RW
6/1/2010
1/1/2010
STP(U)
STP(U)
780
3000
180
600
960
3600
960
3600
CE
Washington Ave. Railroad Grade Separation
P
CN
1/1/2011
STP(U)
6240
960
7200
7200
Yes
Washington Ave.
from: Longfibre Road to:
S
T
Railroad grade overpass including all utilities
W
1/1/2009
Totals 10,020 1740 11760 11760
16
54
01
P
4.0
0
PE
RW
6/1/2010
1/1/2010
STP(U)
STP(U)
240
720
36
84
276
804
276
804
CE
Citywide Pathway Connections
P
CN
1/1/2011
STP(U)
1800
300
2100
2100
Yes
Yakima
from: to:
S
T
Cowiche Canyon Trail, Powerhouse Rd pathway, east side canal paths,
WOD Trail, Greenway including Naches Rail Spur, signage and amenities
W
1/1 /2009
Totals 2,760 420 3180 276 2904
16
55
01
P
1.1
0
PE
1/1/2010
STP(U)
2076
324
2400
2400
E. 'H" St. Extension
08
P
RW
CN
1/1/2012
6/1/2013
STP(U)
2076
324
2400
2400
CE
E. "H" St.
from: 1st St. to: Yakima River
S
T
STP(U)
1142
1782
2924
2924
Yes
Construct road including water, sewer, curb, gutter and sidewalk for future
development.
W
1/1/2011
Totals 5,294 2430 7724 7724
17
56
p
1.3
0
PE
RW
1/1/2011
1/1/2012
STP(C)
STP(U)
665
5190
103
810
768
6000
768
6000
CE
N. 9th St Extension
P
CN
6/1/2012
STP(U)
7474
926
8400
8400
Yes
N. 9th St.
S
from: R St. to: Yakima Ave.
T
Construct road including water,sewer, curb, gutter, sidewalk for future
development.
W
1/1/2010
Totals 13,329 1839 15168 15168
Report Date: June 27, 2007
Page 14
v. 5.7 - Supersedes previous editions
Ank
Washington State Department of Transportation
-en
Agency: Yakima
Co. No.: 39
City No.: 1485
Co. Name: Yakima Co.
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 7-3-2007 Adoption Date: 7/3/2007
Amend Date:
Resolution No.: 2007-95
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - EndingMP or Road
g g
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(mwyy)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
57
YVT Pathway
YVT Railway Corridor.
from: to:
Development pathway in West Valley area including 53rd Ave, Wide
Hollow, 64th Ave, Ahtanum including all utilities and signage
03
32
p
N/A
0
P
S
T
W
PE
CN
1/1/2011
6/1/2011
STP(U)
STP(U)
300
900
36
120
336
1020
336
1020
CE
No
Totals 1,200 156 1356 1356
17
58
34th Ave Sr River Rd Improvements
Fruitvale Blvd.
from: 34th Ave. to: River Rd.
Intersection improvements including lumination, sewer, water, curb, water
and sidewalks
01
12
P
N/A
0
S
T
W
PE
CN
1/1/2010
6/1/2010
STP(U)
STP(U)
60
540
5
72
65
612
65
612
CE
No
Totals 600 77 677 677
17
59
Englewood Ave
Englewood Ave
from: 24th Ave to: 40th Ave
Reconstruct roadway, widen, curb, gutter and sidewalks. Sewer, water
lines and streetlights.
01
05
12
P
1.0
0
S
T
W
PE
RW
CN
1/1/2009
6/1/2010
1/1/2011
STP(U)
STP(U)
STP(U)
208
311
2838
32
49
232
240
360
3070
240
360
3070
CE
Yes
1/1/2009
Totals 3,357 313 3670 600 3070
16
60
Frontage Road & °H" St. Loop
N. 8th St.
from: "H" St. to: 1-82
Construct new roadway, water, sewer, cutb, gutter, sidewalk and lighting for
future development and Terrace Heights connection.
01
P
1.3
C
G
P
S
T
W
PE
RW
CN
1/1/2009
6/1/2009
1/1/2010
STP(U)
STP(U)
STP(U)
259
332
2240
41
52
324
300
384
2564
300
384
2564
CE
Yes
.1/112008
Totals 2,831 417 3248 684 2564
Report Date: June 27, 2007
Page 15
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 7-3-2007 Adoption Date: 7/3/2007
Amend Date:
Resolution No.: 2007-95
Functional
Class
Priority
Number
Project Identification
A. PINIFederal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - Ending MP or Road
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
Local Agency)
Federally Funded !
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund1st
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(MM/YY)
Federal
Fund
Code
Federal
Cost by
Phase
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
00
61
Crtyvvide Alleys
from: to:
Pave alleys throughout the city.
07
P
.5
G
P
S
W
T
CN
6/1/2008
72
72
24
24
24
CE
No
Totals
72
72
24 24 24
14
62
Nob Hill Corridor
Nob Hill
from: 1-82 to: S. 16th Ave.
Widen roadway, sidewalk, curb, gutter, lighting
03
04
P
2.7
C
G
0
P
S
T
W
PE
1/1/2009
STP(U)
1 1201
17
1371
137
CE
Totals
120
17
137
137
14
63
16th Ave. Corridor
16th Ave.
from: SR -12 to: Xaahington AveNalley Mall
Widen roadway, curb, gutter, sidewalk, lighting.
P
3.5
C
G
0
P
S
T
W
PE
1/1/2011 1
STP(U)
120
17
1371
137
CE
Totals
120
17
137
137
14
64
40th Ave. Corridor
40th Ave.
from: SR -12 to: Washington Ave.
Widen roadway, curb, gutter, sidewalks, lighting.
04
P
3.2
C
0
G
P
8
W
T
PE
1 1/1/2010 1
STP(U)
120
1
17
1371
137
CE
Totals
120
17
137
137
Report Date: June 27, 2007
Page 16
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485
MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 7-3-2007 Adoption Date: 7/3/2007
Amend Date:
Resolution No.: 2007-95
Functional
Class
Priority
Number
Project Identification
A. PINIFederalAid No. B. Bridge No.
C. Project Title
D. StreetJRoad Name or Number
E. Beginning MP or Road - EndingMP or Road
g g
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Phase
Start
(mm/dd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
RIVV
Required
Date
(M�
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
14
65
S. 1st St/Main St. Corridor
S. 1st St./Main St.
from: Nob Hill Blvd. to: Barker Mill Bridge
Joint protect with Union Gap to siden roadway, curb, gutter, sidewalk,
lighting.
04
P
2.0
C
G
O
P
T
W
PE
1/1/2011
STP(U)
120
17
137
137
CE
Totals 120 17 137 137
14
66
W Yakima North/South Connector to West Valley
Unknown road
from: North - South to: in West Valley
City & County joint project to build/extend roadways.
P1
6.0
C
G
0
P
S
T
W
PE
1/1/2011
120
1201
120
CE
Totals 120 120 120
17
67
Yakima Downtown Future Initiatives, Phase 3
from: 1st Street to: 3rd Street
Install Historic Ligh ling, Sidewalk Modification & Other Improvements.
06
12
S
.60
W
S
T
PE
CN
1/1/2008
4/1/2008
OTHER
OTHER
50
950
50
950
50
1 950
Totals 1000 1000 1000
00
-
68
Coolidge Road Widening and Paving.
from: 80th AVE. to: 88TH AVE.
Widen roadway and pave with curb and gutter.
03
05
06
S
.50
S
P
T
'
PE
RW
CN
1/1/2008
4/4/2008
1/1/2009
CMAQ
CMAQ
CMAQ
50
50
380
226
50
50
606
50
50
606
Totals 480 226 706 100 606
Report Date: June 27, 2007
Page 17
v. 5.7 - Supersedes previous editions
Washington State Department of Transportation
-en
Agency: Yakima
Co. No.: 39 Co. Name: Yakima Co.
City No.: 1485 MPO/RTPO: YVCOG
Six Year Transportation Improvement Program
From 2008 to 2013
Hearing Date: 7-3-2007 Adoption Date: 7/3/2007
Amend Date:
Resolution No.: 2007-95
Functional
Class
Priority
Number
Project Identification
A. PIN/Federal Aid No. B. Bridge No.
C. Project Title
D. Street/Road Name or Number
E. Beginning MP or Road - EndingMP or Road
9 g
F. Describe Work to be Done
Improvement
Type(s)
Status
Total Length
Utility Codes
Project Costs in Thousands of Dollars
Expenditure Schedule
(Local Agency)
Federally Funded
Projects Only
Project Phase
Start
(mmldd/yyyy)
Fund Source Information
Federal Funding
State
Fund
Code
State
Funds
Local
Funds
Total
Funds
Envir.
Type
R/W
Required
Date
(My)
Federal
Fund
Code
Federal
Cost by
Phase
1st
2nd
3rd
4th
Thru
6th
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
06
69
Occidental Road Construction.
from: 58th Ave. to: 64th Ave.
Constrict roadway
01
P
38
S
W
P
T
PE
1/1/2011
100
100
100
Totals 100 100 100
00
70
86th Ave. Road Construction
from: Occidental to: Coolidge
Construct roadway
01
p
27
PE
1/1/2011
100
1001
100
Totals 100 100 100
71
16th Ave. Pedestrian Crossing.
from: "J" st. to: Hathaway.
Place new signalized pedestrian crossing.
06
12
P
.05
PE
CN
1/1/2010
7/1/2010
STP(S)
STP(S)
30
120
5
16
35
136
1
35
136
CE
NO
Totals 150 21 171 171
72
64th Ave. Roadway Widening.
from: Washington Avenue. to: Tieton Drive.
Wide Roadway,Curb, Gutter, Sidewalks, Lighting, Drainage.
04
06
P
1.5
W
F
T
C
O
PE
1/1/2010
STP(U)
120
17
1371
137
EA
YES
Totals 120 17 137 137
Report Date: June 27, 2007
Grand Totals for Yakima
108,422 16,673 25,603 150,698 25,382 28612 29,089 67,615
Page 18
v. 5.7 - Supersedes previous editions
BUSINESS OF THE CITY COUNCIL
YAKIMA, WASHINGTON
AGENDA STATEMENT
Item No. '7
For Meeting of July 3, 2007
ITEM TITLE: Public Hearing to consider:
A) Adoption of the Six-year Transportation Improvement Program (TIP) for
years 2008 to 2013, and to amend the Metropolitan Transportation Plan;
and
B) Amend the Yakima Urban Area Comprehensive Plan Capital Facilities
Element to incorporate the adopted Six-year Transportation Improvement
Program (STIP).
SUBMITTED BY: Department of Community and Economic Development -
William Cook, Director
CONTACT PERSON/TELEPHONE: Bob Desgrosellier, Senior Engineer, 575-6228.
SUMMARY EXPLANATION:
See Attached.
Resolutions X Ordinance_ Contract _Other (Specify) STIP: Bike/Ped Committee Project List
Funding Source
APPROVED FOR SUBMITTAL:
City Manager
STAFF RECOMMENDATION:
1) Hold the Public Hearing to consider adoption of Resolution approving the Six-year TIP and
amending the regional Metropolitan Transportation Plan and the Comprehensive Plan Capital
Facilities Element.
2) Adopt the plan.
BOARD/COMMISSION RECOMMENDATION:
COUNCIL ACTION: Resolution adopted. RESOLUTION NO. R-2007-95
Six-year Transportation Improvement Program (continued)
SUMMARY EXPLANATION: Attached is the 2008-2013 Six -Year TIP. Four projects have been added to
the six-year TIP following the June 19, 2007 meeting. These projects are:
• #67. Yakima Downtown Futures Initiative, Phase 3, construct sidewalk and streetscape
improvements on 1st Street, 2nd Street and 3rd Street.
• #68. Coolidge Road, paving and reconstruction from 80th Avenue to 88th Avenue
• #69. Occidental Road, road construction from 58th Avenue to 64th Avenue
• #70. 86th Avenue, road construction from Occidental to Coolidge
Project rankings are determined by reviewing data supplied by the City's Street and Traffic Division and
integrating particular needs of the City.
Projects that were deleted from the 2007-2012 TIP as they were completed or funds were obligated include:
• Yakima Railroad Grade Separation, Phase 1,
• River Road Realignment
• N. 16th Avenue and River Road Signal
• W. Lincoln Avenue Sidewalks
• SR 12 — N. 40th Avenue Reconstruction
• Yakima Avenue Historic District Pedestrian Improvement
Council and the public are welcome to add other arterial system projects to this list. The Six -Year TIP
listing will be finalized at today's hearing and sent to Yakima Valley Conference of Governments,
(YVCOG) after approval.
City and County staff, together with the Council Intergovernmental Committee, are working toward common
standards and coordinated planning for public projects that impact both the city and surrounding county
areas. Agreement on these issues will be the first step toward the goal of a seamless transportation planning
process between the City and County.
A) Each year the City is required by RCW 35.77.010 and RCW 36.81.121 to update its Six -Year
Transportation Improvement Program (TIP) for submittal to the Washington State Department of
Transportation. This plan must include all transportation projects for which state gas tax revenue or
federal revenue will be used.
The plan for 2008 — 2013 includes sixteen (16) funded projects and locally identified activities. Funding for
the remainder of the projects will continue to be sought.
On August 10, 2005, the President signed into law the Safe, Accountable, Flexible, Efficient
Transportation Equity Act: A Legacy for Users (SAFETEA-LU). This act is the next authorization after
the prior Transportation Equity Act of 1998 for the 21st Century (TEA -21) and previous Intermodal Surface
Transportation Efficiency Act (ISTEA) of 1991. The current act again specifies the systems on which certain
funds can be used, and activities for which funds can be used and promotes the role of the Metropolitan
Planning Organizations (MPO) in the planning and programming of projects. SAFETEA-LU requires each
designated MPO to develop a Transportation Improvement Program (TIP), and the state to develop a
Statewide Transportation Improvement Program (STIP) as a condition to securing federal funds for the
transportation projects.
2 -- June 28, 2007
Projects listed in the STIP that are on an identified federal route are the only projects that will be eligible for
approval by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) to
utilize federal funds or by the State of Washington for approved State -funding agencies. The STIP is a
prioritized program of transportation projects, compiled from local and regional plans, along with the
Washington Transportation System Plan (WTP), which provides a backbone for developing projects for the
intermodal transportation network in the State of Washington.
The STIP contains federally funded projects plus state and local projects that are regionally significant.
These projects have been identified through the planning process as the highest priority for the available
funding to the state's transportation program.
Planning activities of state and local governments are essential parts of integrated regional planning
processes. Long range transportation planning is a part of the comprehensive land use planning carried out
by local governments. Citizen participation is an integral part of the planning process at all levels. Local
Agencies are required to develop and adopt a six-year transportation program. All local agencies are
required to hold at least one public hearing during the development of the six-year transportation program.
All Transaction Committee projects within the city limits are listed in the TIP with at least preliminary
engineering needs identified.
B) The City needs to amend the Yakima Urban Area Comprehensive Plan Capital Facilities Element to
incorporate the adopted Six-year Transportation Plan for 2007 to 2012. This will ensure that we are in
compliance with the Growth Management Act and that we are consistent with the Comprehensive Plan as
required. This amendment is limited to incorporate only those projects that are adopted in the STIP and
is not subject to the "once a year" change required under the laws of the Growth Management Act.